5th Central & Eastern Europe Nuclear Industry Congress 2019 · 5th Central & Eastern Europe Nuclear...
Transcript of 5th Central & Eastern Europe Nuclear Industry Congress 2019 · 5th Central & Eastern Europe Nuclear...
5th Central & Eastern EuropeNuclear Industry Congress 2019January 28-29 | Prague, Czech RepublicGrasping New Opportunities throughout the Entire Nuclear Power Plant Life Cycle in CEE Region
Part of Previous Media
Organizers
12+ Exhibitors12+ CountriesRepresented30+ Speeches180+ Delegates
www.szwgroup.com/central-eastern-europe-nuclear-industry-congress-2019
Register Online
Tel: +86 24-31259204 ext. 804 Fax: +86 21 5831 1668 Email: [email protected] Website: www.szwgroup.com/central-eastern-europe-nuclear-industry-congress-2019/
January 28-29, 2019Prague, Czech Republic5th Central & Eastern Europe Nuclear Industry Congress 2019
Part of Previous Speakers in 2018Greg RzentkowskiDirector, Division of Nuclear Installa�on SafetyInternational Atomic Energy Agency (IAEA)
János SüliMinister without Por�olioHungarian Government
Part of Previous Sponsors and VIP Participants
Countries We Focus On
Hungary Slovakia Bulgaria Finland LithuaniaRomaniaPolandCzech Republic Ukraine Slovenia
A�la AszódiState SecretaryPrime Minister’s Office, Hungarian Government
Maksim MazurenkaHead of DivisionGosatomnadzor
Natália Bo�aNuclear Safety Inspector, Division of Nuclear Waste and DecommissioningNuclear Regulatory Authority of the Slovak Republic
Chirica Minodor TeodorPresidentEuropean Atomic Forum (FORATOM)
András AradszkiMinister of State for Energy AffairsMinistry of National Develop-ment, Hungary
Ferenc LórándSenior AdviserHungarian Atomic Energy Authority (HAEA)
Petr ZávodskýDirector Nuclear Power Plants Construc�onČEZ, a.s.
Vince NovakDirector, Nuclear Safety DepartmentEuropean Bank for Reconstruction and Development (EBRD)
Jean-Christophe ConusProject Manager, Division of Decom-missioning & Waste Management (DP2D)EDF
Tamás János KatonaScien�fic AdvisorMVM Paks Nuclear Power Plant Ltd.
Joseph BoucauDirector, Global D&D/WM Business DevelopmenWestinghouse Electric Company
Alexandru HavrisDirector, Develop-ment and ProjectsSN Nuclearelectri-ca SA
Bilyana SimeonovaHead of Engineering and Technical Ac�vi�es Depart-mentKozloduy Nuclear Power Plant - New Build Plc
Roman VoronovBusiness Develop-ment Manager, Projects Manage-ment ServiceIgnalina Nuclear Power Plant
Jakub OśkoRadia�on Protec�on and Nuclear Dosime-try SpecialistNational Centre for Nuclear Research (NCBJ), Poland
Bálint NősDirector of Strategy and TechnologyPublic Limited Company for Radioactive Waste Management (PURAM), Hungary
Alice Mariana DimaDirector, Nuclear Projects and Strategies Division Nuclear Agency and for Radioactive Waste (ANDR), Romania
Nicolas SolenteInterna�onal Cooper-a�on & Projects Manager, Develop-ment, Innova�on and Interna�onal DivisionAndra
Register OnlineConference Website: www.szwgroup.com/central-eastern-europe-nuclear-industry-congress-2019/Tel: +86 24-31259204 ext. 804 Fax: +86 21 5831 1668 Email: [email protected]
January 28-29, 2019Prague, Czech Republic5th Central & Eastern Europe Nuclear Industry Congress 2019
Dear Colleagues,
It’s my greatest pleasure, on behalf of the Organizing Commi�ee, to welcome you to a�end the 5th Central & Eastern Europe Nuclear Industry Congress 2019, which will take place during January 30-31, in Prague, Czech Republic.
