5th Central & Eastern Europe Nuclear Industry Congress 2019 · 5th Central & Eastern Europe Nuclear...

8
5th Central & Eastern Europe Nuclear Industry Congress 2019 January 28-29 | Prague, Czech Republic Grasping New Opportunies throughout the Enre Nuclear Power Plant Life Cycle in CEE Region Part of Previous Media Organizers 12+ Exhibitors 12+ Countries Represented 30+ Speeches 180+ Delegates www.szwgroup.com/central-eastern-europe-nuclear-industry-congress-2019

Transcript of 5th Central & Eastern Europe Nuclear Industry Congress 2019 · 5th Central & Eastern Europe Nuclear...

Page 1: 5th Central & Eastern Europe Nuclear Industry Congress 2019 · 5th Central & Eastern Europe Nuclear Industry Congress 2019 Prague, Czech Republic Dear Colleagues, It’s my greatest

5th Central & Eastern EuropeNuclear Industry Congress 2019January 28-29 | Prague, Czech RepublicGrasping New Opportunities throughout the Entire Nuclear Power Plant Life Cycle in CEE Region

Part of Previous Media

Organizers

12+ Exhibitors12+ CountriesRepresented30+ Speeches180+ Delegates

www.szwgroup.com/central-eastern-europe-nuclear-industry-congress-2019

Page 2: 5th Central & Eastern Europe Nuclear Industry Congress 2019 · 5th Central & Eastern Europe Nuclear Industry Congress 2019 Prague, Czech Republic Dear Colleagues, It’s my greatest

Register Online

Tel: +86 24-31259204 ext. 804 Fax: +86 21 5831 1668 Email: [email protected] Website: www.szwgroup.com/central-eastern-europe-nuclear-industry-congress-2019/

January 28-29, 2019Prague, Czech Republic5th Central & Eastern Europe Nuclear Industry Congress 2019

Part of Previous Speakers in 2018Greg RzentkowskiDirector, Division of Nuclear Installa�on SafetyInternational Atomic Energy Agency (IAEA)

János SüliMinister without Por�olioHungarian Government

Part of Previous Sponsors and VIP Participants

Countries We Focus On

Hungary Slovakia Bulgaria Finland LithuaniaRomaniaPolandCzech Republic Ukraine Slovenia

A�la AszódiState SecretaryPrime Minister’s Office, Hungarian Government

Maksim MazurenkaHead of DivisionGosatomnadzor

Natália Bo�aNuclear Safety Inspector, Division of Nuclear Waste and DecommissioningNuclear Regulatory Authority of the Slovak Republic

Chirica Minodor TeodorPresidentEuropean Atomic Forum (FORATOM)

András AradszkiMinister of State for Energy AffairsMinistry of National Develop-ment, Hungary

Ferenc LórándSenior AdviserHungarian Atomic Energy Authority (HAEA)

Petr ZávodskýDirector Nuclear Power Plants Construc�onČEZ, a.s.

Vince NovakDirector, Nuclear Safety DepartmentEuropean Bank for Reconstruction and Development (EBRD)

Jean-Christophe ConusProject Manager, Division of Decom-missioning & Waste Management (DP2D)EDF

Tamás János KatonaScien�fic AdvisorMVM Paks Nuclear Power Plant Ltd.

Joseph BoucauDirector, Global D&D/WM Business DevelopmenWestinghouse Electric Company

Alexandru HavrisDirector, Develop-ment and ProjectsSN Nuclearelectri-ca SA

Bilyana SimeonovaHead of Engineering and Technical Ac�vi�es Depart-mentKozloduy Nuclear Power Plant - New Build Plc

Roman VoronovBusiness Develop-ment Manager, Projects Manage-ment ServiceIgnalina Nuclear Power Plant

Jakub OśkoRadia�on Protec�on and Nuclear Dosime-try SpecialistNational Centre for Nuclear Research (NCBJ), Poland

Bálint NősDirector of Strategy and TechnologyPublic Limited Company for Radioactive Waste Management (PURAM), Hungary

Alice Mariana DimaDirector, Nuclear Projects and Strategies Division Nuclear Agency and for Radioactive Waste (ANDR), Romania

