5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE...

206
Route CR-NA Project Description OVERLOOK AND SILVER HILLS NEIGHBORHOOD SIDEWALK CONNECTIONS ALONG SUMMER LANE, PLANTERS RIDGE, SILVER HILLS DRIVE, SWEET RIDGE ROAD, WEAVER STREET, JAY STREET, SHEILA BOULEVARD, AND AMANDA LANE IN THE CITY OF PRATTVILLE Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor CITY OF PRATTVILLE LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100069431 TAPMN TA18 (937) CONSTRUCTION SIDEWALK 2019 $193 $0 $48 $241 TOTAL COST: $193 $0 $48 $241 Route CR-NA Project Description RESURFACING ON UPPER KINGSTON ROAD FROM 7TH STREET TO PRATTVILLE CITY LIMITS (SITE 1); WIDENING AND RESURFACING ON MARTIN LUTHER KING, JR. DRIVE FROM 7TH STREET TO POWELL ROAD (SITE 2) Project Length in Miles 3.916 Urban Area MONTGOMERY Sponsor CITY OF PRATTVILLE COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100057564 PE 2018 100057524 STPMN-STPAA 0118 (252) CONSTRUCTION WIDENING AND RESURFACING (RDWY) 2020 $885 $221 $0 $1,106 TOTAL COST: $885 $221 $0 $1,106 Route CR-NA Project Description ADDITIONAL TURN LANES AT INTERSECTIONS ON FAIRVIEW AVENUE BETWEEN SR-3 (US-31) AND JASMINE TRAIL Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor CITY OF PRATTVILLE COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100063688 SP 2018 100068602 STPMN 0115 (252) PRELIMINARY ENGINEERING TURN LANES 2020 $512 $0 $128 $640 100063689 STPMN 0115 () CONSTRUCTION TURN LANES 2023 $3,200 $0 $800 $4,000 TOTAL COST: $3,712 $0 $928 $4,640 Route SR-3 Project Description ADDING TURN LANES AT INTERSECTIONS ON SR-3 (US-31) BETWEEN 6TH STREET (PRATTVILLE) NORTH TO I-65 Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor CITY OF PRATTVILLE COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100063686 STPMN 0115 () PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $4 $0 $1 $5 100063687 STPMN 0115 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2023 $2,000 $0 $500 $2,500 TOTAL COST: $2,004 $0 $501 $2,505 Route SR-3 Project Description RESURFACING AND BRIDGE GUARDRAIL RETROFIT ON SR-3 (US-31) FROM I-65 TO THE CHILTON COUNTY LINE Project Length in Miles 11.667 Urban Area MONTGOMERY Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100069866 STPAA 0003 (626) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE LEVEL 2 2020 $3,965 $991 $0 $4,956 TOTAL COST: $3,965 $991 $0 $4,956 6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 10/1/2019-9/30/2023 1 of 206 HIGHWAY PROJECTS - AUTAUGA STIP PLAN: 2020 - Original

Transcript of 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE...

Page 1: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description OVERLOOK AND SILVER HILLS NEIGHBORHOOD SIDEWALK CONNECTIONS ALONG SUMMER LANE, PLANTERS RIDGE, SILVER HILLS DRIVE, SWEET RIDGE ROAD, WEAVER STREET, JAY STREET, SHEILA BOULEVARD, AND AMANDA LANE IN THE CITY OF PRATTVILLE

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor CITY OF PRATTVILLE  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069431 TAPMN TA18 (937) CONSTRUCTION SIDEWALK 2019 $193 $0 $48 $241

TOTAL COST: $193 $0 $48 $241

Route CR-NA Project Description RESURFACING ON UPPER KINGSTON ROAD FROM 7TH STREET TO PRATTVILLE CITY LIMITS (SITE 1); WIDENING AND RESURFACING ON MARTIN LUTHER KING, JR. DRIVE FROM 7TH STREET TO POWELL ROAD (SITE 2)

Project Length in Miles 3.916  Urban Area MONTGOMERY  Sponsor CITY OF PRATTVILLE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100057564 PE 2018

100057524 STPMN-STPAA 0118 (252)

CONSTRUCTION WIDENING AND RESURFACING (RDWY)

2020 $885 $221 $0 $1,106TOTAL COST: $885 $221 $0 $1,106

Route CR-NA Project Description ADDITIONAL TURN LANES AT INTERSECTIONS ON FAIRVIEW AVENUE BETWEEN SR-3 (US-31) AND JASMINE TRAIL

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor CITY OF PRATTVILLE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063688 SP 2018

100068602 STPMN 0115 (252) PRELIMINARY ENGINEERING TURN LANES 2020 $512 $0 $128 $640100063689 STPMN 0115 () CONSTRUCTION TURN LANES 2023 $3,200 $0 $800 $4,000

TOTAL COST: $3,712 $0 $928 $4,640

Route SR-3 Project Description ADDING TURN LANES AT INTERSECTIONS ON SR-3 (US-31) BETWEEN 6TH STREET (PRATTVILLE) NORTH TO I-65

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor CITY OF PRATTVILLE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063686 STPMN 0115 () PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $4 $0 $1 $5100063687 STPMN 0115 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2023 $2,000 $0 $500 $2,500

TOTAL COST: $2,004 $0 $501 $2,505

Route SR-3 Project Description RESURFACING AND BRIDGE GUARDRAIL RETROFIT ON SR-3 (US-31) FROM I-65 TO THE CHILTON COUNTY LINE

Project Length in Miles 11.667  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069866 STPAA 0003 (626) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $3,965 $991 $0 $4,956

TOTAL COST: $3,965 $991 $0 $4,956

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

1 of 206

HIGHWAY PROJECTS - AUTAUGASTIP PLAN: 2020 - Original

Page 2: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-6 Project Description ADDITIONAL LANES ON SR-6 (US-82) FROM SR-14 TO SR-3 (US-31) IN PRATTVILLE

Project Length in Miles 2.740  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100004438 PE 2001 / 100062112 PE 2015 / 100004451 RW 2012 / 100071577 CN 2020

100004425 RACR-001-006-001-CN ()

CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND BRG

2020 $0 $16,200 $0 $16,200TOTAL COST: $0 $16,200 $0 $16,200

Route SR-6 Project Description ADDING TURN LANES ON SR-6 (US-82) AT CR-47 (GOLSON ROAD)

Project Length in Miles 0.300  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070705 PE 2020

100071064 ATRP2-01-2020-001-CN ()

CONSTRUCTION TURN LANES 2020 $0 $464 $0 $464TOTAL COST: $0 $464 $0 $464

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

2 of 206

HIGHWAY PROJECTS - AUTAUGASTIP PLAN: 2020 - Amendment # 3

Page 3: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-13 Project Description CONSTRUCTION OF ROUNDABOUT AT THE INTERSECTION OF CR-13 AND CR-44

Project Length in Miles 0.750  Urban Area EASTERN SHORE   Sponsor BALDWIN COUNTY COMMISSION  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069294 PE 2019 / 100069296 RW 2021 / 100069295 UT 2021 / 100069297 CN 2021

100069296 HSIP 0219 (251) RIGHT OF WAY GRADE, DRAIN, BASE AND PAVE 2021 $92 $0 $10 $102100069295 HSIP 0219 (251) UTILITIES GRADE, DRAIN, BASE AND PAVE 2021 $202 $0 $22 $224100069297 HSIP 0219 () CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2021 $1,435 $0 $159 $1,594

TOTAL COST: $1,728 $0 $192 $1,920

Route CR-30 Project Description TURN LANE CONSTRUCTION AND TRAFFIC SIGNAL UPGRADE ON CR-30 (GAYFER AVENUE) AT SR-42 (US-98) IN THE CITY OF FAIRHOPE

Project Length in Miles 0.000  Urban Area EASTERN SHORE   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070857 STPOA 0220 () PRELIMINARY ENGINEERING TURN LANES 2020 $74 $0 $18 $92100070858 STPOA 0220 () CONSTRUCTION TURN LANES 2020 $522 $0 $130 $652

TOTAL COST: $595 $0 $149 $744

Route CR-31 Project Description INTERSECTION REALIGNMENT AND INSTALLATION OF TURN LANES AT CR-31 (OLD HIGHWAY 31) AND SR-3 (US-31)

Project Length in Miles 0.300  Urban Area EASTERN SHORE   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070639 RW 2021 / 100070638 UT 2021 / 100070641 CN 2021

100070637 HSIP 0220 (250) PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2020 $36 $4 $0 $41100070639 HSIP 0220 (250) RIGHT OF WAY SAFETY IMPROVEMENTS 2021 $32 $4 $0 $35100070638 HSIP 0220 (250) UTILITIES SAFETY IMPROVEMENTS 2021 $45 $5 $0 $51100070641 HSIP 0220 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $303 $34 $0 $337

TOTAL COST: $417 $46 $0 $463

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

3 of 206

HIGHWAY PROJECTS - BALDWINSTIP PLAN: 2020 - Original

Page 4: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-64 Project Description RESURFACING ON CR-64 FROM SR-42 (US-98) TO CR-13 AND INTERSECTION IMPROVEMENTS ON CR-64 AT POLLARD ROAD

Project Length in Miles 1.500  Urban Area EASTERN SHORE   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070861 STPOA 0220 () PRELIMINARY ENGINEERING RESURFACING 2020 $48 $0 $12 $60100070862 STPOA 0220 () CONSTRUCTION RESURFACING 2020 $992 $0 $248 $1,240

TOTAL COST: $1,040 $0 $260 $1,300

Route CR-64 Project Description WIDENING AND ADDING CENTER TURN LANE ON CR-64 FROM SR-181 TO CR-54, AND INSTALLATION OF ROUNDABOUT AT AUSTIN ROAD-RIGSBY ROAD

Project Length in Miles 3.020  Urban Area EASTERN SHORE   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069347 PE 2019

100070859 STPOA 0219 () RIGHT OF WAY WIDENING AND RESURFACING (RDWY)

2020 $240 $0 $60 $300100070860 STPOA 0219 () UTILITIES WIDENING AND RESURFACING

(RDWY)2021 $1,212 $0 $303 $1,515

TOTAL COST: $1,452 $0 $363 $1,815

Route CR-65 Project Description BRIDGE DECK REPLACEMENT AT 2 SITES, CR-65 OVER TURKEY BRANCH (BIN 16349) AND DOC MCDUFFIE ROAD OVER WOLF CREEK (BIN 19657)

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071605 TIDP 0220 () CONSTRUCTION BRIDGE REHABILITATION 2021 $1,000 $0 $250 $1,250

TOTAL COST: $1,000 $0 $250 $1,250

Route CR-68 Project Description RESURFACING AND WIDENING ALONG CR-68 FROM THE LOXLEY TOWN LIMITS TO THE BALDWIN BEACH EXPRESS

Project Length in Miles 0.000  Urban Area EASTERN SHORE   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070867 STPOA 0220 () PRELIMINARY ENGINEERING WIDENING AND RESURFACING

(RDWY)2022 $41 $0 $10 $51

100070868 STPOA 0220 () CONSTRUCTION WIDENING AND RESURFACING (RDWY)

2022 $600 $0 $150 $750TOTAL COST: $641 $0 $160 $801

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

4 of 206

HIGHWAY PROJECTS - BALDWINSTIP PLAN: 2020 - Amendment # 7

Page 5: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-99 Project Description ADD PAVED SHOULDERS ON CR-99 FROM CARRIER DRIVE TO SPANISH COVE DRIVE

Project Length in Miles 3.280  Urban Area LILLIAN(PENSACOLA)   Sponsor BALDWIN COUNTY COMMISSION COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063403 STPLL 0219 (254) PRELIMINARY ENGINEERING SHOULDER WIDENING 2020 $40 $0 $10 $50100063404 STPLL 0219 () CONSTRUCTION SHOULDER WIDENING 2020 $408 $0 $102 $510

TOTAL COST: $448 $0 $112 $560

Route CR-99 Project Description ADD PAVED SHOULDERS ON CR-99 FROM CR-91 TO CARRIER DRIVE

Project Length in Miles 0.000  Urban Area LILLIAN(PENSACOLA)   Sponsor BALDWIN COUNTY COMMISSION COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063640 CN 2023

100063634 STPLL 0215 () PRELIMINARY ENGINEERING SHOULDER PAVING 2021 $75 $0 $19 $94TOTAL COST: $75 $0 $19 $94

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

5 of 206

HIGHWAY PROJECTS - BALDWINSTIP PLAN: 2020 - Original

Page 6: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description COASTAL CONNECTION SCENIC BYWAY WAYSHOWING PROGRAM AND SIGNAGE PLAN

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100057820 SB SP12 () SPECIAL UNCLASSIFIED 2020 $17 $4 $0 $21

TOTAL COST: $17 $4 $0 $21

Route CR-NA Project Description STREETSCAPES ALONG SR-42 (US-98) FROM ALABAMA STREET TO CHICAGO STREET

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068388 TAPAA TA18 (925) CONSTRUCTION STREETSCAPE 2019 $311 $0 $78 $389

TOTAL COST: $311 $0 $78 $389

Route CR-NA Project Description SIDEWALKS ALONG NORTH DOBSON AVENUE FROM PHILLIPS STREET TO BOYKIN STREET

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068390 TAPAA TA18 (926) CONSTRUCTION SIDEWALK 2020 $374 $0 $93 $467

TOTAL COST: $374 $0 $93 $467

Route CR-NA Project Description SDW ON E 2ND AVE FROM GULF SHORES PKWY TO E 2ND ST, E 2ND ST FROM E 2ND AVE TO E BEACH BLVD, E 1ST AVE FROM GULF SHORES PKWY TO E 2ND ST, E 1ST ST FROM E 2ND AVE TO E. BEACH BLVD, W 1ST AVE FROM GULF SHORES PKWY TO W 2ND ST, AND W 1ST ST TO W 1ST

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069030 TAPAA TA19 (924) CONSTRUCTION SIDEWALK 2020 $640 $0 $160 $799

TOTAL COST: $640 $0 $160 $799

Route CR-NA Project Description ROUNDABOUT AT NORTH SECTION STREET/CITY 104/VETERANS DRIVE/SCENIC 98

Project Length in Miles 0.000  Urban Area EASTERN SHORE   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070869 STPOA 0220 () PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2023 $111 $0 $28 $139100070870 STPOA 0220 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2023 $960 $0 $240 $1,200

TOTAL COST: $1,072 $0 $268 $1,339

Route CR-NA Project Description CONSTRUCT OFFSET LEFT TURN LANES ON FOLEY BEACH EXPRESS AT CR-12

Project Length in Miles 0.250  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069229 PE 2019 / 100068989 CN 2020

100068989 HRRR 0219 (250) CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $381 $0 $42 $423TOTAL COST: $381 $0 $42 $423

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

6 of 206

HIGHWAY PROJECTS - BALDWINSTIP PLAN: 2020 - Original

Page 7: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route I-10 Project Description BRIDGE PAINTING ON BRIDGES ALONG I-10. ON SR-16 (US-98) OVER I-10 (BIN 10002,10003) ON I-10 OVER FISH RIVER (BIN 10170,10171) ON I-10 OVER 3-MILE CRK (BIN 10172,10173) ON I-10 OVER COWPEN CRK (BIN 8527,8528) ON I-10 OVER STYX RIVER (BIN 8530, 8531)

Project Length in Miles 0.300  Urban Area EASTERN SHORE   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069462 BR I010 (347) PRELIMINARY ENGINEERING BRIDGE PAINTING 2020 $91 $10 $0 $101100069479 BR I010 () CONSTRUCTION BRIDGE PAINTING 2021 $1,376 $344 $0 $1,719

TOTAL COST: $1,466 $354 $0 $1,820

Route I-10 Project Description I-10 INTERCHANGE AT CR-68 WITH CONNECTOR TO (983) BALDWIN BEACH EXPRESS

Project Length in Miles 2.000  Urban Area EASTERN SHORE   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100055053 PE 2019 / 100055054 CN 2021

100055054 IM I010 () CONSTRUCTION LIGHTING 2021 $931 $103 $0 $1,034TOTAL COST: $931 $103 $0 $1,034

Route SR-16 Project Description INTERSECTION IMPROVEMENTS ON SR-16(US-90)/SR-42(US-98) AT SR-3(US-31) AND REALIGNMENT OF SPANISH MAIN STREET

Project Length in Miles 0.960  Urban Area EASTERN SHORE   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069813 RP MR19 (904) PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $332 $83 $0 $415100069814 STPAA MR19 (904) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $1,224 $306 $0 $1,530100069815 STPAA MR19 (904) UTILITIES INTERSECTION IMPROVEMENTS 2022 $330 $82 $0 $412100069816 STPAA MR19 (904) CONSTRUCTION INTERSECTION IMPROVEMENTS 2022 $1,236 $309 $0 $1,545

TOTAL COST: $3,122 $781 $0 $3,903

Route SR-16 Project Description INTERSECTION RELOCATION AND TRAFFIC SIGNAL INSTALLATION ON SR-16 (US-90) AT SR-59 IN LOXLEY

Project Length in Miles 0.529  Urban Area EASTERN SHORE   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067778 PE 2018 / 100067785 RW 2019 / 100067786 UT 2020

100067786 HSIP-STPOA 0016 (524) UTILITIES GRADE, DRAIN, BASE AND PAVE 2020 $713 $79 $0 $792100067784 HSIP-STPOA 0016 (524) CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2020 $1,732 $399 $0 $2,132

TOTAL COST: $2,445 $479 $0 $2,924

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

7 of 206

HIGHWAY PROJECTS - BALDWINSTIP PLAN: 2020 - Original

Page 8: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-161 Project Description SR-161 CONNECTOR FROM SR-180 TO NORTH OF CR-4 (COTTON CREEK DR)

Project Length in Miles 0.670  Urban Area LILLIAN(PENSACOLA)   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063605 ST-002-000-015 () CONSTRUCTION BRIDGE 2020 $0 $42,768 $0 $42,768

TOTAL COST: $0 $42,768 $0 $42,768

Route SR-161 Project Description SR-161 CONNECTOR FROM NORTH OF CR-4 (COTTON CREEK DR) TO FOLEY BEACH EXPRESS

Project Length in Miles 5.460  Urban Area LILLIAN(PENSACOLA)   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065621 PE 2016 / 100066949 RW 2018 / 100063604 UT 2020

100066950 ST-002-999-005 () CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND BRG

2021 $0 $20,185 $0 $20,185TOTAL COST: $0 $20,185 $0 $20,185

Route SR-180 Project Description SR-180 NEW LOCATION AND WIDENING FROM SR-59 IN GULF SHORES TO FOLEY BEACH EXPRESS

Project Length in Miles 9.480  Urban Area LILLIAN(PENSACOLA)   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100040566 STPAA 0180 () RIGHT OF WAY GRADE, DRAIN, BASE AND PAVE 2022 $3,391 $848 $0 $4,239100040567 STPAA 0180 () UTILITIES GRADE, DRAIN, BASE AND PAVE 2023 $1,118 $279 $0 $1,397

TOTAL COST: $4,509 $1,127 $0 $5,636

Route SR-181 Project Description SR-181, ADDITIONAL LANES FROM SR-42 (US-98) TO CR-32

Project Length in Miles 7.260  Urban Area EASTERN SHORE   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100044780 PE 2007 / 100044783 CN 2024

100044781 STPAA 0181 () RIGHT OF WAY GRADE, DRAIN, BASE AND PAVE 2022 $4,133 $1,033 $0 $5,166100044782 STPAA 0181 () UTILITIES GRADE, DRAIN, BASE AND PAVE 2023 $2,722 $680 $0 $3,402

TOTAL COST: $6,855 $1,714 $0 $8,568

Route SR-181 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-181 FROM SR-42 (US-98) TO JUST SOUTH OF QUAIL CREEK DRIVE

Project Length in Miles 6.950  Urban Area EASTERN SHORE   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066642 STPAA-HSIP 0181 (508) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2020 $1,548 $351 $0 $1,899

TOTAL COST: $1,548 $351 $0 $1,899

Route SR-3 Project Description RESURFACING ON SR-3 (US-31) FROM CROSBY ROAD TO THE ESCAMBIA COUNTY LINE

Project Length in Miles 11.330  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069728 STPAA 0003 (623) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,834 $459 $0 $2,293

TOTAL COST: $1,834 $459 $0 $2,293

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

8 of 206

HIGHWAY PROJECTS - BALDWINSTIP PLAN: 2020 - Original

Page 9: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-42 Project Description ACCESS MANAGEMENT ON SR-42 (US-98) FROM CR-64 TO VAN AVENUE IN THE CITY OF DAPHNE

Project Length in Miles 0.800  Urban Area EASTERN SHORE   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071523 STPOA 0042 () PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2020 $120 $0 $30 $150100071524 STPOA 0042 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $1,762 $0 $441 $2,203

TOTAL COST: $1,882 $0 $471 $2,353

Route SR-42 Project Description ADD PAVED SHOULDERS ON SR-42 (US-98) FROM BARCLAY AVENUE TO ALABAMA STATE LINE

Project Length in Miles 1.348  Urban Area LILLIAN(PENSACOLA)   Sponsor BALDWIN COUNTY COMMISSION COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060029 CN 2024

100060027 STPLL 0042 () PRELIMINARY ENGINEERING SHOULDER WIDENING 2023 $20 $0 $5 $25TOTAL COST: $20 $0 $5 $25

Route SR-42 Project Description TRAFFIC SIGNAL INSTALLATION AT THE INTERSECTION OF SR-42 (US-98) AND CR-34

Project Length in Miles 0.010  Urban Area EASTERN SHORE   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069345 STPOA 0042 (537) CONSTRUCTION SIGNALIZATION 2020 $280 $0 $70 $350

TOTAL COST: $280 $0 $70 $350

Route SR-42 Project Description RESURFACING SR-42 (US-98) FROM D'OLIVE CREEK TO JUST NORTH OF SR-104

Project Length in Miles 7.550  Urban Area EASTERN SHORE   Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066184 NH 0042 (534) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $2,661 $665 $0 $3,326

TOTAL COST: $2,661 $665 $0 $3,326

Route SR-59 Project Description RESURFACING ON SR-59 FROM MCMILLIAN ROAD TO CR-80

Project Length in Miles 12.451  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068301 STPAA-HSIP 0059 (518) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $4,180 $1,037 $0 $5,217

TOTAL COST: $4,180 $1,037 $0 $5,217

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

9 of 206

HIGHWAY PROJECTS - BALDWINSTIP PLAN: 2020 - Original

Page 10: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-20 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 007678) ON CR-20 OVER JACKSON CREEK; SITE 2 - (BIN 007679) ON CR-20 OVER PAULS CREEK; SITE 3 - (BIN 005189) ON CR-20 OVER LINDSEY CREEK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071450 HRRR 0320 (250) CONSTRUCTION GUARDRAIL 2020 $162 $0 $18 $180

TOTAL COST: $162 $0 $18 $180

Route SR-1 Project Description REMOVE (BIN 007606), (BIN 007607) AND PEDESTRIAN (BIN 011380) ON SR-1 (US-431) OVER ABANDONED GEORGIA SOUTHWESTERN RAILROAD. REMOVE AND REPLACE (BIN 007604) AND (BIN 007605) AND REMOVE PEDESTRIAN (BIN 011379) ON SR-1 (US-431) OVER CHEWALLA CREEK

Project Length in Miles 0.304  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068900 PE 2019

100040558 BR 0001 (609) RIGHT OF WAY BRIDGE REPLACEMENT 2021 $88 $22 $0 $109100040559 BR 0001 (609) UTILITIES BRIDGE REPLACEMENT 2022 $118 $29 $0 $147100040561 BR 0001 () CONSTRUCTION BRIDGE REPLACEMENT 2022 $6,482 $1,621 $0 $8,103

TOTAL COST: $6,688 $1,672 $0 $8,360

Route SR-10 Project Description MILLING AND RESURFACING ON SR-10 FROM .48 MILE EAST OF SR-51 TO EAST INTERSECTION OF CR-41 AND SR-10.

Project Length in Miles 18.620  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068709 STPNU 0010 (550) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 12020 $1,016 $254 $0 $1,270

TOTAL COST: $1,016 $254 $0 $1,270

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

10 of 206

HIGHWAY PROJECTS - BARBOURSTIP PLAN: 2020 - Original

Page 11: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-2 Project Description RESURFACING ON CR-2 (WEST ASHBY ROAD) FROM SR-25 TO SR-139 - BCP 04-01-19

Project Length in Miles 5.313  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071683 STPNU 0420 (250) CONSTRUCTION RESURFACING 2021 $1,225 $0 $306 $1,531

TOTAL COST: $1,225 $0 $306 $1,531

Route CR-51 Project Description FULL DEPTH RECLAMATION, RESURFACING, AND STRIPING ON CR-51 FROM PERRY COUNTY LINE NORTH TO SR-219

Project Length in Miles 6.450  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069407 FLAP-STPNU FLAP (027) CONSTRUCTION RESURFACING 2018 $570 $143 $0 $713

TOTAL COST: $570 $143 $0 $713

Route CR-51 Project Description FULL DEPTH RECLAMATION, RESURFACING, AND STRIPING ON CR-51 FROM PERRY COUNTY LINE NORTH TO SR-219

Project Length in Miles 6.450  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071694 FLAP-STPNU FLAP (027) CONSTRUCTION RESURFACING 2020 $322 $80 $0 $402

TOTAL COST: $322 $80 $0 $402

Route SR-5 Project Description REPLACE BRIDGE ON SR-5 OVER BLUE GIRTH CREEK (BIN# 002651) AND RELIEF (BIN# 002650)

Project Length in Miles 1.665  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049166 PE 2018

100070849 BR 0005 (556) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $100 $25 $0 $125100071634 BR 0005 (556) UTILITIES BRIDGE REPLACEMENT 2020 $80 $20 $0 $100100049167 BR 0005 (556) CONSTRUCTION BRIDGE REPLACEMENT 2021 $8,863 $2,216 $0 $11,079

TOTAL COST: $9,043 $2,261 $0 $11,304

Route SR-6 Project Description BRIDGE REPLACEMENT ON SR-6 (US-82) OVER SANDY CREEK (BIN 1189)

Project Length in Miles 1.652  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066952 PE 2017 / 100066953 RW 2019

100066954 BR 0006 (573) UTILITIES BRIDGE REPLACEMENT 2020 $259 $65 $0 $324100066955 BR 0006 (573) CONSTRUCTION BRIDGE REPLACEMENT 2020 $4,671 $1,168 $0 $5,838

TOTAL COST: $4,930 $1,233 $0 $6,163

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

11 of 206

HIGHWAY PROJECTS - BIBBSTIP PLAN: 2020 - Amendment # 1

Page 12: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-22 Project Description BRIDGE REPLACEMENT ON CR-22 (DEANS FERRY ROAD) OVER CSX RAILROAD BIN 012072 - BCP 05-163-17

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068195 BRZ 0518 (251) CONSTRUCTION BRIDGE REPLACEMENT 2020 $1,857 $33 $554 $2,444

TOTAL COST: $1,857 $33 $554 $2,444

Route CR-51 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 006221) ON CR-51 OVER BLACK WARRIOR RIVER; SITE 2 - (BIN 004976) ON CR-29 OVER HIGHLAND LAKE; SITE 3 - (BIN 007159) ON CR-33 OVER CALVERT PRONG

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071451 HRRR 0520 (251) CONSTRUCTION GUARDRAIL 2020 $141 $0 $16 $156

TOTAL COST: $141 $0 $16 $156

Route CR-9 Project Description RESURFACING ON CR-9 FROM SR-160 TO SR-3 (US-31) - BCP 05-170-19

Project Length in Miles 5.800  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071529 STPNU 0520 (250) CONSTRUCTION RESURFACING 2022 $490 $0 $122 $612

TOTAL COST: $490 $0 $122 $612

Route NA Project Description CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES 3, 4, 7, 23, 25, 34, 53, 67, 74, 75, 79, 132, 144, 160 AND 174 IN BLOUNT AND ST CLAIR COUNTIES

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061455 PE 2014

100061456 STPAA NR13 (934) CONSTRUCTION SIDEWALK 2022 $106 $27 $0 $133TOTAL COST: $106 $27 $0 $133

Route SR-160 Project Description INTERSECTION IMPROVEMENTS ON SR-160 AT THE I-65 INTERCHANGE RAMP AND AT SR-3 (US-31)

Project Length in Miles 1.500  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066786 PE 2017 / 100066787 RW 2021 / 100066788 UT 2021 / 100066789 CN 2022

100066787 HSIP 0160 () RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $468 $52 $0 $520100066788 HSIP 0160 () UTILITIES INTERSECTION IMPROVEMENTS 2021 $937 $104 $0 $1,041100066789 HSIP 0160 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2022 $4,730 $526 $0 $5,255

TOTAL COST: $6,134 $682 $0 $6,816

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

12 of 206

HIGHWAY PROJECTS - BLOUNTSTIP PLAN: 2020 - Original

Page 13: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-53 Project Description REPLACE BRIDGE AND APPROACHES ON SR-53 (US-231) OVER THE BLACKBURN FORK OF THE LITTLE WARRIOR RIVER BIN 002844 STR #53-5-3.3

Project Length in Miles 0.200  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064121 PE 2018

100038326 BR 0053 (559) RIGHT OF WAY BRIDGES AND APPROACHES 2021 $204 $51 $0 $255100003356 BR 0053 () CONSTRUCTION BRIDGES AND APPROACHES 2022 $2,885 $721 $0 $3,606

TOTAL COST: $3,089 $772 $0 $3,861

Route SR-74 Project Description BRIDGE REPLACEMENT AND APPROACHES (BIN 004560) ON SR-74 (US-278) AT LOCUST FORK, GRADE, DRAIN, BASE, PAVE, BRIDGE, AND BRIDGE REMOVAL

Project Length in Miles 2.272  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064177 PE 2016 / 100067595 RW 2019

100069045 BR 0074 (537) UTILITIES BRIDGES AND APPROACHES 2020 $440 $110 $0 $550100003565 BR 0074 (537) CONSTRUCTION BRIDGES AND APPROACHES 2020 $3,801 $950 $0 $4,751

TOTAL COST: $4,241 $1,060 $0 $5,301

Route SR-75 Project Description RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-75 FROM 2100 FEET NORTH OF CR-39 TO SR-74 (US-278)

Project Length in Miles 10.665  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068645 STPAA 0075 (538) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $3,510 $878 $0 $4,388

TOTAL COST: $3,510 $878 $0 $4,388

Route SR-79 Project Description SIDEWALKS AND PEDESTRIAN IMPROVEMENTS ALONG SR-79 FROM PARK ROAD TO CR-13, AND ALONG CR-13 FROM SR-79 TO SCHOOL ROAD

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069327 TAPBH TA19 (931) CONSTRUCTION SIDEWALK 2020 $640 $0 $160 $800

TOTAL COST: $640 $0 $160 $800

Route SR-79 Project Description REPL BIN#004658 ON SR-79 OVER BLACKBURN FORK OF LITTLE WARRIOR RIVER

Project Length in Miles 0.500  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100003399 PE 1999 / 100038330 RW 2011

100044645 BR 0079 (500) UTILITIES BRIDGE REPLACEMENT 2023 $296 $74 $0 $370100003396 BR 0079 (500) CONSTRUCTION BRIDGE REPLACEMENT 2023 $8,335 $2,084 $0 $10,419

TOTAL COST: $8,631 $2,158 $0 $10,789

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

13 of 206

HIGHWAY PROJECTS - BLOUNTSTIP PLAN: 2020 - Original

Page 14: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-165 Project Description BRIDGE SCOUR COUNTERMEASURES AND GUARDRAIL INSTALLATION ON CR-165 AT BIN 005642 OVER WILLIAMS CREEK (SITE 1) AND AT BIN 005643 OVER OLD TOWN CREEK (SITE 2) - BCP 06-02-18

Project Length in Miles 0.200  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069346 BR 0618 (251) CONSTRUCTION BRIDGE REHABILITATION 2020 $337 $0 $84 $422

TOTAL COST: $337 $0 $84 $422

Route CR-165 Project Description RESURFACING ON CR-165 FROM SR-110 TO CR-130 - BCP 06-02-19

Project Length in Miles 0.700  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070536 RASTPNU 0619 () CONSTRUCTION RESURFACING 2020 $90 $23 $0 $113

TOTAL COST: $90 $23 $0 $113

Route CR-177 Project Description RESURFACING AND TRAFFIC STRIPE ON CR-177 FROM CR-87 TO 500 FT NORTH OF PENN ROAD - BCP 06-01-19

Project Length in Miles 3.000  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069755 RASTPNU 0619 () CONSTRUCTION RESURFACING 2021 $392 $98 $0 $490

TOTAL COST: $392 $98 $0 $490

Route NA Project Description VEGETATION MANAGEMENT ALONG BULLOCK COUNTY ROADS

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067221 TAPOA TA17 (931) CONSTRUCTION UNCLASSIFIED 2020 $119 $0 $30 $148

TOTAL COST: $119 $0 $30 $148

Route SR-223 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-223 FROM THE PIKE COUNTY LINE TO 0.57 MILE SOUTH OF CR-28

Project Length in Miles 3.820  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070171 STPAA-HSIP 0223 (505) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2020 $1,346 $278 $0 $1,624

TOTAL COST: $1,346 $278 $0 $1,624

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

14 of 206

HIGHWAY PROJECTS - BULLOCKSTIP PLAN: 2020 - Original

Page 15: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-11 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT (BIN 009989) ON CR-11 OVER CEDAR CREEK RELIEF BRANCH

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071453 HRRR 0720 () CONSTRUCTION GUARDRAIL 2020 $71 $0 $8 $79

TOTAL COST: $71 $0 $8 $79

Route CR-16 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN004836) ON CR-16 ON ROCKY CREEK; SITE 2 - (BIN 004839) ON CR-16 OVER PERSIMMON CREEK RELIEF - BCP 07-189-18

Project Length in Miles 0.142  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069562 HRRR 0719 (250) CONSTRUCTION GUARDRAIL 2019 $90 $20 $0 $110

TOTAL COST: $90 $20 $0 $110

Route CR-16 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT (BIN 004838) ON CR-16 OVER PERSIMMON CREEK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071452 HRRR 0720 () CONSTRUCTION GUARDRAIL 2020 $54 $0 $6 $60

TOTAL COST: $54 $0 $6 $60

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

15 of 206

HIGHWAY PROJECTS - BUTLERSTIP PLAN: 2020 - Original

Page 16: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route I-65 Project Description PAVEMENT PRESERVATION ON I-65 FROM CR-41 TO .7 MILE SOUTH OF THE LOWNDES COUNTY LINE

Project Length in Miles 14.328  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069001 CN 2021

100071093 IM I065 (516) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 1

2020 $45 $5 $0 $50100069001 IM I065 () CONSTRUCTION PREVENTATIVE MAINTENANCE

LEVEL 12021 $4,034 $448 $0 $4,483

TOTAL COST: $4,079 $453 $0 $4,533

Route I-65 Project Description PAVEMENT PRESERVATION ON I-65 FROM .7 MILE SOUTH OF BUTLER COUNTY LINE TO .63 MILE SOUTH OF SR-97

Project Length in Miles 22.380  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068999 CN 2021

100070853 IM I065 (511) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 1

2020 $45 $5 $0 $50100068999 IM I065 () CONSTRUCTION PREVENTATIVE MAINTENANCE

LEVEL 12021 $4,681 $520 $0 $5,202

TOTAL COST: $4,726 $525 $0 $5,252

Route I-65 Project Description REST AREA REPLACEMENT NB AND SB I-65 NEAR GREENVILLE BLDG AND PK

Project Length in Miles 0.041  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100001702 PE 1995 / 100001681 RW 2000

100001665 IM I065 (423) CONSTRUCTION REST AREA REHABILITATION 2022 $9,273 $1,030 $0 $10,303TOTAL COST: $9,273 $1,030 $0 $10,303

Route I-65 Project Description SIGN REHABILITATION ALONG I-65 FROM CONECUH CL THROUGH BUTLER, LOWNDES, MONTGOMERY, ELMORE, AND AUTAUGA TO CHILTON CL.

Project Length in Miles 92.467  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100054299 PE 2010 / 100054300 CN 2021

100054300 IM I065 (407) CONSTRUCTION SIGN REHABILITATION 2021 $3,608 $401 $0 $4,009TOTAL COST: $3,608 $401 $0 $4,009

Route I-65 Project Description RESURFACING ON I-65 FROM 0.87 MILE NORTH OF PETTIBONE ROAD TO CR-41

Project Length in Miles 7.716  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069861 CN 2022

100069861 IM I065 () CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 2

2022 $4,322 $480 $0 $4,802TOTAL COST: $4,322 $480 $0 $4,802

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

16 of 206

HIGHWAY PROJECTS - BUTLERSTIP PLAN: 2020 - Original

Page 17: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-185 Project Description ROADWAY IMPROVEMENTS SR-185, INCLUDING ROADWAY WIDENING, SIGNALS AND TURN LANE FROM CR-42 (MANNINGHAM ROAD) TO 0.2 MILE NORTH CR-73 (CAHABA RD)

Project Length in Miles 0.670  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056464 PE 2012

100056506 STPAA 0185 (501) CONSTRUCTION ROADWAY WIDENING 2021 $1,415 $354 $0 $1,769TOTAL COST: $1,415 $354 $0 $1,769

Route SR-185 Project Description RESURFACING ON SR-185 FROM THE NORTH END OF THE RAILROAD BRIDGE TO WILLOW LANE

Project Length in Miles 2.181  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067902 STPAA 0185 (504) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22019 $1,553 $388 $0 $1,942

TOTAL COST: $1,553 $388 $0 $1,942

Route SR-263 Project Description CAPE SEALING ON SR-263 FROM SR-185 TO SR-21

Project Length in Miles 15.132  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070058 STPAA 0263 (503) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 12020 $1,918 $480 $0 $2,398

TOTAL COST: $1,918 $480 $0 $2,398

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

17 of 206

HIGHWAY PROJECTS - BUTLERSTIP PLAN: 2020 - Original

Page 18: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-19 Project Description BRIDGE REPLACEMENT AND APPROACHES (BIN 010008) ON BALLPLAY ROAD OVER MILL CREEK - CCP 08-96-17

Project Length in Miles 0.106  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071499 BR 0818 (251) CONSTRUCTION BRIDGES AND APPROACHES 2020 $760 $0 $190 $950

TOTAL COST: $760 $0 $190 $950

Route CR-440 Project Description CR-440 (64TH STREET) BRIDGE REPLACEMENT BIN # 6204 NEAR WEAVER

Project Length in Miles 0.020  Urban Area ANNISTON  Sponsor CALHOUN COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100054937 STPOA 7448 () RIGHT OF WAY BRIDGE REPLACEMENT 2024 $30 $0 $8 $38100054938 STPOA 7448 () UTILITIES BRIDGE REPLACEMENT 2025 $20 $0 $5 $25

TOTAL COST: $50 $0 $13 $63

Route CR-NA Project Description REHABILITATE BOWL ROAD (RT 420), MOUNTAIN LONGLEAF WILDLIFE REFUGE (APPORTIONMENT FY 2017)

Project Length in Miles 0.000  Urban Area ANNISTON  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065122 PFH 0816 () CONSTRUCTION RESURFACING 2020 $237 $0 $0 $237

TOTAL COST: $237 $0 $0 $237

Route CR-NA Project Description RESURFACING ON HENRY ROAD AND COUNTRY CLUB DRIVE SOUTHWEST TO THE JACKSONVILLE CITY LIMITS

Project Length in Miles 0.000  Urban Area ANNISTON  Sponsor CITY OF JACKSONVILLE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070197 STPOA 0819 () PRELIMINARY ENGINEERING RESURFACING 2020 $70 $0 $17 $87100070198 STPOA 0819 () CONSTRUCTION RESURFACING 2021 $376 $0 $94 $470

TOTAL COST: $446 $0 $112 $558

Route CR-NA Project Description RESURFACING ON GEORGE DOUTHIT DRIVE SOUTHWEST FROM SR-21 TO BRIERWOOD PLACE

Project Length in Miles 0.000  Urban Area ANNISTON  Sponsor CITY OF JACKSONVILLE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070203 STPOA 0819 () PRELIMINARY ENGINEERING RESURFACING 2022 $170 $0 $43 $213100070208 STPOA 0819 () CONSTRUCTION RESURFACING 2023 $917 $0 $229 $1,146

TOTAL COST: $1,087 $0 $272 $1,359

Route CR-NA Project Description BICYCLE AND PEDESTRIAN MULTI-USE PATH CONSTRUCTION AND RIDE SHARE ON BALTZELL GATE ROAD FROM SR-21 TO WEST OF FEDERAL WAY

Project Length in Miles 0.000  Urban Area ANNISTON  Sponsor CITY OF ANNISTON COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070238 STPOA 0819 () PRELIMINARY ENGINEERING SIDEWALK 2022 $15 $0 $4 $18100070239 STPOA 0819 () CONSTRUCTION SIDEWALK 2023 $147 $0 $37 $183

TOTAL COST: $161 $0 $40 $201

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

18 of 206

HIGHWAY PROJECTS - CALHOUNSTIP PLAN: 2020 - Original

Page 19: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description BICYCLE AND PEDESTRIAN MULTI-USE PATH CONSTRUCTION, SR-202 COLDWATER MOUNTAIN/MULBERRY STREET TO LEGARDE AVENUE FOR 1,075 FT

Project Length in Miles 0.300  Urban Area ANNISTON  Sponsor CITY OF ANNISTON COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070241 STPOA 0202 () PRELIMINARY ENGINEERING SIDEWALK 2021 $26 $0 $7 $33100070242 STPOA 0202 () CONSTRUCTION SIDEWALK 2022 $132 $0 $33 $165

TOTAL COST: $158 $0 $39 $197

Route CR-NA Project Description WIDENING ON FRIENDSHIP ROAD FROM CHEAHA DRIVE TO CIRCLE DRIVE (PHASE I); PHASE I WILL INCLUDE DESIGN AND FUNCTIONAL DRAINAGE TO CORRECT EXISTING WATER FLOW ISSUES

Project Length in Miles 0.000  Urban Area ANNISTON  Sponsor CITY OF OXFORD COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070247 STPOA 0819 () PRELIMINARY ENGINEERING WIDENING AND RESURFACING

(RDWY)2020 $252 $0 $63 $314

100070248 STPOA 0819 () RIGHT OF WAY WIDENING AND RESURFACING (RDWY)

2021 $261 $0 $65 $326100070249 STPOA 0819 () UTILITIES WIDENING AND RESURFACING

(RDWY)2022 $259 $0 $65 $323

100070250 STPOA 0819 () CONSTRUCTION WIDENING AND RESURFACING (RDWY)

2023 $1,212 $0 $303 $1,515TOTAL COST: $1,983 $0 $496 $2,479

Route CR-NA Project Description BRIDGE REPLACEMENT ON FRIENDSHIP ROAD OVER CHOCCOLOCCO CREEK (BIN 004773) AND CHOCCOLOCCO CREEK RELIEF (BIN 004774)

Project Length in Miles 0.000  Urban Area ANNISTON  Sponsor CITY OF OXFORD COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070257 CN 2025

100070253 STPOA 0819 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2020 $282 $0 $71 $353100070254 STPOA 0819 () RIGHT OF WAY BRIDGE REPLACEMENT 2021 $155 $0 $39 $193100070255 STPOA 0819 () UTILITIES BRIDGE REPLACEMENT 2022 $153 $0 $38 $192

TOTAL COST: $590 $0 $148 $738

Route CR-NA Project Description RESURFACING, WIDENING AND UPGRADING EXISTING TURN SIGNALS AND ADDING TURN LANES ON FRIENDSHIP ROAD AT CHEAHA DRIVE

Project Length in Miles 0.000  Urban Area ANNISTON  Sponsor CITY OF OXFORD COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070271 CN 2025

100070259 STPOA 0819 () PRELIMINARY ENGINEERING WIDENING AND RESURFACING (RDWY)

2020 $122 $0 $30 $152100070262 STPOA 0819 () RIGHT OF WAY WIDENING AND RESURFACING

(RDWY)2021 $87 $0 $22 $108

100070269 STPOA 0819 () UTILITIES WIDENING AND RESURFACING (RDWY)

2022 $86 $0 $22 $108TOTAL COST: $295 $0 $74 $368

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

19 of 206

HIGHWAY PROJECTS - CALHOUNSTIP PLAN: 2020 - Original

Page 20: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description RESURFACING ON ALEXANDRIA-JACKSONVILLE HIGHWAY FROM CEDAR SPRINGS ROAD TO THE JACKSONVILLE CITY LIMITS - CCP 08-107-19

Project Length in Miles 0.000  Urban Area ANNISTON  Sponsor CALHOUN COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070224 STPOA 0819 (250) CONSTRUCTION RESURFACING 2020 $587 $0 $147 $734

TOTAL COST: $587 $0 $147 $734

Route CR-NA Project Description RESURFACING ON WHITES GAP ROAD SOUTHEAST FROM SR-21 TO THE JACKSONVILLE CITY LIMITS AND ON WHITES GAP ROAD FROM WHITES GAP ROAD SOUTHEAST TO SR-9

Project Length in Miles 0.000  Urban Area ANNISTON  Sponsor CALHOUN COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070226 STPOA 0819 () CONSTRUCTION RESURFACING 2021 $1,028 $0 $257 $1,285

TOTAL COST: $1,028 $0 $257 $1,285

Route CR-NA Project Description RESURFACING ON ROY WEBB ROAD FROM SR-21 TO FOSTER WEST ROAD

Project Length in Miles 0.000  Urban Area ANNISTON  Sponsor CALHOUN COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070230 STPOA 0819 () CONSTRUCTION RESURFACING 2022 $783 $0 $196 $979

TOTAL COST: $783 $0 $196 $979

Route CR-NA Project Description RESURFACING ON EULATON GATE ROAD FROM BYNUM LEATHERWOOD ROAD TO THE ANNISTON ARMY DEPOT GATE

Project Length in Miles 0.000  Urban Area ANNISTON  Sponsor CALHOUN COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070232 STPOA 0819 () CONSTRUCTION RESURFACING 2023 $312 $0 $78 $390

TOTAL COST: $312 $0 $78 $390

Route CR-NA Project Description RESURFACING CHURCH AVENUE FROM SR-21 TO 11TH STREET NORTHEAST CITY OF JACKSONVILLE

Project Length in Miles 3.350  Urban Area ANNISTON  Sponsor CITY OF JACKSONVILLE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064885 PE 2018

100064886 STPOA 0815 (261) CONSTRUCTION RESURFACING 2020 $1,528 $0 $382 $1,910TOTAL COST: $1,528 $0 $382 $1,910

Route CR-NA Project Description BRIDGE REPLACEMENT ON AIRPORT ROAD AT COLDWATER CREEK BIN # 11215 CITY OF OXFORD

Project Length in Miles 0.000  Urban Area ANNISTON  Sponsor CITY OF OXFORD COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064887 PE 2018

100064888 STPOA 0815 (260) RIGHT OF WAY BRIDGE REPLACEMENT 2021 $8 $0 $2 $10100064889 STPOA 0815 (260) UTILITIES BRIDGE REPLACEMENT 2021 $62 $0 $16 $78100064890 STPOA 0815 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $1,715 $0 $429 $2,144

TOTAL COST: $1,786 $0 $446 $2,232

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

20 of 206

HIGHWAY PROJECTS - CALHOUNSTIP PLAN: 2020 - Original

Page 21: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description INSTALLATION OF A ROUNDABOUT AT THE BYNUM LEATHERWOOD ROAD (CR-109) AND OLD GADSDEN HIGHWAY INTERSECTION

Project Length in Miles 0.000  Urban Area ANNISTON  Sponsor CALHOUN COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064896 PE 2018

100064897 STPOA 0815 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $727 $0 $182 $909TOTAL COST: $727 $0 $182 $909

Route CR-NA Project Description RESURFACE RUSSELL DRIVE FROM ALEXANDRIA ROAD TO PEACEBURG ROAD CITY OF WEAVER

Project Length in Miles 0.660  Urban Area ANNISTON  Sponsor CITY OF WEAVER COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064898 PE 2018

100064899 STPOA 0818 () CONSTRUCTION RESURFACING 2021 $330 $0 $83 $413TOTAL COST: $330 $0 $83 $413

Route I-20 Project Description RESURFACING I-20 (OPEN GRADE FRICTION COURSE) FROM EXIT 185 (SR-21) MP 185.830 TO CLEBURNE COUNTY LINE MP 193.823

Project Length in Miles 15.983  Urban Area ANNISTON  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100071440 CN 2021

100071441 IM I020 (360) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 1

2020 $81 $9 $0 $90100071440 IM I020 () CONSTRUCTION PREVENTATIVE MAINTENANCE

LEVEL 12021 $6,181 $687 $0 $6,868

TOTAL COST: $6,262 $696 $0 $6,958

Route NA Project Description BICYCLE LANE, STRIPING AND POSSIBLE 2 FT SHOULDER WIDENING ALONG SOUTH NOBLE STREET FROM CHESTNUT STREET TO FOURTH STREET

Project Length in Miles 1.500  Urban Area ANNISTON  Sponsor CITY OF ANNISTON COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070244 STPOA 0819 () PRELIMINARY ENGINEERING SIDEWALK 2020 $4 $0 $1 $6100070245 STPOA 0819 () CONSTRUCTION SIDEWALK 2021 $36 $0 $9 $45

TOTAL COST: $40 $0 $10 $50

Route SR-1 Project Description ACCESS MANAGEMENT, RESURFACING, TRAFFIC STRIPE, GUARDRAIL, AND BRIDGE RAIL RETROFIT ON SR-1 (US-431) FROM THE END OF SR-1 (US-431) BYPASS (MP 233.238) TO 0.116 MILE NORTH OF SR-144 (MP 240.491)

Project Length in Miles 7.253  Urban Area ANNISTON  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068386 NH-FMGR 0001 (613) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $7,374 $1,843 $0 $9,217

TOTAL COST: $7,374 $1,843 $0 $9,217

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

21 of 206

HIGHWAY PROJECTS - CALHOUNSTIP PLAN: 2020 - Original

Page 22: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-144 Project Description RESURFACING, TRAFFIC STRIPING, 2 FT SAFETY WIDENING, AND BRIDGE GUARDRAIL RETROFITTING ON SR-144 FROM THE ST CLAIR COUNTY LINE (MP 17.173) TO .15 MILE WEST OF SR-1 (US-431) (MP 26.537)

Project Length in Miles 9.364  Urban Area ANNISTON  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069004 STPAA-HSIP 0144 (502) FEDERAL MAINT CN PREVENTATIVE MAINT MINOR

REHAB W/ SAFETY WIDENING2020 $3,206 $718 $0 $3,924

TOTAL COST: $3,206 $718 $0 $3,924

Route SR-202 Project Description SIGNAL UPGRADES AT SR-202 AND NORTH HUNTER STREET

Project Length in Miles 0.000  Urban Area ANNISTON  Sponsor CALHOUN COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070695 STPOA 0202 () PRELIMINARY ENGINEERING SIGNALIZATION 2020 $24 $0 $6 $30100070228 STPOA 0202 () CONSTRUCTION SIGNALIZATION 2021 $82 $0 $20 $102

TOTAL COST: $106 $0 $26 $132

Route SR-204 Project Description BRIDGE REPLACEMENT OVER ABANDONED RAILROAD AND TALLAHATCHEE CREEK ON SR-204 (BIN 4684)

Project Length in Miles 0.250  Urban Area ANNISTON  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049971 CN 2026

100049969 BR 0204 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2023 $288 $72 $0 $360TOTAL COST: $288 $72 $0 $360

Route SR-21 Project Description SIGNAL UPGRADE SR-21 AT BALTZELL GATE ROAD

Project Length in Miles 0.015  Urban Area ANNISTON  Sponsor CITY OF ANNISTON COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100047013 PE 2007

100047014 STPOA 0021 (516) CONSTRUCTION SIGNALIZATION 2020 $363 $91 $0 $454TOTAL COST: $363 $91 $0 $454

Route SR-4 Project Description RE-CONFIGURE INTERSECTION SR-4 (US-78)ATCR-186 (BARRY STREET)

Project Length in Miles 0.100  Urban Area ANNISTON  Sponsor CITY OF OXFORD COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100057404 PE 2012 / 100057405 RW 2019

100057406 STPOA 0004 (536) UTILITIES INTERSECTION IMPROVEMENTS 2020 $94 $0 $23 $117100057407 STPOA 0004 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $534 $0 $134 $668

TOTAL COST: $628 $0 $157 $785

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

22 of 206

HIGHWAY PROJECTS - CALHOUNSTIP PLAN: 2020 - Original

Page 23: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-9 Project Description REPLACE BRIDGE BIN 005152, SR-9 OVER SOUTHERN RR, 1.8 MILES N OF SR-4(US-78) NEAR IRON CITY (SUFF=43.1,STAT=FO, 2001 HBRRP LIST)

Project Length in Miles 0.250  Urban Area ANNISTON  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100041404 CN 2026

100061463 BR 0009 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2023 $135 $34 $0 $169TOTAL COST: $135 $34 $0 $169

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

23 of 206

HIGHWAY PROJECTS - CALHOUNSTIP PLAN: 2020 - Amendment # 3

Page 24: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-208 Project Description INTERSECTION IMPROVEMENTS AT CR-208 (PHILLIPS ROAD) AND CR-299 (CUSSETA ROAD) - CCP 09-15-03

Project Length in Miles 1.077  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071174 RASTPNU 0916 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $1,760 $440 $0 $2,200

TOTAL COST: $1,760 $440 $0 $2,200

Route CR-289 Project Description WIDENING, LEVELING, RESURFACING AND TRAFFIC STRIPING ON CR-289 FROM 3750 FEET NORTH OF CR-216 NORTHWEST FOR 770 FEET

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071454 HRRR 0920 (250) CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2020 $134 $0 $15 $149

TOTAL COST: $134 $0 $15 $149

Route CR-83 Project Description WIDENING, LEVELING, RESURFACING AND TRAFFIC STRIPING ON CR-83 FROM 3.6 MILES SOUTH OF SR-50 NORTHWEST FOR .68 MILE - CCP 09-10-18

Project Length in Miles 0.700  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069588 HRRR-HSIP 0919 (250) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $300 $1 $33 $334

TOTAL COST: $300 $1 $33 $334

Route I-85 Project Description REMOVE AND REPLACE LIGHTING ON I-85 AT SR-15 (US-29)

Project Length in Miles 0.620  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100071044 CN 2021

