© 2014 HDR, all rights reserved. Informational Meeting June 1 st , 2015 7:30 pm to 9:00 pm Interstate 229 Major Investment Study Exit 6 – 10 th Street Sub-Study

Transcript of 60 Street N. Benson Road Street Sub-study 3/Public Meet… · Benson Road 60th Street N. Benson...

Page 1: 60 Street N. Benson Road Street Sub-study 3/Public Meet… · Benson Road 60th Street N. Benson Road 60th Street N. PROJECT CONTACTS: Jason Kjenstad – HDR Engineering, Inc. 605-977-7740

© 2014 HDR, all rights reserved.

Informational MeetingJune 1st, 2015

7:30 pm to 9:00 pm

Interstate 229 Major Investment Study Exit 6 – 10th Street

Sub-Study

Benson Road

60th Street N.

Benson Road

60th Street N.

Page 2: 60 Street N. Benson Road Street Sub-study 3/Public Meet… · Benson Road 60th Street N. Benson Road 60th Street N. PROJECT CONTACTS: Jason Kjenstad – HDR Engineering, Inc. 605-977-7740

Study Area Map

I-229 Corridor Study

Meeting will focus on:Exit 6 – 10th Street

Solberg Avenue Overpassto60th Street N. Overpass

10th Street

Solbe

rg A

ve

60th Street N.

Page 3: 60 Street N. Benson Road Street Sub-study 3/Public Meet… · Benson Road 60th Street N. Benson Road 60th Street N. PROJECT CONTACTS: Jason Kjenstad – HDR Engineering, Inc. 605-977-7740

Study Advisory PartnersSouth Dakota Department of Transportation (SDDOT)

South Dakota Highway Patrol

City of Sioux Falls

Sioux Falls Metropolitan Planning Organization (MPO)

Federal Highway Administration (FHWA)

Page 4: 60 Street N. Benson Road Street Sub-study 3/Public Meet… · Benson Road 60th Street N. Benson Road 60th Street N. PROJECT CONTACTS: Jason Kjenstad – HDR Engineering, Inc. 605-977-7740

Exit 6 (10th Street) Crossroad Study

Goals• Reduce traffic congestion • Develop Corridor Growth Plan to meet

traffic demands but minimizing impacts to developed properties

• Improve pedestrian mobility• Improve safety for corridor users• Identify improvements to the

interchange as well as the 10th Street and Cleveland Ave intersection

Fran

klin A

ve

Syca

more

Ave

Page 5: 60 Street N. Benson Road Street Sub-study 3/Public Meet… · Benson Road 60th Street N. Benson Road 60th Street N. PROJECT CONTACTS: Jason Kjenstad – HDR Engineering, Inc. 605-977-7740

10th Street Corridor OverviewFr

ankli

n Ave

Syca

more

Ave

nue

Cliff

Aven

ue

Bahn

son A

venu

e

Fairfa

x Ave

Snev

e Ave

nue

Clev

eland

Ave

Blain

e Ave

Conk

lin A

veLo

well A

ve

Jess

ica A

ve

Blau

velt A

ve

Page 6: 60 Street N. Benson Road Street Sub-study 3/Public Meet… · Benson Road 60th Street N. Benson Road 60th Street N. PROJECT CONTACTS: Jason Kjenstad – HDR Engineering, Inc. 605-977-7740

10th Street Corridor Overview

Downtown viaducts over the existing rail yard and

river.

Signal spacing not ideal to maximize traffic flow.

Page 7: 60 Street N. Benson Road Street Sub-study 3/Public Meet… · Benson Road 60th Street N. Benson Road 60th Street N. PROJECT CONTACTS: Jason Kjenstad – HDR Engineering, Inc. 605-977-7740

10th Street Corridor Overview

10th and Cliff intersection improvements in 2010, reconstruction due to significant crash

problems and need for capacity.

Page 8: 60 Street N. Benson Road Street Sub-study 3/Public Meet… · Benson Road 60th Street N. Benson Road 60th Street N. PROJECT CONTACTS: Jason Kjenstad – HDR Engineering, Inc. 605-977-7740

10th Street Corridor Overview

Multiple driveways and side streets affect corridor

progression.