This January we have successfully held the 4th Central & Eastern Europe Nuclear Industry Congress in Budapest, Hungary. It is the one of the most recognized and best established nuclear industry conference in Central & Eastern Europe, which will cover the whole industry chain. In 2019, this annual interna�onal event will come to Prague and let’s enjoy a great �me there.
The congress in Prague aims to bring together companies involved in all areas of the nuclear power plant life cycle to address cu�ng-edge issues and emerging trends which affect and even lead the nuclear industry. Governments, regulators, u�li�es/operators, reactor vendors, decommissioning contractors, waste management agencies, technology & service providers and other organiza�ons will share valuable insights into the most important aspects of new build, life extension & decommissioning projects as well as radioac�ve waste handling. This conference is a "must-a�end" for anyone who wants to stay current and on top of industry trends and develop-ments. Meanwhile, for those who are keen to find new investment opportuni�es or strengthen their presence in this market, our two-day event will also provide a cozy pla�orm to meet your future partners.
We are looking forward to seeing you in Prague!
Best regards,Organizing Commi�ee of the 5th Central & Eastern Europe Nuclear Industry Congress 2019
The Orga
nizin
g Com
mitte
e o
f 5th Central & Eastern Europe Nuclear Industry Congress 2019
Event at a Glance
Day 1
Day 2
Main Forum09:00-10:00 General Status and Global Trends10:00-16:00 Session 2: Nuclear Situa�on and Overview in CEE Region (Lunch Time: 12:30-14:00)● Czech Republic, Bulgaria, Hungary, Poland, Slovakia, etc.
Sub-Forum
16:00-17:30 Session 3: Financing, Risk and Project Management Financing, Risk and Project Management17:30-18:30 Session 4: Skills Development and Knowledge Transfer
Sub-Forum 1: Nuclear New Build and Long Term Opera�on09:00-12:30 Session 1: Project Updates& Case Study● Czech Republic, Bulgaria, Hungary, Poland, Romania, etc.14:00-16:00 Session 2: Life�me Extension and Long Term Opera�ons of NPPs● Slovakia, Ukraine, etc.16:00-18:00 Session 3: Innova�ve Technologies and Supply Chain Op�miza�on
Sub-Forum 2: Nuclear Decommissioning and Radioac-�ve Waste Management09:00-12:30 Session 1: Decommissioning Ac�vi�es and Interna�onal Prac�ces● Bulgaria, Lithuania, Slovakia, Ukraine, etc.14:00-16:00 Session 2: Management of Radioac�ve Waste and Final Disposal● Czech Republic, Finland, Hungary, etc.16:00-18:00 Session 3: Supply Chain Considera�ons and Advanced Technologies
Why you can’t Miss
The ONLY Conference Focusing on Latest Projects and Contract Opportuni�es in all CEE Hot Countries: Czech Republic, Hungary, Slovakia, Poland, Bulgaria, Finland, Romania, Lithuania, Ukraine 2 Sub-Forums on Day Two to Cover the Whole Industry Chain Opportuni�es,- New Build +LTO- Decommissioning + WMLearn Valuable Insights from Interna�onal Experts about Project Updates, Strategy & Regula�on, Financing & Risk Management, Advanced Nuclear Technology and Disposal of Radioac�ve Waste Highlight Supply Chain and Vendor Technology Demonstra�on Session for Sponsor OpportunityInterac�ve in Exclusive Panel Discussions on “Advanced Nuclear Fuel Cycle- Challenges and Innova�ons” and “How to Manage a Project on Time and within Budget?” Get One on One Mee�ng Opportunity with Your Future Partner (First 10 Registered Delegate & Sponsor Companies Only)Mul� - Registra�on Benefits: Discount & Free Booth
1230 Networking Luncheon
1400 Updates of Romanian Nuclear Energy Sector
Nuclear energy plan in Romania
Negotiation with CGN and construction preparations for
Cernavoda 3-4
Decommissioning planning and life management for NPPs