Nicolas SolenteInterna�onal Cooper-a�on & Projects Manager, Develop-ment, Innova�on and Interna�onal DivisionAndra

Page 3: 5th Central & Eastern Europe Nuclear Industry Congress 2019 · 5th Central & Eastern Europe Nuclear Industry Congress 2019 Prague, Czech Republic Dear Colleagues, It’s my greatest

Register OnlineConference Website: www.szwgroup.com/central-eastern-europe-nuclear-industry-congress-2019/Tel: +86 24-31259204 ext. 804 Fax: +86 21 5831 1668 Email: [email protected]

January 28-29, 2019Prague, Czech Republic5th Central & Eastern Europe Nuclear Industry Congress 2019

Dear Colleagues,

It’s my greatest pleasure, on behalf of the Organizing Commi�ee, to welcome you to a�end the 5th Central & Eastern Europe Nuclear Industry Congress 2019, which will take place during January 30-31, in Prague, Czech Republic.

This January we have successfully held the 4th Central & Eastern Europe Nuclear Industry Congress in Budapest, Hungary. It is the one of the most recognized and best established nuclear industry conference in Central & Eastern Europe, which will cover the whole industry chain. In 2019, this annual interna�onal event will come to Prague and let’s enjoy a great �me there.

The congress in Prague aims to bring together companies involved in all areas of the nuclear power plant life cycle to address cu�ng-edge issues and emerging trends which affect and even lead the nuclear industry. Governments, regulators, u�li�es/operators, reactor vendors, decommissioning contractors, waste management agencies, technology & service providers and other organiza�ons will share valuable insights into the most important aspects of new build, life extension & decommissioning projects as well as radioac�ve waste handling. This conference is a "must-a�end" for anyone who wants to stay current and on top of industry trends and develop-ments. Meanwhile, for those who are keen to find new investment opportuni�es or strengthen their presence in this market, our two-day event will also provide a cozy pla�orm to meet your future partners.

We are looking forward to seeing you in Prague!

Best regards,Organizing Commi�ee of the 5th Central & Eastern Europe Nuclear Industry Congress 2019

The Orga

nizin

g Com

mitte

e o

f 5th Central & Eastern Europe Nuclear Industry Congress 2019

Event at a Glance

Day 1

Day 2

Main Forum09:00-10:00 General Status and Global Trends10:00-16:00 Session 2: Nuclear Situa�on and Overview in CEE Region (Lunch Time: 12:30-14:00)● Czech Republic, Bulgaria, Hungary, Poland, Slovakia, etc.

Sub-Forum

16:00-17:30 Session 3: Financing, Risk and Project Management Financing, Risk and Project Management17:30-18:30 Session 4: Skills Development and Knowledge Transfer

Sub-Forum 1: Nuclear New Build and Long Term Opera�on09:00-12:30 Session 1: Project Updates& Case Study● Czech Republic, Bulgaria, Hungary, Poland, Romania, etc.14:00-16:00 Session 2: Life�me Extension and Long Term Opera�ons of NPPs● Slovakia, Ukraine, etc.16:00-18:00 Session 3: Innova�ve Technologies and Supply Chain Op�miza�on

Sub-Forum 2: Nuclear Decommissioning and Radioac-�ve Waste Management09:00-12:30 Session 1: Decommissioning Ac�vi�es and Interna�onal Prac�ces● Bulgaria, Lithuania, Slovakia, Ukraine, etc.14:00-16:00 Session 2: Management of Radioac�ve Waste and Final Disposal● Czech Republic, Finland, Hungary, etc.16:00-18:00 Session 3: Supply Chain Considera�ons and Advanced Technologies

Why you can’t Miss

The ONLY Conference Focusing on Latest Projects and Contract Opportuni�es in all CEE Hot Countries: Czech Republic, Hungary, Slovakia, Poland, Bulgaria, Finland, Romania, Lithuania, Ukraine 2 Sub-Forums on Day Two to Cover the Whole Industry Chain Opportuni�es,- New Build +LTO- Decommissioning + WMLearn Valuable Insights from Interna�onal Experts about Project Updates, Strategy & Regula�on, Financing & Risk Management, Advanced Nuclear Technology and Disposal of Radioac�ve Waste Highlight Supply Chain and Vendor Technology Demonstra�on Session for Sponsor OpportunityInterac�ve in Exclusive Panel Discussions on “Advanced Nuclear Fuel Cycle- Challenges and Innova�ons” and “How to Manage a Project on Time and within Budget?” Get One on One Mee�ng Opportunity with Your Future Partner (First 10 Registered Delegate & Sponsor Companies Only)Mul� - Registra�on Benefits: Discount & Free Booth

