![Page 1: 60 DEAD LOAD DEFLECTIONrelaxation steel strand shall conform to the requirements of AASHTO M203 (ASTM A-416) and Supplement I. STRAND: All strands shall be the size and type as shown](https://reader031.fdocuments.in/reader031/viewer/2022020417/5e5194d2fedb481f1f72551a/html5/thumbnails/1.jpg)
U3 and H Bars
(placed as shown)
(placed as shown)
DESIGN DATA
12
7
12
12
12
12
S1
S2
S1
S2
12
12
U4
U3
S3
S4
DETAIL OF LIFTING EYE
PLAN
U2
U1
SPAN
"d"
C
C C
C
C
C
C
Diaphragm (Typ.)
GENERAL NOTES
C
C
C
C
PLAN
C
ELEVATION - 0 SKEW ELEVATION - 30 SKEW
C
END VIEW
WITH REINFORCING
CENTERLINE SECTION END VIEW
WITH REINFORCING
CENTERLINE SECTION CENTERLINE SECTIONEND VIEW
WITH REINFORCING
END VIEW
WITH REINFORCING
CENTERLINE SECTION
OPERATING
RATING
DEAD LOAD
DEFLECTION
TYPICAL DIAPHRAGM SPACING - 30 SKEW
DEAD LOAD DEFLECTION
DIAGRAM
End of
Beam
End of U2 Bars End of K4 Bars
CL Brng.
NOTE:
C
CL Brng.
(See End View and L Section)C(See End View and L Section)C
"d" @ L Span
(See Table)
of beam. Straight strands shall be cut flush with ends of beam.
S4
S3
C
at L BeamC
Dimensions along L BeamC
50 Dia. open hole for diaph.
(placed as shown)
(placed as shown)
(placed as shown)
(placed as shown)
(placed as shown)
(placed as shown)
75 Dia.
114
Bars @
12
7
Bars @
12
7
Bars @
127
75
279
216 50
5
0
50 5
0
50
50
50
50
50
50
50
50
50
50
SECTION THRU BEAM
HS 55
HS 48
HS 43
HS 42
PRESTRESSED CONCRETE BEAMS:
otherwise noted.
FORMS & PALLETS: All beams shall be cast in concrete floored pallets and metal
forms.
FINISH: Top of beams to be rough floated. At approximately the time of initial
set, entire top of beam shall be scrubbed transversely with coarse wire brush to
remove all laitance and to produce a roughened surface for bonding slab.
CEMENT: Type I or III Portland Cement may be used for the Prestressed Concrete
Beams.
HANDLING: In the handling of the beams, they must be maintained in an
upright position at all times and must be picked up from the lifting eye
provided at the beam ends. Disregard of this requirement may lead to collapse
of the member.
relaxation steel strand shall conform to the requirements of AASHTO M203
(ASTM A-416) and Supplement I.
STRAND: All strands shall be the size and type as shown on the Plans. Initial
load per strand shall be 75% of the breaking strength of the strand for low
relaxation strand.
Painting to be done by fabricator.
SHOP DRAWINGS: The Contractor shall have his Prestressed Concrete Beam
Fabricator furnish the Bridge Engineer, for his approval, two sets of checked shop
drawings. Shop drawings shall show the casting length center to center of
bearings, and the calculated prestress shortening. One copy shall be returned to
the fabricator with any desired corrections indicated. The fabricator shall then
furnish the Bridge Engineer with as many, generally seven, corrected copies of the
shop drawings as may be required for approval and distribution. The approval
of the shop drawings in no way relieves the Contractor or his fabricator of the
responsibility for mistakes on the shop drawings.
ll
ll
Angle to Suit Lifting Beam
S4 BARS #13 x 1117
U1 BARS #13 x 5025
U2 BARS #13 x 4875
U3 BARS #13 x 5050
U4 BARS #13 x 4885
S2 BARS #13 x 1066
76 76
305
8 S2 #13 @150 c/c (Bottom of Beam) 8 S4 #13 @ 150 c/c (Bottom of Beam)
@ 150 c/c
@ 150 c/c
@ 150 c/c
@ 150 c/c
@ 150 c/c
@ 150 c/c
@ 150 c/c
@ 150 c/c
@ 150 c/c
@ 150 c/c
@ 150 c/c
@ 150 c/c
152
152
152
153
152
3 spcs. @ 50 c/c=150 (L1 #13
914
457
76
381
153
50
65
50
2 H #13 Bars
40
5
65
140 13 mm Dia. Pretensioned Strands
@ 127 c/c
3 spcs. @ 50 c/c=150
50
65
60
10 2
12 4
16 12
14 7
160
8 S4 #13
4 U4 #13
8 S3 #13
2 H #13 Bars Roughened Surface Symm. about L
Hold Down Point
13 Dia. Pretensioned Strands
405
@ 127 c/c
635
Draped strands, U1, U3, and H bars shall extend 65 mm beyond ends
U2 and U4 bars shall be set 50 mm clear from ends of beam.
8 S2 or S4
8 S1 or S3
50
UL1 Bars #13
2 H Bars #13
2 U Bars #13
L1 Bars in pairs
25 cl.25 cl.