in Romania
Robert Tudorache, State Secretary, Ministry of Energy,
Romania
1430 Regulatory Framework for Nuclear Industry in Finland
Construction preparations for Hanhikivi 1 and supply
chain management
Regulation updates for SMRs and other advanced reactor
designs
Regulatory procedures for decommissioning of nuclear
installations in Finland
Radiation and Nuclear Safety Authority (STUK), Finland
1500 Nuclear Power Plants in Slovakia
Nuclear capacity maintenance and expansion
Nuclear new build timeline
Decommissioning NPPs: Bohunice V1, Bohunice A1
Ministry of Economy of the Slovak Republic
1530 Networking Coffee Break
Session 3: Financing, Risk and Project Management
1600 Financing Regime & Funds Management for New Builds
Operator/ Sponsor Available
1630 Nuclear Decommissioning in CEE – EBRD Perspective
European Bank for Reconstruction and Development (EBRD)
1700 Commercial and Risk Management in Nuclear Projects
EPC Companies/ Sponsor Available
Session 4: Skills Development and Knowledge Transfer
1730 Education and Skills Development for Nuclear Sector
1800 Preservation and Transfer of Nuclear Knowledge
1830 The End of Day One Conference & Chairman’s Remarks
Presentation Sponsorship Available
The presentation sponsorship provide you a 30-minutes
presentation to get the complete Captive audience,making
an unrivalled branding Opportunity than your competitor
before the Decision Makers in the offshore sector.For more
details,Please contact [email protected]
Day 1 Jan. 28
Day One Main Forum
0800 Registration & Morning Tea
0850 Welcome & Chairman’s Opening Address
Session 1: General Status and Global Trends
0900 The Role of Nuclear Power in Global Energy Mix
International Atomic Energy Agency (IAEA)
0930 Nuclear Perspectives in Europe
Nuclear capacity expansion and maintenance in Europe
Nuclear new build plan and NPPs under construction in CEE
region
Decommissioning programmes and waste management
activities
Chirica Minodor Teodor, President, FORATOM
Session 2: Nuclear Situation and Overview in CEE Region
1000 Nuclear Development and Waste Management in the
Czech Republic
New build projects at Temelin and Dukovany
Supply chain innovations and international cooperation
National strategy for waste disposal
Ministry of Industry and Trade of the Czech Republic, Czech
Republic
1030 Networking Coffee Break
1100 Nuclear in Bulgaria: Status and Prospects
Restart of nuclear new build project and latest updates of
new nuclear
Decommissioning status of Kozloduy units
Procurement plan and contract opportunities
Ministry of Energy, Bulgaria
1130 First Nuclear Power Plant in Poland
National decision and future plan
Latest updates and time frame of new build
Tender opportunities and challenges
Ministry of Energy, Poland
1200 National Strategy for Nuclear Sector in Hungary
Nuclear energy strategy and plan in Hungary
Capacity maintenance and lifetime extension programmes
Paks II project updates
Decommissioning plan and preparations for NPPs in
operation
Ministry of Innovation and Technology, Hungary
Conference Website:www.szwgroup.com/central-eastern-europe-nuclear-industry-congress-2019/
Tel: +86 24-31259204 ext. 804 Fax: +86 21 5831 1668 Email: [email protected]
Day 2. Jan 29
Day Two Sub-Forum
Sub-Forum 1 Nuclear New Build and Long Term Operation
0800 Registration & Morning Tea
0850 Welcome & Chairman’s Opening Address
Session 1: Project Updates& Case Study
0900 Safety Preparations for New Units
World Association of Nuclear Operators
0930 Nuclear New Build Updates in the Czech Republic
New build decision on units at Dukovany
Investing model and financing issues
Lifetime extension to maintain nuclear capacity
Petr Závodský, Director Nuclear Power Plants Construction, ČEZ,
a. s.