100071044 IM I085 () CONSTRUCTION LIGHTING 2021 $909 $101 $0 $1,010TOTAL COST: $909 $101 $0 $1,010

Route SR-147 Project Description RESURFACING AND TRAFFIC STRIPE ON SR-147 FROM THE LEE COUNTY LINE (MP 12.826) TO THE INTERSECTION OF SR-1 (US-431) (MP 17.001)

Project Length in Miles 4.175  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069809 STPAA 0147 (504) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,152 $288 $0 $1,440

TOTAL COST: $1,152 $288 $0 $1,440

Route SR-77 Project Description BRIDGE REPLACEMENT ON SR-77 AT HOOTALOOCO CREEK 4.8 MILES NORTH WEST OF US-431 BIN 2600

Project Length in Miles 0.050  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067064 PE 2018

100003702 BR 0077 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $2,204 $551 $0 $2,755TOTAL COST: $2,204 $551 $0 $2,755

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

24 of 206

HIGHWAY PROJECTS - CHAMBERSSTIP PLAN: 2020 - Original

Page 25: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-25 Project Description INTERSECTION SAFETY IMPROVEMENTS ON SR-25 (US-411) AT WALMART (MP 238.800), SIGNAL INSTALLATION BY STATE FORCES

Project Length in Miles 1.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068145 PE 2019 / 100068146 CN 2021 / 100068147 CN 2021

100068146 HSIP 0025 (560) CONSTRUCTION SIGNALIZATION 2021 $32 $4 $0 $36100068147 HSIP 0025 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $139 $15 $0 $155

TOTAL COST: $171 $19 $0 $190

Route SR-68 Project Description BRIDGE REMOVAL BIN 002591, SR-68 OVER TAG RAILROAD 0.5 MILE NORTH OF SR-273 (SUFF=64.4, STATUS=FO)

Project Length in Miles 0.625  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049708 PE 2010 / 100049709 RW 2013

100049710 BR 0068 (505) UTILITIES BRIDGE REMOVAL 2020 $378 $95 $0 $473100049707 BR 0068 (505) CONSTRUCTION BRIDGE REMOVAL 2020 $3,171 $793 $0 $3,963

TOTAL COST: $3,549 $887 $0 $4,436

Route SR-9 Project Description RESURFACING ON SR-9 IN CENTRE FROM THE INTERSECTION OF SR-68 TO THE SOUTH END OF THE BRIDGE OVER THE COOSA RIVER NEAR CEDAR BLUFF TO INCLUDE GUARDRAIL RESET (SAFETY REPLACEMENT OF STEEL BLOCK OUTS)

Project Length in Miles 5.020  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068417 STPAA-HSIP 0009 (575) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,966 $457 $0 $2,423

TOTAL COST: $1,966 $457 $0 $2,423

Route SR-9 Project Description RESURFACING ON SR-9 IN CENTRE FROM THE INTERSECTION OF SR-68 TO THE SOUTH END OF THE BRIDGE OVER THE COOSA RIVER NEAR CEDAR BLUFF TO INCLUDE GUARDRAIL RESET (SAFETY REPLACEMENT OF STEEL BLOCK OUTS)

Project Length in Miles 5.020  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071445 STPAA 0009 (575) UTILITIES PREVENTATIVE MAINTENANCE

LEVEL 22020 $505 $126 $0 $631

TOTAL COST: $505 $126 $0 $631

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

25 of 206

HIGHWAY PROJECTS - CHEROKEESTIP PLAN: 2020 - Original

Page 26: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-51 Project Description PATCHING AND TRAFFIC STRIPING ON CR-51 FROM CR-44 TO CR-42 - CCP 11-587-19

Project Length in Miles 4.000  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070592 STPNU 1119 (250) CONSTRUCTION PAVEMENT REHABILITATION 2020 $302 $0 $178 $480

TOTAL COST: $302 $0 $178 $480

Route I-65 Project Description I-65 BRIDGE RAISING AT BIN 006787 (CR-59), BIN 006788 (CR-24), BIN 006093 (CR-32), BIN 006793 (CR-51), BIN 007152 (SR-145), BIN 006794 (CR-43), BIN 006795 (CR-48) FROM THE AUTAUGA COUNTY LINE TO THE SHELBY COUNTY LINE

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066599 UT 2020 / 100066598 CN 2020

100066597 IM I065 (514) PRELIMINARY ENGINEERING BRIDGE RAISING 2020 $360 $40 $0 $400100066599 IM I065 (514) UTILITIES BRIDGE RAISING 2020 $180 $20 $0 $200100066598 IM I065 () CONSTRUCTION BRIDGE RAISING 2020 $2,520 $280 $0 $2,800

TOTAL COST: $3,060 $340 $0 $3,400

Route I-65 Project Description ROUNDABOUTS, SIGNING AND STRIPING ON I-65 ON-RAMPS AND OFF-RAMPS AT EXIT 208 (CR-28 INTERSECTION)

Project Length in Miles 0.753  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068100 PE 2020 / 100068101 RW 2021 / 100068102 UT 2021 / 100068103 CN 2021

100068103 HSIP I065 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $1,893 $210 $0 $2,104100068100 HSIP I065 (502) PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2020 $230 $26 $0 $255100068101 HSIP I065 (502) RIGHT OF WAY SAFETY IMPROVEMENTS 2021 $93 $10 $0 $103100068102 HSIP I065 (502) UTILITIES SAFETY IMPROVEMENTS 2021 $93 $10 $0 $103

TOTAL COST: $2,308 $256 $0 $2,565

Route SR-3 Project Description BRIDGE WIDENING BIN# 006916 ON SR-3 (US-31) AT I-65 IN CLANTON (EXIT 205)

Project Length in Miles 0.380  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065814 PE 2017

100068720 BR 0003 (607) UTILITIES BRIDGE WIDENING 2020 $373 $93 $0 $467100065815 BR 0003 (607) CONSTRUCTION BRIDGE WIDENING 2021 $2,438 $609 $0 $3,047

TOTAL COST: $2,811 $703 $0 $3,514

Route SR-3 Project Description RESURFACING, 2 FT SAFETY WIDENING, AND SHOULDER SCORING ON SR-3 (US-31) PARALLEL TO THE CSX RAILROAD FROM THE THORSBY NORTH CITY LIMITS TO THE JEMISON NORTH CITY LIMITS

Project Length in Miles 3.766  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070199 STPAA-HSIP 0003 (627) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2020 $1,661 $390 $0 $2,050

TOTAL COST: $1,661 $390 $0 $2,050

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

26 of 206

HIGHWAY PROJECTS - CHILTONSTIP PLAN: 2020 - Original

Page 27: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-14 Project Description BRIDGE REPLACEMENT CR-14 EAST RELIEF FOR PUSS CUSS CREEK BIN # 3125

Project Length in Miles 0.000  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100062180 PE 2014 / 100062385 CN 2021

100062385 BR 1214 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $357 $0 $89 $447TOTAL COST: $357 $0 $89 $447

Route CR-14 Project Description BRIDGE REPLACEMENT CR-14 WEST RELIEF FOR PUSS CUSS CREEK BIN # 3126

Project Length in Miles 0.000  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100062181 PE 2014 / 100062386 CN 2021

100062386 BR 1214 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $357 $0 $89 $446TOTAL COST: $357 $0 $89 $446

Route CR-18 Project Description RESURFACING ON CR-18 FROM MELVIN CUTOFF ROAD TO CR-11 - CCP 12-03-19

Project Length in Miles 3.281  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070366 STPNU 1219 () CONSTRUCTION RESURFACING 2021 $596 $0 $149 $745

TOTAL COST: $596 $0 $149 $745

Route CR-32 Project Description BRIDGE REPLACEMENT OVER NEALS CREEK ON CR-32 BIN #442

Project Length in Miles 0.000  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100062156 PE 2014 / 100061343 CN 2021

100061343 BR 1214 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $166 $0 $42 $208TOTAL COST: $166 $0 $42 $208

Route CR-9 Project Description RESURFACING ON CR-9 FROM BONNER TOWN ROAD TO MELVIN CUTOFF ROAD - CCP 12-02-19

Project Length in Miles 3.193  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070365 STPNU 1219 (251) CONSTRUCTION RESURFACING 2020 $642 $0 $160 $802

TOTAL COST: $642 $0 $160 $802

Route SR-10 Project Description RESURFACING ON SR-10 FROM CR-45 TO 0.47 MILE WEST OF THE BUTLER TOWN LIMITS

Project Length in Miles 7.945  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070063 STPAA 0010 (548) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,524 $381 $0 $1,906

TOTAL COST: $1,524 $381 $0 $1,906

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

27 of 206

HIGHWAY PROJECTS - CHOCTAWSTIP PLAN: 2020 - Original

Page 28: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-12 Project Description BRIDGE REPLACEMENT ON SR-12 (US-84) OVER TOMBIGBEE RIVER (BIN # 006201)

Project Length in Miles 5.075  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100040182 BRF 0012 (572) UTILITIES BRIDGE REPLACEMENT 2022 $479 $120 $0 $599100038706 BRF 0012 (572) CONSTRUCTION BRIDGE REPLACEMENT 2023 $22,162 $5,541 $0 $27,703

TOTAL COST: $22,641 $5,660 $0 $28,302

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

28 of 206

HIGHWAY PROJECTS - CHOCTAWSTIP PLAN: 2020 - Original

Page 29: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-1 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT (BIN 009583) ON CR-1 OVER CANE CREEK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071455 HRRR 1320 () CONSTRUCTION GUARDRAIL 2020 $34 $0 $4 $38

TOTAL COST: $34 $0 $4 $38

Route CR-21 Project Description BRIDGE REPLACEMENT (BIN # 007957) AND APPROACHES ON CR-21 OVER SATILPA CREEK RELIEF - CCP 13-37-16

Project Length in Miles 0.037  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070595 RABRZ 1317 (250) CONSTRUCTION BRIDGE REPLACEMENT 2020 $1,020 $0 $255 $1,275

TOTAL COST: $1,020 $0 $255 $1,275

Route CR-27 Project Description RESURFACING ON CR-27 (OLD HIGHWAY 5 NORTH) FROM THE THOMASVILLE CITY LIMITS TO THE WILCOX COUNTY LINE - CCP 13-46-19

Project Length in Miles 5.509  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070302 RASTPNU 1319 () CONSTRUCTION RESURFACING 2021 $1,200 $300 $0 $1,500

TOTAL COST: $1,200 $300 $0 $1,500

Route CR-NA Project Description STREETSCAPES ALONG PECAN CIRCLE, SOUTH PORTIS AVENUE, MAGNOLIA DRIVE, COMMERCE STREET, BROAD STREET, AND SOUTH KIMBALL AVENUE

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069032 TAPNU TA19 (926) CONSTRUCTION STREETSCAPE 2019 $446 $0 $112 $558

TOTAL COST: $446 $0 $112 $558

Route SR-13 Project Description RELOCATE INTERSECTION SR-13 (US-43) ATCR-3 (MCVAY RD) FROM 0.1 MILE NORTH OF CR-484 (TELLIE TRAIL) TO 0.4 MILE NORTH OF CR-3 (MCVAY RD)

Project Length in Miles 0.670  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100054555 PE 2010 / 100054556 RW 2011 / 100054557 UT 2012

100054558 NH 0013 (564) CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $425 $106 $0 $531TOTAL COST: $425 $106 $0 $531

Route SR-177 Project Description RESURFACING ON SR-177 FROM WEST OF MILLER STREET TO SOUTH OF SR -13 (US-43)

Project Length in Miles 2.958  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071690 STPAA 0177 (503) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $843 $211 $0 $1,054

TOTAL COST: $843 $211 $0 $1,054

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

29 of 206

HIGHWAY PROJECTS - CLARKESTIP PLAN: 2020 - Original

Page 30: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-5 Project Description RESURFACING ON SR-5 FROM SR-13 (US-43) TO THE WILCOX COUNTY LINE

Project Length in Miles 4.725  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070069 NH 0005 (558) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $967 $242 $0 $1,209

TOTAL COST: $967 $242 $0 $1,209

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

30 of 206

HIGHWAY PROJECTS - CLARKESTIP PLAN: 2020 - Original

Page 31: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-49 Project Description RESURFACING ON SR-49 FROM SR-9 (MP 68.517) TO 0.22 MILE NORTH OF CARVER STREET (MP 69.620)

Project Length in Miles 1.183  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068369 STPAA 0049 (512) FEDERAL MAINT CN PAVEMENT MINOR

REHABILITATION2020 $637 $159 $0 $796

TOTAL COST: $637 $159 $0 $796

Route SR-49 Project Description RESURFACING AND STRIPING ON SR-49 FROM 0.25 MILES NORTH OF CARVER STREET (MP 69.700) TO INTERSECTION OF SR-281 (MP 82.684).

Project Length in Miles 12.984  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069812 STPAA 0049 (513) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 12020 $1,300 $325 $0 $1,625

TOTAL COST: $1,300 $325 $0 $1,625

Route SR-77 Project Description RESURFACING, TRAFFIC STRIPING, AND 2 FT SAFETY WIDENING ON SR-77 FROM THE RANDOLPH COUNTY LINE (MP 25.208) TO SR-49 (MP 32.099)

Project Length in Miles 6.953  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069811 STPAA-HSIP 0077 (525) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2021 $2,243 $492 $0 $2,736

TOTAL COST: $2,243 $492 $0 $2,736

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

31 of 206

HIGHWAY PROJECTS - CLAYSTIP PLAN: 2020 - Original

Page 32: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-10 Project Description WIDENING AND RESURFACING ON CR-10 FROM CR-25 TO CR-51 - CCP 15-55-18

Project Length in Miles 4.295  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069650 RASTPNU 1519 (251) CONSTRUCTION RESURFACING 2020 $964 $241 $0 $1,205

TOTAL COST: $964 $241 $0 $1,205

Route CR-35 Project Description RESURFACING ON CR-35 FROM SR-4 (US-78) TO CR-49 - CCP 15-56-18

Project Length in Miles 3.321  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069371 RASTPNU 1518 () CONSTRUCTION RESURFACING 2021 $298 $75 $0 $373

TOTAL COST: $298 $75 $0 $373

Route CR-50 Project Description BRIDGE REPLACEMENT (BIN # 9400) AND APPROACHES ON CR-50 OVER MUSCADINE CREEK - CCP 15-30-12

Project Length in Miles 0.390  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060379 RABRZ 1514 (251) CONSTRUCTION BRIDGE REPLACEMENT 2020 $619 $0 $155 $774

TOTAL COST: $619 $0 $155 $774

Route CR-55 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE - 1 (BIN 011919) ON CR-55 OVER SOUTH FORK TERRAPIN CREEK; SITE 2 - (BIN 004932) ON CR-49 OVER TERRAPIN CREEK NORTH; SITE - 3 (BIN 004931) ON CR-49 OVER TERRAPIN CREEK SOUTH

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071456 HRRR 1520 () CONSTRUCTION GUARDRAIL 2020 $139 $0 $15 $154

TOTAL COST: $139 $0 $15 $154

Route CR-94 Project Description BRIDGE REPLACEMENT ON CR-94 OVER TERRAPIN CREEK BIN # 832

Project Length in Miles 0.000  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061540 PE 2014 / 100060395 CN 2021

100060395 RABRZ 1513 () CONSTRUCTION BRIDGE 2021 $495 $124 $0 $618TOTAL COST: $495 $124 $0 $618

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

32 of 206

HIGHWAY PROJECTS - CLEBURNESTIP PLAN: 2020 - Original

Page 33: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route I-20 Project Description WELCOME CENTER REPLACEMENT AND PARKING UPGRADES ON I-20 NEAR HEFLIN.

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100071547 CN 2023

100071546 IM I020 () PRELIMINARY ENGINEERING REST AREA COMPLETE 2021 $909 $101 $0 $1,010TOTAL COST: $909 $101 $0 $1,010

Route I-20 Project Description RESURFACING ON I-20 FROM SR-9 (EXIT 199) (MP 199.835) TO SR-46 (EXIT 205) (MP 205.054)

Project Length in Miles 10.439  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070886 CN 2020

100070887 IM I020 (359) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 2

2020 $63 $7 $0 $70100070886 IM I020 (359) CONSTRUCTION PREVENTATIVE MAINTENANCE

LEVEL 22020 $5,804 $645 $0 $6,449

TOTAL COST: $5,867 $652 $0 $6,519

Route I-20 Project Description RESURFACING (OGFC) ON I-20 FROM SR-46 (MP 205.054) TO CR-49 (MP 210.383)

Project Length in Miles 10.659  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100071647 CN 2021

100071659 IM I020 (361) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 1

2020 $94 $10 $0 $104100071647 IM I020 () CONSTRUCTION PREVENTATIVE MAINTENANCE

LEVEL 12021 $4,727 $525 $0 $5,252

TOTAL COST: $4,820 $536 $0 $5,356

Route I-20 Project Description RESURFACING (OGFC) ON I-20 FROM THE CALHOUN COUNTY LINE (MP 193.823) TO SR-9 (EXIT 199) (MP 199.850)

Project Length in Miles 6.012  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067282 PE 2019 / 100067283 CN 2020

100067283 IM I020 (358) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1

2020 $2,761 $307 $0 $3,067TOTAL COST: $2,761 $307 $0 $3,067

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

33 of 206

HIGHWAY PROJECTS - CLEBURNESTIP PLAN: 2020 - Original

Page 34: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-420 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 009670) ON CR-420 OVER HAYS CREEK; SITE 2 - (BIN 009937) ON CR-719 OVER WILSON MILL CREEK; SITE 3 - (BIN 014257) ON CR-148 OVER KISER MILL CREEK; SITE 4 - (BIN 013670) ON CR-148 OVER BRANCH

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071457 HRRR 1620 (250) CONSTRUCTION GUARDRAIL 2020 $116 $0 $13 $129

TOTAL COST: $116 $0 $13 $129

Route SR-12 Project Description RESURFACING AND PLANING ON SR-12 (US-84) FROM SR-203 TO SR-87

Project Length in Miles 2.797  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068700 NH 0012 (571) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $939 $235 $0 $1,173

TOTAL COST: $939 $235 $0 $1,173

Route SR-125 Project Description RESURFACING ON SR-125 FROM SR-167 TO THE PIKE COUNTY LINE

Project Length in Miles 5.825  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071048 STPAA 0125 (504) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,128 $282 $0 $1,410

TOTAL COST: $1,128 $282 $0 $1,410

Route SR-134 Project Description PLANING, RESURFACING AND 2' SAFETY WIDENING OF SR-134 FROM SR-87 TO SR-88

Project Length in Miles 10.800  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068699 STPAA-HSIP 0134 (508) FEDERAL MAINT CN PREVENTATIVE MAINT MINOR

REHAB W/ SAFETY WIDENING2020 $3,754 $807 $0 $4,562

TOTAL COST: $3,754 $807 $0 $4,562

Route SR-167 Project Description ADDITIONAL LANES ON SR-167 FROM SR-12 (US-84) TO 0.28 MILE NORTH OF CR-48 (SALEM RD)

Project Length in Miles 2.140  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100047415 PE 2006 / 100047416 RW 2009 / 100052587 UT 2012

100047417 STPAA A115 (900) CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $7,345 $1,836 $0 $9,181TOTAL COST: $7,345 $1,836 $0 $9,181

Route SR-167 Project Description PLANING AND RESURFACING ON SR-167 FROM SR-12 (US-84) (BOLL WEEVIL CIRCLE) TO CR-154

Project Length in Miles 8.230  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068716 STPAA 0167 () FEDERAL MAINT CN PAVEMENT MINOR

REHABILITATION2021 $1,224 $306 $0 $1,530

TOTAL COST: $1,224 $306 $0 $1,530

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

34 of 206

HIGHWAY PROJECTS - COFFEESTIP PLAN: 2020 - Original

Page 35: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-189 Project Description PLANING AND RESURFACING ON SR-189 FROM SR-203 SOUTH OF ELBA TO SR-203 NORTH OF ELBA

Project Length in Miles 2.105  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068702 STPAA 0189 (505) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $428 $107 $0 $534

TOTAL COST: $428 $107 $0 $534

Route SR-27 Project Description RESURFACING AND PLANING ON SR-27 FROM SR-12 IN ENTERPRISE TO THE DALE COUNTY LINE

Project Length in Miles 7.535  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068712 STPAA 0027 (516) FEDERAL MAINT CN PAVEMENT MINOR

REHABILITATION2021 $2,804 $701 $0 $3,505

TOTAL COST: $2,804 $701 $0 $3,505

Route SR-51 Project Description PREVENTATIVE MAINTENANCE ON SR-51 FROM SR-12 (US-84) TO SR-167

Project Length in Miles 5.600  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068698 STPAA 0051 (517) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 12021 $866 $217 $0 $1,083

TOTAL COST: $866 $217 $0 $1,083

Route SR-87 Project Description PLANING AND RESURFACING ON SR-87 FROM SR-12 (US-84) TO SR-203

Project Length in Miles 0.792  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068701 STPAA 0087 (516) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $290 $73 $0 $363

TOTAL COST: $290 $73 $0 $363

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

35 of 206

HIGHWAY PROJECTS - COFFEESTIP PLAN: 2020 - Original

Page 36: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-24 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 011420) ON CR-24 OVER TOWN CREEK; SITE 2 - (BIN 009705) ON CR-36 OVER LITTLE BEAR CREEK; SITE 3 - (BIN 001265) ON CR-61 OVER POLK CREEK

Project Length in Miles 0.000  Urban Area SHOALS  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071458 HRRR 1720 () CONSTRUCTION GUARDRAIL 2020 $117 $0 $13 $130

TOTAL COST: $117 $0 $13 $130

Route CR-48 Project Description UPGRADE RR CROSSING DEVICES ON MAIN ST. DOT NO. 731919B AND SADIE ROBERSON ST. DOT NO. 731921C, REF#1412(XVII-R) IN LEIGHTON TO INCLUDE MAST MOUNTED SIGNALS, GATES, BELLS, GCP'S, SIGNS, MARKINGS AND LEGENDS

Project Length in Miles 0.057  Urban Area SHOALS  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070148 RHCH RR19 (911) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $732 $0 $183 $915

TOTAL COST: $732 $0 $183 $915

Route CR-55 Project Description RESURFACING ON CR-55 (WOODMONT DRIVE) FROM PONDEROSA DRIVE TO TUSCUMBIA CITY LIMITS

Project Length in Miles 0.000  Urban Area SHOALS  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071742 STPOA 1720 (250) CONSTRUCTION RESURFACING 2020 $1,082 $0 $270 $1,352

TOTAL COST: $1,082 $0 $270 $1,352

Route CR-NA Project Description NATCHEZ TRACE PARKWAY OVERLAY PARK ROAD FROM MP 316.55 TO MP 334.55

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067955 FLAP FLAP () CONSTRUCTION RESURFACING 2020 $4,170 $0 $1,042 $5,212

TOTAL COST: $4,170 $0 $1,042 $5,212

Route CR-NA Project Description SIDEWALKS ALONG BROWN ST FROM ROOSEVELT AVE TO GIRARD AVE, ALONG ELLEDGE LANE FROM 6TH ST TO HUSTON DR, ALONG WEBSTER ST FROM WEBSTER CIR TO EAST AVALON AVE AND ALONG EDWARDS AVE / BROOKFORD ST FROM FIRESTONE AVE TO EAST AVALON AVE

Project Length in Miles 0.000  Urban Area SHOALS  Sponsor MUSCLE SHOALS  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068358 TAPOA TA18 (909) CONSTRUCTION SIDEWALK 2020 $413 $0 $103 $517

TOTAL COST: $413 $0 $103 $517

Route CR-NA Project Description RAILROAD GRADE CROSSING IMPROVEMENTS, MAST MOUNTED SIGNALS, BELLS, GATES, SIGNS, MARKINGS AND LEGENDS AT WEST 2ND STREET AND NORFOLK SOUTHERN RAILROAD IN TUSCUMBIA, DOT NO. 731950M

Project Length in Miles 0.081  Urban Area SHOALS  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070181 RHPD RR19 (910) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $298 $0 $33 $331

TOTAL COST: $298 $0 $33 $331

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

36 of 206

HIGHWAY PROJECTS - COLBERTSTIP PLAN: 2020 - Original

Page 37: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description IMP RVR RD FR BR HATN TO SR184, RVR RD FR SR133 TO FRD RD, LIME KLN RD, CL RD FR SR20 TO OLD SR20, SKWL LN FR SR157 TO SR20, SPR VA RD FR 3 MI LN TO LGR RD, RVR RD FR FORD RD TO BR HTN, CL RD SR184 TO RVR RD

Project Length in Miles 0.000  Urban Area SHOALS  Sponsor COLBERT COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065034 STPOA 1716 () CONSTRUCTION RESURFACING 2023 $1,973 $0 $493 $2,466

TOTAL COST: $1,973 $0 $493 $2,466

Route CR-NA Project Description RESURFACING, LEVELING, AND DRAINAGE IMPROVEMENTS ON COX BOULEVARD FROM AVALON AVENUE TO SECOND STREET INCLUDING NORFOLK-SOUTHERN RAILROAD CROSSING

Project Length in Miles 2.000  Urban Area SHOALS  Sponsor SHEFFIELD COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056074 PE 2011 / 100056076 RW 2019

100056077 STPOA 8822 (601) UTILITIES RESURFACING 2020 $71 $0 $18 $88100056078 STPOA 8822 (601) CONSTRUCTION RESURFACING 2020 $2,042 $0 $510 $2,552

TOTAL COST: $2,112 $0 $528 $2,641

Route CR-NA Project Description RAILROAD GRADE CROSSING IMPROVEMENTS, SIGNS, MARKINGS AND LEGENDS AT SOUTHWEST 12TH STREET AND NORFOLK SOUTHERN RAILOAD IN SHEFFIELD, AL

Project Length in Miles 0.000  Urban Area SHOALS  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069655 RHCH RR19 (903) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $3 $0 $0 $4

TOTAL COST: $3 $0 $0 $4

Route NA Project Description BICYCLE AND PEDESTRIAN TRAIL EXTENDING IN THE NORTHEAST QUADRANT OF WHIPPORWILL PARK IN THE CITY OF SHEFFIELD

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069005 TAPAA TA19 (900) CONSTRUCTION SIDEWALK 2020 $293 $0 $73 $366

TOTAL COST: $293 $0 $73 $366

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

37 of 206

HIGHWAY PROJECTS - COLBERTSTIP PLAN: 2020 - Original

Page 38: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-2 Project Description REPLACE BRIDGES AND APPROACHES, BIN 001708 AND BIN 005442, ON SR-2 (US-72) OVER ASHE BOULEVARD (SUFF=66.2, STATUS=FO)

Project Length in Miles 0.200  Urban Area SHOALS  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049337 PE 2008 / 100068037 RW 2018 / 100055932 UT 2019

100049340 BR 0002 (529) CONSTRUCTION BRIDGES AND APPROACHES 2020 $5,333 $1,333 $0 $6,666TOTAL COST: $5,333 $1,333 $0 $6,666

Route SR-2 Project Description RESURFACING ON SR-2 (US-72) FROM MILL CREEK LOOP TO LAIR LANE

Project Length in Miles 3.499  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068252 NH 0002 (588) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,820 $455 $0 $2,275

TOTAL COST: $1,820 $455 $0 $2,275

Route SR-20 Project Description SAFETY IMPROVEMENTS TO INTERSECTION OF SR-20 AND SR-157

Project Length in Miles 1.000  Urban Area SHOALS  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056499 PE 2012

100056500 NH 0020 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $767 $192 $0 $959TOTAL COST: $767 $192 $0 $959

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

38 of 206

HIGHWAY PROJECTS - COLBERTSTIP PLAN: 2020 - Original

Page 39: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route I-65 Project Description BRIDGE RAISING (BIN 006461) OVER I-65 (EXIT 83) AT CR-6 OVERPASS

Project Length in Miles 0.388  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100071126 CN 2020

100071125 IM I065 (513) PRELIMINARY ENGINEERING BRIDGE RAISING 2020 $30 $3 $0 $33100071126 IM I065 (513) CONSTRUCTION BRIDGE RAISING 2020 $295 $33 $0 $328

TOTAL COST: $325 $36 $0 $361

Route I-65 Project Description REPLACE BRIDGES I-65 OVER SEPULGA RIVER AND RELIEF,BIN 6808,6809,6810,6811,6812 AND 6813

Project Length in Miles 1.277  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100057624 PE 2019

100057625 IM I065 (497) CONSTRUCTION BRIDGE REPLACEMENT 2023 $22,971 $2,552 $0 $25,523TOTAL COST: $22,971 $2,552 $0 $25,523

Route I-65 Project Description RESURFACING ON I-65 FROM CR-6 UNDERPASS TO .5 MILE SOUTH OF SR-12(US-84)

Project Length in Miles 9.421  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069089 PE 2019 / 100069059 CN 2021

100069059 IM I065 () CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1

2021 $3,772 $419 $0 $4,191TOTAL COST: $3,772 $419 $0 $4,191

Route SR-12 Project Description SR-12 (US-84) ADDITIONAL LANES FROM MP 96.3 TO I-65

Project Length in Miles 3.720  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064647 PE 2016 / 100064649 RW 2018

100064652 HPPF A107 (900) UTILITIES GRADE, DRAIN, BASE AND PAVE 2021 $2,094 $523 $0 $2,617100064653 HPPF-NHF A107 (900) CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2022 $4,885 $1,221 $0 $6,107

TOTAL COST: $6,979 $1,745 $0 $8,724

Route SR-3 Project Description INTERSECTION RE-ALIGNMENT AND MODIFICATIONS OF SR-3 (US-31) AND SR-12 (US-84) FROM MP 92.7 TO MP 93.1

Project Length in Miles 1.600  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070623 RW 2021 / 100070622 UT 2022 / 100070624 CN 2022

100070621 HSIP 0003 (628) PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2020 $262 $29 $0 $291100070623 HSIP 0003 (628) RIGHT OF WAY SAFETY IMPROVEMENTS 2021 $37 $4 $0 $41100070622 HSIP 0003 (628) UTILITIES SAFETY IMPROVEMENTS 2022 $417 $46 $0 $464100070624 HSIP 0003 () CONSTRUCTION SAFETY IMPROVEMENTS 2022 $2,194 $244 $0 $2,437

TOTAL COST: $2,910 $323 $0 $3,233

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

39 of 206

HIGHWAY PROJECTS - CONECUHSTIP PLAN: 2020 - Original

Page 40: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-32 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT A CULVERT ON CR-32 BETWEEN SR-55 AND CR-45

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071460 HRRR 2020 () CONSTRUCTION GUARDRAIL 2020 $31 $0 $3 $34

TOTAL COST: $31 $0 $3 $34

Route CR-85 Project Description RESURFACING, WIDENING AND LEVELING ON CR-85 FROM CR-38 (POTTER ROAD) TO SR-9 (US-331) - CCP 20-378-19

Project Length in Miles 2.263  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071692 STPNU 2020 () CONSTRUCTION RESURFACING 2021 $584 $0 $146 $729

TOTAL COST: $584 $0 $146 $729

Route CR-89 Project Description LEVELING AND TRIPLE SURFACE TREAMENT ON CR-89 FROM FOREST ROAD TO THE GENEVA COUNTY LINE - CCP 20-379-19

Project Length in Miles 1.860  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071691 STPNU 2020 () CONSTRUCTION RESURFACING 2021 $270 $0 $68 $338

TOTAL COST: $270 $0 $68 $338

Route CR-93 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 011305) ON CR-93 OVER POND CREEK; SITE 2 - (BIN 007466) ON CR-93 OVER POND CREEK; SITE 3 - (BIN 007111) ON CR-93 OVER A STREAM

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071459 HRRR 2020 () CONSTRUCTION GUARDRAIL 2020 $115 $0 $13 $128

TOTAL COST: $115 $0 $13 $128

Route CR-NA Project Description FIVE BRIDGE REPLACEMENTS IN CONECUH NF: CR-11 OVER BLACK WATER CREEK (BIN 017111); GILES RD OVER HURRICANE CREEK (BIN 013826); GILES RD OVER PANTHER CREEK (BIN 013722); SANDERS RD OVER RUM CREEK (BIN 015884); CR-11 OVER BLACK WATER CREEK (BIN 014361)

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067952 N-FLAP FLAP (020) CONSTRUCTION BRIDGE REPLACEMENT 2020 $638 $0 $160 $798

TOTAL COST: $638 $0 $160 $798

Route SR-12 Project Description PLANING AND RESURFACING ON SR-12 (US-84) FROM CR-77 TO SR-9 (US-331)

Project Length in Miles 3.554  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068715 NH 0012 (570) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $1,883 $471 $0 $2,354

TOTAL COST: $1,883 $471 $0 $2,354

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

40 of 206

HIGHWAY PROJECTS - COVINGTONSTIP PLAN: 2020 - Original

Page 41: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-52 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-52 FROM SR-9 (US-331) IN OPP TO HARVEST TIME ROAD

Project Length in Miles 14.560  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068697 STPAA-HSIP 0052 (517) FEDERAL MAINT CN PREVENTATIVE MAINT MINOR

REHAB W/ SAFETY WIDENING2020 $4,571 $1,017 $0 $5,588

TOTAL COST: $4,571 $1,017 $0 $5,588

Route SR-55 Project Description ROUNDABOUT INSTALLATION AT THE INTERSECTION OF SR-55 AND SR-12 (US-84)

Project Length in Miles 0.248  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068778 PE 2019 / 100068779 RW 2021 / 100071676 UT 2022 / 100068780 CN 2022

100068779 HSIP 0055 (514) RIGHT OF WAY SAFETY IMPROVEMENTS 2021 $111 $12 $0 $124100071676 HSIP 0055 () UTILITIES UTILITY ADJUSTMENT 2022 $322 $36 $0 $358100068780 HSIP 0055 () CONSTRUCTION SAFETY IMPROVEMENTS 2022 $2,352 $261 $0 $2,613

TOTAL COST: $2,785 $309 $0 $3,094

Route SR-9 Project Description BRIDGE REPLACEMENT (BIN 002285) ON SR-9 (US-331) OVER LIGHTWOOD KNOT CREEK

Project Length in Miles 1.140  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068901 PE 2019

100033503 BR 0009 (573) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $23 $6 $0 $28100038583 BR 0009 (573) UTILITIES BRIDGE REPLACEMENT 2021 $292 $73 $0 $365100033501 BR 0009 (573) CONSTRUCTION BRIDGE REPLACEMENT 2021 $6,287 $1,572 $0 $7,859

TOTAL COST: $6,601 $1,650 $0 $8,252

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

41 of 206

HIGHWAY PROJECTS - COVINGTONSTIP PLAN: 2020 - Original

Page 42: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-10 Project Description PAVEMENT PRESERVATION ON SR-10 (US-29) FROM GLENWOOD AVENUE TO SR-53 (US-231)

Project Length in Miles 20.150  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068708 STPNU 0010 (549) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 12021 $2,742 $685 $0 $3,427

TOTAL COST: $2,742 $685 $0 $3,427

Route SR-9 Project Description INTERSECTION IMPROVEMENTS ON SR-9 (US-331) AT SR-10 (US-29)

Project Length in Miles 0.480  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069730 CN 2025

100069729 NH 0009 () PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2021 $122 $31 $0 $153100069741 NH 0009 () RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $245 $61 $0 $306100069742 NH 0009 () UTILITIES INTERSECTION IMPROVEMENTS 2023 $250 $62 $0 $312

TOTAL COST: $617 $154 $0 $771

Route SR-9 Project Description REPLACE BRIDGE, BIN 003021, SR-9 (US-331) OVER PATSALIGA CREEK (SUFF=57.9, STATUS=FO)

Project Length in Miles 1.059  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049231 PE 2010 / 100068211 RW 2019 / 100068556 UT 2019

100049232 BR 0009 (541) CONSTRUCTION BRIDGE REPLACEMENT 2020 $11,287 $2,822 $0 $14,109TOTAL COST: $11,287 $2,822 $0 $14,109

Route SR-97 Project Description RESURFACING, 2FT SAFETY WIDENING,CULVERT EXTENSIONS AND GUARDRAIL ON SR-97 FROM SR-9 (US-331) TO THE MONTGOMERY COUNTY LINE

Project Length in Miles 7.780  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068684 STPAA-HSIP 0097 (507) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2020 $2,530 $482 $0 $3,012

TOTAL COST: $2,530 $482 $0 $3,012

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

42 of 206

HIGHWAY PROJECTS - CRENSHAWSTIP PLAN: 2020 - Original

Page 43: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-1141 Project Description RESURFACING ON CR-1141 FROM CR-1147 TO CR-1246 - CCP 22-67-21

Project Length in Miles 3.277  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069674 RASTPNU 2219 (250) CONSTRUCTION RESURFACING 2020 $536 $0 $134 $670

TOTAL COST: $536 $0 $134 $670

Route CR-NA Project Description STREETSCAPES ON 1ST AVENUE NE FROM ARNOLD STREET NE TO 2ND STREET NE

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068360 TAPAA TA18 (910) CONSTRUCTION STREETSCAPE 2019 $640 $0 $160 $800

TOTAL COST: $640 $0 $160 $800

Route SR-157 Project Description SR-157, ADDITIONAL LANES AND BRIDGES FROM SR-69 TO EAST OF SR-3 (US-31) NORTH OF CULLMAN. BRIDGES OVER LAKE CATOMA AND CSX RAILROAD

Project Length in Miles 8.834  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100038838 PE 2001 / 100038839 RW 2007

100038840 NHF 0157 (506) UTILITIES GRADE, DRAIN, BASE AND PAVE 2020 $2,942 $735 $0 $3,677100038842 BUILD-NHF 0157 (506) CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2020 $22,809 $1,202 $1,000 $25,011

TOTAL COST: $25,751 $1,938 $1,000 $28,688

Route SR-3 Project Description RESURFACE SR-3 (US-31) FROM SR-69 TO THE INTERSECTION OF 7TH STREET

Project Length in Miles 0.900  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100062744 STPAA 0003 () FEDERAL MAINT CN PAVEMENT MINOR

REHABILITATION2022 $1,561 $390 $0 $1,951

TOTAL COST: $1,561 $390 $0 $1,951

Route SR-69 Project Description RESURFACE SR-69 FROM 0.4 MILES SOUTH OF CR-112 NEAR BREMEN TO NORTH OF I-65 IN DODGE CITY

Project Length in Miles 8.340  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067158 STPAA 0069 (560) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $2,409 $602 $0 $3,012

TOTAL COST: $2,409 $602 $0 $3,012

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

43 of 206

HIGHWAY PROJECTS - CULLMANSTIP PLAN: 2020 - Original

Page 44: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-74 Project Description BRIDGE REPLACEMENT AND APPROACHES ON SR-74 (US-278) OVER CROOKED CREEK, BIN 001617

Project Length in Miles 1.610  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068182 PE 2019 / 100068185 UT 2025 / 100068183 CN 2025

100068184 BR 0074 (544) RIGHT OF WAY BRIDGES AND APPROACHES 2023 $84 $21 $0 $105TOTAL COST: $84 $21 $0 $105

Route SR-74 Project Description RESURFACING ON SR-74(US-278) FROM SR-91 IN HOLLY POND TO THE EAST END OF THE BRIDGE OVER BLACK WARRIOR RIVER / BLOUNT COUNTY LINE

Project Length in Miles 3.195  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070102 RP-NH 0074 (545) FEDERAL MAINT CN PAVEMENT MINOR

REHABILITATION2020 $1,301 $325 $0 $1,626

TOTAL COST: $1,301 $325 $0 $1,626

Route SR-91 Project Description BRIDGE REPLACEMENT AND APPROACHES ON SR-91 OVER DUCK RIVER, BIN 004129

Project Length in Miles 1.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068169 PE 2019 / 100068170 CN 2024

100068171 BR 0091 (506) RIGHT OF WAY BRIDGES AND APPROACHES 2022 $83 $21 $0 $104100068172 BR 0091 (506) UTILITIES BRIDGES AND APPROACHES 2023 $84 $21 $0 $105

TOTAL COST: $167 $42 $0 $209

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

44 of 206

HIGHWAY PROJECTS - CULLMANSTIP PLAN: 2020 - Original

Page 45: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-21 Project Description RESURFACING ON CR-21 FROM SR-123 TO THE OZARK CITY LIMITS (SITE 1); RESURFACING ON CR-82 FROM THE COFFEE COUNTY LINE TO SR-53(US-231) (SITE 2); WIDENING AND RESURFACING ON CR-33 FROM CR-20 TO CR-54 (SITE 3)

Project Length in Miles 3.241  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070303 RASTPAA 2319 (252) CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2020 $525 $131 $0 $656

TOTAL COST: $525 $131 $0 $656

Route CR-47 Project Description RESURFACING ON CR-47 FROM THE HOUSTON COUNTY LINE TO SR-134

Project Length in Miles 5.180  Urban Area DOTHAN  Sponsor DALE COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065700 STPOA 2319 (250) CONSTRUCTION RESURFACING 2020 $729 $0 $182 $912

TOTAL COST: $729 $0 $182 $912

Route CR-9 Project Description WIDENING AND RESURFACING ON CR-9 FROM THE HOUSTON COUNTY LINE TO SR-134

Project Length in Miles 4.031  Urban Area DOTHAN  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070304 RASTPNU 2319 (251) CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2020 $692 $0 $173 $865

TOTAL COST: $692 $0 $173 $865

Route CR-NA Project Description INSTALL GUARDRAIL AND END ANCHORS (BIN 012726) CR-2 AT CLAYBANK CRK, (BIN 012976) CR-113 AT JUDY CRK, (BIN 012995) CR-19W AT JUDY CRK, (BIN 008291) CR-19E AT LITTLE JUDY CRK, (BIN 010981) CR-60 AT LITTLE JUDY CRK, AND (BIN 003095) CR-54 AT COTTON CRK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069567 HRRR 2319 () CONSTRUCTION GUARDRAIL 2020 $74 $0 $8 $82

TOTAL COST: $74 $0 $8 $82

Route SR-134 Project Description RESURFACING AND 2' SAFETY WIDENING ON SR-134 FROM SR-123 TO CR-67

Project Length in Miles 6.480  Urban Area DOTHAN  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068717 STPAA-HSIP 0134 (509) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2021 $1,171 $257 $0 $1,428

TOTAL COST: $1,171 $257 $0 $1,428

Route SR-53 Project Description RESURFACING ON SR-53 (US-231) NORTH OF OZARK FROM SOUTH OF SR-27 TO NORTH OF CR-2

Project Length in Miles 6.040  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068686 NH 0053 (585) FEDERAL MAINT CN PAVEMENT MINOR

REHABILITATION2020 $4,973 $1,243 $0 $6,217

TOTAL COST: $4,973 $1,243 $0 $6,217

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

45 of 206

HIGHWAY PROJECTS - DALESTIP PLAN: 2020 - Original

Page 46: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-85 Project Description REALIGNING OF SR-85, SIGNING UPGRADE, AND REMOVING OVERHEAD FLASHER AT SR-85 AND SR-167

Project Length in Miles 1.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071549 HSIP 0085 (504) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $32 $4 $0 $35

TOTAL COST: $32 $4 $0 $35

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

46 of 206

HIGHWAY PROJECTS - DALESTIP PLAN: 2020 - Original

Page 47: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-140 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 004660) ON HARRISON AVENUE OVER BEECH CREEK; SITE 2 - (BIN 007960) ON CR-21 OVER CAINE CREEK; SITE 3 - (BIN 007961) ON CR-21 OVER BEAR CREEK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071461 HRRR 2420 (250) CONSTRUCTION GUARDRAIL 2020 $233 $0 $26 $258

TOTAL COST: $233 $0 $26 $258

Route CR-NA Project Description RIVERFRONT BOARDWALK-PHASE II CITY OF SELMA

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067164 TAPAA TA17 (924) CONSTRUCTION SIDEWALK 2020 $371 $0 $93 $464

TOTAL COST: $371 $0 $93 $464

Route NA Project Description RIVERFRONT BOARDWALK-PHASE I LOCATED ALONG THE ALABAMA RIVER ON AN ELEVATED BANK RUNNING PARALLEL TO WATER AVENUE IN THE CITY OF SELMA.

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065546 TAPAA TA16 (922) CONSTRUCTION SIDEWALK 2020 $393 $0 $98 $491

TOTAL COST: $393 $0 $98 $491

Route NA Project Description ADDING CURB RAMPS TO EXISTING SIDEWALKS OR REPAIRS TO CURB RAMPS THAT ARE NON-ADA COMPLIANT ON STATE ROUTES 8, 14 AND 22 FOR DALLAS COUNTY (DISTRICT 5) PHASE 3

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060240 PE 2014

100060243 STPAA NR13 () CONSTRUCTION SIDEWALK 2021 $187 $47 $0 $233TOTAL COST: $187 $47 $0 $233

Route SR-14 Project Description BRIDGE REPLACEMENT ON SR-14 AT BLUE GIRTH SWAMP (BIN 1556 AND 1557)

Project Length in Miles 0.783  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061667 PE 2017

100068988 BR 0014 () RIGHT OF WAY BRIDGE REPLACEMENT 2021 $63 $16 $0 $79100068984 BR 0014 () UTILITIES BRIDGE REPLACEMENT 2021 $122 $31 $0 $153100061670 BR 0014 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $6,178 $1,545 $0 $7,723

TOTAL COST: $6,364 $1,591 $0 $7,954

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

47 of 206

HIGHWAY PROJECTS - DALLASSTIP PLAN: 2020 - Original

Page 48: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-22 Project Description SR-22 FR END OF EXISTING 4-LN TO CR-63

Project Length in Miles 5.436  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100008926 PE 2000 / 100037669 RW 2006 / 100008924 CN 2024

100008928 STPAA 0022 (504) UTILITIES GRADE, DRAIN, BASE, PAVE AND BRG

2022 $2,170 $543 $0 $2,713TOTAL COST: $2,170 $543 $0 $2,713

Route SR-41 Project Description PLANING AND RESURFACING ON SR-41 (US-80 TRUCK ROUTE) FROM 50' NORTH OF THE MERIDIAN AND BIGBEE RAILROAD (MP 122.813) TO SOUTH OF SR-14 (MP127.446)

Project Length in Miles 4.633  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067822 NH 0041 (519) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $3,043 $761 $0 $3,804

TOTAL COST: $3,043 $761 $0 $3,804

Route SR-8 Project Description PLANING AND RESURFACING ON SR-8 (US-80) (EASTBOUND ONLY) FROM THE PERRY COUNTY LINE (MP 59.941) TO .4 MILE WEST OF THE CAHABA RIVER BRIDGE (MP 73.765)

Project Length in Miles 13.824  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069865 NH 0008 (595) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $3,432 $858 $0 $4,290

TOTAL COST: $3,432 $858 $0 $4,290

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

48 of 206

HIGHWAY PROJECTS - DALLASSTIP PLAN: 2020 - Original

Page 49: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-89 Project Description ROADWAY SIGNING IMPROVEMENTS ALONG THE CORRIDOR OF CR-89(DESOTO PARKWAY NE) FROM SR-35 TO THE ENTRANCE OF DESOTO STATE PARK

Project Length in Miles 5.100  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071462 HRRR 2520 (250) CONSTRUCTION SIGNING 2020 $42 $0 $5 $47

TOTAL COST: $42 $0 $5 $47

Route CR-89 Project Description SIGN UPGRADES AND PAVEMENT MARKERS ON CR-89 BEGINNING AT SOUTH END OF DESOTO STATE PARK TO CR-165

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071464 HRRR 2520 () CONSTRUCTION SIGNING 2020 $212 $0 $24 $236

TOTAL COST: $212 $0 $24 $236

Route CR-NA Project Description ADA COMPLIANT SIDEWALK ALONG THE NORTH SIDE OF SR-117 FROM COVE ROAD TO DEMPSEY AVENUE - PHASE I

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069011 TAPNU TA19 (906) CONSTRUCTION SIDEWALK 2020 $382 $0 $96 $478

TOTAL COST: $382 $0 $96 $478

Route I-59 Project Description RECONSTRUCTION OF THE NORTHBOUND ROADWAY ON I-59 FROM SOUTH OF SR-35 (MP 217.850) TO NORTH OF SR-7 (MP 225.350)

Project Length in Miles 7.750  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066507 PE 2018 / 100066508 CN 2020

100066508 IM I059 (407) CONSTRUCTION PAVEMENT REHABILITATION 2020 $32,133 $3,570 $0 $35,704TOTAL COST: $32,133 $3,570 $0 $35,704

Route NA Project Description CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES 2, 7, 35, 75, 79, 117, 227 AND 279 IN DEKALB AND JACKSON COUNTIES

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060150 PE 2014

100060151 STPAA NR13 () CONSTRUCTION SIDEWALK 2021 $158 $39 $0 $197TOTAL COST: $158 $39 $0 $197

Route NA Project Description WELCOME CENTER REHABILITATION ALONG I-59 NEAR GEORGIA STATE LINE

Project Length in Miles 0.100  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100047076 IM I059 (334) CONSTRUCTION REST AREA REHABILITATION 2024 $9,459 $1,051 $0 $10,510

TOTAL COST: $9,459 $1,051 $0 $10,510

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

49 of 206

HIGHWAY PROJECTS - DEKALBSTIP PLAN: 2020 - Original

Page 50: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-176 Project Description SURFACE TREATMENT ON SR-176 FROM CR-669 IN DOGTOWN TO SR-35 AT LITTLE RIVER CANYON

Project Length in Miles 11.940  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068423 STPAA 0176 (502) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 12021 $808 $202 $0 $1,010

TOTAL COST: $808 $202 $0 $1,010

Route SR-35 Project Description ROUNDABOUT AND ACCESS MANAGEMENT ON SR-35 FROM 0.25 MILES EAST OF I-59 TO I-59

Project Length in Miles 0.512  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065373 CN 2023

100065372 HSIP 0035 () PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2021 $109 $0 $0 $109100065373 HSIP 0035 () CONSTRUCTION SAFETY IMPROVEMENTS 2023 $750 $0 $0 $750

TOTAL COST: $860 $0 $0 $860

Route SR-35 Project Description INTERSECTION IMPROVEMENTS AT SR-35 AND AIRPORT ROAD / JORDAN ROAD IN FORT PAYNE

Project Length in Miles 0.410  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068764 PE 2019

100071437 NH 0035 (535) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2020 $120 $30 $0 $150100065375 NH 0035 (535) CONSTRUCTION INTERSECTION IMPROVEMENTS 2022 $624 $0 $156 $780

TOTAL COST: $744 $30 $156 $930

Route SR-68 Project Description RESURFACING ON SR-68 FROM SR-7 (US-11) TO THE CHEROKEE COUNTY LINE

Project Length in Miles 2.380  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067156 STPAA 0068 () FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $734 $184 $0 $918

TOTAL COST: $734 $184 $0 $918

Route SR-75 Project Description BRIDGE REPLACEMENT (BIN 002717) AND APPROACHES ON SR-75 OVER TOWN CREEK

Project Length in Miles 2.100  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068513 PE 2019

100068517 BR 0075 (536) RIGHT OF WAY BRIDGE REPLACEMENT 2021 $265 $66 $0 $332100068518 BR 0075 (536) UTILITIES BRIDGE REPLACEMENT 2022 $260 $65 $0 $325100068519 BR 0075 (536) CONSTRUCTION BRIDGE REPLACEMENT 2022 $10,303 $2,576 $0 $12,879

TOTAL COST: $10,828 $2,707 $0 $13,535

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

50 of 206

HIGHWAY PROJECTS - DEKALBSTIP PLAN: 2020 - Original

Page 51: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-154 Project Description SAFETY WIDENING, GUARDRAIL IMPROVEMENTS, AND TRAFFIC STRIPING ON BURT MILL ROAD FROM FLAT ROCK ROAD TO SR-14

Project Length in Miles 4.100  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071463 HRRR 2620 (251) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $239 $0 $27 $266

TOTAL COST: $239 $0 $27 $266

Route CR-23 Project Description MICROSURFACING ON S EDGEWOOD AND EDGEWOOD ROADS (CR-23) FROM COBBS FORD ROAD (CR-2) TO SR-143 - ECP 26-57-19

Project Length in Miles 2.100  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070658 STPMN 2619 (261) CONSTRUCTION RESURFACING 2020 $176 $0 $44 $220

TOTAL COST: $176 $0 $44 $220

Route CR-8 Project Description WIDENING ON CR-8 (REDLAND ROAD) FROM SR-9 (US-231) TO CR-4 (RIFLE RANGE ROAD) AND BRIDGE REPLACEMENT AT HARWELL MILL CREEK (BIN #10936) AND INTERSECTION IMPROVEMENTS AT CR-8 (REDLAND ROAD) AND CR-4 (RIFLE RANGE ROAD)

Project Length in Miles 2.960  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063125 PE 2015 / 100063230 RW 2018

100063232 STPMN 2615 (250) UTILITIES WIDENING AND RESURFACING (RDWY)

2020 $700 $0 $175 $875100063233 STPMN 2615 () CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2020 $1,200 $0 $300 $1,500

TOTAL COST: $1,900 $0 $475 $2,375

Route CR-8 Project Description INSTALLATION OF A ROUNDABOUT AT THE INTERSECTION OF REDLAND ROAD (CR-8) AND FIRETOWER/DOZIER ROAD (CR-59).