8 S2 or S4
8 S1 or S3
25 cl.
25 cl.
L1 Bars in pairs
2 U Bars #13
2 H Bars #13
UL1 Bars #13
30
5
30
5
61
4
61
4
100
100
100
10
0
203203 203203 153 153 153 153
50
(12 - 13mm Dia. Strands)
c/c
=3
81
216
11
4 254
114
114
406
457
8 S2 or S4
8 S1 or S3
UL1 Bars #13
2 H Bars #13
2 U Bars #13
L1 Bars in pairs
25 cl.
25 cl.
8 S2 or S4
8 S1 or S3
2 U Bars #13
2 H Bars #13
UL1 Bars #13
25 cl.
61
4
c/c
=3
81
c/c
=3
81
56
4
30
5
30
5
100
100
103
103
103
103
100
10
0
103
103
103
103
(18 - 13 mm Dia. Strands)
50
50
25 cl.
CHAMFER REQUIREMENT: Chamfer all exposed edges of P.C. Beams 19 mm unless
2400
2400
22
5
250
810
L1 BARS #13 x 1060
25
0
140
UL1 BARS #13 x 640
Hold Down Point
Bars @
12
7
c/c
=3
81
(10 - 13 mm Dia. Strands) (14 - 13 mm Dia. Strands)
bars in pairs & UL1 Bars #13)
L1 #13 Bars in Pairs & UL1 Bars #13 @ 300 c/c
rod. (14.0 m and 16.0 m
Spans only)
4 U
#1
3
4 U
#1
3
4 U
#13
4 U
#1
3
8 S3 #13 @ 150 c/c (Top of Beam)
2 U3 #13 Bars
4 U4 #13 Bars
4855 (10 m Span), 5855 (12 m Span)
6855 (14 m Span), 7855 (16 m Span)
4875 (10 m Span), 5875 (12 m Span)
6875 (14 m Span), 7875 (16 m Span)
1000 (10 m Span)
1200 (12 m Span)
1400 (14 m Span)
1600 (16 m Span)
10 m SPAN 12 m SPAN 14 m SPAN 16 m SPAN
(L1 #13 bars in pairs & UL1 Bars #13)
L1 #13 Bars in Pairs & UL1 Bars #13 @ 300 c/c
2 U3 #13 Bars
(14 m & 16 m Spans only)
1000 (10 m Span)
1200 (12 m Span)
1400 (14 m Span)
1600 (16 m Span)
CONCRETE:
f’c = 41 MPa
f’ci = 31 MPa
S3 BARS #13 x 735
S1 BARS #13 x 710
25085
(14 m AND 16 m SPANS ONLY)
1270
100
1010
SPECIFICATIONS FOR STEEL STRANDS: Grade 270, 7-wire, uncoated, low
1999 SPECIFICATIONS
ALL DIMENSIONS ON THIS SHEET IN MILLIMETERS UNLESS OTHERWISE NOTED.
OKLAHOMA DEPT. OF TRANSPORTATION
DATEAPPROVED BY BRIDGE ENGINEER
COUNTY BRIDGE STANDARD ( METRIC )
P.C. BEAM ELEVATIONS AND SECTIONS
TYPE I I - 7.8 m RDY.
CB-32M
00M
8 S1 #13 @150 c/c (Top of Beam)
Beam Length = 13 750 (14 m Span), 15 750 (16 m Span)
Beam Length = 9750 (10 m Span), 11 750 (12 m Span) Beam Length = 9710 (10 m Span), 11 710 (12 m Span)
Beam Length = 13 710 (14 m Span), 15 710 (16 m Span)
The Prestressed Concrete Beams may be redesigned to use "Debonded" and or
15 mm strands rather than the "Draped" strands shown. The New Design and
Structural Calculations for "Debonded" and or 15 mm strands must be prepared
by and sealed by a Professional Engineer registered in the State of Oklahoma
and submitted to the Bridge Engineer for approval.
If "Debonded" Strands are used the "U" bars shall extend an additional
1200 mm, toward the middle of the span, just past the point of debonding.
TREATMENT OF CUT STRANDS: All cut off strands that will be exposed are to
FABRICATOR SHALL PROVIDE
REQUIRED DESIGN STRENGTH
NOTE: 30 Rt. Fwd. Skew shown.
30 Lt. Fwd. Skew by opposite hand.
50 Dia. open hole as required for diaph. rod.
mbe coated with two coats of an approved zinc rich paint (minimum 80 m).
LOADING: MS 18+1 kPa Future
Wearing Surface
Span Length
L Brng. L Brng.
End of beam at L Beam
Symm. about LRoughened Surface2 U1 #13 Bars
End of Draped Strands, U1 and H Bars
End of beam
2 U1 #13 Bars
4 U2 #13 Bars2 H #13 Bars
Symm. about L
L Beam
End of Draped Strands,
End of Beam @ L Beam
60
2 H #13 Bars
Symm. about L
L Beam
Twisted Cable
L End Diaphragm
L Span
L End Diaphragm
L Bridge
L1 Bars in pairs
End of beam
8 S1 #13
4 U2 #13
8 S2 #13
End of beam
Intermediate
PCB3-1