1000 Construction Updates of Paks II Project
Paks II Ltd./ TBA
1030 NetworkingCoffee Break
1100 Nuclear New Build Project in Bulgaria: Status and
Prospects
Approved plan to resume construction of new build
Financing regime and project schedule
“Kozloduy Nuclear Power Plant – New Build” Plc
1130Current Status of Cernavoda 3-4 in Romania
Investing model and financing regime for Cernavoda 3-4
New build timescale and related infrastructure
developments
Cosmin Ghita, CEO, SN Nuclearelectrica S.A.
1200 Developing New Nuclear Capacity in Finland
Status of NPPs in Finland
Construction preparations for Hanhikivi 1 and latest
progress
Procurement plan and opportunities for domestic &
international suppliers
Fennovoima Oy
1230 Nuclear New Build Project in Poland
PGE EJ1 Sp zoo.
1300 Networking Luncheon
1400 Panel Discussion: Advanced Nuclear Fuel Cycle-
Challenges and Innovations
3-5 Seats Available
Session 2: Lifetime Extension and Long Term Operations of
NPPs
1440 LTO of Nuclear Power Plants in Slovakia
Procedure and safety criteria for lifetime extension
programmes
Maintenance and upgrade activities for operating NPPs
Slovenské Elektrárne (SE)
1510 Lifetime Extension of Operating NPPs in Ukraine
Scheduled lifetime of NPPs in Ukraine and Energoatom’s
extension plan
Ageing management and preparation for long term
operation
Safety upgrades and contract opportunities
Energoatom
1540 Networking Coffee Break
Session 3: Innovative Technologies and Supply Chain
Optimization
1610 Advanced Reactor Design and Global Trends
SMR/ next generation of nuclear reactors as a viable
option
Opportunities and challenges
Rosatom/ Westinghouse/ TBC
1640 Digital Technologies and Processes in Nuclear
Construction and Engineering Activities
Sponsor Available
1710 Optimize Supply Chain’s Capability, Capacity and
Competitiveness for New Build
Procurement rules for and domestic & international
suppliers
Approaches to secure an adequate supply of vendors
and services
International cooperation and localization of nuclear
technology
EPC Companies/ TBA
1740 Vendor Technology Demonstrations (20 minutes/per)
NSSS: Pressurizer /Heat Exchanger /Steam Generator
/Main Coolant Pump
Conventional Island: Steam Turbine / Generator / Pump
/ Valve
Other Equipment & Service: Lift Equipment /Site
Investigation /Steel Products and Forgings / Simulator
and Simulation Products
Sponsor Available
1840 The End of the Two-Day Conference & Chairman’s
Closing Remarks
Conference Website:www.szwgroup.com/central-eastern-europe-nuclear-industry-congress-2019/
Tel: +86 24-31259204 ext. 804 Fax: +86 21 5831 1668 Email: [email protected]
Day 2Sept.19th
Regulation and procedures for RAW management
Treatment of ILW &HLW
Latest progress of Czech repository plan
Radioactive Waste Repository Authority (SÚ RAO), Czech
Republic
1430 Construction of Deep Geological Repository for Final
Disposal of Nuclear Waste
Posiva Solutions Oy
1500 Interim Storage, Transport and Final Disposal Plan in
Hungary
Regulatory framework for waste management
Safe and efficient transport of nuclear and radioactive
material
Repository plan for long-lived ILW and high-level wastes
Public Limited Company for Radioactive Waste Management
(PURAM)
1530 Networking Coffee Break
Session 3: Supply Chain Considerations and Advanced
Technologies
1600 Dismantling of Reactor Pressure Vessel and Technical
Innovations
Westinghouse Electric Company
1630 Supply Chain Development and Procurement
Approaches for Decommissioning Activities
EPC Companies/TBA
1700 Robotic Technologies and Virtual Reality Potentials for
Nuclear Decommissioning
Innovative robotics and remote handling system
Underwater cutting techniques
Usage of virtual reality in D&D activities
Sponsor Available/TBA
1730 Vendor Technology Demonstrations (20 minutes/per)
