QUSAHWIRA FULL FIELD DEVELOPMENT PROJECT ADCO PROJECT No. P-14364
ADCO CONTRACT NO.: 7278.01/EC 10737 NPCC PROJECT No.: 9063
STRESS CRITICAL LINE LIST- CDS
ADCO DOCUMENT No.: 58.01.17.1601
I 16-11-2010 VD VS AS ISSUE FOR IDC
REV. DATE ORIGINATOR REVIEWED APPROVED APPROVED
NPCC DESCRIPTION
THIS DOCUMENT IS INTENDED FOR USE BY ADCO AND ITS NOMINATED CONSULTANTS, CONTRACTORS, MANUFACTURERS AND SUPPLIERS.
EPC CONTRACTOR: NATIONAL PETROLEUM CONSTRUCTION COMPANY P.O. BOX 2058, ABU DHABI, UNITED ARAB EMIRATES
____________________________________________________________________
ENGINEER: ENGINEERS INDIA LIMITED , NEW DELHI, INDIA
ADCO DOC. No 58.01.17.1601 CONTRACTOR DOC No.: A049-001-16-43-LL-0001 PAGE: 1 OF 6
DOCUMENT TITLE:
STRESS CRITICAL LINE LIST- CDS
PROJECT No. :P 14364
ADCO DOC.No.: 58.01.17.1601
REV : I DATE: 16 -Nov- 10
CONTRACTOR DOC. No. A049-001-16-43-LL-0001 PAGE: 2 OF 6
TABLE OF CONTENTS
1.0 PROJECT INTRODUCTION ..................................................................................... 3
2.0 PROJECT SCOPE .................................................................................................... 3
3.0 PURPOSE ................................................................................................................. 4
4.0 REFERENCES .......................................................................................................... 5
5.0 DOCUMENT PRECEDENCE .................................................................................... 5
6.0 CRITICAL LINE SELECTION CRITERIA ................................................................. 6
7.0 CRITICALITY CODES............................................................................................... 6
ANNEXURE-1 CRITICAL LINE LIST-CDS -QUSAHWIRA
ANNEXURE-2 CRITICAL LINE LIST-CDS FLARE –QUSAHWIRA
ANNEXURE-3 CRITICAL LINE LIST-CDS –ASAB
STRESS CRITICAL LINE
CONTRACTOR
1.0 PROJECT INTRODUCTION
ADCO has been chartered by their shareholders to expand sustainable crude oil production from its current level of 1.4 million barrels oil per day (MMBOPD) to 1.8 MMBOPD. Accordingly, ADCO has undertaken projects for development of its marginal fields to hachieve this target, which involves increasing production at existing Bab & Northfields and beginning productions from two new oil fields, namely, Bida Al Qemzan & Qusahwira. Qusahwira is a new undeveloped field located about 80 Km Soutfield and approximately 200 km southQusahwira field is depicted in Figure 1
The development drilling commenced at the end of year 2006 & full field develobe completed in two phases. The development under Phaseblock of the field, which involves developing Thamama Zones A/B and F. The first phase of Qusahwira project will contribute 30 MBOPD to 1.8 MMBOPD scheme from period of about five years. After completion of second phase, its total production shall increase to 42.47 MBOPD. Additionally, 20 MBOPD from Mender and South East fields shall be implemented in future.
2.0 PROJECT SCOPE
The Phase-1 of Qusahwira Full Field Development Project shall have facilities at three locations and an interface with the existing Asab oil field. Broadly, the following facilities are part of Phase-1 project:
DOCUMENT TITLE:
STRESS CRITICAL LINE LIST- CDS
PROJECT No
ADCO DOC.
REV : I
OR DOC. No. A049-001-16-43-LL-0001 PAGE:
PROJECT INTRODUCTION
ADCO has been chartered by their shareholders to expand sustainable crude oil production from its current level of 1.4 million barrels oil per day (MMBOPD) to 1.8 MMBOPD. Accordingly, ADCO has undertaken projects for development of its marginal fields to hachieve this target, which involves increasing production at existing Bab & Northfields and beginning productions from two new oil fields, namely, Bida Al Qemzan &
Qusahwira is a new undeveloped field located about 80 Km Southeast of existing Asab oil field and approximately 200 km south-southeast of Abu Dhabi city. The location of the Qusahwira field is depicted in Figure 1-1 below:
Figure 1-1
The development drilling commenced at the end of year 2006 & full field develobe completed in two phases. The development under Phase-1 is limited to the southern block of the field, which involves developing Thamama Zones A/B and F. The first phase of Qusahwira project will contribute 30 MBOPD to 1.8 MMBOPD scheme from period of about five years. After completion of second phase, its total production shall increase to 42.47 MBOPD. Additionally, 20 MBOPD from Mender and South East fields shall
ira Full Field Development Project shall have facilities at three locations and an interface with the existing Asab oil field. Broadly, the following facilities are
PROJECT No. :P 14364
ADCO DOC.No.: 58.01.17.1601
DATE: 16 -Nov- 10
3 OF 6
ADCO has been chartered by their shareholders to expand sustainable crude oil production from its current level of 1.4 million barrels oil per day (MMBOPD) to 1.8 MMBOPD. Accordingly, ADCO has undertaken projects for development of its marginal fields to help achieve this target, which involves increasing production at existing Bab & North-East Bab oil fields and beginning productions from two new oil fields, namely, Bida Al Qemzan &
heast of existing Asab oil southeast of Abu Dhabi city. The location of the
The development drilling commenced at the end of year 2006 & full field development shall 1 is limited to the southern
block of the field, which involves developing Thamama Zones A/B and F. The first phase of Qusahwira project will contribute 30 MBOPD to 1.8 MMBOPD scheme from year 2013 for a period of about five years. After completion of second phase, its total production shall increase to 42.47 MBOPD. Additionally, 20 MBOPD from Mender and South East fields shall
ira Full Field Development Project shall have facilities at three locations and an interface with the existing Asab oil field. Broadly, the following facilities are
DOCUMENT TITLE:
STRESS CRITICAL LINE LIST- CDS
PROJECT No. :P 14364
ADCO DOC.No.: 58.01.17.1601
REV : I DATE: 16 -Nov- 10
CONTRACTOR DOC. No. A049-001-16-43-LL-0001 PAGE: 4 OF 6
- Constructing a new Central Degassing Station (CDS) at Qusahwira. It shall include
facilities as below: o Inlet manifolds for receiving production transfer line from a new Remote
Degassing Station (RDS-1) & two direct production flow lines o Multi phase flow meters (MPFMs) o Two trains of three phase production separators o Two trains of four stage gas compression o Gas injection directly to four gas injection wells o Two glycol contactors & one common glycol regeneration o Vapor recovery compressor package o Produced water treatment & disposal to five disposal wells o Main oil Line (MOL) booster pumps and MOL pumps for exporting crude oil
to Asab CDS o Various supporting utilities & chemical injections systems.
- Constructing a new Remote Degassing Station (RDS-1) at approximately 9.2 km southwest of the new Qusahwira CDS. The RDS -1 shall gather & test 22 production flow lines and deliver the raw crude to the Qusahwira CDS. This shall also serve as distribution points for injection gas from the Qusahwira CDS to 5 gas injection wells in Thamama A/B zone for pressure maintenance besides various supporting utilities and chemical injection facilities.
- Constructing two new Water Injection Clusters (WIC-1 and WIC2) southwest of the
Qusahwira CDS for water injection to oil wells in Thamama F zone for pressure maintenance including chemical injection facilities. Four wells shall be served from WIC-1 and one well from WIC-2.
- Constructing a 20” production fluid transfer line from RDS-1 to the CDS
- Constructing a 6” gas injection trunk line from the CDS to RDS-1for distribution to
gas injection wells.
- Constructing 22 flow lines from producing wells to RDS-1 and 2 flow lines directly to
the CDS and constructing 5 gas injection flow lines from RDS-1 and 4 gas injection lines directly from the CDS.
- Constructing a 14” Main Oil Line (MOL) to the CDS at Asab oil field. - Providing expandability for future facilities at CDS to support 62.47 MBOPD crude
oil production at Qusahwira by:
• Providing plot space for a third train of production separator, a third train of gas compression, gas dehydration & glycol regeneration, additional water separation tanks and additional produced water disposal pumps.
• Providing utility systems for both phase-1 and phase-2
3.0 PURPOSE
The purpose of this document is to identify the stress critical lines present in CDS / CDS FLARE / CDS ASAB depending on stress critical line criteria mentioned in Doc. No. 58.99.23.1602.
DOCUMENT TITLE:
STRESS CRITICAL LINE LIST- CDS
PROJECT No. :P 14364
ADCO DOC.No.: 58.01.17.1601
REV : I DATE: 16 -Nov- 10
CONTRACTOR DOC. No. A049-001-16-43-LL-0001 PAGE: 5 OF 6
4.0 REFERENCES
The following documents shall be referred.
• 58.01.04.1601 CDS Overall Plot Plan • 58.39.04.1601 CDS Flare Overall Plot Plan • 31.38.01.11 -Gen Piping General Requirements (SHELL DEP) • 31.38.01.29 -Gen Pipe Supports (SHELL DEP) • 30.99.12.0023 Plant Layout and Piping Basis of Design (ADCO STD) • 58.99.12.1602 Specification for Piping Flexibility Analysis • 58.99.91.2701 Piping Design Basis • 58.99.12.1601 Piping Material Class Specification • 58.99.23.1602 Stress Critical Line Philosophy • 58.01.17.1601 Piping Line List - CDS • 58.39.17.1601 Piping Line List – Offsite Flares • 14.01.17.1601 Piping Line List - Asab CDS • -- Process & Utilities P&IDs -CDS 5.0 DOCUMENT PRECEDENCE
In case of any conflict between documentation, the following order of precedence shall apply:
• The Laws, Standards and Regulation of United Arab Emirates.
• ADNOC Codes of Practice.
• This Project Specification.
• Approved Technical Deviations.
• ADCO Procedures, Codes & Standards.
• ADCO Specifications and Engineering Practices.
• ADCO Amendments & Supplements to Shell DEPs.
• Shell DEPs (v26).
• International Oil & Gas Industry Codes, Standard and Recommended practices (all where specified in the above or, where none of the above is applicable, as proposed by Contractor and Approved by ADCO).
• Internationally recognised Oil & Gas Industry sound practices.
DOCUMENT TITLE:
STRESS CRITICAL LINE LIST- CDS
PROJECT No. :P 14364
ADCO DOC.No.: 58.01.17.1601
REV : I DATE: 16 -Nov- 10
CONTRACTOR DOC. No. A049-001-16-43-LL-0001 PAGE: 6 OF 6
6.0 CRITICAL LINE SELECTION CRITERIA
The stress critical line list as per Annexure-1, 2, 3 identifies lines from the process issued piping line lists which meet the criticality criteria as mentioned in clause 7.0 of critical line philosophy Doc No: 58.99.23.1602. Lines on the piping line list are identified as either category 1, 2, 3 or 4. Lines which are identified in category 1, 2, & 3 are listed in critical line list. Lines identified with criticality category 4 have not been included in critical line list unless otherwise they form a part of stress system with lines in criticality category 1, 2, or 3. Such line shall be included in stress system till nearest isolation point. Criticality codes also mentioned for each line depending on the equipment to which they are connected.
The stress critical lines have been grouped under different stress analysis piping systems, based on the layout/ P&ID etc. The system number for each line is indicated in the stress critical line list.
The lines appearing in the list as per Annexure-1, 2, 3 shall be stress analyzed for most stringent category meeting the requirement of specification for piping flexibility analysis Doc No: 58.99.12.1602.
7.0 CRITICALITY CODES
Criticality codes appearing in the Critical Line List are specified as follows:
P = Pumps
K = Compressors
A = Air Fin Cooler
C = Column
TK = Tankage
S = Safety / Relief Valves
O = Others
MSM = Multiselector Manifold
DOCUMENT TITLE:
STRESS CRITICAL LINE LIST- CDS
PROJECT No. :P 14364
ADCO DOC.No.: 58.01.17.1601
REV : I DATE: 16 -Nov- 10
CONTRACTOR DOC. No. A049-001-16-43-LL-0001 PAGE: TOP SHEET
ANNEXURE-1
STRESS CRITICAL LINE LIST- CDS-QUSAHWIRA
ANNEXURE-1
QUSAHWIRA FULL FIELD DEVELOPEMENT PROJECT
CRITICAL LINE LIST -CDS- QUSAHWIRA
SL NO. SYSTEM NO.PLANT
AREALINE NUMBER STREAM DESCRIPTION OPERATING CONDITION
TEST
MEDIUMP&ID No.