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065211 HSIP 2616 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $1,123 $0 $125 $1,248

TOTAL COST: $1,123 $0 $125 $1,248

Route CR-8 Project Description WIDENING AND RESURFACING WITH INTERSECTION IMPROVEMENTS AT CR-8 (REDLAND ROAD) AND CR-4 (RIFLE RANGE ROAD)

Project Length in Miles 0.550  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067261 STPMN 2615 () CONSTRUCTION ADDITIONAL ROADWAY LANES 2020 $1,520 $0 $380 $1,900

TOTAL COST: $1,520 $0 $380 $1,900

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

51 of 206

HIGHWAY PROJECTS - ELMORESTIP PLAN: 2020 - Original

Page 52: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description INTERSECTION IMPROVEMENTS WITH ROUNDABOUT AT ORLINE ST AND COMPANY ST; SIDEWALKS, PEDESTRIAN LIGHTING AND LANDSCAPING ON COMPANY ST FROM E BRIDGE ST TO ORLINE ST, ORLINE ST FROM COMPANY ST TO HILL ST AND HILL ST FROM ORLINE ST TO E BRIDGE ST

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071163 STPMN 2620 (252) PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $186 $0 $47 $233100071164 STPMN 2620 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $1,243 $0 $311 $1,553

TOTAL COST: $1,429 $0 $357 $1,786

Route CR-NA Project Description RESURFACING AND TRAFFIC STRIPE ON FOXWOOD ROAD FROM THE AUTAUGA COUNTY LINE TO DEATSVILLE HIGHWAY - ECP 26-11-19

Project Length in Miles 0.300  Urban Area MONTGOMERY  Sponsor ELMORE COUNTY COMMISSION  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069844 STPAA 2619 (254) CONSTRUCTION RESURFACING 2020 $81 $0 $21 $102

TOTAL COST: $81 $0 $21 $102

Route CR-NA Project Description MICROSURFACING ON COOSADA ROAD (CR-23) FROM SR-143 TO BLACKWELL DRIVE

Project Length in Miles 4.400  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070657 STPMN 2619 (256) CONSTRUCTION RESURFACING 2020 $296 $0 $74 $370

TOTAL COST: $296 $0 $74 $370

Route CR-NA Project Description MICRO-SURFACE AND TRAFFIC STRIPE ON FLATWOOD ROAD FROM CEASERVILLE ROAD TO THE FLATWOOD ROAD DEAD END - ECP 26-53-19

Project Length in Miles 4.650  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070682 STPMN 2619 (257) CONSTRUCTION RESURFACING 2020 $176 $0 $54 $230

TOTAL COST: $176 $0 $54 $230

Route CR-NA Project Description MICRO-SURFACE ON FLATWOOD CURVE FROM MEHEARG ROAD TO FLATWOOD ROAD

Project Length in Miles 0.480  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070683 STPMN 2619 (258) CONSTRUCTION RESURFACING 2020 $28 $0 $8 $37

TOTAL COST: $28 $0 $8 $37

Route CR-NA Project Description MICRO-SURFACE ON MEHEARG ROAD FROM SR-14 TO FLATWOOD ROAD

Project Length in Miles 1.620  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070684 STPMN 2619 (259) CONSTRUCTION RESURFACING 2020 $98 $0 $29 $127

TOTAL COST: $98 $0 $29 $127

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

52 of 206

HIGHWAY PROJECTS - ELMORESTIP PLAN: 2020 - Amendment # 3

Page 53: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description MICRO-SURFACING ON FORT TOULOUSE ROAD FROM FORT TOULOUSE PARK ENTRANCE TO THE WETUMPKA CITY LIMITS

Project Length in Miles 2.430  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070685 STPMN 2619 (260) CONSTRUCTION RESURFACING 2020 $145 $0 $43 $187

TOTAL COST: $145 $0 $43 $187

Route CR-NA Project Description RESURFACING ON LAUREL CREEK ROAD AND REA ROAD FROM SR-21 (US-231) TO WEOKA ROAD

Project Length in Miles 3.550  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070686 STPMN 2620 (250) CONSTRUCTION RESURFACING 2020 $323 $81 $0 $403

TOTAL COST: $323 $81 $0 $403

Route CR-NA Project Description RESURFACE DEATSVILLE HIGHWAY FROM THE MILLBROOK CITY LIMITS TO ALPHA LANE - ECP 26-10-19

Project Length in Miles 5.500  Urban Area MONTGOMERY  Sponsor ELMORE COUNTY COMMISSION  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069845 RASTPAA 2619 (255) CONSTRUCTION RESURFACING 2020 $712 $0 $178 $890

TOTAL COST: $712 $0 $178 $890

Route CR-NA Project Description UTILITY RELOCATION AND STREET IMPROVEMENTS ON COMPANY STREET FROM LOGAN STREET TO EAST BRIDGE STREET AND SOUTH MAIN STREET FROM EAST BRIDGE STREET TO SR-9 (US-231)

Project Length in Miles 2.520  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056089 PE 2012

100057512 STPMN 2619 () UTILITIES RESURFACING 2020 $95 $0 $24 $118100056090 STPMN 2619 () CONSTRUCTION RESURFACING 2020 $640 $0 $160 $800

TOTAL COST: $735 $0 $184 $918

Route I-65 Project Description INTERCHANGE LIGHTING ON I-65 AT SR-14 (EXIT 181) - PRATTVILLE / MILLBROOK

Project Length in Miles 1.200  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100055338 PE 2011 / 100055339 CN 2020

100055339 IM I065 (418) CONSTRUCTION LIGHTING 2020 $1,890 $210 $0 $2,100TOTAL COST: $1,890 $210 $0 $2,100

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

53 of 206

HIGHWAY PROJECTS - ELMORESTIP PLAN: 2020 - Original

Page 54: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description STREETSCAPE IMPROVEMENTS ALONG SR-14, SISTRUNK STREET, JAMES STREET AND SOUTH ANN AVENUE

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069023 TAPNU TA19 (917) CONSTRUCTION STREETSCAPE 2020 $580 $0 $145 $725

TOTAL COST: $580 $0 $145 $725

Route NA Project Description CITY OF WETUMPKA RIVERWALK - PHASE 2

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069432 TAPMN TA18 () CONSTRUCTION UNCLASSIFIED 2020 $48 $0 $12 $60

TOTAL COST: $48 $0 $12 $60

Route NA Project Description ADDING CURB RAMPS TO EXISTING SIDEWALKS OR REPAIRS TO CURB RAMPS THAT ARE NON-ADA COMPLIANT ON STATE ROUTES 63, 111 AND 143 IN ELMORE AND MONTGOMERY COUNTIES (DISTRICTS 1 AND 3)

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060168 PE 2013

100060170 STPAA NR13 (925) CONSTRUCTION SIDEWALK 2022 $171 $43 $0 $214TOTAL COST: $171 $43 $0 $214

Route SR-14 Project Description ADD LANE SR-14 FROM 0.5 MILE WEST CR-3 (INGRAM RD) TO CR-153 (COOSADA PKWY)

Project Length in Miles 8.610  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100054493 PE 2017

100064189 STPAA 0014 (541) RIGHT OF WAY ADDITIONAL ROADWAY LANES 2020 $3,863 $966 $0 $4,829100064194 STPAA 0014 (541) UTILITIES ADDITIONAL ROADWAY LANES 2023 $780 $195 $0 $975100054496 STPAA 0014 (541) CONSTRUCTION ADDITIONAL ROADWAY LANES 2023 $7,775 $1,944 $0 $9,719

TOTAL COST: $12,418 $3,105 $0 $15,523

Route SR-14 Project Description ADDING TURN LANES WHERE COOSADA PARKWAY AND INGRAM ROAD INTERSECT WITH SR-14; ADDING OR RECONFIGURING LANES AT SR-143 AND COBBS FORD ROAD; STUDY INTERSECTION OF SR-14 AND OAK TREE ROAD

Project Length in Miles 0.072  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070735 PE 2020

100071072 ATRP2-26-2020-026-CN ()

CONSTRUCTION TURN LANES 2021 $0 $1,202 $0 $1,202TOTAL COST: $0 $1,202 $0 $1,202

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

54 of 206

HIGHWAY PROJECTS - ELMORESTIP PLAN: 2020 - Amendment # 3

Page 55: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-229 Project Description PAVEMENT PRESERVATION ON SR-229 FROM SR-14 (MP 11.566) TO SR-63 (MP 22.751)

Project Length in Miles 11.233  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070057 STPAA 0229 (507) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 12020 $1,359 $340 $0 $1,699

TOTAL COST: $1,359 $340 $0 $1,699

Route SR-9 Project Description UPGRADE TRAFFIC SIGNALS ON SR-9 (US-231) FROM TODD ROAD TO SR-9 (CENTRAL PLANK ROAD)

Project Length in Miles 11.271  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070139 HSIP 0009 (576) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $167 $19 $0 $185

TOTAL COST: $167 $19 $0 $185

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

55 of 206

HIGHWAY PROJECTS - ELMORESTIP PLAN: 2020 - Original

Page 56: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-4 Project Description INSTALL TRAFFIC STRIPING, RAISED PAVEMENT MARKERS, TRAFFIC CONTROL MARKINGS AND LEGENDS ON CR-4 (BRADLEY ROAD) FROM SR-15 (US-29) TO THE COVINGTON COUNTY LINE

Project Length in Miles 17.700  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069585 HRRR 2719 (250) CONSTRUCTION SAFETY IMPROVEMENTS 2019 $101 $1 $10 $112

TOTAL COST: $101 $1 $10 $112

Route CR-NA Project Description STREETSCAPE IMPROVEMENTS ALONG ALCO DRIVE, COLLEGE DRIVE, FLEMING LANE, BLACKSHER LANE, SCOTT STREET, EDWARDS STREET, DENARD STREET, DAWSON STREET, STALLWORTH STREET, WEST SHORE DRIVE AND STALLWORTH STREET

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069028 TAPAA TA19 (922) CONSTRUCTION STREETSCAPE 2020 $640 $0 $160 $800

TOTAL COST: $640 $0 $160 $800

Route NA Project Description SIDEWALK IMPROVEMENTS ALONG WILLIAMSON STREET FROM W.S. NEAL ELEMENTARY AND W.S. MIDDLE SCHOOL TO R.T. JOHNSON RECREATIONAL FACILITIES AND SUMMERCHASE APARTMENTS IN EAST BREWTON

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067319 TAPAA TA17 (939) CONSTRUCTION SIDEWALK 2020 $212 $0 $53 $265

TOTAL COST: $212 $0 $53 $265

Route SR-15 Project Description RESURFACING ON SR-15 (US-29) FROM .3 MILE SOUTH OF FINLAY LANE TO .16 MILE SOUTH OF WILLIAM COOK ROAD

Project Length in Miles 11.420  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068013 STPAA 0015 (534) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,926 $481 $0 $2,407

TOTAL COST: $1,926 $481 $0 $2,407

Route SR-15 Project Description RESURFACING SR-15 (US-29) FROM SR-3 TO 0.44 MILE NORTH OF EAST BREWTON CITY LIMIT WITH CSX RAILROAD RESURFACING AT CROSSING 351319Y

Project Length in Miles 1.290  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068303 STPAA 0015 (535) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $507 $127 $0 $633

TOTAL COST: $507 $127 $0 $633

Route SR-15 Project Description RESURFACING ON SR-15 (US-29) FROM WILLIAM COOK ROAD TO THE COVINGTON COUNTY LINE. HSIP FUNDING FOR GUARDRAIL WITH STEEL BLOCKOUTS.

Project Length in Miles 7.291  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068014 STPAA-HSIP 0015 (536) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,325 $329 $0 $1,653

TOTAL COST: $1,325 $329 $0 $1,653

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

56 of 206

HIGHWAY PROJECTS - ESCAMBIASTIP PLAN: 2020 - Original

Page 57: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-21 Project Description RESURFACING ON SR-21 FROM .2 MILE SOUTH OF POARCH ROAD TO .16 MILE SOUTH OF I-65

Project Length in Miles 0.585  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070127 STPAA 0021 (571) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $420 $105 $0 $525

TOTAL COST: $420 $105 $0 $525

Route SR-3 Project Description RESURFACING ON SR-3 (US-31) FROM NORTH END OF BURNT CORN CREEK BRIDGE TO 500 FEET NORTH OF TIGER DRIVE ALONG CSX RAILROAD WITH RESURFACING AT CROSSINGS 351319Y, 351317K AND 351315W

Project Length in Miles 2.849  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067962 NH 0003 (622) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,285 $321 $0 $1,606

TOTAL COST: $1,285 $321 $0 $1,606

Route SR-41 Project Description BRIDGE REPAIRS AND OVERLAY OVER CONECUH RIVER (BIN 018828) AND DEMOLITION OF EXISTING BRIDGES (BIN 7030 AND 7029) ON SR-41

Project Length in Miles 0.830  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100071333 PE 2020

100071334 ST-027-041-001-CN () CONSTRUCTION BRIDGE REPLACEMENT 2020 $0 $6,000 $0 $6,000TOTAL COST: $0 $6,000 $0 $6,000

Route SR-41 Project Description RESURFACING AND STEEL BLOCKOUT REPLACEMENT ON SR-41 FROM SR-3 TO NORTH OF BURNT CORN CREEK

Project Length in Miles 2.350  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068305 STPAA-HSIP 0041 (520) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $711 $175 $0 $886

TOTAL COST: $711 $175 $0 $886

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

57 of 206

HIGHWAY PROJECTS - ESCAMBIASTIP PLAN: 2020 - Original

Page 58: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description RESURFACING MAIN STREET FROM SR-1 (US-431) TO NORTH OF HATLEY AVENUE IN THE CITY OF GLENCOE

Project Length in Miles 0.000  Urban Area GADSDEN  Sponsor CITY OF GLENCOE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064389 STPOA 2815 () PRELIMINARY ENGINEERING RESURFACING 2020 $29 $0 $7 $36100064392 STPOA 2815 () CONSTRUCTION RESURFACING 2021 $285 $0 $71 $356

TOTAL COST: $313 $0 $78 $392

Route CR-NA Project Description RESURFACING AND TRAFFIC STRIPE ON WALNUT STREET FROM SR-25 (US-411/ALBERT RAINS BLVD) TO 12TH STREET IN THE CITY OF GADSDEN

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064641 STPOA 2815 () PRELIMINARY ENGINEERING RESURFACING 2022 $44 $0 $11 $55100064642 STPOA 2815 () CONSTRUCTION RESURFACING 2023 $250 $0 $63 $313

TOTAL COST: $294 $0 $74 $368

Route CR-NA Project Description PARTIAL REALIGNMENT AND RESURFACING OF SOUTH 11TH STREET FROM THE BRIDGE OVER BLACK CREEK TO RANDALL STREET IN THE CITY OF GADSDEN

Project Length in Miles 0.000  Urban Area GADSDEN  Sponsor CITY OF GADSDEN COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064654 STPOA 2815 () PRELIMINARY ENGINEERING RESURFACING 2020 $68 $0 $17 $85100064655 STPOA 2815 () CONSTRUCTION RESURFACING 2021 $390 $0 $97 $487

TOTAL COST: $458 $0 $114 $572

Route CR-NA Project Description RESURFACING AND TRAFFIC STRIPE ON 4TH STREET FROM 4TH AVENUE TO SR-1 (US-431) IN THE CITY OF ATTALLA

Project Length in Miles 0.000  Urban Area GADSDEN  Sponsor CITY OF ATTALLA COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070054 STPOA 2819 () PRELIMINARY ENGINEERING RESURFACING 2022 $58 $0 $14 $72100070055 STPOA 2819 () CONSTRUCTION RESURFACING 2023 $832 $0 $208 $1,041

TOTAL COST: $890 $0 $223 $1,113

Route CR-NA Project Description RESURFACING AND WIDENING ON BLACK CREEK PARKWAY FROM WILLS CREEK ROAD TO SOUTH 11TH STREET IN GADSDEN

Project Length in Miles 0.000  Urban Area GADSDEN  Sponsor CITY OF GADSDEN COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070075 STPOA 2819 () PRELIMINARY ENGINEERING RESURFACING 2022 $58 $0 $14 $72100070076 STPOA 2819 () CONSTRUCTION RESURFACING 2023 $832 $0 $208 $1,041

TOTAL COST: $890 $0 $223 $1,113

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

58 of 206

HIGHWAY PROJECTS - ETOWAHSTIP PLAN: 2020 - Original

Page 59: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description RESURFACING ON SARDIS ROAD FROM SR-1 (US-431) TO THE DEKALB COUNTY LINE - ECP 28-02-20

Project Length in Miles 6.840  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071443 RASTPAA 2820 () CONSTRUCTION RESURFACING 2020 $711 $178 $0 $889

TOTAL COST: $711 $178 $0 $889

Route CR-NA Project Description RESURFACING ON PILGRIMS REST ROAD FROM SR-77 TO GREEN VALLEY ROAD - ECP 28-03-20

Project Length in Miles 2.640  Urban Area GADSDEN  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071501 RASTPNU 2820 () CONSTRUCTION RESURFACING 2020 $251 $0 $63 $313

TOTAL COST: $251 $0 $63 $313

Route CR-NA Project Description RESURFACING AIR DEPOT ROAD FROM COLLEGE PARKWAY TO LONESOME BEND ROAD IN THE CITY OF GLENCOE

Project Length in Miles 0.000  Urban Area GADSDEN  Sponsor CITY OF GLENCOE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064393 PE 2020

100064394 STPOA 2815 () CONSTRUCTION RESURFACING 2021 $309 $0 $77 $387TOTAL COST: $309 $0 $77 $387

Route CR-NA Project Description RECONSTRUCTION OF SOUTH 11TH STREET FROM BLACK CREEK PARKWAY TO THE BRIDGE AT BLACK CREEK

Project Length in Miles 0.000  Urban Area GADSDEN  Sponsor CITY OF GADSDEN COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064626 PE 2017

100069735 STPOA 2815 (252) RIGHT OF WAY PAVEMENT REHABILITATION 2020 $410 $0 $103 $513100064625 STPOA 2815 (252) CONSTRUCTION PAVEMENT REHABILITATION 2021 $374 $0 $94 $468

TOTAL COST: $784 $0 $196 $981

Route CR-NA Project Description BRIDGE REPLACEMENT ON HICKORY STREET OVER BLACK CREEK IN THE CITY OF GADSDEN BIN# 003666

Project Length in Miles 0.000  Urban Area GADSDEN  Sponsor CITY OF GADSDEN COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064636 PE 2017

100064638 STPOA 2815 (253) CONSTRUCTION BRIDGE REPLACEMENT 2021 $1,444 $0 $361 $1,805TOTAL COST: $1,444 $0 $361 $1,805

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

59 of 206

HIGHWAY PROJECTS - ETOWAHSTIP PLAN: 2020 - Original

Page 60: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description CONSTRUCTION OF SEVENTY-FOUR (74) ADA COMPLIANT UPGRADES INCLUDING CURB CUTS, SIDEWALK REPLACEMENTS, AND DETECTABLE WARNING SURFACES EAST OF THE COOSA RIVER AND SOUTH OF THE GOOD YEAR TIRE PLANT IN THE CITY OF GADSDEN

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069010 TAPNU TA19 (905) CONSTRUCTION SIDEWALK 2019 $367 $0 $92 $458

TOTAL COST: $367 $0 $92 $458

Route NA Project Description CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES 1, 7, 25, 74, 77, 291 AND 759 IN ETOWAH COUNTY

Project Length in Miles 0.000  Urban Area GADSDEN  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061453 PE 2014

100061454 STPAA NR13 () CONSTRUCTION SIDEWALK 2022 $36 $9 $0 $45TOTAL COST: $36 $9 $0 $45

Route SR-205 Project Description BRIDGE REPLACEMENT AND APPROACHES ON SR 205 OVER ATN RAILROAD (BIN 000438) (SUFF = 47.4)

Project Length in Miles 1.140  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064720 PE 2016

100064725 BR 0205 (507) RIGHT OF WAY BRIDGES AND APPROACHES 2021 $85 $21 $0 $106100064724 BR 0205 (507) UTILITIES BRIDGES AND APPROACHES 2021 $64 $16 $0 $80100064723 BR 0205 () CONSTRUCTION BRIDGES AND APPROACHES 2021 $2,403 $601 $0 $3,004

TOTAL COST: $2,552 $638 $0 $3,189

Route SR-211 Project Description RESURFACING ON SR-211 FROM SR-1 (US-431) TO SR-7 (US-11), INCLUDING GUARDRAIL RESET (SAFETY REPLACEMENT FOR STEEL BLOCKOUTS) AND GUARDRAIL RETROFIT

Project Length in Miles 4.610  Urban Area GADSDEN  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067159 STPAA-HSIP-FMGR 0211

(500)FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22019 $1,733 $432 $0 $2,165

TOTAL COST: $1,733 $432 $0 $2,165

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

60 of 206

HIGHWAY PROJECTS - ETOWAHSTIP PLAN: 2020 - Original

Page 61: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-25 Project Description ADDTIONAL LANES ON SR-25 (US-411) FROM TURKEYTOWN TO .65 MILES NORTH OF CHEROKEE CR-20

Project Length in Miles 8.920  Urban Area GADSDEN  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070038 STPAA 0025 (556) PRELIMINARY ENGINEERING GRADE, DRAIN, BASE, PAVE AND

BRG2020 $1,600 $400 $0 $2,000

100008734 RAEDAA 0025 (556) CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND BRG

2020 $32,512 $8,128 $0 $40,640TOTAL COST: $34,112 $8,528 $0 $42,640

Route SR-25 Project Description RESURFACING ON SR-25 (US-411) FROM SR-77 IN RAINBOW CITY TO 1000 FEET NORTH OF RIVERBEND DRIVE IN GADSDEN

Project Length in Miles 6.150  Urban Area GADSDEN  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068418 NH 0025 (555) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $3,591 $898 $0 $4,488

TOTAL COST: $3,591 $898 $0 $4,488

Route SR-77 Project Description SR-77 FR I-59 RAMP(WEST SIDE) TO US-11 IN ATTALLA

Project Length in Miles 7.200  Urban Area GADSDEN  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064756 NH 0077 () PRELIMINARY ENGINEERING ADDITIONAL ROADWAY LANES 2021 $425 $106 $0 $531100054836 NH 0077 () RIGHT OF WAY ADDITIONAL ROADWAY LANES 2022 $1,210 $302 $0 $1,512100049111 NH 0077 () UTILITIES ADDITIONAL ROADWAY LANES 2023 $915 $229 $0 $1,143100004852 NH 0077 () CONSTRUCTION ADDITIONAL ROADWAY LANES 2023 $6,375 $1,594 $0 $7,969

TOTAL COST: $8,924 $2,231 $0 $11,155

Route SR-77 Project Description REPLACE BRIDGE, BIN 002035, SR-77 (NORTH BOUND) OVER COOSA RIVER. (SUFF=56.8, STATUS=FO)

Project Length in Miles 1.200  Urban Area GADSDEN  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059992 DE A181 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2022 $825 $0 $0 $825100050052 BR A181 () CONSTRUCTION BRIDGE REPLACEMENT 2024 $17,077 $4,269 $0 $21,347

TOTAL COST: $17,902 $4,269 $0 $22,171

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

61 of 206

HIGHWAY PROJECTS - ETOWAHSTIP PLAN: 2020 - Original

Page 62: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description CURB RAMP INSTALLATION ON SR-171 IN FAYETTE COUNTY AND ON SR-17, SR-18, AND SR-118 IN LAMAR COUNTY

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061461 PE 2014

100070606 STPAA NR13 (944) RIGHT OF WAY SIDEWALK 2021 $41 $10 $0 $51100061462 STPAA NR13 (944) CONSTRUCTION SIDEWALK 2022 $289 $72 $0 $362

TOTAL COST: $330 $83 $0 $413

Route SR-13 Project Description SR-13 BRIDGE REPLACEMENT OVER CLEAR CREEK BIN #5845 AND BRIDGE REMOVAL OVER SOUTHERN RR (ABAND) BIN #5846

Project Length in Miles 0.900  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100038406 CN 2024

100061533 BRF 0013 (513) PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2021 $442 $110 $0 $552100038407 BR 0013 (513) RIGHT OF WAY BRIDGE REPLACEMENT 2022 $24 $6 $0 $30

TOTAL COST: $465 $116 $0 $582

Route SR-171 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-171 FROM STOUGH ROAD AT MP 47.101 TO THE MARION COUNTY LINE AT MP 52.775

Project Length in Miles 5.674  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068632 STPAA-HSIP 0171 (517) FEDERAL MAINT CN PAVEMENT MINOR

REHABILITATION2020 $2,777 $613 $0 $3,390

TOTAL COST: $2,777 $613 $0 $3,390

Route SR-18 Project Description BRIDGE REPLACEMENT SR-18 (US-43) OVER DEADWATER CREEK WEST OF BANKSTON, BIN 000278

Project Length in Miles 0.570  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061119 PE 2015 / 100061120 RW 2018 / 100061121 UT 2018

100061122 BR 0018 (505) CONSTRUCTION BRIDGE REPLACEMENT 2020 $3,027 $757 $0 $3,783TOTAL COST: $3,027 $757 $0 $3,783

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

62 of 206

HIGHWAY PROJECTS - FAYETTESTIP PLAN: 2020 - Original

Page 63: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-42 Project Description RAILROAD CROSSING IMPROVEMENTS, GATES, LIGHTS, BELLS, SIGNS, MARKINGS AND LEGENDS AT CR-42 (WALNUT GATE ROAD) AND NORFOLK SOUTHERN RAILROAD

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069654 RHPD RR19 (902) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $335 $0 $37 $372

TOTAL COST: $335 $0 $37 $372

Route CR-60 Project Description RESURFACING ON CR-60 FROM BADGETT ROAD TO CR-56, CR-56 FROM CR-60 TO CR-77, AND CR-77 FROM CR-56 TO THE COLBERT COUNTY LINE o FCP 30-19-01

Project Length in Miles 3.750  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069589 RASTPAA 3019 (251) CONSTRUCTION RESURFACING 2020 $488 $62 $130 $680

TOTAL COST: $488 $62 $130 $680

Route CR-8 Project Description BRIDGE REPLACEMENT OF BIN# 5145 ON CR-8 OVER IVY BRANCH (DISMAL BRANCH)

Project Length in Miles 0.000  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100062452 RABRZ 3015 (250) CONSTRUCTION BRIDGES AND APPROACHES 2021 $450 $112 $0 $562

TOTAL COST: $450 $112 $0 $562

Route CR-NA Project Description INSTALL RAILROAD CROSSING DEVICES ON BREWER LANE IN RUSSELLVILLE, DOT NO. 727132W, REF#1315 (XVI-R), TO INCLUDE STANDARD MAST MOUNTED SIGNALS, GATES, BELLS, GCP'S, SIGNS, MARKINGS AND LEGENDS

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066698 RHPD RR17 (913) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $303 $0 $34 $337

TOTAL COST: $303 $0 $34 $337

Route SR-19 Project Description RESURFACING ON SR-19 FROM ELEVENTH STREET TO THE MISSISSIPPI STATE LINE

Project Length in Miles 1.766  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068474 STPAA 0019 (506) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $781 $195 $0 $976

TOTAL COST: $781 $195 $0 $976

Route SR-24 Project Description INTERCHANGE LIGHTING AT SR-24 (CORR V) AND SR-19

Project Length in Miles 0.760  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060598 PE 2014

100060599 NH 0024 () CONSTRUCTION LIGHTING 2021 $849 $212 $0 $1,062TOTAL COST: $849 $212 $0 $1,062

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

63 of 206

HIGHWAY PROJECTS - FRANKLINSTIP PLAN: 2020 - Original

Page 64: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-243 Project Description BRIDGE REPLACEMENT (BIN 008912) ON SR-243 OVER CEDAR CREEK (SUFF = 6.0, STAT = 1)

Project Length in Miles 0.075  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063654 PE 2019

100049146 BR 0243 (504) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $288 $72 $0 $360100049147 BR 0243 (504) UTILITIES BRIDGE REPLACEMENT 2021 $116 $29 $0 $145100040791 BR 0243 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $1,734 $434 $0 $2,168

TOTAL COST: $2,139 $535 $0 $2,674

Route SR-247 Project Description REPLACE BRIDGE, BIN 008467, SR-247 OVER CEDAR CREEK. (SUFF=46.8, STATUS=SD)

Project Length in Miles 1.500  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049910 PE 2013

100049911 BR 0247 (501) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $58 $14 $0 $72100049912 BR 0247 (501) UTILITIES BRIDGE REPLACEMENT 2021 $58 $15 $0 $73100049913 BR 0247 (501) CONSTRUCTION BRIDGE REPLACEMENT 2021 $4,297 $1,074 $0 $5,371

TOTAL COST: $4,413 $1,103 $0 $5,516

Route SR-247 Project Description BRIDGE REPLACEMENT (BIN 008466) ON SR-247 OVER LITTLE BEAR CREEK

Project Length in Miles 0.800  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069593 PE 2019

100069595 BR 0247 () CONSTRUCTION BRIDGE REPLACEMENT 2023 $3,954 $989 $0 $4,943TOTAL COST: $3,954 $989 $0 $4,943

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

64 of 206

HIGHWAY PROJECTS - FRANKLINSTIP PLAN: 2020 - Original

Page 65: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-17 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS FOR CULVERTS AT SITE 1 (BIN 003970) ON CR-17 OVER SAMSON BRANCH; SITE 2 (BIN 009982) ON CR-8 OVER LONG BRANCH; SITE 3 (BIN 013483) ON CR-16 OVER JUSTICE MILL CREEK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071466 HRRR 3120 (252) CONSTRUCTION GUARDRAIL 2020 $118 $0 $13 $131

TOTAL COST: $118 $0 $13 $131

Route CR-4 Project Description RESURFACING ON CR-4 FROM CR-53 TO CR-61 - GCP 31-04-19

Project Length in Miles 2.900  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070267 RASTPNU 3119 (253) CONSTRUCTION RESURFACING 2020 $392 $0 $98 $490

TOTAL COST: $392 $0 $98 $490

Route CR-49 Project Description RESURFACE AND TRAFFIC STRIPE ON CR-49 FROM CR-68 TO THE HOUSTON COUNTY LINE

Project Length in Miles 0.910  Urban Area DOTHAN  Sponsor GENEVA COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069707 STPOA 3119 (251) CONSTRUCTION RESURFACING 2020 $257 $0 $64 $321

TOTAL COST: $257 $0 $64 $321

Route CR-53 Project Description RESURFACING ON CR-53 FROM THE FLORIDA LINE TO CR-4 - GCP 31-05-19

Project Length in Miles 1.600  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070270 RASTPNU 3119 (252) CONSTRUCTION RESURFACING 2020 $251 $0 $63 $313

TOTAL COST: $251 $0 $63 $313

Route CR-85 Project Description STOP LINES AND RUMBLE STRIPS INSTALLATION FOR THE FOLLOWING SITES: SITE 1 - INTERSECTION OF CR-85 AND CR-44; SITE 2 - INTERSECTION OF CR-49 AND CR-28

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071465 HRRR 3120 (251) CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $4 $0 $0 $4

TOTAL COST: $4 $0 $0 $4

Route CR-85 Project Description SAFETY SIGNING INSTALLATION FOR THE FOLLOWING SITES: SITE 1-INTERSECTION OF CR-85 AND CR-44 SITE 2-INTERSECTION OF CR-49 AND CR-28

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071487 HRRR 3120 (250) CONSTRUCTION SIGNING 2020 $4 $0 $0 $4

TOTAL COST: $4 $0 $0 $4

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

65 of 206

HIGHWAY PROJECTS - GENEVASTIP PLAN: 2020 - Original

Page 66: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description SIDEWALKS ALONG SR-52 FROM 6TH AVENUE TO 4TH AVENUE

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068373 TAPNU TA18 (917) CONSTRUCTION SIDEWALK 2020 $352 $0 $88 $440

TOTAL COST: $352 $0 $88 $440

Route NA Project Description CURB RAMP INSTALLATIONS AND MODIFICATIONS ON STATE ROUTES 1, 12, 27, 52, 53, 87, 95, 103, 123, 196 AND 210 IN GENEVA AND HOUSTON COUNTIES

Project Length in Miles 0.000  Urban Area DOTHAN  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060276 STPAA NR13 () CONSTRUCTION SIDEWALK 2022 $600 $150 $0 $750

TOTAL COST: $600 $150 $0 $750

Route SR-153 Project Description INSTALLING RUMBLE STRIPS, UPGRADING SIGNING, AND REMOVAL OF OVERHEAD FLASHER ON SR-153 AT SR-52

Project Length in Miles 1.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071550 HSIP 0153 (501) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $13 $1 $0 $14

TOTAL COST: $13 $1 $0 $14

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

66 of 206

HIGHWAY PROJECTS - GENEVASTIP PLAN: 2020 - Original

Page 67: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-199 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 011009) ON CR-199 OVER UNNAMED CREEK; SITE 2 - (BIN 007917) ON CR-133 OVER BRUSH CREEK; SITE 3 - (BIN 010965) ON CR-48 OVER MCCONNICO CREEK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071467 HRRR 3220 () CONSTRUCTION GUARDRAIL 2020 $157 $0 $17 $174

TOTAL COST: $157 $0 $17 $174

Route CR-60 Project Description RESURFACING, TRAFFIC STRIPING AND INSTALLING PAVEMENT MARKERS ON CR-60 FROM CR-191 TO THE TUSCALOOSA COUNTY LINE

Project Length in Miles 2.800  Urban Area TUSCALOOSA   Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071224 RASTPNU 3218 (251) CONSTRUCTION RESURFACING 2020 $500 $0 $125 $625

TOTAL COST: $500 $0 $125 $625

Route CR-69 Project Description BRIDGE REPLACEMENT (BIN 005106) ON CR-69 OVER MCCONNICO CREEK AND BRIDGE REPAIRS (BIN 005107) ON CR-69 OVER MCCONNICO CREEK - GCP 32-02-18P

Project Length in Miles 0.250  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068564 PE 2018 / 100068599 CN 2021

100068599 RABRZ 3218 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $536 $134 $0 $670TOTAL COST: $536 $134 $0 $670

Route CR-NA Project Description STREETSCAPE IMPROVEMENTS NEAR AND AROUND THE EUTAW COURTHOUSE

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068371 TAPNU TA18 (915) CONSTRUCTION STREETSCAPE 2020 $640 $0 $160 $800

TOTAL COST: $640 $0 $160 $800

Route I-59 Project Description RESURFACING ON I-59 FROM SR-14 (MP 40.307) TO CR-211 (MP 46.989)

Project Length in Miles 6.682  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069093 PE 2019 / 100069094 CN 2021

100069094 IM I059 (415) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1

2021 $929 $103 $0 $1,032TOTAL COST: $929 $103 $0 $1,032

Route I-59 Project Description I-59/I-20 PARTIAL LIGHTING OF THE SR-14 INTERCHANGE (EXIT 40) IN EUTAW

Project Length in Miles 0.600  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069554 PE 2019 / 100069555 CN 2020

100069555 IM I059 (420) CONSTRUCTION LIGHTING 2020 $599 $67 $0 $665TOTAL COST: $599 $67 $0 $665

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

67 of 206

HIGHWAY PROJECTS - GREENESTIP PLAN: 2020 - Original

Page 68: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES 6, 7, 13, 14, 17, 32, 39, 86, 140 AND 159 IN GREENE AND PICKENS COUNTIES

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060102 PE 2013

100060103 STPAA NR13 (926) CONSTRUCTION SIDEWALK 2022 $241 $60 $0 $301TOTAL COST: $241 $60 $0 $301

Route SR-14 Project Description BRIDGE REPLACEMENT ON SR-14 OVER THE SIPSEY RIVER (BIN# 002676)

Project Length in Miles 5.200  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070678 BR 0014 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2020 $200 $50 $0 $250100070679 BR 0014 () RIGHT OF WAY BRIDGE REPLACEMENT 2022 $82 $20 $0 $102100070680 BR 0014 () UTILITIES BRIDGE REPLACEMENT 2022 $82 $20 $0 $102100070681 BR 0014 () CONSTRUCTION BRIDGE REPLACEMENT 2023 $3,297 $824 $0 $4,121

TOTAL COST: $3,660 $915 $0 $4,575

Route SR-7 Project Description MICROSURFACING ON SR-7 (US-11) FROM THE TENNESSEE-TOMBIGBEE WATERWAY BRIDGE TO THE ALABAMA AND GULF COAST RAILWAY BRIDGE

Project Length in Miles 6.904  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068553 STPAA 0007 (550) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 12020 $958 $239 $0 $1,197

TOTAL COST: $958 $239 $0 $1,197

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

68 of 206

HIGHWAY PROJECTS - GREENESTIP PLAN: 2020 - Original

Page 69: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-40 Project Description BRIDGE REPLACEMENT AND APPROACHES OF BIN'S 5029 AND 5030 ON CR-40 (GREER CREEK ROAD) OVER A TRIBUTARY TO GREER CREEK, AND BIN 6854 ON CR-40 (GREER CREEK ROAD) OVER GREER CREEK

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060338 ACBRZ60338 ATRP (006) CONSTRUCTION BRIDGES AND APPROACHES 2021 $698 $174 $0 $872

TOTAL COST: $698 $174 $0 $872

Route CR-44 Project Description WIDEN AND RESURFACE CR-44 FROM SR-69 TO CR-50 - HCP 33-03-18

Project Length in Miles 4.746  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068958 RASTPNU 3318 (251) CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2020 $573 $221 $400 $1,194

TOTAL COST: $573 $221 $400 $1,194

Route NA Project Description WETLAND MITIGATION AREA AT PRAIRIE CREEK

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100048467 PE 2006

100064688 STPAA 3315 () CONSTRUCTION UNCLASSIFIED 2021 $400 $100 $0 $500TOTAL COST: $400 $100 $0 $500

Route NA Project Description CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES 5, 8, 14, 25, 60, 61, 68, 69, 175, 183, 219 AND 289 IN HALE AND PERRY COUNTIES

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060104 PE 2014

100060105 STPAA NR13 () CONSTRUCTION SIDEWALK 2021 $279 $70 $0 $349TOTAL COST: $279 $70 $0 $349

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

69 of 206

HIGHWAY PROJECTS - HALESTIP PLAN: 2020 - Original

Page 70: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-25 Project Description RESURFACING AND LIME STABILIZATION ON SR-25 FROM 1.7 MILES SOUTH CR-10 (MP-41.180) TO PICKS CREEK (MP-48.026).

Project Length in Miles 6.846  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100057824 STPAA 0025 (535) CONSTRUCTION RESURFACING 2022 $2,461 $615 $0 $3,076

TOTAL COST: $2,461 $615 $0 $3,076

Route SR-25 Project Description RESURFACING AND LIME STABILIZATION ON SR-25 FROM MARENGO COUNTY LINE (MP 37.007) TO .35 MILE SOUTH OF CR-57 (MP 41.153) AND FROM .65 MILE SOUTH OF CR-54 (MP 48.180) TO INTERSECTION OF SR-69 IN GREENSBORO.

Project Length in Miles 4.416  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100057825 PE 2012

100057826 STPAA 0025 (536) CONSTRUCTION RESURFACING 2021 $876 $219 $0 $1,095TOTAL COST: $876 $219 $0 $1,095

Route SR-69 Project Description RESURFACING, 2 FT SAFETY WIDENING, CENTERLINE AND EDGELINE SCORING ON SR-69 FROM 0.61 MILE SOUTH OF CR-32 TO SR-60

Project Length in Miles 8.039  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070186 STPAA-HSIP 0069 (563) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2020 $2,896 $653 $0 $3,549

TOTAL COST: $2,896 $653 $0 $3,549

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

70 of 206

HIGHWAY PROJECTS - HALESTIP PLAN: 2020 - Original

Page 71: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-46 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT (BIN 010222) ON CR-46 OVER ABBIE CREEK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069572 HRRR 3419 (250) CONSTRUCTION GUARDRAIL 2019 $34 $0 $4 $38

TOTAL COST: $34 $0 $4 $38

Route CR-55 Project Description RESURFACING ON CR-55 FROM SR-134 TO CR-26

Project Length in Miles 4.896  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071176 RASTPNU 3419 (251) CONSTRUCTION RESURFACING 2020 $481 $24 $667 $1,172

TOTAL COST: $481 $24 $667 $1,172

Route SR-1 Project Description RESURFACING SR-1(US-431) FROM JUST NORTH OF INTERSECTION OF SR-173 IN HEADLAND TO JUST NORTH OF CR-18

Project Length in Miles 6.670  Urban Area DOTHAN  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068682 NH 0001 (606) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $3,243 $811 $0 $4,054

TOTAL COST: $3,243 $811 $0 $4,054

Route SR-10 Project Description BRIDGE REPLACEMENT ON SR-10 OVER MCRAE MILL CREEK (BIN #002543) (SUFF=55.2, STATUS=FO)

Project Length in Miles 0.657  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064176 PE 2018

100069448 BR 0010 (545) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $41 $10 $0 $51100049234 BR 0010 (545) CONSTRUCTION BRIDGE REPLACEMENT 2020 $3,242 $811 $0 $4,053

TOTAL COST: $3,284 $821 $0 $4,105

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

71 of 206

HIGHWAY PROJECTS - HENRYSTIP PLAN: 2020 - Original

Page 72: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-203 Project Description RESURFACING ON CR-203/CAMPBELLTON HIGHWAY FROM HADDEN ROAD TO SR-1 (US-231) SOUTH OATES STREET

Project Length in Miles 6.050  Urban Area DOTHAN  Sponsor HOUSTON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069713 STPOA 3519 () CONSTRUCTION RESURFACING 2023 $1,145 $0 $286 $1,431

TOTAL COST: $1,145 $0 $286 $1,431

Route CR-203 Project Description INTERSECTION IMPROVEMENTS (ROUNDABOUT) AT CAMPBELLTON HIGHWAY (CR-203) AND TAYLOR ROAD (CR-64)

Project Length in Miles 0.020  Urban Area DOTHAN  Sponsor HOUSTON COUNTY  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066842 PE 2017 / 100066848 RW 2019 / 100067032 UT 2019 / 100066849 CN 2020

100067032 HSIP NR17 (929) UTILITIES INTERSECTION IMPROVEMENTS 2019 $144 $16 $0 $160100066849 HSIP NR17 (929) CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $526 $0 $58 $585

TOTAL COST: $671 $16 $58 $745

Route CR-25 Project Description CR-25 (DENTON RD) ADD LANES FROM SR-210 (ROSS CLARK CIRCLE) TO WESTGATE PARKWAY

Project Length in Miles 1.203  Urban Area DOTHAN  Sponsor CITY OF DOTHAN COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100008620 PE 2009 / 100008621 RW 2015

100008618 STPOA 9450 (602) CONSTRUCTION ADDITIONAL ROADWAY LANES 2020 $4,988 $653 $2,560 $8,201TOTAL COST: $4,988 $653 $2,560 $8,201

Route CR-33 Project Description RESURFACING ON S CR-33 (FIRST AVENUE) FROM SR-12 (US-84) TO OLD HIGHWAY 84 - HCP 35-406-19

Project Length in Miles 1.290  Urban Area DOTHAN  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065701 STPOA 3519 (255) CONSTRUCTION RESURFACING 2020 $80 $20 $0 $100

TOTAL COST: $80 $20 $0 $100

Route CR-41 Project Description RESURFACING ON CR-41 (WALDEN DRIVE) FROM KINSEY ROAD TO BROAD STREET - HCP 35-408-19

Project Length in Miles 1.770  Urban Area DOTHAN  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065702 STPOA 3516 () CONSTRUCTION RESURFACING 2021 $424 $0 $106 $530

TOTAL COST: $424 $0 $106 $530

Route CR-51 Project Description RESURFACE CR-51 (BETHEL ROAD) FROM CR-41 (BROAD STREET) TO SR-1 (US-431)

Project Length in Miles 0.890  Urban Area DOTHAN  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065705 STPOA 3516 () CONSTRUCTION RESURFACING 2022 $197 $0 $49 $246

TOTAL COST: $197 $0 $49 $246

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

72 of 206

HIGHWAY PROJECTS - HOUSTONSTIP PLAN: 2020 - Original

Page 73: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-65 Project Description RESURFACE CR-65 (COWARTS CREEK RD/SOUTH BROAD STREET) FROM CR-24 (LUCY GRADE ROAD) TO SR-12 (US-84)

Project Length in Miles 2.767  Urban Area DOTHAN  Sponsor HOUSTON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065697 STPOA 3516 () CONSTRUCTION RESURFACING 2023 $498 $0 $124 $622

TOTAL COST: $498 $0 $124 $622

Route CR-65 Project Description RESURFACE N BROAD STREET AND OMUSSEE ROAD FROM SR-12 (US-84) TO SR-52 (COLUMBIA HIGHWAY)

Project Length in Miles 3.320  Urban Area DOTHAN  Sponsor HOUSTON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065698 STPOA 3519 (253) CONSTRUCTION RESURFACING 2020 $607 $152 $0 $758

TOTAL COST: $607 $152 $0 $758

Route CR-NA Project Description STREETSCAPE IMPROVEMENTS ALONG BROAD STREET FROM JORDAN AVENUE TO WICKER ROAD AND ON WICKER ROAD FROM BROAD STREET TO THE DEAD END.

Project Length in Miles 0.000  Urban Area DOTHAN  Sponsor TOWN OF COWARTS  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067202 TAPOA TA17 (927) CONSTRUCTION STREETSCAPE 2020 $337 $84 $0 $421

TOTAL COST: $337 $84 $0 $421

Route CR-NA Project Description BIKE AND PEDESTRIAN FACILITIES ALONG HOUSTON STREET FROM GROVE STREET TO CR-55

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069026 TAPNU TA19 (920) CONSTRUCTION SIDEWALK 2020 $140 $0 $35 $175

TOTAL COST: $140 $0 $35 $175

Route CR-NA Project Description RESURFACE SUGGS ROAD FROM HEADLAND AVENUE TO THE HOUSTON/HENRY COUNTY LINE

Project Length in Miles 0.970  Urban Area DOTHAN  Sponsor HOUSTON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065703 STPOA 3519 () CONSTRUCTION RESURFACING 2021 $258 $0 $65 $323

TOTAL COST: $258 $0 $65 $323

Route CR-NA Project Description RESURFACING ON HOSEA ROAD FROM THE GENEVA COUNTY LINE TO SR-605 - HCP 35-407-19

Project Length in Miles 0.970  Urban Area DOTHAN  Sponsor HOUSTON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065704 STPOA 3516 () CONSTRUCTION RESURFACING 2022 $194 $0 $49 $243

TOTAL COST: $194 $0 $49 $243

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

73 of 206

HIGHWAY PROJECTS - HOUSTONSTIP PLAN: 2020 - Original

Page 74: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description RESURFACING ON ASHFORD ROAD FROM ENON ROAD TO BEN IVEY ROAD

Project Length in Miles 1.170  Urban Area DOTHAN  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069704 STPOA 3519 () CONSTRUCTION RESURFACING 2021 $248 $0 $62 $310

TOTAL COST: $248 $0 $62 $310

Route CR-NA Project Description RESURFACING ON HODGESVILLE ROAD FROM E SAUNDERS ROAD TO ROSS CLARK CIRCLE

Project Length in Miles 1.870  Urban Area DOTHAN  Sponsor HOUSTON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069705 STPOA 3519 (254) CONSTRUCTION RESURFACING 2020 $529 $132 $0 $661

TOTAL COST: $529 $132 $0 $661

Route CR-NA Project Description RESURFACING ON JORDAN AVENUE FROM RUTH CIRCLE TO BEN IVEY ROAD

Project Length in Miles 0.000  Urban Area DOTHAN  Sponsor HOUSTON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069708 STPOA 3519 () CONSTRUCTION RESURFACING 2021 $243 $0 $61 $303

TOTAL COST: $243 $0 $61 $303

Route CR-NA Project Description RESURFACING ON RONEY ROAD FROM SR-1 (US-431) TO WALDEN DRIVE

Project Length in Miles 3.040  Urban Area DOTHAN  Sponsor HOUSTON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069710 STPOA 3519 () CONSTRUCTION RESURFACING 2022 $626 $0 $156 $782

TOTAL COST: $626 $0 $156 $782

Route CR-NA Project Description RESURFACING ON TAYLOR ROAD FROM SR-605 TO CAMPBELLTON HIGHWAY

Project Length in Miles 3.930  Urban Area DOTHAN  Sponsor HOUSTON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069711 STPOA 3519 () CONSTRUCTION RESURFACING 2022 $845 $0 $211 $1,057

TOTAL COST: $845 $0 $211 $1,057

Route CR-NA Project Description RESURFACE SOUTH PARK AVENUE FROM TAYLOR ROAD TO ROSS CLARK CIRCLE

Project Length in Miles 1.088  Urban Area DOTHAN  Sponsor HOUSTON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069706 STPOA 3519 (252) CONSTRUCTION RESURFACING 2020 $284 $71 $0 $354

TOTAL COST: $284 $71 $0 $354

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

74 of 206

HIGHWAY PROJECTS - HOUSTONSTIP PLAN: 2020 - Original

Page 75: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-12 Project Description INSTALL RAILROAD CROSSING DEVICES ON SR-12 (US-84) AND MUSEUM AVENUE IN DOTHAN, DOT NO. 733686N, REF #1325 (XVI-R), TO INCLUDE STANDARD MAST MOUNTED SIGNALS, GATES, BELLS, GCP'S, SIGNS MARKINGS AND LEGENDS

Project Length in Miles 0.000  Urban Area DOTHAN  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066498 RHCH RR17 (903) CONSTRUCTION RR CROSSING IMPROVEMENTS 2021 $270 $30 $0 $300

TOTAL COST: $270 $30 $0 $300

Route SR-12 Project Description INTERSECTION IMPROVEMENTS AND ACCESS MANAGEMENT WEST OF COWARTS ON SR-12 (US-84) FROM 150' WEST OF HEALTH SCIENCES BLVD TO 1470' EAST OF EDDINS RD INCLUDING WIDENING OF TURN LANE, ADDITION OF ACCELERATION LANE AND MEDIAN CROSSOVER PROTECTION

Project Length in Miles 2.000  Urban Area DOTHAN  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070256 CN 2023

100070066 HSIP 0012 (568) PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2021 $6 $1 $0 $7100070256 HSIP 0012 (568) CONSTRUCTION SAFETY IMPROVEMENTS 2023 $1,452 $161 $0 $1,613

TOTAL COST: $1,458 $162 $0 $1,620

Route SR-210 Project Description ADDING LANES ON SR-210 (ROSS CLARK CIRCLE) FROM US-231 SOUTH TO BAUMAN DRIVE

Project Length in Miles 2.682  Urban Area DOTHAN  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100038196 RW 2023 / 100038197 UT 2024 / 100038198 CN 2024

100062175 NHF 0210 () PRELIMINARY ENGINEERING ADDITIONAL ROADWAY LANES 2022 $4,046 $1,012 $0 $5,058TOTAL COST: $4,046 $1,012 $0 $5,058

Route SR-210 Project Description ADDING LANES ON SR-210 (ROSS CLARK CIRCLE) FROM SOUTH OF MEADOWBROOK DRIVE SOUTH TO NORTH CHEROKEE AVENUE AND ON SR-53 (US-231) FROM GIRARD AVENUE TO BUYERS DRIVE

Project Length in Miles 1.434  Urban Area DOTHAN  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069318 NHF 0210 (509) CONSTRUCTION ADDITIONAL ROADWAY LANES 2022 $14,963 $3,741 $0 $18,704

TOTAL COST: $14,963 $3,741 $0 $18,704

Route SR-52 Project Description RESURFACING ON SR-52 FROM SR-605 TO SR-210 (US-231/ROSS CLARK CIRCLE)

Project Length in Miles 3.023  Urban Area DOTHAN  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068718 NH 0052 (518) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $2,440 $610 $0 $3,050

TOTAL COST: $2,440 $610 $0 $3,050

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

75 of 206

HIGHWAY PROJECTS - HOUSTONSTIP PLAN: 2020 - Original

Page 76: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-53 Project Description PAVEMENT PRESERVATION SR-53 (US-231) FROM SR-210 (US-431/ROSS CLARK CIRCLE) TO THE DALE COUNTY LINE

Project Length in Miles 3.690  Urban Area DOTHAN  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068704 NH 0053 (587) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 12020 $2,189 $547 $0 $2,736

TOTAL COST: $2,189 $547 $0 $2,736

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

76 of 206

HIGHWAY PROJECTS - HOUSTONSTIP PLAN: 2020 - Original

Page 77: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-21 Project Description INSTALLING TRAFFIC CONTROL DEVICES ON CR-21 FROM MAPLE AVENUE TO CR-321

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071468 HRRR 3620 () CONSTRUCTION TRAFFIC CONTROL MARKING &

LEGN2020 $38 $0 $4 $42

TOTAL COST: $38 $0 $4 $42

Route CR-61 Project Description RESURFACING ON CR-61 FROM CR-58 TO SR-71 - JCP 36-46-19

Project Length in Miles 2.247  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069957 STPNU 3619 (251) CONSTRUCTION RESURFACING 2020 $510 $0 $134 $644

TOTAL COST: $510 $0 $134 $644

Route CR-90 Project Description RESURFACING ON CR-90 FROM SR-73 TO THE GEORGIA STATE LINE JCP 36-53-19

Project Length in Miles 1.875  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071052 STPNU 3620 (250) CONSTRUCTION RESURFACING 2020 $335 $214 $0 $549

TOTAL COST: $335 $214 $0 $549

Route CR-NA Project Description INSTALL NEW RAILROAD CROSSING DEVICES ON VENSON STREET IN THE TOWN WOODVILLE AT NORFOLK SOUTHERN RAILROAD, DOT NO. 731-754F, REF NO. 1319 (XVI-R), TO INCLUDE STANDARD MAST MOUNTED SIGNALS, GATES, BELLS, GCP'S, SIGNS, STRIPING, MARKINGS AND LEGENDS

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100058017 RHCH RR17 (905) CONSTRUCTION RR XING SIGNAL-SIGN-PAVE

MARK2020 $338 $0 $38 $375

TOTAL COST: $338 $0 $38 $375

Route CR-NA Project Description GUARDRAIL END ANCHORS AT (BIN 000988) ON SNODGRASS ROAD OVER DRY CREEK; WILL INCLUDE RELOCATION OF DUCTILE WATER LINE

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071473 HRRR 3620 () CONSTRUCTION GUARDRAIL 2020 $67 $0 $7 $74

TOTAL COST: $67 $0 $7 $74

Route SR-117 Project Description REHABILITATE BIN #006378 OVER TENNESSE RIVER AND BIN #006377 OVER TENNESSEE RIVER RELIEF

Project Length in Miles 2.400  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100052835 PE 2009

100002736 BR 0117 (506) RIGHT OF WAY BRIDGE REHABILITATION 2021 $303 $76 $0 $378100002735 BR 0117 () CONSTRUCTION BRIDGE REHABILITATION 2021 $11,678 $2,920 $0 $14,598

TOTAL COST: $11,981 $2,995 $0 $14,976

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

77 of 206

HIGHWAY PROJECTS - JACKSONSTIP PLAN: 2020 - Original

Page 78: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-2 Project Description ACCESS MANAGEMENT AND INTERSECTION IMPROVEMENTS ON SR-2 (US-72) AT COUNTY PARK ROAD IN THE CITY OF SCOTTSBORO

Project Length in Miles 0.920  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069457 CN 2021

100069426 HSIP 0002 (587) PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2019 $105 $12 $0 $117100069457 HSIP 0002 (587) CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $846 $94 $0 $940

TOTAL COST: $951 $106 $0 $1,057

Route SR-2 Project Description INTERSECTION MODIFICATIONS AT THE INTERSECTION OF SR-2 (US-72) AND SR-79

Project Length in Miles 1.500  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067709 PE 2019 / 100067710 CN 2021

100067710 HSIP 0002 (584) CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $695 $77 $0 $773TOTAL COST: $695 $77 $0 $773

Route SR-2 Project Description RESURFACING ON SR-2 (US-72) FROM PORTER ROAD TO 0.44 MILE WEST OF SR-35

Project Length in Miles 3.100  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068424 NH-FMGR 0002 (585) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $2,209 $552 $0 $2,761

TOTAL COST: $2,209 $552 $0 $2,761

Route SR-35 Project Description RESURFACING ON SR-35 FROM BRELAND BLUFF ROAD TO CR-67

Project Length in Miles 3.800  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068416 NH 0035 (536) FEDERAL MAINT CN PAVEMENT MINOR

REHABILITATION2020 $2,595 $649 $0 $3,243

TOTAL COST: $2,595 $649 $0 $3,243

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

78 of 206

HIGHWAY PROJECTS - JACKSONSTIP PLAN: 2020 - Original

Page 79: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-143 Project Description RESURFACING AND REALIGNMENT OF CR-143 (GRANTS MILL ROAD) FROM GRANTSWOOD ROAD TO OLD LEEDS ROAD

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070201 ST-037-888-009 () CONSTRUCTION RESURFACING 2020 $0 $5,188 $1,297 $6,485

TOTAL COST: $0 $5,188 $1,297 $6,485

Route CR-18 Project Description EASTERN VALLEY ROAD (CR-18), WIDENING TO 3 LANES FROM MCASHAN DRIVE TO LETSON FARM PARKWAY

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor JEFFERSON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064232 RW 2024 / 100064233 UT 2026 / 100064234 CN 2027

100064231 STPBH 3715 () PRELIMINARY ENGINEERING ADDITIONAL ROADWAY LANES 2020 $480 $0 $120 $600TOTAL COST: $480 $0 $120 $600

Route CR-2303 Project Description CR-2303 (LAKESHORE PKWY) AT I-65 INTERCHANGE MODIFICATIONS.