Page 4: 5th Central & Eastern Europe Nuclear Industry Congress 2019 · 5th Central & Eastern Europe Nuclear Industry Congress 2019 Prague, Czech Republic Dear Colleagues, It’s my greatest

1230 Networking Luncheon

1400 Updates of Romanian Nuclear Energy Sector

Nuclear energy plan in Romania

Negotiation with CGN and construction preparations for

Cernavoda 3-4

Decommissioning planning and life management for NPPs

in Romania

Robert Tudorache, State Secretary, Ministry of Energy,

Romania

1430 Regulatory Framework for Nuclear Industry in Finland

Construction preparations for Hanhikivi 1 and supply

chain management

Regulation updates for SMRs and other advanced reactor

designs

Regulatory procedures for decommissioning of nuclear

installations in Finland

Radiation and Nuclear Safety Authority (STUK), Finland

1500 Nuclear Power Plants in Slovakia

Nuclear capacity maintenance and expansion

Nuclear new build timeline

Decommissioning NPPs: Bohunice V1, Bohunice A1

Ministry of Economy of the Slovak Republic

1530 Networking Coffee Break

Session 3: Financing, Risk and Project Management

1600 Financing Regime & Funds Management for New Builds

Operator/ Sponsor Available

1630 Nuclear Decommissioning in CEE – EBRD Perspective

European Bank for Reconstruction and Development (EBRD)

1700 Commercial and Risk Management in Nuclear Projects

EPC Companies/ Sponsor Available

Session 4: Skills Development and Knowledge Transfer

1730 Education and Skills Development for Nuclear Sector

1800 Preservation and Transfer of Nuclear Knowledge

1830 The End of Day One Conference & Chairman’s Remarks

Presentation Sponsorship Available

The presentation sponsorship provide you a 30-minutes

presentation to get the complete Captive audience,making

an unrivalled branding Opportunity than your competitor

before the Decision Makers in the offshore sector.For more

details,Please contact [email protected]

Day 1 Jan. 28

Day One Main Forum

0800 Registration & Morning Tea

0850 Welcome & Chairman’s Opening Address

Session 1: General Status and Global Trends

0900 The Role of Nuclear Power in Global Energy Mix

International Atomic Energy Agency (IAEA)

0930 Nuclear Perspectives in Europe

Nuclear capacity expansion and maintenance in Europe

Nuclear new build plan and NPPs under construction in CEE

region

Decommissioning programmes and waste management

activities

Chirica Minodor Teodor, President, FORATOM

Session 2: Nuclear Situation and Overview in CEE Region

1000 Nuclear Development and Waste Management in the

Czech Republic

New build projects at Temelin and Dukovany

Supply chain innovations and international cooperation

National strategy for waste disposal

Ministry of Industry and Trade of the Czech Republic, Czech

Republic

1030 Networking Coffee Break

1100 Nuclear in Bulgaria: Status and Prospects

Restart of nuclear new build project and latest updates of

new nuclear

Decommissioning status of Kozloduy units

Procurement plan and contract opportunities

Ministry of Energy, Bulgaria

1130 First Nuclear Power Plant in Poland

National decision and future plan

Latest updates and time frame of new build

Tender opportunities and challenges

Ministry of Energy, Poland

1200 National Strategy for Nuclear Sector in Hungary

Nuclear energy strategy and plan in Hungary

Capacity maintenance and lifetime extension programmes

Paks II project updates

Decommissioning plan and preparations for NPPs in

operation

Ministry of Innovation and Technology, Hungary

Conference Website:www.szwgroup.com/central-eastern-europe-nuclear-industry-congress-2019/

Tel: +86 24-31259204 ext. 804 Fax: +86 21 5831 1668 Email: [email protected]

Page 5: 5th Central & Eastern Europe Nuclear Industry Congress 2019 · 5th Central & Eastern Europe Nuclear Industry Congress 2019 Prague, Czech Republic Dear Colleagues, It’s my greatest

