Transcript of 5a. SPC- Variables Chart.ppt
![Page 1: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/1.jpg)
Prof G.R.C. Prof G.R.C. NairNair
![Page 2: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/2.jpg)
Quality Control (QC)
Control – the activity of ensuring conformance to requirements and taking corrective action when necessary to correct problems
Importance– Daily management of processes– Prerequisite to longer-term improvements
Prof G.R.C. NairProf G.R.C. Nair
![Page 3: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/3.jpg)
Inspection
Inspection should never be a means of assuring quality.
The purpose of inspection should be to gather information to understand and improve the processes that produce products and services.
Prof G.R.C. NairProf G.R.C. Nair
![Page 4: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/4.jpg)
4
Quality Checking Points
Receiving inspectionIn-process inspectionFinal inspection
Prof G.R.C. NairProf G.R.C. Nair
![Page 5: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/5.jpg)
5
Receiving Inspection
Random check procedures100 percent inspectionAcceptance sampling
Prof G.R.C. NairProf G.R.C. Nair
![Page 6: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/6.jpg)
6
In-Process Inspection
What to inspect?– Key quality characteristics that are related to
cost or quality (customer requirements)Where to inspect?
– Key processes, especially high-cost and value-added
How much to inspect?– All, nothing, or a sample
Prof G.R.C. NairProf G.R.C. Nair
![Page 7: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/7.jpg)
7
Statistical Process Control (SPC)
A methodology for monitoring a process to identify special causes of variation and signal the need to take corrective action when appropriate.
SPC relies on Shewhart’s Control Charts )
Prof G.R.C. NairProf G.R.C. Nair
![Page 8: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/8.jpg)
Objectives of SQC
Understand the problem of variation in all processes causing problems of quality.
Distinguish between chance or random cause and assignable cause of variation
Assess the “process capability”
Prof G.R.C. NairProf G.R.C. Nair
![Page 9: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/9.jpg)
Process Variation
All processes are subject to two basic types of variation:
Specific Cause (Assignable) Variation(Very few, but causes significant variations)
andChance Cause (Random) Variation
(Many insgnificant variations)
Prof G.R.C. NairProf G.R.C. Nair
![Page 10: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/10.jpg)
Common Cause Variation Influences all of the measurements in an
unpredictable way “Random Variation” Caused by system faults (also called chance
causes) Examples – lack of attention, poor supervision,
poor training / instructions, inappropriate work methods, fatigue
Requires a change in the system – only management can specify and implement the change
Prof G.R.C. NairProf G.R.C. Nair
![Page 11: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/11.jpg)
Not the operators’ fault Reducing common cause variation
improves process performance (once specific causes are eliminated )
Prof G.R.C. NairProf G.R.C. Nair
![Page 12: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/12.jpg)
Specific Cause Variation
Caused by local faults (also called specific causes or assignable causes)
Can be identified /corrected at the machine by the operator or supervisor by systematic study and analysis.
Prof G.R.C. NairProf G.R.C. Nair
![Page 13: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/13.jpg)
Examples – worn out scale, machine slippage, changes in raw material, error in program, temperature variation
Prof G.R.C. NairProf G.R.C. Nair
![Page 14: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/14.jpg)
14
SPC Implementation Requirements
Top management commitmentProject championInitial workable projectEmployee education and trainingAccurate measurement system
Prof G.R.C. NairProf G.R.C. Nair
![Page 15: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/15.jpg)
• Statistical Process Control is sampling
to determine if the process is performing within acceptable limits of tolerance.
Prof G.R.C. NairProf G.R.C. Nair
![Page 16: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/16.jpg)
Statistical Control
Process is stable Process is predictable over time Only Random variation is present
Size
Prediction
Prof G.R.C. NairProf G.R.C. Nair
![Page 17: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/17.jpg)
Process not in Statistical Control
?
Size
Prediction
??
??
??
??
??
? ?
Not stableNot predictableCauses waste and inefficiency Prof G.R.C. NairProf G.R.C. Nair
![Page 18: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/18.jpg)
Importance of Statistical Control
For a process to operate satisfactorily, it must be in a state of statistical control. S P C helps to identify specific causes for the change in quality.
