7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr. Barraq Jumaa Welcome to our presentation

Transcript of 7 An-Najah National University Civil Engineering Department Management engineering prepared by :...

Page 1: 7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.

7An-Najah National UniversityCivi l Engineering Department

Management engineeringprepared by : Mariam Al-Qarow

Hala Harb Amani Saleh

Submitted to: Dr. Barraq JumaaWelcome to our presentat ion

Page 2: 7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.

7

What is a Project?

is a work eff ort made over period of time to create a unique

product, or a service. & because it has a start and a fi nish, it is

also called a temporary eff ort or endeavor .

Page 3: 7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.

7

* Pro ject L i fecyc le

f rom the beg inning o f the pro ject to the end , i t s go through steps such:1- defi ning the project object ives2- Planning the work to achieve those object ives 3- performing the work4- monitor ing and control l ing al l those steps careful ly 5-c losing the project after receiving product acceptance .

Page 4: 7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.

7

Page 5: 7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.

7* Project management

Its the usage of knowledge, skills, and tools to manage a project from start to fi nish with the goal of meeting the project requirements, and its divided to main 9 issues which are :

Page 6: 7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.

7

1-Managing scope : it includes the processes required to ensure that the project includes all the work required to complete the project successfully

2- Managing Time : The project schedule is the organization of all project activities by time and by their logical dependencies and each with a start date and a finish date.

Page 7: 7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.

7

3-Managing Cost : includes the processes involved in planning, estimating, budgeting, and controlling costs so that the project can be completed within the approved budget

Page 8: 7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.

74-Managing Human Resources :

processes required to coordinate the human resources on a project, such processes include those needed to plan, obtain, orient, assign, and release staff over the l i fe of the project .

Page 9: 7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.

7

5- Managing Risk : identifi cation and treatment of these r isks. I ts object ive is to add maximum sustainable value to al l the activi t ies of the organization

6-Managing Quality : "Qual i ty" refers to the abi l i ty of product to satisfy both stated and impl ied needs requirements

Page 10: 7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.

7

7-Managing Integration: 

The need for integration in project management becomes evident in situations where individual processes interact, and the picture below samurais the whole process

Page 11: 7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.

7

8-Managing Communication : Any project requires good communicat ions to manage day-to -day act iv it ies and ensure success of the project

9- Procurement managing:

includes the processes required to acquire goods and services from outside the performing organization.

Page 12: 7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.

7

C a s e s t u d y Pa r t t w o

S h o r t D e s c r i p t i o n 

a l - mo q a t a ’ a l o c a t e s i n Tu l ka re m c i t yTo t a l a re a o f t h e b u i l d i n g e q u a l 42 65 .9 3 m 2 a n d c o n s i s t o f fi v e fl o o r co n t a i n k i t c h e n , re ce p t i o n a n d d o rm i t o r y.

 

Page 13: 7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.

Description Unit

No. of floor NO. 5

Basement floor area m2 840.6

Ground floor area m2 842.62

1st floor area m2 834.83

2nd floor area m2 831.07

3rd floor area m2 831.07

Stair area m2 85.73

Page 14: 7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.

7

 Objective

The purpose of our study is to obtain the fi nal cost, and duration

for al-moqata’a building and information are shown below .

Page 15: 7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.

71-WBS

Page 16: 7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.

7

2- Quant i ty and durat ion for each act iv i ty

Example : i n t e rna l p l a s te r i ng f o r t he ( ba s ement fl o o r )

Q ty. = 1 7 0 0 m 2

Du ra t i o n = Q ty / p ro duc t i v i t y ( 3 ma s on = 1 2 0 m 2 / d )

= 1 7 0 0 / 1 2 0 = 1 3 day

Page 17: 7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.

73-Total cost

description unit Qty. Unit price(NIS)

Tot.(NIS)

Internal plastering

M2 1700 29 49300

Page 18: 7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.

4- check design using sap

D.L= 0.5 ton/m2 L.L= 0.6 ton/m2

The design appear to be ok

Page 19: 7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.

7

5- Analysis of the project

using primavera 6.1 Calendar: 6day work/ week

Page 20: 7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.

7

6- Result

Total project cost = 7314479 NIS

Profi t = 30% from total cost

Project duration 248 work day

Page 21: 7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.

7

 Earned value

analysis

ACWPBCWPCV = 7318479 - 8167433

= -848954 NIS

CPI = BCWP / ACWP = 7318479/8167433 = 0.89 < 1 over budget