Project Length in Miles 0.560  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064151 PE 2015

100040771 STPBHF-STPAAF 7026 (601)

CONSTRUCTION RAMP REVISIONS 2021 $11,200 $0 $2,800 $14,000TOTAL COST: $11,200 $0 $2,800 $14,000

Route CR-337 Project Description RESURFACE AND DRAINAGE IMPROVEMENTS ON CR-337(MCCALLA ROAD) FROM CR-18(EASTERN VALLEY ROAD) TO NORFOLK SOUTHERN RAILROAD (PHASE 1)

Project Length in Miles 1.000  Urban Area BIRMINGHAM   Sponsor BESSEMER COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059497 ACAA59497 ATRP (007) CONSTRUCTION RESURFACING 2021 $1,257 $0 $314 $1,571

TOTAL COST: $1,257 $0 $314 $1,571

Route CR-337 Project Description RESURFACE AND DRAINAGE IMPROVEMENTS ON CR-337(MCCALLA ROAD) FROM CR-18(EASTERN VALLEY ROAD) TO NORFOLK SOUTHERN RAILROAD (PHASE 1)

Project Length in Miles 0.960  Urban Area BIRMINGHAM   Sponsor BESSEMER COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060504 STPBH 3713 (252) UTILITIES RESURFACING 2021 $360 $0 $90 $450

TOTAL COST: $360 $0 $90 $450

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

79 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 80: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-46 Project Description CR-46 (HUEYTOWN ROAD) ADDITIONAL TURN LANES AND INTERSECTION IMPROVEMENTS FROM WALKER AVENUE TO NORTH OF HILLSIDE DRIVE

Project Length in Miles 1.000  Urban Area BIRMINGHAM   Sponsor HUEYTOWN COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056287 PE 2014 / 100056288 RW 2017

100056289 STPBH 7021 (600) UTILITIES INTERSECTION IMPROVEMENTS 2020 $200 $0 $50 $250100056290 STPBH 7021 (600) CONSTRUCTION INTERSECTION IMPROVEMENTS 2023 $1,200 $0 $300 $1,500

TOTAL COST: $1,400 $0 $350 $1,750

Route CR-NA Project Description SIDEWALKS ALONG CR-67 (HAZELWOOD ROAD), FROM BURGANDY DR TO HARRIS AVENUE

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor ADAMSVILLE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100048382 STPBH 7234 (600) CONSTRUCTION SIDEWALK 2020 $86 $0 $21 $107

TOTAL COST: $86 $0 $21 $107

Route CR-NA Project Description ADD BIKE LANES AND STREETSCAPE IMPROVEMENTS ALONG 13TH STREET SOUTH FROM 4TH AVE SOUTH TO 10TH AVE SOUTH

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor UAB COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068127 CMAQ 3718 () PRELIMINARY ENGINEERING STREETSCAPE 2020 $302 $0 $75 $377100068128 CMAQ 3718 () UTILITIES STREETSCAPE 2023 $84 $0 $21 $105100068129 CMAQ 3718 () CONSTRUCTION STREETSCAPE 2023 $1,749 $0 $437 $2,186

TOTAL COST: $2,135 $0 $534 $2,669

Route CR-NA Project Description SIDEWALKS ALONG ALDEN AVENUE FROM 8TH STREET TO 12TH STREET AND ALONG 12TH STREET FROM ALDEN AVENUE TO 12TH AVENUE

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor MIDFIELD  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068363 TAPAA TA18 (912) CONSTRUCTION SIDEWALK 2020 $405 $0 $101 $507

TOTAL COST: $405 $0 $101 $507

Route CR-NA Project Description A SIDEWALK ALONG DUNBARTON DRIVE FROM NORTH WOODRIDGE ROAD TO LOCKSLEY DRIVE

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor MOUNTAIN BROOK  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068450 TAPBH TA18 (931) CONSTRUCTION SIDEWALK 2020 $549 $0 $137 $686

TOTAL COST: $549 $0 $137 $686

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

80 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 81: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description GREENWAY AND ROAD DIET ON RICHARD ARRINGTON JR BOULEVARD FROM 15TH AVENUE SOUTH TO VALLEY AVENUE

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor BIRMINGHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068467 CMAQ 3718 (252) PRELIMINARY ENGINEERING UNCLASSIFIED 2020 $240 $0 $60 $300

TOTAL COST: $240 $0 $60 $300

Route CR-NA Project Description IMPROVEMENT OF CROSSWALKS AND REFUGE ISLANDS ON UNIVERSITY BOULEVARD AT THE INTERSECTIONS OF 12TH STREET S, 14TH STREET S, AND 16TH STREET S

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069018 TAPAA TA19 (913) CONSTRUCTION SIDEWALK 2020 $208 $0 $52 $260

TOTAL COST: $208 $0 $52 $260

Route CR-NA Project Description SIDEWALKS AND PEDESTRIAN IMPROVEMENTS ALONG HAGOOD STREET FROM EUCLID AVENUE TO MONTCLAIR ROAD

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor MOUNTAIN BROOK  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069329 TAPBH TA19 (930) CONSTRUCTION SIDEWALK 2020 $640 $0 $160 $800

TOTAL COST: $640 $0 $160 $800

Route CR-NA Project Description RAILROAD CROSSING IMPROVEMENTS, SIGNS, LEGENDS AND MARKINGS AT THE INTERSECTION OF PAWNEE VILLAGE ROAD AND CSX RAILROAD, DOT NO. 352724S

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070085 RHCH RR19 (907) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $10 $1 $0 $11

TOTAL COST: $10 $1 $0 $11

Route CR-NA Project Description RAILROAD CROSSING IMPROVEMENTS, SIGNALS, GATES, BELLS, SIGNS, LEGENDS AND MARKINGS, AT THE INTERSECTION OF BRASHER ROAD AND CSX RAILROAD, DOT NO. 352236N

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070086 RHCH RR19 (908) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $236 $26 $0 $262

TOTAL COST: $236 $26 $0 $262

Route CR-NA Project Description HOOVER TOPICS PROJECT-PATTON CHAPEL RD, PHASE III FROM CRAYRICH DRIVE TO CHAPEL LANE. COORDINATE WITH JEFFERSON CO. PROJECT. ADD 3RD LANE.

Project Length in Miles 1.500  Urban Area BIRMINGHAM   Sponsor JEFFERSON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100007559 PE 1997 / 100007557 RW 2013 / 100069325 UT 2019

100007555 STPBH 7020 (601) CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND BRG

2019 $10,074 $0 $2,519 $12,593TOTAL COST: $10,074 $0 $2,519 $12,593

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

81 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 82: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description >VARIOUS INTERSECTIONS - PHASE 7 1. MT. OLIVE RD AT NEW FOUND RD./MT OLIVE-BROOKSIDE RD 2. UNION GROVE AT BANKHEAD HWY 3. HEFLIN AV AT RIDERWOOD TR 4. TARRANT RD AT PINEYWOOD RD /SKELTON AVE 5.TYLER LOOP RD AT SWEENEY HOLLOW RD 6.CHALKVILLE RD.

Project Length in Miles 0.500  Urban Area BIRMINGHAM   Sponsor JEFFERSON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100007648 PE 1995 / 100007637 RW 2002

100060490 STPBH 9802 (904) UTILITIES INTERSECTION IMPROVEMENTS 2020 $960 $0 $240 $1,200100007628 STPBH 9802 (904) CONSTRUCTION INTERSECTION IMPROVEMENTS 2023 $5,245 $0 $1,311 $6,556

TOTAL COST: $6,205 $0 $1,551 $7,756

Route CR-NA Project Description INTERSECTION IMPROVEMENTS AT 2 LOCATIONS; SITE 1. MAYFIELD ROAD AND MONTEVALLO ROAD. SITE 3 CROSSHAVEN DRIVE AND GREEN VALLEY DRIVE.

Project Length in Miles 0.250  Urban Area BIRMINGHAM   Sponsor JEFFERSON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100007654 PE 1995 / 100056486 PE 2012 / 100007638 RW 2014

100060046 STPBH 9802 (924) UTILITIES INTERSECTION IMPROVEMENTS 2020 $120 $0 $30 $150100007629 STPBH 9802 (924) CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $2,655 $0 $664 $3,318

TOTAL COST: $2,775 $0 $694 $3,468

Route CR-NA Project Description OXMOOR BLVD-GREEN SPRINGS TO BARBER COURT. INTERSECTION IMPROVEMENTS AT BARBER CT. AND OXMOOR RD. AND I-65 AND CONTINUOUS TWO WAY TURN LANE

Project Length in Miles 3.300  Urban Area BIRMINGHAM   Sponsor HOMEWOOD COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100029542 PE 2006

100029563 STPBH 9802 () RIGHT OF WAY INTERSECTION IMPROVEMENTS 2020 $243 $0 $61 $304100029566 STPBH 9802 () UTILITIES UTILITY ADJUSTMENT 2022 $658 $0 $164 $822100029510 STPBH 9802 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2022 $3,597 $0 $899 $4,496

TOTAL COST: $4,498 $0 $1,125 $5,623

Route CR-NA Project Description BRIDGE REPLACEMENT (BIN# 000282) ON PRATT HIGHWAY AT BLACK CREEK NEAR SANDUSKY IN BIRMINGHAM

Project Length in Miles 0.500  Urban Area BIRMINGHAM   Sponsor BIRMINGHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100045073 PE 2005 / 100059893 RW 2019

100033434 HPP-STPBH 1602 (519) UTILITIES BRIDGE REPLACEMENT 2020 $424 $0 $106 $530100059894 STPBH 1602 (519) CONSTRUCTION BRIDGE REPLACEMENT 2022 $1,680 $0 $420 $2,100

TOTAL COST: $2,104 $0 $526 $2,630

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

82 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 83: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description STREETSCAPE AND TRANSPORTATION IMPROVEMENTS ON 16TH STREET CORRIDOR FROM 11TH AVE NORTH TO I-65 WITHIN FOUNTATIN HEIGHTS NEIGHBORHOOD

Project Length in Miles 1.100  Urban Area BIRMINGHAM   Sponsor BIRMINGHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056314 PE 2014

100056315 STPBH 7117 (600) UTILITIES UTILITY ADJUSTMENT 2020 $200 $0 $50 $250100056316 STPBH 7117 (600) CONSTRUCTION STREETSCAPE 2021 $2,613 $0 $653 $3,266

TOTAL COST: $2,813 $0 $703 $3,516

Route CR-NA Project Description SIDEWALKS ALONG CR-42 (MASSEY ROAD) FROM SR-3 (US-31, MONTGOMERY HIGHWAY) TO CR-99 (COLUMBIANA ROAD) IN VESTAVIA HILLS

Project Length in Miles 2.280  Urban Area BIRMINGHAM   Sponsor VESTAVIA HILLS COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100057171 PE 2013

100057172 CMAQ 7030 (600) RIGHT OF WAY SIDEWALK 2020 $316 $0 $79 $395100057173 CMAQ 7030 (600) UTILITIES UTILITY ADJUSTMENT 2020 $73 $0 $18 $91100057174 CMAQ 7030 (600) CONSTRUCTION SIDEWALK 2021 $2,137 $0 $534 $2,671

TOTAL COST: $2,526 $0 $631 $3,157

Route CR-NA Project Description STREET IMPROVEMENTS ON 19TH STREET ENSLEY FROM ENSLEY AVENUE TO BUSH BOULEVARD PAVING, SIDEWALKS, CURB AND GUTTER, AND STORM DRAINAGE

Project Length in Miles 1.500  Urban Area BIRMINGHAM   Sponsor BIRMINGHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100058187 PE 2016

100033432 STPBH 3716 (251) CONSTRUCTION STREETSCAPE 2021 $661 $0 $165 $827TOTAL COST: $661 $0 $165 $827

Route CR-NA Project Description DRAINAGE IMPROVEMENTS FOR APPROXIMATELY 0.2 MILE ALONG RUTLEDGE DRIVE, 0.25 MILES WEST OF WOODWARD ROAD

Project Length in Miles 1.500  Urban Area BIRMINGHAM   Sponsor MIDFIELD COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059488 ACAA59488 ATRP (006) CONSTRUCTION DRAINAGE CORRECTION 2020 $422 $370 $0 $791

TOTAL COST: $422 $370 $0 $791

Route CR-NA Project Description NORWOOD NEIGHBORHOOD STREETSCAPE ALONG 12TH AVE NORTH FROM 24TH STREET NORTH TO 31ST STREET NORTH

Project Length in Miles 0.630  Urban Area BIRMINGHAM   Sponsor BIRMINGHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100059189 PE 2015

100059190 CMAQ 3715 (257) CONSTRUCTION STREETSCAPE 2022 $520 $0 $130 $650TOTAL COST: $520 $0 $130 $650

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

83 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 84: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description INTERSECTION IMPROVEMENTS CAHABA RD/SR-38(US-280)/CULVER RD/LANE PARK RD-CITY OF MOUNTAIN BROOK

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor MOUNTAIN BROOK COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064199 PE 2017

100064200 CMAQ 3715 () RIGHT OF WAY INTERSECTION IMPROVEMENTS 2020 $303 $0 $76 $378100064201 CMAQ 3715 () UTILITIES INTERSECTION IMPROVEMENTS 2021 $425 $0 $106 $531100064202 CMAQ 3715 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $1,797 $0 $449 $2,246

TOTAL COST: $2,524 $0 $631 $3,155

Route CR-NA Project Description PAVEMENT REHABILITATION ON LAKESHORE PARKWAY FROM LEAF LAKE DRIVE TO VENICE ROAD

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor BIRMINGHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064224 PE 2017

100064225 STPBH 3715 (269) CONSTRUCTION PAVEMENT REHABILITATION 2020 $960 $240 $0 $1,200TOTAL COST: $960 $240 $0 $1,200

Route CR-NA Project Description INTERSECTION IMPROVEMENTS AT REX LAKE ROAD AND ZEIGLER ROAD

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor LEEDS COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064310 PE 2019 / 100064312 UT 2024 / 100064313 CN 2025

100064311 CMAQ 3715 (271) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2023 $160 $0 $40 $200TOTAL COST: $160 $0 $40 $200

Route CR-NA Project Description BRIDGE RECONSTRUCTION AND REHABILITATION FOR OLD BROOK TRAIL BRIDGE (BIN # 012869) OVER LITTLE SHADES CREEK AND CANTERBURY ROAD BRIDGE (BIN # 002873) OVER WATKINS CREEK, CITY OF MOUNTAIN BROOK

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor MOUNTAIN BROOK COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066110 PE 2017

100066111 STPBH 3716 (256) RIGHT OF WAY BRIDGE REHABILITATION 2020 $80 $0 $20 $100100066112 STPBH 3716 (256) UTILITIES BRIDGE REHABILITATION 2021 $80 $0 $20 $100100066113 STPBH 3716 () CONSTRUCTION BRIDGE REHABILITATION 2021 $880 $0 $220 $1,100

TOTAL COST: $1,040 $0 $260 $1,300

Route CR-NA Project Description SIDEWALKS ALONG PINE RIDGE ROAD FROM OVERBROOK ROAD TO OLD LEEDS ROAD

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor MOUNTAIN BROOK COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068123 PE 2019

100068125 CMAQ 3718 () RIGHT OF WAY SIDEWALK 2023 $42 $0 $11 $53100068124 CMAQ 3718 () UTILITIES SIDEWALK 2023 $84 $0 $21 $105100068126 CMAQ 3718 () CONSTRUCTION SIDEWALK 2023 $1,963 $0 $491 $2,454

TOTAL COST: $2,089 $0 $522 $2,612

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

84 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 85: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description BRIDGE REPLACEMENT ON SPRINGDALE ROAD OVER FIVE MILE CREEK BIN# 15837

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor JEFFERSON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068651 STPBH 3717 (250) UTILITIES BRIDGE REPLACEMENT 2020 $404 $0 $101 $505100059460 STPBH 3717 (250) CONSTRUCTION BRIDGE REPLACEMENT 2020 $3,001 $0 $750 $3,752

TOTAL COST: $3,405 $0 $851 $4,257

Route I-20 Project Description PAVEMENT REHABILITATION ON I-20 FROM EXIT 140 TO THE ST. CLAIR COUNTY LINE

Project Length in Miles 2.800  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068064 PE 2019 / 100068066 CN 2020

100068066 IM I020 (356) CONSTRUCTION PAVEMENT MINOR REHABILITATION

2020 $7,113 $790 $0 $7,904TOTAL COST: $7,113 $790 $0 $7,904

Route I-20 Project Description PLANING, OVERLAY AND STRIPING ON I-20 FROM THE EAST END OF THE BRIDGE OVER 1ST AVE. NORTH TO THE EAST END OF THE BRIDGE OVER US-78 (AL-4) AT EXIT 140

Project Length in Miles 9.520  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100071617 CN 2022

100071617 IM I020 () CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1

2022 $7,611 $846 $0 $8,457TOTAL COST: $7,611 $846 $0 $8,457

Route I-22 Project Description PAVEMENT REHABILITATION ON I-22 FROM THE WALKER COUNTY LINE TO COALBURG ROAD

Project Length in Miles 13.085  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068228 PE 2019 / 100068229 CN 2020

100068229 IM-IMGR I022 (315) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1

2020 $10,123 $1,125 $0 $11,248TOTAL COST: $10,123 $1,125 $0 $11,248

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

85 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 86: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route I-459 Project Description INTERCHANGE LIGHTING ON I-459 AT CR-18 (EXIT #1) AND CR-52 (EXIT #6) (PRIORITY #29)

Project Length in Miles 9.128  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100005120 CN 2021

100005123 IM I459 () PRELIMINARY ENGINEERING LIGHTING 2020 $129 $14 $0 $143100005120 IM I459 () CONSTRUCTION LIGHTING 2021 $1,633 $181 $0 $1,815

TOTAL COST: $1,762 $196 $0 $1,958

Route I-459 Project Description CONCRETE PAVEMENT REHABILITATION ON I-459 FROM SR-3 (US-31) TO LORNA ROAD

Project Length in Miles 1.856  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068227 CN 2021

100068226 IM I459 (317) PRELIMINARY ENGINEERING PAVEMENT REHABILITATION 2020 $225 $25 $0 $250100068227 IM I459 () CONSTRUCTION PAVEMENT REHABILITATION 2021 $1,818 $202 $0 $2,020

TOTAL COST: $2,043 $227 $0 $2,270

Route I-459 Project Description I-459 INTERSTATE MEDIAN CROSSOVER PROTECTION FROM I-20/I-59 TO 0.56 MILES SOUTH OF SR-150

Project Length in Miles 10.700  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063237 HSIP I459 (312) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $900 $0 $0 $900

TOTAL COST: $900 $0 $0 $900

Route I-59 Project Description CONC PVMT REPAIR, OVERLAY AND BRIDGE RAIL RETROFIT ON I-59 FROM .4 MILE S OF ARKADELPHIA RD TO THE CBD BRIDGE, I-65 FROM 1ST AVE N TO 16TH ST N, SR-3 (US-31) FROM N OF 12TH AVE N TO N OF FINLEY BLVD AND 10TH ST N FROM 3RD AVE N TO 6TH AVE N

Project Length in Miles 2.194  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100003905 PE 2012 / 100059959 RW 2015 / 100060200 CN 2016 / 100065792 CN 2016 / 100071628 CN 2020

100063656 IMF-STPAAF I059 (410) CONSTRUCTION PAVEMENT REHABILITATION 2019 $11,769 $1,308 $0 $13,077TOTAL COST: $11,769 $1,308 $0 $13,077

Route I-59 Project Description SIGN REHAB ON I-59 FROM TUSCALOOSA CL TO ST.CLAIR CL; I-65 FROM SHELBY CL TO EXIT 280 (WARRIOR); I-459 FROM I-59 S OF TRUSSVILLE (PHASE 3)

Project Length in Miles 46.889  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100042475 CN 2020

100042475 IM I059 () CONSTRUCTION SIGN REHABILITATION 2020 $3,803 $423 $0 $4,226TOTAL COST: $3,803 $423 $0 $4,226

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

86 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 87: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route I-59 Project Description RESURFACE I-59 FROM 1ST AVENUE NORTH (MP 132.160) TO I-459 (MP 137.19) IN TRUSSVILLE

Project Length in Miles 4.570  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100062067 PE 2016 / 100062068 CN 2021

100062068 IM I059 () CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 2

2021 $12,719 $1,413 $0 $14,132TOTAL COST: $12,719 $1,413 $0 $14,132

Route I-59 Project Description CONCRETE PAVEMENT REHABILITATION ON I-59 FROM AVIATION AVENUE TO 85TH STREET

Project Length in Miles 2.579  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068224 PE 2019 / 100068225 CN 2021

100068225 IM I059 () CONSTRUCTION PAVEMENT REHABILITATION 2021 $7,804 $867 $0 $8,671TOTAL COST: $7,804 $867 $0 $8,671

Route I-59 Project Description CONCRETE REHABILITATION ON I-59 FROM VALLEY ROAD TO SR-5 (ARKADELPHIA ROAD)

Project Length in Miles 4.791  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069256 PE 2019 / 100069257 CN 2020

100069257 IM I059 (417) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 2

2020 $14,500 $1,611 $0 $16,112TOTAL COST: $14,500 $1,611 $0 $16,112

Route I-59 Project Description CONCRETE PAVEMENT REHABILITATION ON I-59 FROM FAIRFIELD BOULEVARD TO VALLEY ROAD

Project Length in Miles 2.000  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069258 PE 2019 / 100069261 CN 2022

100069261 IM I059 () CONSTRUCTION PAVEMENT REHABILITATION 2022 $25,200 $2,800 $0 $28,000TOTAL COST: $25,200 $2,800 $0 $28,000

Route I-59 Project Description CONCRETE REHABILITATION, SHOULDER RECONSTRUCTION, AND BRIDGE RAIL RETROFIT ON I-59 FROM 0.87 MILE SOUTH OF CR-10 TO THE ST. CLAIR COUNTY LINE"

Project Length in Miles 8.145  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069285 PE 2019 / 100069286 CN 2020

100069286 IM I059 (419) CONSTRUCTION PAVEMENT MINOR REHABILITATION

2020 $12,774 $1,419 $0 $14,193TOTAL COST: $12,774 $1,419 $0 $14,193

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

87 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 88: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route I-59 Project Description PAVEMENT REHABILITATION ON I-59 FROM ALABAMA ADVENTURE PKWY(EXIT 110) TO THE SOUTH END OF FAIRFIELD BLVD BRIDGE (END OF ASPHALT PAVEMENT)

Project Length in Miles 13.224  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069855 PE 2020 / 100069856 CN 2021

100069856 IM I059 () CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1

2021 $2,273 $253 $0 $2,525100069855 IM I059 (421) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE

LEVEL 12020 $225 $25 $0 $250

TOTAL COST: $2,498 $278 $0 $2,775

Route I-65 Project Description CONCRETE PAVEMENT REHABILITATION ON I-65 FROM RALEIGH AVENUE TO 1ST AVENUE NORTH (NORTH END OF BIN #14407)

Project Length in Miles 8.020  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069281 CN 2021

100069272 IM I065 () PRELIMINARY ENGINEERING PAVEMENT REHABILITATION 2020 $450 $50 $0 $500100069281 IM I065 () CONSTRUCTION PAVEMENT REHABILITATION 2021 $10,099 $1,122 $0 $11,221

TOTAL COST: $10,549 $1,172 $0 $11,721

Route I-65 Project Description PAVEMENT REHABILITATION ON I-65 FROM WALKER CHAPEL ROAD INTERCHANGE TO CR-112 (MOUNT OLIVE ROAD INTERCHANGE)

Project Length in Miles 9.188  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069859 CN 2021

100069858 IM I065 (517) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 1

2020 $243 $27 $0 $270100069859 IM I065 () CONSTRUCTION PREVENTATIVE MAINTENANCE

LEVEL 12021 $3,708 $412 $0 $4,120

TOTAL COST: $3,951 $439 $0 $4,390

Route I-65 Project Description CONCRETE PAVEMENT REHAB, UNDERSEAL, GRINDING, PAVERLAID SURFACE TREATMENT, UNDERDRAIN, SHOULDER PAVEMENT, GUARDRAIL ON I-65 FROM SR-3(US-31) TO RALEIGH AVENUE OVERPASS (PRIORITY #35)

Project Length in Miles 7.520  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066473 PE 2020 / 100055415 CN 2021

100066473 IM I065 () PRELIMINARY ENGINEERING PAVEMENT REHABILITATION 2020 $227 $25 $0 $253100055415 IM I065 () CONSTRUCTION PAVEMENT REHABILITATION 2021 $9,508 $1,056 $0 $10,564

TOTAL COST: $9,735 $1,082 $0 $10,817

Route NA Project Description SIDEWALK IMPROVEMENTS AND LIGHTING ALONG MAIN ST FROM MT OLIVE RD TO FIELDSTOWN RD, ALONG BELL ST TO THE DEAD END AND A PEDESTRIAN TRAIL WITH 1 PED BRIDGE TRAVERSING ACROSS CITY OWNED PROPERTY

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor GARDENDALE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100050724 CMAQ 3717 (253) CONSTRUCTION UNCLASSIFIED 2020 $544 $0 $136 $680

TOTAL COST: $544 $0 $136 $680

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

88 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 89: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description NORFOLK SOUTHERN BIRMINGHAM REGIONAL INTERMODAL FACILITY, MCCALLA

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100055374 CTGR-STPBH-FAUP

3714 ()CONSTRUCTION UNCLASSIFIED 2020 $2,673 $0 $668 $3,342

TOTAL COST: $2,673 $0 $668 $3,342

Route NA Project Description 7TH AVENUE SOUTH STREETSCAPE AND IMPROVEMENTS PROJECT LOCATED ON 7TH AVENUE SOUTH AND OTHER VARIOUS STREETS IN THE CITY OF BIRMINGHAM.

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor BIRMINGHAM  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065573 TAPBH TA16 (943) CONSTRUCTION STREETSCAPE 2020 $1,100 $0 $275 $1,375

TOTAL COST: $1,100 $0 $275 $1,375

Route NA Project Description ADVANCED TRAFFIC MANAGEMENT SYSTEM ASSESSMENT

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor BIRMINGHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065798 CMAQ 3716 () SPECIAL TRAFFIC CONTROL MARKING &

LEGN2023 $343 $0 $86 $429

TOTAL COST: $343 $0 $86 $429

Route NA Project Description WOODLAWN NEIGHBORHOOD STREETSCAPE PHASE 2 (CITY OF BIRMINGHAM)

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor BIRMINGHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066708 CMAQ 3717 () PRELIMINARY ENGINEERING STREETSCAPE 2020 $204 $0 $51 $255100066710 CMAQ 3717 () UTILITIES STREETSCAPE 2020 $204 $0 $51 $255100066709 CMAQ 3717 () CONSTRUCTION STREETSCAPE 2022 $1,261 $0 $315 $1,577

TOTAL COST: $1,669 $0 $417 $2,087

Route NA Project Description ST SCAPE IMP ALONG:4TH AVE N FR 15TH TO 19TH ST N,5TH AVE N FR 11TH ST N TO 1800 BLOCK,6TH/7TH AVE N FR 14TH TO 17TH ST N,15TH/16TH ST N FR 3RD AVE N TO 8TH ALY N,17TH ST N FR 3RD AVE ALY N TO REV ABR WOODS JR BLVD,18TH ST N FR 3RD TO 4TH AVE N

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor BIRMINGHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067026 CMAQ 3717 () PRELIMINARY ENGINEERING STREETSCAPE 2020 $345 $0 $86 $431100067027 CMAQ 3717 () UTILITIES STREETSCAPE 2023 $127 $0 $32 $159100067028 CMAQ 3717 () CONSTRUCTION STREETSCAPE 2023 $425 $0 $106 $531

TOTAL COST: $897 $0 $224 $1,121

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

89 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 90: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description A SIDEWALK FROM MERRYVALE LANE TO 1090 MONTGOMERY HIGHWAY THEN WRAPPING AROUND TO CONNECT TO MAYLAND LANE

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor VESTAVIA HILLS   LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068361 TAPAA TA18 (911) CONSTRUCTION SIDEWALK 2020 $280 $0 $70 $350

TOTAL COST: $280 $0 $70 $350

Route NA Project Description SIDEWALK, LANDSCAPING AND LIGHTING AROUND THE HOOVER PUBLIC LIBRARY CORNER LOT BETWEEN MUNICIPAL LANE, MONTGOMERY HIGHWAY, AND MUNICIPAL DRIVE

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor HOOVER  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068449 TAPBH TA18 (932) CONSTRUCTION SIDEWALK 2020 $583 $0 $146 $729

TOTAL COST: $583 $0 $146 $729

Route NA Project Description BICYCLE/PEDESTRIAN PLAN FOR JEFFERSON COUNTY, SPONSOR IS JEFFERSON COUNTY

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor JEFFERSON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068759 CMAQ NR18 () SPECIAL UNCLASSIFIED 2020 $120 $0 $30 $150

TOTAL COST: $120 $0 $30 $150

Route NA Project Description PURCHASE OF 5 FULLY EQUIPPED (ASAP) VEHICLES FOR THE BIRMINGHAM AREA

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069333 CMAQ NR20 (909) SPECIAL UNCLASSIFIED 2020 $242 $61 $0 $303

TOTAL COST: $242 $61 $0 $303

Route NA Project Description RESURFACING AND ADA UPGRADES IN THE CITY OF BIRMINGHAM

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor BIRMINGHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069758 STPBH 3719 () PRELIMINARY ENGINEERING RESURFACING 2020 $280 $0 $70 $350100069759 STPBH 3719 () CONSTRUCTION RESURFACING 2021 $4,000 $0 $1,000 $5,000

TOTAL COST: $4,280 $0 $1,070 $5,350

Route NA Project Description STREETSCAPE AND SIDEWALK ENHANCEMENTS INCLUDING ADA UPGRADES IN THE CITY OF BIRMINGHAM

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor BIRMINGHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069760 CMAQ NR19 () PRELIMINARY ENGINEERING STREETSCAPE 2020 $250 $0 $63 $313100069761 CMAQ NR19 () CONSTRUCTION STREETSCAPE 2023 $2,081 $0 $520 $2,602

TOTAL COST: $2,331 $0 $583 $2,914

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

90 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 91: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description OZONE AWARENESS PROGRAM FOR JEFFERSON AND SHELBY COUNTIES FY 2020 AND FY 2021

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor RPCGB COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070047 CMAQ NR19 () SPECIAL UNCLASSIFIED 2020 $889 $0 $222 $1,111

TOTAL COST: $889 $0 $222 $1,111

Route NA Project Description REGIONAL TRANSPORTATION MANAGEMENT CENTER AND ASAP PROGRAM FROM FY- 2020-2021.

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071054 STPAA NR20 (904) SPECIAL UNCLASSIFIED 2020 $1,600 $400 $0 $2,000

TOTAL COST: $1,600 $400 $0 $2,000

Route NA Project Description PEDESTRIAN AND STREETSCAPE IMPROVEMENTS UNDERNEATH THE I-59/I-20 CBD BRIDGE

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor BIRMINGHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100003905 PE 2012 / 100059959 RW 2015 / 100060200 CN 2016 / 100065792 CN 2016 / 100071628 CN 2020

100065615 ACIM-ACCMAQ-CMAQ 3716 (258)

CONSTRUCTION STREETSCAPE 2020 $32,675 $2,706 $2,081 $37,462TOTAL COST: $32,675 $2,706 $2,081 $37,462

Route NA Project Description RESURFACING ON MINOR PARKWAY FROM BIRMINGPORT ROAD (SR-269) TO CRUMLY CHAPEL ROAD

Project Length in Miles 3.000  Urban Area BIRMINGHAM   Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071626 STPAA 3720 () CONSTRUCTION RESURFACING 2020 $1,186 $0 $296 $1,482

TOTAL COST: $1,186 $0 $296 $1,482

Route NA Project Description SHADES CREEK GREENWAY MULTI-PURPOSE TRAIL - PHASE TWO GRADE, DRAIN, BASE, PAVE, BRIDGE, STRIPING, SIGNING AND LANDSCAPING CITY OF HOMEWOOD JEFFERSON COUNTY

Project Length in Miles 1.500  Urban Area BIRMINGHAM   Sponsor HOMEWOOD COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100029549 PE 1999 / 100043449 RW 2016 / 100029526 CN 2024

100029525 CMAQ 9802 (911) CONSTRUCTION UNCLASSIFIED 2021 $4,229 $0 $1,057 $5,286TOTAL COST: $4,229 $0 $1,057 $5,286

Route NA Project Description TRUSSVILLE GREENWAY AND WALKWAY MULTI-USE TRAIL-GREENWAY FROM CHALKVILLE MTN RD (CR-10) TO CALUMET PARKWAY NEAR SR-7 (US-11), (PHASE 1)

Project Length in Miles 5.900  Urban Area BIRMINGHAM   Sponsor TRUSSVILLE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100032378 PE 2000 / 100032370 CN 2012 / 100064434 CN 2015

100052630 CMAQ 9802 () CONSTRUCTION UNCLASSIFIED 2023 $1,186 $0 $296 $1,482TOTAL COST: $1,186 $0 $296 $1,482

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

91 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 92: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description >SHADES CREEK GREENWAY MULTI-USE TRAIL SHADES CREEK GREENWAY - 1. ON-ROAD CONNECTION VIA ELDER STREET MONCLAIR ROAD AND CRESTWOOD BLVD FROM 15TH STREET TO 20TH ST. 2. OFF-ROAD TRAIL ALONG SHADESCREEK. CONNECTORS ALONG GREENWAY TRAIL INCLUD

Project Length in Miles 2.500  Urban Area BIRMINGHAM   Sponsor IRONDALE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100032392 CN 2042

100032397 CMAQ 9802 () RIGHT OF WAY UNCLASSIFIED 2020 $63 $0 $16 $79TOTAL COST: $63 $0 $16 $79

Route NA Project Description VILLAGE CREEK GREENWAY (PHASE 2) FROM 3RD STREET TO TALLAPOOSA STREET

Project Length in Miles 10.000  Urban Area BIRMINGHAM   Sponsor BIRMINGHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100039843 PE 2006 / 100039849 PE 2024 / 100039850 RW 2025 / 100039845 CN 2015 / 100039848 CN 2024 / 100039851 CN 2027

100039846 CMAQ NR02 () PRELIMINARY ENGINEERING UNCLASSIFIED 2023 $534 $0 $133 $667100039847 CMAQ NR02 () RIGHT OF WAY UNCLASSIFIED 2023 $267 $0 $67 $333

TOTAL COST: $800 $0 $200 $1,000

Route NA Project Description RAILROAD RESERVATION/1ST AVENUE SOUTH PHASE 2 AND 3 ENGINEERING: 1ST AVENUE SOUTH FROM 18TH STREET TO 32ND STREET AND NORTH TO SLOSS FURNACE.

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor BIRMINGHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100039855 PE 2010

100056176 CMAQ 3700 () PRELIMINARY ENGINEERING UNCLASSIFIED 2023 $263 $0 $66 $329TOTAL COST: $263 $0 $66 $329

Route NA Project Description PEDESTRIAN BRIDGE OVER US-31 AND SIDEWALKS IN VESTAVIA HILLS NEAR WALD PARK

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor VESTAVIA HILLS COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100050996 PE 2008

100051157 DE-HPP-TAPBH A104 (916)

CONSTRUCTION PEDESTRIAN OVERPASS 2021 $1,067 $0 $266 $1,333TOTAL COST: $1,067 $0 $266 $1,333

Route NA Project Description REED HARVEY GREENWAY ALONG FIVE MILE CREEK FROM BOBOLINK LANE TO CENTER POINT BALL PARK

Project Length in Miles 6.300  Urban Area BIRMINGHAM   Sponsor CENTER POINT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056519 PE 2013

100056520 CMAQ RW13 () RIGHT OF WAY UNCLASSIFIED 2021 $92 $0 $23 $115100056521 CMAQ UT14 () UTILITIES UNCLASSIFIED 2021 $88 $0 $22 $110100056522 CMAQ CN14 () CONSTRUCTION UNCLASSIFIED 2023 $591 $0 $148 $739

TOTAL COST: $771 $0 $193 $964

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

92 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 93: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description SIDEWALK ALONG CR-1142 (CHAPEL ROAD) FROM PARK AVE TO STONE BROOK PKWY (CITY OF HOOVER)

Project Length in Miles 2.400  Urban Area BIRMINGHAM   Sponsor HOOVER COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056538 PE 2012 / 100056539 RW 2017

100056540 CMAQ 7282 (600) UTILITIES SIDEWALK 2020 $90 $0 $23 $113100056541 CMAQ 7282 (600) CONSTRUCTION SIDEWALK 2021 $841 $0 $210 $1,051

TOTAL COST: $931 $0 $233 $1,164

Route NA Project Description SIDEWALK ON VALLEY STREET, TYLER ROAD, CLOUDLAND DRIVE, SAVOY STREET AND CLEARVIEW ROAD IN BLUFF PARK GRADE, DRAIN, CURB AND GUTTER, AND SIDEWALK

Project Length in Miles 1.420  Urban Area BIRMINGHAM   Sponsor HOOVER COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056544 PE 2012 / 100056545 RW 2017

100056547 CMAQ 3715 (254) CONSTRUCTION SIDEWALK 2019 $1,861 $0 $465 $2,327TOTAL COST: $1,861 $0 $465 $2,327

Route NA Project Description SIDEWALKS ALONG SR-150 (JOHN HAWKINS PKWY) FROM CAHABA RIVER ESTATES RD. TO SR-3 (US-31, MONTGOMERY HWY) CITY OF HOOVER

Project Length in Miles 5.430  Urban Area BIRMINGHAM   Sponsor HOOVER COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056556 PE 2018

100056557 CMAQ NR13 (961) RIGHT OF WAY SIDEWALK 2022 $112 $0 $28 $139100056558 CMAQ NR13 (961) UTILITIES SIDEWALK 2022 $103 $0 $26 $129100056559 CMAQ NR13 () CONSTRUCTION SIDEWALK 2023 $2,887 $0 $722 $3,609

TOTAL COST: $3,102 $0 $775 $3,877

Route NA Project Description RESURFACING, SIDEWALK ADDITIONS AND DRAINAGE IMPROVEMENTS ALONG POLLY REED ROAD FROM SR-75 TO REED ROAD NE

Project Length in Miles 0.400  Urban Area BIRMINGHAM   Sponsor CENTER POINT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100054521 STPBH 3716 (250) CONSTRUCTION UNCLASSIFIED 2020 $3,410 $0 $853 $4,263

TOTAL COST: $3,410 $0 $853 $4,263

Route NA Project Description VULCAN TRAIL EXTENSION FROM 11TH PLACE SOUTH TO GREEN SPRINGS HIGHWAY

Project Length in Miles 2.700  Urban Area BIRMINGHAM   Sponsor BIRMINGHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064283 PE 2017

100064288 CMAQ 3715 (267) RIGHT OF WAY UNCLASSIFIED 2021 $40 $0 $10 $50100064289 CMAQ 3715 (267) UTILITIES UNCLASSIFIED 2021 $40 $0 $10 $50100064290 CMAQ 3715 () CONSTRUCTION UNCLASSIFIED 2022 $320 $0 $80 $400

TOTAL COST: $400 $0 $100 $500

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

93 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 94: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description STREETSCAPE IMPROVEMENTS ALONG 2ND AVE S FROM 24TH ST S TO 32ND ST S, 27TH ST S FROM 2ND AVE S TO 3RD AVE S, AND 29TH ST S FROM 2ND AVE S TO 3RD AVE S

Project Length in Miles 1.200  Urban Area BIRMINGHAM   Sponsor BIRMINGHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064291 PE 2016

100064293 CMAQ 3715 (262) UTILITIES STREETSCAPE 2020 $83 $0 $21 $104100064294 TAPBH-CMAQ 3715 () CONSTRUCTION STREETSCAPE 2020 $1,000 $0 $250 $1,250

TOTAL COST: $1,083 $0 $271 $1,354

Route NA Project Description 41ST STREET STREETSCAPE- FROM 1ST AVENUE SOUTH TO 5TH AVENUE SOUTH

Project Length in Miles 0.800  Urban Area BIRMINGHAM   Sponsor BIRMINGHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064295 PE 2016

100064296 CMAQ 3715 (261) UTILITIES STREETSCAPE 2020 $80 $0 $20 $100100064297 CMAQ 3715 () CONSTRUCTION STREETSCAPE 2021 $816 $0 $204 $1,020

TOTAL COST: $896 $0 $224 $1,120

Route NA Project Description SIDEWALKS AND STREETSCAPE ON GREENSPRINGS HIGHWAY FROM VALLEY AVENUE TO 16TH AVENUE SOUTH

Project Length in Miles 3.000  Urban Area BIRMINGHAM   Sponsor BIRMINGHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064301 PE 2016

100064302 CMAQ 3715 (264) UTILITIES SIDEWALK 2021 $40 $0 $10 $50100064303 CMAQ 3715 () CONSTRUCTION SIDEWALK 2021 $1,600 $0 $400 $2,000

TOTAL COST: $1,640 $0 $410 $2,050

Route NA Project Description SIDEWALKS, BICYCLE LANES, CROSSWALKS, LANDSCAPE AND SIGNAGE INSTALLATION ALONG 22ND ST. N., 12TH AVE. N., 20TH ST. N., AND SHUTTLESWORTH DRIVE/HUNTSVILLE ROAD

Project Length in Miles 5.400  Urban Area BIRMINGHAM   Sponsor BIRMINGHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064309 PE 2016

100064315 CMAQ 3715 (263) RIGHT OF WAY SIDEWALK 2021 $40 $0 $10 $50100064316 CMAQ 3715 (263) UTILITIES SIDEWALK 2021 $40 $0 $10 $50100064317 CMAQ 3715 () CONSTRUCTION SIDEWALK 2022 $960 $0 $240 $1,200

TOTAL COST: $1,040 $0 $260 $1,300

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

94 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 95: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description 18TH STREET REVITALIZATION FROM 28TH AVENUE SOUTH TO A POINT APPROXIMATELY 1000' NORTH OF ROSEDALE DRIVE IN THE CITY OF HOMEWOOD

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor HOMEWOOD COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065218 PE 2019

100065219 CMAQ TA15 (903) RIGHT OF WAY STREETSCAPE 2020 $880 $0 $220 $1,100100065220 CMAQ TA15 (903) UTILITIES STREETSCAPE 2020 $83 $0 $21 $104100064505 TAPAA-CMAQ TA15

(903)CONSTRUCTION STREETSCAPE 2020 $1,200 $0 $300 $1,500

TOTAL COST: $2,163 $0 $541 $2,704

Route NA Project Description DOWNTOWN STREETSCAPE AND SIDEWALKS ALONG B.Y. WILLIAMS SR. DRIVE IN THE CITY OF MIDFIELD.

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor MIDFIELD COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065502 PE 2017 / 100062999 CN 2019

100065504 TAPAA-CMAQ TA14 (930)

UTILITIES SIDEWALK 2020 $82 $0 $21 $103TOTAL COST: $82 $0 $21 $103

Route NA Project Description BIKESHARE WAYFINDING SIGNS IN DOWNTOWN BIRMINGHAM

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor BIRMINGHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066621 PE 2019

100066622 CMAQ 3717 () CONSTRUCTION UNCLASSIFIED 2023 $1,166 $0 $291 $1,457TOTAL COST: $1,166 $0 $291 $1,457

Route SR-119 Project Description REPLACE BRIDGE, BIN 001308, SR-119 OVER SHEPARD BRANCH (SUFF=56.3, STATUS=FO)

Project Length in Miles 0.300  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049954 PE 2019

100049986 BR 0119 (513) RIGHT OF WAY BRIDGE REPLACEMENT 2022 $59 $15 $0 $73100049987 BR 0119 (513) UTILITIES BRIDGE REPLACEMENT 2022 $35 $9 $0 $44100049955 BR 0119 () CONSTRUCTION BRIDGE REPLACEMENT 2023 $2,362 $591 $0 $2,953

TOTAL COST: $2,456 $614 $0 $3,070

Route SR-149 Project Description RESURFACING, PLANING, PATCHING, STRIPING, AND LEVELING ON SR-149 FROM COLUMBIANA ROAD TO WILDWOOD CIRCLE

Project Length in Miles 1.150  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070159 NH 0149 (503) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,591 $398 $0 $1,989

TOTAL COST: $1,591 $398 $0 $1,989

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

95 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 96: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-150 Project Description SR-150 FR WEST OF CR-6 (PARKWOOD RD) TO WEST OF SHADES CREEK (PHASE 2)

Project Length in Miles 2.349  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100025540 ST-659-17 () CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND

BRG2021 $0 $10,048 $0 $10,048

TOTAL COST: $0 $10,048 $0 $10,048

Route SR-150 Project Description PEDESTRIAN BRIDGE OVER SR-150 BETWEEN BERKLEY AVE AND CLARENDON AVE - CITY OF BESSEMER

Project Length in Miles 0.065  Urban Area BIRMINGHAM   Sponsor BESSEMER COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064226 PE 2019 / 100064230 CN 2024

100064228 CMAQ 3715 (270) RIGHT OF WAY PEDESTRIAN OVERPASS 2022 $86 $0 $21 $107100064229 CMAQ 3715 (270) UTILITIES PEDESTRIAN OVERPASS 2023 $87 $0 $22 $108

TOTAL COST: $172 $0 $43 $215

Route SR-150 Project Description BRIDGE REPLACEMENT ON SR-150 OVER LITTLE SHADES CREEK BIN # 2866

Project Length in Miles 1.000  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066942 PE 2018

100066943 BR 0150 (505) UTILITIES BRIDGE REPLACEMENT 2020 $247 $62 $0 $309100066944 BR 0150 (505) CONSTRUCTION BRIDGE REPLACEMENT 2020 $4,096 $1,024 $0 $5,120

TOTAL COST: $4,343 $1,086 $0 $5,429

Route SR-25 Project Description RESURFACE, PLANE, STRIPE, LEVEL, PATCH SR-25 FROM THE SHELBY COUNTY LINE TO SR-4 (US-78)

Project Length in Miles 2.081  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070160 STPAA 0025 () FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $2,854 $713 $0 $3,567

TOTAL COST: $2,854 $713 $0 $3,567

Route SR-269 Project Description BRIDGE REPLACEMENT (BIN 009187) ON SR-269 (BIRMINGPORT ROAD) OVER THE LOCUST FORK OF THE WARRIOR RIVER

Project Length in Miles 0.436  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069529 PE 2019

100069530 BR 0269 () CONSTRUCTION BRIDGE REPLACEMENT 2022 $7,583 $1,896 $0 $9,479TOTAL COST: $7,583 $1,896 $0 $9,479

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

96 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 97: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-3 Project Description SR-3 (US-31)ATSR-150 UPGRADE TRAFFIC CAMERAS AND INSTALL FIBER OPTIC CABLE

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor HOOVER COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100056560 CMAQF NR13 () PRELIMINARY ENGINEERING SIGNALIZATION 2020 $90 $0 $23 $113

TOTAL COST: $90 $0 $23 $113

Route SR-3 Project Description AUXILIARY LANES ON SR-3(US-31/RED MOUNTAIN EXPRESSWAY) BETWEEN HIGHLAND AVE AND 21ST AVE.

Project Length in Miles 3.196  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064506 CMAQ 0003 () PRELIMINARY ENGINEERING STREETSCAPE 2020 $83 $21 $0 $104100064507 CMAQ 0003 () CONSTRUCTION STREETSCAPE 2023 $2,707 $677 $0 $3,384

TOTAL COST: $2,790 $698 $0 $3,488

Route SR-3 Project Description BR REPL AND APP ON SR-3 (US-31) BIN# 002243 OVER SOU RR #3-37-15.8B

Project Length in Miles 0.100  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100003817 CN 2026

100003818 BR 7044 (600) PRELIMINARY ENGINEERING BRIDGES AND APPROACHES 2023 $126 $31 $0 $157TOTAL COST: $126 $31 $0 $157

Route SR-3 Project Description SLOPE STABILIZATION ON SR-3 (US-31) AT BROOKWOOD MEDICAL CENTER DRIVE

Project Length in Miles 0.500  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056425 PE 2012

100056427 NH 0003 () CONSTRUCTION SLIDE CORRECTION 2021 $92 $23 $0 $115TOTAL COST: $92 $23 $0 $115

Route SR-3 Project Description SR-3 (US-31) LIGHTING SYSTEM FROM PATTON CHAPEL ROAD TO I-65 CITY OF HOOVER

Project Length in Miles 1.418  Urban Area BIRMINGHAM   Sponsor HOOVER COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064203 PE 2019

100064209 STPBH 0003 (619) CONSTRUCTION LIGHTING 2021 $1,600 $0 $400 $2,000TOTAL COST: $1,600 $0 $400 $2,000

Route SR-3 Project Description RESURFACING, PLANING, STRIPING, LEVELING, PATCHING AND 2FT SAFETY WIDENING ON SR-3(US-31) FROM .2 MILE NORTH OF FINLEY BLVD TO A JOINT AT 52ND AVE NORTH

Project Length in Miles 2.325  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070151 STPAA-HSIP 0003 (620) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2020 $2,332 $574 $0 $2,906

TOTAL COST: $2,332 $574 $0 $2,906

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

97 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 98: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-4 Project Description REPLACE BRIDGE, BIN 000884, SR-4 (US-78) OVER LITTLE CAHABA RIVER (SUFF=58.4, STATUS=FO)

Project Length in Miles 0.600  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049956 PE 2010

100049988 BR 0004 () RIGHT OF WAY BRIDGE REPLACEMENT 2021 $58 $15 $0 $73100049989 BR 0004 () UTILITIES BRIDGE REPLACEMENT 2022 $35 $9 $0 $44100049957 BR 0004 () CONSTRUCTION BRIDGE REPLACEMENT 2022 $2,639 $660 $0 $3,299

TOTAL COST: $2,732 $683 $0 $3,415

Route SR-4 Project Description INTERSECTION IMPROVEMENTS AT PARKWAY DRIVE SR-4 (US-78) AND PRESIDENT STREET IN THE CITY OF LEEDS

Project Length in Miles 0.780  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065388 PE 2017

100065396 STPAA 0004 () RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $420 $0 $105 $526100065397 STPAA 0004 () UTILITIES INTERSECTION IMPROVEMENTS 2023 $429 $0 $107 $536100063799 STPAA 0004 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2023 $2,599 $0 $650 $3,249

TOTAL COST: $3,448 $0 $862 $4,310

Route SR-4 Project Description RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-4 (US-78) FROM A SPOT 86 FEET WEST OF 46TH ALLEY SOUTH TO ST. PATRICK CIRCLE

Project Length in Miles 3.541  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068636 STPAA 0004 (548) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $2,418 $604 $0 $3,022

TOTAL COST: $2,418 $604 $0 $3,022

Route SR-4 Project Description RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-4 (US-78) FROM 1ST AVE NORTH TO A POINT 86 FEET WEST OF 46TH ALLEY SOUTH INCLUDING EASTBOUND AND WESTBOUND LANES

Project Length in Miles 3.964  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068637 STPAA 0004 (546) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22019 $3,486 $872 $0 $4,358

TOTAL COST: $3,486 $872 $0 $4,358

Route SR-4 Project Description RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-4 (US-78) FROM ANDERSON STREET TO THE ST. CLAIR COUNTY LINE

Project Length in Miles 2.102  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070161 STPAA 0004 () FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $481 $120 $0 $601

TOTAL COST: $481 $120 $0 $601

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

98 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 99: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-5 Project Description BRIDGE REPLACEMENT (BIN 007627) ON SR-5 OVER LOCUST FORK OF BLACK WARRIOR RIVER

Project Length in Miles 0.681  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100050014 PE 2007

100002809 BR 0005 (517) CONSTRUCTION BRIDGE REPLACEMENT 2020 $7,924 $1,981 $0 $9,905TOTAL COST: $7,924 $1,981 $0 $9,905

Route SR-5 Project Description RESURFACING,PLANING,STRIPING, LEVELING AND PATCHING ON SR-5 (US-11) FROM 31 FEET NORTH OF ACADEMY DRIVE TO 111 FEET NORTH OF 22ND STREET NORTH

Project Length in Miles 3.983  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068644 NH 0005 (557) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $2,957 $739 $0 $3,696

TOTAL COST: $2,957 $739 $0 $3,696

Route SR-5 Project Description RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-5 (US-78) FROM FINLEY AVENUE TO CHERRY AVENUE

Project Length in Miles 1.528  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070164 NH 0005 () FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $979 $245 $0 $1,224

TOTAL COST: $979 $245 $0 $1,224

Route SR-7 Project Description WIDEN SR-7(US-11) FROM CHALKVILLE RD TO THE CAHABA RIVER BRIDGE

Project Length in Miles 0.441  Urban Area BIRMINGHAM   Sponsor TRUSSVILLE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100039838 PE 2001 / 100050342 UT 2015

100039839 STPBH 7073 (602) CONSTRUCTION WIDENING AND RESURFACING (RDWY)

2020 $2,049 $512 $0 $2,562TOTAL COST: $2,049 $512 $0 $2,562

Route SR-75 Project Description RESURFACING, PLANING, STRIPING, LEVELING, PATCHING AND 2FT SAFETY WIDENING ON SR-75 FROM A JOINT 116FT SOUTH OF FOX HILL DR. TO 240FT SOUTH OF INNSBROOKE PARKWAY

Project Length in Miles 3.934  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068643 RP-NH-HSIP 0075 (535) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2020 $2,621 $650 $0 $3,271

TOTAL COST: $2,621 $650 $0 $3,271

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

99 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 100: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-959 Project Description FY 2020 AND 2021 BIRMINGHAM NORTHERN BELTLINE WETLAND AND STREAM MITIGATION CREDITS

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063383 SP 2018

100063385 APDF 1602 (563) SPECIAL UNCLASSIFIED 2020 $1,880 $470 $0 $2,350TOTAL COST: $1,880 $470 $0 $2,350

Route SR-959 Project Description BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER SELF CREEK AT STATIONS 2183+00 TO 2199+00, DUAL MAINLINE BRIDGES AT STATION 2208+50 TO 2218+50, AND SINGLE BRIDGES ON RAMPS B AND D AT SR-79.