Size
Prediction
Prof G.R.C. NairProf G.R.C. Nair
![Page 19: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/19.jpg)
Process Mean & Standard Deviation
Statistically, this means that 99.73 % of our measurements are within 3 of the process mean
-3 -2 -1 MEAN +1 2 +3
99.73%
The Process Mean is the average value of the process statistic:
Denoted by X
The standard deviation indicates the amount of spread about the process mean
Prof G.R.C. NairProf G.R.C. Nair
![Page 20: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/20.jpg)
Statistical Process Control (SPC)
Identifies specific causes for variation in quality and helps establish the proper corrective action
Establishes how the process should operate,when it is subject to random causes only
So it makes possible to determine when special causes are at work, based on the continual on-line monitoring of process variations
Prof G.R.C. NairProf G.R.C. Nair
![Page 21: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/21.jpg)
SPC Charts
SPC tool used to monitor a product’s key quality characteristics.
Control charts graphically display the history of the process average and variation, and how the operation is working now.
Compares the current performance with process history and detects special causes,if any.
It tells you whether or not your process is stable and in statistical control
Prof G.R.C. NairProf G.R.C. Nair
![Page 22: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/22.jpg)
Types of Process Data
Variable Data can be any value in a large range. is measured and expressed in numbers. examples: diameter (millimeters), product
weight (kgs), down loading time (seconds)
Prof G.R.C. NairProf G.R.C. Nair
![Page 23: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/23.jpg)
Attribute Data can only be classified into one of two classes are expressed as “yes or no,” “good or bad,” “go
or no go,” examples: color blemishes on a painted surface,
number of surface flaws on a shaft, frequent wrong number calls, over ripe fruits
Types of Process Data
Prof G.R.C. NairProf G.R.C. Nair
![Page 24: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/24.jpg)
SPC / SQC Charts
There are two types of charts used for controlling the quality of product/process.
They are:Charts for Variables – for controlling the
dimension / weight /any thing measurable. Charts for Attributes - for controlling the
percentages of bad / unacceptable products.
Prof G.R.C. NairProf G.R.C. Nair
![Page 25: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/25.jpg)
Control Charts for Variable Data X and R charts
Control Charts for Attribute Data p-charts
c-charts
Prof G.R.C. NairProf G.R.C. Nair
![Page 26: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/26.jpg)
What are Process Control Charts?
X-Bar Chart
Time
Upper Control Limit = UCL
Lower Control Limit = LCL
3x
2x
1x
X-bar
1x
2x
3x
Essentially, use charts with statistically determined control limits.
Prof G.R.C. NairProf G.R.C. Nair
![Page 27: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/27.jpg)
Setting up X and R Charts
Decide which quality characteristic(s) to monitor Decide how often you want to take samples (also
called subgroups) Determine sample size
this number is denoted ‘n’ n typically ranges from four to six n must remain constant during the period of
process observation reflected on the control chart
Prof G.R.C. NairProf G.R.C. Nair
![Page 28: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/28.jpg)
Setting up X and R Charts
Collect 25 – 50 samples/subgroups. A minimum of 25 samples must be collected to initiate control charts, but 40 – 50 is recommended.
Goal is to collect data over the entire range of variation.
Prof G.R.C. NairProf G.R.C. Nair
![Page 29: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/29.jpg)
Setting up X and R Charts
For each sample, calculate the sample mean, which will be denoted X. The sample mean is simply the average of the individual measurements in that particular subgroup.
For each sample, calculate the range. This range, called the sample range and denoted R, is found by subtracting the smallest observation in the sample from the largest observation. (R = Xlargest – Xsmallest).
Prof G.R.C. NairProf G.R.C. Nair
![Page 30: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/30.jpg)
Setting up X and R Charts
Average of the X’s X Called X double bar
X = grand average = solid centerline on X chart
Average of R’s R
R = solid centerline on R Chart
Prof G.R.C. NairProf G.R.C. Nair
![Page 31: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/31.jpg)
X Chart Control Limits
On the X chart, the control limits are 3 x from the centerline. However, there are several other formulae that can be used to find the control limits. They are summarized below:
X 3x
X A2 R
X 3R/[d2 n(1/2)]
Other formula that might be helpful x = /n(1/2)
is = R/d2 Prof G.R.C. NairProf G.R.C. Nair
![Page 32: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/32.jpg)
R Chart Control Limits
Formulae to be used to find R chart control limits(UCLR and LCLR):R 3R
Other formulae are,
UCLR = D4R
LCLR = D3R
Prof G.R.C. NairProf G.R.C. Nair
![Page 33: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/33.jpg)
Statistical Constants
Constants d2, d3, A2, D3, and D4
n A2 D3 D4 d2 d3
2 1.88 0 3.27 1.128 0.85253 1.02 0 2.57 1.693 0.88844 0.73 0 2.28 2.059 0.87985 0.58 0 2.11 2.326 0.8641
6 0.48 0 2.00 2.534 0.8480 7 0.42 0.08 1.92 2.704
Prof G.R.C. NairProf G.R.C. Nair
![Page 34: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/34.jpg)
Importance of the R Chart
The R chart is always constructed first. After constructing the R chart, the sample ranges
are plotted, and the rules are applied to test for out-of control conditions.