System&Large-scale equipment decontamination
/Waste decontamination liquid processing
/Decontamination effect measurement
Remote operating/automatic control /Reactor core
internal cutting /Reactor pressure vessel cutting
/Biological shield wall surface layer dismantling
Wide-range contamination measuring /Penetrated
contamination measurement /Final measurement for
verification /Innovative equipments& solutions
Radioactivity measurement /Decommissioning waste
decontamination /Metal recycling /Concrete recycling
Sponsor Available
1830 The End of the Two-Day Conference & Chairman’s
Closing Remarks
Day 2. Jan 29
Day Two Sub-Forum
Sub-Forum 2 Nuclear Decommissioning and Radioactive
Waste Management
0800 Registration & Morning Tea
0850 Welcome & Chairman’s Opening Address
Session 1: Decommissioning Activities and International
Practices
0900 Cost Estimation and Financing for Decommissioning of
Nuclear Facilities
- Cost estimation: purpose, approaches and risks
- Challenges for managing the decommissioning fund and
good practices for sharing
- Benchmarking projects- lessons learnt
OECD Nuclear Energy Agency/ EPC/ Consultancy
0930 Decommissioning Updates of Unit 1-4 at Kozloduy NPP
State Enterprise Radioactive Waste (SE RAW)
1000 Ignalina NPP Decommissioning and Optimized Waste
Management in Lithuania
- INPP Decommissioning Programme & latest updates
- Decommissioning technologies and infrastructure
- Waste management route and storage facilities
- Procurement plan and potential opportunities
Ignalina Nuclear Power Plant
1030 Networking Coffee Break
1100 Status and Plan of Chernobyl NPP Decommissioning
SSE ChNPP
1130 Decommissioning Updates at the Bohunice Units in
Slovakia
Nuclear Regulatory Authority of the Slovak Republic
1200 Case Study: Decommissioning and Service Operations
in France
EDF’s decommissioning strategy and methods
Decommissioningexperiences of French reactors
Project and risk management for decommissioning
programme
EDF
1230 Panel Discussion: Decommissioning Programmes -
How to manage a project on time and within budget?
3-5 Seats Available
1310 Networking Luncheon
Session 2: Management of Radioactive Waste and Final
Disposal
1400 Management and Disposal of Radioactive Waste and
SNF in the Czech Republic
Conference Website:www.szwgroup.com/central-eastern-europe-nuclear-industry-congress-2019/
Tel: +86 24-31259204 ext. 804 Fax: +86 21 5831 1668 Email: [email protected]
Register OnlineConference Website: www.szwgroup.com/central-eastern-europe-nuclear-industry-congress-2019/Tel: +86 24-31259204 ext. 804 Fax: +86 21 5831 1668 Email: [email protected]
CEE NIC 2018 Review
Exhibi�onConference Coffee BreakPanel Discussion
Par�cipa�on By Segment
Good and efficient organization of the event.------ Stefano Monti, International Atomic Energy Agency (IAEA)
Excellent organized, and very good selection of speakers in front of an active and knowledgeble audience! ------ Teodor Chirica, European Atomic Forum (FORATOM)
The event was well organized and met all my expectations. It is an excellent forum for the multilateral discussions among stakeholders regarding nuclear safety issues and , thus, rising the personal experience of its participants.------ Maksim Mazurenka, Gosatomnadzor
Thank you once again for the excellent organization of the congress, interesting information and professional participants. And very nice, friendly and atmosphere!------ Roman Voronov, Ignalina Nuclear Power Plant
I’d like to welcome the organizing committee for the perfect and fruitful organization of the event.------ Bilyana Simeonova, Kozloduy Nuclear Power Plant - New Build Plc
I was very proud to participate in this important event.------ Jean-Christophe Conus, EDF
Thank you for an invitation.------ Maciej Wojcik, PGE Polska Grupa Energetyczna S.A.