Project Length in Miles 2.780  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100048413 APDF 1602 (550) CONSTRUCTION BRIDGE 2023 $42,174 $10,544 $0 $52,718

TOTAL COST: $42,174 $10,544 $0 $52,718

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

100 of 206

HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original

Page 101: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description INSTALL GUARDRAIL AND END ANCHORS CR-49 AT BLOWHORN(#4247), YELLOW RELIEF(#4248,#4249), YELLOW(#4250); CR-21 AT EALON BR(#4527), CUT BANK(#6869); CR-36 AT TRIB(#4529); CR-41 AT MILL(#4746), TRIB(#4747); CR-15 AT DRY (#6871); CR-35 AT LOST REED(#9948)

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069573 HRRR 3819 (250) CONSTRUCTION GUARDRAIL 2020 $234 $0 $26 $261

TOTAL COST: $234 $0 $26 $261

Route SR-118 Project Description BRIDGE REPLACEMENT (BIN 001818) AND (BIN 001819) ON SR-118 (US-278) OVER BOGUE CREEK

Project Length in Miles 1.350  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068804 PE 2019

100068805 BR 0118 (517) RIGHT OF WAY BRIDGE REPLACEMENT 2021 $163 $41 $0 $204100068806 BR 0118 (517) UTILITIES BRIDGE REPLACEMENT 2021 $408 $102 $0 $510100068807 BR 0118 () CONSTRUCTION BRIDGE REPLACEMENT 2022 $2,473 $618 $0 $3,091

TOTAL COST: $3,044 $761 $0 $3,805

Route SR-17 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-17 FROM THE PICKENS COUNTY LINE AT MP 220.970 TO THE MILLPORT CITY LIMITS AT MP 227.000

Project Length in Miles 6.030  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068531 STPAA-HSIP 0017 (580) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2020 $2,852 $670 $0 $3,522

TOTAL COST: $2,852 $670 $0 $3,522

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

101 of 206

HIGHWAY PROJECTS - LAMARSTIP PLAN: 2020 - Original

Page 102: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-16 Project Description CR-16 BRIDGE REPLACEMENT OVER CYPRESS CREEK IN LAUDERDALE COUNTY BIN #001434

Project Length in Miles 0.300  Urban Area SHOALS  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100059048 PE 2014

100059049 STPOA 3914 (251) RIGHT OF WAY BRIDGE REPLACEMENT 2021 $204 $0 $51 $255100059050 STPOA 3914 (251) UTILITIES BRIDGE REPLACEMENT 2022 $346 $0 $87 $433100059051 STPOA 3914 () CONSTRUCTION BRIDGE REPLACEMENT 2022 $3,212 $0 $803 $4,015

TOTAL COST: $3,762 $0 $941 $4,703

Route CR-NA Project Description JOHN COFFEE MEMORIAL BRIDGE RAIL PAINTING. NATCHEZ TRACE PARKWAY

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065123 PFH 3916 () CONSTRUCTION BRIDGE PAINTING 2020 $5,203 $0 $0 $5,203

TOTAL COST: $5,203 $0 $0 $5,203

Route CR-NA Project Description STREETSCAPES ALONG LEE STREET BETWEEN WHEELER STREET AND THE ROGERSVILLE PUBLIC LIBRARY AND ADA CURB RAMPS ALONG WHEELER STREET BETWEEN SR-2 (US-72) AND LEE STREET

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069006 TAPNU TA19 (901) CONSTRUCTION STREETSCAPE 2020 $140 $0 $35 $175

TOTAL COST: $140 $0 $35 $175

Route CR-NA Project Description WIDENING AND PEDESTRIAN FACILITIES ON RICKWOOD RD FROM CHISHOLM RD TO JUST EAST OF TENNESSEE SOUTHERN RAILROAD

Project Length in Miles 0.000  Urban Area SHOALS  Sponsor FLORENCE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063587 PE 2016

100063588 STPOA 3915 (250) RIGHT OF WAY ADDITIONAL ROADWAY LANES 2020 $400 $0 $100 $500100063589 STPOA 3915 (250) UTILITIES ADDITIONAL ROADWAY LANES 2021 $376 $0 $94 $470100063590 STPOA 3915 (250) CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $1,552 $0 $388 $1,939

TOTAL COST: $2,328 $0 $582 $2,909

Route SR-101 Project Description RESURFACING ON SR-101 FROM SR-2 (US-72) TO THE TENNESSEE STATE LINE

Project Length in Miles 10.867  Urban Area SHOALS  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068266 STPAA 0101 (573) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,886 $472 $0 $2,358

TOTAL COST: $1,886 $472 $0 $2,358

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

102 of 206

HIGHWAY PROJECTS - LAUDERDALESTIP PLAN: 2020 - Original

Page 103: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-2 Project Description SR-2 (US-72) FLORENCE BLVD ADD LANES FROM INDIAN SPRINGS DRIVE TO SHOAL CREEK

Project Length in Miles 2.210  Urban Area SHOALS  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100053764 RW 2021 / 100031926 UT 2021 / 100031924 CN 2021

100063474 NHF 0002 (516) PRELIMINARY ENGINEERING ADDITIONAL ROADWAY LANES 2020 $252 $63 $0 $315TOTAL COST: $252 $63 $0 $315

Route SR-2 Project Description BRIDGE REPLACEMENT (BIN 001709) ON SR-2 (US-72) OVER SR-20

Project Length in Miles 1.110  Urban Area SHOALS  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066652 PE 2018

100038052 BR 0002 (579) RIGHT OF WAY BRIDGES AND APPROACHES 2021 $2,324 $581 $0 $2,906100038505 BR 0002 (579) UTILITIES BRIDGES AND APPROACHES 2021 $698 $175 $0 $873100002587 BR 0002 () CONSTRUCTION BRIDGES AND APPROACHES 2021 $4,784 $1,196 $0 $5,980

TOTAL COST: $7,807 $1,952 $0 $9,759

Route SR-2 Project Description RESURFACING ON SR-2 (US-72) FROM HARRIS DRIVE TO CR-66 (JC MAULDIN HIGHWAY)

Project Length in Miles 1.881  Urban Area SHOALS  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068265 NH 0002 (589) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,486 $371 $0 $1,857

TOTAL COST: $1,486 $371 $0 $1,857

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

103 of 206

HIGHWAY PROJECTS - LAUDERDALESTIP PLAN: 2020 - Original

Page 104: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-270 Project Description BRIDGE REPLACEMENT ON JEFFERSON STREET (CR-270) OVER BIG NANCE CREEK (BIN # 349) AND RELIEF BRIDGE (BIN # 348) IN THE CITY OF COURTLAND (R.A.M.P.)

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060555 ACBRZ60555 ATRP (011) CONSTRUCTION BRIDGE REPLACEMENT 2020 $910 $227 $0 $1,137

TOTAL COST: $910 $227 $0 $1,137

Route CR-434 Project Description THE REALIGNMENT OF CR-434 FROM CR-429 TO 900 FEET NORTH OF THE PROPOSED AT-GRADE NORFOLK SOUTHERN RAILROAD CROSSING - LCP 40-137-17

Project Length in Miles 0.507  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070464 RASTPNU 4017 (251) CONSTRUCTION RESURFACING 2020 $242 $61 $0 $303

TOTAL COST: $242 $61 $0 $303

Route CR-NA Project Description SIDEWALK ALONG BYLER ROAD FROM SOMMERVILLE AVENUE TO SR-157

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068353 TAPNU TA18 (905) CONSTRUCTION SIDEWALK 2020 $424 $0 $106 $530

TOTAL COST: $424 $0 $106 $530

Route SR-101 Project Description REPLACE BRIDGE, BIN 001493, SR-101 OVER BIG NANCE CREEK. (SUFF=36.0, STATUS=SD)

Project Length in Miles 1.500  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049905 PE 2018

100049906 BR 0101 (570) RIGHT OF WAY BRIDGES AND APPROACHES 2020 $1,000 $250 $0 $1,250100049907 BR 0101 (570) UTILITIES BRIDGES AND APPROACHES 2021 $114 $29 $0 $143100049908 BR 0101 (570) CONSTRUCTION BRIDGES AND APPROACHES 2021 $2,895 $724 $0 $3,618

TOTAL COST: $4,009 $1,002 $0 $5,011

Route SR-101 Project Description RESURFACING ON SR-101 FROM SR-157 TO SR-20 (US-72)

Project Length in Miles 6.893  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068236 STPAA 0101 (571) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,115 $279 $0 $1,394

TOTAL COST: $1,115 $279 $0 $1,394

Route SR-101 Project Description RESURFACING ON SR-101 FROM SR-20 (US-72A) TO SR-184 INCLUDING NORFOLK SOUTHERN RAILROAD CROSSING

Project Length in Miles 4.955  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068251 STPAA 0101 (572) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $786 $196 $0 $982

TOTAL COST: $786 $196 $0 $982

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

104 of 206

HIGHWAY PROJECTS - LAWRENCESTIP PLAN: 2020 - Original

Page 105: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-157 Project Description RESURFACE SR-157 FROM STA. 19+00 (MP. 36.573) JUST SOUTH OF BYLER RD. TO STA. 175+82 (MP. 39.500) JUST SOUTH OF GORDON DR.

Project Length in Miles 2.927  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068238 NH 0157 (526) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,575 $394 $0 $1,969

TOTAL COST: $1,575 $394 $0 $1,969

Route SR-20 Project Description RESURFACING SR-20(US-72A) FROM 0.10 MILE EAST OF CR-585 TO 0.12 MILE WEST OF SR-33 INCLUDING NORFOLK SOUTHERN RAILROAD CROSSING

Project Length in Miles 4.874  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068235 NH 0020 (530) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,980 $495 $0 $2,475

TOTAL COST: $1,980 $495 $0 $2,475

Route SR-33 Project Description SURFACE TREATMENT ON SR-33 FROM THE WINSTON COUNTY LINE TO CR-70

Project Length in Miles 6.030  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068267 STPAA 0033 (508) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 12021 $364 $91 $0 $456

TOTAL COST: $364 $91 $0 $456

Route SR-33 Project Description RESURFACING (HMA; MILL AND FILL) ON SR-33 FROM CR-460 (COURT STREET) TO 0.15 MILE NORTH OF COX ROAD

Project Length in Miles 2.196  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068232 STPAA 0033 (507) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $432 $108 $0 $540

TOTAL COST: $432 $108 $0 $540

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

105 of 206

HIGHWAY PROJECTS - LAWRENCESTIP PLAN: 2020 - Original

Page 106: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-137 Project Description RESURFACING AND WIDENING ON CR-137 FROM THE MACON COUNTY LINE TO CHADWICK LANE

Project Length in Miles 3.562  Urban Area AUBURN-OPELIKA   Sponsor LEE COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070043 STPOA 4119 () CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2023 $837 $0 $209 $1,046

TOTAL COST: $837 $0 $209 $1,046

Route CR-188 Project Description FULL DEPTH RECLAMATION, RESURFACING, AND TRAFFIC STRIPING ON CR-188 FROM SR-14 TO SOUGAHATCHEE CREEK

Project Length in Miles 2.694  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069408 RASTPNU 4119 (252) CONSTRUCTION RESURFACING 2020 $604 $0 $295 $899

TOTAL COST: $604 $0 $295 $899

Route CR-197 Project Description FULL DEPTH RECLAMATION, PAVE, AND TRAFFIC STRIPE CR-197 FROM CR-208 TO CR-240 - LCP 41-147-17

Project Length in Miles 2.400  Urban Area PHENIX CITY  Sponsor LEE COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100062982 STPPC 4118 (252) CONSTRUCTION RESURFACING 2020 $788 $0 $197 $985

TOTAL COST: $788 $0 $197 $985

Route CR-243 Project Description FULL DEPTH RECLAMATION, RESURFACING, AND TRAFFIC STRIPING ON CR-243 FROM THE RUSSELL COUNTY LINE TO CR-248

Project Length in Miles 3.200  Urban Area PHENIX CITY  Sponsor LEE COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067543 STPPC 4119 (253) CONSTRUCTION RESURFACING 2020 $586 $147 $0 $733

TOTAL COST: $586 $147 $0 $733

Route CR-249 Project Description RESURFACING ON CR-249 FROM CR-379 TO CR-318 IN SMITHS STATION

Project Length in Miles 1.700  Urban Area PHENIX CITY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067545 STPPC 4117 () CONSTRUCTION RESURFACING 2020 $442 $0 $111 $553

TOTAL COST: $442 $0 $111 $553

Route CR-318 Project Description RESURFACING ON CR-318 FROM CR-248 (SUMMERVILLE ROAD) TO CR-249 IN SMITHS STATION

Project Length in Miles 4.800  Urban Area PHENIX CITY  Sponsor LEE COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067544 STPPC 4117 () CONSTRUCTION RESURFACING 2020 $1,056 $0 $264 $1,320

TOTAL COST: $1,056 $0 $264 $1,320

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

106 of 206

HIGHWAY PROJECTS - LEESTIP PLAN: 2020 - Original

Page 107: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-379 Project Description RESURFACING ON CR-379 FROM SR-1 (US-280) TO THE BRIDGE OVER HARDING LAKE IN SMITHS STATION

Project Length in Miles 9.700  Urban Area PHENIX CITY  Sponsor LEE COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067546 STPPC 4117 () CONSTRUCTION RESURFACING 2021 $1,300 $0 $325 $1,625

TOTAL COST: $1,300 $0 $325 $1,625

Route CR-379 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT (4430) CR-379 MILL CR; (4750) CR-148 PHELPS CR; (10292) CR-188 LOBLOCKEE CR; (3310) CR-175 TRIB TO LITTLE UCHEE CR; (4416) CR-183 WACOOCHEE CR; (3645) CR-126 BRUSH CR; (5051) CR-29 COSSEY BR

Project Length in Miles 0.000  Urban Area PHENIX CITY  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071469 HRRR 4120 (250) CONSTRUCTION GUARDRAIL 2020 $180 $0 $20 $200

TOTAL COST: $180 $0 $20 $200

Route CR-40 Project Description RESURFACING,WIDENING,TRAFFIC SIGNALS AND DRAINAGE IMPROVEMENTS ON SOUTH COLLEGE STREET,SAMFORD AVENUE, GAY STREET, AND REESE AVENUE

Project Length in Miles 0.968  Urban Area AUBURN-OPELIKA   Sponsor AUBURN COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065890 PE 2017 / 100065891 RW 2019

100065892 STPOA 4116 (250) UTILITIES WIDENING AND RESURFACING (RDWY)

2021 $109 $0 $27 $136100061106 STPOA 4116 (250) CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2021 $3,627 $0 $907 $4,533

TOTAL COST: $3,736 $0 $934 $4,670

Route CR-NA Project Description SIDEWALKS AND IMPROVEMENTS ALONG CARVER AVE FROM THE COVINGTON RECREATION CENTER PARKING LOT TO CLANTON ST, ON CLANTON ST FROM CARVER AVE TO MCCOY ST, ON MCCOY ST FROM CLANTON ST TO GENEVA ST AND ON GENEVA ST FROM MCCOY ST TO VAUGHN AVE

Project Length in Miles 0.000  Urban Area AUBURN-OPELIKA   Sponsor OPELIKA  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067220 TAPAA TA17 (922) CONSTRUCTION UNCLASSIFIED 2019 $391 $0 $98 $489

TOTAL COST: $391 $0 $98 $489

Route CR-NA Project Description STREETSCAPE IMPROVEMENTS ON N 8TH STREET FROM N RAILROAD AVENUE TO 1ST AVENUE, AND ON 1ST AVENUE FROM N 8TH STREET TO N 7TH STREET

Project Length in Miles 0.000  Urban Area AUBURN-OPELIKA   Sponsor OPELIKA  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069022 TAPAA TA19 (916) CONSTRUCTION STREETSCAPE 2020 $331 $0 $83 $414

TOTAL COST: $331 $0 $83 $414

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

107 of 206

HIGHWAY PROJECTS - LEESTIP PLAN: 2020 - Original

Page 108: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description ROUNDABOUT AT THE INTERSECTION OF WIRE ROAD AND COX ROAD IN THE CITY OF AUBURN

Project Length in Miles 0.000  Urban Area AUBURN-OPELIKA   Sponsor AUBURN  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069293 RW 2021 / 100069292 CN 2021

100069291 HSIP 4119 (251) PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $86 $0 $10 $96100069293 HSIP 4119 (251) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $191 $0 $21 $213100069292 HSIP 4119 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $1,267 $0 $141 $1,408

TOTAL COST: $1,545 $0 $172 $1,716

Route CR-NA Project Description RESURFACING, SIDEWALKS AND SIGNALS ALONG PEPPERELL PARKWAY FROM LOWNDES STREET TO AUBURN CITY LIMITS

Project Length in Miles 0.000  Urban Area AUBURN-OPELIKA   Sponsor OPELIKA COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070013 STPOA 4119 () PRELIMINARY ENGINEERING RESURFACING 2022 $55 $0 $14 $69100070014 STPOA 4119 () RIGHT OF WAY RESURFACING 2022 $52 $0 $13 $65100070015 STPOA 4119 () UTILITIES RESURFACING 2023 $140 $0 $35 $175100070016 STPOA 4119 () CONSTRUCTION RESURFACING 2023 $1,357 $0 $339 $1,696

TOTAL COST: $1,604 $0 $401 $2,005

Route CR-NA Project Description ADD TURN LANE ON DONAHUE DRIVE FROM NORTH OF BRAGG AVENUE TO CARY DRIVE

Project Length in Miles 1.410  Urban Area AUBURN-OPELIKA   Sponsor AUBURN COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065935 PE 2017

100008577 STPOA 4116 () RIGHT OF WAY TURN LANES 2021 $408 $0 $102 $510100033351 STPOA 4116 () UTILITIES TURN LANES 2021 $522 $0 $131 $653100008575 STPOA 4116 () CONSTRUCTION TURN LANES 2022 $1,947 $0 $487 $2,434

TOTAL COST: $2,878 $0 $719 $3,597

Route CR-NA Project Description RESURFACING, MILLING, PEDESTRIAN SIDEWALKS AND SIGNALS ON PEPPERELL PARKWAY FROM LOWNDES STREET TO GATEWAY DRIVE (SR-38/US-280)

Project Length in Miles 0.000  Urban Area AUBURN-OPELIKA   Sponsor OPELIKA COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068459 PE 2019

100068460 STPOA 4118 (250) RIGHT OF WAY RESURFACING 2021 $21 $0 $5 $26100068461 STPOA 4118 (250) UTILITIES RESURFACING 2021 $52 $0 $13 $64100068462 STPOA 4118 () CONSTRUCTION RESURFACING 2021 $1,385 $0 $346 $1,731

TOTAL COST: $1,457 $0 $364 $1,821

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

108 of 206

HIGHWAY PROJECTS - LEESTIP PLAN: 2020 - Original

Page 109: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description RESURFACING, MILLING, PEDESTRIAN SIDEWALKS AND SIGNALS ON PEPPERELL PARKWAY FROM WESTEND COURT (FIVE POINTS) TO GATEWAY DRIVE (SR-38/US-280)

Project Length in Miles 1.776  Urban Area AUBURN-OPELIKA   Sponsor OPELIKA COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068464 STPOA 4118 (251) RIGHT OF WAY RESURFACING 2021 $21 $0 $5 $26100068465 STPOA 4118 (251) UTILITIES RESURFACING 2021 $52 $0 $13 $64100068466 STPOA 4118 () CONSTRUCTION RESURFACING 2021 $1,072 $0 $268 $1,339

TOTAL COST: $1,144 $0 $286 $1,430

Route CR-NA Project Description INTERSECTION IMPROVEMENTS ON COLUMBUS PARKWAY AT 4TH, 6TH AND 7TH STREETS

Project Length in Miles 0.000  Urban Area AUBURN-OPELIKA   Sponsor OPELIKA  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069300 PE 2019 / 100069306 RW 2021 / 100069307 UT 2021 / 100069301 CN 2021

100069306 HSIP 4119 (250) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $262 $0 $29 $291100069307 HSIP 4119 (250) UTILITIES INTERSECTION IMPROVEMENTS 2021 $294 $0 $33 $326100069301 HSIP 4119 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $1,111 $0 $123 $1,234

TOTAL COST: $1,666 $0 $185 $1,851

Route I-85 Project Description RESURFACING ON I-85 FROM .4 MILE SOUTH OF SR-147(EXIT 51) TO .38 MILE SOUTH OF BENT CREEK ROAD

Project Length in Miles 5.525  Urban Area AUBURN-OPELIKA   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069862 CN 2022

100071653 IM I085 () PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 2

2021 $164 $18 $0 $182100069862 IM I085 () CONSTRUCTION PREVENTATIVE MAINTENANCE

LEVEL 22022 $3,095 $344 $0 $3,439

TOTAL COST: $3,258 $362 $0 $3,621

Route I-85 Project Description PAVEMENT PRESERVATION ON I-85 FROM THE MACON COUNTY LINE TO .42 MILE WEST OF SR-15

Project Length in Miles 7.412  Urban Area AUBURN-OPELIKA   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068991 CN 2021

100069065 IM I085 (369) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 2

2020 $205 $23 $0 $227100068991 IM I085 () CONSTRUCTION PREVENTATIVE MAINTENANCE

LEVEL 22021 $2,525 $281 $0 $2,805

TOTAL COST: $2,729 $303 $0 $3,033

Route I-85 Project Description INTERCHANGE LIGHTING AND LANDSCAPING ON I-85 AT EXIT 50 (COX ROAD)

Project Length in Miles 2.000  Urban Area AUBURN-OPELIKA   Sponsor AUBURN COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070019 STPOA I085 (371) PRELIMINARY ENGINEERING LIGHTING 2020 $80 $20 $0 $100100070020 STPOA I085 (371) CONSTRUCTION LIGHTING 2021 $889 $0 $222 $1,111

TOTAL COST: $969 $20 $222 $1,211

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

109 of 206

HIGHWAY PROJECTS - LEESTIP PLAN: 2020 - Original

Page 110: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route I-85 Project Description INTERCHANGE LIGHTING AND LANDSCAPING ON I-85 AT EXIT 57 (BENT CREEK ROAD)

Project Length in Miles 2.000  Urban Area AUBURN-OPELIKA   Sponsor AUBURN COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070044 STPOA I085 (370) PRELIMINARY ENGINEERING LIGHTING 2020 $80 $20 $0 $100100070021 STPOA I085 () CONSTRUCTION LIGHTING 2021 $889 $0 $222 $1,111

TOTAL COST: $969 $20 $222 $1,211

Route I-85 Project Description BRIDGE WIDENING ON I-85 (BIN# 008593) AND (BIN# 008594) OVER CHOCTAFAULA CREEK(SITE 1) ; BRIDGE WIDENING ON I-85 (BIN# 007262) AND (BIN# 007263) OVER HALAWAKEE CREEK(SITE 2)

Project Length in Miles 0.300  Urban Area AUBURN-OPELIKA   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066325 PE 2019 / 100051084 CN 2022

100051084 IM I085 (366) CONSTRUCTION BRIDGE WIDENING 2022 $3,254 $362 $0 $3,615TOTAL COST: $3,254 $362 $0 $3,615

Route I-85 Project Description I-85 BRIDGE REPLACEMENTS OVER CR-54 (LONG ST BIN# 6495 AND 6496), NS RR (BIN# 6497 AND 6498) AND SR-51 (MARVYN PKWY BIN# 6499 AND 6500) W/ ACCEL/DECEL EXTENSIONS NB OFF RAMP AND SB ON RAMP

Project Length in Miles 4.300  Urban Area AUBURN-OPELIKA   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067235 PE 2018

100067237 IMF I085 (362) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $544 $60 $0 $605100067238 IMF-CHBP I085 (362) CONSTRUCTION BRIDGE REPLACEMENT 2021 $25,213 $1,595 $0 $26,808100070677 IMF I085 (362) UTILITIES BRIDGE REPLACEMENT 2020 $346 $38 $0 $385

TOTAL COST: $26,103 $1,694 $0 $27,798

Route NA Project Description MULTI-USE PATH ALONG MARTIN LUTHER KING DRIVE/SR-14 FROM WEBSTER ROAD TO SHUG JORDAN PARKWAY OVERPASS IN AUBURN

Project Length in Miles 0.000  Urban Area AUBURN-OPELIKA   Sponsor AUBURN  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067301 TAPAAF TA17 (923) CONSTRUCTION UNCLASSIFIED 2020 $400 $0 $100 $500

TOTAL COST: $400 $0 $100 $500

Route SR-147 Project Description ROUNDABOUT AT THE INTERSECTION OF SR-147 (NORTH COLLEGE STREET) AND CR-72 (FARMVILLE ROAD)

Project Length in Miles 0.206  Urban Area AUBURN-OPELIKA   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068029 PE 2018 / 100068031 RW 2019 / 100068032 UT 2020 / 100068030 CN 2020

100068032 HSIP 0147 (503) UTILITIES SAFETY IMPROVEMENTS 2020 $259 $29 $0 $288100068030 HSIP 0147 (503) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $2,661 $296 $0 $2,957

TOTAL COST: $2,920 $324 $0 $3,244

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

110 of 206

HIGHWAY PROJECTS - LEESTIP PLAN: 2020 - Original

Page 111: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-147R Project Description FEASIBILITY STUDY RELOCATE SR-147 BY CONSTRUCTING A NEW ROAD FROM I-85ATCR-26 (BEEHIVE RD) TO SR-38 (US-280)ATMP-101.37, AND WIDENING PREVIOUS ROADWAY

Project Length in Miles 13.000  Urban Area AUBURN-OPELIKA   Sponsor AUBURN COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100043913 STPOA 0147 (910) SPECIAL UNCLASSIFIED 2020 $230 $0 $58 $288

TOTAL COST: $230 $0 $58 $288

Route SR-38 Project Description MODIFYING VERTICAL CURVE, ADDING ACCELERATION LANES, AND IMPROVING MEDIAN ON SR-38 (US-280) AT SR-147

Project Length in Miles 3.000  Urban Area AUBURN-OPELIKA   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070665 UT 2021 / 100070666 CN 2021

100070664 HSIP 0038 (546) PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2020 $167 $19 $0 $185100070665 HSIP 0038 (546) UTILITIES SAFETY IMPROVEMENTS 2021 $91 $10 $0 $101100070666 HSIP 0038 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $1,265 $141 $0 $1,406

TOTAL COST: $1,523 $169 $0 $1,692

Route SR-51 Project Description BRIDGE REPLACEMENT ON SR-51 OVER WATULA CREEK BIN 002012

Project Length in Miles 0.200  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100012530 CN 2026

100066232 BR 0051 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2023 $42 $11 $0 $53TOTAL COST: $42 $11 $0 $53

Route SR-51 Project Description BRIDGE REPLACEMENT ON SR-51 OVER CHEWACLA CREEK (BIN #004213)

Project Length in Miles 0.069  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069446 PE 2019

100070387 BR 0051 (516) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $92 $23 $0 $115100070377 BR 0051 (516) UTILITIES BRIDGE REPLACEMENT 2021 $73 $18 $0 $92100069445 BR 0051 (516) CONSTRUCTION BRIDGE REPLACEMENT 2021 $3,672 $918 $0 $4,590

TOTAL COST: $3,838 $959 $0 $4,797

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

111 of 206

HIGHWAY PROJECTS - LEESTIP PLAN: 2020 - Original

Page 112: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-109 Project Description INTERSECTION MODIFICATION ON CR-109 (EAST LIMESTONE ROAD) AND CR-36 (CAPSHAW ROAD) TO INSTALL ROUNDABOUT

Project Length in Miles 0.000  Urban Area HUNTSVILLE  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065202 PE 2016 / 100065281 RW 2020 / 100065282 UT 2021 / 100065283 CN 2021

100065281 HSIP 4216 (250) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2020 $300 $0 $0 $300100065282 HSIP 4216 (250) UTILITIES INTERSECTION IMPROVEMENTS 2021 $63 $0 $0 $63100065283 HSIP 4216 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $788 $0 $0 $788

TOTAL COST: $1,151 $0 $0 $1,151

Route CR-65 Project Description WIDENING, LEVELING, AND RESURFACING ON CR-65(EASTER FERRY ROAD) FROM 0.03 MILES NORTH OF SULPHUR CREEK BRIDGE FOR 826 FEET

Project Length in Miles 0.250  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069427 PE 2019 / 100069430 CN 2020

100069430 HRRR 4220 (250) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $184 $0 $20 $205TOTAL COST: $184 $0 $20 $205

Route CR-NA Project Description SIDEWALKS ALONG SR-3 FROM SOUTH OF HOBB STREET TO JUNIPER CIRCLE; PRYOR STREET FROM WEST OF SUSSEX DRIVE MOVING EAST TO SR-3 IN THE CITY OF ATHENS

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067253 TAPAA TA17 (911) CONSTRUCTION SIDEWALK 2019 $393 $0 $98 $491

TOTAL COST: $393 $0 $98 $491

Route CR-NA Project Description RESURFACING ON SHAW ROAD FROM .913 MILE NORTH OF NUCLEAR PLANT ROAD TO SR-2 (US-72) - LCP 42-168-17

Project Length in Miles 6.142  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070383 RASTPNU 4218 (250) CONSTRUCTION RESURFACING 2020 $263 $0 $303 $566

TOTAL COST: $263 $0 $303 $566

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

112 of 206

HIGHWAY PROJECTS - LIMESTONESTIP PLAN: 2020 - Original

Page 113: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route I-565 Project Description RESURFACING AND WIDENING ON I-565 FROM 0.545 MILE WEST OF I-65 TO 1.62 MILES EAST OF GREENBRIER ROAD

Project Length in Miles 5.640  Urban Area HUNTSVILLE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066496 PE 2019

100066497 RACRNH-RACRIM I565 (313)

CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 2

2020 $12,433 $2,027 $0 $14,460TOTAL COST: $12,433 $2,027 $0 $14,460

Route I-565 Project Description RESURFACING AND WIDENING ON I-565 FROM 1.62 MILES EAST OF GREENBRIER RD TO 0.25 MILE WEST OF COUNTY LINE ROAD

Project Length in Miles 1.890  Urban Area HUNTSVILLE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068887 PE 2019

100068889 RACRNH-RACRIM I565 (314)

CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 2

2020 $5,331 $932 $0 $6,262TOTAL COST: $5,331 $932 $0 $6,262

Route I-65 Project Description WELCOME CENTER REPLACEMENT ON I-65 NORTH OF ATHENS

Project Length in Miles 0.100  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063652 PE 2018

100045459 IMF I065 (496) CONSTRUCTION REST AREA COMPLETE 2021 $9,181 $1,020 $0 $10,201TOTAL COST: $9,181 $1,020 $0 $10,201

Route I-65 Project Description RESURFACING ON I-65 FROM 0.2 MILE NORTH OF SR-2 (US-72) TO 1 MILE SOUTH OF CSXT OVERPASS INCLUDING BRIDGE RAISING ON BLACK ROAD AND WALES STREET

Project Length in Miles 7.750  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065907 PE 2018 / 100065908 CN 2020

100065908 IM I065 (492) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 2

2020 $10,786 $1,198 $0 $11,984TOTAL COST: $10,786 $1,198 $0 $11,984

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

113 of 206

HIGHWAY PROJECTS - LIMESTONESTIP PLAN: 2020 - Original

Page 114: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-2 Project Description SAFETY IMPROVEMENTS ON SR-2 (US-72) AT CAMBRIDGE LANE

Project Length in Miles 0.800  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100071157 CN 2022

100071156 HSIP 0002 () PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2022 $69 $8 $0 $77100071157 HSIP 0002 () CONSTRUCTION SAFETY IMPROVEMENTS 2022 $689 $77 $0 $765

TOTAL COST: $757 $84 $0 $842

Route SR-2 Project Description INTERSECTION IMPROVEMENTS TO INTERSECTION OF SR-2 (US-72) AND CR-71 (MOORESVILLE RD)

Project Length in Miles 0.500  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100058226 CN 2024

100058225 NH 0002 () PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2023 $70 $18 $0 $88TOTAL COST: $70 $18 $0 $88

Route SR-2 Project Description WIDENING SR-2(US-72) FROM JEFFERSON ST TO JUST EAST OF CSX RAILROAD UNDERPASS IN ATHENS GRADE, DRAIN, BASE, PAVE, SIGNAL, AND RETAINING WALLS

Project Length in Miles 0.119  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100053877 PE 2010 / 100067910 RW 2019

100067911 DEF-NHF A205 (937) UTILITIES ADDITIONAL ROADWAY LANES 2022 $125 $31 $0 $156100055214 DEF-NHF A205 (937) CONSTRUCTION ADDITIONAL ROADWAY LANES 2022 $1,424 $0 $356 $1,780

TOTAL COST: $1,549 $31 $356 $1,936

Route SR-20 Project Description BUILD DISCRETIONARY GRANT (PROJECT SMAART) INTERCHANGE IMPROVEMENTS OVER SR-20/ALT US-72 ALONG BIBB GARRETT ROAD IN LIMESTONE COUNTY

Project Length in Miles 0.835  Urban Area DECATUR   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069665 FAUP NR19 () CONSTRUCTION INTERCHANGE 2020 $14,365 $0 $0 $14,365

TOTAL COST: $14,365 $0 $0 $14,365

Route SR-20 Project Description RESURFACING ON SR-20 (US-72A) FROM .33 MILE WEST OF SR-3 (US-31) TO .54 MILE WEST OF I-65

Project Length in Miles 2.707  Urban Area DECATUR  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068243 NH 0020 (531) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,193 $298 $0 $1,491

TOTAL COST: $1,193 $298 $0 $1,491

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

114 of 206

HIGHWAY PROJECTS - LIMESTONESTIP PLAN: 2020 - Original

Page 115: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-251 Project Description INTERSECTION MODIFICATION ON SR-251 AT CR-83 (LINDSAY LANE) TO INSTALL ROUNDABOUT

Project Length in Miles 0.250  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065146 PE 2016 / 100065229 RW 2018 / 100065230 UT 2019 / 100065231 CN 2021

100065231 HSIPF 0251 (501) CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $2,733 $304 $0 $3,037TOTAL COST: $2,733 $304 $0 $3,037

Route SR-3 Project Description BRIDGE REPLACEMENT BINS 006153 AND 001391 ON SR-3 (US-31) OVER NORFOLK SOUTHERN RAILROAD

Project Length in Miles 0.006  Urban Area DECATUR  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067287 PE 2019

100037845 BR 0003 () CONSTRUCTION BRIDGE REPLACEMENT 2022 $4,995 $1,249 $0 $6,244TOTAL COST: $4,995 $1,249 $0 $6,244

Route SR-304 Project Description WIDENING ON SR-304 (OLD CR-24) FROM SR-3 (US-31) TO THE I-65 (EXIT 347) INTERCHANGE (INCLUDING RAMP MODIFICATIONS AND OVERPASS WIDENING); INCLUDES REPLACING BIN # 006236, 006237, 008955; INCLUDES WIDENING BIN # 010688)

Project Length in Miles 2.800  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069854 PE 2019 / 100071930 UT 2020

100070204 RAED-042-888-035-RW ()

RIGHT OF WAY ADDITIONAL ROADWAY LANES 2020 $0 $4,091 $0 $4,091100070205 RAED-042-888-035-CN () CONSTRUCTION ADDITIONAL ROADWAY LANES 2020 $0 $21,957 $0 $21,957

TOTAL COST: $0 $26,047 $0 $26,047

Route SR-53 Project Description RESURFACE SR-53 FROM JUST NORTH OF CR-122 TO SR-251 IN ARDMORE

Project Length in Miles 5.600  Urban Area HUNTSVILLE  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068234 NH 0053 (586) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,228 $307 $0 $1,535

TOTAL COST: $1,228 $307 $0 $1,535

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

115 of 206

HIGHWAY PROJECTS - LIMESTONESTIP PLAN: 2020 - Original

Page 116: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-37 Project Description RESURFACING AND TRAFFIC STRIPE ON CR-37 FROM SR-97 TO SR-8 (US-80) - LCP 43-06-18

Project Length in Miles 9.919  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068276 RASTPNU 4318 (250) CONSTRUCTION RESURFACING 2020 $529 $0 $1,084 $1,614

TOTAL COST: $529 $0 $1,084 $1,614

Route SR-21 Project Description RESURFACING AND BRIDGE GUARDRAIL RETROFIT ON SR-21 FROM THE WILCOX COUNTY LINE (MP 97.521) TO 0.5 MILES SOUTH OF CR-45 (MP 108.462)

Project Length in Miles 10.941  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069869 STPAA-FMGR 0021 (570) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $2,769 $692 $0 $3,461

TOTAL COST: $2,769 $692 $0 $3,461

Route SR-97 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-97 FROM SR-3 (US-31) TO I-65

Project Length in Miles 4.174  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070532 STPAA-HSIP 0097 (508) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 1 W/ SAFETY WIDEN2020 $1,059 $233 $0 $1,292

TOTAL COST: $1,059 $233 $0 $1,292

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

116 of 206

HIGHWAY PROJECTS - LOWNDESSTIP PLAN: 2020 - Original

Page 117: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description PEDESTRIAN IMPROVEMENTS ALONG BIBB STREET FROM SR-8 (US-80)TO WEST MONTGOMERY ROAD IN THE CITY OF TUSKEGEE.

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065542 TAPAA TA16 (918) CONSTRUCTION SIDEWALK 2020 $314 $0 $78 $392

TOTAL COST: $314 $0 $78 $392

Route CR-NA Project Description NEW SANITARY SEWER LIFT STATION AND FORCE MAIN AT REST AREA, I-85 MACON COUNTY

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069252 PE 2019

100068445 IM I085 () CONSTRUCTION REST AREA REHABILITATION 2022 $139 $15 $0 $155TOTAL COST: $139 $15 $0 $155

Route I-85 Project Description PAVEMENT PRESERVATION ON I-85 FROM THE MACON COUNTY LINE TO SR-138

Project Length in Miles 7.092  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069000 CN 2021

100070852 IM I085 (368) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 1

2020 $45 $5 $0 $50100069000 IM I085 () CONSTRUCTION PREVENTATIVE MAINTENANCE

LEVEL 12021 $1,997 $222 $0 $2,219

TOTAL COST: $2,042 $227 $0 $2,269

Route I-85 Project Description PAVEMENT PRESERVATION ON I-85 FROM 1.15 MILE NORTH OF CR-36 TO THE LEE COUNTY LINE

Project Length in Miles 23.000  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069002 CN 2021

100071492 IM I085 (372) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 1

2020 $135 $15 $0 $150100069002 IM I085 () CONSTRUCTION PREVENTATIVE MAINTENANCE

LEVEL 12021 $6,454 $717 $0 $7,171

TOTAL COST: $6,589 $732 $0 $7,321

Route NA Project Description MAIN STREET PEDESTRIAN IMPROVEMENTS BETWEEN THE NEW LOVES TRAVEL STOP AND THE POST OFFICE IN THE TOWN OF SHORTER.

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065547 TAPNU TA16 (924) CONSTRUCTION STREETSCAPE 2020 $133 $0 $33 $166

TOTAL COST: $133 $0 $33 $166

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

117 of 206

HIGHWAY PROJECTS - MACONSTIP PLAN: 2020 - Original

Page 118: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-14 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-14 FROM THE TALLAPOOSA COUNTY LINE TO THE LEE COUNTY LINE

Project Length in Miles 9.306  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067908 STPAA-HSIP 0014 (546) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2020 $2,195 $498 $0 $2,694

TOTAL COST: $2,195 $498 $0 $2,694

Route SR-49 Project Description RESURFACING ON SR-49 FROM I-85 TO THE TALLAPOOSA COUNTY LINE

Project Length in Miles 4.060  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067906 STPAA 0049 (511) FEDERAL MAINT CN PAVEMENT MINOR

REHABILITATION2020 $2,350 $588 $0 $2,938

TOTAL COST: $2,350 $588 $0 $2,938

Route SR-81 Project Description BRIDGE REPLACEMENT ON SR-81 OVER UPHAPEE CREEK BIN # 2853

Project Length in Miles 0.480  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061663 PE 2019

100070391 BR 0081 () RIGHT OF WAY BRIDGE REPLACEMENT 2021 $41 $10 $0 $51100070379 BR 0081 () UTILITIES BRIDGE REPLACEMENT 2022 $124 $31 $0 $155100061664 BR 0081 () CONSTRUCTION BRIDGE REPLACEMENT 2023 $6,631 $1,658 $0 $8,288

TOTAL COST: $6,795 $1,699 $0 $8,494

Route SR-81 Project Description BRIDGE REPLACEMENT (BIN 001489) ON SR-81 OVER CSXT RAILROAD

Project Length in Miles 0.270  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068672 PE 2019

100070390 BR 0081 () RIGHT OF WAY BRIDGE REPLACEMENT 2021 $41 $10 $0 $51100070378 BR 0081 () UTILITIES BRIDGE REPLACEMENT 2022 $124 $31 $0 $155100068673 BR 0081 () CONSTRUCTION BRIDGE REPLACEMENT 2023 $5,557 $1,389 $0 $6,946

TOTAL COST: $5,721 $1,430 $0 $7,152

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

118 of 206

HIGHWAY PROJECTS - MACONSTIP PLAN: 2020 - Original

Page 119: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-11 Project Description DOT # 736-007H - RR CROSSING IMPROVEMENTS ON CR-11 (MARTIN ROAD) AND JAMES RECORD ROAD AT HUNTSVILLE MADISON COUNTY AIRPORT AUTHORITY (HMCAA)

Project Length in Miles 0.000  Urban Area HUNTSVILLE  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066585 RHCH RR17 (910) CONSTRUCTION RR XING SIGNAL-SIGN-PAVE

MARK2023 $270 $30 $0 $300

TOTAL COST: $270 $30 $0 $300

Route CR-17 Project Description 2 FT SAFETY WIDENING AND RESURFACING OF CR-17(BALCH ROAD)FROM .53 MILE SOUTH OF CR-21(BROWNS FERRY ROAD)TO NORTH OF CR-27(GOOCH LANE)IN THE CITY OF MADISON

Project Length in Miles 2.450  Urban Area HUNTSVILLE  Sponsor CITY OF MADISON COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066571 PE 2018

100046745 DE-STPAA-STPHV AL81 (940)

CONSTRUCTION WIDENING AND RESURFACING (RDWY)

2022 $1,486 $0 $195 $1,681TOTAL COST: $1,486 $0 $195 $1,681

Route CR-19 Project Description ADDITIONAL LANES ON JEFF ROAD (CR-19) FROM DOUGLASS ROAD TO SR-53

Project Length in Miles 6.400  Urban Area HUNTSVILLE  Sponsor MADISON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100062257 UT 2024 / 100062258 CN 2025

100062241 STPHV 4514 () PRELIMINARY ENGINEERING ADDITIONAL ROADWAY LANES 2020 $800 $0 $200 $1,000100062256 STPHV 4514 () RIGHT OF WAY ADDITIONAL ROADWAY LANES 2022 $1,800 $0 $450 $2,250

TOTAL COST: $2,600 $0 $650 $3,250

Route CR-19 Project Description ADDITIONAL LANES ON CR-19 (JEFF ROAD) FROM 0.8 MILES SOUTH OF CR-28 (CAPSHAW ROAD) TO NORTH OF DOUGLASS ROAD

Project Length in Miles 2.800  Urban Area HUNTSVILLE  Sponsor MADISON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100061458 ACAA61458 ATRP (015) CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2021 $9,045 $0 $4,455 $13,500

TOTAL COST: $9,045 $0 $4,455 $13,500

Route CR-93 Project Description ADDITIONAL LANES ON CR-93 (WINCHESTER ROAD) FROM CR-983 (DOMINION CIRCLE) TO CR-406 (NAUGHER ROAD)

Project Length in Miles 2.300  Urban Area HUNTSVILLE  Sponsor CITY OF HUNTSVILLE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100061222 ACAA61222 ATRP (010) CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $10,385 $0 $5,115 $15,500

TOTAL COST: $10,385 $0 $5,115 $15,500

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

119 of 206

HIGHWAY PROJECTS - MADISONSTIP PLAN: 2020 - Original

Page 120: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description HUNTSVILLE NORTHERN BYPASS FROM 1500 FEET EAST OF SR-1 (US-231/431) INTERSECTION TO WINCHESTER ROAD

Project Length in Miles 18.180  Urban Area HUNTSVILLE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100062238 CN 2024

100062235 STPHV 4514 () PRELIMINARY ENGINEERING GRADE, DRAIN, BASE AND PAVE 2020 $120 $0 $30 $150100062236 STPHV 4514 () RIGHT OF WAY GRADE, DRAIN, BASE AND PAVE 2021 $1,520 $0 $380 $1,900100062237 STPHV 4514 () UTILITIES GRADE, DRAIN, BASE AND PAVE 2022 $1,506 $0 $376 $1,882

TOTAL COST: $3,146 $0 $786 $3,932

Route CR-NA Project Description ADDITIONAL LANES ON SLAUGHTER ROAD FROM OLD MADISON PIKE TO SR-20

Project Length in Miles 4.760  Urban Area HUNTSVILLE  Sponsor CITY OF HUNTSVILLE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100062240 STPHV 4514 () PRELIMINARY ENGINEERING ADDITIONAL ROADWAY LANES 2020 $572 $0 $143 $715100062253 STPHV 4514 () RIGHT OF WAY ADDITIONAL ROADWAY LANES 2021 $844 $0 $211 $1,055100062254 STPHV 4514 () UTILITIES ADDITIONAL ROADWAY LANES 2021 $1,144 $0 $286 $1,430100062255 STPHV 4514 () CONSTRUCTION ADDITIONAL ROADWAY LANES 2023 $8,800 $0 $2,200 $11,000

TOTAL COST: $11,360 $0 $2,840 $14,200

Route CR-NA Project Description CORRIDOR STUDY FOR WIDENING OF WALL-TRIANA HIGHWAY FROM SR-2 (US-72) TO 500' NORTH OF NICK DAVIS ROAD

Project Length in Miles 3.880  Urban Area HUNTSVILLE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066076 STPHV 4516 () SPECIAL CORRIDOR STUDY 2020 $250 $0 $63 $313

TOTAL COST: $250 $0 $63 $313

Route CR-NA Project Description SIDEWALK ALONG BRADFORD FARMS DRIVE FROM HUGHES ROAD TRAVELING EAST AND TURNING ON TO GREEN SPRINGS LANE AND ENDING IN THE CUL DE SAC

Project Length in Miles 0.000  Urban Area HUNTSVILLE  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068777 TAPHV TA18 (934) CONSTRUCTION SIDEWALK 2020 $224 $0 $56 $280

TOTAL COST: $224 $0 $56 $280

Route CR-NA Project Description SIDEWALK ALONG HAYDEN STREET STARTING AT MAIN DRIVE TRAVELING SOUTH, AND ON WASHINGTON AVENUE FROM HAYDEN STREET TO CITY HALL, AND ON OAK GROVE ROAD FROM MAIN DRIVE SOUTH TO JOHNSON AVENUE, AND ON JOHNSON AVENUE EAST TO MAIN DRIVE

Project Length in Miles 0.000  Urban Area HUNTSVILLE  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069009 TAPAA TA19 (904) CONSTRUCTION SIDEWALK 2020 $639 $0 $160 $798

TOTAL COST: $639 $0 $160 $798

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

120 of 206

HIGHWAY PROJECTS - MADISONSTIP PLAN: 2020 - Original

Page 121: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description REDSTONE ARSENAL EAST CONNECTOR FROM I-565 TO REDSTONE ARSENAL GATE 10 (PATTON ROAD GATE)

Project Length in Miles 0.000  Urban Area HUNTSVILLE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070587 CN 2024

100070584 RP 4519 (251) PRELIMINARY ENGINEERING GRADE, DRAIN, BASE, PAVE AND BRG

2020 $2,259 $0 $565 $2,823100070585 RP 4519 (251) RIGHT OF WAY GRADE, DRAIN, BASE, PAVE AND

BRG2021 $800 $0 $200 $1,000

100070586 STPHV 4519 (251) UTILITIES GRADE, DRAIN, BASE, PAVE AND BRG

2022 $1,600 $0 $400 $2,000TOTAL COST: $4,659 $0 $1,165 $5,823

Route CR-NA Project Description PEDESTRIAN BRIDGE IN THE OWENS CROSSROADS AREA ALONG OLD BIG COVE ROAD BETWEEN HIGHLAND PARK DRIVE AND RIVER PARK BOULEVARD

Project Length in Miles 0.250  Urban Area HUNTSVILLE  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070591 TAPHV TA19 (932) CONSTRUCTION PEDESTRIAN OVERPASS 2020 $207 $0 $52 $259

TOTAL COST: $207 $0 $52 $259

Route CR-NA Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT (BIN 001861) ON PULASKI PIKE OVER LIMESTONE CREEK

Project Length in Miles 0.000  Urban Area HUNTSVILLE  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071470 HRRR 4520 () CONSTRUCTION GUARDRAIL 2020 $69 $0 $8 $76

TOTAL COST: $69 $0 $8 $76

Route CR-NA Project Description BRIDGE AND APPRO CHURCH STREET BRIDGE OVER BIG SPRING AT BIG SPRING PARK

Project Length in Miles 0.000  Urban Area HUNTSVILLE  Sponsor CITY OF HUNTSVILLE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100051832 PE 2009 / 100051833 RW 2019

100051834 DEF A179 (922) UTILITIES BRIDGES AND APPROACHES 2023 $277 $0 $0 $277100051835 DEF-STPHVF A179 (922) CONSTRUCTION BRIDGES AND APPROACHES 2023 $4,072 $0 $718 $4,790

TOTAL COST: $4,349 $0 $718 $5,067

Route CR-NA Project Description HUNTSVILLE NORTHERN BYPASS FROM 1.2 MILES EAST OF CR-86 (PULASKI PIKE) TO 1500 FT EAST OF SR-1 (US-231/431) INTERSECTION

Project Length in Miles 8.400  Urban Area HUNTSVILLE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100054997 PE 2010

100061850 ST-045-000-015-UT () UTILITIES GRADE, DRAIN, BASE, PAVE AND BRG

2020 $0 $0 $3,820 $3,820100061851 ST-045-000-015-CN () CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND

BRG2020 $0 $0 $23,688 $23,688

TOTAL COST: $0 $0 $27,508 $27,508

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

121 of 206

HIGHWAY PROJECTS - MADISONSTIP PLAN: 2020 - Original

Page 122: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description ADDITIONAL LANES ON CR-11 (MARTIN RD) FROM WALL-TRIANA HIGHWAY TO OLD JIM WILLIAMS RD

Project Length in Miles 0.975  Urban Area HUNTSVILLE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100055286 STPAA 4520 () CONSTRUCTION ADDITIONAL ROADWAY LANES 2023 $9,326 $2,332 $0 $11,658

TOTAL COST: $9,326 $2,332 $0 $11,658

Route CR-NA Project Description CONSTRUCT CONNECTOR ROAD FROM MAYSVILLE ROAD TO EPWORTH DRIVE.