CRITICALITY
CODE
TYPE OF
FLOW
REMARKS
SIZE (INCH)
SERVICE
SERIAL NUMBER
PIPING CLA
SS
INSULA
TION
FROM TO
FLO
W MEDIUM
NORMAL
PRESSURE barg
NORMAL TEMP.OC
DESIGN
PRESSURE barg
DESIGN TEMP.OC
CATEGORY
1
CATEGORY
2
CATEGORY
3
CATEGORY
4
1 01-02PG0033 01 2 PG 0033 093451Z N V-3113 3RD STAGE SUCTION DRUM 3"-VG-0083-013421X-N Process Gas 33.20 65 109.2 180/-70 WATER58.01.08.1637 Sht
1/3O 2
2 01-02PG0044 01 2 PG 0044 253451Z N V-3114 4TH STAGE SUCTION DRUM 3"-VG-0090-033421X-N Process Gas 87.60 65 227 180/-90 WATER58.01.08.1638 Sht
1/3O 2 3
3 01-02PG0094 01 2 PG 0094 093451Z N V-3123 3RD STAGE SUCTION DRUM 3"-VG-0114-013421X-N Process Gas 34.20 65 109.2 180/-70 WATER58.01.08.1643 Sht
1/3O 2 3
4 01-02PG0095 01 2 PG 0095 253451Z N V-3124 4TH STAGE SUCTION DRUM 3"-VG-0121-033421X-N Process Gas 87.60 65 227 180/-90 WATER58.01.08.1644 Sht
1/3O 2 3
01 3 DF 0002 011412Z N T-6301 DIESEL TANK P-6301-01 DIESEL TRANSFER PUMP Diesel Fuel ATM 58 0.06 85 WATER 58.01.08.1673 TK 2 4
01 3 DF 0003 011412Z N 3"-DF-0002-011412Z-N P-6301-02 DIESEL TRANSFER PUMP Diesel Fuel ATM 58 0.06 85 WATER 58.01.08.1673 p 2 4
01 3 DF 0004 011412Z N P-6301-01 DIESEL TRANSFER PUMP S-6301 DIESEL FINE FILTER Diesel Fuel 3.50 58 5 85 WATER 58.01.08.1673 P 2 4
01 3 DF 0005 011412Z N P-6301-02 DIESEL TRANSFER PUMP 3"-DF-0004-011412Z-N Diesel Fuel 3.50 58 5 85 WATER 58.01.08.1673 P 2 4
01 3 DF 0006 011412Z N 3"-DF-0004-011412Z-N T-6301 DIESEL TANK Diesel Fuel 3.50 58 5 85 WATER 58.01.08.1673 P 2 4
01 3 DF 0007 011412Z N 3"-DF-0005-011412Z-N T-6301 DIESEL TANK Diesel Fuel 3.50 58 5 85 WATER 58.01.08.1673 P 2 4
01 3 DF 0008 011412Z N S-6301 DIESEL FINE FILTER T-4201 DIESEL DAY TANK Diesel Fuel 3.50 58 5 85 WATER 58.01.08.1673 P 2 4
01 3 DF 0011 011412Z N 3"-DF-0008-011412Z-N FIRE WATER PUMP DAY TANK Diesel Fuel 3.50 58 5 85 WATER58.01.08.1673 /
58.01.08.1678P 2 4
8 01-03HC0001 01 3 HC 0001 038220X N V-3112-01 2ND STAGE SUCTION DRUM 3"-HC-0015-031441X-NHydrocarbon
Condensate8.20 55 19 180/-20 WATER
58.01.08.1634 Sht
1/3O 3 4
9 01-03HC0004 01 3 HC 0004 093451Z N V-3113 3RD STAGE SUCTION DRUM 3"-HC-0004-093451Z-N, 2"-D-0107-098220X-NHydrocarbon
Condensate33.20 65 109.2 180/-70 WATER
58.01.08.1637 Sht
1/3O 3 4
10 01-03HC0021 01 3 HC 0021 038220X N V-3122-01 2ND STAGE SUCTION DRUM 3"-HC-0016-031441X-N, 2"-D-0117-038220X-NHydrocarbon
Condensate8.20 55 19 180/-20 WATER
58.01.08.1640 Sht
1/3O 3 4
11 01-03HC0024 01 3 HC 0024 093451Z N V-3123 3RD STAGE SUCTION DRUM 3"-HC-0013-031441X-N, 2"-D-0123-098220X-NHydrocarbon
Condensate33.20 65 109.2 180/-70 WATER
58.01.08.1643 Sht
1/3O 3 4
12 01-03PG0009 01 3 PG 0009 038220X N V-3111 1ST STAGE SUCTION DRUM 2"-VG-0066-011503Z-N Process Gas 1.50 60 19 180/-20 WATER58.01.08.1633 Sht
1/3O 3 4
13 01-03PG0057 01 3 PG 0057 038220X N V-3121 1ST STAGE SUCTION DRUM 4"-VG-0097-011503Z-N Process Gas 1.50 60 19 180/-20 WATER58.01.08.1639 Sht
1/3O 3 4
01 2 PO 0073 016620X N V-1510 RECOVERED OIL COLLECTION TANK 3"-PO-0074-038220X-N Process Oil 3.74 60 15.6 85 WATER 58.01.08.1662 O 2 4
01 3 PO 0073 038220X N 2"-PO-0073-016620X-N 3"-PO-0074-038220X-N Process Oil 4.50 65 47.1 93 WATER 58.01.08.1662 O 2 4
01 2 PO 0074 016620X N V-1510 RECOVERED OIL COLLECTION TANK V-1510 RECOVERED OIL COLLECTION TANK Process Oil 3.74 60 15.6 85 WATER 58.01.08.1662 O 2 4
01 3 PO 0074 038220X N 2"-PO-0074-016620X-N 3"-PO-0084-031441X-N Process Oil 4.50 65 47.1 93 WATER
58.01.08.1662,
58.01.08.1627 Sht
2/2
O 2 4
01 2 PO 0288 016620X N 2"-PO-0073-016620X-N V-1510 RECOVERED OIL COLLECTION TANK Process Oil 4.50 65 47.1 93 WATER 58.01.08.1662 O 2 4
01 2 PO 0289 016620X N 2"-PO-0074-016620X-N V-1510 RECOVERED OIL COLLECTION TANK Process Oil 4.50 65 47.1 93 WATER 58.01.08.1662 O 2 4
01 3 PO 0077 031502Z N V-6702 PROCESS DRAIN DRUM6"-PO-0081-031441X-N, 6"-PO-0080-031441X-N, 6"-PO-0079-
031441X-NProcess Oil 7.12 60 47.1 85 WATER 58.01.08.1666 O 2 4
01 2 PO 0078 031502Z N 3"-PO-0077-031440X-N V-6702 PROCESS DRAIN DRUM Process Oil 7.12 60 47.1 85 WATER 58.01.08.1666 O 2 4
01 3 PO 0294 031502Z N P-6702-02 PROCESS DRAIN PUMP 3"-PO-0077-031503Z-N Process Oil 7.12 60 47.1 85 WATER 58.01.08.1666 P 2 4
CATEGORY FOR STRESS CRITICALITY
7
5
6
14
15
01-03DF0002
01-03DF0004
01-03DF0008
01-03PO0074
01-03PO0077
ADCO DOC. NO: 58.01.17.1601, REV- I
CONTRACTOR DOC. NO: A049-001-16-43-LL-0001 PAGE 1 OF 13
ANNEXURE-1
QUSAHWIRA FULL FIELD DEVELOPEMENT PROJECT
CRITICAL LINE LIST -CDS- QUSAHWIRA
SL NO. SYSTEM NO.PLANT
AREALINE NUMBER STREAM DESCRIPTION OPERATING CONDITION
TEST
MEDIUMP&ID No.
CRITICALITY
CODE
TYPE OF
FLOW
REMARKS
SIZE (INCH)
SERVICE
SERIAL NUMBER
PIPING CLA
SS
INSULA
TION
FROM TO
FLO
W MEDIUM
NORMAL
PRESSURE barg
NORMAL TEMP.OC
DESIGN
PRESSURE barg
DESIGN TEMP.OC
CATEGORY
1
CATEGORY
2
CATEGORY
3
CATEGORY
4
CATEGORY FOR STRESS CRITICALITY
01 2 PO 0295 031502Z N 3"-PO-0294-031502Z-N V-6702 PROCESS DRAIN DRUM Process Oil 7.12 60 47.1 85 WATER 58.01.08.1666 O 2 4
16 01-03VG0317 01 3 VG 0317 018220X N V-3802 MECHANICAL SEAL POT PSV-3801-01 A/B Vent Gas 7 225/4 AIR58.01.08.1663
Sht2/2S 3 4
17 01-03VG0319 01 3 VG 0319 018220X N V-3801 THREE PHASE SEPARATOR PSV-3801-02 A/B Vent Gas 7 225/4 AIR58.01.08.1663
Sht2/2S 3 4
01 4 PG 0046 251503Z P XD-3114-02 4TH STAGE DISCHARGE DAMPENER E-3114-02 4TH STAGE COOLER Process Gas 247.80 137 302.2 180/-45 WATER
58.01.08.1638 Sht
2/3 / 58.01.08.1638
Sht 3/3
A 2 3
01 4 PG 0047 251503Z P 4"-PG-0046-251503Z-P 6"-VG-0096-031503Z-N Process Gas 247.80 137 302.2 180/-45 WATER58.01.08.1638 Sht
3/3O 2 3
01 2 PG 0048 251503Z P 4"-PG-0047-251503Z-P 2"-VG-0095-253451Z-N Process Gas 247.80 137 302.2 180/-45 WATER58.01.08.1638 Sht
3/3O 2 3
01 2 PG 0050 251503Z P 4"-PG-0047-251503Z-P 3"-VG-0217-033421X-N Process Gas 247.80 137 302.2 180/-45 WATER58.01.08.1638 Sht
3/3O 2 3
01 4 PG 0052 251503Z P 4"-PG-0046-251503Z-N 4"-PG-0054-251503Z-N Process Gas 247.80 136 302.2 180/-45 WATER58.01.08.1638 Sht
3/3O 2 3
01 2 VG 0095 253451Z N 2-PG-0048-251503Z-P 3"-VG-0217-033421X-N Vent Gas 247.80 137 302.2 180/-90 WATER58.01.08.1638 Sht
3/3O 2 3
19 01-02VG0126 01 2 VG 0126 253451Z N 4"-PG-0090-251503Z-P 3"-VG-0219-033421X-N Vent Gas 248.30 133 302.2 180/-50 WATER58.01.08.1644 Sht
3/3S 2 3
20 01-04PO0001 01 4 PO 0001 151441X N 4"-PO-0223-151441R-N M-0201 INLET MANIFOLD Process Oil 6.00 85 219.5 93 WATER58.01.08.1624 Sht
1/2MSM 2 4 2-PHASE
21 01-04PO0002 01 4 PO 0002 151441X N 4"-PO-0224-151441R-N M-0201 INLET MANIFOLD Process Oil 6.00 85 219.5 93 WATER58.01.08.1624 Sht
1/2MSM 2 4 2-PHASE
22 01-04PO0003 01 4 PO 0003 151441X N FUTURE LINE M-0201 INLET MANIFOLD Process Oil 6.00 85 219.5 93 WATER58.01.08.1624 Sht
1/2MSM 2 4 2-PHASE
23 01-04PO0004 01 4 PO 0004 151441X N FUTURE LINE M-0201 INLET MANIFOLD Process Oil 6.00 85 219.5 93 WATER58.01.08.1624 Sht
1/2MSM 2 4 2-PHASE
24 01-04PO0005 01 4 PO 0005 151441X N FUTURE LINE M-0201 INLET MANIFOLD Process Oil 6.00 85 219.5 93 WATER58.01.08.1624 Sht
1/2MSM 2 4 2-PHASE
25 01-04PO0006 01 4 PO 0006 151441X N FUTURE LINE M-0201 INLET MANIFOLD Process Oil 6.00 85 219.5 93 WATER58.01.08.1624 Sht
1/2MSM 2 4 2-PHASE
26 01-04PO0007 01 4 PO 0007 151441X N FUTURE LINE M-0201 INLET MANIFOLD Process Oil 6.00 85 219.5 93 WATER58.01.08.1624 Sht
1/2MSM 2 4 2-PHASE
27 01-04PO0008 01 4 PO 0008 151441X N FUTURE LINE M-0202 INLET MANIFOLD Process Oil 6.00 85 219.5 93 WATER58.01.08.1624 Sht
2/2MSM 2 4 2-PHASE
28 01-04PO0009 01 4 PO 0009 151441X N FUTURE LINE M-0202 INLET MANIFOLD Process Oil 6.00 85 219.5 93 WATER58.01.08.1624 Sht
2/2MSM 2 4 2-PHASE
29 01-04PO0010 01 4 PO 0010 151441X N FUTURE LINE M-0202 INLET MANIFOLD Process Oil 6.00 85 219.5 93 WATER58.01.08.1624 Sht
2/2MSM 2 4 2-PHASE
30 01-04PO0011 01 4 PO 0011 151441X N FUTURE LINE M-0202 INLET MANIFOLD Process Oil 6.00 85 219.5 93 WATER58.01.08.1624 Sht
2/2MSM 2 4 2-PHASE
31 01-04PO0012 01 4 PO 0012 151441X N FUTURE LINE M-0202 INLET MANIFOLD Process Oil 6.00 85 219.5 93 WATER58.01.08.1624 Sht
2/2MSM 2 4 2-PHASE
32 01-04PO0013 01 4 PO 0013 151441X N FUTURE LINE M-0202 INLET MANIFOLD Process Oil 6.00 85 219.5 93 WATER58.01.08.1624 Sht
2/2MSM 2 4 2-PHASE
33 01-04PO0014 01 4 PO 0014 151441X N FUTURE LINE M-0202 INLET MANIFOLD Process Oil 6.00 85 219.5 93 WATER58.01.08.1624 Sht
2/2MSM 2 4 2-PHASE
01 4 PO 0016 151441X N M-0201 INLET MANIFOLD 4"-PO-0021-151441X-N TEST HEADER Process Oil 5.00 80 219.5 93 WATER58.01.08.1624 Sht
1/2MSM 2 4 2-PHASE
01 4 PO 0018 151441X N M-0202 INLET MANIFOLD 4"-PO-0021-151441X-N TEST HEADER Process Oil 5.00 80 219.5 93 WATER58.01.08.1624 Sht
2/2MSM 2 4 2-PHASE
01 4 PO 0021 151441X N TEST HEADER FT-0201 MULTIPHASE FLOW METER Process Oil 5.00 80 219.5 93 WATER58.01.08.1625 Sht
1/2MSM 2 4 2-PHASE
01 4 PO 0022 151441X N 4"-PO-0021-151441X-N, 4"-PO-0023-151441X-N 4"-PO-0021-151441X-N, 4"-PO-0023-151441X-N Process Oil 5.00 80 219.5 93 WATER58.01.08.1625 Sht
1/2MSM 2 4 2-PHASE
34
18 01-04PG0046
01-04PO0021
HOLD (BY VRC
VENDOR)
HOLD (BY VRC
VENDOR)
ADCO DOC. NO: 58.01.17.1601, REV- I
CONTRACTOR DOC. NO: A049-001-16-43-LL-0001 PAGE 2 OF 13
ANNEXURE-1
QUSAHWIRA FULL FIELD DEVELOPEMENT PROJECT
CRITICAL LINE LIST -CDS- QUSAHWIRA
SL NO. SYSTEM NO.PLANT
AREALINE NUMBER STREAM DESCRIPTION OPERATING CONDITION
TEST
MEDIUMP&ID No.