Day 2. Jan 29

Day Two Sub-Forum

Sub-Forum 1 Nuclear New Build and Long Term Operation

0800 Registration & Morning Tea

0850 Welcome & Chairman’s Opening Address

Session 1: Project Updates& Case Study

0900 Safety Preparations for New Units

World Association of Nuclear Operators

0930 Nuclear New Build Updates in the Czech Republic

New build decision on units at Dukovany

Investing model and financing issues

Lifetime extension to maintain nuclear capacity

Petr Závodský, Director Nuclear Power Plants Construction, ČEZ,

a. s.

1000 Construction Updates of Paks II Project

Paks II Ltd./ TBA

1030 NetworkingCoffee Break

1100 Nuclear New Build Project in Bulgaria: Status and

Prospects

Approved plan to resume construction of new build

Financing regime and project schedule

“Kozloduy Nuclear Power Plant – New Build” Plc

1130Current Status of Cernavoda 3-4 in Romania

Investing model and financing regime for Cernavoda 3-4

New build timescale and related infrastructure

developments

Cosmin Ghita, CEO, SN Nuclearelectrica S.A.

1200 Developing New Nuclear Capacity in Finland

Status of NPPs in Finland

Construction preparations for Hanhikivi 1 and latest

progress

Procurement plan and opportunities for domestic &

international suppliers

Fennovoima Oy

1230 Nuclear New Build Project in Poland

PGE EJ1 Sp zoo.

1300 Networking Luncheon

1400 Panel Discussion: Advanced Nuclear Fuel Cycle-

Challenges and Innovations

3-5 Seats Available

Session 2: Lifetime Extension and Long Term Operations of

NPPs

1440 LTO of Nuclear Power Plants in Slovakia

Procedure and safety criteria for lifetime extension

programmes

Maintenance and upgrade activities for operating NPPs

Slovenské Elektrárne (SE)

1510 Lifetime Extension of Operating NPPs in Ukraine

Scheduled lifetime of NPPs in Ukraine and Energoatom’s

extension plan

Ageing management and preparation for long term

operation

Safety upgrades and contract opportunities

Energoatom

1540 Networking Coffee Break

Session 3: Innovative Technologies and Supply Chain

Optimization

1610 Advanced Reactor Design and Global Trends

SMR/ next generation of nuclear reactors as a viable

option

Opportunities and challenges

Rosatom/ Westinghouse/ TBC

1640 Digital Technologies and Processes in Nuclear

Construction and Engineering Activities

Sponsor Available

1710 Optimize Supply Chain’s Capability, Capacity and

Competitiveness for New Build

Procurement rules for and domestic & international

suppliers

Approaches to secure an adequate supply of vendors

and services

International cooperation and localization of nuclear

technology

EPC Companies/ TBA

1740 Vendor Technology Demonstrations (20 minutes/per)

NSSS: Pressurizer /Heat Exchanger /Steam Generator

/Main Coolant Pump

Conventional Island: Steam Turbine / Generator / Pump

/ Valve

Other Equipment & Service: Lift Equipment /Site

Investigation /Steel Products and Forgings / Simulator

and Simulation Products

Sponsor Available

1840 The End of the Two-Day Conference & Chairman’s

Closing Remarks

Conference Website:www.szwgroup.com/central-eastern-europe-nuclear-industry-congress-2019/

Tel: +86 24-31259204 ext. 804 Fax: +86 21 5831 1668 Email: [email protected]

Page 6: 5th Central & Eastern Europe Nuclear Industry Congress 2019 · 5th Central & Eastern Europe Nuclear Industry Congress 2019 Prague, Czech Republic Dear Colleagues, It’s my greatest

Day 2Sept.19th

Regulation and procedures for RAW management

Treatment of ILW &HLW

Latest progress of Czech repository plan

Radioactive Waste Repository Authority (SÚ RAO), Czech

Republic

1430 Construction of Deep Geological Repository for Final

Disposal of Nuclear Waste

Posiva Solutions Oy

1500 Interim Storage, Transport and Final Disposal Plan in

Hungary

Regulatory framework for waste management

Safe and efficient transport of nuclear and radioactive

material

Repository plan for long-lived ILW and high-level wastes

Public Limited Company for Radioactive Waste Management

(PURAM)