Project Length in Miles 0.000  Urban Area HUNTSVILLE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059903 FAUP 8523 () CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2021 $4,416 $552 $552 $5,520

TOTAL COST: $4,416 $552 $552 $5,520

Route CR-NA Project Description PLACEMENT OF WEARING SURFACE AND STRIPING OF TOWN MADISON BOULEVARD FROM THE CITY OF HUNTSVILLE / MADISON BOUNDARY TO ZIERDT ROAD

Project Length in Miles 2.200  Urban Area HUNTSVILLE  Sponsor CITY OF MADISON COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100061239 ACAA61239 ATRP (010) CONSTRUCTION RESURFACING 2020 $402 $11 $89 $503

TOTAL COST: $402 $11 $89 $503

Route CR-NA Project Description INTERSECTION MODIFICATIONS ON BALCH ROAD AT GILLESPIE ROAD TO INSTALL A ROUNDABOUT

Project Length in Miles 0.000  Urban Area HUNTSVILLE  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066681 PE 2018 / 100066682 CN 2021

100066682 HSIP 4517 (250) CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $468 $0 $52 $520TOTAL COST: $468 $0 $52 $520

Route CR-NA Project Description WHEELER NATIONAL WILDLIFE REFUGE REHABILITATE ROCKHOUSE ROAD (ROUTE 15)

Project Length in Miles 0.000  Urban Area HUNTSVILLE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069070 PE 2018 / 100067953 CN 2019

100067956 FLAP FLAP () CONSTRUCTION PAVEMENT REHABILITATION 2020 $960 $0 $240 $1,200TOTAL COST: $960 $0 $240 $1,200

Route CR-NA Project Description SAFETY IMPROVEMENTS (SHOULDER WIDENING, LEFT TURN LANE, PAVING SCORING, SIGNING AND STRIPING) ALONG WALL TRIANA HIGHWAY FROM THE MADISON CITY LIMITS TO THE HUNTSVILLE CITY LIMITS AT MCCRARY ROAD

Project Length in Miles 0.560  Urban Area HUNTSVILLE  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067811 HRRR 4516 (253) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $374 $0 $42 $415

TOTAL COST: $374 $0 $42 $415

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

122 of 206

HIGHWAY PROJECTS - MADISONSTIP PLAN: 2020 - Original

Page 123: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description WIDENING, RESURFACING, AND RESTRIPING WALL TRIANA HIGHWAY; WIDENING AND RESURFACING GRAPHICS DRIVE; WIDENING AND REALIGNING I-565 EASTBOUND OFF RAMP AT WALL TRIANA HIGHWAY

Project Length in Miles 0.414  Urban Area HUNTSVILLE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070767 PE 2020

100071084 ATRP2-45-2020-327-RW ()

RIGHT OF WAY WIDENING AND RESURFACING (RDWY)

2021 $0 $42 $0 $42100071083 ATRP2-45-2020-327-CN

()CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2021 $0 $1,608 $0 $1,608

TOTAL COST: $0 $1,649 $0 $1,649

Route I-565 Project Description RESURFACING AND TRAFFIC STRIPING ON I-565 FROM THE LIMESTONE COUNTY LINE (MP 7.025) TO INDIAN CREEK (MP 12.553)

Project Length in Miles 11.056  Urban Area HUNTSVILLE  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068982 CN 2021

100068980 IM I565 (315) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 2

2020 $273 $30 $0 $303100068982 IM I565 () CONSTRUCTION PREVENTATIVE MAINTENANCE

LEVEL 22021 $5,968 $663 $0 $6,631

TOTAL COST: $6,240 $693 $0 $6,934

Route I-565 Project Description RESURFACING AND TRAFFIC STRIPING ON I-565 FROM INDIAN CREEK (MP 12.553) TO .26 MILE EAST OF THE TRIANA BOULEVARD OVERPASS (MP 18.332)

Project Length in Miles 11.558  Urban Area HUNTSVILLE  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069195 CN 2021

100069738 IM I565 (316) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 2

2020 $540 $60 $0 $600100069195 IM I565 () CONSTRUCTION PREVENTATIVE MAINTENANCE

LEVEL 22021 $9,640 $1,071 $0 $10,711

TOTAL COST: $10,180 $1,131 $0 $11,311

Route I-565 Project Description RESURFACING AND TRAFFIC STRIPING ON I-565 FROM .26 MILE EAST OF THE TRIANA BOULEVARD OVERPASS (MP 18.332) TO .45 MILE EAST OF THE SR-2 (US-72) OVERPASS (MP 22.305)

Project Length in Miles 7.946  Urban Area HUNTSVILLE  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068983 CN 2021

100069737 IM I565 (317) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 2

2020 $342 $38 $0 $380100068983 IM I565 () CONSTRUCTION PREVENTATIVE MAINTENANCE

LEVEL 22021 $3,489 $388 $0 $3,876

TOTAL COST: $3,831 $426 $0 $4,256

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

123 of 206

HIGHWAY PROJECTS - MADISONSTIP PLAN: 2020 - Amendment # 49

Page 124: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description DRY CREEK GREENWAY FROM INDIAN CREEK GREENWAY/GATES MILL ROAD TO THE INTERSECTION OF ARCH STREET AND BILTMORE DRIVE IN NORTHWEST HUNTSVILLE

Project Length in Miles 0.000  Urban Area HUNTSVILLE  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067267 TAPHV TA17 (946) CONSTRUCTION UNCLASSIFIED 2020 $400 $0 $100 $500

TOTAL COST: $400 $0 $100 $500

Route NA Project Description A - GREENWAY STARTING AT JOHNSON ROAD SW AND RUNNING NORTH ALONG PINHOOK CREEK AND TURNING WEST ALONG MERRIMAC BRANCH WITH A PEDESTRIAN BRIDGE AT THE MIDPOINT OF THE WATERS EDGE

Project Length in Miles 0.000  Urban Area HUNTSVILLE  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068799 TAPHV TA18 (933) CONSTRUCTION SIDEWALK 2020 $411 $0 $103 $514

TOTAL COST: $411 $0 $103 $514

Route NA Project Description CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES 1, 2 AND 53 IN MADISON COUNTY

Project Length in Miles 0.000  Urban Area HUNTSVILLE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060144 PE 2014

100060145 STPAA NR13 (945) CONSTRUCTION SIDEWALK 2021 $398 $99 $0 $497TOTAL COST: $398 $99 $0 $497

Route SR-1 Project Description SR-1 (MEMORIAL PARKWAY) FROM 0.31 MI S OF CR-75 (MASTIN LAKE RD) TO CR-65 (WINCHESTER RD) INCLUDING AN OVERPASS AT CR-75 AND ACCESS IMPROVEMENTS TO CR-65

Project Length in Miles 1.887  Urban Area HUNTSVILLE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100041420 NHF 0001 (610) UTILITIES GRADE, DRAIN, BASE, PAVE AND

BRG2020 $683 $171 $0 $853

100004926 NHF 0001 () CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND BRG

2022 $34,084 $8,521 $0 $42,606100070087 NH 0001 (611) CONSTRUCTION CLEARING AND GRUBBING 2020 $425 $106 $0 $531

TOTAL COST: $35,192 $8,798 $0 $43,990

Route SR-2 Project Description ADDITIONAL LANES SR-2 (US-72) FROM COUNTY LINE ROAD TO PROVIDENCE MAIN ROAD IN THE CITY OF HUNTSVILLE

Project Length in Miles 5.440  Urban Area HUNTSVILLE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061841 PE 2014 / 100061846 UT 2024 / 100061847 CN 2024

100061845 NHF 0002 (566) RIGHT OF WAY ADDITIONAL ROADWAY LANES 2021 $6,244 $1,561 $0 $7,805TOTAL COST: $6,244 $1,561 $0 $7,805

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

124 of 206

HIGHWAY PROJECTS - MADISONSTIP PLAN: 2020 - Original

Page 125: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-53 Project Description ACCESS MANAGEMENT AND INTERSECTION IMPROVEMENTS ON SR-53 (US-231) FROM VETERANS DRIVE TO .2 MILE SOUTH OF WEATHERLY ROAD

Project Length in Miles 7.590  Urban Area HUNTSVILLE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061837 PE 2014

100061839 NH 0053 (571) RIGHT OF WAY UNCLASSIFIED 2021 $327 $82 $0 $408100061838 NH 0053 (571) UTILITIES UNCLASSIFIED 2022 $1,271 $318 $0 $1,588100061840 NH 0053 () CONSTRUCTION UNCLASSIFIED 2022 $7,356 $1,839 $0 $9,195

TOTAL COST: $8,953 $2,238 $0 $11,191

Route SR-53 Project Description RESURFACING ON SR-53 FROM SR-1(US-431/231 - MEMORIAL PKWY) TO 14TH STREET

Project Length in Miles 1.540  Urban Area HUNTSVILLE  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068421 NH 0053 (588) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $1,061 $265 $0 $1,326

TOTAL COST: $1,061 $265 $0 $1,326

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

125 of 206

HIGHWAY PROJECTS - MADISONSTIP PLAN: 2020 - Original

Page 126: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-38 Project Description BRIDGE REPLACEMENT (BIN # 7404) AND APPROACHES ON CR-38 OVER ELAM BRANCH

Project Length in Miles 0.000  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060438 BRZ 4614 (252) CONSTRUCTION BRIDGES AND APPROACHES 2021 $295 $0 $74 $369

TOTAL COST: $295 $0 $74 $369

Route CR-44 Project Description BRIDGE REPLACEMENT ON CR-44 OVER DRY CREEK BIN # 13020

Project Length in Miles 0.000  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060439 RABRZ 4614 (251) CONSTRUCTION BRIDGE REPLACEMENT 2020 $327 $56 $400 $783

TOTAL COST: $327 $56 $400 $783

Route SR-28 Project Description RESURFACING ON SR-28 FROM 0.4 MILE WEST OF AIRPORT ROAD TO 0.1 MILE WEST OF SR-66

Project Length in Miles 10.700  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068501 STPAA 0028 (514) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $2,231 $558 $0 $2,788

TOTAL COST: $2,231 $558 $0 $2,788

Route SR-69 Project Description RESURFACING ON SR-69 FROM SR-114 TO SR-13 (US-43)

Project Length in Miles 8.870  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070062 STPAA 0069 (561) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $2,093 $523 $0 $2,616

TOTAL COST: $2,093 $523 $0 $2,616

Route SR-69 Project Description RESURFACING ON SR-69 FROM SR-13 (US-43) TO SR-8 (US-80)

Project Length in Miles 13.637  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070071 STPAA 0069 (562) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $2,712 $678 $0 $3,390

TOTAL COST: $2,712 $678 $0 $3,390

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

126 of 206

HIGHWAY PROJECTS - MARENGOSTIP PLAN: 2020 - Original

Page 127: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-8 Project Description REPL BRIDGE AND RELIEF SR-8 (US-80) BIN 003018 AND BIN # 003017 OVER COTTONWOOD CREEK, EAST OF FAUNSDALE

Project Length in Miles 1.206  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100043728 PE 2007 / 100043729 RW 2018

100043730 BRF 0008 (542) UTILITIES BRIDGE REPLACEMENT 2020 $92 $23 $0 $116100043731 BRF 0008 (542) CONSTRUCTION BRIDGE REPLACEMENT 2021 $7,437 $1,859 $0 $9,296

TOTAL COST: $7,529 $1,882 $0 $9,411

Route SR-8 Project Description RESTRICTED CROSSING U-TURN INTERSECTION ON SR-8 (US-80) AND SR-25

Project Length in Miles 0.610  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069548 PE 2019 / 100069774 CN 2020

100069774 HSIP 0008 (594) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $2,020 $224 $0 $2,244TOTAL COST: $2,020 $224 $0 $2,244

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

127 of 206

HIGHWAY PROJECTS - MARENGOSTIP PLAN: 2020 - Original

Page 128: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 015452) ON CR-56 OVER HURRICANE CREEK; SITE 2 - (BIN 006076) ON CR-47 OVER EAST BRANCH; SITE 3 - (BIN 012641) ON CR-85 OVER FLATT CREEK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069577 HRRR 4719 (252) CONSTRUCTION GUARDRAIL 2020 $88 $0 $10 $98

TOTAL COST: $88 $0 $10 $98

Route CR-NA Project Description RESURFACING, WIDENING AND DRAINAGE IMPROVEMENTS ON WEBB STREET FROM MAIN STREET TO BROOKSIDE ROAD IN THE TOWN OF BRILLIANT

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069100 PE 2019 / 100067744 CN 2020

100069102 APL 4719 (251) CONSTRUCTION RESURFACING 2019 $100 $0 $0 $100TOTAL COST: $100 $0 $0 $100

Route I-22 Project Description RESURFACING ON I-22 FROM MP 0.00 AT THE MISSISSIPPI STATE LINE TO MP 6.00 JUST WEST OF REESE ROAD OVERPASS

Project Length in Miles 6.000  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068042 PE 2018 / 100068043 CN 2020

100068043 IM I022 (310) CONSTRUCTION PAVEMENT MINOR REHABILITATION

2020 $12,712 $1,412 $0 $14,125TOTAL COST: $12,712 $1,412 $0 $14,125

Route I-22 Project Description RESURFACING ON I-22 FROM MP 6.00 JUST WEST OF REESE ROAD OVERPASS TO MP 16.8 AT EXIT 16

Project Length in Miles 10.800  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068044 PE 2018 / 100068045 CN 2021

100068045 IM I022 (309) CONSTRUCTION PAVEMENT MINOR REHABILITATION

2021 $23,111 $2,568 $0 $25,679TOTAL COST: $23,111 $2,568 $0 $25,679

Route I-22 Project Description RESURFACING ON I-22 FROM THE SR-233 OVERPASS (MP 34.46) TO THE WALKER COUNTY LINE (MP 38.47)

Project Length in Miles 3.970  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069095 PE 2019 / 100069096 CN 2020

100069096 IM I022 (312) CONSTRUCTION PAVEMENT MINOR REHABILITATION

2020 $7,798 $866 $0 $8,665TOTAL COST: $7,798 $866 $0 $8,665

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

128 of 206

HIGHWAY PROJECTS - MARIONSTIP PLAN: 2020 - Original

Page 129: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description CURB AND RAMP INSTALLATION ON SR-253, SR-17, SR-74, SR-142, SR-118, SR-171, SR-13, AND SR-195

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061281 PE 2014

100070427 STPAA NR13 (931) RIGHT OF WAY SIDEWALK 2020 $21 $5 $0 $26100061282 STPAA NR13 (931) CONSTRUCTION SIDEWALK 2021 $276 $69 $0 $345

TOTAL COST: $298 $74 $0 $372

Route SR-171 Project Description BRIDGE REPLACEMENT ON SR-171 (US-43) OVER BEAVER CREEK (BIN 4677)

Project Length in Miles 0.780  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069594 CN 2026

100069592 BR 0171 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2023 $208 $52 $0 $260TOTAL COST: $208 $52 $0 $260

Route SR-241 Project Description RESURFACING, 2FT SAFETY WIDENING, AND CENTER AND EDGELINE SCORING ON SR-241 FROM CR-143 (MP 6.500) TO BEAR CREEK (MP 11.086)

Project Length in Miles 4.586  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068628 STPAA-HSIP 0241 (502) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2021 $2,016 $455 $0 $2,471

TOTAL COST: $2,016 $455 $0 $2,471

Route SR-241 Project Description RESURFACING, CENTERLINE AND SHOULDER SCORING, AND 2 FT SAFETY WIDENING ON SR-241 FROM SR-172 AT MP 11.548 TO THE FRANKLIN COUNTY LINE AT MP 13.503

Project Length in Miles 1.955  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070144 STPAA-HSIP 0241 (503) FEDERAL MAINT CN PREVENTATIVE MAINT MINOR

REHAB W/ SAFETY WIDENING2020 $1,070 $233 $0 $1,302

TOTAL COST: $1,070 $233 $0 $1,302

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

129 of 206

HIGHWAY PROJECTS - MARIONSTIP PLAN: 2020 - Original

Page 130: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description CONSTRUCTION OF SIDEWALKS ALONG MAIN STREET FROM NORTH MARSHALL UTILITIES TO 11TH STREET WEST; ALSO ADA RAMPS AND IMPROVEMENTS FROM 11TH STREET WEST TO WYLE AYERS ROAD

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068356 TAPNU TA18 (907) CONSTRUCTION SIDEWALK 2019 $395 $0 $99 $494

TOTAL COST: $395 $0 $99 $494

Route CR-NA Project Description MULTI-USE TRAIL ALONG SR-1 (US-431) FROM LURLEEN B WALLACE DRIVE FOR 0.45 MILE - PHASE II

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069012 TAPAA TA19 (907) CONSTRUCTION SIDEWALK 2019 $1,039 $0 $260 $1,299

TOTAL COST: $1,039 $0 $260 $1,299

Route CR-NA Project Description RESURFACE MARTLING GAP ROAD FROM GILLILAND ROAD TO MARTLING ROAD

Project Length in Miles 3.000  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068345 STPOA 4818 (251) CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2020 $338 $0 $84 $422

TOTAL COST: $338 $0 $84 $422

Route NA Project Description L/N TRAIN DEPOT RESTORATION IN THE CITY OF ALBERTVILLE

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067167 TAPNU TA17 (917) CONSTRUCTION UNCLASSIFIED 2019 $318 $0 $80 $398

TOTAL COST: $318 $0 $80 $398

Route SR-1 Project Description INSTALLATION OF TRAFFIC SIGNAL AND ACCELERATION LANE EXTENSION AT SR-1 (US-431) AND SR-79

Project Length in Miles 1.065  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070877 CN 2021 / 100070878 CN 2021

100070876 HSIP 0001 () PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $108 $12 $0 $120100070877 HSIP 0001 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $1,169 $130 $0 $1,299100070878 HSIP 0001 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $91 $10 $0 $101

TOTAL COST: $1,368 $152 $0 $1,520

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

130 of 206

HIGHWAY PROJECTS - MARSHALLSTIP PLAN: 2020 - Original

Page 131: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-168 Project Description REPLACE BRIDGE, BIN 003362, SR-168 OVER SHORT CREEK 3 MILES EAST SR-1 (US-431) (SUFF=48.1, STATUS=FO)

Project Length in Miles 0.500  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049731 PE 2010 / 100049732 RW 2019

100049733 BR 0168 (501) UTILITIES BRIDGE REPLACEMENT 2020 $40 $10 $0 $50100049734 BR 0168 (501) CONSTRUCTION BRIDGE REPLACEMENT 2021 $2,779 $695 $0 $3,474

TOTAL COST: $2,819 $705 $0 $3,524

Route SR-205 Project Description RESURFACING ON SR-205 FROM GUINEVERE DRIVE TO SR-75

Project Length in Miles 2.310  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068415 STPAA 0205 (510) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $1,061 $265 $0 $1,326

TOTAL COST: $1,061 $265 $0 $1,326

Route SR-68 Project Description RESURFACING ON SR-68 FROM SR-75 TO JUANITA DRIVE

Project Length in Miles 9.020  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070097 STPAA 0068 (508) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $2,309 $577 $0 $2,886

TOTAL COST: $2,309 $577 $0 $2,886

Route SR-69 Project Description RESURFACING ON SR-69 FROM SR-53 (US-231) TO MAIN STREET

Project Length in Miles 0.950  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067154 STPAA 0069 (564) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $449 $112 $0 $561

TOTAL COST: $449 $112 $0 $561

Route SR-75 Project Description RESURFACING ON SR-75 FROM STRICKLAND STREET TO SR-1 (US-431)

Project Length in Miles 2.040  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068414 STPAA 0075 (537) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $1,858 $465 $0 $2,323

TOTAL COST: $1,858 $465 $0 $2,323

Route SR-75R Project Description RELOCATION OF SR-75 AROUND THE ALBERTVILLE AIRPORT EXPANSION (HORTON ROAD) FROM CR-152 SOUTH (ONEONTA CUT-OFF ROAD) TO CR-325 NORTH (TURNPIKE ROAD).

Project Length in Miles 1.990  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100059032 PE 2013 / 100060127 PE 2049 / 100059033 UT 2044 / 100059060 CN 2045

100060124 STPAA 0075 (529) RIGHT OF WAY GRADE, DRAIN, BASE AND PAVE 2023 $2,252 $563 $0 $2,815TOTAL COST: $2,252 $563 $0 $2,815

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

131 of 206

HIGHWAY PROJECTS - MARSHALLSTIP PLAN: 2020 - Original

Page 132: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-25 Project Description NEW ALIGNMENT OF CR-25 (MCFARLAND ROAD) FROM CR-28 (OLD PASCAGOULA ROAD) TO CR-358 (THREE NOTCH ROAD)

Project Length in Miles 12.000  Urban Area MOBILE  Sponsor MOBILE COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100059788 PE 2018

100059789 STPMB 4918 (250) RIGHT OF WAY GRADE, DRAIN, BASE AND PAVE 2021 $4,800 $0 $1,200 $6,000100059790 STPMB 4918 (250) UTILITIES GRADE, DRAIN, BASE AND PAVE 2022 $1,920 $0 $480 $2,400100059791 STPMB 4918 () CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2023 $10,480 $0 $2,620 $13,100

TOTAL COST: $17,200 $0 $4,300 $21,500

Route CR-32 Project Description THREE NOTCH ROAD (CR-32) ADDITIONAL LANES FROM SCHILLINGER ROAD TO MCDONALD ROAD.

Project Length in Miles 1.000  Urban Area MOBILE  Sponsor MOBILE COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100052461 PE 2019 / 100052463 UT 2024 / 100052464 CN 2024

100052462 STPMB 4919 (250) RIGHT OF WAY ADDITIONAL ROADWAY LANES 2021 $732 $0 $183 $915TOTAL COST: $732 $0 $183 $915

Route CR-33 Project Description WIDENING, RESURFACING AND STRIPING ON DAWES ROAD (CR-33) FROM SCOTT DAIRY LOOP ROAD SOUTH TO DIBERVILLE DRIVE WEST

Project Length in Miles 1.336  Urban Area MOBILE  Sponsor MOBILE COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068763 RASTPAA 4915 (251) CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2020 $667 $167 $0 $833

TOTAL COST: $667 $167 $0 $833

Route CR-39 Project Description MCDONALD ROAD (CR-39) ADDITIONAL LANES FROM NORTH OF I-10 TO OLD PASCAGOULA ROAD.

Project Length in Miles 1.000  Urban Area MOBILE  Sponsor MOBILE COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100052447 PE 2010 / 100052448 RW 2018

100052449 STPMB 7612 (600) UTILITIES GRADE, DRAIN, BASE AND PAVE 2021 $560 $0 $140 $700100052450 STPMB 7612 (600) CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2022 $3,840 $0 $960 $4,800

TOTAL COST: $4,400 $0 $1,100 $5,500

Route CR-41 Project Description ADDITIONAL LANES ON CR-41 (CELESTE ROAD) FROM FOREST AVENUE TO JUST WEST OF I-65

Project Length in Miles 3.200  Urban Area MOBILE  Sponsor MOBILE COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069498 PE 2019 / 100069501 CN 2025

100069499 STPMB 4919 (251) RIGHT OF WAY ADDITIONAL ROADWAY LANES 2020 $1,600 $0 $400 $2,000100069500 STPMB 4919 (251) UTILITIES ADDITIONAL ROADWAY LANES 2022 $800 $0 $200 $1,000

TOTAL COST: $2,400 $0 $600 $3,000

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

132 of 206

HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original

Page 133: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-56 Project Description ADDITIONAL LANES WITH REALIGNMENT ON CR-56 FROM 0.28 MILE WEST OF ELIZA JORDAN ROAD TO SNOW ROAD

Project Length in Miles 4.380  Urban Area MOBILE  Sponsor MOBILE COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068532 PE 2019

100068533 STPMB 4918 () RIGHT OF WAY ADDITIONAL ROADWAY LANES 2021 $1,200 $0 $300 $1,500100068534 STPMB 4918 () UTILITIES UNCLASSIFIED 2022 $800 $0 $200 $1,000100068535 STPMB 4918 () CONSTRUCTION UNCLASSIFIED 2023 $7,920 $0 $1,980 $9,900

TOTAL COST: $9,920 $0 $2,480 $12,400

Route CR-656 Project Description ZEIGLER BLVD ADDITIONAL LANES FROM ATHEY RD TO FOREST HILL DR

Project Length in Miles 3.410  Urban Area MOBILE  Sponsor CITY OF MOBILE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100037214 PE 2004 / 100045453 RW 2014

100037215 DBMB-STPMB 7550 (600)

CONSTRUCTION ADDITIONAL ROADWAY LANES 2020 $16,650 $0 $4,163 $20,813TOTAL COST: $16,650 $0 $4,163 $20,813

Route CR-656 Project Description ADDITIONAL LANES ON CR-656 (ZEIGLER BLVD) FROM CR-70 (TANNER WILLIAMS RD) TO CR-31 (SCHILLINGER RD)

Project Length in Miles 4.200  Urban Area MOBILE  Sponsor MOBILE COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100055880 PE 2012

100055881 STPMB 7550 (602) RIGHT OF WAY GRADE, DRAIN, BASE AND PAVE 2020 $1,504 $0 $376 $1,880100055882 STPMB 7550 (602) UTILITIES GRADE, DRAIN, BASE AND PAVE 2021 $905 $0 $226 $1,131100055883 STPMB 7550 (602) CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2022 $4,080 $0 $1,020 $5,101

TOTAL COST: $6,489 $0 $1,622 $8,112

Route CR-NA Project Description SIDEWALKS ON DAUPHIN ISLAND PARKWAY BETWEEN THE I-10 INTERCHANGE AND OLD MILITARY ROAD IN MOBILE

Project Length in Miles 0.000  Urban Area MOBILE  Sponsor CITY OF MOBILE  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067315 TAPAA TA17 (938) CONSTRUCTION SIDEWALK 2020 $139 $0 $35 $173

TOTAL COST: $139 $0 $35 $173

Route CR-NA Project Description ADD SIDEWALK ALONG OLD SHELL ROAD FROM MYRTLEWOOD LANE TO WEST I-65 SERVICE ROAD NORTH IN MOBILE

Project Length in Miles 0.000  Urban Area MOBILE  Sponsor CITY OF MOBILE  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067418 TAPMB TA18 (900) CONSTRUCTION SIDEWALK 2020 $161 $0 $40 $201

TOTAL COST: $161 $0 $40 $201

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

133 of 206

HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original

Page 134: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description ADD SIDEWALKS ALONG WHISTLER STREET FROM NORTH SHELTON BEACH ROAD TO NORTH PRICE AVENUE IN PRICHARD

Project Length in Miles 0.000  Urban Area MOBILE  Sponsor CITY OF PRICHARD  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067420 TAPMB TA18 (902) CONSTRUCTION SIDEWALK 2020 $162 $0 $41 $203

TOTAL COST: $162 $0 $41 $203

Route CR-NA Project Description RAILROAD CROSSING IMPROVEMENTS, MARKINGS, LIGHTS, BELLS, LEGENDS, GATES, SIGNS AND SIGNALS ON FERRY AVENUE AT NORFOLK SOUTHERN RAILROAD DOT# 727825T AND ALABAMA AND GULF COAST RAILWAY DOT# 665312V IN SARALAND

Project Length in Miles 0.000  Urban Area MOBILE  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067738 RHCH RR18 (902) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $502 $0 $56 $558

TOTAL COST: $502 $0 $56 $558

Route CR-NA Project Description SIDEWALKS ALONG THE SOUTH SIDE OF AIRPORT BOULEVARD BETWEEN HILLCREST ROAD AND REGENTS WAY IN MOBILE

Project Length in Miles 0.000  Urban Area MOBILE  Sponsor CITY OF MOBILE  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067749 TAPMB TA18 (903) CONSTRUCTION SIDEWALK 2020 $160 $0 $40 $200

TOTAL COST: $160 $0 $40 $200

Route CR-NA Project Description SIDEWALKS ALONG THE NORTH SIDE OF OLD SHELL ROAD FROM THE WEST SIDE OF PARKWAY DRIVE TO UNIVERSITY BOULEVARD IN MOBILE

Project Length in Miles 0.000  Urban Area MOBILE  Sponsor CITY OF MOBILE  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067750 TAPMB TA17 (950) CONSTRUCTION SIDEWALK 2020 $192 $0 $48 $240

TOTAL COST: $192 $0 $48 $240

Route CR-NA Project Description VARIOUS ADA UPGRADES AT AND AROUND THE PRICHARD CITY HALL

Project Length in Miles 0.000  Urban Area MOBILE  Sponsor CITY OF PRICHARD  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068379 TAPAA TA18 (922) CONSTRUCTION SIDEWALK 2020 $149 $0 $37 $186

TOTAL COST: $149 $0 $37 $186

Route CR-NA Project Description SIDEWALK ALONG OLD MILITARY ROAD FROM SR-13 (US-43) TO MUNICIPAL STREET

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068395 TAPNU TA18 (929) CONSTRUCTION SIDEWALK 2020 $308 $0 $77 $385

TOTAL COST: $308 $0 $77 $385

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

134 of 206

HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original

Page 135: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description SIDEWALKS AND IMPROVEMENTS ALONG EAST STATE STREET AND EAST LEBARON AVENUE FROM NORTH 3RD STREET AND NORTH MAIN STREET

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069029 TAPNU TA19 (923) CONSTRUCTION SIDEWALK 2020 $640 $0 $160 $800

TOTAL COST: $640 $0 $160 $800

Route CR-NA Project Description SIDEWALK ALONG OLD HIGHWAY 43 FROM CRENSHAW PARK TO BRADLEY ROAD

Project Length in Miles 0.000  Urban Area MOBILE  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069031 TAPAA TA19 (925) CONSTRUCTION SIDEWALK 2020 $303 $0 $76 $379

TOTAL COST: $303 $0 $76 $379

Route CR-NA Project Description SIDEWALKS ALONG EASTERLING STREET FROM W CLARK AVENUE TO GARRISON AVENUE, ON GARRISON AVENUE FROM EASTERLING STREET TO MAGEE STREET, AND ON MAGEE STREET FROM GARRISON AVENUE TO W CLARK AVENUE

Project Length in Miles 0.000  Urban Area MOBILE  Sponsor CITY OF PRICHARD  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069054 TAPMB TA19 (928) CONSTRUCTION SIDEWALK 2020 $200 $0 $50 $250

TOTAL COST: $200 $0 $50 $250

Route CR-NA Project Description ROUNDABOUT INSTALLATION AT CANAL STREET AND BROAD STREET

Project Length in Miles 0.000  Urban Area MOBILE  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069797 CN 2020

100069746 HSIP 4919 (252) PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2019 $36 $0 $4 $40100069797 HSIP 4919 (252) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $1,382 $0 $154 $1,535

TOTAL COST: $1,418 $0 $158 $1,575

Route CR-NA Project Description RAILROAD CROSSING IMPROVEMENTS, GATES AND SIGNALS ON BAYOU AVENUE EAST IN SATSUMA AT NORFOLK SOUTHERN RAILROAD, JUST EAST OF SR-13 (US-43), AAR/DOT NO. 727820J

Project Length in Miles 0.000  Urban Area MOBILE  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070116 RHCH RR19 (909) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $297 $0 $33 $330

TOTAL COST: $297 $0 $33 $330

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

135 of 206

HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original

Page 136: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description DAUPHIN STREET ADDITIONAL LANES FROM SAGE AVENUE TO WEST OF I-65 AT SPRINGHILL MEMORIAL HOSPITAL.

Project Length in Miles 3.300  Urban Area MOBILE  Sponsor CITY OF MOBILE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100052457 PE 2012

100052458 STPMB 7533 () RIGHT OF WAY GRADE, DRAIN, BASE, PAVE AND BRG

2021 $216 $0 $54 $270100052459 STPMB 7533 () UTILITIES GRADE, DRAIN, BASE, PAVE AND

BRG2021 $225 $0 $56 $281

100052460 STPMB 7533 () CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND BRG

2021 $5,656 $0 $1,414 $7,070TOTAL COST: $6,097 $0 $1,524 $7,621

Route CR-NA Project Description MCGREGOR AVENUE WIDENING FROM AIRPORT BOULEVARD TO DAUPHIN STREET AND INSTALLATION OF A ROUNDABOUT AT DAUPHIN STREET

Project Length in Miles 0.980  Urban Area MOBILE  Sponsor CITY OF MOBILE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100052468 PE 2012 / 100052600 RW 2018

100052601 STPMBF 7508 (600) UTILITIES GRADE, DRAIN, BASE AND PAVE 2021 $1,200 $0 $300 $1,500100052602 STPMBF 7508 (600) CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2021 $2,706 $0 $676 $3,382

TOTAL COST: $3,906 $0 $976 $4,882

Route CR-NA Project Description INTERSECTION IMPROVEMENTS - CONGESTION MANAGEMENT PROCESS - DAUPHIN STREET FROM SAGE AVENUE TO SPRINGHILL HOSPITAL

Project Length in Miles 0.000  Urban Area MOBILE  Sponsor CITY OF MOBILE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066705 STPMB 4918 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $500 $0 $125 $625

TOTAL COST: $500 $0 $125 $625

Route CR-NA Project Description INTERSECTION IMPROVEMENTS - CONGESTION MANAGEMENT PROCESS - AIRPORT BLVD FROM UNIVERSITY BLVD TO HILLCREST ROAD

Project Length in Miles 0.000  Urban Area MOBILE  Sponsor CITY OF MOBILE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066707 STPMB 4918 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $500 $0 $125 $625

TOTAL COST: $500 $0 $125 $625

Route I-065 Project Description RESURFACING ON I-65 FROM 0.56 MILE NORTH OF SR-158 TO 2.39 MILE NORTH OF SR-13(US-43)

Project Length in Miles 15.940  Urban Area MOBILE  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069061 CN 2021

100069090 IM I065 (512) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 1

2020 $222 $25 $0 $247100069061 IM I065 () CONSTRUCTION PREVENTATIVE MAINTENANCE

LEVEL 12021 $2,243 $249 $0 $2,493

TOTAL COST: $2,466 $274 $0 $2,740

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

136 of 206

HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original

Page 137: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route I-10 Project Description RESURFACING ON I-10 FROM 1.36 MILES EAST OF SR-193 TO THE WALLACE TUNNEL

Project Length in Miles 17.158  Urban Area MOBILE  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069062 CN 2021

100069091 IM I010 (349) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 1

2020 $491 $55 $0 $546100069062 IM I010 () CONSTRUCTION PREVENTATIVE MAINTENANCE

LEVEL 12021 $6,518 $724 $0 $7,243

TOTAL COST: $7,010 $779 $0 $7,789

Route I-10 Project Description RESURFACE I-10 THROUGH WALLACE TUNNEL

Project Length in Miles 1.437  Urban Area MOBILE  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070821 CN 2021

100071432 IM I010 (348) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 2

2020 $68 $8 $0 $75100070821 IM I010 () CONSTRUCTION PREVENTATIVE MAINTENANCE

LEVEL 22021 $682 $76 $0 $758

TOTAL COST: $749 $83 $0 $833

Route I-10 Project Description ADDITIONAL LANES ON I-10 FROM CR-39 TO CR-59 (CAROL PLANTATION RD)

Project Length in Miles 8.920  Urban Area MOBILE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100071997 CN 2021

100064147 NH I010 (346) PRELIMINARY ENGINEERING ADDITIONAL ROADWAY LANES 2020 $252 $63 $0 $315100033461 RACRNH I010 () CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $10,238 $2,560 $0 $12,798

TOTAL COST: $10,491 $2,623 $0 $13,113

Route I-10 Project Description RESURFACING ON I-10 FROM .28 MILE WEST OF CAROL PLANTATION ROAD TO 1.36 MILES EAST OF SR-193

Project Length in Miles 6.913  Urban Area MOBILE  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069088 PE 2020 / 100069060 CN 2020

100069060 IM I010 (345) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1

2020 $3,914 $435 $0 $4,349100069088 IM I010 (345) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE

LEVEL 12020 $138 $15 $0 $154

TOTAL COST: $4,052 $450 $0 $4,502

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

137 of 206

HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original

Page 138: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route I-65 Project Description BRIDGE PAINTING ON BRIDGES ALONG I-65. ON I-65 OVER AL GULF COAST RR (10195,10196) ON I-65/I-65 NB OFF RAMP OVER US-43 (10197,10198,10199) ON I-65 OVER 1-65 NB OFF RAMP/NORFOLK SO. RR (10200,10201) ON I-65 OVER GUNNISON CRK (10202,10203)

Project Length in Miles 1.568  Urban Area MOBILE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069460 BR I065 (515) PRELIMINARY ENGINEERING BRIDGE PAINTING 2022 $82 $21 $0 $103100069478 BR I065 (515) CONSTRUCTION BRIDGE PAINTING 2023 $2,313 $578 $0 $2,891

TOTAL COST: $2,396 $599 $0 $2,994

Route I-65 Project Description RESURFACING ON I-65 FROM I-10 TO MAIN STREET

Project Length in Miles 8.976  Urban Area MOBILE  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069167 PE 2019 / 100069170 CN 2020

100069170 IM I065 (508) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1

2020 $6,084 $676 $0 $6,760TOTAL COST: $6,084 $676 $0 $6,760

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

138 of 206

HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original

Page 139: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description OLD SHELL ROAD SIDEWALK IMPROVEMENTS IN THE CITY OF MOBILE

Project Length in Miles 0.000  Urban Area MOBILE  Sponsor CITY OF MOBILE  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065881 TAPMB TA16 (947) CONSTRUCTION SIDEWALK 2020 $192 $0 $48 $240

TOTAL COST: $192 $0 $48 $240

Route NA Project Description SIDEWALKS ON OLD SHELL ROAD BETWEEN DURANT STREET AND UNION AVENUE IN MOBILE

Project Length in Miles 0.000  Urban Area MOBILE  Sponsor CITY OF MOBILE  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067397 TAPMB TA17 (947) CONSTRUCTION SIDEWALK 2020 $200 $0 $50 $251

TOTAL COST: $200 $0 $50 $251

Route NA Project Description TRAIL LOCATED ON THE NORTH SIDE OF THREE MILE CREEK FROM THE UNIVERSITY OF SOUTH ALABAMA MEDICAL CENTER TOWARDS STRICKLAND YOUTH CENTER

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068380 TAPAA TA18 (923) CONSTRUCTION SIDEWALK 2020 $555 $0 $139 $694

TOTAL COST: $555 $0 $139 $694

Route NA Project Description ADA COMPLIANT CURB RAMPS WITHIN KINGS BRANCH ESTATES NORTH OF SR-42 (US-98) AND WEST OF JARRETT ROAD, ALSO IN WOODBRIDGE PLACE AND CUMBERLAND SUBDIVISIONS SOUTH OF COTTAGE HILL ROAD AND EAST OF SCHILLINGER ROAD S

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069055 TAPMB TA19 (929) CONSTRUCTION SIDEWALK 2019 $200 $0 $50 $250

TOTAL COST: $200 $0 $50 $250

Route NA Project Description CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES 13, 16, 17, 42, 163, I-10 SERVICE ROAD AND I-65 SERVICE ROAD IN MOBILE

Project Length in Miles 0.000  Urban Area MOBILE  Sponsor MOBILE COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060121 PE 2013

100060122 STPAA NR13 (910) CONSTRUCTION SIDEWALK 2022 $667 $167 $0 $833TOTAL COST: $667 $167 $0 $833

Route SR-13 Project Description BRIDGE REPLACEMENT (BIN 005712 AND BIN 005856) ON SR-13 (US-43) OVER COLD CREEK

Project Length in Miles 0.200  Urban Area MOBILE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068526 BR 0013 (614) PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2020 $404 $101 $0 $505100068528 BR 0013 () CONSTRUCTION BRIDGE REPLACEMENT 2023 $4,162 $1,041 $0 $5,203

TOTAL COST: $4,566 $1,142 $0 $5,708

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

139 of 206

HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original

Page 140: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-158 Project Description ADDITIONAL LANES ON SR-158 FROM MP 7.75 TO SPARTAN DRIVE

Project Length in Miles 0.485  Urban Area MOBILE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070795 PE 2020 / 100071652 RW 2020

100071115 ATRP2-49-2020-442-CN ()

CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $0 $1,825 $0 $1,825TOTAL COST: $0 $1,825 $0 $1,825

Route SR-158X Project Description SR-158 EXTENSION LOTT ROAD OVERPASS AND JUG HANDLE. GRADE, DRAIN, BASE, PAVE AND BRIDGE (EB SEABURY CREEK TRIBUTARY AND PARTIAL LOTT ROAD)

Project Length in Miles 3.863  Urban Area MOBILE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100043116 PE 2003 / 100042207 RW 2006 / 100067136 UT 2018 / 100060152 CN 2018 / 100060155 CN 2024 / 100060482 CN 2024 / 100060483 CN 2026 / 100060484 CN 2026

100068084 NHF 0158 (505) UTILITIES GRADE, DRAIN, BASE, PAVE AND BRG

2020 $305 $76 $0 $381100060154 NHF 0158 (505) CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND

BRG2020 $15,542 $3,885 $0 $19,427

TOTAL COST: $15,847 $3,962 $0 $19,808

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

140 of 206

HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original

Page 141: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-16 Project Description STUDY - CORRIDOR STUDY ON US 90 IN MOBILE NEAR INTERSTATE10

Project Length in Miles 4.500  Urban Area MOBILE  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071607 HSIP 0016 () HIGHWAY PLANNING CORRIDOR STUDY 2020 $52 $6 $0 $57

TOTAL COST: $52 $6 $0 $57

Route SR-16 Project Description BRIDGE REPLACEMENT (BIN 003691) ON SR-16 (US-90) OVER HALLS MILL CREEK

Project Length in Miles 1.400  Urban Area MOBILE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068522 CN 2024

100068521 BR 0016 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2021 $734 $184 $0 $918100068523 BR 0016 () UTILITIES BRIDGE REPLACEMENT 2022 $21 $5 $0 $26

TOTAL COST: $755 $189 $0 $944

Route SR-16 Project Description REPLACE BRIDGE, BIN 008714, SR-16 (US-90) WESTBOUND OVER TENSAW-SPANISH RIVER. (SUFF=49.7, STATUS=SD)

Project Length in Miles 1.306  Urban Area MOBILE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064691 PE 2017

100056130 BRF 0016 (522) UTILITIES BRIDGE REPLACEMENT 2020 $451 $113 $0 $564100049566 BRF 0016 (522) CONSTRUCTION BRIDGE REPLACEMENT 2020 $28,133 $7,033 $0 $35,166

TOTAL COST: $28,584 $7,146 $0 $35,729

Route SR-16 Project Description INTERSECTION IMPROVEMENTS - CONGESTION MANAGEMENT PROCESS - SR-16 (US-90) FROM BROAD STREET TO BANKHEAD TUNNEL

Project Length in Miles 1.460  Urban Area MOBILE  Sponsor CITY OF MOBILE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066702 PE 2019

100066703 STPMB 0016 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $590 $782 $0 $1,373TOTAL COST: $590 $782 $0 $1,373

Route SR-163 Project Description BRIDGE REPLACEMENT ON SR-163 OVER PERCH CREEK BIN 011865 FROM MP 3.931 TO MP 3.983

Project Length in Miles 0.052  Urban Area MOBILE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067045 PE 2019

100067047 BR 0163 (505) CONSTRUCTION BRIDGE REPLACEMENT 2020 $4,733 $1,183 $0 $5,917TOTAL COST: $4,733 $1,183 $0 $5,917

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

141 of 206

HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original

Page 142: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-17 Project Description BRIDGE REPL SR-17(US-45) (STR#17-49-35.7) OVER BENNETTS CK BIN 003218

Project Length in Miles 0.060  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063583 PE 2018

100002812 BR 0017 (574) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $9 $2 $0 $11100043179 BR 0017 (574) UTILITIES BRIDGE REPLACEMENT 2021 $117 $29 $0 $146100002811 BR 0017 (574) CONSTRUCTION BRIDGE REPLACEMENT 2021 $2,548 $637 $0 $3,185

TOTAL COST: $2,673 $668 $0 $3,342

Route SR-188 Project Description RESURFACING ON SR-188 FROM LAKELAND DRIVE TO THE IRVINGTON BAYOU LA BATRE HIGHWAY

Project Length in Miles 3.980  Urban Area MOBILE  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067957 STPAA 0188 (505) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $950 $237 $0 $1,187

TOTAL COST: $950 $237 $0 $1,187

Route SR-188 Project Description RESURFACING ON SR-188 FROM FRANKLIN ROAD TO LAKELAND DRIVE

Project Length in Miles 4.240  Urban Area MOBILE  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070541 STPAA 0188 (504) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $717 $179 $0 $897

TOTAL COST: $717 $179 $0 $897

Route SR-188 Project Description INTERSECTION IMPROVEMENTS, INCLUDING ADDING ROUNDABOUT AT SR-188 AND IRVINGTON BAYOU LA BATRE HIGHWAY

Project Length in Miles 0.188  Urban Area MOBILE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070772 PE 2020

100071087 ATRP2-49-2020-049-RW ()

RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $0 $86 $0 $86100071086 ATRP2-049-2020-049-CN

()CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $0 $1,028 $0 $1,028

TOTAL COST: $0 $1,114 $0 $1,114

Route SR-193 Project Description RESURFACING ON SR-193 FROM SR-163 TO HIGGINS ROAD

Project Length in Miles 3.278  Urban Area MOBILE  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068297 NH 0193 (506) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,747 $437 $0 $2,184

TOTAL COST: $1,747 $437 $0 $2,184

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

142 of 206

HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original

Page 143: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-213 Project Description RESURFACING ON SR-213 (SHELTON BEACH ROAD) FROM SR-158 TO SR-13(US-43)

Project Length in Miles 2.490  Urban Area MOBILE  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067959 STPAA 0213 (504) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22019 $664 $166 $0 $830

TOTAL COST: $664 $166 $0 $830

Route SR-217 Project Description REPLACE BRIDGE, BIN 004471, SR-217 OVER BIG CREEK. (SUFF=50.6, STATUS=FO)

Project Length in Miles 0.222  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049583 PE 2010 / 100058253 RW 2014

100049586 BR 0217 (501) UTILITIES BRIDGE REPLACEMENT 2022 $29 $7 $0 $37100049584 BR 0217 () CONSTRUCTION BRIDGE REPLACEMENT 2022 $884 $221 $0 $1,105

TOTAL COST: $913 $228 $0 $1,142

Route SR-42 Project Description US-98 EASTBOUND LANES FROM MISSISSIPPI LINE TO 0.5 MILE EAST OF GLENWOOD ROAD. BASE AND PAVE

Project Length in Miles 4.870  Urban Area MOBILE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100052808 PE 2011 / 100060485 CN 2025

100040584 NH 0042 (509) CONSTRUCTION BASE AND PAVE 2021 $14,560 $3,640 $0 $18,200TOTAL COST: $14,560 $3,640 $0 $18,200

Route SR-42 Project Description INSTALLATION OF NEW GENERATOR TO REPLACE EXISTING GENERATOR FOR BANKHEAD TUNNEL AND ITS DEVICES

Project Length in Miles 0.840  Urban Area MOBILE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069483 LB 2019

100069442 NH 0042 (538) CONSTRUCTION INFORMATION TECHNOLOGY SYSTEMS

2020 $950 $237 $0 $1,187TOTAL COST: $950 $237 $0 $1,187

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

143 of 206

HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original

Page 144: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-42R Project Description EXTEND WESTBOUND BRIDGE ON SR-42 (US-98) OVER BIG CREEK BIN # 018684

Project Length in Miles 0.010  Urban Area MOBILE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100004326 PE 2000 / 100052808 PE 2011 / 100052809 PE 2009 / 100040580 RW 2003 / 100040569 UT 2006 / 100040581 CN 2006 / 100066805 CN 2017

100060481 NHF 0042 () CONSTRUCTION BRIDGE 2023 $4,765 $1,191 $0 $5,956TOTAL COST: $4,765 $1,191 $0 $5,956

Route SR-42R Project Description CONSTRUCT BRIDGE ON GLENWOOD ROAD OVER SR-42 (US-98) GRADE, DRAIN, BASE AND PAVE, BRIDGE AND RETAINING WALLS

Project Length in Miles 0.010  Urban Area MOBILE  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066916 RW 2018

100052812 NHF 0042 (517) CONSTRUCTION BRIDGE 2022 $7,695 $1,924 $0 $9,618TOTAL COST: $7,695 $1,924 $0 $9,618

Route SR-42R Project Description CONSTRUCT BRIDGE ON (CR-63) WILMER-GEORGETOWN ROAD OVER SR-42 (US-98) WITH JUGHANDLE INTERCHANGE ONTO SR-42 (US-98)

Project Length in Miles 0.020  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068081 PE 2018 / 100066917 RW 2018

100071693 NHF 0042 (535) UTILITIES BRIDGE 2021 $129 $32 $0 $162100060480 NHF 0042 (535) CONSTRUCTION BRIDGE 2021 $8,928 $2,232 $0 $11,160

TOTAL COST: $9,057 $2,264 $0 $11,321

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

144 of 206

HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Amendment # 7

Page 145: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-39 Project Description PLANING AND RESURFACING ON CR-39 FROM SR-12 (US-84) TO THE ALABAMA RIVER CELLULOSE, LLC ENTRANCE (GATE 4) - MCP 50-10-18

Project Length in Miles 0.000  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068336 RASTPNU 5018 (251) CONSTRUCTION RESURFACING 2020 $1,011 $0 $400 $1,411

TOTAL COST: $1,011 $0 $400 $1,411

Route CR-NA Project Description SIDEWALKS ALONG SYCAMORE CIRCLE; 2ND STREET; FRISCO CITY STREET FROM DOLLAR GENERAL TO GRIFFIN STREET; KELLY AVENUE FROM E BUFFINGTON STREET TO MIXON STREET; S MAIN STREET FROM HARRISON STREET TO S MANNING STREET; HARRISON STREET AND S MANNING STREET

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068392 TAPNU TA18 (927) CONSTRUCTION SIDEWALK 2019 $323 $0 $81 $404

TOTAL COST: $323 $0 $81 $404

Route CR-NA Project Description SIDEWALKS ALONG SR-265 FROM RAILROAD STREET TO ROBBINS STREET, ALONG SR-21 FROM 0.07 MILE WEST OF GRANT BOULEVARD TO 6TH AVENUE AND ALONG 6TH AVENUE ENDING AT J F SHIELDS HIGH SCHOOL

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068393 TAPNU TA18 (928) CONSTRUCTION STREETSCAPE 2020 $229 $0 $57 $286

TOTAL COST: $229 $0 $57 $286

Route SR-12 Project Description BRIDGE RAIL RETROFIT (BIN 011202) AND GUARDRAIL ON SR-12 (US-84) FROM CLARKE COUNTY LINE TO 0.367 MILE EAST OF CR-1

Project Length in Miles 2.700  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100052611 NH 0012 (535) CONSTRUCTION BRIDGE REHABILITATION 2021 $452 $113 $0 $565

TOTAL COST: $452 $113 $0 $565

Route SR-21 Project Description RESURFACING ON SR-21 FROM HOOKS ROAD TO RUMBLEY ROAD

Project Length in Miles 2.463  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069682 STPAA 0021 (569) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $771 $193 $0 $963

TOTAL COST: $771 $193 $0 $963

Route SR-47 Project Description RESURFACING ON SR-47 FROM SR-12 (US-84) TO SR-41

Project Length in Miles 5.214  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069686 STPAA 0047 (506) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $978 $245 $0 $1,223

TOTAL COST: $978 $245 $0 $1,223

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

145 of 206

HIGHWAY PROJECTS - MONROESTIP PLAN: 2020 - Original

Page 146: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-234 Project Description RESURFACING AND WIDENING RYAN ROAD (CR-234) FROM VAUGHN ROAD TO CHANTILLY PARKWAY

Project Length in Miles 2.460  Urban Area MONTGOMERY  Sponsor MONTGOMERY COUNTY COMMISSION COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064673 STPMN 5115 () PRELIMINARY ENGINEERING WIDENING AND RESURFACING

(RDWY)2020 $286 $0 $71 $357

100064674 STPMN 5115 () RIGHT OF WAY WIDENING AND RESURFACING (RDWY)

2021 $170 $0 $42 $212100064675 STPMN 5115 () CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2023 $2,400 $0 $600 $3,000

TOTAL COST: $2,855 $0 $714 $3,569

Route CR-236 Project Description RESURFACE, CURB AND GUTTER, INLET CONVERSION, TRAFFIC STRIPING AND SIDEWALKS ON FEDERAL DRIVE FROM ATLANTA HIGHWAY TO CSX RAILROAD CROSSING.

Project Length in Miles 2.130  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100059721 PE 2016

100059831 STPMN 5116 () CONSTRUCTION RESURFACING 2021 $2,400 $0 $600 $3,000TOTAL COST: $2,400 $0 $600 $3,000

Route CR-28 Project Description RESURFACING ON CR-28 (MERIWETHER TRAIL) FROM SR-94 TO THE PIKE COUNTY LINE - MCP 51-04-18

Project Length in Miles 7.047  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068888 STPNU 5118 (256) CONSTRUCTION RESURFACING 2020 $908 $103 $223 $1,233

TOTAL COST: $908 $103 $223 $1,233

Route CR-33 Project Description BRIDGE REPLACEMENT ON CR-33 (NARROW LANE ROAD) AT HANNON SLOUGH (BIN # 003250 AND # 003249)

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100055806 PE 2011 / 100055807 CN 2024

100060092 STPMN 7702 (601) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $60 $0 $15 $75100060091 STPMN 7702 (601) UTILITIES BRIDGE REPLACEMENT 2023 $160 $0 $40 $200

TOTAL COST: $220 $0 $55 $275

Route CR-39 Project Description BRIDGE REPLACEMENT ON CR-39 (WOODLEY ROAD)ATWHITES SLOUGH AND TRIBUTARY (BIN # 003047 AND 003048)

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100055808 PE 2011

100060096 STPMN 7701 (602) RIGHT OF WAY BRIDGE REPLACEMENT 2021 $93 $0 $23 $116100060095 STPMN 7701 (602) UTILITIES BRIDGE REPLACEMENT 2021 $160 $0 $40 $200100055809 STPMN 7701 (602) CONSTRUCTION BRIDGE REPLACEMENT 2023 $2,340 $0 $585 $2,925

TOTAL COST: $2,592 $0 $648 $3,240

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

146 of 206

HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Original

Page 147: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-42 Project Description RESURFACE AND TRAFFIC STRIPE HYUNDAI BOULEVARD (CR-42) FROM SR-3 (US-31) TO SR-9 (US-331) TO INCLUDE AN AT-GRADE RAILROAD CROSSING WITH CSX TRANSPORTATION

Project Length in Miles 2.700  Urban Area MONTGOMERY  Sponsor MONTGOMERY COUNTY COMMISSION COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064378 STPMN 5118 (251) CONSTRUCTION RESURFACING 2020 $740 $185 $0 $925

TOTAL COST: $740 $185 $0 $925

Route CR-54 Project Description WIDENING, RESURFACING, AND TRAFFIC SIGNAL IMPROVEMENTS ON CR-54 (HUNTER LOOP ROAD) FROM OLD SELMA ROAD TO SR-3(US-31)

Project Length in Miles 3.700  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067638 PE 2019

100067639 STPMN 5118 (255) CONSTRUCTION WIDENING AND RESURFACING (RDWY)

2021 $2,800 $0 $700 $3,500TOTAL COST: $2,800 $0 $700 $3,500

Route CR-626 Project Description FEASIBILITY STUDY FOR SIDEWALKS/MULTI-USE PATH ON (CR-626) VAUGHN ROAD FROM TAYLOR ROAD TO CHANTILLY PARKWAY

Project Length in Miles 4.400  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100062338 STPMN 5115 () SPECIAL SIDEWALK 2021 $240 $0 $60 $300

TOTAL COST: $240 $0 $60 $300

Route CR-70 Project Description RESURFACING ON CR-70 (PAULK ROAD) FROM CR-70 (HILLABEE ROAD) TO CR-39 (MT ZION ROAD) - MCP 51-01-19

Project Length in Miles 2.000  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070372 STPMN 5119 (251) CONSTRUCTION RESURFACING 2020 $286 $12 $59 $358

TOTAL COST: $286 $12 $59 $358

Route CR-NA Project Description RESURFACE, OPERATIONAL IMPROVEMENTS, HANDICAP RAMPS AND SIDEWALKS ON FEDERAL DRIVE FROM SOUTH OF THE RR TO ATLANTA HWY.