CRITICALITY
CODE
TYPE OF
FLOW
REMARKS
SIZE (INCH)
SERVICE
SERIAL NUMBER
PIPING CLA
SS
INSULA
TION
FROM TO
FLO
W MEDIUM
NORMAL
PRESSURE barg
NORMAL TEMP.OC
DESIGN
PRESSURE barg
DESIGN TEMP.OC
CATEGORY
1
CATEGORY
2
CATEGORY
3
CATEGORY
4
CATEGORY FOR STRESS CRITICALITY
01 4 PO 0023 151441X N TEST HEADER FT-0202 MULTIPHASE FLOW METER Process Oil 5.00 80 219.5 93 WATER58.01.08.1625 Sht
1/2MSM 2 4 2-PHASE
35 01-06FG0001 01 6,4 FG 0001 018220X H V-3201 FUEL GAS SCRUBBER ; 4"-FG-0087-018220X-N FUEL GAS DISTRIBUTION HEADER Fuel Gas 3.00 60 15.6 85/-1 WATER 58.01.08.1667 O 3 4
36 01-06IA0006 01 6 IA 0006 018011X N V-6111 INSTRUMENT AIR RECEIVER PSV-6111-01 Instrument Air 9.00 40 11.55 85/4 WATER58.01.08.1668
Sht2/2S 3 4
37 01-06IA0007 01 6 IA 0007 018011X N PSV-6111-01 TO ATM Instrument Air ATM 65 3.5 85 WATER58.01.08.1668
Sht2/2S 3 4
38 01-06NN0008 01 6 NN 0008 011412Z N V-6901 NITROGEN RECEIVER PSV-6901-01 Nitrogen 8.00 40 11.55 85/4 WATER58.01.08.1670 Sht
3/3S 3 4
01 6 PA 0001 018011X N K-6101/02/03/04 INSTRUMENT AIR COMPRESSORS V-6110 PLANT AIR RECEIVER Plant Air 9.50 40 11.55 85/4 WATER58.01.08.1668
Sht1/2K 3 4
01 6 PA 0002 018011X N 6"-PA-0001-018011X-N 2"-PA-0003-018011X-N Plant Air 9.50 40 11.55 85/4 WATER 58.01.08.1668
Sht1/2O 3 4
01 2 PA 0003 018011X N V-6110 PLANT AIR RECEIVER 4"-PA-0004-018011X-N, UTILITY STATIONS Plant Air 9.50 40 11.55 85/4 WATER58.01.08.1668
Sht1/2O 2 4
01 4 PA 0004 018011X N 2"-PA-0003-018011X-N D-6101-01/02 INSTRUMENT AIR DRYERS Plant Air 9.50 40 11.55 85/4 WATER58.01.08.1668
Sht1/2O 2 4
40 01-06PA0005 01 6 PA 0005 018011X N V-6110 PLANT AIR RECEIVER PSV-6110-01 Plant Air 9.50 40 11.55 85/4 WATER58.01.08.1668
Sht1/2S 3 4
41 01-06PA0006 01 6 PA 0006 018011X N PSV-6110-01 TO ATM Plant Air ATM 65 3.5 85 WATER 58.01.08.1668 S 3 4
42 01-06PG0024 01 6 PG 0024 068220X N V-3112-02 2nd STAGE DISCHARGE DRUM 8"-VG-0076-011503Z-N Process Gas 34.20 65 46.9 180/-20 WATER 58.01.08.1635 O 3 4
01 6 PG 0045 253451Z H
V-3114 4TH STAGE SUCTION DRUM, ST-3114-01 4TH
STAGE SUCTION STRAINER, ST-3114-02 4TH STAGE
SUCTION STRAINER
XD-3114-01 4TH STAGE SUCTION DAMPENER Process Gas 87.60 65 227 180/-90 WATER
58.01.08.1638 Sht
1/3 / 58.01.08.1638
Sht 2/3
O 2 3
01 2 VG 0094 253451Z N ST-3114-01/02 4TH STAGE SUCTION STRAINER 2"-VG-0094-033421X-N Vent Gas 87.60 65 227 180/-90 AIR58.01.08.1638 Sht
2/3O 2 3
44 01-06PG0071 01 6 PG 0071 068220X N V-3122-02 2nd STAGE DISCHARGE DRUM 8"-VG-0107-011503Z-N Process Gas 34.20 65 46.9 180/-20 WATER 58.01.08.1641 O 3 4
01 6 PG 0088 253451Z H V-3124 4TH STAGE SUCTION DRUM
ST-3124-02 4TH STAGE SUCTION STRAINER, ST-3124-01 4TH
STAGE SUCTION STRAINER, XD-3124-01 4TH STAGE SUCTION
DAMPENER
Process Gas 87.60 65 227 180/-90 WATER
58.01.08.1644 Sht
1/3 / 58.01.08.1644
Sht 2/3
O 2 3
01 2 VG 0125 253451Z NST-3124-02 4TH STAGE SUCTION STRAINER, ST-3124-01
4TH STAGE SUCTION STRAINER2"-VG-0125-033421X-N Vent Gas 87.60 65 227 180/-90 AIR
58.01.08.1644 Sht
2/3O 2 3
01 6 PO 0075 038220X N P-6701-01 CLOSED DRAIN RETURN PUMPS 6"-PO-0082-031441X-N Process Oil 7.30 60 47.1 85 WATER 58.01.08.1665 P 2 4
01 3 PO 0076 038220X N 6"-PO-0075-038220X-N V-6701 CLOSED DRAIN DRUM Process Oil 7.30 60 47.1 85 WATER 58.01.08.1665 O 2 4
01 6 PO 0081 031441X N
6"-PO-0086-031441X-N, 2"-HC-0030-031441X-N, 6"-PO-0085-
031441X-N, 2"-HC-0035-031441X-N, 2"-PO-0083-031441X-
N,3"-PO-0084-031441X-N,4"-PO-0082-031441X-N,3"-HC-0011-
031441X-N,2"-HC-0012-031441X-N,2"-HC-0013-031441X-N,2"-
HC-0015-031441X-N
6"-PO-0081-031441X-N Process Oil 5.00 60 47.1 93 WATER 58.01.08.1627 Sht
2/2O 3 4
01 4 PO 0082 031441X N 6"-PO-0075-038220X-N6"-PO-0081-031441X-N, 6"-PO-0080-031441X-N, 6"-PO-0079-
031441X-NProcess Oil 5.00 60 47.1 93 WATER
58.01.08.1627 Sht
2/2O 2 4
01 6 PO 0290 038220X N P-6701-02 CLOSED DRAIN RETURN PUMP 6"-PO-0075-038220X-N Process Oil 7.30 60 47.1 85 WATER 58.01.08.1665 P 3 4
01 3 PO 0291 038220X N 6"-PO-0290-038220X-N V-1510 RECOVERED OIL COLLECTION TANK Process Oil 7.30 60 47.1 85 WATER 58.01.08.1665 O 2 4
01 6 PW 0022 038220X N 6"-PO-0075-038220X-N 6"-PW-0022-016620X-N Produced Water 7.30 60 17 85/-1 WATER58.01.08.1659 Sht
1/4O 3 4
47 01-06VG0180 01 6 VG 0180 011502Z N V-1510 RECOVERED OIL COLLECTION TANK 6"-VG-0181-011503Z-N Vent Gas 0.02 60 3.5 85 WATER 58.01.08.1662 S 2 4
48 01-06VG0184 01 6 VG 0184 011503Z N V-6701 CLOSED DRAIN DRUM 6"-VG-0185-011503Z-N Vent Gas 0.20 85 7 150 WATER 58.01.08.1665 S 2 3
39
43
45
46
01-06PA0001
01-06PG0045
01-06PG0088
01-06PO0075
ADCO DOC. NO: 58.01.17.1601, REV- I
CONTRACTOR DOC. NO: A049-001-16-43-LL-0001 PAGE 3 OF 13
ANNEXURE-1
QUSAHWIRA FULL FIELD DEVELOPEMENT PROJECT
CRITICAL LINE LIST -CDS- QUSAHWIRA
SL NO. SYSTEM NO.PLANT
AREALINE NUMBER STREAM DESCRIPTION OPERATING CONDITION
TEST
MEDIUMP&ID No.
CRITICALITY
CODE
TYPE OF
FLOW
REMARKS
SIZE (INCH)
SERVICE
SERIAL NUMBER
PIPING CLA
SS
INSULA
TION
FROM TO
FLO
W MEDIUM
NORMAL
PRESSURE barg
NORMAL TEMP.OC
DESIGN
PRESSURE barg
DESIGN TEMP.OC
CATEGORY
1
CATEGORY
2
CATEGORY
3
CATEGORY
4
CATEGORY FOR STRESS CRITICALITY
49 01-08NN0009 01 8 NN 0009 011412Z N PSV-6901-01 VENT TO SAFE LOCATION Nitrogen ATM 65 3.5 85/4 WATER58.01.08.1670 Sht
3/3S 3 4
01 8 PG 0018 061502Z P XD-3112-02 2ND STAGE DISCHARGE DAMPENER E-3112 2ND STAGE COOLER Process Gas 35.00 139 46.9 180/-20 WATER
58.01.08.1634 Sht
2/3 /
58.01.08.1634 Sht
3/3
A 2 3 4
01 8 PG 0019 061502Z P 8"-PG-0018-061502Z-P 10"-VG-0075-011503Z-N Process Gas 35.00 139 46.9 180/-20 WATER58.01.08.1634 Sht
3/3O 3 4
01 2 PG 0020 061502Z P 8"-PG-0019-061502Z-P 3"-VG-0075-011503Z-N Process Gas 35.00 139 46.9 180/-20 WATER58.01.08.1634 Sht
3/3O 3 4
01 8 PG 0021 068220X P 8"-PG-0018-061502Z-P 8"-PG-0023-068220X-P Process Gas 34.20 65 46.9 180/-20 WATER58.01.08.1634 Sht
3/3O 3 4
01 8 PG 0023 068220X N E-3112 2ND STAGE COOLER V-3112-02 2ND STAGE DISCHARGE DRUM Process Gas 34.20 65 46.9 180/-20 WATER
58.01.08.1634 Sht
3/3 /
58.01.08.1635
A 2 3 4
01 2, 8 PG 0025 068220X N V-3112-02 2nd STAGE DISCHARGE DRUM C-3111-01 GLYCOL CONTACTOR Process Gas 34.20 65 46.9 180/-20 WATER58.01.08.1635 /
58.01.08.1636C 3 4
01 8 PG 0026 068220X N 8"-PG-0025-068220X-N 12"-PG-0027-038220X-N Process Gas 34.20 65 46.9 180/-20 WATER58.01.08.1634 Sht
2/3O 3 4
01 3 HC 0006 253451Z N V-3114 4TH STAGE SUCTION DRUM 8"-PG-0032-253451Z-PHydrocarbon
Condensate87.60 65 227 180/-90 WATER
58.01.08.1638 Sht
1/3 / 58.01.08.1637
Sht 1/3
O 2 3
01 8, 2 PG 0029 061502Z P C-3111-01 GLYCOL CONTACTOR 2"-PG-0029-061502Z-P, 8"-PG-0032-093451Z-P Process Gas 34.20 75 46.9 155 WATER
58.01.08.1636 /
58.01.08.1637 Sht
1/3
C 3 4
012, 8,
10PG 0032 093451Z P 8"-PG-0029-061502Z-P, 2"-PG-0032-093451Z-N V-3113 3RD STAGE SUCTION DRUM Process Gas 33.20 65 109.2 180/-70 WATER
58.01.08.1637 Sht
1/3O 3 4
01 8 PG 0042 093451Z N 6"-PG-0041-153451Z-N 8"-PG-0032-093451Z-P Process Gas 33.20 65 109.2 180/-20 WATER
58.01.08.1637 Sht
2/3 / 58.01.08.1637
Sht 1/3
O 2 4
01 8 PG 0034 093451Z H V-3113 3RD STAGE SUCTION DRUM ST-3113-02 , ST-3113-01 3RD STAGE SUCTION STRAINER Process Gas 33.20 65 109.2 180/-70 WATER
58.01.08.1637 Sht
1/3 / 58.01.08.1637
Sht 2/3
O 2 3
01 2 VG 0086 093451Z N ST-3113-01/02 3RD STAGE SUCTION STRAINER 2"-VG-0086-013421X-N Vent Gas 33.20 65 109.2 180/-50 WATER58.01.08.1637 Sht
2/3O 2 3
01 2 VG 0087 091502Z N 2"-PG-0037-091502Z-P 2"-VG-0039-153451Z-N Vent Gas 89.00 136 119 180/-45 WATER58.01.08.1637 Sht
3/3O 2 3
01 8 PG 0035 091502Z P XD-3113-02 3RD STAGE DISCHARGE DAMPENER E-3113 3RD STAGE COOLER, 6"-PG-0038-153451Z-P Process Gas 89.00 136 119 180/-45 WATER58.01.08.1637 Sht
2/3 / 58.01.08.1637
Sht 3/3
A 2 3
01 4 PG 0036 091502Z P 8"-PG-0035-091502Z-P 2"-PG-0037-091502Z-P, 6"-VG-0088-011503Z-N Process Gas 89.00 136 119 180/-45 WATER58.01.08.1637 Sht
3/3O 2 3
01 2 PG 0037 091502Z P 4"-PG-0036-091502Z-P 2"-VG-0087-091502Z-P Process Gas 89.00 136 119 180/-45 WATER58.01.08.1637 Sht
3/3O 2 3
01 8 PG 0038 153451Z P 8"-PG-0035-091502Z-P 8"-PG-0040-153451Z-N Process Gas 89.00 136 119 180/-70 WATER58.01.08.1637 Sht
3/3O 2 3
01 4,8 PG 0040 153451Z N E-3113 3RD STAGE COOLER 8"-PG-0043-253451Z-N Process Gas 88.00 65 119 180/-70 WATER
58.01.08.1637 Sht
3/3 /
58.01.08.1638 Sht
A 2 3
01 6 PG 0041 153451Z N 8"-PG-0040-153451Z-N 8"-PG-0042-093451Z-N Process Gas 88.00 65 119 180/-70 WATER
58.01.08.1637 Sht
3/3 /
58.01.08.1637 Sht
2/3
O 2 3
01 2, 8 PG 0043 253451Z N 8"-PG-0040-153451Z-N, 2"-PG-0043-253451Z-N V-3114 4TH STAGE SUCTION DRUM Process Gas 87.60 65 227 180/-90 WATER58.01.08.1638 Sht
1/3O 2 3
01 6 PG 0055 253451Z N 4"-PG-0055-251503Z-N 8"-PG-0043-253451Z-N Process Gas 87.60 65 227 180/-90 WATER
58.01.08.1638 Sht
1/3 /
58.01.08.1638 Sht
2/3
O 2 3
50
52
53
54
51 01-08PG0025
01-08PG0029
01-08PG0034
01-08PG0035
01-08PG0018
ADCO DOC. NO: 58.01.17.1601, REV- I
CONTRACTOR DOC. NO: A049-001-16-43-LL-0001 PAGE 4 OF 13
ANNEXURE-1
QUSAHWIRA FULL FIELD DEVELOPEMENT PROJECT
CRITICAL LINE LIST -CDS- QUSAHWIRA
SL NO. SYSTEM NO.PLANT
AREALINE NUMBER STREAM DESCRIPTION OPERATING CONDITION
TEST
MEDIUMP&ID No.