Fabulous event. Will definitely attend next year,met an abun-dance of new contacts and some opportunities.------ Kevin Ward, Porvair Filtration
Perfect event-from start to finish! Would love to present at one of the next events as previously in Istanbul.------ Kostadin Sirleshtov, CMS
Associa�onGovernment/Regulator EPCU�lity/OperatorEquipment VendorEngineering ConsultancyProfessional ServiceTech ProviderR&D Ins�tuteOther
5%7.5%7.5%10%32.5%15%10%5%3.5%4%
Interna�onal Associa�ons/ Governments/ Regulators/ Agencies: Interna�onal Atomic Energy Agency/ European Commission/ OECD NEA/ World Associa�on of Nuclear Operators/ European Atomic Forum (FORATOM)/ European Bank for Reconstruc�on and Develop-ment (EBRD)/ Ministry of Industry and Trade of the Czech Republic, Czech Republic/ Ministry of Energy, Bulgaria/ Ministry of Energy, Poland/ Ministry of Na�onal Development, Hungary/ Ministry of Economic Affairs and Employment, Finland/ Bulgarian Nuclear Regulatory Agency (BNRA)/ Ministry of Economy of the Slovak Republic/ Nuclear Regulatory Authority of the Slovak Republic/ Nuclear Agency and for Radioac�ve Waste (ANDR), Romania/Agency for Radwaste Management (ARAO), Slovenia/ ……
Research Ins�tutes/ Universi�es: Horia Hulubei Na�onal Ins�tute of Physics and Nuclear Engineering (IFIN HH), Romania/ Hungarian Academy of Sciences, Hungary/ Na�onal Centre for Nuclear Research (NCBJ), Poland/ Czech Metrology Ins�tute/ Na�onal Nuclear Labora-tory Ltd/ ……
U�li�es/ Operators/ Licensees: ČEZ, a.s./ MVM Paks Nuclear Power Plant Ltd. / Paks II. Nuclear Power Plant Zrt/ Hitachi-Horizon Nuclear Power/ PGE Polska Grupa Energetyczna SA / SN Nuclearelectrica S.A./ PGE EJ1 Sp. z o.o./ Kozloduy NPP plc/ Energoatom/ State Enterprise Radioac�ve Waste (SE RAW)/ Kozloduy Nuclear Power Plant - New Build Plc, Bulgaria/ Ignalina Nuclear Power Plant/ SSE ChNPP/ Fortum/ Public Limited Company for Radioac�ve Waste Management (PURAM), Hungary/ Radioac�ve Waste Repository Authority (SÚRAO), Czech Republic/ ……
Reactor Vendors: Wes�nghouse/ Rusatom Overseas/ AREVA NP/GE-GE Hitachi Nuclear Energy / General Atomics……
Tier 1 & 2 contractor/ EPC: Fortum Power and Heaty Oy/ Rosatom-Atomproekt / UJV REZ / ANSALDO Nuclear/ Amec Foster Wheeler Nuclear Slovakia s.r.o./ ŠKODA JS a.s./ Nuvia/ CH2M Hill / Freyssinet / Hatch/ ZVVZ a.s ……
Engineering Consul�ng Firms: TRACTEBEL ENGINEERING SA / EXCEL Services Corpora�on/ VF, a.s./ RENECOL/ EKSORB/IDOM/ ELMONT KRSKO/ Pöyry/ KGL Globus/ UJV REZ, a.s./ Sipro Inzeniring/ EASY FREIGHT/ ……
Nuclear Fuel Cycle: Rosatom-NUKEM / URENCO / TradeTech Energy/ Belgoprocess / RSB Logis�c/ ……
Law Firms: Morgan, Lewis & Bockius/ CMS Cameron McKenna Nabarro/ ……
Simula�on & So�ware Vendors: The Simulator Center KSG|GfS/ L-3 MAPPS / Innova�ve Systems So�ware/ ESI Group……