If the range chart is out-of-control, the X-bar chart is not valid and should not be constructed.
Prof G.R.C. NairProf G.R.C. Nair
![Page 35: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/35.jpg)
Bringing the R Chart into Control
Determine special cause(s)
Delete the corresponding sample(s)
Recalculate R
Prof G.R.C. NairProf G.R.C. Nair
![Page 36: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/36.jpg)
StepsFind X bar = ∑ X / n, (n is the sample sizeFind X bar bar = ∑ X bar / k ,(k is # of samples) Find R bar = ∑ R / kFind UCL R = D4 R bar
Find LCL R = D3 R bar
Find ULC X bar = X bar bar + A2 R bar
Find LCL X bar = X bar bar - A2 R bar
If any point falls out side the limits, rework eliminating those points
Prof G.R.C. NairProf G.R.C. Nair
![Page 37: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/37.jpg)
Exercise 1
The following data was obtained from a manufacturing company over a ten day period.The sample size was 5 and every day at the end of the day one sample as drawn randomly from the finished product from a machine. All the figures pertain to a single machine operated by the same operator. Prepare the X bar and R charts and commend on the process quality.
Prof G.R.C. NairProf G.R.C. Nair
![Page 38: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/38.jpg)
Sample No Observations
1 2 3 4 5 X R
1 10 12 13 8 9 10.4 5
2 7 10 8 11 9
3 11 12 9 12 10
4 10 9 8 13 11
5 8 11 11 7 7
6 11 8 8 11 10
7 10 12 13 13 9
8 10 12 12 10 12
9 12 13 11 12 10
10 10 13 7 9 12
![Page 39: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/39.jpg)
R = 3.9, UCL R =D4R = 2.11*3.9 = 8.229
LCL = D3R =0*3.9 = 0
X = 10.32UCLX = X +A2R =10.32+0.58*3.9 =12.582
LCLX = X –A2R = 10.32-0.58*3.9 = 8.058
Prof G.R.C. NairProf G.R.C. Nair
![Page 40: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/40.jpg)
R chart
LCL=0.00
R=3.9
UCL=8.229
Prof G.R.C. NairProf G.R.C. Nair
![Page 41: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/41.jpg)
LCL=8.058
X=10..32
UCL=12.582
=
Comment : The above process appear to be in good control.
X Bar Chart
Prof G.R.C. NairProf G.R.C. Nair
![Page 42: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/42.jpg)
Exercise 2
An inspector of a company recorded the size of a part on ten days ,the sample size being 5. Plot the Control Charts and see if the process is in statistical control.
Prof G.R.C. NairProf G.R.C. Nair
![Page 43: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/43.jpg)
Sample No Observations
1 2 3 4 5 X R
1 25 25.01 25 25.03 25.01 25.01 0.03
2 25 25.03 25 25.04 25.03 0.04
3 25.01 25.02 25.02 25.03 25.02 25.02 0.02
4 25.01 25.02 25.02 25.01 25.04 25.02 0.03
5 25.02 25.02 25.03 25.03 25 25.02 0.03
6 25.06 25.03 25.02 25 24.99 25.02 0.07
7 24.99 24.98 25.02 25.02 24.99 25 0.04
8 25.02 25.01 25.01 24.99 25.02 25.01 0.03
9 25.03 25.01 24.97 25.01 25.03 25.01 0.06
10 25.02 24.99 24.99 24.98 24.97 24.98 0.05
Prof G.R.C. NairProf G.R.C. Nair
![Page 44: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/44.jpg)
R = 0.039 X = 25.01 UCLX = 25.03
LCLX = 24.99
Since the mean of the 10th sample falls out side the control limits, rework omitting that ample.
Revised X=25.014, R = 0.039 Revised UCLX = 25.04
Revised LCLX = 24.09
Revised UCLR= 0.082
Revised LCLR = 24.09. Plot the control charts.
Now the 9 samples show statistical control of the processProf G.R.C. NairProf G.R.C. Nair
![Page 45: 5a. SPC- Variables Chart.ppt](https://reader031.fdocuments.in/reader031/viewer/2022020320/55cf9770550346d033919f2e/html5/thumbnails/45.jpg)
Prof G.R.C. NairProf G.R.C. Nair