CRITICALITY
CODE
TYPE OF
FLOW
REMARKS
SIZE (INCH)
SERVICE
SERIAL NUMBER
PIPING CLA
SS
INSULA
TION
FROM TO
FLO
W MEDIUM
NORMAL
PRESSURE barg
NORMAL TEMP.OC
DESIGN
PRESSURE barg
DESIGN TEMP.OC
CATEGORY
1
CATEGORY
2
CATEGORY
3
CATEGORY
4
CATEGORY FOR STRESS CRITICALITY
01 2 VG 0039 153451Z N 2"-VG-0087-091502Z-N 2"-VG-0216-013421X-N Vent Gas 89.00 136 119 180/-45 WATER58.01.08.1637 Sht
3/3O 2 3
01 2 VG 0089 153451Z N 8"-PG-0038-153451Z-P 2"-VG-0088-011503Z-N Vent Gas 89.00 136 119 180/-50 WATER58.01.08.1637 Sht
3/3O 2 3
01 8 PG 0067 061502Z P XD-3122-02 2ND STAGE DISCHARGE DAMPENER E-3122 2ND STAGE COOLER Process Gas 35.24 139 46.9 180/-20 WATER
58.01.08.1640 Sht
2/3 /
58.01.08.1640 Sht
3/3
A 3 4
01 8 PG 0068 061502Z P 8"-PG-0067-061502Z-P 10"-VG-0106-011503Z-N, 2"-PG-0069-061502Z-P Process Gas 35.24 139 46.9 180/-20 WATER 58.01.08.1640 Sht
3/3O 3 4
01 8 PG 0070 068220X N E-3122 2ND STAGE COOLER V-3122-02 2nd STAGE DISCHARGE DRUM Process Gas 34.20 65 46.9 180/-20 WATER
58.01.08.1640 Sht
3/3 /
58.01.08.1641
A 2 3 4
01 2, 8 PG 0072 068220X N V-3122-02 2nd STAGE DISCHARGE DRUM C-3111-02 GLYCOL CONTACTOR Process Gas 34.20 65 46.9 180/-20 WATER58.01.08.1641 /
58.01.08.1642C 3 4
01 8 PG 0073 068220X N 8"-PG-0072-068220X-N 12"-PG-0074-038220X-N Process Gas 34.20 65 46.9 180/-20 WATER
58.01.08.1641 /
58.01.08.1640 Sht
2/3
O 3 4
01 3 HC 0026 253451Z N V-3124 4TH STAGE SUCTION DRUM 3"-PG-0079-093451Z-P, 2"-D-0126-258220X-NHydrocarbon
Condensate87.60 65 227 180/-40 WATER
58.01.08.1644 Sht
1/3 / 58.01.08.1643
Sht 1/3
O 2 3
01 8 PG 0077 061502Z P C-3111-02 GLYCOL CONTACTOR 8"-PG-0079-093451Z-P, 8"-VG-0113-011503Z-N Process Gas 34.16 75 46.9 155 WATER
58.01.08.1642 /
58.01.08.1643 Sht
1/3
C 3
01 8 PG 0079 093451Z P 8"-PG-0077-061502Z-P, 2"-PG-0079-093451Z-P V-3123 3RD STAGE SUCTION DRUM Process Gas 33.20 65 109.2 180/-70 WATER58.01.08.1643 Sht
1/3O 2 3
01 8 PG 0086 093451Z N 6"-PG-0085-153451Z-N 8"-PG-0079-093451Z-P Process Gas 33.20 65 109.2 180/-70 WATER
58.01.08.1643 Sht
2/3 / 58.01.08.1643
Sht 1/3
O 2 3
58 01-08PG0080 01 8 PG 0080 093451Z H V-3123 3RD STAGE SUCTION DRUMST-3123-02 , ST-3123-01 3RD STAGE SUCTION STRAINER, XD-
3123-01 3RD STAGE SUCTION DAMPENERProcess Gas 33.20 65 109.2 180/-70 WATER
58.01.08.1643 Sht
1/3 / 58.01.08.1643
Sht 2/3
O 2 3
01 8 PG 0081 091502Z P XD-3123-02 3RD STAGE DISCHARGE DAMPENER E-3123 3RD STAGE COOLER, 8"-PG-0084-153451Z-P Process Gas 88.50 136 119 180/-45 WATER
58.01.08.1643 Sht
2/3 / 58.01.08.1643
Sht 3/3
A 2 3
01 4 PG 0082 091502Z P 8"-PG-0081-091502Z-P 6"-VG-0119-011503Z-N, 2"-PG-0083-091502Z-P Process Gas 88.50 136 119 180/-45 WATER58.01.08.1643 Sht
3/3O 2 3
01 2 PG 0083 091502Z P 4"-PG-0082-091502Z-P 2"-VG-0118-091502Z-N Process Gas 88.50 136 119 180/-45 WATER58.01.08.1643 Sht
3/3O 2 3
01 8 PG 0084 091502Z P 8"-PG-0081-091502Z-P 8"-PG-0084-153451Z-N Process Gas 88.50 136 119 180/-45 WATER 58.01.08.1643 Sht
3/3O 2 3
01 8 PG 0084 153451Z P E-3123 3RD STAGE COOLER, 8"-PG-0081-091502Z-P 8"-PG-0087-253451Z-N, 2"-PG-0084-153451Z-N Process Gas 87.60 65 119 180/-70 WATER
58.01.08.1643 Sht
3/3 / 58.01.08.1644
Sht 1/3
A 2 3
01 2 PG 0084 153451Z N 8"-PG-0084-153451Z-P 2"-PG-0087-253451Z-N Process Gas 87.60 65 119 180/-70 WATER
58.01.08.1644 Sht
1/3 / 58.01.08.1643
Sht 3/3
O 2 3
01 6 PG 0085 153451Z N 8"-PG-0084-153451Z-N 8"-PG-0086-093451Z-N Process Gas 87.60 65 119 180/-70 WATER
58.01.08.1643 Sht
3/3 / 58.01.08.1643
Sht 2/3
O 2 3
01 2, 8 PG 0087 253451Z N 2"-PG-0084-153451Z-N V-3124 4TH STAGE SUCTION DRUM Process Gas 87.60 65 227 180/-90 WATER58.01.08.1644 Sht
1/3O 2 3
01 2 VG 0118 091502Z N 2"-PG-0083-091502Z-P 2"-VG-0215-153451Z-N Vent Gas 88.50 136 119 180/-45 WATER58.01.08.1643 Sht
3/3O 2 3
60 01-08PG0093 01 PG 0093 253451Z N 4"-PG-0092-251503Z-N 8"-PG-0087-253451Z-N Process Gas 87.60 65 302.2 180/-90 WATER
58.01.08.1644 Sht
2/3 / 58.01.08.1644
Sht 1/3
O 2 3
57
59
55
56
01-08PG0081
01-08PG0072
01-08PG0067
01-08PG0077
ADCO DOC. NO: 58.01.17.1601, REV- I
CONTRACTOR DOC. NO: A049-001-16-43-LL-0001 PAGE 5 OF 13
ANNEXURE-1
QUSAHWIRA FULL FIELD DEVELOPEMENT PROJECT
CRITICAL LINE LIST -CDS- QUSAHWIRA
SL NO. SYSTEM NO.PLANT
AREALINE NUMBER STREAM DESCRIPTION OPERATING CONDITION
TEST
MEDIUMP&ID No.
CRITICALITY
CODE
TYPE OF
FLOW
REMARKS
SIZE (INCH)
SERVICE
SERIAL NUMBER
PIPING CLA
SS
INSULA
TION
FROM TO
FLO
W MEDIUM
NORMAL
PRESSURE barg
NORMAL TEMP.OC
DESIGN
PRESSURE barg
DESIGN TEMP.OC
CATEGORY
1
CATEGORY
2
CATEGORY
3
CATEGORY
4
CATEGORY FOR STRESS CRITICALITY
01 4 PG 0089 251503Z P XD-3124-02 4TH STAGE DISCHARGE DAMPENER E-3124 4TH STAGE COOLER, 4"-PG-0091-251503Z-N Process Gas 248.30 133 302.2 20 WATER
58.01.08.1644 Sht
2/3 / 58.01.08.1644
Sht 3/3
A 2 4
01 2, 4 PG 0090 251503Z P 4"-PG-0089-251503Z-P 3"-VG-0219-033421X-N, 6"-VG-0127-031503Z-N Process Gas 248.30 133 302.2 180/-45 WATER58.01.08.1644 Sht
3/3O 2 3
01 8, 10 PO 0038 031441X N 8"-PO-0038-031441X-N,P-0901/0902 MOL BOOSTER PUMPS 8"-PO-0048-091441X-N, 8"-PO-0051-031441X-N Process Oil 7.00 60 29 85 WATER
58.01.08.1629 Sht
1/2 / 58.01.08.1630
Sht 1/3 /
58.01.08.1630 Sht
2/3
P 2 3
01 6 PO 0039 011441X N 6"-PO-0093-031441X-N V-0301 PRODUCTION SEPARATOR Process Oil 3.50 65 15.6 85 WATER58.01.08.1629 Sht
1/2O 3 4
01 6 PO 0040 011441X N 6"-PO-0094-031441X-N 6"-PO-0039-011441X-N Process Oil 3.50 65 15.6 85 WATER58.01.08.1629 Sht
1/2O 3 4
01 6 PO 0093 031441X N 8"-PO-0038-031441X-N 6"-PO-0039-011441X-N Process Oil 3.50 60 29 85 WATER58.01.08.1629 Sht
1/2O 3 4
01 6 PO 0094 031441X N 8"-PO-0038-031441X-N 6"-PO-0040-011441X-N Process Oil 3.50 60 29 85 WATER58.01.08.1629 Sht
1/2O 3 4
01 8 PO 0044 031441X NP-0903 MOL BOOSTER PUMP, P-0904 MOL BOOSTER
PUMP
10"-PO-0044-031441X-N, 6"-PO-0095-031441X-N, 6"-PO-0096-
031441X-N, 2"-D-0072-038220X-NProcess Oil 7.00 60 29 85 WATER
58.01.08.1629 Sht
2/2P 2 4
01 6 PO 0045 011441X N 6"-PO-0095-031441X-N V-0302 PRODUCTION SEPARATOR Process Oil 3.50 65 15.6 85 WATER58.01.08.1629 Sht
2/2O 3 4
01 6 PO 0046 011441X N 6"-PO-0096-031441X-N 6"-PO-0045-011441X-N Process Oil 3.50 65 15.6 85 WATER58.01.08.1629 Sht
2/2O 3 4
01 6 PO 0095 031441X N 8"-PO-0044-031441X-N 6"-PO-0045-011441X-N Process Oil 3.50 60 29 85 WATER58.01.08.1629 Sht
2/2O 3 4
01 6 PO 0096 031441X N 8"-PO-0044-031441X-N 6"-PO-0046-011441X-N Process Oil 3.50 60 29 85 WATER58.01.08.1629 Sht
2/2O 3 4
64 01-08VG0151 01 8 VG 0151 011503Z N V-3101 GLYCOL DRAIN DRUM 8"-VG-0152-011503Z-N Vent Gas 0.02 85 3.5 240 WATER 58.01.08.1656 O 2
65 01-08VG0188 01 8 VG 0188 011503Z N V6702 PROCESS DRAIN DRUM 10"-VG-0189-011503Z-N Vent Gas 0.20 85 7 100 WATER 58.01.08.1666 S 2 3
01 4 PG 0054 251503Z N E-3114-02 4TH STAGE COOLER, 4"-PG-0052-251503Z-P 10"-IG-0001-251503Z-N Process Gas 247.80 65 302.2 180/-45 WATER58.01.08.1638 Sht
3/3A 2 3
01 4 PG 0055 251503Z N 4"-PG-0054-251503Z-N 4"-PG-0055-253451Z-N Process Gas 249.20 65 302.2 180/-45 WATER
58.01.08.1638 Sht
3/3 / 58.01.08.1638
Sht 2/3
O 2 3
01 4 PG 0091 251503Z N E-3124 4TH STAGE COOLER 6"-PG-0054-251503Z-N Process Gas 248.30 65 302.2 180/-45 WATER58.01.08.1644 Sht
3/3A 2 3
01 4 PG 0092 251503Z N 4"-PG-0091-251503Z-N 6"-PG-0093-253451Z-N Process Gas 248.20 65 302.2 180/-45 WATER58.01.08.1644 Sht
2/3O 2 3
01 2 VG 0124 253451Z NST-3124-02 4TH STAGE SUCTION STRAINER, ST-3124-01
4TH STAGE SUCTION STRAINER, 4"-PG-0092-251503Z-N2"-VG-0125-033421X-N Vent Gas 248.20 65 302.2 180/-90 WATER
58.01.08.1644 Sht
2/3O 2 3
67 01-10PG0015 01 10 PG 0015 038220X N V-3112-01 2ND STAGE SUCTION DRUM 12"-VG-0071-011503Z-N Process Gas 8.20 55 19 180/-20 WATER58.01.08.1634 Sht
1/3O 2 3 4
68 01-10PG0063 01 10 PG 0063 038220X N V-3122-01 2ND STAGE SUCTION DRUM 12"-VG-0102-011503Z-N Process Gas 8.20 65 19 180/-20 WATER58.01.08.1640 Sht
1/3O 2 4
01 10 PO 0015 151441X N M-0201 INLET MANIFOLD 10"-PO-0019-031441X-N Process Oil 5.00 80 219.5 93 WATER58.01.08.1624 Sht
1/2MSM 2 4 2-PHASE
01 10 PO 0019 031441X N 10"-PO-0015-151441X-N PRODUCTION MANIFOLD Process Oil 5.00 80 47.1 93 WATER58.01.08.1625 Sht
2/2MSM 2 3 4 2-PHASE
01 4 PO 0025 151441X NFT-0202 MULTIPHASE FLOW METER, 4"-PO-0024-151441X-
N10"-PO-0015-151441X-N Process Oil 5.00 80 219.5 93 WATER
58.01.08.1625 Sht
1/2MSM 2 4 2-PHASE
01 4 PO 0027 151441X N 4"-PO-0025-151441X-N PHASE-2 PRODUCTION HEADER Process Oil 5.00 80 219.5 93 WATER58.01.08.1625 Sht
1/2MSM 2 4 2-PHASE
01 10 PO 0017 151441X N M-0202 INLET MANIFOLD 10"-PO-0020-031441X-N Process Oil 5.00 80 219.5 93 WATER58.01.08.1624 Sht
2/2MSM 2 4 2-PHASE
01 10 PO 0020 031441X N 10"-PO-0017-151441X-N PRODUCTION MANIFOLD Process Oil 5.00 80 47.1 93 WATER58.01.08.1625 Sht
2/2MSM 2 3 4 2-PHASE
61
62
63
66
69
70
01-08PG0089
01-08PO0044
01-04PG0054
01-10PO0015
01-10PO0038
01-10PO0017
ADCO DOC. NO: 58.01.17.1601, REV- I
CONTRACTOR DOC. NO: A049-001-16-43-LL-0001 PAGE 6 OF 13
ANNEXURE-1
QUSAHWIRA FULL FIELD DEVELOPEMENT PROJECT
CRITICAL LINE LIST -CDS- QUSAHWIRA
SL NO. SYSTEM NO.PLANT
AREALINE NUMBER STREAM DESCRIPTION OPERATING CONDITION
TEST
MEDIUMP&ID No.