Page 9: 60 Street N. Benson Road Street Sub-study 3/Public Meet… · Benson Road 60th Street N. Benson Road 60th Street N. PROJECT CONTACTS: Jason Kjenstad – HDR Engineering, Inc. 605-977-7740

10th Street Corridor Overview

Access from side streets difficult and impedes travel

speeds along Corridor

Page 10: 60 Street N. Benson Road Street Sub-study 3/Public Meet… · Benson Road 60th Street N. Benson Road 60th Street N. PROJECT CONTACTS: Jason Kjenstad – HDR Engineering, Inc. 605-977-7740

10th Street Corridor Overview

Interchange crashes typically at off ramps due to ramp queuing; lengthening

off ramp south of the interchange has helped mitigate this issue.

Distance between Cleveland Avenue & I-229 causes congestion due to

overlapping traffic backups; crash rates higher than normal at this location.

Single point intersection projected to be at capacity by 2035.

Page 11: 60 Street N. Benson Road Street Sub-study 3/Public Meet… · Benson Road 60th Street N. Benson Road 60th Street N. PROJECT CONTACTS: Jason Kjenstad – HDR Engineering, Inc. 605-977-7740

10th Street Corridor Overview

Cleveland Avenue expansion recommended between 12th Street and

Rice Street in 2008 study.

10th Street & Cleveland Avenue intersection projected to be over

capacity by 2035.

Page 12: 60 Street N. Benson Road Street Sub-study 3/Public Meet… · Benson Road 60th Street N. Benson Road 60th Street N. PROJECT CONTACTS: Jason Kjenstad – HDR Engineering, Inc. 605-977-7740

10th Street Corridor Overview

Numerous driveways along 10th Street impacts traffic flow and increases

potential for conflicts.

Adding lanes to 10th Street would be difficult due to adjacent businesses.

Page 13: 60 Street N. Benson Road Street Sub-study 3/Public Meet… · Benson Road 60th Street N. Benson Road 60th Street N. PROJECT CONTACTS: Jason Kjenstad – HDR Engineering, Inc. 605-977-7740

10th Street Corridor Overview

Intersection reconstructed in 2014 with dual left turn lanes and right turn lanes to address high

crash rates (48 crashes in 4 year period).

Connection to 12th Street in close proximity to Sycamore Avenue making it difficult to

enter/exit 10th Street.

Page 14: 60 Street N. Benson Road Street Sub-study 3/Public Meet… · Benson Road 60th Street N. Benson Road 60th Street N. PROJECT CONTACTS: Jason Kjenstad – HDR Engineering, Inc. 605-977-7740

What you will be able to see tonight: 8 Interchange Conceptual Options 4 Corridor Options Median Changes or Driveway Closures to

Improve Safety

Conceptual Ideas for 10th Street Corridor

10th Street / I-229 Interchange Diverging Diamond Option

Page 15: 60 Street N. Benson Road Street Sub-study 3/Public Meet… · Benson Road 60th Street N. Benson Road 60th Street N. PROJECT CONTACTS: Jason Kjenstad – HDR Engineering, Inc. 605-977-7740

What you will be able to see tonight: 8 Interchange Conceptual Options 4 Corridor Options Median Changes or Driveway Closures to

Improve Safety

Conceptual Ideas for 10th Street Corridor

10th Street Median Divided 4 Lane Roadway Option

Page 16: 60 Street N. Benson Road Street Sub-study 3/Public Meet… · Benson Road 60th Street N. Benson Road 60th Street N. PROJECT CONTACTS: Jason Kjenstad – HDR Engineering, Inc. 605-977-7740

Finalize Composite Comparison Matrixo Traffic Assessmento Environmental Screeningo ROW Impactso Overall Costso Public Involvement Support

Complete additional Traffic Operations analysis on a reduced number of options based on the screening activities

Develop Priority Phasing Plan for I-229 Corridor and Sub-Study Corridor

Schedule and Conduct next public meeting

Next Steps for 10th Street

Page 17: 60 Street N. Benson Road Street Sub-study 3/Public Meet… · Benson Road 60th Street N. Benson Road 60th Street N. PROJECT CONTACTS: Jason Kjenstad – HDR Engineering, Inc. 605-977-7740

© 2014 HDR, all rights reserved.

Thanks for Attending!!!!!

Interstate 229 Major Investment Study Exit 6 – 10th Street

Sub-Study

Benson Road

60th Street N.

Benson Road

60th Street N.PROJECT CONTACTS:Jason Kjenstad – HDR Engineering, Inc.605-977-7740 or [email protected]

Chris Malmberg – HDR Engineering, Inc.402-399-4959 or [email protected]

Shannon Ausen – City of Sioux Falls605-367-8607 or [email protected]

Steve Gramm – SDDOT Project Development605-773-6641 or [email protected]