1530 Networking Coffee Break

Session 3: Supply Chain Considerations and Advanced

Technologies

1600 Dismantling of Reactor Pressure Vessel and Technical

Innovations

Westinghouse Electric Company

1630 Supply Chain Development and Procurement

Approaches for Decommissioning Activities

EPC Companies/TBA

1700 Robotic Technologies and Virtual Reality Potentials for

Nuclear Decommissioning

Innovative robotics and remote handling system

Underwater cutting techniques

Usage of virtual reality in D&D activities

Sponsor Available/TBA

1730 Vendor Technology Demonstrations (20 minutes/per)

System&Large-scale equipment decontamination

/Waste decontamination liquid processing

/Decontamination effect measurement

Remote operating/automatic control /Reactor core

internal cutting /Reactor pressure vessel cutting

/Biological shield wall surface layer dismantling

Wide-range contamination measuring /Penetrated

contamination measurement /Final measurement for

verification /Innovative equipments& solutions

Radioactivity measurement /Decommissioning waste

decontamination /Metal recycling /Concrete recycling

Sponsor Available

1830 The End of the Two-Day Conference & Chairman’s

Closing Remarks

Day 2. Jan 29

Day Two Sub-Forum

Sub-Forum 2 Nuclear Decommissioning and Radioactive

Waste Management

0800 Registration & Morning Tea

0850 Welcome & Chairman’s Opening Address

Session 1: Decommissioning Activities and International

Practices

0900 Cost Estimation and Financing for Decommissioning of

Nuclear Facilities

- Cost estimation: purpose, approaches and risks

- Challenges for managing the decommissioning fund and

good practices for sharing

- Benchmarking projects- lessons learnt

OECD Nuclear Energy Agency/ EPC/ Consultancy

0930 Decommissioning Updates of Unit 1-4 at Kozloduy NPP

State Enterprise Radioactive Waste (SE RAW)

1000 Ignalina NPP Decommissioning and Optimized Waste

Management in Lithuania

- INPP Decommissioning Programme & latest updates

- Decommissioning technologies and infrastructure

- Waste management route and storage facilities

- Procurement plan and potential opportunities

Ignalina Nuclear Power Plant

1030 Networking Coffee Break

1100 Status and Plan of Chernobyl NPP Decommissioning

SSE ChNPP

1130 Decommissioning Updates at the Bohunice Units in

Slovakia

Nuclear Regulatory Authority of the Slovak Republic

1200 Case Study: Decommissioning and Service Operations

in France

EDF’s decommissioning strategy and methods

Decommissioningexperiences of French reactors

Project and risk management for decommissioning

programme

EDF

1230 Panel Discussion: Decommissioning Programmes -

How to manage a project on time and within budget?

3-5 Seats Available

1310 Networking Luncheon

Session 2: Management of Radioactive Waste and Final

Disposal

1400 Management and Disposal of Radioactive Waste and

SNF in the Czech Republic

Conference Website:www.szwgroup.com/central-eastern-europe-nuclear-industry-congress-2019/

Tel: +86 24-31259204 ext. 804 Fax: +86 21 5831 1668 Email: [email protected]

Page 7: 5th Central & Eastern Europe Nuclear Industry Congress 2019 · 5th Central & Eastern Europe Nuclear Industry Congress 2019 Prague, Czech Republic Dear Colleagues, It’s my greatest

Register OnlineConference Website: www.szwgroup.com/central-eastern-europe-nuclear-industry-congress-2019/Tel: +86 24-31259204 ext. 804 Fax: +86 21 5831 1668 Email: [email protected]

CEE NIC 2018 Review

Exhibi�onConference Coffee BreakPanel Discussion

Par�cipa�on By Segment

Good and efficient organization of the event.------ Stefano Monti, International Atomic Energy Agency (IAEA)

Excellent organized, and very good selection of speakers in front of an active and knowledgeble audience! ------ Teodor Chirica, European Atomic Forum (FORATOM)

The event was well organized and met all my expectations. It is an excellent forum for the multilateral discussions among stakeholders regarding nuclear safety issues and , thus, rising the personal experience of its participants.------ Maksim Mazurenka, Gosatomnadzor

Thank you once again for the excellent organization of the congress, interesting information and professional participants. And very nice, friendly and atmosphere!------ Roman Voronov, Ignalina Nuclear Power Plant

I’d like to welcome the organizing committee for the perfect and fruitful organization of the event.------ Bilyana Simeonova, Kozloduy Nuclear Power Plant - New Build Plc

I was very proud to participate in this important event.------ Jean-Christophe Conus, EDF

Thank you for an invitation.------ Maciej Wojcik, PGE Polska Grupa Energetyczna S.A.