CRITICALITY
CODE
TYPE OF
FLOW
REMARKS
SIZE (INCH)
SERVICE
SERIAL NUMBER
PIPING CLA
SS
INSULA
TION
FROM TO
FLO
W MEDIUM
NORMAL
PRESSURE barg
NORMAL TEMP.OC
DESIGN
PRESSURE barg
DESIGN TEMP.OC
CATEGORY
1
CATEGORY
2
CATEGORY
3
CATEGORY
4
CATEGORY FOR STRESS CRITICALITY
01 4 PO 0024 151441X N FT-0201 MULTIPHASE FLOW METER 10"-PO-0017-151441X-N Process Oil 5.00 80 219.5 93 WATER58.01.08.1625 Sht
1/2MSM 2 4 2-PHASE
01 8 PO 0047 031441X N PHASE-2 BOOSTER PUMPS 10"-PO-0038-031441X-N Process Oil 7.00 60 29 85 WATER58.01.08.1630 Sht
1/3O 3 4
01 8 PO 0048 091441X N 8"-PO-0038-031441X-N P-1001 MOL PUMP Process Oil 4.70 60 120(H) 85 WATER58.01.08.1630 Sht
1/3P 2 4
01 8 PO 0051 091441X N 8"-PO-0038-031441X-N P-1002 MOL PUMP, 2"-D-0082-098220X-N Process Oil 4.70 60 120(H) 85 WATER58.01.08.1630 Sht
2/3P 2 4
01 8 PO 0060 031441X N 8"-PO-0050-091441X-N, 8"-PO-0060-091441X-N 10"-PO-0038-031441X-N Process Oil 7.00 60 29 85 WATER 58.01.08.1631 A 2 4
72 01-10VG0155 01 10 VG 0155 011502Z N T-2401 WATER SEPARATION TANK 16"-VG-0156-011502Z-N Vent Gas 0.02 60 3.5 85 WATER58.01.08.1659 Sht
1/4TK 2 4
73 01-10VG0157 01 10 VG 0157 011502Z N T-2401 WATER SEPARATION TANK 16"-VG-0158-011502Z-N Vent Gas 0.02 60 3.5 85 WATER58.01.08.1659 Sht
1/4TK 2 4
74 01-10VG0161 01 10 VG 0161 011502Z N T-2402 WATER SEPARATION TANK 16"-VG-0162-011502Z-N Vent Gas 0.02 60 3.5 85 WATER58.01.08.1659 Sht
2/4TK 2 4
75 01-10VG0163 01 10 VG 0163 011502Z N T-2402 WATER SEPARATION TANK 16"-VG-0164-011502Z-N Vent Gas 0.02 60 3.5 85 WATER58.01.08.1659 Sht
2/4TK 2 4
01 3 HC 0003 068220X N V-3112-02 2nd STAGE DISCHARGE DRUM 20"-PG-0014-038220X-N, 2"-D-0105-068220X-NHydrocarbon
Condensate34.20 65 46.9 180/-20 WATER
58.01.08.1634 Sht
1/3 / 58.01.08.1635
Sht 1/1
O 3 4
01 12 PG 0011 038220X P XD-3111-02 1ST STAGE DISCHARGE DAMPENER E-3111 1ST STAGE COOLER, 12"-PG-0014-038220X-P Process Gas 8.65 140 19 180/-20 WATER
58.01.08.1633 Sht
2/3 /
58.01.08.1633 Sht
3/3
O 2 3 4
01 8 PG 0012 038220X P 12"-PG-0011-038220X-P 10"-VG-0070-011503Z-N Process Gas 8.65 140 19 180/-20 WATER58.01.08.1633 Sht
3/3O 3 4
01 2 PG 0013 038220X P 8"-PG-0012-038220X-P 2"-VG-0070-011503Z-N Process Gas 8.80 140 19 180/-20 WATER58.01.08.1633 Sht
3/3O 3 4
0112,
20PG 0014 038220X N E-3111 1ST STAGE COOLER V-3112-01 2ND STAGE SUCTION DRUM Process Gas 8.80 65 19 180/-20 WATER
58.01.08.1633 Sht
3/3 /
58.01.08.1634 Sht
1/3
A 1 2 3 4
01 12 PG 0027 038220X N 8"-PG-0026-068220X-N 20"-PG-0014-038220X-N Process Gas 8.20 55 19 180/-20 WATER
58.01.08.1634 2/3 /
58.01.08.1634 Sht
1/3
O 3
01 3 HC 0023 068220X N V-3122-02 2nd STAGE DISCHARGE DRUM 3"-PG-0062-038220X-N, 2"-D-0121-068220X-NHydrocarbon
Condensate34.20 65 46.9 180/-20 WATER
58.01.08.1641 /
58.01.08.1640 Sht
1/3
O 3 4
01 12 PG 0059 038220X P XD-3121-02 1ST STAGE DISCHARGE DAMPENER E-3121 1ST STAGE COOLER Process Gas 8.65 139 19 180/-20 WATER
58.01.08.1639 Sht
2/3 /
58.01.08.1639 Sht
3/3
A 2 4
01 8 PG 0060 038220X P 12"-PG-0059-038220X-P 2"-PG-0061-038220X-P, 10"-VG-0101-011503Z-N Process Gas 8.65 139 19 180/-20 WATER58.01.08.1639 Sht
3/3O 3 4
01 2 PG 0061 038220X P 8"-PG-0060-038220X-P 2"-VG-0101-011503Z-N Process Gas 8.65 139 19 180/-20 WATER58.01.08.1639 Sht
3/3O 3 4
0112,
20PG 0062 038220X P E-3121 1ST STAGE COOLER V-3122-01 2ND STAGE SUCTION DRUM Process Gas 8.20 55 19 180/-20 WATER
58.01.08.1639 Sht
3/3 / 58.01.08.1640
Sht 1/3
A 1 2 3
01 12 PG 0074 038220X N 8"-PG-0073-068220X-N 20"-PG-0062-038220X-N Process Gas 8.20 55 19 180/-20 WATER
58.01.08.1640 Sht
2/3 / 58.01.08.1640
Sht 1/3
O 3 4
0112,
20PG 0064 038220X H V-3122-01 2ND STAGE SUCTION DRUM
ST-3122-02 , ST-3122-01 2ND STAGE SUCTION STRAINER, XD-
3122-01 2ND STAGE SUCTION DAMPENERProcess Gas 8.20 65 19 180/-20 WATER
58.01.08.1640 Sht
1/3 /
58.01.08.1640 Sht
2/3
O 1 2 3
76
77
78
71
01-12PG0059
01-12PG0064
01-08PO0048
ADCO DOC. NO: 58.01.17.1601, REV- I
CONTRACTOR DOC. NO: A049-001-16-43-LL-0001 PAGE 7 OF 13
ANNEXURE-1
QUSAHWIRA FULL FIELD DEVELOPEMENT PROJECT
CRITICAL LINE LIST -CDS- QUSAHWIRA
SL NO. SYSTEM NO.PLANT
AREALINE NUMBER STREAM DESCRIPTION OPERATING CONDITION
TEST
MEDIUMP&ID No.
CRITICALITY
CODE
TYPE OF
FLOW
REMARKS
SIZE (INCH)
SERVICE
SERIAL NUMBER
PIPING CLA
SS
INSULA
TION
FROM TO
FLO
W MEDIUM
NORMAL
PRESSURE barg
NORMAL TEMP.OC
DESIGN
PRESSURE barg
DESIGN TEMP.OC
CATEGORY
1
CATEGORY
2
CATEGORY
3
CATEGORY
4
CATEGORY FOR STRESS CRITICALITY
01 12 PG 0065 038220X N 12"-PG-0064-038220X-H 16"-PG-0066-038220X-N Process Gas 8.20 65 19 180/-20 WATER
58.01.08.1640 Sht
1/3 / 58.01.08.1639
Sht 2/3
O 2 4
01 12 PO 0035 011441X N V-0301 PRODUCTION SEPARATOR 12"-PO-0035-031441X-N Process Oil 3.50 65 15.6 85 WATER
58.01.08.1628 Sht
1/2 / 58.01.08.1629
Sht 1/2
P 2 3
01 12 PO 0035 031441X N 12"-PO-0035-011441X-NST-0902 BOOSTER PUMP SUCTION STRAINER, ST-0901
BOOSTER PUMP SUCTION STRAINERProcess Oil 3.50 60 29 85 WATER
58.01.08.1629 Sht
1/2P 2 3
01 12 PO 0036 031441X N ST-0901 BOOSTER PUMP SUCTION STRAINER P-0901 MOL BOOSTER PUMP Process Oil 3.50 60 29 85 WATER58.01.08.1629 Sht
1/2P 2 3
01 12 PO 0037 031441X N ST-0902 BOOSTER PUMP SUCTION STRAINER P-0902 MOL BOOSTER PUMP Process Oil 3.50 60 29 85 WATER58.01.08.1629 Sht
1/2P 2 3
01 12 PO 0041 011441X N V-0302 PRODUCTION SEPARATOR 12"-PO-0041-031441X-N, 12"-PO-0097-031441X-N Process Oil 3.50 60 15.6 85 WATER58.01.08.1629 Sht
2/2O 2 3
01 12 PO 0041 031441X N 12"-PO-0041-011441X-N ST-0904 BOOSTER PUMP SUCTION STRAINER Process Oil 3.50 60 29 85 WATER58.01.08.1629 Sht
2/2P 2 3
01 12 PO 0042 031441X N ST-0903 BOOSTER PUMP SUCTION STRAINER P-0903 MOL BOOSTER PUMP Process Oil 3.50 60 29 85 WATER58.01.08.1629 Sht
2/2P 2 3
01 12 PO 0043 031441X N ST-0904 BOOSTER PUMP SUCTION STRAINER P-0904 MOL BOOSTER PUMP Process Oil 3.50 60 29 85 WATER58.01.08.1629 Sht
2/2P 2 3
01 12 PO 0097 031441X N 12"-PO-0041-011441X-N ST-0903 BOOSTER PUMP SUCTION STRAINER Process Oil 3.50 60 29 85 WATER58.01.08.1629 Sht
2/2O 3
01 12 PW 0001 016620X N V-0301 PRODUCTION SEPARATOR 4"-D-0036-018220X-N, 12"-PW-0003-016620X-N Produced Water 3.50 65 15.6 85 WATER58.01.08.1628 Sht
1/2O 2 3
01 12 PW 0002 016620X N V-0302 PRODUCTION SEPARATOR12"-PW-0003-016620X-N, 4"-D-0044-018220X-N,2"-D-0048-
016620X-NProduced Water 3.50 65 15.6 85 WATER
58.01.08.1628 Sht
1/2 /
58.01.08.1628 Sht
2/2
O 2 3
01 12 PW 0003 016620X N 12"-PW-0001-016620X-N, 12"-PW-0002-016620X-N T-2401 WATER SEPARATION TANK Produced Water 3.50 65 15.6 85/-20 WATER
58.01.08.1628 Sht
1/2 / 58.01.08.1659
Sht 1/4
TK 2 4
01 12,8 PW 0004 016620X N 12"-PW-0003-016220X-N T-2402 WATER SEPARATION TANK Produced Water 3.50 60 15.6 85/-20 WATER
58.01.08.1659 Sht
1/4 / 58.01.08.1659
Sht 2/4
TK 2 4
01 6 PW 0022 016620X N 6"-PW-0022-038220X-N 12"-PW-0003-016620X-N Produced Water 0.02 60 3.5 85/-1 WATER58.01.08.1659 Sht
1/4O 3 4
018, 10,
12PW 0005 016620X N T-2401 WATER SEPARATION TANK 10"-PW-0007-016620X-N, T-2404 WATER DISPOSAL TANK Produced Water 0.02 60 3.5 85 WATER
58.01.08.1659 Sht
1/4 / 58.01.08.1659
Sht 4/4
TK 2 4
01 8 PW 0006 016620X N T-2402 WATER SEPARATION TANK 12"-PW-0005-016620X-N Produced Water 0.02 60 3.5 85 WATER58.01.08.1659 Sht
2/4TK 3 4
01 10 PW 0007 016620X N 12"-PW-0005-016620X-N T-2405 WATER DISPOSAL TANK Produced Water 0.02 60 3.5 85 WATER58.01.08.1659 Sht
4/4TK 2 4
01 10 PW 0008 016620X N T-2404 WATER DISPOSAL TANK 12"-PW-0009-016620X-N Produced Water 0.02 60 3.5 85 WATER58.01.08.1659 Sht
4/4TK 2 4
01 10,12 PW 0009 016620X N T-2405 WATER DISPOSAL TANK6"-PW-0012-036620X-N,6"-PW-0010-036620X-N,6"-PW-0011-
036620X-N,12"-PW-0503-016620X-N,Produced Water 0.02 60 3.5 85 WATER
58.01.08.1659 Sht
4/4TK 2 3
01 6 PW 0010 036620X N 6"-PW-0009-016620X-N P-2402-01 DISPOSAL WATER PUMP Produced Water 0.02 60 33.5 85 WATER58.01.08.1660 Sht
1/2P 2 4
01 6 PW 0011 036620X N 6"-PW-0009-016220X-N P-2402-02 DISPOSAL WATER PUMP Produced Water 0.02 60 33.5 85 WATER58.01.08.1660 Sht
1/2P 2 4
01 6 PW 0012 036620X N 6"-PW-0009-016220X-N P-2402-03 DISPOSAL WATER PUMP Produced Water 0.02 60 33.5 85 WATER58.01.08.1660 Sht
1/2P 2 4
01 6,12 PW 0503 016220X N 12"-PW-0009-016220X-N 6"-PW-0504-036620X-N, 6"-PW-0505-036620X-N Produced Water 0.02 60 3.5 85 WATER58.01.08.1660 Sht
2/2O 3
01 6 PW 0504 016220X N 6"-PW-0503-016220X-N P-2402-04 DISPOSAL WATER PUMP Produced Water 0.02 60 33.5 85 WATER58.01.08.1660 Sht
2/2P 2 4
78
80
81
82
83
01-12PW0005
01-12PW0003
01-12PW0009
01-12PG0064
01-12PO0041
01-12PO003579
ADCO DOC. NO: 58.01.17.1601, REV- I
CONTRACTOR DOC. NO: A049-001-16-43-LL-0001 PAGE 8 OF 13
ANNEXURE-1
QUSAHWIRA FULL FIELD DEVELOPEMENT PROJECT
CRITICAL LINE LIST -CDS- QUSAHWIRA
SL NO. SYSTEM NO.PLANT
AREALINE NUMBER STREAM DESCRIPTION OPERATING CONDITION
TEST
MEDIUMP&ID No.