Project Length in Miles 4.200  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063731 STPMN 5115 () PRELIMINARY ENGINEERING RESURFACING 2020 $342 $0 $86 $428100063732 STPMN 5115 () CONSTRUCTION RESURFACING 2021 $3,939 $0 $985 $4,923

TOTAL COST: $4,281 $0 $1,070 $5,351

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

147 of 206

HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Original

Page 148: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description LIGHTING IMPROVEMENTS ON MONROE STREET FROM S DECATUR STREET TO N UNION STREET, AND ON WASHINGTON AVENUE FROM S BAINBRIDGE STREET TO S UNION STREET - PHASE II

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069024 TAPAA TA19 (918) CONSTRUCTION LIGHTING 2019 $445 $0 $111 $556

TOTAL COST: $445 $0 $111 $556

Route CR-NA Project Description PIKE ROAD NATURE TRAIL: MERIWEATHER ROAD

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor TOWN OF PIKE ROAD  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069433 TAPMN TA18 (938) CONSTRUCTION UNCLASSIFIED 2020 $200 $0 $50 $250

TOTAL COST: $200 $0 $50 $250

Route CR-NA Project Description WIDENING AND RESURFACING ON DOZIER ROAD FROM CR-64(WARES FERRY ROAD) TO THE EMERALD MOUNTAIN TOLL BRIDGE

Project Length in Miles 1.700  Urban Area MONTGOMERY  Sponsor MONTGOMERY COUNTY COMMISSION COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070368 STPMN 5119 (252) CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2020 $396 $0 $99 $495

TOTAL COST: $396 $0 $99 $495

Route CR-NA Project Description WIDEN AND RESURFACE PERRY HILL ROAD FROM HARRISON ROAD TO CR-235 (ATLANTA HIGHWAY)

Project Length in Miles 1.710  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100044273 STPMN 7724 () RIGHT OF WAY WIDENING AND RESURFACING

(RDWY)2021 $2,368 $0 $592 $2,960

TOTAL COST: $2,368 $0 $592 $2,960

Route CR-NA Project Description WIDENING AND RESURFACING ON PERRY HILL RD FROM SOUTH OF CARDINAL LN TO NORTH OF ATLANTA HWY AND ALONG ATLANTA HWY FROM W OF PERRY HILL RD TO BELLHURST DR

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067740 STPMN 5115 () PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $444 $0 $111 $555

TOTAL COST: $444 $0 $111 $555

Route CR-NA Project Description WIDEN AND RESURFACE ANN STREET FROM BREWTON ST. AND REALIGN TO FEDERAL DRIVE (PHASE 1)

Project Length in Miles 0.220  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100047399 PE 2006 / 100053060 RW 2014

100053059 STPAA 7733 (601) CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2021 $1,898 $474 $0 $2,372TOTAL COST: $1,898 $474 $0 $2,372

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

148 of 206

HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Original

Page 149: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description WIDEN AND RESURFACE ZELDA ROAD FROM ANN STREET TO CARTER HILL ROAD

Project Length in Miles 1.000  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100040817 STPMN 5116 () CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2023 $1,248 $0 $312 $1,560

TOTAL COST: $1,248 $0 $312 $1,560

Route CR-NA Project Description WIDEN AND RESURFACE ZELDA ROAD FROM ANN STREET TO CARTER HILL ROAD

Project Length in Miles 2.000  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064606 STPMN 5116 (250) RIGHT OF WAY WIDENING AND RESURFACING

(RDWY)2020 $200 $0 $50 $250

100064607 STPMN 5116 (250) UTILITIES WIDENING AND RESURFACING (RDWY)

2023 $40 $0 $10 $50TOTAL COST: $240 $0 $60 $300

Route CR-NA Project Description RESURFACING, CURB AND GUTTER, INLET CONVERSION, STRIPING, SIDEWALKS AND CONVERSION FROM 4 LANE TO 3 LANE WITH PEDESTRIAN FACILITIES ON FAIRVIEW FROM SOUTH COURT STREET TO NARROW LANE ROAD

Project Length in Miles 2.500  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063694 PE 2016

100059726 STPMN 5115 (251) UTILITIES RESURFACING 2020 $80 $0 $20 $100100063695 STPMN 5115 () CONSTRUCTION RESURFACING 2022 $3,200 $0 $800 $4,000

TOTAL COST: $3,280 $0 $820 $4,100

Route CR-NA Project Description INTERSECTION IMPROVEMENTS AT VAUGHN ROAD AND RYAN ROAD

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor MONTGOMERY COUNTY COMMISSION COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067610 PE 2019

100067611 STPMN 5117 (254) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2020 $32 $0 $8 $40100067613 STPMN 5117 (254) UTILITIES INTERSECTION IMPROVEMENTS 2021 $80 $0 $20 $100100067614 STPMN 5117 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2022 $400 $0 $100 $500

TOTAL COST: $512 $0 $128 $640

Route CR-NA Project Description RESURFACING, TRAFFIC SIGNALS AND SIDEWALKS ON WARES FERRY ROAD FROM EASTERN BOULEVARD TO THE WEST SIDE OF THE FOGGY BOTTOM BRIDGE (PHASE II)

Project Length in Miles 9.750  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068971 PE 2019

100068972 STPMN 5118 (254) RIGHT OF WAY RESURFACING 2021 $160 $0 $40 $200100068973 STPMN 5118 (254) UTILITIES RESURFACING 2022 $80 $0 $20 $100100068974 STPMN 5118 () CONSTRUCTION RESURFACING 2023 $2,600 $0 $650 $3,250

TOTAL COST: $2,840 $0 $710 $3,550

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

149 of 206

HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Original

Page 150: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description WIDEN AND RESURFACE ANN STREET FROM HIGHLAND AVENUE TO BREWTON STREET (PHASE2)

Project Length in Miles 0.900  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100053061 STPMN 7733 (602) RIGHT OF WAY WIDENING AND RESURFACING

(RDWY)2021 $983 $0 $246 $1,229

100045392 STPMN 7733 () CONSTRUCTION WIDENING AND RESURFACING (RDWY)

2023 $1,474 $0 $368 $1,842TOTAL COST: $2,457 $0 $614 $3,071

Route I-65 Project Description INSTALL WRONG-WAY ENTRY COUNTERMEASURES, SIGNS AND CONCRETE CURBS AT I-65 AND EDGEMONT AVENUE

Project Length in Miles 0.200  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070138 HSIP I065 (509) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $20 $2 $0 $22

TOTAL COST: $20 $2 $0 $22

Route I-65 Project Description RESURFACE I-65 FROM NORTH OF FAIRVIEW AVENUE TO THE ALABAMA RIVER BRIDGE

Project Length in Miles 2.030  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066458 PE 2018 / 100066459 CN 2020

100066459 IM I065 (493) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1

2020 $3,381 $376 $0 $3,757TOTAL COST: $3,381 $376 $0 $3,757

Route I-65 Project Description PAVEMENT PRESERVATION ON I-65 FROM THE NORTH END OF THE ALABAMA RIVER BRIDGE TO THE ELMORE COUNTY LINE

Project Length in Miles 4.650  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069067 PE 2019 / 100068992 CN 2020

100068992 IM I065 (507) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1

2020 $1,689 $188 $0 $1,877TOTAL COST: $1,689 $188 $0 $1,877

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

150 of 206

HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Original

Page 151: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route I-85 Project Description SIGN REHABILITATION ALONG I-85 FROM I-65 THROUGH MONTGOMERY, MACON AND LEE COUNTY TO THE CHAMBERS COUNTY LINE

Project Length in Miles 47.460  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100054301 PE 2010 / 100054302 CN 2021

100054302 IM I085 (333) CONSTRUCTION SIGN REHABILITATION 2021 $2,561 $285 $0 $2,845TOTAL COST: $2,561 $285 $0 $2,845

Route I-85 Project Description BRIDGE WIDENING ON I-85 NB AND SB OVER LINE CREEK (BIN # 007554 AND 007555) AND RELIEF BRIDGES (BIN # 007556, 007557, 007566 AND 007567)

Project Length in Miles 0.480  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100059252 PE 2019

100059253 IM I085 (365) CONSTRUCTION BRIDGE WIDENING 2022 $12,843 $1,427 $0 $14,270TOTAL COST: $12,843 $1,427 $0 $14,270

Route NA Project Description MULTI-PURPOSE NATURE TRAIL,WALLAHATCHIE ROAD - PHASE 3, LOCATED ALONG MARLER ROAD NORTH WAUGH TOWN CENTER CONNECTOR

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066530 TAPMN TA16 (949) CONSTRUCTION UNCLASSIFIED 2020 $188 $0 $47 $235

TOTAL COST: $188 $0 $47 $235

Route NA Project Description PIKE ROAD NATURE TRAIL: WALLAHATCHIE ROAD-PHASE 4

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066847 TAPMN TA17 (900) CONSTRUCTION UNCLASSIFIED 2020 $200 $0 $50 $250

TOTAL COST: $200 $0 $50 $250

Route NA Project Description PROTECTIVE PURCHASE FOR PROPERTIES ON THE EAST SIDE OF ANN STREET BETWEEN MCQUEEN ST AND THRASHER ST

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071638 STPMN 5120 () RIGHT OF WAY WIDENING AND RESURFACING

(RDWY)2020 $240 $0 $60 $300

TOTAL COST: $240 $0 $60 $300

Route NA Project Description RESURFACING AND BRIDGE REPLACEMENT (BIN 005831) ON WARES FERRY RD FROM WEST SIDE OF FROGGY BOTTOM BRIDGE TO MCLEMORE RD

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071639 STPMN 5120 () PRELIMINARY ENGINEERING RESURFACING 2020 $180 $0 $45 $225

TOTAL COST: $180 $0 $45 $225

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

151 of 206

HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Amendment # 7

Page 152: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-3 Project Description ADDITION OF TURNLANE ON SR-3 (US-31) AT HYUNDAI BOULEVARD (MP 174.663)

Project Length in Miles 0.530  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071496 STPAA 0003 (629) PRELIMINARY ENGINEERING TURN LANES 2020 $40 $10 $0 $50100071436 STPAA 0003 (629) CONSTRUCTION TURN LANES 2020 $258 $64 $0 $322

TOTAL COST: $298 $74 $0 $372

Route SR-53 Project Description RESURFACING ON SR-53(US-231) FROM CR-89 TO ATHEY ROAD

Project Length in Miles 4.657  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069868 NH 0053 (589) FEDERAL MAINT CN PAVEMENT MINOR

REHABILITATION2021 $4,746 $1,187 $0 $5,933

TOTAL COST: $4,746 $1,187 $0 $5,933

Route SR-6 Project Description BRIDGE REPLACEMENT ON SR-6 (US-231) AT JENKINS CREEK BIN # 000735

Project Length in Miles 1.200  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100004316 PE 2016 / 100004317 RW 2019

100004312 BR 0006 (563) CONSTRUCTION BRIDGES AND APPROACHES 2020 $5,853 $1,463 $0 $7,316TOTAL COST: $5,853 $1,463 $0 $7,316

Route SR-6 Project Description INTERSECTION IMPROVEMENTS TO SR-6 (US-231) AT MERIWETHER ROAD AND TROTMAN ROAD; INCLUDING TURN LANES, AND RAISED MEDIANS

Project Length in Miles 1.147  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070788 PE 2020

100071082 ATRP2-51-2020-402-CN ()

CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $0 $520 $0 $520TOTAL COST: $0 $520 $0 $520

Route SR-8 Project Description INSTALLING INTERSECTION CONFLICT WARNING SYSTEM AT THE INTERSECTION OF SR-8 (US-80) AND WARES FERRY ROAD

Project Length in Miles 0.300  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071948 TDAI 0008 (596) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $15 $4 $0 $19

TOTAL COST: $15 $4 $0 $19

Route SR-8 Project Description TRAFFIC STUDY ON SR-8 (US-80) FROM WAUGH TO MARLER ROAD

Project Length in Miles 0.269  Urban Area MONTGOMERY  Sponsor MONTGOMERY COUNTY COMMISSION COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064157 STPMN 5115 () SPECIAL CORRIDOR STUDY 2023 $96 $0 $24 $120

TOTAL COST: $96 $0 $24 $120

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

152 of 206

HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Original

Page 153: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-NA Project Description INSTALLATION OF ROUNDABOUTS ON SR-126 AT BOTH I-85 EXIT 16 RAMPS, AND AT SR-126/SR-8 (US-80) INTERSECTION, AND ON SR-8 (US-80) AT MARLER ROAD

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068811 PE 2019 / 100068821 RW 2021 / 100068820 UT 2021 / 100068810 CN 2021

100068821 HSIP 5119 (250) RIGHT OF WAY SAFETY IMPROVEMENTS 2021 $227 $25 $0 $253100068820 HSIP 5119 (250) UTILITIES SAFETY IMPROVEMENTS 2021 $161 $18 $0 $179100068810 HSIP 5119 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $1,716 $191 $0 $1,906

TOTAL COST: $2,104 $234 $0 $2,337

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

153 of 206

HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Original

Page 154: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-1 Project Description REPLACE ROADWAY CULVERT AND APPROACHES ON WEST MORGAN ROAD OVER BAKERS CREEK

Project Length in Miles 1.200  Urban Area DECATUR   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070845 STPOA 5220 () PRELIMINARY ENGINEERING DRAINAGE CORRECTION 2020 $32 $0 $8 $40100070846 STPOA 5220 () RIGHT OF WAY DRAINAGE CORRECTION 2020 $50 $0 $12 $62100070847 STPOA 5220 () UTILITIES DRAINAGE CORRECTION 2021 $109 $0 $27 $136100070848 STPOA 5220 () CONSTRUCTION DRAINAGE CORRECTION 2021 $640 $0 $160 $800

TOTAL COST: $831 $0 $208 $1,038

Route CR-1297 Project Description WIDENING AND TRAFFIC STRIPE ON HULACO ROAD (CR-1297) FROM SR-67 TO THE MARSHALL COUNTY LINE (SITE 1); LEVELING AND RESURFACING ON BOWLES BRIDGE ROAD (CR-1193) FROM 0.6 MILES EAST OF ANTIQUE LANE FOR 849 FEET (SITE 2)

Project Length in Miles 1.230  Urban Area DECATUR  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071471 HRRR 5220 (250) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $236 $0 $26 $262

TOTAL COST: $236 $0 $26 $262

Route CR-684 Project Description RESURFACING ON CR-684 (CHURCH STREET) FROM SOMERVILLE ROAD TO RIVERVIEW AVENUE IN THE CITY OF DECATUR

Project Length in Miles 0.820  Urban Area DECATUR   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071485 STPOA 5220 () PRELIMINARY ENGINEERING RESURFACING 2020 $100 $0 $25 $125100071486 STPOA 5220 () CONSTRUCTION RESURFACING 2021 $707 $0 $177 $884

TOTAL COST: $807 $0 $202 $1,009

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

154 of 206

HIGHWAY PROJECTS - MORGANSTIP PLAN: 2020 - Amendment # 2

Page 155: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description SIDEWALKS ON BEECH STREET, 14TH AVENUE, 7TH STREET SE, 8TH STREET SE, 19TH AVENUE SE, AND 16TH AVENUE

Project Length in Miles 0.000  Urban Area DECATUR   Sponsor CITY OF DECATUR  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069007 TAPOA TA19 (902) CONSTRUCTION SIDEWALK 2020 $332 $0 $83 $415

TOTAL COST: $332 $0 $83 $415

Route CR-NA Project Description RESURFACING ON NORTH SENECA DRIVE FROM OLD HIGHWAY 24 TO SR-20 (US-72A) IN THE TOWN OF TRINITY

Project Length in Miles 2.750  Urban Area DECATUR  Sponsor TOWN OF TRINITY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069658 STPOA 5219 (251) PRELIMINARY ENGINEERING RESURFACING 2020 $13 $0 $3 $16100069659 STPOA 5219 (251) CONSTRUCTION RESURFACING 2020 $463 $0 $116 $579

TOTAL COST: $476 $0 $119 $595

Route CR-NA Project Description INTERSECTION IMPROVEMENTS ON VAUGHN BRIDGE ROAD AT SR-3 (US-31)

Project Length in Miles 2.000  Urban Area DECATUR  Sponsor CITY OF HARTSELLE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069660 STPOA 5219 (252) PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $80 $0 $20 $100100069661 STPOA 5219 (252) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $12 $0 $3 $15100069662 STPOA 5219 (252) UTILITIES INTERSECTION IMPROVEMENTS 2021 $30 $0 $7 $37100069663 STPOA 5219 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $571 $0 $143 $714

TOTAL COST: $693 $0 $173 $867

Route I-65 Project Description PAINT, RETROFIT BRIDGE RAILS AND REPLACE BEARING ASSEMBLIES ON I-65 BRIDGES OVER THE TENNESSEE RIVER, BIN# 010882 AND 010883

Project Length in Miles 1.880  Urban Area DECATUR   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067272 PE 2019

100042493 IM I065 () CONSTRUCTION BRIDGE REHABILITATION 2022 $10,193 $1,133 $0 $11,325TOTAL COST: $10,193 $1,133 $0 $11,325

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

155 of 206

HIGHWAY PROJECTS - MORGANSTIP PLAN: 2020 - Original

Page 156: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-3 Project Description REPLACE SOUTHBOUND BRIDGE, BIN 000882, SR-3 (US-31) OVER CEDAR CREEK

Project Length in Miles 0.250  Urban Area DECATUR   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049716 PE 2015 / 100049717 RW 2019 / 100049718 UT 2019

100049719 BR 0003 (591) CONSTRUCTION BRIDGE REPLACEMENT 2020 $5,253 $1,313 $0 $6,566TOTAL COST: $5,253 $1,313 $0 $6,566

Route SR-3 Project Description RESURFACE SR-3 (US-31) FROM SR-36 TO THE SOUTH END OF THE FLINT CREEK BRIDGE

Project Length in Miles 3.710  Urban Area DECATUR  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068239 NH 0003 (625) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,652 $413 $0 $2,066

TOTAL COST: $1,652 $413 $0 $2,066

Route SR-36 Project Description RESURFACING ON SR-36 FROM SR-3 (US-31) (MP 21.136) TO THE WEST END OF THE I-65 BRIDGE (MP 23.555) INCLUDING CXS RAILROAD CROSSING

Project Length in Miles 2.419  Urban Area DECATUR   Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068237 NH 0036 (512) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $924 $231 $0 $1,155

TOTAL COST: $924 $231 $0 $1,155

Route SR-67 Project Description RESURFACE SR-67 FROM MP 24.050 JUST SOUTH OF SR-36 TO MP 35.670 JUST NORTH OF INDIAN HILLS RD.

Project Length in Miles 11.620  Urban Area DECATUR   Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066932 RP-NH 0067 (509) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $2,614 $653 $0 $3,267

TOTAL COST: $2,614 $653 $0 $3,267

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

156 of 206

HIGHWAY PROJECTS - MORGANSTIP PLAN: 2020 - Original

Page 157: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-12 Project Description FULL DEPTH RECLAMATION ON CR-12 FROM SR-183 TO SR-5 - PCP 53-13-17

Project Length in Miles 9.000  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068202 RASTPNU 5318 (250) CONSTRUCTION RESURFACING 2020 $0 $0 $0 $0

TOTAL COST: $0 $0 $0 $0

Route CR-12 Project Description FULL DEPTH RECLAMATION ON CR-12 FROM SR-183 TO SR-5 - PCP 53-13-17

Project Length in Miles 9.000  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071246 RASTPNU 5318 (250) CONSTRUCTION RESURFACING 2020 $2,188 $147 $400 $2,736

TOTAL COST: $2,188 $147 $400 $2,736

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

157 of 206

HIGHWAY PROJECTS - PERRYSTIP PLAN: 2020 - Original

Page 158: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-14 Project Description REPLACE BRIDGE ON SR-14 OVER LUBBUB CREEK BIN # 002672

Project Length in Miles 1.666  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049164 PE 2010 / 100060609 RW 2019

100060610 BR 0014 (521) UTILITIES BRIDGE REPLACEMENT 2020 $723 $181 $0 $904100049165 BR 0014 (521) CONSTRUCTION BRIDGE REPLACEMENT 2020 $2,749 $687 $0 $3,436

TOTAL COST: $3,472 $868 $0 $4,340

Route SR-14 Project Description BRIDGE REPLACEMENT ON SR-14 OVER BLUBBER CREEK WEST OF ALICEVILLE, BIN # 003677

Project Length in Miles 0.570  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061123 PE 2016 / 100061124 RW 2019 / 100061125 UT 2019

100061126 BR 0014 (536) CONSTRUCTION BRIDGE REPLACEMENT 2020 $4,118 $1,030 $0 $5,148TOTAL COST: $4,118 $1,030 $0 $5,148

Route SR-17 Project Description RESURFACING, 2 FT SAFETY WIDENING, AND CENTER AND SHOULDER SCORING ON SR-17 FROM BEAVER CREEK ROAD AT MP 215.700 TO THE LAMAR COUNTY LINE AT MP 220.970

Project Length in Miles 5.270  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068630 STPAA-HSIP 0017 (581) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2020 $3,074 $687 $0 $3,761

TOTAL COST: $3,074 $687 $0 $3,761

Route SR-17 Project Description RESURFACE, 1.5 FT SAFETY WIDENING, CENTER AND EDGELINE SCORING ON SR-17 FROM MP 210.425 JUST NORTH OF 8TH AVENUE TO MP 215.700 SOUTH OF BEAVER CREEK ROAD

Project Length in Miles 5.270  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068626 STPAA-HSIP 0017 (579) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2020 $2,485 $557 $0 $3,042

TOTAL COST: $2,485 $557 $0 $3,042

Route SR-6 Project Description SR-6 (US-82) FROM WEST OF GORDO TO TUSCALOOSA COUNTY LINE

Project Length in Miles 6.740  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100032473 NHF 0006 (576) CONSTRUCTION BASE AND PAVE 2021 $23,164 $5,791 $0 $28,955

TOTAL COST: $23,164 $5,791 $0 $28,955

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

158 of 206

HIGHWAY PROJECTS - PICKENSSTIP PLAN: 2020 - Original

Page 159: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-2209 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 010958) ON CR-2209 OVER DOUBLE BRANCH CREEK; SITE 2 - (BIN 009776) ON CR-2253 OVER WARRICK CREEK; SITE - 3 (BIN 008382) ON CR-3319 OVER MIMS CREEK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071472 HRRR 5520 () CONSTRUCTION GUARDRAIL 2020 $154 $0 $17 $171

TOTAL COST: $154 $0 $17 $171

Route CR-2238 Project Description CENTERLINE AND EDGELINE RAISED PAVEMENT MARKERS AND EDGELINE STRIPING ON CR-2238 FROM CR-2243 TO CR-2290 AND ON CR-6600 FROM SR-223 TO CR-6602; GUARDRAIL AND GUARDRAIL END ANCHORS AT CULVERT ON CR-2238 1.864 MILES WEST OF CR-2290

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071479 HRRR 5520 () CONSTRUCTION SAFETY IMPROVEMENTS 2020 $128 $0 $14 $143

TOTAL COST: $128 $0 $14 $143

Route CR-NA Project Description SIDEWALK IMPROVEMENTS ON SOUTH 3 NOTCH STREET, WEST CHURCH STREET AND MARKET STREET IN TROY

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067200 TAPOA TA17 (925) CONSTRUCTION SIDEWALK 2019 $399 $0 $100 $499

TOTAL COST: $399 $0 $100 $499

Route CR-NA Project Description A MULTI-USE PATH ALONG ELM STREET FROM COLLEGE DRIVE TO SOUTH GEORGE WALLACE DRIVE

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068376 TAPAA TA18 (919) CONSTRUCTION SIDEWALK 2020 $478 $0 $119 $597

TOTAL COST: $478 $0 $119 $597

Route CR-NA Project Description SIDEWALKS ALONG WINDMILL DRIVE FROM VETERANS BOULEVARD TO GALLOWAY ROAD, AND ALONG GALLOWAY ROAD FROM 6TH AVENUE TRAVELLING ALONG GALLOWAY ROAD TURNING SOUTH ON HENDERSON STREET AND EAST ON VETERANS BOULEVARD BEFORE ENDING SHORT OF MAIN STREET

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069025 TAPNU TA19 (919) CONSTRUCTION SIDEWALK 2020 $385 $0 $96 $481

TOTAL COST: $385 $0 $96 $481

Route CR-NA Project Description INSTALL GUARDRAIL AND END ANCHORS AT (BIN 6602) ON CR-1165 OVER YOUNGBLOOD CR; (BIN 7705) ON CR-3339 OVER WHITEWATER CR; (BIN 9748) ON CR-5534 OVER UNNAMED CR; (BIN 8721) ON CR-1111 OVER BEEMAN CR

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069579 HRRR 5519 (250) CONSTRUCTION GUARDRAIL 2019 $201 $0 $22 $224

TOTAL COST: $201 $0 $22 $224

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

159 of 206

HIGHWAY PROJECTS - PIKESTIP PLAN: 2020 - Original

Page 160: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-15 Project Description RESURFACING AND 2' SAFETY WIDENING ON SR-15 (US-29) FROM SR-93 IN BANKS TO THE BULLOCK COUNTY LINE

Project Length in Miles 9.977  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068714 STPAA-HSIP 0015 (537) FEDERAL MAINT CN PREVENTATIVE MAINT MINOR

REHAB W/ SAFETY WIDENING2020 $3,601 $780 $0 $4,381

TOTAL COST: $3,601 $780 $0 $4,381

Route SR-167 Project Description FEASIBILITY STUDY FOR ROUNDABOUT AT INTERSECTION OF SR-167 AND SR-87 IN SPRINGHILL

Project Length in Miles 1.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069502 HSIP 0167 (513) SPECIAL PRELIMINARY DESIGN PE 2020 $52 $6 $0 $58

TOTAL COST: $52 $6 $0 $58

Route SR-167 Project Description RESURFACING AND PLANING ON SR-167 FROM THE COFFEE COUNTY LINE TO SR-87 IN SPRINGHILL

Project Length in Miles 4.084  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068710 STPNU 0167 (512) FEDERAL MAINT CN PAVEMENT MINOR

REHABILITATION2020 $1,312 $328 $0 $1,640

TOTAL COST: $1,312 $328 $0 $1,640

Route SR-87 Project Description RESURFACING ON SR-87 FROM SR-167 IN SPRINGHILL TO CR-3304/CR-59

Project Length in Miles 5.444  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068711 STPAA 0087 (514) FEDERAL MAINT CN PAVEMENT MINOR

REHABILITATION2020 $2,599 $650 $0 $3,249

TOTAL COST: $2,599 $650 $0 $3,249

Route SR-87 Project Description RESURFACING ON SR-87 FROM CR-3304(CURTIS ROAD) TO SR-10 ( US-231)

Project Length in Miles 2.140  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068696 STPAA 0087 (515) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,258 $314 $0 $1,572

TOTAL COST: $1,258 $314 $0 $1,572

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

160 of 206

HIGHWAY PROJECTS - PIKESTIP PLAN: 2020 - Original

Page 161: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description SIDEWALK ALONG CR-64 FROM MAIN STREET TO THE CROSSWALK AT WOODLAND HIGH SCHOOL

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069020 TAPNU TA19 (915) CONSTRUCTION SIDEWALK 2020 $80 $0 $20 $100

TOTAL COST: $80 $0 $20 $100

Route CR-NA Project Description INSTALL GUARDRAIL AND END ANCHORS (BIN 011235) ON CR-37 OVER KNOKES CRK; (BIN 007726) ON CR-46 OVER WEDOWEE CRK; (BIN 005976) ON CR-67 OVER WEDOWEE CRK; (BIN 008712) ON CR-15 OVER THE TALLAPOOSA RIVER; AND (BIN 010074) ON CR-5 OVER WESOBULGA CRK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069580 HRRR 5619 (251) CONSTRUCTION GUARDRAIL 2020 $101 $11 $0 $113

TOTAL COST: $101 $11 $0 $113

Route SR-1 Project Description BRIDGE REPLACEMENT (BIN 000327) ON SR-1 (US-431) OVER CORNHOUSE CREEK

Project Length in Miles 0.345  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069618 BR 0001 (612) PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2020 $242 $61 $0 $303100069619 BR 0001 () CONSTRUCTION BRIDGE REPLACEMENT 2022 $1,731 $433 $0 $2,164

TOTAL COST: $1,973 $493 $0 $2,467

Route SR-22 Project Description BRIDGE REPLACEMENT ON SR-22 OVER TALLAPOOSA RIVER (BIN 001766) AND SR-22 OVER CSX RAILROAD (BIN 001767)

Project Length in Miles 0.346  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069616 BR 0022 (531) PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2020 $640 $160 $0 $800100069617 BR 0022 () CONSTRUCTION BRIDGE REPLACEMENT 2023 $11,322 $2,830 $0 $14,152

TOTAL COST: $11,962 $2,990 $0 $14,952

Route SR-22R Project Description REALIGNMENT OF SR-22 FROM SR-22/MAINSTREET INTERSECTION TO US-431 IN ROANOKE

Project Length in Miles 0.670  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100004421 PE 2008 / 100004422 RW 2012 / 100004423 UT 2014

100004420 ACSTPAA 0022 (505) CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND BRG

2021 $7,926 $1,981 $0 $9,907TOTAL COST: $7,926 $1,981 $0 $9,907

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

161 of 206

HIGHWAY PROJECTS - RANDOLPHSTIP PLAN: 2020 - Original

Page 162: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-61 Project Description RESURFACING AND TRAFFIC STRIPING ON CR-61 (FREEMAN ROAD) FROM CR-28 (SANDFORT ROAD) TO SR-1 (US-431)

Project Length in Miles 2.300  Urban Area PHENIX CITY  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071684 STPNU 5720 () CONSTRUCTION RESURFACING 2020 $386 $0 $96 $482

TOTAL COST: $386 $0 $96 $482

Route CR-NA Project Description STREETSCAPE IMPROVEMENTS ON 14TH STREET IN DOWNTOWN PHENIX CITY

Project Length in Miles 0.000  Urban Area PHENIX CITY  Sponsor CITY OF PHENIX CITY  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067217 TAPPC TA17 (919) CONSTRUCTION STREETSCAPE 2020 $339 $0 $85 $423

TOTAL COST: $339 $0 $85 $423

Route CR-NA Project Description BRIDGE REPLACEMENT ON SEALE ROAD OVER COCHGALECHEE CREEK BIN # 004291 IN PHENIX CITY

Project Length in Miles 0.000  Urban Area PHENIX CITY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067447 STPPC 5717 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2020 $32 $0 $8 $40100067448 STPPC 5717 () UTILITIES BRIDGE REPLACEMENT 2020 $32 $0 $8 $40100067449 STPPC 5717 () CONSTRUCTION BRIDGE REPLACEMENT 2020 $352 $0 $88 $440

TOTAL COST: $416 $0 $104 $520

Route CR-NA Project Description RESURFACING AND WIDENING ON FREEMAN ROAD FROM SANDFORT ROAD TO SR-1 (US-431) IN PHENIX CITY

Project Length in Miles 2.300  Urban Area PHENIX CITY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067563 STPPC 5717 () CONSTRUCTION RESURFACING 2021 $322 $0 $81 $403

TOTAL COST: $322 $0 $81 $403

Route CR-NA Project Description WIDEN AND RESURFACE BRADLEY ROAD FROM NUCKOLS ROAD TO SR-165

Project Length in Miles 2.940  Urban Area PHENIX CITY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063092 STPPC 5714 () CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2020 $412 $0 $103 $515

TOTAL COST: $412 $0 $103 $515

Route CR-NA Project Description WIDEN AND RESURFACE LATO ROAD FROM UCHEE HILL HIGHWAY

Project Length in Miles 2.880  Urban Area PHENIX CITY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063093 STPPC 5714 () CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2021 $403 $0 $101 $504

TOTAL COST: $403 $0 $101 $504

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

162 of 206

HIGHWAY PROJECTS - RUSSELLSTIP PLAN: 2020 - Original

Page 163: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description WIDEN AND RESURFACE TARVER ROAD FROM LATO ROAD TO NUCKOLS ROAD

Project Length in Miles 2.240  Urban Area PHENIX CITY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063094 STPPC 5714 () CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2020 $314 $0 $78 $392

TOTAL COST: $314 $0 $78 $392

Route CR-NA Project Description RESURFACING AND WIDENING ON OWENS ROAD FROM MCCLENDON ROAD TO PATTERSON ROAD IN FORT MITCHELL

Project Length in Miles 0.496  Urban Area PHENIX CITY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067564 STPPC 5717 () CONSTRUCTION RESURFACING 2021 $69 $0 $17 $87

TOTAL COST: $69 $0 $17 $87

Route CR-NA Project Description RESURFACING AND WIDENING ON OWENS ROAD FROM SR-165 TO MCCLENDON ROAD IN FORT MITCHELL

Project Length in Miles 1.200  Urban Area PHENIX CITY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067565 STPPC 5717 () CONSTRUCTION RESURFACING 2022 $168 $0 $42 $210

TOTAL COST: $168 $0 $42 $210

Route CR-NA Project Description RESURFACING AND WIDENING ON MCCLENDON ROAD FROM OWENS ROAD TO OWENS ROAD IN FORT MITCHELL

Project Length in Miles 1.884  Urban Area PHENIX CITY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067566 STPPC 5717 () CONSTRUCTION RESURFACING 2021 $264 $0 $66 $330

TOTAL COST: $264 $0 $66 $330

Route CR-NA Project Description RESURFACING ON BRICKYARD ROAD FROM DILLINGHAM STREET TO STATE DOCKS ROAD

Project Length in Miles 2.100  Urban Area PHENIX CITY  Sponsor CITY OF PHENIX CITY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063080 PE 2016

100063082 STPPC 5716 (253) CONSTRUCTION RESURFACING 2020 $1,038 $0 $260 $1,298TOTAL COST: $1,038 $0 $260 $1,298

Route CR-NA Project Description RESURFACING ON BRICKYARD ROAD FROM STATE DOCKS ROAD TO THE CITY LIMITS

Project Length in Miles 2.100  Urban Area PHENIX CITY  Sponsor CITY OF PHENIX CITY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063085 PE 2016

100063086 STPPC 5716 (252) CONSTRUCTION RESURFACING 2020 $366 $0 $92 $458TOTAL COST: $366 $0 $92 $458

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

163 of 206

HIGHWAY PROJECTS - RUSSELLSTIP PLAN: 2020 - Original

Page 164: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description RESURFACING ON SOUTH RAILROAD STREET FROM SR-38 (US-280) TO STADIUM DRIVE

Project Length in Miles 1.360  Urban Area PHENIX CITY  Sponsor CITY OF PHENIX CITY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063088 STPPC 5716 (255) CONSTRUCTION RESURFACING 2020 $791 $0 $198 $989

TOTAL COST: $791 $0 $198 $989

Route CR-NA Project Description RESURFACING ON SOUTH RAILROAD STREET FROM STADIUM DRIVE TO SUMMERVILLE DRIVE

Project Length in Miles 0.000  Urban Area PHENIX CITY  Sponsor CITY OF PHENIX CITY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063089 PE 2016

100063090 STPPC 5716 (250) CONSTRUCTION RESURFACING 2020 $633 $0 $158 $791TOTAL COST: $633 $0 $158 $791

Route SR-165 Project Description ADDING LEFT TURN LANE ON SR-165 AT CR-24

Project Length in Miles 0.400  Urban Area PHENIX CITY  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070662 RW 2020 / 100070660 UT 2021 / 100070663 CN 2021

100070661 HSIP 0165 (506) PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2020 $41 $5 $0 $45100070662 HSIP 0165 (506) RIGHT OF WAY SAFETY IMPROVEMENTS 2020 $68 $8 $0 $75100070660 HSIP 0165 (506) UTILITIES SAFETY IMPROVEMENTS 2021 $91 $10 $0 $101100070663 HSIP 0165 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $469 $52 $0 $521

TOTAL COST: $668 $74 $0 $742

Route SR-165 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-165 FROM THE BARBOUR COUNTY LINE TO .29 MILE SOUTH OF SR-208

Project Length in Miles 6.006  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069870 STPAA-HSIP 0165 (504) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2020 $1,847 $417 $0 $2,264

TOTAL COST: $1,847 $417 $0 $2,264

Route SR-165 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-165 FROM .36 MILE SOUTH OF NEW HOPE CHURCH ROAD TO .1 MILE SOUTH OF NUCKOLS ROAD

Project Length in Miles 12.389  Urban Area PHENIX CITY  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069871 STPAA-HSIP 0165 (505) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2021 $4,596 $1,009 $0 $5,605

TOTAL COST: $4,596 $1,009 $0 $5,605

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

164 of 206

HIGHWAY PROJECTS - RUSSELLSTIP PLAN: 2020 - Original

Page 165: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-10 Project Description HYDRO DEMOLISH AND REHABILITATE THE DECKS ON FOLLOWING BRIDGES: ON CR-10 (BIN 005311) OVER BIG BLACK CREEK (SITE 1); ON KELLY CREEK ROAD (BIN 008064) OVER KELLY CREEK (SITE 2) - SCCP 58-38-19

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069883 RABR 5819 (251) CONSTRUCTION BRIDGE REHABILITATION 2020 $366 $0 $92 $458

TOTAL COST: $366 $0 $92 $458

Route CR-31 Project Description BRIDGE REPLACEMENT OF BIN 1045 ON CR-31 (WASHINGTON VALLEY ROAD) OVER WALKER BRANCH.

Project Length in Miles 434.000  Urban Area BIRMINGHAM   Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068739 RABRZ 5818 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $247 $62 $0 $309

TOTAL COST: $247 $62 $0 $309

Route CR-NA Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 008027) ON VALLEY ROAD OVER TROUT CREEK; SITE 2 - (BIN 005607) ON PLEASANT VALLEY ROAD OVER FISHING CREEK; AND SITE 3 - (BIN 008435) ON ACMAR ROAD OVER LITTLE BLACK CREEK

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071474 HRRR 5820 () CONSTRUCTION GUARDRAIL 2020 $94 $0 $10 $105

TOTAL COST: $94 $0 $10 $105

Route CR-NA Project Description INSTALLING GUARDRAIL AND END ANCHORS (BIN 008064) ON KELLY CREEK ROAD OVER KELLY CREEK

Project Length in Miles 0.052  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069581 HRRR 5819 (250) CONSTRUCTION GUARDRAIL 2019 $35 $0 $4 $39

TOTAL COST: $35 $0 $4 $39

Route I-20 Project Description BRIDGE AND APPROACHES (BIN 007850 AND 007851) ON I-20 OVER COOSA RIVER AT ST. CLAIR AND TALLADEGA CO LINE

Project Length in Miles 1.500  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100042214 CN 2025

100064150 BR I020 () PRELIMINARY ENGINEERING BRIDGES AND APPROACHES 2021 $711 $178 $0 $889TOTAL COST: $711 $178 $0 $889

Route I-20 Project Description PAVEMENT REHABILITATION ON I-20 FROM THE JEFFERSON COUNTY LINE TO 0.87 MILE EAST OF KELLY CREEK ROAD

Project Length in Miles 4.983  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068217 PE 2019 / 100068218 CN 2020

100068218 IM I020 (357) CONSTRUCTION PAVEMENT MINOR REHABILITATION

2020 $13,243 $1,471 $0 $14,714TOTAL COST: $13,243 $1,471 $0 $14,714

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

165 of 206

HIGHWAY PROJECTS - ST. CLAIRSTIP PLAN: 2020 - Original

Page 166: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route I-59 Project Description I-59 REPLACE BRIDGES, BIN 007238 (SUFF=40.1, STATUS=SD) AND BIN 007239 (SUFF=65.4, STATUS=FO), OVER MUCKLEROY CREEK, SOUTH OF SR-53 (US-231)

Project Length in Miles 0.200  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049999 RW 2024 / 100049998 UT 2025 / 100049966 CN 2026

100049965 BRF I059 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2023 $297 $74 $0 $371TOTAL COST: $297 $74 $0 $371

Route I-59 Project Description CONCRETE PAVEMENT REHAB ON I-59 FROM JEFFERSON COUNTY LINE TO NORTH OF SR-23

Project Length in Miles 8.660  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066471 PE 2019 / 100066472 CN 2021

100066472 IM I059 () CONSTRUCTION PAVEMENT REHABILITATION 2021 $14,454 $1,606 $0 $16,060TOTAL COST: $14,454 $1,606 $0 $16,060

Route SR-174 Project Description INTERSECTION IMPROVEMENTS AT SR-174, MURPHREES VALLEY ROAD AND SR-7 (US-11)

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070050 UT 2024 / 100070051 CN 2025

100070045 CMAQ 0174 () PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $618 $0 $155 $773100070048 CMAQ 0174 () RIGHT OF WAY INTERSECTION IMPROVEMENTS 2023 $83 $0 $21 $104

TOTAL COST: $701 $0 $175 $877

Route SR-23 Project Description BR REPL AND APP ON SR-23 OVER BRANCH #000226 STR #23-58-0.7

Project Length in Miles 0.200  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100013033 PE 1999 / 100037997 RW 2002

100040861 BR 5815 (200) UTILITIES BRIDGE REPLACEMENT 2020 $23 $6 $0 $29100013032 BR 5815 (200) CONSTRUCTION BRIDGE REPLACEMENT 2021 $946 $237 $0 $1,183

TOTAL COST: $969 $242 $0 $1,212

Route SR-23 Project Description RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-23 FROM SR-7 (US-11) IN SPRINGVILLE TO SR-53 (US-231) IN ASHVILLE

Project Length in Miles 12.610  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070163 STPAA 0023 () FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $1,469 $367 $0 $1,836

TOTAL COST: $1,469 $367 $0 $1,836

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

166 of 206

HIGHWAY PROJECTS - ST. CLAIRSTIP PLAN: 2020 - Original

Page 167: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-25 Project Description INTERSECTION IMPROVEMENTS ON SR-25 (US-411) AT PARK AVENUE (PHASE 1)

Project Length in Miles 0.052  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070989 CMAQ 0025 (559) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2020 $40 $10 $0 $50100064324 CMAQ 0025 (559) UTILITIES INTERSECTION IMPROVEMENTS 2021 $121 $0 $30 $152100064325 CMAQ 0025 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $808 $0 $202 $1,010

TOTAL COST: $969 $10 $232 $1,212

Route SR-25 Project Description INTERSECTION IMPROVEMENTS ON SR-25(US-411) AT CR-6(SANIE ROAD/SIMPSON ROAD) PHASE 2

Project Length in Miles 0.010  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100071679 CN 2022

100070990 CMAQ 0025 (558) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $182 $45 $0 $227TOTAL COST: $182 $45 $0 $227

Route SR-34 Project Description INTERSECTION IMPROVEMENTS ON SR-34 AT CROPWELL DRIVE AND HARDWICK ROAD (CR-45), INCLUDING ROUNDABOUT CONSTRUCTION IN PELL CITY

Project Length in Miles 0.500  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066388 PE 2017 / 100066391 UT 2024 / 100066392 CN 2024

100066390 STPAA-HSIP 0034 () RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $319 $0 $46 $364TOTAL COST: $319 $0 $46 $364

Route SR-53 Project Description SR-53 (US-231) ADD LANES FROM CR-516 (CROPWELL DR) TO SR-34

Project Length in Miles 1.180  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056631 PE 2012 / 100056634 RW 2013

100056633 STPAA 0053 (565) UTILITIES ADDITIONAL ROADWAY LANES 2021 $16 $4 $0 $19100056635 STPAA 0053 (565) CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $3,397 $849 $0 $4,246

TOTAL COST: $3,412 $853 $0 $4,266

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

167 of 206

HIGHWAY PROJECTS - ST. CLAIRSTIP PLAN: 2020 - Original

Page 168: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-7 Project Description DRAINAGE IMPROVEMENTS ON SR-7 (US-11) FROM ROBINSON ST. TO NEAR TERRY ST. AND DOWNTOWN SPRINGVILLE STREET

Project Length in Miles 0.789  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100055162 HPP 10AL (002) CONSTRUCTION DRAINAGE CORRECTION 2020 $639 $0 $160 $799

TOTAL COST: $639 $0 $160 $799

Route SR-7 Project Description ROADWAY AND DRAINAGE IMPROVEMENTS ON SR-7(US-11) AT SPRINGVILLE MIDDLE SCHOOL

Project Length in Miles 1.500  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100052626 PE 2009

100052627 HPP-TCSP A187 (900) UTILITIES DRAINAGE CORRECTION 2020 $40 $10 $0 $50100052628 HPP A187 (900) CONSTRUCTION DRAINAGE CORRECTION 2020 $640 $0 $160 $800

TOTAL COST: $680 $10 $160 $850

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

168 of 206

HIGHWAY PROJECTS - ST. CLAIRSTIP PLAN: 2020 - Original

Page 169: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-1396 Project Description CR-1396 (CAHABA BEACH ROAD), EXTENSION FROM CR-346 (SWAN DRIVE) TO CR-60 (SICARD HOLLOW ROAD) INCLUDING A BRIDGE OVER THE LITTLE CAHABA RIVER

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor SHELBY COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059534 ACAA59534 ATRP (015) CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND

BRG2022 $3,200 $0 $800 $4,000

TOTAL COST: $3,200 $0 $800 $4,000

Route CR-17 Project Description ADDITIONAL LANES ON CR-17 (VALLEYDALE RD) FROM SR-3 (US-31) TO RIVERCHASE PARKWAY EAST

Project Length in Miles 1.500  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100046236 PE 2006 / 100046237 RW 2016

100046238 STPBH 7112 (602) UTILITIES ADDITIONAL ROADWAY LANES 2020 $553 $0 $138 $691100046239 STPBH 7112 () CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $3,149 $0 $787 $3,936

TOTAL COST: $3,702 $0 $925 $4,627

Route CR-24 Project Description BRIDGE REPLACEMENT (BIN 015617) AND APPROACHES ON CR-24 OVER SPRING CREEK - SCP 59-810-12U

Project Length in Miles 0.202  Urban Area BIRMINGHAM   Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070892 BR 5914 (252) UTILITIES UTILITY ADJUSTMENT 2020 $214 $0 $54 $268

TOTAL COST: $214 $0 $54 $268

Route CR-29 Project Description WIDEN CR-29\1277 FROM CR-370(HEATHERWOOD DR.) TO CR-2311 (ACTON ROAD) AND BRG REPLACEMENT OVER CAHABA RIVER.

Project Length in Miles 8.000  Urban Area BIRMINGHAM   Sponsor JEFFERSON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100007541 PE 2002

100045964 STPBH 5939 (200) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $4,274 $0 $1,069 $5,343100007540 STPBH 5939 (200) CONSTRUCTION BRIDGE REPLACEMENT 2022 $1,589 $0 $397 $1,986

TOTAL COST: $5,863 $0 $1,466 $7,329

Route CR-433 Project Description RAILROAD CROSSING IMPROVEMENTS, SIGNS, LEGENDS AND MARKINGS AT THE INTERSECTION OF CR-433 AND CSX RAILROAD/DOT NO. 639418X

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070001 RHCH RR19 (905) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $10 $1 $0 $11

TOTAL COST: $10 $1 $0 $11

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

169 of 206

HIGHWAY PROJECTS - SHELBYSTIP PLAN: 2020 - Original

Page 170: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-52 Project Description BRIDGE REPLACEMENT OF CR-52 BIN # 3267 OVER BUCK CREEK (AASHTO)

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor SHELBY COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059502 ACBR59502 ATRP (009) CONSTRUCTION BRIDGE REPLACEMENT 2020 $3,152 $0 $1,269 $4,420

TOTAL COST: $3,152 $0 $1,269 $4,420

Route CR-55 Project Description BRIDGE REPLACEMENT ON CR-55 OVER NORFOLK SOUTHERN RAILROAD NEAR STERRETT BIN # 10357

Project Length in Miles 0.900  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056308 PE 2014

100056309 STPBH 5914 (250) RIGHT OF WAY BRIDGES AND APPROACHES 2020 $477 $0 $119 $596100056310 STPBH 5914 (250) UTILITIES BRIDGES AND APPROACHES 2020 $200 $0 $50 $250100056311 STPBH 5914 () CONSTRUCTION BRIDGES AND APPROACHES 2021 $1,000 $0 $250 $1,250

TOTAL COST: $1,677 $0 $419 $2,096

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

170 of 206

HIGHWAY PROJECTS - SHELBYSTIP PLAN: 2020 - Original

Page 171: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description INSTALL RAILROAD CROSSING DEVICES ON PILGREEN DRIVE IN CALERA, DOT NO. 727 400E, REF#1323 (XVI-R), TO INCLUDE STANDARD MAST MOUNTED SIGNAL, GATE, BELL, GCP'S, SIGNS

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066434 RHCH RR17 (909) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $315 $35 $0 $350

TOTAL COST: $315 $35 $0 $350

Route CR-NA Project Description STREETSCAPE IMPROVEMENTS FROM DOWNTOWN WILSONVILLE TO NEW COMMERCIAL DEVELOPMENT ON SR-25

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067296 TAPNU TA17 (907) CONSTRUCTION STREETSCAPE 2020 $400 $0 $100 $500

TOTAL COST: $400 $0 $100 $500

Route CR-NA Project Description VALLEYDALE RD FROM CALDWELL MILL RD TO MEADOW DRIVE - PHASE 1

Project Length in Miles 7.000  Urban Area BIRMINGHAM   Sponsor HOOVER COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100033035 PE 2000 / 100033036 RW 2007

100033067 STPBH 9802 (905) UTILITIES ADDITIONAL ROADWAY LANES 2020 $6,400 $0 $1,600 $8,000100033064 STPBH 9802 (905) CONSTRUCTION ADDITIONAL ROADWAY LANES 2022 $16,400 $1,300 $2,800 $20,500

TOTAL COST: $22,800 $1,300 $4,400 $28,500

Route CR-NA Project Description SAFETY AND INTERSECTION IMPROVEMENTS ON STATE PARK ROAD FROM JOHN FINDLAY DRIVE TO STATE ROUTE 119 TO INCLUDE THE ADDITION OF BIKE LANES IN THE CITY OF PELHAM

Project Length in Miles 3.353  Urban Area BIRMINGHAM   Sponsor SHELBY COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063240 PE 2015 / 100063241 RW 2018

100063242 STPBH-CMAQ 5915 (250)

UTILITIES INTERSECTION IMPROVEMENTS 2020 $312 $0 $78 $390100063243 STPBH-CMAQ 5915

(250)CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $6,303 $0 $1,576 $7,879

TOTAL COST: $6,615 $0 $1,654 $8,269

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

171 of 206

HIGHWAY PROJECTS - SHELBYSTIP PLAN: 2020 - Original

Page 172: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route I-65 Project Description BRIDGE WIDEN ON I-65 CSX RR AND BUXAHATCHEE CK, SOUTH OF EXIT 228 BIN# 006832 AND #006833

Project Length in Miles 0.020  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100055323 CN 2022

100055322 IMF I065 () PRELIMINARY ENGINEERING BRIDGE WIDENING 2020 $746 $83 $0 $829100055323 IMF I065 () CONSTRUCTION BRIDGE WIDENING 2022 $7,000 $778 $0 $7,778

TOTAL COST: $7,746 $861 $0 $8,607

Route I-65 Project Description BRIDGE WIDENING ON I-65 OVER L AND N RAILROAD, 0.8 MILE NORTH OF SR-3 (US-31) IN CALERA, BIN #006484 AND #006485

Project Length in Miles 0.080  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100055333 CN 2022

100055332 IMF I065 () PRELIMINARY ENGINEERING BRIDGE WIDENING 2020 $368 $41 $0 $409100055333 IMF I065 () CONSTRUCTION BRIDGE WIDENING 2022 $3,756 $417 $0 $4,173

TOTAL COST: $4,125 $458 $0 $4,583

Route I-65 Project Description BRIDGE WIDENING ON I-65 SOUTH OF SR-3 (US-31) IN ALABASTER BIN #006489 AND #006490 OVER L AND N RR, BIN #006491 AND #006492 OVER CR-26 AND BIN #006493 AND #006494 OVER L AND N RR/CR-87

Project Length in Miles 1.080  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100055335 CN 2022

100055334 IMF I065 () PRELIMINARY ENGINEERING BRIDGE WIDENING 2020 $1,297 $144 $0 $1,442100055335 IMF I065 () CONSTRUCTION BRIDGE WIDENING 2022 $12,212 $1,357 $0 $13,569

TOTAL COST: $13,509 $1,501 $0 $15,010

Route I-65 Project Description PLANING, OVERLAY, AND STRIPING ON I-65 FROM THE CR-52 OVERPASS TO THE SOUTH END OF THE CAHABA RIVER BRIDGE

Project Length in Miles 13.396  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070835 IM I065 (510) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE

LEVEL 12020 $273 $30 $0 $303

100070839 IM-NH I065 (510) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1

2020 $6,761 $884 $0 $7,646TOTAL COST: $7,034 $915 $0 $7,949

Route NA Project Description MULTI-USE TRAIL AND GREENWAY SYSTEM ALONG THE SR-3 (US-31) CORRIDOR ADJACENT TO BISHOP CREEK IN PELHAM; PHASES 3 AND 4

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor PELHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067294 TAPAA-CMAQ TA17

(904)CONSTRUCTION UNCLASSIFIED 2022 $1,183 $0 $296 $1,479

TOTAL COST: $1,183 $0 $296 $1,479

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

172 of 206

HIGHWAY PROJECTS - SHELBYSTIP PLAN: 2020 - Original

Page 173: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description BUCK CREEK MULTI-USE TRAIL FROM BUCK CREEK TO THOMPSON HIGH SCHOOL. TRAIL WILL LINK HIGH DENSITY RESIDENTIAL PARTS OF ALABASTER TO DESTINATIONS SUCH AS PARKS AND SCHOOLS. PROJECT SPONSOR: CITY OF ALABASTER .

Project Length in Miles 1.250  Urban Area BIRMINGHAM   Sponsor ALABASTER COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100032369 CMAQ 9802 () CONSTRUCTION UNCLASSIFIED 2021 $232 $0 $58 $291

TOTAL COST: $232 $0 $58 $291

Route NA Project Description HELENA BUCK CREEK, TACOA, AND RUFFIN TRAIL SYSTEMS MULTIUSE TRAIL AND BRIDGES NEAR CSX RAILROAD

Project Length in Miles 7.340  Urban Area BIRMINGHAM   Sponsor HELENA COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100032380 PE 2000

100032383 CMAQ 9802 (925) CONSTRUCTION UNCLASSIFIED 2021 $2,306 $0 $577 $2,883100032386 CMAQ 9802 () CONSTRUCTION UNCLASSIFIED 2021 $289 $0 $72 $362

TOTAL COST: $2,596 $0 $649 $3,244

Route NA Project Description NON-COMPLIANT CURB RAMP REPLACEMENT ON STATE ROUTES 3, 4, 5, 7, 25, 38, 53, 70, 75, 76, 119, 139, 145, 149, 150, 151, 155, 261, 269 AND 378 WITHIN JEFFERSON AND SHELBY COUNTIES

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060181 PE 2013

100060174 STPAA NR13 (909) CONSTRUCTION SIDEWALK 2023 $1,490 $373 $0 $1,863TOTAL COST: $1,490 $373 $0 $1,863

Route NA Project Description TRAIL DESIGN AND CONSTRUCTION PELHAM GREENWAY ALONG BISHOP CREEK FROM PELHAM CITY PARK TO OAK MOUNTAIN PARK ROAD.

