Transcript of 5th Qatar BIM User Day, Understanding stakeholder roles in BIM
1Mohammad Obaidullah, QDC
Mohammad ObaidullahProject Manager, Qatar Design Consortium (QDC)
Understanding STAKEHOLDER Roles in BIM
2Mohammad Obaidullah, QDC
Content
• Importance of Client interests and involvements
• BIM – An adoption Curve
• Case Study – Walk in Qatar 2022 Al-Bayt Stadium (Al Khor)
3Mohammad Obaidullah, QDC
WHO REALLY ARE STAKEHOLDERS
• All the parties involved in a project can be classified as stakeholders.
• Promoting and providing support for the implementation.
• Promoting BIM as an emerging technology to assist in conceiving, designing, constructing and operating the buildings
Source: The Stakeholder Matrix for BIM projects (www.cl3ver.com) Source: www.bluentcad.com
4Mohammad Obaidullah, QDC
WHO REALLY ARE STAKEHOLDER
• BIM users: Architects, Engineers, Constructors and Building product suppliers.
• NON BIM users: Are all those stakeholders that have decision power or influence on the BIM project. Those are CEO’s, Board Members, Investors, Private & Governments etc..
Source: The Stakeholder Matrix for BIM projects (www.cl3ver.com)
5Mohammad Obaidullah, QDC
IMPORTANCE OF CLIENT INTERESTS AND INVOLVEMENTS
• No such idea can be fruitful unless it has Investor's.
• The benefits will ultimately be in using the model to manage complete facilities.
• A client, who can be a patron, developer, owner, occupier, user, FM manager, or funder/investor, has a critical role to play in the transformation of industry
Source: Study by J.C. Cannistraro Source: NBS National BIM Report 2015
6Mohammad Obaidullah, QDC
BIM Benefits for the client
• More effective participation
• Increased confidence
• Helps decision making
• Reduced programme
• Greater predictability of outcomes
• Reduced project risks
• Receive more competitive bids
• Easier life cycle planning
• Better asset management
• Adds long-term value to their business
Source: Balfour Beatty
7Mohammad Obaidullah, QDC
BIM Benefits for the client
BENEFITS
Faster delivery
50%Reduction in overall
time, from inception to completion, for new
build and refurbished assets.
Lower emissions
50%Reduction in
greenhouse gas emissions in the built
environment.
Reduction
20%Reduction in build costs
Life time reduction
33%Reduction is costs
over the life time of the building
Reduction in conflicts
47% - 65%Reduction in conflicts
and rework during construction.
Better predictability
35% - 43%Reduction in risk, better
predictability of outcomes
Improvement in review
32% - 38%Improvement in review
and approval cycles
Increase in quality
44% - 59%Increase in the overall
project quality
Major clients implemented BIM, reports that the significant benefits from BIM are:
Source: UK Government Cabinet Office BIM Strategy Paper
8Mohammad Obaidullah, QDC
BIM ADOPTION AROUND THE GLOBE
BIM - An Adoption Curve….
Source: WSP Group
9Mohammad Obaidullah, QDC
BIM Adoption growth in past 2 years
Middle
East
32%
62%
Source: International Journal of Civil, Environmental, Structural, Construction and Architectural Engineering Vol:9, No:5, 2015
10Mohammad Obaidullah, QDC
BIM - An Adoption Curve
• Traditional practice to use drawing boards and parallel bars.
• Improvement in construction technology demands a new approach.
• The people involved in industry required a tool that could help them to manage large projects.
• Also computer technology was getting matured, with the introduction of AUTOCAD.
• Discussion about BIM has proliferated, and awareness of it is now nearly universal. Many more people are using BIM than were in 2010.
Source: NBS National BIM Report 2015
11Mohammad Obaidullah, QDC
BIM - An Adoption Curve
A NEW ROLE WITH NEW RESPONSIBILITY…
• Defining the right BIM processes.• Taking care of the BIM related personnel.• Responsible for choosing the right IT environment.• Checking the contract conditions to fit in the BIM approach.• Leading the training and education required for personnel.• Managing process, people technology and policy.
Source: AEC(UK)BIM TechnologyProtocol-v2.1.1
12Mohammad Obaidullah, QDC
CASE STUDY - Walk in Qatar 2022 Al-Bayt Stadium (Al Khor)
Al-Bayt Stadium Al-Khor, DohaSeating Capacity- 65000 Approx
Site Area- 1.3 Million Sqm (Approx.)