CRITICALITY
CODE
TYPE OF
FLOW
REMARKS
SIZE (INCH)
SERVICE
SERIAL NUMBER
PIPING CLA
SS
INSULA
TION
FROM TO
FLO
W MEDIUM
NORMAL
PRESSURE barg
NORMAL TEMP.OC
DESIGN
PRESSURE barg
DESIGN TEMP.OC
CATEGORY
1
CATEGORY
2
CATEGORY
3
CATEGORY
4
CATEGORY FOR STRESS CRITICALITY
01 6 PW 0505 016220X N 6"-PW-0503-016220X-N P-2402-05 DISPOSAL WATER PUMP Produced Water 0.02 60 33.5 85 WATER58.01.08.1660 Sht
2/2P 2 4
01 6,12 PW 0013 036620X NP-2402-01/02/03 DISPOSAL WATER PUMPS,12"-PW-0507-
036620X-N12"-PW-0017-037030X-N, 2"-D-0153-037030X-N Produced Water 27.60 60 33.5 85 WATER
58.01.08.1660 Sht
1/2P 2 4
01 3,6 PW 0014 036620X N 6"-PW-0013-036620X-N, 6"-PW-0508-036620X-N 6"-PW-0015-016620Z-N, 6"-PW-0016-016620X-N Produced Water 27.60 60 33.5 85 WATER58.01.08.1660 Sht
1/2O 2 4
01 6 PW 0015 016220X N 6"-PW-0014-036620X-N T-2404 WATER DISPOSAL TANK Produced Water 27.60 60 3.5 85 WATER58.01.08.1659 Sht
3/4TK 3 4
01 6 PW 0016 016220X N 6"-PW-0014-036620X-N T-2405 WATER DISPOSAL TANK Produced Water 27.60 60 3.5 85 WATER58.01.08.1659 Sht
4/4TK 3 4
01 6,12 PW 0507 016220X N P-2402-04/05 DISPOSAL WATER PUMP 12"-PW-0013-036620X-N Produced Water 27.60 60 33.5 85 WATER 58.01.08.1660 2/2 P 2 3 4
01 3,6 PW 0508 016220X N 6"-PW-0507-036620X-N 6"-PW-0014-036620X-N Produced Water 27.60 60 33.5 85 WATER58.01.08.1660 1/2
2/2O 2 4
01 8,14 PO 0049 091441X N P-1001 MOL PUMP ST-1001 MOL BASKET STRAINER Process Oil 72.50 62 120(H) 85 WATER
58.01.08.1630 Sht
1/3 / 58.01.08.1630
Sht 3/3
P 2 4
01 6, 8 PO 0050 091441X N 6"-PO-0053-091441X-N, 6"-PO-0050-091441X-N6"-PO-0050-091441X-N, E-1001 MOL RECYCLE COOLER, 8"-PO-
0060-031441X-NProcess Oil 7.00 79 120(H) 85 WATER
58.01.08.1630 Sht
1/3 / 58.01.08.1631A 2 4
01 8 PO 0052 091441X N P-1002 MOL PUMP 14"-PO-0049-091441X-N Process Oil 72.50 62 120(H) 85 WATER
58.01.08.1630 Sht
2/3 /
58.01.08.1630 Sht
3/3
P 2 4
01 6 PO 0053 091441X N 8"-PO-0052-091441X-N 8"-PO-0050-091441X-N Process Oil 7.00 79 120(H) 85 WATER 58.01.08.1631 O 3 4
01 14 PO 0054 091441X N PHASE-2 MOL PUMPS 14"-PO-0049-091441X-N Process Oil 72.50 62 120(H) 85 WATER58.01.08.1630 Sht
3/3O 2
01 14 PO 0056 091441X N 14"-PO-0049-091441X-N ST-1002 MOL BASKET STRAINER Process Oil 72.50 62 120(H) 85 WATER58.01.08.1630 Sht
3/3P 2 3
01 6 PO 0059 091441X N PHASE-2 MOL PUMPS 14"-PO-0050-091441X-N Process Oil 7.00 79 120(H) 85 WATER 58.01.08.1631 P 2 4
01 14 PO 0057 091441X N ST-1001 MOL BASKET STRAINER LP-1303 MOL LAUNCHER Process Oil 72.50 62 120(H) 85 WATER
58.01.08.1630 Sht
3/3 / 58.01.08.1632
Sht 1/2
O 2 3
01 14 PO 0058 091441X N ST-1002 MOL BASKET STRAINER 14"-PO-0057-091441X-N Process Oil 72.50 62 120(H) 85 WATER58.01.08.1630 Sht
3/3O 2 3
87 01-14VG0049 01 14 VG 0049 018220X N V-0301 PRODUCTION SEPARATOR 24"-VG-0050-011503Z-N, 24"-VG-0022-011503Z-N Vent Gas 3.50 60 15.6 85/-20 WATER58.01.08.1628 Sht
1/2O 2 4
88 01-14VG0056 01 14 VG 0056 018220X N V-0302 PRODUCTION SEPARATOR 24"-VG-0057-011503Z-N, 24"-VG-0023-011503Z-N Vent Gas 3.50 60 15.6 85/-20 WATER58.01.08.1628 Sht
2/2O 2 3 4
89 01-16PG0010 01 16 PG 0010 038220X H V-3111 1ST STAGE SUCTION DRUM
ST-3111-02 1ST STAGE SUCTION STRAINER, ST-3111-01 1ST
STAGE SUCTION STRAINER, XD-3111-01 1ST STAGE SUCTION
DAMPENER
Process Gas 1.50 60 19 180/-20 WATER
58.01.08.1633 Sht
1/3 /
58.01.08.1633 Sht
2/3
O 2 3 4
90 01-16PG0058 01 16 PG 0058 038220X H V-3121 1ST STAGE SUCTION DRUM
ST-3121-01 1ST STAGE SUCTION STRAINER, ST-3121-02 1ST
STAGE SUCTION STRAINER, XD-3121-01 1ST STAGE SUCTION
DAMPENER
Process Gas 1.50 60 19 180/-20 WATER
58.01.08.1639 Sht
1/3 /
58.01.08.1639 Sht
2/3
O 2 4
91 01-16VG0156 01 16 VG 0156 011502Z N 10"-VG-0155-011502Z-N SAFE LOCATION Vent Gas ATM 60 3.5 85 AIR58.01.08.1659 Sht
1/4S 2 4
92 01-16VG0158 01 16 VG 0158 011502Z N 10'-VG-0157-011502Z-N SAFE LOCATION Vent Gas ATM 60 3.5 85 AIR58.01.08.1659 Sht
1/4TK 2 4
93 01-16VG0162 01 16 VG 0162 011502Z N 10"-VG-0161-011502Z-N SAFE LOCATION Vent Gas ATM 60 3.5 85 AIR58.01.08.1659 Sht
2/4TK 2 3
94 01-16VG0164 01 16 VG 0164 011502Z N 10"-VG-0163-011502Z-N SAFE LOCATION Vent Gas ATM 60 3.5 85 AIR58.01.08.1659 Sht
2/4S 2 3
85
86
84
01-14PO0057
01-12PW0013
01-14PO0049
ADCO DOC. NO: 58.01.17.1601, REV- I
CONTRACTOR DOC. NO: A049-001-16-43-LL-0001 PAGE 9 OF 13
ANNEXURE-1
QUSAHWIRA FULL FIELD DEVELOPEMENT PROJECT
CRITICAL LINE LIST -CDS- QUSAHWIRA
SL NO. SYSTEM NO.PLANT
AREALINE NUMBER STREAM DESCRIPTION OPERATING CONDITION
TEST
MEDIUMP&ID No.
CRITICALITY
CODE
TYPE OF
FLOW
REMARKS
SIZE (INCH)
SERVICE
SERIAL NUMBER
PIPING CLA
SS
INSULA
TION
FROM TO
FLO
W MEDIUM
NORMAL
PRESSURE barg
NORMAL TEMP.OC
DESIGN
PRESSURE barg
DESIGN TEMP.OC
CATEGORY
1
CATEGORY
2
CATEGORY
3
CATEGORY
4
CATEGORY FOR STRESS CRITICALITY
01 16 PG 0001 018220X N V-0301 PRODUCTION SEPARATOR 18"-PG-0007-018220X-N Process Gas 3.50 60 15.6 85/-20 WATER
58.01.08.1628 Sht
1/2 / 58.01.08.1633
Sht 1/3
O 2 4
01 16 PG 0003 018220X N V-0302 PRODUCTION SEPARATOR 18"-PG-0007-018220X-N Process Gas 3.50 60 15.6 85/-20 WATER
58.01.08.1628 Sht
2/2 / 58.01.08.1633
Sht 1/3
O 2 4
01 6 PG 0005 018220X N 18"-VG-0194-011502Z-N 18"-PG-0007-018220X-N Process Gas 4.07 121 7 225/4 WATER58.01.08.1663 Sht
2/2O 3 4
01 16 PG 0006 018220X N 18"-PG-0007-018220X-N 16"-PG-0056-038220X-N Process Gas 3.47 60 15.6 85 WATER
58.01.08.1633 Sht
1/3 /
58.01.08.1639 Sht
1/3
O 2 4
0116,
18PG 0007 018220X N
16"-PG-0001-018220X-N, 16"-PG-0003-018220X-N, 4"-PG-
0004-018220X-N, 6"-PG-0005-018220X-N, 16"-PG-0006-018220X-N, 16"-PG-0008-038220X-N Process Gas 3.50 60 15.6 85/-20 WATER
58.01.08.1633 Sht
1/3O 2 4
01 16 PG 0008 038220X N 16"-PG-0007-018220X-N V-3111 1ST STAGE SUCTION DRUM Process Gas 1.50 60 19 180/-20 WATER58.01.08.1633 Sht
1/3O 2 4
01 16 PG 0056 038220X N 16"-PG-0006-018220X-N V-3121 1ST STAGE SUCTION DRUM Process Gas 1.50 60 19 180/-20 WATER58.01.08.1639 Sht
1/3O 2 4
01 16 PG 0066 038220X N 12"-PG-0065-038220X-N 16"-PG-0056-038220X-N Process Gas 1.50 60 19 180/-20 WATER
58.01.08.1639 Sht
2/3 /
58.01.08.1639 Sht
1/3
O 2 4
01 16 VG 0053 018220X N 16-PG-0001-018220X-N 16"-VG-0055-011503Z-N Vent Gas 3.50 60 15.6 85/-20 WATER58.01.08.1628 Sht
1/2O 2 3 4
01 16 VG 0060 018220X N 16"-PG-0003-018220X-N 16"-VG-0062-011503Z-N Vent Gas 3.50 60 15.6 85/-20 WATER58.01.08.1628 Sht
2/2O 2 3 4
0112,
20PG 0016 038220X H V-3112-01 2ND STAGE SUCTION DRUM XD-3112-01 2ND STAGE SUCTION DAMPENER Process Gas 8.20 55 19 180/-20 WATER
58.01.08.1634 Sht
1/3 /
58.01.08.1634 Sht
2/3
O 1 2 3 4
01 12,16 PG 0017 038220X N 12"-PG-0016-038220X-H 16"-PG-0008-038220X-N Process Gas 8.20 55 19 180/-20 WATER
58.01.08.1634 Sht
1/3 / 58.01.08.1633
Sht 2/3 /
58.01.08.1633 Sht
O 2 3 4
01 20 PO 0029 031441X N 20"-PO-0151-031441R-N PRODUCTION MANIFOLD Process Oil 5.00 15/60 47.1 93 WATER
58.01.08.1626 /
58.01.08.1627 Sht
1/2
MSM 1 2 3 2-PHASE
01 4 PO 0030 031441X N RP-1301 PIG RECEIVER FROM RDS-1 8"-PO-0031-031441X-N Process Oil 5.00 15/60 47.1 93 WATER 58.01.08.1626 O 2 4 2-PHASE
01 8 PO 0031 031441X N RP-1301 PIG RECEIVER FROM RDS-1 20"-PO-0029-031441X-N Process Oil 5.00 15/60 47.1 93 WATER 58.01.08.1626 O 2 3 4 2-PHASE
01 24 PO 0032 031441X N10"-PO-0020-031441X-N/10"-PO-0019-031441X-N/20"-PO-
0029-031441X-NV-0301 PRODUCTION SEPARATOR Process Oil 4.00 15/60 47.1 93 WATER
58.01.08.1627/
58.01.08.1628 Sht
1/2
O 1 2
01 6 PO 0079 031441X N
6"-PO-0086-031441X-N, 2"-HC-0030-031441X-N, 6"-PO-0085-
031441X-N, 2"-HC-0035-031441X-N, 2"-PO-0083-031441X-
N,3"-PO-0084-031441X-N,4"-PO-0082-031441X-N,3"-HC-0011-
031441X-N,2"-HC-0012-031441X-N,2"-HC-0013-031441X-N,2"-
HC-0015-031441X-N
24"-PO-0032-031441X-N Process Oil 5.00 60 47.1 93 WATER 58.01.08.1627 Sht
2/2O 3 4
01 24 PO 0033 031441X N10"-PO-0020-031441X-N/10"-PO-0019-031441X-N/20"-PO-
0029-031441X-NV-0302 PRODUCTION SEPARATOR Process Oil 4.00 15/60 47.1 93 WATER
58.01.08.1627/
58.01.08.1628 Sht
2/2
O 1 2
01 6 PO 0080 031441X N
6"-PO-0086-031441X-N, 2"-HC-0030-031441X-N, 6"-PO-0085-
031441X-N, 2"-HC-0035-031441X-N, 2"-PO-0083-031441X-
N,3"-PO-0084-031441X-N,4"-PO-0082-031441X-N,3"-HC-0011-
031441X-N,2"-HC-0012-031441X-N,2"-HC-0013-031441X-N,2"-
HC-0015-031441X-N
24"-PO-0033-031441X-N Process Oil 5.00 60 47.1 93 WATER 58.01.08.1627 Sht
2/2O 3 4
99
95
96
98
97
01-24PO0033
01-20PG0016
01-20PO0029
01-18PG0007
01-24PO0032
ADCO DOC. NO: 58.01.17.1601, REV- I
CONTRACTOR DOC. NO: A049-001-16-43-LL-0001 PAGE 10 OF 13
ANNEXURE-1
QUSAHWIRA FULL FIELD DEVELOPEMENT PROJECT
CRITICAL LINE LIST -CDS- QUSAHWIRA
SL NO. SYSTEM NO.PLANT
AREALINE NUMBER STREAM DESCRIPTION OPERATING CONDITION
TEST
MEDIUMP&ID No.