Fabulous event. Will definitely attend next year,met an abun-dance of new contacts and some opportunities.------ Kevin Ward, Porvair Filtration

Perfect event-from start to finish! Would love to present at one of the next events as previously in Istanbul.------ Kostadin Sirleshtov, CMS

Associa�onGovernment/Regulator EPCU�lity/OperatorEquipment VendorEngineering ConsultancyProfessional ServiceTech ProviderR&D Ins�tuteOther

5%7.5%7.5%10%32.5%15%10%5%3.5%4%

Interna�onal Associa�ons/ Governments/ Regulators/ Agencies: Interna�onal Atomic Energy Agency/ European Commission/ OECD NEA/ World Associa�on of Nuclear Operators/ European Atomic Forum (FORATOM)/ European Bank for Reconstruc�on and Develop-ment (EBRD)/ Ministry of Industry and Trade of the Czech Republic, Czech Republic/ Ministry of Energy, Bulgaria/ Ministry of Energy, Poland/ Ministry of Na�onal Development, Hungary/ Ministry of Economic Affairs and Employment, Finland/ Bulgarian Nuclear Regulatory Agency (BNRA)/ Ministry of Economy of the Slovak Republic/ Nuclear Regulatory Authority of the Slovak Republic/ Nuclear Agency and for Radioac�ve Waste (ANDR), Romania/Agency for Radwaste Management (ARAO), Slovenia/ ……

Research Ins�tutes/ Universi�es: Horia Hulubei Na�onal Ins�tute of Physics and Nuclear Engineering (IFIN HH), Romania/ Hungarian Academy of Sciences, Hungary/ Na�onal Centre for Nuclear Research (NCBJ), Poland/ Czech Metrology Ins�tute/ Na�onal Nuclear Labora-tory Ltd/ ……

U�li�es/ Operators/ Licensees: ČEZ, a.s./ MVM Paks Nuclear Power Plant Ltd. / Paks II. Nuclear Power Plant Zrt/ Hitachi-Horizon Nuclear Power/ PGE Polska Grupa Energetyczna SA / SN Nuclearelectrica S.A./ PGE EJ1 Sp. z o.o./ Kozloduy NPP plc/ Energoatom/ State Enterprise Radioac�ve Waste (SE RAW)/ Kozloduy Nuclear Power Plant - New Build Plc, Bulgaria/ Ignalina Nuclear Power Plant/ SSE ChNPP/ Fortum/ Public Limited Company for Radioac�ve Waste Management (PURAM), Hungary/ Radioac�ve Waste Repository Authority (SÚRAO), Czech Republic/ ……

Reactor Vendors: Wes�nghouse/ Rusatom Overseas/ AREVA NP/GE-GE Hitachi Nuclear Energy / General Atomics……

Tier 1 & 2 contractor/ EPC: Fortum Power and Heaty Oy/ Rosatom-Atomproekt / UJV REZ / ANSALDO Nuclear/ Amec Foster Wheeler Nuclear Slovakia s.r.o./ ŠKODA JS a.s./ Nuvia/ CH2M Hill / Freyssinet / Hatch/ ZVVZ a.s ……

Engineering Consul�ng Firms: TRACTEBEL ENGINEERING SA / EXCEL Services Corpora�on/ VF, a.s./ RENECOL/ EKSORB/IDOM/ ELMONT KRSKO/ Pöyry/ KGL Globus/ UJV REZ, a.s./ Sipro Inzeniring/ EASY FREIGHT/ ……

Nuclear Fuel Cycle: Rosatom-NUKEM / URENCO / TradeTech Energy/ Belgoprocess / RSB Logis�c/ ……