Other Vendors: Andritz/ Porvair Filtra�on Group Lt/ PAC TEC Ltd/ Bedus Ltd./ AVANTECH/ ENEXIO (Former GEA EGI Cooling)/ Belgopro-cess/ JSC OKAN/ REEL - Nkm Noell/ Schneider Electric/ Mirion Technologies/ Energus - Nuclear Graduate/ HMS Group/ Numip/ VALAN/ VF, a.s./ Waterfall/ ……
Part of Previous A�endees
Tes�monial
Register OnlineConference Website: www.szwgroup.com/central-eastern-europe-nuclear-industry-congress-2019/Tel: +86 24-31259204 ext. 804 Fax: +86 21 5831 1668 Email: [email protected]
January 28-29, 2019Prague, Czech Republic5th Central & Eastern Europe Nuclear Industry Congress 2019
Become a Sponsor. Make Your Connection
Do business with both the CEOs & GMs from Operator, Reactor Vendor, EPC Contractor in one place!ARE YOUR POTENTIAL CLIENTS AWARE OF THE EXPERTISE YOU OFFER?• Educate the market about your products, services, key personnel and track record• Enjoy a complete cap�ve audience by holding a full 30 minute presenta�on• Join a key panel debate or distribute literature directly towards your client
Solu�on1: Keynote address/Chairman opportuni�es/Moderator/Panelist…
Solu�on3: Exhibi�on booth/Delegate bag/Inser�on…
DO YOU FIND IT HARD TO IDENTIFY AND GET IN FRONT OF THE DECISION MAKERS?• Benefit from having all your poten�al clients in one place at one �me• Send your best sales people to ensure you have the man power to meet everyone• Use CONTACT and SPEED NETWORKING to make 1-1 contact before, during and a�er the event
ARE YOUR COMPETITORS EATING YOUR LUNCH?• No one can afford to sit back and let the business come to them• Don’t sit in the audience and listen to your compe�tors say how great they are – be at the forefront!• Ensure your business is at the forefront of your prospects’ minds
IS YOUR BRAND RECOGNISED BY THE NUCLEAR MARKET?• Use our extensive global marke�ng campaign to posi�on your logo and profile in front of your target markets from all over the world - even those that don’t a�end the event!
Solu�on4: Luncheon sponosr
Solu�on2: Exhibi�on booth/coffee break sponsor/luncheon
sponsor/cocktail sponsor…
Gold Sponsor
Silver Sponsor
Recommended Sponsor Package
Bronze Sponsor
Presenta�on Sponsor
Welcome Recep�on Sponsor
Luncheon Sponsor
Cocktail Party Sponsor
Golf Match Sponsor
Lanyard Sponsor
Delegate Bag Sponsor
10
Tickets
8
6
4
4
6
4
4
3
3
Exhibi�on
9m2
6m2
4m2
X
4m2
4m2
4m2
X
X
X
X
X
X
X
X
X
Tabletop
Standard Booth
2
3 6m2
4m2X
X
Speech
Who Should Be the Sponsors?
Exhibi�on Floor Plan
• Interna�onal Reactor Vendors• EPC Contractor and Engineering Consul�ng vendors• Law Firms / Insurance Firms • Inspec�on Firms / Accoun�ng Firms• Management Consul�ng Firms• So�ware/Simula�on Solu�on Vendors• NSSS and Other Reactor Island Equipment Vendors• Auxiliary Equipment suppliers• Conven�onal Island Equipment Vendors• Laboratories/ Foreign Technology Research Centers• Nuclear Fuel Mining/ Recycling Technology Suppliers• All the other vendors that are in bidding process
Tabletop 4mStandard Booth 6mLuxury Booth 9m
2
2
2
ABC
2 3
109
87
11
1312 14
15
4 5 6