CRITICALITY
CODE
TYPE OF
FLOW
REMARKS
SIZE (INCH)
SERVICE
SERIAL NUMBER
PIPING CLA
SS
INSULA
TION
FROM TO
FLO
W MEDIUM
NORMAL
PRESSURE barg
NORMAL TEMP.OC
DESIGN
PRESSURE barg
DESIGN TEMP.OC
CATEGORY
1
CATEGORY
2
CATEGORY
3
CATEGORY
4
CATEGORY FOR STRESS CRITICALITY
100 39-06PO0087 01 6 PO 0085 031441X N 6"-PO-0087-031440X-N6"-PO-0081-031441X-N, 6"-PO-0080-031441X-N, 6"-PO-0079-
031441X-NProcess Oil 5.00 60 47.1 93 WATER
58.01.08.1627 Sht
2/2O 3 4
01 2 VG 0086 013421X N 2"-VG-0086-093451Z-N 8"-VG-0236-013421X-N Vent Gas 1.60 120 7 150/-45 AIR58.01.08.1637 Sht
2/3O 2 4
01 2 VG 0094 033421X N 2"-VG-0093-251503Z-N, 2"-VG-0094-253451Z-N 8"-VG-0236-013421X-N Vent Gas 1.60 120 7 150/-45 WATER58.01.08.1638 Sht
2/3O 2 4
01 2 VG 0125 033421X N 2"-VG-0124-253451Z-N, 2"-VG-253451Z-N 8"-VG-0235-013421X-N Vent Gas 1.60 120 7 150/-45 WATER58.01.08.1644 Sht
2/3O 2 4
01 3 VG 0132 033421X N 2"-IG-0001-253451Z-N 6"-VG-0136-033421X-N Vent Gas ATM 65 35.5 205 AIR 58.01.08.1652 S 3
01 2 VG 0134 033421X N PSV-1302-01 6"-VG-0136-033421X-N Vent Gas ATM 65 35.5 205 AIR 58.01.08.1652 S 2 3
01 6 VG 0136 033421X N HEADER 6"-VG-0136-033421X-N Vent Gas ATM 65 35.5 205 AIR 58.01.08.1652 O 2 3
01 3 VG 0137 013421X N 3"-VG-0137-253451Z-N 8"-VG-0237-013421Z-N Vent Gas ATM 65 7 150/-45 AIR 58.01.08.1653 S 2 4
01 2 VG 0215 153451Z N 2"-VG-0118-091502Z-N 2"-VG-0218-013451Z-N Vent Gas 89.00 133 119 180/-50 WATER58.01.08.1643 Sht
3/3O 2 3
01 6 VG 0147 011502Z N V-3116-03 TEG SURGE DRUM 18"-VG-0194-011440Z-N Vent Gas 0.01 85 7 150/-1 AIR58.01.08.1654 Sht
2/2O 2 3 4
01 2 VG 0149 011440Z N V-3101 GLYCOL DRAIN DRUM 2"-VG-0150-011440Z-N Vent Gas 0.02 85 3.5 240 AIR 58.01.08.1656 O 3
01 2 VG 0150 011440Z N S-3101 GLYCOL DRAIN FILTER, 2"-VG-0150-011502Z-N 18"-VG-0194-011440Z-N Vent Gas 0.01 85 7 150 AIR 58.01.08.1656 O 2 4
01 6 VG 0153 011440Z N T-2401 WATER SEPARATION TANK 6"-VG-0154-011440Z-N Vent Gas 0.02 60 15.6 85 AIR58.01.08.1659 Sht
1/4TK 2 4
01 2,6 VG 0154 011440Z N 6"-VG-0153-011440Z-N 18"-VG-0194-011440Z-N Vent Gas 0.01 85 7 150/-1 AIR58.01.08.1659 Sht
1/4O 2 3 4
01 6 VG 0159 011440Z N T-2402 WATER SEPARATION TANK 6"-VG-0160-011440Z-N Vent Gas 0.02 60 15.6 85 AIR58.01.08.1659 Sht
2/4TK 2 4
01 2,6 VG 0160 011440Z N 6"-VG-0159-011440Z-N 18"-VG-0194-011440Z-N Vent Gas 0.01 85 7 150/-1 AIR58.01.08.1659 Sht
2/4O 2 4
01 6 VG 0165 011440Z N T-2404 WATER DISPOSAL TANK 4"-VG-0169-011440Z-N Vent Gas 0.01 85 7 150/-1 AIR58.01.08.1659 Sht
4/4TK 2 3
01 6 VG 0167 011440Z N T-2405 6"-VG-0213-011440Z-N Vent Gas 0.01 85 7 150/-1 AIR58.01.08.1659 Sht
4/4TK 3 4
01 6 VG 0169 011440Z N 4"-FG-0017-018220X-N 18"-VG-0194-011440Z-N Vent Gas 0.01 85 7 150/-1 AIR58.01.08.1659 Sht
4/4O 2 3 4
01 18 VG 0194 011440Z N VAPOUR RECOVERY HEADER VAPOUR RECOVERY UNIT U-3801 Vent Gas 0.01 74 7 150/-1 AIR
58.01.08.1663 Sht
1/2 / 58.01.08.1663
Sht 2/2
S 2 3
01 18 VG 0195 011440Z N 18"-VG-0194-011440Z-N V-1941 TANK FLARE KNOCKOUT DRUM Vent Gas 0.02 74 7 150/-1 AIR
58.01.08.1663 Sht
1/2 / 58.39.08.1606
Sht 1/2
O 2 3
01 8 VG 0196 011440Z N 18"-VG-0194-011440Z-N 18"-VG-0195-011440Z-N Vent Gas 0.02 74 7 150/-1 AIR58.01.08.1663 Sht
1/2O 2 3 4
01 6 VG 0213 011440Z N 3"-FG-0013-011440Z-N 18"-VG-0194-011440Z-N Vent Gas 0.01 85 7 150/-1 AIR58.01.08.1659 Sht
4/4O 2 3 4
01 6 VG 0020 011503Z N PSV-1301-02 6"-VG-0045-011503Z-N Vent Gas ATM 60 7 150/0 AIR 58.01.08.1626 S 2 3
01 4 VG 0021 031441X N 20"-PO-0151-031441R-N PSV-1301-02 Vent Gas 5.00 60 47.1 93 AIR 58.01.08.1626 S 2 4
01 24 VG 0022 011503Z N 14"-VG-0049-018220X-N 42"-VG-0230-011503Z-N Vent Gas 0.30 100 7 150/0 AIR58.01.08.1628 Sht
1/2O 1 2 3
01 24 VG 0023 011503Z N 14"-VG-0056-018220X-N 42"-VG-0230-011503Z-N Vent Gas 0.30 100 7 150/0 AIR58.01.08.1628 Sht
2/2O 1 2 3
101
102
39-08VG0238
39-18VG0195
ADCO DOC. NO: 58.01.17.1601, REV- I
CONTRACTOR DOC. NO: A049-001-16-43-LL-0001 PAGE 11 OF 13
ANNEXURE-1
QUSAHWIRA FULL FIELD DEVELOPEMENT PROJECT
CRITICAL LINE LIST -CDS- QUSAHWIRA
SL NO. SYSTEM NO.PLANT
AREALINE NUMBER STREAM DESCRIPTION OPERATING CONDITION
TEST
MEDIUMP&ID No.
CRITICALITY
CODE
TYPE OF
FLOW
REMARKS
SIZE (INCH)
SERVICE
SERIAL NUMBER
PIPING CLA
SS
INSULA
TION
FROM TO
FLO
W MEDIUM
NORMAL
PRESSURE barg
NORMAL TEMP.OC
DESIGN
PRESSURE barg
DESIGN TEMP.OC
CATEGORY
1
CATEGORY
2
CATEGORY
3
CATEGORY
4
CATEGORY FOR STRESS CRITICALITY
01 4 VG 0041 011503Z N 2"-VG-0041-011503Z-N 42"-VG-0230-011503Z-N Vent Gas ATM 70 7 150/0 AIR58.01.08.1625 Sht
1/2O 2 4
01 2 VG 0044 011503Z N PSV-1301-01 6"-VG-0045-011503Z-N Vent Gas ATM 60 7 150 AIR 58.01.08.1626 S 2 4
01 6 VG 0045 011503Z N HEADER 42"-VG-0230-011503Z-N Vent Gas ATM 60 7 150 AIR 58.01.08.1626 O 2 3
01 24 VG 0050 011503Z N 14"-VG-0049-018220X-N 42"-VG-0230-011503Z-N Vent Gas 0.30 100 7 150/-1 AIR58.01.08.1628 Sht
1/2O 1 2 3
01 4 VG 0051 018220X N V-0301 PRODUCTION SEPARATOR 4"-VG-0052-011503Z-N Vent Gas 3.50 60 15.6 85/-20 WATER58.01.08.1628 Sht
1/2O 2 4
01 4 VG 0052 011503Z N 4"-VG-0051-018220X-N 16"-VG-0055-011503Z-N Vent Gas 3.50 60 7 150/0 AIR58.01.08.1628 Sht
1/2O 2 4
01 16 VG 0055 011503Z N 16"-VG-0053-018220X-N 42"-VG-0230-011503Z-N Vent Gas 0.30 100 7 150/0 AIR58.01.08.1628 Sht
1/2/ 58.39.08.1601O 2 4
01 24 VG 0057 011503ZZ N 14"-VG-0056-018220X-N 42"-VG-0230-011503Z-N Vent Gas 0.30 100 7 150/0 AIR58.01.08.1628 Sht
2/2O 1 2 3
01 4 VG 0058 018220X N V-0302 PRODUCTION SEPARATOR 4"-VG-0059-011503Z-N Vent Gas 3.50 60 15.6 85/-20 WATER58.01.08.1628 Sht
2/2O 2 4
01 4 VG 0059 011503Z N 4"-VG-0058-018220Z-N 16"-VG-0062-011503Z-N Vent Gas ATM 65 7 150/0 AIR58.01.08.1628 Sht
2/2O 2 4
01 16 VG 0062 011503Z N 16"-VG-0060-018220X-N 42"-VG-0230-011503Z-N Vent Gas 0.30 100 7 150/0 AIR58.01.08.1628 Sht
2/2/ 58.39.08.1601O 2 4
01 3 VG 0065 011503Z 2"-VG-0063-091441X-N,PSV-1303-01 HP FLARE HEADER Vent Gas ATM 62 7 150/0 WATER58.01.08.1632 Sht
1/2O 2 4
01 4 VG 0066 011503Z N 3"-PG-0009-038220X-N 18"-VG-0228-011503Z-N Vent Gas 0.30 100 7 150/0 AIR58.01.08.1633 Sht
1/3O 2 4
01 2, 10 VG 0070 011503Z N2"-PG-0013-038220X-P,12"-PG-0011-038220X-P, 8"-PG-0012-
038220X-P18"-VG-0228-011503Z-N Vent Gas 0.30 100 7 150/0 AIR
58.01.08.1633 Sht
3/3O 2 4
01 12 VG 0071 011503Z N 10"-PG-0015-038220X-N 18"-VG-0228-011503Z-N Vent Gas 0.30 100 7 150/0 AIR
58.01.08.1634 Sht
1/3 /
58.39.08.08.1601
O 2 3 4
012, 3,
10VG 0075 011503Z N 8"-PG-0019-061502Z-P, 2"-PG-0020-061502Z-P 18"-VG-0228-011503Z-N Vent Gas 0.30 100 7 150/0 AIR
58.01.08.1634 Sht
3/3S 2 3 4
01 8 VG 0076 011503Z N2"-VG-0076-011503Z-N, 2"-PG-0024-068220X-N, 8"-PG-0024-
068220X-N 18"-VG-0228-011503Z-N Vent Gas 0.30 100 7 150/0 AIR 58.01.08.1635 S 2 3 4
01 8 VG 0082 011503Z P 8"-PG-0029-061502Z-P 18"-VG-0228-011503Z-N Vent Gas 0.30 100 7 150/0 AIR 58.01.08.1636 O 2 3 4
01 3 VG 0083 013421Z N 2"-VG-0083-013421X-N, 3"-PG-0033-093451Z-N 8"-VG-0236-013421Z-N Vent Gas 1.60 120 7 150/-45 AIR58.01.08.1637 Sht
1/3S 2 4
01 2, 6 VG 0088 011503Z N 2"-VG-0089-153451Z-N 18"-VG-0228-011503Z-N Vent Gas 0.30 100 7 150/0 WATER58.01.08.1637 Sht
3/3O 2 4
01 3 VG 0090 033421X N 3"-VG-0090-253451Z-N, 2"-PG-0044-253451Z-N 8"-VG-0236-013421X-N Vent Gas 1.60 120 7 150/-45 AIR58.01.08.1638 Sht
1/3O 2 4
01 6 VG 0096 031503Z N 2"-PG-0050-251503Z-P, 4"-PG-0047-251503Z-P 6"-VG-0228-011503Z-N Vent Gas 0.30 100 7 150/0 AIR58.01.08.1638 Sht
3/3S 2 4
01 4 VG 0097 011503Z N 3"-PG-0057-038220X-N 18"-VG-0227-011503Z-N Vent Gas 0.30 100 7 150/0 AIR58.01.08.1639 Sht
1/3S 2 4
01 2, 10 VG 0101 011503Z N 2"-PG-0061-038220X-P, 12"-PG-0062-038220X-P 18"-VG-0227-011503Z-N Vent Gas 0.30 100 7 150/0 AIR58.01.08.1639 Sht
3/3S 2 3 4
01 12 VG 0102 011503Z N 10"-PG-0063-038220X-N 18"-VG-0227-011503Z-N Vent Gas 0.30 100 7 150/0 AIR58.01.08.1640 Sht
1/3 / 58.39.08.1601S 2 3 4
012, 3,
10VG 0106 011503Z N 8"-PG-0068-061502Z-P 18"-VG-0227-011503Z-N Vent Gas 0.30 100 7 150/0 AIR
58.01.08.1640 Sht
3/3S 2 3 4
01 8 VG 0107 011503Z N 2"-VG-0107-011503Z-N, 6"-PG-0071-068220X-N 18"-VG-0227-011503Z-N Vent Gas 0.30 100 7 150/0 AIR 58.01.08.1641 S 2 3 4
103 39-42VG0230
ADCO DOC. NO: 58.01.17.1601, REV- I
CONTRACTOR DOC. NO: A049-001-16-43-LL-0001 PAGE 12 OF 13
ANNEXURE-1
QUSAHWIRA FULL FIELD DEVELOPEMENT PROJECT
CRITICAL LINE LIST -CDS- QUSAHWIRA
SL NO. SYSTEM NO.PLANT
AREALINE NUMBER STREAM DESCRIPTION OPERATING CONDITION
TEST
MEDIUMP&ID No.
CRITICALITY
CODE
TYPE OF
FLOW
REMARKS
SIZE (INCH)
SERVICE
SERIAL NUMBER
PIPING CLA
SS
INSULA
TION
FROM TO
FLO
W MEDIUM
NORMAL
PRESSURE barg
NORMAL TEMP.OC
DESIGN
PRESSURE barg
DESIGN TEMP.OC
CATEGORY
1
CATEGORY
2
CATEGORY
3
CATEGORY
4
CATEGORY FOR STRESS CRITICALITY
01 4 VG 0110 011503Z P 4"-PG-0076-068220X-N 18"-VG-0227-011503Z-N Vent Gas 0.30 100 7 150/0 AIR 58.01.08.1642 S 2 4
01 8 VG 0113 011503Z P 8"-PG-0077-061502Z-P 18"-VG-0227-011503Z-N Vent Gas 0.30 100 7 150/0 AIR 58.01.08.1642 S 2 3 4
01 3 VG 0114 013421X N 3"-PG-0094-093451Z-N, 2"-VG-0114-013421X-N 8"-VG-0235-013421X-N Vent Gas 1.60 120 7 150/-45 AIR58.01.08.1643 Sht
1/3S 2 4
01 6 VG 0119 011503Z N 4"-PG-0082-091502Z-N 18"-VG-0227-011503Z-N Vent Gas 0.30 100 7 150/-1 WATER58.01.08.1643 Sht
3/3S 2 4
01 3 VG 0121 033421X N 2"-VG-0121-253451Z-N, 2"-PG-0095-253451Z-N 8"-VG-0235-013421X-N Vent Gas 1.60 120 7 150/-45 AIR58.01.08.1644 Sht
1/3O 2 3 4
01 6 VG 0127 031503Z N 4"-PG-0090-251503Z-P 18"-VG-0227-011503Z-N Vent Gas 0.30 100 7 150/0 AIR58.01.08.1644 Sht
3/3S 2 3
01 4 VG 0146 018220X P 2"-PG-0004-018220X-P 2"-VG-0146-011503Z-P Vent Gas 4.16 77 15.6 90 WATER58.01.08.1654 Sht
1/2O 2 4
01 4 VG 0146 011503Z N V-3116-01 GLYCOL FLASH DRUM 8"-VG-0226-011503Z-N Vent Gas 0.30 100 7 150/0 AIR58.01.08.1654 Sht
1/2O 2 4
01 8 VG 0152 011503Z N 8"-VG-0151-011503Z-N 8"-VG-0226-011503Z-N Vent Gas 0.30 100 7 150/0 AIR 58.01.08.1656 S 2 3 4
01 6 VG 0181 011503Z N 6"-VG-0180-011503Z-N 42"-VG-0230-011503Z-N, -VG-0181-011503Z-N Vent Gas 0.30 100 7 150/0 AIR 58.01.08.1662 S 2 3 4
01 6 VG 0185 011503Z N 6"-VG-0184-011503Z-N, 2"-VG-0184-011503Z-N 42"-VG-0230-011503Z-N Vent Gas 0.30 100 7 150/0 AIR 58.01.08.1665 S 2 3 4
01 10 VG 0189 011503Z N V-6702 PROCESS DRAIN DRUM 42"-VG-0230-011503Z-N Vent Gas 0.30 100 7 150/0 AIR 58.01.08.1666 S 2 3 4
01 4 VG 0191 011503Z N PSV-3201-01A/B HP FLARE HEADER 18"-VG-0228-011503Z-N Vent Gas ATM 65 7 150/-1 AIR 58.01.08.1667 S 2 4
01 4 VG 0197 011503Z NPSV-3801-02A/B VAPOUR RECOVERY COMPRESSOR
PACKAGE8"-VG-0226-011503Z-N Vent Gas 0.30 85 7 150 AIR
58.01.08.1663 Sht
2/2S 2 4
01 4 VG 0318 011503X N PSV-3801-01A/B VRC PACKAGE 4"-VG-0197-011503Z-N Vent Gas 0.30 85 7 150 AIR58.01.08.1663
Sht2/2S 2 4
01 4 VG 0320 011503Z N PSV-0200-03 OUTLET 4"-VG-0041-011503Z-N Vent Gas ATM 70 7 150/0 AIR58.01.08.1625 Sht
1/2S 2 4
01 4 VG 0321 011503Z N PSV-0200-04 OUTLET 4"-VG-0041-011503Z-N Vent Gas ATM 70 7 150/0 AIR58.01.08.1625 Sht
1/2S 2 4
ADCO DOC. NO: 58.01.17.1601, REV- I
CONTRACTOR DOC. NO: A049-001-16-43-LL-0001 PAGE 13 OF 13
DOCUMENT TITLE:
STRESS CRITICAL LINE LIST- CDS FLARE
PROJECT No. :P 14364
ADCO DOC.No.: 58.01.17.1601
REV : I DATE: 16 -Nov- 10
CONTRACTOR DOC. No. A049-001-16-43-LL-0001 PAGE: TOP SHEET
ANNEXURE-2
STRESS CRITICAL LINE LIST- CDS FLARE-QUSAHWIRA
ANNEXURE-2
QUSAHWIRA FULL FIELD DEVELOPMENT PROJECT
CRITICAL LINE LIST- CDS FLARE- QUSAHWIRA
SL NO. SYSTEM NO.PLANT
AREALINE NUMBER STREAM DESCRIPTION OPERATING CONDITION
TEST
MEDIUMP&ID No.