Law Firms: Morgan, Lewis & Bockius/ CMS Cameron McKenna Nabarro/ ……

Simula�on & So�ware Vendors: The Simulator Center KSG|GfS/ L-3 MAPPS / Innova�ve Systems So�ware/ ESI Group……

Other Vendors: Andritz/ Porvair Filtra�on Group Lt/ PAC TEC Ltd/ Bedus Ltd./ AVANTECH/ ENEXIO (Former GEA EGI Cooling)/ Belgopro-cess/ JSC OKAN/ REEL - Nkm Noell/ Schneider Electric/ Mirion Technologies/ Energus - Nuclear Graduate/ HMS Group/ Numip/ VALAN/ VF, a.s./ Waterfall/ ……

Part of Previous A�endees

Tes�monial

Page 8: 5th Central & Eastern Europe Nuclear Industry Congress 2019 · 5th Central & Eastern Europe Nuclear Industry Congress 2019 Prague, Czech Republic Dear Colleagues, It’s my greatest

Register OnlineConference Website: www.szwgroup.com/central-eastern-europe-nuclear-industry-congress-2019/Tel: +86 24-31259204 ext. 804 Fax: +86 21 5831 1668 Email: [email protected]

January 28-29, 2019Prague, Czech Republic5th Central & Eastern Europe Nuclear Industry Congress 2019

Become a Sponsor. Make Your Connection

Do business with both the CEOs & GMs from Operator, Reactor Vendor, EPC Contractor in one place!ARE YOUR POTENTIAL CLIENTS AWARE OF THE EXPERTISE YOU OFFER?• Educate the market about your products, services, key personnel and track record• Enjoy a complete cap�ve audience by holding a full 30 minute presenta�on• Join a key panel debate or distribute literature directly towards your client

Solu�on1: Keynote address/Chairman opportuni�es/Moderator/Panelist…

Solu�on3: Exhibi�on booth/Delegate bag/Inser�on…

DO YOU FIND IT HARD TO IDENTIFY AND GET IN FRONT OF THE DECISION MAKERS?• Benefit from having all your poten�al clients in one place at one �me• Send your best sales people to ensure you have the man power to meet everyone• Use CONTACT and SPEED NETWORKING to make 1-1 contact before, during and a�er the event

ARE YOUR COMPETITORS EATING YOUR LUNCH?• No one can afford to sit back and let the business come to them• Don’t sit in the audience and listen to your compe�tors say how great they are – be at the forefront!• Ensure your business is at the forefront of your prospects’ minds

IS YOUR BRAND RECOGNISED BY THE NUCLEAR MARKET?• Use our extensive global marke�ng campaign to posi�on your logo and profile in front of your target markets from all over the world - even those that don’t a�end the event!

Solu�on4: Luncheon sponosr

Solu�on2: Exhibi�on booth/coffee break sponsor/luncheon

sponsor/cocktail sponsor…

Gold Sponsor

Silver Sponsor

Recommended Sponsor Package

Bronze Sponsor

Presenta�on Sponsor

Welcome Recep�on Sponsor

Luncheon Sponsor

Cocktail Party Sponsor

Golf Match Sponsor

Lanyard Sponsor

Delegate Bag Sponsor

10

Tickets

8

6

4

4

6

4

4

3

3

Exhibi�on

9m2

6m2

4m2

X

4m2

4m2

4m2

X

X

X

X

X

X

X

X

X

Tabletop

Standard Booth

2

3 6m2

4m2X

X

Speech

Who Should Be the Sponsors?

Exhibi�on Floor Plan

• Interna�onal Reactor Vendors• EPC Contractor and Engineering Consul�ng vendors• Law Firms / Insurance Firms • Inspec�on Firms / Accoun�ng Firms• Management Consul�ng Firms• So�ware/Simula�on Solu�on Vendors• NSSS and Other Reactor Island Equipment Vendors• Auxiliary Equipment suppliers• Conven�onal Island Equipment Vendors• Laboratories/ Foreign Technology Research Centers• Nuclear Fuel Mining/ Recycling Technology Suppliers• All the other vendors that are in bidding process

Tabletop 4mStandard Booth 6mLuxury Booth 9m

2

2

2

ABC

2 3

109

87

11

1312 14

15

4 5 6