Client - Aspire Zone Foundation [AZF]
13Mohammad Obaidullah, QDC
CASE STUDY - Walk in Qatar 2022 Al-Bayt Stadium (Al Khor)
Main Stadium
Energy Centre
Retail
Site Landscapeand Hardscape
Site View
Parking
14Mohammad Obaidullah, QDC
CASE STUDY - Walk in Qatar 2022 Al-Bayt Stadium (Al Khor)
BIM Execution Plan
15Mohammad Obaidullah, QDC
CASE STUDY - Walk in Qatar 2022 Al-Bayt Stadium (Al Khor)
Training For Client:
• To review and manage further developments into the Revit BIM Models by the ASPIRE
• BIM training was provided for easement of review to the client.
• The BIM training includes the following subjects:
• Revit Interface• Project Browser and Properties• Navigation• Working with several models and linked files.• Project and Shared parameters.• Schedule from model and linked files.• Family type hosted system and in place.• Interference check with other discipline.• IFC exports
• The training sessions became part of BIM Execution plan task list.
16Mohammad Obaidullah, QDC
CASE STUDY - Walk in Qatar 2022 Al-Bayt Stadium (Al Khor)
BIM Training For Operative Team:
• Our experts provided necessary training (Basic and Advanced) to the client coordination team related to model operations and review through softwares
• As a result, the entire team could access models on the cloud .
• Everyone including client team could open, run and monitor over task progress and review the submitted repository for comments and approval.
CLIENT PARTICIPATION POSITIVES
• Client actively participated in whole BIM process, expressed their desires
• As an outcome of clients Involvement and clear decisions we managed to finish the project BIM job in set time limits.
• Since client was then aware of the flexible outputs of BIM, the task density increased in a challenging way.
• With mutual discussions we figured out the ultimate requirements like Sightlines analysis, area/room/space wise BOQ verification and complex Clash resolutions.
17Mohammad Obaidullah, QDC
BENEFITS FOR THE CLIENT – SIGHTLINE STUDY.
For the entire stadium seat-wise sightline analysis was done which perfectly elaborated the visual quality and seat kills out of entire seat count.
18Mohammad Obaidullah, QDC
QUANTITY TAKEOFF AND VALIDATION….
19Mohammad Obaidullah, QDC
CASE STUDY - Walk in Qatar 2022 Al-Bayt Stadium (Al Khor)
Work Sharing using cloud based services to enable teams at different location to synchronize the model.
Facade Concrete Structure Interiors Steel Structure
Drainage HSR Electrical Plumbing
HVAC Façade Tent Grandstand Upper Level Steel Structure
20Mohammad Obaidullah, QDC
CASE STUDY - Walk in Qatar 2022 Al-Bayt Stadium (Al Khor)
Working team Involved around the globe
21Mohammad Obaidullah, QDC
CASE STUDY - Walk in Qatar 2022 Al-Bayt Stadium (Al Khor)
Clash Detection & Resolution
• The BIM STRATEGY also Included Interactive workshop sessions with the Design team/Client to discuss and extract solutions for the major Clashes among different desciplines.
• 7 weeks Interactive workshop for Main Stadium and Retail Building that resolved around 80% of complicated and packed zones of the Building.
Mechanical equipment Clash with Steel Structure
Solutions Solutions
22Mohammad Obaidullah, QDC
CASE STUDY - Walk in Qatar 2022 Al-Bayt Stadium (Al Khor)
BIM OVERVIEW - MASTERPLAN
23Mohammad Obaidullah, QDC
CASE STUDY - Walk in Qatar 2022 Al-Bayt Stadium (Al Khor)
BIM OVERVIEW – Part Site Model
24Mohammad Obaidullah, QDC
CASE STUDY - Walk in Qatar 2022 Al-Bayt Stadium (Al Khor)
BIM OVERVIEW - STADIUM
25Mohammad Obaidullah, QDC
CASE STUDY - Walk in Qatar 2022 Al-Bayt Stadium (Al Khor)
BIM OVERVIEW – STADIUM(Structure & Grandstand)
26Mohammad Obaidullah, QDC
CASE STUDY - Walk in Qatar 2022 Al-Bayt Stadium (Al Khor)
BIM OVERVIEW – STADIUM (Interior)
27Mohammad Obaidullah, QDC
CASE STUDY - Walk in Qatar 2022 Al-Bayt Stadium (Al Khor)
BIM OVERVIEW – STADIUM (HVAC)
28Mohammad Obaidullah, QDC
THANK YOU !!!
OVERALL SERVICES(MEP) LAYOUT
ELECTRICAL LAYOUT HVAC [email protected]