CRITICALITY
CODE
TYPE OF
FLOWREMARKS
SIZE (INCH)
SERVICE
SERIAL NUMBER
PIPING CLA
SS
INSULA
TION
FROM TO
FLO
W M
EDIUM
NORMAL
PRESSURE barg
NORMAL TEMP.OC
DESIGN
PRESSURE barg
DESIGN TEMP.OC
CATEGORY 1 CATEGORY 2 CATEGORY 3 CATEGORY 4
1 39-02D0228 39 2 D 0228 018220X N
V-1911 HP COLD FLARE
KNOCKOUT DRUM, FL-1911 FLARE
CONTROLS
4"-D-0228-017011X-N Drain 1.60 -24.7 7 150/(-)45 WATER 58.39.08.1604 Sht1/2 O 2 4
2 39-02VG0240 39 2 VG 0240 011502Z N
P-1911-01/02 HP COLD FLARE
KNOCKOUT DRUM PUMPS, 1"-VG-
0240-011502Z-N
TANK FLARE HEADER 18"-VG-0195-
011502Z-NVent Gas ATM 65 7 150/-45 AIR 58.39.08.1604 P 2 4
3 39-03D0236 39 3 D 0236 011440X N P-6701-01/02 FLARE DRAIN PUMPS 4"-D-0236-017011X-N Drain 1.69 35 7 100/-1 WATER 58.39.08.1608 P 2 4
4 39-03HC0031 39 3 HC 0031 031502Z NP-1911-01/02 HPCOLD FKOD
PUMPS3''-HC-0031-031441X-N
Hydrocarbon
Condensate6.55 65 47.1 85 WATER 58.39.08.1604 Sht1/2 P 2 4
5 39-03HC0037 39 3 HC 0037 031502Z NV-1911 HP COLD FLARE
KNOCKOUT DRUM
P-1911-01 HP COLD FLARE KOD
PUMPS
Hydrocarbon
Condensate1.60 -24.7 7 150 / -45 WATER 58.39.08.1604 Sht1/2 P 2 4
6 39-03HC0038 39 3 HC 0038 031502Z NV-1911 HP COLD FLARE
KNOCKOUT DRUM
P-1911-02 HP COLD FLARE KOD
PUMPS
Hydrocarbon
Condensate1.60 -24.7 7 150 / -45 WATER 58.39.08.1604 Sht1/2 P 2 4
7 39-04D0227 39 4 D 0227 018220X NV-1931 HP SPARE FLARE
KNOCKOUT DRUM4"-D-0227-017011X-N Drain 0.3 (-24.7)-85 7 150/-45 WATER 58.39.08.1605 Sht1/2 O 2 4
8 39-06PO0087 39 6 PO 0087 031440X NP-1921-01/02 HP FLARE KNOCKOUT
DRUM PUMPS6"-PO-0085-031441X-N Process Oil 6.30 35 47.1 85 WATER 58.39.08.1603 Sht 1/2 P 2 4
9 39-06PO0088 39 6 PO 0088 031502Z NP-1931-01/02 HP SPARE FLARE
KNOCKOUT DRUM PUMPS6"-PO-0088-031441X-N Process Oil 6.30 35 47.1 85 WATER 58.39.08.1603 Sht 1/2 P 2 4
10 39-06PO0089 39 6 PO 0089 011440Z NV-1921 HP FLARE KNOCKOUT
DRUM6"-PO-0089-031440X-N Process Oil 0.30 85 7 150 WATER 58.39.08.1603 Sht 1/2 O 3
11 39-06PO0090 39 6 PO 0090 011440Z NV-1921 HP FLARE KNOCKOUT
DRUM6"-PO-0090-031440X-N Process Oil 0.30 85 7 150 WATER 58.39.08.1603 Sht 1/2 O 3
12 39-06PO0091 39 6 PO 0091 031502Z NV-1931 HP SPARE FLARE
KNOCKOUT DRUM
P-1931-01 HP SPARE FLARE
KNOCKOUT DRUM PUMPProcess Oil 0.30 (-24.7)-85 7 150/-45 WATER 58.39.08.1605 Sht 1/2 P 2 3
13 39-06PO0092 39 6 PO 0092 031502Z NV-1931 HP SPARE FLARE
KNOCKOUT DRUM
P-1931-02 HP SPARE FLARE
KNOCKOUT DRUM PUMPProcess Oil 0.30 (-24.7)-85 7 150/-45 WATER 58.39.08.1605 Sht 1/2 P 2 3
39 8 VG 0235 013421X N HP COLD FLARE SUBHEADER 8"-VG-0238-013421X-N Vent Gas 1.60 -24.7 7 150/-45 AIR 58.39.08.1602 O 2 3 2-PHASE
39 8 VG 0236 013421X N HP COLD FLARE SUBHEADER 8"-VG-0238-013421X-N Vent Gas 1.60 -24.7 7 150/-45 AIR 58.39.08.1602 O 2 3 2-PHASE
39 8 VG 0237 013421X N HP COLD FLARE SUBHEADER 8"-VG-0238-013421X-N Vent Gas 1.60 -24.7 7 150/-45 AIR 58.39.08.1602 O 2 3 2-PHASE
39 8 VG 0238 013421X N HP COLD FLARE HEADER
V-1911 HP COLD FLARE
KNOCKOUT DRUM, 42"-VG-0230-
013421X-N
Vent Gas 1.60 -24.7 7 150/-45 AIR
58.39.08.1602 /
58.39.08.1604 /
58.39.08.1605
O 2 3 2-PHASE
15 39-08VG0239 39 8 VG 0239 011502Z NV-1911 HP COLD FLARE
KNOCKOUT DRUMFL-1911 HP COLD FLARE Vent Gas 1.60 65 7 150/-45 AIR 58.39.08.1604 O 2 3
16 39-18VG0195 39 18 VG 0195 011440Z N 18"-VG-0195-011502Z-NV-1951 SPARE TANK FLARE
KNOCKOUT DRUMVent Gas ATM 75 7 150/-1 AIR
58.39.08.1606 Sht 1/2 /
58.39.08.1607 Sht 1/2O 2 4
17 39-18VG0241 39 18 VG 0241 011440Z NV-1941 TANK FLARE KNOCKOUT
DRUMFL-1941 TANK FLARE STACK Vent Gas 0.01 74.2 7 150/-1 AIR
58.39.08.1606 Sht1/2,
58.39.08.1606 Sht2/2O 2 4
18 39-18VG0243 39 18 VG 0243 011440Z NV-1951 SPARE TANK FLARE
KNOCKOUT DRUMFL-1951 SPARE TANK FLARE Vent Gas ATM 74.2 7 150/-1 AIR
58.39.08.1607 Sht1/2,
58.39.08.1607 Sht 2/2O 2 4
19 39-30VG0231 39 30 VG 0231 011440X NV-1921 HP FLARE KNOCKOUT
DRUMFL-1921 HP FLARE Vent Gas 0.30 65 7 150 AIR 58.39.08.1603 O 1 2
20 39-30VG0233 39 30 VG 0233 011503Z NV-1931 HP SPARE FLARE
KNOCKOUT DRUMFL-1931 HP FLARE Vent Gas 0.30 65 7 150/-45 AIR 58.39.08.1605 O 1 2
14 39-08VG0238
CATEGORY FOR STRESS CRITICALITY
ADCO DOC. NO: 58.01.17.1601, REV- I
CONTRACTOR DOC. NO: AO49-001-16-43-LL-0001 PAGE 1 OF 2
ANNEXURE-2
QUSAHWIRA FULL FIELD DEVELOPMENT PROJECT
CRITICAL LINE LIST- CDS FLARE- QUSAHWIRA
SL NO. SYSTEM NO.PLANT
AREALINE NUMBER STREAM DESCRIPTION OPERATING CONDITION
TEST
MEDIUMP&ID No.
CRITICALITY
CODE
TYPE OF
FLOWREMARKS
SIZE (INCH)
SERVICE
SERIAL NUMBER
PIPING CLA
SS
INSULA
TION
FROM TO
FLO
W M
EDIUM
NORMAL
PRESSURE barg
NORMAL TEMP.OC
DESIGN
PRESSURE barg
DESIGN TEMP.OC
CATEGORY 1 CATEGORY 2 CATEGORY 3 CATEGORY 4
CATEGORY FOR STRESS CRITICALITY
39 8 VG 0226 011503Z N HP FLARE SUBHEADER 18"-VG-0230-011503Z-N Vent Gas 0.30 85 7 150 AIR 58.39.08.1601 O 2 3 2-PHASE
39 18 VG 0227 011503Z N HP FLARE SUBHEADER 18"-VG-0230-011503Z-N Vent Gas 0.30 85 7 150 AIR 58.39.08.1601 O 2 2-PHASE
39 18 VG 0228 011503Z N HP FLARE SUBHEADER 18"-VG-0230-011503Z-N Vent Gas 0.30 85 7 150 AIR 58.39.08.1601 O 2 2-PHASE
392,18,
42VG 0230 011503Z N HP FLARE HEADER
V-1921 HP FLARE KNOCKOUT
DRUM, 42"-VG-0230-013421X-NVent Gas 0.30 85 7 150 AIR
58.39.08.1601,
58.39.08.1603;
58.39.08.1605
O 1 2 4SLUG / 2-
PHASE
39 42 VG 0230 013421X N 42"-VG-0230-011503Z-NV-1931 HP SPARE FLARE
KNOCKOUT DRUMVent Gas 0.30 85 7 150 AIR 58.39.08.1605 Sht1/2 O 1 2
SLUG / 2-
PHASE
21 39-42VG0230
ADCO DOC. NO: 58.01.17.1601, REV- I
CONTRACTOR DOC. NO: AO49-001-16-43-LL-0001 PAGE 2 OF 2
DOCUMENT TITLE:
STRESS CRITICAL LINE LIST- CDS ASAB
PROJECT No. :P 14364
ADCO DOC.No.: 58.01.17.1601
REV : I DATE: 16 -Nov- 10
CONTRACTOR DOC. No. A049-001-16-43-LL-0001 PAGE: TOP SHEET
ANNEXURE-3
STRESS CRITICAL LINE LIST- CDS-ASAB
ANNEXURE-3
QUSAHWIRA FULL FIELD DEVELOPMENT PROJECT
CRITICAL LINE LIST- CDS- ASAB
SL NO. SYSTEM NO.PLANT
AREALINE NUMBER STREAM DESCRIPTION OPERATING CONDITION
TEST
MEDIUMP&ID No.
CRITICALITY
CODE
TYPE OF
FLOWREMARKS
SIZE (INCH)
SERVICE
SERIAL NUMBER
PIPING CLA
SS
INSULA
TION
FROM TO
FLO
W M
EDIUM
NORMAL
PRESSURE barg
NORMAL TEMP.OC
DESIGN
PRESSURE barg
DESIGN TEMP.OC
CATEGORY 1 CATEGORY 2 CATEGORY 3 CATEGORY 4
01 3 VG 0205 011503Z N PSV-1311-01 3"-VG-0207-011503Z-N Vent Gas ATM 60 7 180 AIR 14.01.08.1601 S 2 3
01 3 VG 0207 011503Z N 3"-VG-0207-091441X-N HP FLARE Vent Gas ATM 60 7 180 AIR 14.01.08.1601 O 3
01 14 PO 0063 091441X N RP-1311 MOL RECEIVER 14"-PO-0066-031441X-N Process Oil 4.50 60 120 85 WATER14.01.08.1601 /
14.01.08.1602O 3
01 14 PO 0066 031441X N 14"-PO-0063-091441X-N HEADER Process Oil 3.50 60 22.4 85 WATER 14.01.08.1602 O 3
01 14 PO 0067 031441X N 14"-PO-0066-031441X-NM-0202 2ND STAGE INLET
MANIFOLDProcess Oil 3.50 60 22.4 85 WATER 14.01.08.1603 MSM 3
01 14 PO 0068 031441X N 14"-PO-0066-031441X-NM-0202 2ND STAGE INLET
MANIFOLDProcess Oil 3.50 60 22.4 85 WATER 14.01.08.1603 MSM 3
01 14 PO 0069 031441X N 14"-PO-0066-031441X-NM-0202 2ND STAGE INLET
MANIFOLDProcess Oil 3.50 60 22.4 85 WATER 14.01.08.1603 MSM 3
01 14 PO 0070 031441X N 14"-PO-0066-031441X-NM-0202 2ND STAGE INLET
MANIFOLDProcess Oil 3.50 60 22.4 85 WATER 14.01.08.1603 MSM 3
01 4 VG 0208 031441X N 14"-PO-0066-031441X-N4"-VG-0209-011503Z-N, PSV-1300-
01A/01BVent Gas 3.50 60 22.4 85 AIR 14.01.08.1602 S 2 4
01 4 VG 0209 011503Z N2"-VG-0208-031441X-N,PSV-1300-
01A/01BTO HP FLARE Vent Gas ATM 60 7 180 AIR 14.01.08.1602 S 2 3
1
2
01-03VG0207
01-14PO0063
CATEGORY FOR STRESS CRITICALITY
ADCO DOC. NO: 58.01.17.1601, REV- I
CONTRACTOR DOC. NO: A049-001-16-43-LL-0001 PAGE 1 OF 1