Project Length in Miles 0.000  Urban Area BIRMINGHAM   Sponsor PELHAM COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065161 PE 2017

100065162 CMAQ 5916 (253) RIGHT OF WAY SIDEWALK 2021 $84 $0 $21 $105100065163 CMAQ 5916 (253) UTILITIES SIDEWALK 2021 $84 $0 $21 $105

TOTAL COST: $168 $0 $42 $210

Route NA Project Description INVERNESS COMMUNITY GREENWAY FROM INVERNESS FIRE STATION TO HOOVER'S NATURE PARK

Project Length in Miles 1.800  Urban Area BIRMINGHAM   Sponsor SHELBY COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100054519 CMAQ 5917 (904) CONSTRUCTION UNCLASSIFIED 2020 $1,042 $0 $261 $1,303

TOTAL COST: $1,042 $0 $261 $1,303

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

173 of 206

HIGHWAY PROJECTS - SHELBYSTIP PLAN: 2020 - Original

Page 174: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-119 Project Description ADDITIONAL LANES ON SR-119 FROM CR-12 TO CR-26 - PHASE 1

Project Length in Miles 1.694  Urban Area BIRMINGHAM   Sponsor ALABASTER COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100061118 ACNH61118 ATRP (012) CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $7,731 $0 $1,933 $9,664

TOTAL COST: $7,731 $0 $1,933 $9,664

Route SR-119 Project Description ADDITIONAL LANES ON SR-119 FROM MEADOWLARK PL TO CR-12 (WEST SIDE ONLY) THEN CONTINUING TO CR-26 (EAST AND WEST SIDES) - PHASE 1

Project Length in Miles 3.388  Urban Area BIRMINGHAM   Sponsor ALABASTER COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100061286 STPBH 0119 (510) RIGHT OF WAY ADDITIONAL ROADWAY LANES 2020 $2,954 $0 $739 $3,693100063109 STPBH 0119 (510) UTILITIES ADDITIONAL ROADWAY LANES 2020 $100 $0 $25 $125

TOTAL COST: $3,054 $0 $764 $3,818

Route SR-139 Project Description RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-139 FROM THE BIBB COUNTY LINE TO SR-25 IN WILTON

Project Length in Miles 0.320  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070153 STPAA 0139 (504) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $115 $29 $0 $144

TOTAL COST: $115 $29 $0 $144

Route SR-25 Project Description RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING, AND 2' SAFETY WIDENING ON SR-25 FROM THE BIBB COUNTY LINE TO CR-73 IN MONTEVALLO

Project Length in Miles 3.685  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070152 STPAA-HSIP 0025 (557) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2020 $1,801 $441 $0 $2,242

TOTAL COST: $1,801 $441 $0 $2,242

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

174 of 206

HIGHWAY PROJECTS - SHELBYSTIP PLAN: 2020 - Original

Page 175: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-261 Project Description ADDITIONAL LANES ON SR-261 FROM BEARDEN ROAD TO SR-3 (US-31)

Project Length in Miles 5.200  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100009266 PE 2000

100046437 STPAA 7112 () UTILITIES ADDITIONAL ROADWAY LANES 2021 $1,395 $349 $0 $1,743100009265 STPAA 7112 () CONSTRUCTION ADDITIONAL ROADWAY LANES 2022 $22,822 $5,705 $0 $28,527

TOTAL COST: $24,217 $6,054 $0 $30,271

Route SR-261 Project Description HELENA BYPASS FROM CR-52 WEST OF HELENA TO SR-261 NORTH OF HELENA

Project Length in Miles 11.763  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049207 PE 2012 / 100049211 CN 2028

100049209 HPP A139 () RIGHT OF WAY GRADE, DRAIN, BASE, PAVE AND BRG

2021 $1,945 $486 $0 $2,431100049210 HPP A139 () UTILITIES GRADE, DRAIN, BASE, PAVE AND

BRG2022 $117 $29 $0 $146

TOTAL COST: $2,062 $515 $0 $2,577

Route SR-261 Project Description INTERSECTION IMPROVEMENTS AT SR-261 AND CR-52E IN THE CITY OF HELENA

Project Length in Miles 0.225  Urban Area BIRMINGHAM   Sponsor HELENA COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067711 PE 2018

100067712 CMAQ 0261 (501) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $247 $0 $62 $308100067713 CMAQ 0261 (501) UTILITIES INTERSECTION IMPROVEMENTS 2023 $607 $0 $152 $758100067714 CMAQ 0261 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2023 $1,234 $0 $309 $1,543

TOTAL COST: $2,088 $0 $522 $2,610

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

175 of 206

HIGHWAY PROJECTS - SHELBYSTIP PLAN: 2020 - Original

Page 176: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-3 Project Description SR-3 (US-31) BRIDGE (BIN NO. 2091) OVER PEVINE CREEK AND CSX RR, BRIDGE REPLACEMENT

Project Length in Miles 0.250  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100057650 CN 2025

100057649 BR 0003 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2022 $445 $111 $0 $557TOTAL COST: $445 $111 $0 $557

Route SR-3 Project Description PELHAM TOPICS, SR-3(US-31) FROM CR-52 TO A POINT 0.25 MILES NORTH OF CR-105 (PHASE II)

Project Length in Miles 1.125  Urban Area BIRMINGHAM   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100039466 PE 2001

100039450 STPBH 7012 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $449 $112 $0 $561TOTAL COST: $449 $112 $0 $561

Route SR-3 Project Description RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-3 (US-31) FROM I-65 TO CR-68

Project Length in Miles 2.590  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068646 NH 0003 (621) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $1,790 $447 $0 $2,237

TOTAL COST: $1,790 $447 $0 $2,237

Route SR-38 Project Description RESURFACING, MICRO-MILLING, PLANING, STRIPING, LEVELING, AND PATCHING ON SR-38 (US-280) FROM A JOINT 686 FT WEST OF CR-62 TO THE TALLADEGA COUNTY LINE

Project Length in Miles 7.308  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068641 NH 0038 (541) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $5,943 $1,486 $0 $7,429

TOTAL COST: $5,943 $1,486 $0 $7,429

Route SR-38 Project Description RESURFACING, MICRO-MILLING, STRIPING, LEVELING AND PATCHING ON SR-38 (US-280) FROM THE SHELBY COUNTY LINE TO HUGH DANIEL DRIVE

Project Length in Miles 2.971  Urban Area BIRMINGHAM   Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070158 NH 0038 (545) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 12021 $1,883 $471 $0 $2,353

TOTAL COST: $1,883 $471 $0 $2,353

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

176 of 206

HIGHWAY PROJECTS - SHELBYSTIP PLAN: 2020 - Original

Page 177: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-12 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 009148) ON CR-12 OVER SUCARNOOCHEE RIVER; SITE 2 - (BIN 006243) ON CR-10 OVER CHAPEL BRANCH; SITE 3 - (BIN 003815) ON CR-12 OVER TEOC CREEK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071476 HRRR 6020 () CONSTRUCTION GUARDRAIL 2020 $210 $0 $23 $234

TOTAL COST: $210 $0 $23 $234

Route CR-83 Project Description INSTALLING TRAFFIC CONTROL DEVICES AT THE CR-34/CR-83 INTERSECTION

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071475 HRRR 6020 (250) CONSTRUCTION TRAFFIC CONTROL MARKING &

LEGN2020 $40 $0 $4 $45

TOTAL COST: $40 $0 $4 $45

Route CR-NA Project Description BRIDGE REPLACEMENT (BIN # 007165) BUMKUN ROAD OVER UNNAMED CREEK IN SUMTER COUNTY

Project Length in Miles 0.000  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100062964 PE 2015 / 100061887 CN 2020

100061887 BRZ 6014 (258) CONSTRUCTION BRIDGE REPLACEMENT 2020 $130 $0 $32 $162TOTAL COST: $130 $0 $32 $162

Route SR-7 Project Description BRIDGE REPLACEMENT ON SR-7(US-11) OVER TOOMSUBA CREEK BIN 002909 AND BIN 002908 RELIEF (SUFF=50.5, STATUS=2)

Project Length in Miles 0.602  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100038698 PE 2002 / 100042196 RW 2003

100042197 BR 0007 (502) UTILITIES BRIDGE REPLACEMENT 2021 $144 $36 $0 $181100038699 BR 0007 (502) CONSTRUCTION BRIDGE REPLACEMENT 2021 $3,485 $871 $0 $4,356

TOTAL COST: $3,629 $907 $0 $4,537

Route SR-7 Project Description BRIDGE REPLACEMENT ON SR-7 (US-11) OVER PARKER CREEK. BIN #002884, STR # 7-60-13.153. (SUFF=45.2, STAT=2)

Project Length in Miles 0.020  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100040201 PE 2002 / 100040204 RW 2003

100040205 BR 0007 (503) UTILITIES BRIDGE REPLACEMENT 2022 $171 $43 $0 $214100040203 BR 0007 (503) CONSTRUCTION BRIDGE REPLACEMENT 2022 $1,285 $321 $0 $1,606

TOTAL COST: $1,456 $364 $0 $1,819

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

177 of 206

HIGHWAY PROJECTS - SUMTERSTIP PLAN: 2020 - Original

Page 178: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-8 Project Description SAFETY IMPROVEMENTS ON SR-8 (US-80) AT SR-28 AND CR-25

Project Length in Miles 0.681  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064866 PE 2016 / 100070942 RW 2021 / 100064862 CN 2021

100070942 HSIP 0008 (584) RIGHT OF WAY GRADE, DRAIN, BASE AND PAVE 2021 $91 $10 $0 $101100064862 HSIP 0008 (584) CONSTRUCTION SAFETY IMPROVEMENTS 2021 $1,986 $221 $0 $2,207

TOTAL COST: $2,077 $231 $0 $2,308

Route SR-NA Project Description SIGN INVENTORY AND ASSESSMENT FOR UNSIGNALIZED AND SIGNALIZED INTERSECTIONS AT STATE AND US ROUTES IN SUMTER COUNTY

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070885 HSIP NR20 (906) SPECIAL SAFETY IMPROVEMENTS 2020 $45 $5 $0 $50

TOTAL COST: $45 $5 $0 $50

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

178 of 206

HIGHWAY PROJECTS - SUMTERSTIP PLAN: 2020 - Original

Page 179: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-175 Project Description RESURFACING ON CR-175 (OAKDALE ROAD) FROM SR-21 TO SR-76 - TCP 61-03-16

Project Length in Miles 5.590  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071538 RASTPOA 6116 (253) CONSTRUCTION RESURFACING 2020 $616 $130 $400 $1,145

TOTAL COST: $616 $130 $400 $1,145

Route CR-190 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITES 1 AND 2 - ON CR-190 (BIN 010422) OVER FANNING BRANCH AND (BIN 008897) OVER HUDSON BRANCH; SITE 3 - (BIN 002871) ON CR-280 OVER CLEAR CREEK; SITE 4 - (BIN 005364) ON CR-382 OVER FAYNE CREEK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071477 HRRR 6120 () CONSTRUCTION GUARDRAIL 2020 $190 $0 $21 $211

TOTAL COST: $190 $0 $21 $211

Route CR-303 Project Description BRIDGE REPLACEMENT (BIN 008086) ON CR-303 (BERNEY STATION ROAD) OVER DRY CREEK

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071573 FLAP FLAP (010) PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2020 $112 $0 $28 $140100067954 FLAP FLAP (010) CONSTRUCTION BRIDGE REPLACEMENT 2021 $200 $0 $50 $251

TOTAL COST: $312 $0 $78 $391

Route CR-NA Project Description INSTALL RAILROAD CROSSING DEVICES ON GENE E. STEWART BLVD IN SYLACAUGA, DOT NO. 351 492B, REF #1321 (XVI-R), TO INCLUDE SIGNS, MARKINGS AND LEGENDS

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066438 RHCH RR17 (906) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $5 $1 $0 $5

TOTAL COST: $5 $1 $0 $5

Route CR-NA Project Description STREETSCAPE IMPROVEMENTS ALONG SR-21 FROM 5TH STREET TO 6TH STREET, ALSO IMPROVEMENTS ALONG 2ND STREET, CALHOUN STREET AND 3RD STREET

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068370 TAPAA TA18 (914) CONSTRUCTION STREETSCAPE 2020 $640 $0 $160 $800

TOTAL COST: $640 $0 $160 $800

Route CR-NA Project Description STREETSCAPE AND ADA IMPROVEMENTS TO THE PARKING AREA BETWEEN NORTON AVENUE AND SR-21, 3RD STREET AND 1ST STREET

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069019 TAPAA TA19 (914) CONSTRUCTION STREETSCAPE 2020 $640 $0 $160 $800

TOTAL COST: $640 $0 $160 $800

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

179 of 206

HIGHWAY PROJECTS - TALLADEGASTIP PLAN: 2020 - Original

Page 180: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route I-20 Project Description INTERCHANGE LIGHTING ON I-20 AT CR-207 (EXIT 165)

Project Length in Miles 0.402  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100004964 CN 2021

100004964 IM I020 (338) CONSTRUCTION LIGHTING 2021 $656 $73 $0 $729TOTAL COST: $656 $73 $0 $729

Route SR-21 Project Description SR-21 REPLACE BRIDGE BIN #001441 NO. 21-61-27.1 OVER SOUTHERN RAILROAD

Project Length in Miles 0.200  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100002464 CN 2024

100002467 BR 0021 () RIGHT OF WAY BRIDGE REPLACEMENT 2021 $393 $98 $0 $491TOTAL COST: $393 $98 $0 $491

Route SR-21 Project Description SR-21 BIN # 2634 BRIDGE REPLACEMENT OVER CHEAHA CREEK

Project Length in Miles 1.400  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060129 PE 2016

100070895 BR 0021 (554) UTILITIES BRIDGE REPLACEMENT 2020 $120 $30 $0 $150100060130 BR 0021 (554) CONSTRUCTION BRIDGE REPLACEMENT 2020 $3,379 $845 $0 $4,224

TOTAL COST: $3,499 $875 $0 $4,374

Route SR-21 Project Description RAILROAD CROSSING IMPROVEMENTS ON SR-21 (NORTH BROADWAY AVENUE) IN SYLACAUGA, REF # 1279, DOT 351-501X

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063002 RHCH RR15 (900) CONSTRUCTION RR CROSSING IMPROVEMENTS 2019 $192 $21 $0 $213

TOTAL COST: $192 $21 $0 $213

Route SR-21 Project Description RESURFACING AND TRAFFIC STRIPING ON SR-21 FROM .37 MILE SOUTH OF SR-76 (MP 220.345) TO .19 MILE SOUTH OF CR-238 (MP 224.831)

Project Length in Miles 4.460  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069803 NH 0021 (568) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $2,308 $577 $0 $2,885

TOTAL COST: $2,308 $577 $0 $2,885

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

180 of 206

HIGHWAY PROJECTS - TALLADEGASTIP PLAN: 2020 - Original

Page 181: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-34 Project Description REPL BIN 003153, SR-34 OVER POOR HOUSE BRANCH, 0.23 MILES NORTH OF CR-332. (SUFF=47.8, STAT=FO, 2001 HBRRP LIST)

Project Length in Miles 0.013  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100041644 PE 2016

100041617 BR 0034 (501) CONSTRUCTION BRIDGE REPLACEMENT 2020 $1,589 $397 $0 $1,986TOTAL COST: $1,589 $397 $0 $1,986

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

181 of 206

HIGHWAY PROJECTS - TALLADEGASTIP PLAN: 2020 - Original

Page 182: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-22 Project Description RESURFACING, TRAFFIC STRIPING AND 2 FT SAFETY WIDENING ON SR-22 FROM .55 MILE SOUTH OF HILLABEE CREEK (MP 122.437) TO SR-49 (MP 130.587)

Project Length in Miles 8.150  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069807 STPAA-HSIP 0022 (532) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2020 $2,398 $559 $0 $2,957

TOTAL COST: $2,398 $559 $0 $2,957

Route SR-49 Project Description RESURFACING, TRAFFIC STRIPING AND 2 FT SAFETY WIDENING ON SR-49 FROM MP 48.302 (SR 22 INT.) TO MP 52.920 (TALLAPOOSA/CLAY COUNTY LINE)

Project Length in Miles 4.619  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069806 STPAA-HSIP 0049 (514) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2020 $1,359 $292 $0 $1,651

TOTAL COST: $1,359 $292 $0 $1,651

Route SR-50 Project Description REPLACE BRIDGE ON SR-50 OVER WIND CREEK BIN 004389

Project Length in Miles 0.030  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067062 PE 2019

100049968 BR 0050 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $2,518 $630 $0 $3,148TOTAL COST: $2,518 $630 $0 $3,148

Route SR-50 Project Description RESURFACING, TRAFFIC STRIPE, AND 2 FT SAFETY WIDENING ON SR-50 FROM SR-38 (US-280) (MP 523.108) TO THE CHAMBERS COUNTY LINE (MP 528.520)

Project Length in Miles 5.412  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068385 STPAA-HSIP 0050 (506) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2020 $1,636 $364 $0 $2,000

TOTAL COST: $1,636 $364 $0 $2,000

Route SR-63 Project Description BRIDGE REPLACEMENT (BIN 014307) ON SR-63 OVER SUGAR CREEK #63-62-11.9

Project Length in Miles 0.240  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068200 PE 2018

100067663 BR 0063 (507) CONSTRUCTION BRIDGE REPLACEMENT 2021 $1,236 $309 $0 $1,545TOTAL COST: $1,236 $309 $0 $1,545

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

182 of 206

HIGHWAY PROJECTS - TALLAPOOSASTIP PLAN: 2020 - Original

Page 183: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-124 Project Description BRIDGE REPLACEMENT CR-124 (OLD FAYETTE ROAD) OVER BARBEE CREEK BIN# 14309

Project Length in Miles 0.000  Urban Area TUSCALOOSA   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059618 ACBRZ59618 ATRP (010) CONSTRUCTION BRIDGE REPLACEMENT 2020 $383 $0 $96 $479

TOTAL COST: $383 $0 $96 $479

Route CR-124 Project Description BRIDGE REPLACEMENT CR-124 (OLD FAYETTE ROAD) OVER AN UNNAMED TRIBUTARY TO BINION CREEK BIN#12282

Project Length in Miles 0.000  Urban Area TUSCALOOSA   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059619 ACBRZ59619 ATRP (010) CONSTRUCTION BRIDGE REPLACEMENT 2020 $241 $0 $60 $302

TOTAL COST: $241 $0 $60 $302

Route CR-1358 Project Description BRIDGE REPLACEMENT ON CR-1358 (HOLMAN CHURCH ROAD) OVER KANSAS CITY SOUTHERN RAILROAD

Project Length in Miles 0.000  Urban Area TUSCALOOSA   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059621 ACBRZ59621 ATRP (007) CONSTRUCTION BRIDGE REPLACEMENT 2020 $694 $0 $173 $867

TOTAL COST: $694 $0 $173 $867

Route CR-NA Project Description STREETSCAPE IMPROVEMENTS ON MAIN AVENUE FROM 4TH STREET TO 1ST STREET - PHASE I

Project Length in Miles 0.000  Urban Area TUSCALOOSA   Sponsor NORTHPORT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069015 TAPAA TA19 (910) CONSTRUCTION STREETSCAPE 2020 $593 $0 $148 $742

TOTAL COST: $593 $0 $148 $742

Route CR-NA Project Description RESURFACE ELIGIBLE STREETS IN THE CITY OF TUSCALOOSA FY10

Project Length in Miles 0.000  Urban Area TUSCALOOSA   Sponsor TUSCALOOSA CITY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100053859 STPAA 6314 () CONSTRUCTION RESURFACING 2022 $251 $63 $0 $313

TOTAL COST: $251 $63 $0 $313

Route CR-NA Project Description WIDENING OF FOSTERS FERRY ROAD FROM JOE MALISHAM PARKWAY TO 29TH STREET

Project Length in Miles 1.365  Urban Area TUSCALOOSA   Sponsor TUSCALOOSA CITY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100061873 ACOA61873 ATRP (017) CONSTRUCTION RESURFACING 2020 $1,491 $0 $373 $1,864

TOTAL COST: $1,491 $0 $373 $1,864

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

183 of 206

HIGHWAY PROJECTS - TUSCALOOSASTIP PLAN: 2020 - Original

Page 184: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description INTERSECTION AND SAFETY IMPROVEMENTS, ROUNDABOUTS, ON 5TH STREET AT SR-13 (LURLEEN WALLACE BOULEVARD), ROBERT CARDINAL ROAD, KENTUCK PARK/WEST CIRCLE, AND BRIDGE AVENUE

Project Length in Miles 0.000  Urban Area TUSCALOOSA   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064427 PE 2015 / 100068208 RW 2021 / 100068951 UT 2022 / 100064428 CN 2022

100068208 HSIPF 6315 (250) RIGHT OF WAY SAFETY IMPROVEMENTS 2021 $227 $25 $0 $253100068951 HSIPF 6315 () UTILITIES SAFETY IMPROVEMENTS 2022 $232 $26 $0 $258100064428 HSIPF 6315 () CONSTRUCTION SAFETY IMPROVEMENTS 2022 $1,930 $214 $0 $2,144

TOTAL COST: $2,389 $265 $0 $2,654

Route CR-NA Project Description MARTIN LUTHER KING BOULEVARD FROM SNOWS MILL AVENUE TO SR-69, ADD TURN LANES, REALIGNMENT OF INTERSECTIONS, SIDEWALKS, LIGHTING, AND BRIDGE REPLACEMENT OVER TWO MILE CREEK

Project Length in Miles 3.450  Urban Area TUSCALOOSA   Sponsor NORTHPORT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065002 PE 2017

100008464 STPOA 6317 (250) RIGHT OF WAY TURN LANES 2020 $910 $0 $228 $1,138100043870 STPOA 6317 (250) UTILITIES TURN LANES 2021 $460 $0 $115 $575100008460 ACSTPOA 6317 () CONSTRUCTION TURN LANES 2021 $5,517 $0 $1,379 $6,897

TOTAL COST: $6,888 $0 $1,722 $8,610

Route CR-NA Project Description WIDENING, STRIPING AND OTHER IMPROVEMENTS ON WATERMELON ROAD FROM SR-6 (US-82) TO SNOWS MILL AVENUE SPONSOR: CITY OF TUSCALOOSA

Project Length in Miles 1.500  Urban Area TUSCALOOSA   Sponsor TUSCALOOSA CITY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067467 PE 2019

100008465 STPOA 6314 (253) RIGHT OF WAY WIDENING AND RESURFACING (RDWY)

2020 $455 $0 $114 $569100043871 STPOA 6314 (253) UTILITIES WIDENING AND RESURFACING

(RDWY)2021 $276 $0 $69 $345

100008461 STPOA 6314 () CONSTRUCTION WIDENING AND RESURFACING (RDWY)

2021 $460 $0 $115 $575TOTAL COST: $1,191 $0 $298 $1,489

Route CR-NA Project Description SIDEWALK ALONG CYPRESS CREEK AVENUE FROM SOUTH OF RUNNING BROOK APARTMENTS TO SKYLAND BOULEVARD - PHASE III (SECTION D)

Project Length in Miles 0.000  Urban Area TUSCALOOSA   Sponsor TUSCALOOSA CITY   LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068781 RW 2021 / 100068372 CN 2021

100068781 TAPAA TA18 (916) RIGHT OF WAY SIDEWALK 2021 $101 $0 $25 $126100068372 TAPAA TA18 (916) CONSTRUCTION SIDEWALK 2021 $194 $0 $48 $242

TOTAL COST: $294 $0 $74 $368

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

184 of 206

HIGHWAY PROJECTS - TUSCALOOSASTIP PLAN: 2020 - Original

Page 185: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description SIDEWALK ON CYPRESS CREEK AVENUE FROM THE CYPRESS CREEK APARTMENTS TO THE REGAL POINTE APARTMENTS

Project Length in Miles 0.000  Urban Area TUSCALOOSA   Sponsor TUSCALOOSA CITY   LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064558 CN 2017 / 100067288 CN 2020

100067288 TAPOA TA17 (944) CONSTRUCTION SIDEWALK 2020 $400 $0 $100 $500TOTAL COST: $400 $0 $100 $500

Route I-59 Project Description RESURFACING THE SERVICE ROADS ON I-59 AT EXIT 89

Project Length in Miles 0.000  Urban Area TUSCALOOSA   Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069098 CN 2021

100069097 IM I059 () PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 2

2020 $227 $25 $0 $253100069098 IM I059 () CONSTRUCTION PREVENTATIVE MAINTENANCE

LEVEL 22021 $995 $111 $0 $1,106

TOTAL COST: $1,222 $136 $0 $1,358

Route I-59 Project Description GUIDE RAIL INSTALLATION ON I-59 FROM GREENE COUNTY LINE TO .25 MI SOUTH OF SR-6 (US-82)(MCFARLAND BLVD)

Project Length in Miles 17.651  Urban Area TUSCALOOSA   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064197 PE 2019 / 100060977 CN 2021

100060977 HSIP I059 (413) CONSTRUCTION SAFETY IMPROVEMENTS 2021 $1,244 $138 $0 $1,382TOTAL COST: $1,244 $138 $0 $1,382

Route I-59 Project Description RESURFACING ON I-59 (I-20) FROM SR-69 (I-359) TO EAST OF SR-6 (US-82) AND ADDITIONAL LANES BETWEEN SR-215 AND SR-6 (US-82), GRADE, DRAIN, BASE, PAVE, SIGNING, STRIPING, AND RESURFACING

Project Length in Miles 2.500  Urban Area TUSCALOOSA   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064910 PE 2017

100039473 IM-NH I059 (399) CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2021 $3,935 $941 $0 $4,876TOTAL COST: $3,935 $941 $0 $4,876

Route I-59 Project Description ROUNDABOUTS, SIGNING AND STRIPING ON I-59/I-20 ON-RAMPS AND OFF-RAMPS AT EXIT 79 (SR-7/US-11 INTERSECTION)

Project Length in Miles 0.628  Urban Area TUSCALOOSA   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068078 PE 2019 / 100068090 RW 2021 / 100068091 UT 2021 / 100068092 CN 2021

100068092 HSIP I059 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $1,469 $163 $0 $1,632100068090 HSIP I059 (414) RIGHT OF WAY SAFETY IMPROVEMENTS 2021 $93 $10 $0 $103100068091 HSIP I059 (414) UTILITIES SAFETY IMPROVEMENTS 2021 $93 $10 $0 $103

TOTAL COST: $1,654 $184 $0 $1,838

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

185 of 206

HIGHWAY PROJECTS - TUSCALOOSASTIP PLAN: 2020 - Original

Page 186: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description SR-7 (US-11) SIDEWALK PROJECT FROM WESTLEE DRIVE TO 21ST STREET IN TUSCALOOSA COUNTY

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064557 TAPAAF TA15 (942) CONSTRUCTION SIDEWALK 2019 $625 $0 $156 $782

TOTAL COST: $625 $0 $156 $782

Route NA Project Description WIDEN AND IMPROVE PEDESTRIAN ACCESS 10TH AVENUE FROM 31ST STREET TO 15TH STREET IN TUSCALOOSA TO BE FUNDED BY HOUSING AND URBAN DEVELOPMENT (HUD)

Project Length in Miles 0.000  Urban Area TUSCALOOSA   Sponsor TUSCALOOSA CITY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059446 HUD FUNDS & LOCAL

FUNDS ()CONSTRUCTION RESURFACING 2020 $5,440 $0 $1,360 $6,800

TOTAL COST: $5,440 $0 $1,360 $6,800

Route NA Project Description GUARDRAIL FOR ROADWAY SAFETY ASSESSMENT SITES ON SR-7 AND SR-171 IN TUSCALOOSA COUNTY

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067055 HSIP NR17 (935) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $624 $69 $0 $693

TOTAL COST: $624 $69 $0 $693

Route NA Project Description CURB RAMP INSTALLATION ON STATE ROUTES 5, 6, 7, 13, 69, 171, 215, 216, 297 AND 300 IN TUSCALOOSA COUNTY

Project Length in Miles 0.000  Urban Area TUSCALOOSA   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068201 STPAA NR18 () CONSTRUCTION SIDEWALK 2023 $231 $58 $0 $289

TOTAL COST: $231 $58 $0 $289

Route SR-171 Project Description REALIGNING SR-171 AND ADD TURNING LANE AT PREWITT LOOP ROAD

Project Length in Miles 0.915  Urban Area TUSCALOOSA   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069513 PE 2019 / 100069514 RW 2020 / 100069515 UT 2021 / 100069516 CN 2021

100069516 HSIP 0171 (516) CONSTRUCTION SAFETY IMPROVEMENTS 2021 $1,377 $153 $0 $1,530100069514 HSIP 0171 (516) RIGHT OF WAY SAFETY IMPROVEMENTS 2020 $27 $3 $0 $30100069515 HSIP 0171 (516) UTILITIES SAFETY IMPROVEMENTS 2021 $23 $3 $0 $26

TOTAL COST: $1,427 $159 $0 $1,586

Route SR-297 Project Description SR-297 ROW CORRIDOR PRESERVATION TUSCALOOSA EAST BYPASS

Project Length in Miles 19.962  Urban Area TUSCALOOSA   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100043861 RW 2003

100060575 DESTP-NCPD 0297 (907) PRELIMINARY ENGINEERING UNCLASSIFIED 2020 $6 $2 $0 $8TOTAL COST: $6 $2 $0 $8

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

186 of 206

HIGHWAY PROJECTS - TUSCALOOSASTIP PLAN: 2020 - Original

Page 187: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-5 Project Description SR-5 BRIDGE REMOVAL STR# 5-63-2.3 A AND B OVER ABANDON L AND N RR, BIN 005799 AND 005800

Project Length in Miles 1.380  Urban Area TUSCALOOSA   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100057835 BR 0005 (540) UTILITIES OVERPASS REMOVAL 2022 $67 $17 $0 $84100038399 BR 0005 () CONSTRUCTION OVERPASS REMOVAL 2022 $764 $191 $0 $955

TOTAL COST: $831 $208 $0 $1,038

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

187 of 206

HIGHWAY PROJECTS - TUSCALOOSASTIP PLAN: 2020 - Original

Page 188: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-6 Project Description INTERSECTION IMPROVEMENTS ON SR-6 (US-82 / MCFARLAND BOULEVARD) AT SR-69

Project Length in Miles 1.230  Urban Area TUSCALOOSA   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068735 CN 2024

100068588 TRC-ST-063-006-019-PE ()

PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $0 $0 $250 $250100068733 NH 0006 () RIGHT OF WAY INTERSECTION IMPROVEMENTS 2022 $416 $104 $0 $520100068734 NH 0006 () UTILITIES INTERSECTION IMPROVEMENTS 2023 $631 $158 $0 $788

TOTAL COST: $1,047 $262 $250 $1,559

Route SR-6 Project Description WIDENING AND INTERCHANGE IMPROVEMENTS ON SR-6 (US-82; MCFARLAND BOULEVARD) AT UNIVERSITY BOULEVARD

Project Length in Miles 0.250  Urban Area TUSCALOOSA   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064403 PE 2015 / 100065855 RW 2020 / 100065854 UT 2020

100064404 TRC-ACAA64404 ATRP (004)

CONSTRUCTION INTERCHANGE 2020 $7,257 $1,814 $0 $9,072TOTAL COST: $7,257 $1,814 $0 $9,072

Route SR-6 Project Description ACCESS MANAGEMENT AND BICYCLE/PEDESTRIAN IMPROVEMENTS ALONG SR-6 (US-82/MCFARLAND BLVD.) FROM ROSE BLVD. TO SR-69

Project Length in Miles 4.282  Urban Area TUSCALOOSA   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065113 PE 2020 / 100065115 UT 2022

100065114 TRC-ST-063-999-038-CN ()

CONSTRUCTION INTERSECTION IMPROVEMENTS 2022 $0 $0 $7,195 $7,195TOTAL COST: $0 $0 $7,195 $7,195

Route SR-6 Project Description ADDITIONAL LANES, ACCESS MANAGEMENT, AND BICYCLE/PEDESTRIAN IMPROVEMENTS ALONG SR-6 (US-82/ MCFARLAND BLVD.) FROM WEST OF SR-69 TO RICE MINE ROAD

Project Length in Miles 8.710  Urban Area TUSCALOOSA   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065936 PE 2016

100067680 RACR-063-999-033-RW ()

RIGHT OF WAY ADDITIONAL ROADWAY LANES 2020 $0 $1,100 $0 $1,100100066242 TRC-RACR-063-999-033-

UT ()UTILITIES ADDITIONAL ROADWAY LANES 2020 $0 $312 $0 $312

100004617 TRC-RACR-063-999-033-CN ()

CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $0 $25,322 $0 $25,322TOTAL COST: $0 $26,734 $0 $26,734

Route SR-6 Project Description BRIDGE REPLACEMENT ON SR-6 (US-82) OVER BIG CREEK (BIN 5819 AND 5818)

Project Length in Miles 0.620  Urban Area TUSCALOOSA   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069590 PE 2019

100069591 BR 0006 () CONSTRUCTION BRIDGE REPLACEMENT 2022 $2,061 $515 $0 $2,576TOTAL COST: $2,061 $515 $0 $2,576

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

188 of 206

HIGHWAY PROJECTS - TUSCALOOSASTIP PLAN: 2020 - Original

Page 189: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-69 Project Description INSTALLATION OF CONFLICT WARNING SYSTEM AT SR-69 AND CR-74 (UPPER HULL ROAD)

Project Length in Miles 0.000  Urban Area TUSCALOOSA   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071582 HSIP 0069 () CONSTRUCTION SAFETY IMPROVEMENTS 2020 $90 $10 $0 $100

TOTAL COST: $90 $10 $0 $100

Route SR-69 Project Description SR-69 INTERSECTION IMPROVEMENTS FROM PLANTATION ROAD TO THE I-59 OVERPASS (INCLUDING THE ALABAMA SOUTHERN RAILROAD OVERPASS)

Project Length in Miles 1.430  Urban Area TUSCALOOSA   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100057983 PE 2012 / 100057985 RW 2019 / 100057986 UT 2020

100057987 TRC-NHF 0069 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $41,917 $0 $10,479 $52,396TOTAL COST: $41,917 $0 $10,479 $52,396

Route SR-7 Project Description REPLACE BRIDGE (BIN 005140) ON SR-7 (US-11) OVER NORFOLK SOUTHERN RAILROAD (SUFF =12.5, STAT= SD)

Project Length in Miles 0.786  Urban Area TUSCALOOSA   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100055889 PE 2017

100055891 BR 0007 (546) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $125 $31 $0 $156100055892 BR 0007 (546) UTILITIES BRIDGE REPLACEMENT 2021 $142 $36 $0 $178100055893 RP-BR 0007 (546) CONSTRUCTION BRIDGE REPLACEMENT 2021 $2,724 $681 $0 $3,405

TOTAL COST: $2,991 $748 $0 $3,739

Route SR-7 Project Description ROUNDABOUT CONSTRUCTION AT THE INTERSECTION OF SR-7 (US-11) AND SR-300 (HOLLEY SPRINGS LANE) IN FOSTERS

Project Length in Miles 0.900  Urban Area TUSCALOOSA   Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068206 PE 2019 / 100069423 RW 2020 / 100069424 UT 2021 / 100069425 CN 2021

100069423 HSIP 0007 (551) RIGHT OF WAY SAFETY IMPROVEMENTS 2020 $227 $25 $0 $253100069424 HSIP 0007 (551) UTILITIES SAFETY IMPROVEMENTS 2021 $230 $26 $0 $255100069425 HSIP 0007 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $2,295 $255 $0 $2,550

TOTAL COST: $2,752 $306 $0 $3,058

Route SR-7 Project Description ADD LANES ON SR-7 (US-11) FROM DAIMLER BENZ BOULEVARD TO THE INTERSECTION OF SR-5

Project Length in Miles 20.760  Urban Area TUSCALOOSA   Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068754 PE 2018 / 100068927 PE 2018

100068755 STPAAF 0007 (549) RIGHT OF WAY ADDITIONAL ROADWAY LANES 2020 $7,052 $1,763 $0 $8,815100068756 STPAAF 0007 (549) UTILITIES ADDITIONAL ROADWAY LANES 2021 $4,945 $1,236 $0 $6,182100068757 ACSTPAAF 0007 (549) CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $41,964 $10,491 $0 $52,455

TOTAL COST: $53,961 $13,490 $0 $67,451

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

189 of 206

HIGHWAY PROJECTS - TUSCALOOSASTIP PLAN: 2020 - Original

Page 190: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-11 Project Description WIDENING, RESURFACING, CULVERT EXTENSIONS, AND TRAFFIC STRIPE ON COUNTY ROAD 11 (NAUVOO ROAD) FROM 9TH AVENUE NORTHWEST TO KEETON FARM ROAD

Project Length in Miles 5.789  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070573 RASTPNU 6419 (251) CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2020 $1,212 $0 $453 $1,666

TOTAL COST: $1,212 $0 $453 $1,666

Route CR-27 Project Description RESURFACING AND TRAFFIC STRIPE ON CR-27 (FALL CITY ROAD) FROM SR-195 TO THE WINSTON COUNTY LINE - WCP 64-01-18

Project Length in Miles 6.684  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070272 RASTPAA 6419 (250) CONSTRUCTION RESURFACING 2020 $1,261 $0 $315 $1,577

TOTAL COST: $1,261 $0 $315 $1,577

Route CR-64 Project Description BRIDGE ALONG CR-64 (BROWNS BRIDGE ROAD) OVER LOST CREEK BIN # 11168

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060969 ACBRZ60969 ATRP (008) CONSTRUCTION BRIDGES AND APPROACHES 2020 $1,558 $0 $389 $1,947

TOTAL COST: $1,558 $0 $389 $1,947

Route CR-NA Project Description STREETSCAPE IMPROVEMENTS ON 18TH STREET WEST FROM ALABAMA AVENUE TO 2ND AVENUE, 18TH STREET WEST FROM 3RD AVENUE TO 4TH AVENUE, 18TH STREET WEST FROM 5TH AVENUE TO 6TH AVENUE, AND ON 6TH AVENUE FROM 18TH STREET WEST TO 19TH STREET WEST

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069014 TAPAA TA19 (909) CONSTRUCTION STREETSCAPE 2019 $640 $0 $160 $800

TOTAL COST: $640 $0 $160 $800

Route CR-NA Project Description BRIDGE REPLACEMENT AND APPROACHES ON SMITH CHAPEL ROAD OVER MILL CREEK BIN# 87

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060970 ACBRZ60970 ATRP (008) CONSTRUCTION BRIDGE REPLACEMENT 2020 $825 $0 $206 $1,031

TOTAL COST: $825 $0 $206 $1,031

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

190 of 206

HIGHWAY PROJECTS - WALKERSTIP PLAN: 2020 - Original

Page 191: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route I-22 Project Description ROUNDABOUTS, SIGNING AND STRIPING ON I-22 ON-RAMPS AND OFF-RAMPS AT EXIT 70 (CR-22 INTERSECTION)

Project Length in Miles 0.400  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068095 RW 2021 / 100068096 UT 2021 / 100068097 CN 2021

100068094 HSIP I022 (314) PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2019 $227 $25 $0 $253100068095 HSIP I022 () RIGHT OF WAY SAFETY IMPROVEMENTS 2021 $93 $10 $0 $103100068096 HSIP I022 () UTILITIES SAFETY IMPROVEMENTS 2021 $93 $10 $0 $103100068097 HSIP I022 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $1,170 $130 $0 $1,300

TOTAL COST: $1,583 $176 $0 $1,759

Route I-22 Project Description RESURFACING ON I-22 FROM .8 MILE EAST OF THE CR-61 OVERPASS TO THE JEFFERSON COUNTY LINE

Project Length in Miles 7.696  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069101 PE 2019 / 100069103 CN 2020

100069103 IM-IMGR I022 (313) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1

2020 $7,689 $854 $0 $8,544TOTAL COST: $7,689 $854 $0 $8,544

Route SR-5 Project Description BRIDGE REPLACEMENT ON SR-5 OVER SR-69 (US-78) BIN #007638

Project Length in Miles 0.500  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100003191 PE 1999 / 100038339 RW 2012

100040851 BRF 0005 (534) UTILITIES BRIDGE REPLACEMENT 2021 $23 $6 $0 $29100003188 BR 0005 (534) CONSTRUCTION BRIDGE REPLACEMENT 2021 $5,765 $1,441 $0 $7,206

TOTAL COST: $5,788 $1,447 $0 $7,235

Route SR-5 Project Description REMOVE BIN #004013, SR-5 (US-78) OVER ABANDONED FRISCO (BNSF) RAILROAD, NEAR DORA

Project Length in Miles 0.182  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100042712 RW 2024 / 100042710 CN 2024

100065246 BR 0005 () PRELIMINARY ENGINEERING BRIDGE REMOVAL 2021 $126 $32 $0 $158100042711 BR 0005 () UTILITIES BRIDGE REMOVAL 2023 $59 $15 $0 $74

TOTAL COST: $185 $46 $0 $232

Route SR-5 Project Description MICRO-MILLING AND RESURFACING ON SR-5 FROM THE JASPER CITY LIMITS TO THE 9TH AVENUE OVERPASS

Project Length in Miles 4.452  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068629 NH 0005 (559) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $3,808 $952 $0 $4,761

TOTAL COST: $3,808 $952 $0 $4,761

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

191 of 206

HIGHWAY PROJECTS - WALKERSTIP PLAN: 2020 - Original

Page 192: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-69 Project Description RESURFACING ON SR-69 FROM MP 200.408 AT INTERSECTION WITH SR-269 TO MP 202.570 AT INTERSECTION WITH SR-118

Project Length in Miles 2.140  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068627 STPAA 0069 (559) FEDERAL MAINT CN PAVEMENT MINOR

REHABILITATION2020 $1,423 $356 $0 $1,779

TOTAL COST: $1,423 $356 $0 $1,779

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

192 of 206

HIGHWAY PROJECTS - WALKERSTIP PLAN: 2020 - Original

Page 193: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-34 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 003074) ON CR-34 OVER MILL CREEK; SITE 2 - (BIN 010751) ON CR-16 OVER BILBO CREEK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071478 HRRR 6520 () CONSTRUCTION GUARDRAIL 2020 $86 $0 $10 $95

TOTAL COST: $86 $0 $10 $95

Route SR-57 Project Description RESURFACING ON SR-57 (US-45) FROM .34 MILE NORTH OF DOUG PRICE ROAD TO THE MISSISSIPPI STATE LINE

Project Length in Miles 8.210  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070067 NH 0057 (501) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,481 $370 $0 $1,851

TOTAL COST: $1,481 $370 $0 $1,851

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

193 of 206

HIGHWAY PROJECTS - WASHINGTONSTIP PLAN: 2020 - Original

Page 194: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-190 Project Description BRIDGE REPLACEMENT ON CR-190 (WILLIE POWELL ROAD) OVER MUD CREEK BIN # 1147 (R.A.M.P.)

Project Length in Miles 51.400  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060499 ACBRZ60499 ATRP (008) CONSTRUCTION BRIDGE 2021 $436 $109 $0 $545

TOTAL COST: $436 $109 $0 $545

Route CR-22 Project Description WIDENING, RESURFACING, AND STRIPING ON CR-22 FROM SR-221 TO SR-10 - WCP 66-10-16

Project Length in Miles 1.300  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070597 STPNU 6616 (251) CONSTRUCTION RESURFACING 2020 $381 $95 $0 $477

TOTAL COST: $381 $95 $0 $477

Route CR-24 Project Description BRIDGE REPLACEMENT ON CR-24 (ALLENTON ROAD) OVER BEAR CREEK (R.A.M.P.) BIN # 6600

Project Length in Miles 0.000  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063410 PE 2015 / 100060443 CN 2021

100060443 BRZ 6615 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $260 $0 $65 $325TOTAL COST: $260 $0 $65 $325

Route CR-NA Project Description TRAIN DEPOT RESTORATION IN THE TOWN OF PINE HILL

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069033 TAPNU TA19 (927) CONSTRUCTION UNCLASSIFIED 2019 $31 $0 $8 $39

TOTAL COST: $31 $0 $8 $39

Route SR-265 Project Description RESURFACING AND 2 FOOT SAFETY WIDENING ON SR-265 FROM THE MONROE COUNTY LINE TO 0.97 MILE NORTH OF CR-51

Project Length in Miles 6.037  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069685 STPAA-HSIP 0265 (502) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2020 $1,121 $244 $0 $1,365

TOTAL COST: $1,121 $244 $0 $1,365

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

194 of 206

HIGHWAY PROJECTS - WILCOXSTIP PLAN: 2020 - Original

Page 195: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-5 Project Description BRIDGE REPLACEMENT ON SR-5 OVER MUD CREEK (BIN #001717)

Project Length in Miles 2.576  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100051321 PE 2011

100051323 BR 0005 (529) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $42 $11 $0 $53100051324 BR 0005 (529) UTILITIES BRIDGE REPLACEMENT 2021 $221 $55 $0 $276100051325 BR 0005 (529) CONSTRUCTION BRIDGE REPLACEMENT 2021 $3,010 $752 $0 $3,762

TOTAL COST: $3,272 $818 $0 $4,091

Route SR-5 Project Description SR-5 BRIDGE REPLACEMENT BIN 002261 AT CUB CREEK AND BIN 002262 AT MOCCASIN CREEK

Project Length in Miles 0.010  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100052908 PE 2009 / 100052911 RW 2015 / 100052918 UT 2018

100052919 BRF 0005 (527) CONSTRUCTION BRIDGE REPLACEMENT 2020 $5,205 $1,301 $0 $6,506TOTAL COST: $5,205 $1,301 $0 $6,506

Route SR-5 Project Description RESURFACING ON SR-5 FROM CLARKE CO. LINE TO SOUTH OF THE MOCCASIN CREEK BRIDGE PROJECT

Project Length in Miles 4.301  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071532 NH 0005 (560) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $1,050 $263 $0 $1,313

TOTAL COST: $1,050 $263 $0 $1,313

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

195 of 206

HIGHWAY PROJECTS - WILCOXSTIP PLAN: 2020 - Original

Page 196: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-2 Project Description RESURFACING AND TRAFFIC STRIPE ON FOREST HIGHWAY 5 ALONG CR-2 FROM SR-195 TO SR-33 WCP 67-195-17

Project Length in Miles 5.400  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069403 FLAP FLAP (029) CONSTRUCTION RESURFACING 2020 $670 $0 $168 $838

TOTAL COST: $670 $0 $168 $838

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

196 of 206

HIGHWAY PROJECTS - WINSTONSTIP PLAN: 2020 - Original

Page 197: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description ATRIP AND CBD DEBT SERVICE PAYMENT SCHEDULE FY 2020

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064435 FRT-NH-BRZ-STPAA-NU

ATRP (999)SPECIAL UNCLASSIFIED 2020 $104,100 $20,185 $0 $124,285

TOTAL COST: $104,100 $20,185 $0 $124,285

Route NA Project Description ATRIP AND CBD DEBT SERVICE PAYMENT SCHEDULE FY 2023

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064436 FRT-NH-BRZ-STPNU

ATRP (999)SPECIAL UNCLASSIFIED 2023 $104,100 $20,185 $0 $124,285

TOTAL COST: $104,100 $20,185 $0 $124,285

Route NA Project Description ATRIP AND CBD DEBT SERVICE PAYMENT SCHEDULE FY 2021

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064437 FRT-NH-BRZ-STPOA-NU

ATRP (999)SPECIAL UNCLASSIFIED 2021 $104,100 $20,185 $0 $124,285

TOTAL COST: $104,100 $20,185 $0 $124,285

Route NA Project Description ATRIP AND CBD DEBT SERVICE PAYMENT SCHEDULE FY 2022

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064438 FRT-NH-BRZ-STPNU

ATRP (999)SPECIAL UNCLASSIFIED 2022 $104,100 $20,185 $0 $124,285

TOTAL COST: $104,100 $20,185 $0 $124,285

Route NA Project Description DEVELOPMENT OF USRAP (PHASE VI); COVERING THE STATE

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066678 HSIP NR20 (905) SPECIAL UNCLASSIFIED 2020 $312 $35 $0 $347

TOTAL COST: $312 $35 $0 $347

Route NA Project Description STATEWIDE MANAGEMENT FOR THE OUTDOOR ADVERTISING PROGRAM FY2018 AND FY2019

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067541 TAPAA TA18 (903) SPECIAL UNCLASSIFIED 2020 $960 $0 $240 $1,200

TOTAL COST: $960 $0 $240 $1,200

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

197 of 206

HIGHWAY PROJECTS - STATEWIDESTIP PLAN: 2020 - Original

Page 198: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description ROADSIDE SAFETY POOLED FUND PROGRAM

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068433 HSIP NR18 () SPECIAL UNCLASSIFIED 2020 $46 $5 $0 $51

TOTAL COST: $46 $5 $0 $51

Route NA Project Description POOLED FUND STUDY - SHRP 2 NATURALISTIC DRIVING STUDY (FOR 5 YEARS)

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068434 HSIP NR18 () SPECIAL UNCLASSIFIED 2020 $230 $26 $0 $255

TOTAL COST: $230 $26 $0 $255

Route NA Project Description LEVEL OF EFFORT COUNTY ALLOCATED FUNDS FY 2020

Project Length in Miles 0.000  Sponsor ALDOT  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069255 COUNTY LVOE () SPECIAL UNCLASSIFIED 2020 $34,306 $0 $8,576 $42,882

TOTAL COST: $34,306 $0 $8,576 $42,882

Route NA Project Description LEVEL OF EFFORT COUNTY ALLOCATED FUNDS FY 2021

Project Length in Miles 0.000  Sponsor ALDOT  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069259 COUNTY LVOE () SPECIAL UNCLASSIFIED 2021 $10,417 $0 $2,604 $13,021

TOTAL COST: $10,417 $0 $2,604 $13,021

Route NA Project Description LEVEL OF EFFORT RECREATIONAL TRAILS FOR FY 2020

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Rec Trails COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069264 RECREATIONAL TRAILS

LVOE ()SPECIAL UNCLASSIFIED 2020 $1,732 $433 $0 $2,165

TOTAL COST: $1,732 $433 $0 $2,165

Route NA Project Description LEVEL OF EFFORT RECREATIONAL TRAILS FOR FY 2021

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Rec Trails COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069265 RECREATIONAL TRAILS

LVOE ()SPECIAL UNCLASSIFIED 2021 $1,732 $433 $0 $2,165

TOTAL COST: $1,732 $433 $0 $2,165

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

198 of 206

HIGHWAY PROJECTS - STATEWIDESTIP PLAN: 2020 - Original

Page 199: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description LEVEL OF EFFORT RECREATIONAL TRAILS FOR FY 2022

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Rec Trails COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069266 RECREATIONAL TRAILS

LVOE ()SPECIAL UNCLASSIFIED 2022 $1,732 $433 $0 $2,165

TOTAL COST: $1,732 $433 $0 $2,165

Route NA Project Description LEVEL OF EFFORT RECREATIONAL TRAILS FOR FY 2023

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Rec Trails COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069267 RECREATIONAL TRAILS

LVOE ()SPECIAL UNCLASSIFIED 2023 $1,732 $433 $0 $2,165

TOTAL COST: $1,732 $433 $0 $2,165

Route NA Project Description LEVEL OF EFFORT SAFETY PROGRAM FY 2020

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069268 SAFETY LVOE () SPECIAL UNCLASSIFIED 2020 $63,000 $7,000 $0 $70,000

TOTAL COST: $63,000 $7,000 $0 $70,000

Route NA Project Description LEVEL OF EFFORT SAFETY PROGRAM FY 2021

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069269 SAFETY LVOE () SPECIAL UNCLASSIFIED 2021 $53,071 $5,897 $0 $58,967

TOTAL COST: $53,071 $5,897 $0 $58,967

Route NA Project Description LEVEL OF EFFORT SAFETY PROGRAM FY 2022

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069270 SAFETY LVOE () SPECIAL UNCLASSIFIED 2022 $53,071 $5,897 $0 $58,967

TOTAL COST: $53,071 $5,897 $0 $58,967

Route NA Project Description LEVEL OF EFFORT SAFETY PROGRAM FY 2023

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069271 SAFETY LVOE () SPECIAL UNCLASSIFIED 2023 $53,071 $5,897 $0 $58,967

TOTAL COST: $53,071 $5,897 $0 $58,967

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

199 of 206

HIGHWAY PROJECTS - STATEWIDESTIP PLAN: 2020 - Original

Page 200: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description LEVEL OF EFFORT NON-INTERSTATE RESURFACING (FM) FY 2020

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069273 STATE RESURFACING

LVOE ()SPECIAL UNCLASSIFIED 2020 $224,000 $56,000 $0 $280,000

TOTAL COST: $224,000 $56,000 $0 $280,000

Route NA Project Description LEVEL OF EFFORT NON-INTERSTATE RESURFACING (FM) FY 2021

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069274 STATE RESURFACING

LVOE ()SPECIAL UNCLASSIFIED 2021 $224,000 $56,000 $0 $280,000

TOTAL COST: $224,000 $56,000 $0 $280,000

Route NA Project Description LEVEL OF EFFORT NON-INTERSTATE RESURFACING (FM) FY 2022

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069275 STATE RESURFACING

LVOE ()SPECIAL UNCLASSIFIED 2022 $224,000 $56,000 $0 $280,000

TOTAL COST: $224,000 $56,000 $0 $280,000

Route NA Project Description LEVEL OF EFFORT NON-INTERSTATE RESURFACING (FM) FY 2023

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069276 STATE RESURFACING

LVOE ()SPECIAL UNCLASSIFIED 2023 $224,000 $56,000 $0 $280,000

TOTAL COST: $224,000 $56,000 $0 $280,000

Route NA Project Description LEVEL OF EFFORT FOR TRANSPORTATION ALTERNATIVES PROGRAM FY 2020

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069277 TAP LVOE () SPECIAL UNCLASSIFIED 2020 $30,400 $7,600 $0 $38,000

TOTAL COST: $30,400 $7,600 $0 $38,000

Route NA Project Description LEVEL OF EFFORT FOR TRANSPORTATION ALTERNATIVES PROGRAM FY 2021

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069278 TAP LVOE () SPECIAL UNCLASSIFIED 2021 $16,276 $4,069 $0 $20,345

TOTAL COST: $16,276 $4,069 $0 $20,345

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

200 of 206

HIGHWAY PROJECTS - STATEWIDESTIP PLAN: 2020 - Original

Page 201: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description LEVEL OF EFFORT FOR TRANSPORTATION ALTERNATIVES PROGRAM FY 2022

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069279 TAP LVOE () SPECIAL UNCLASSIFIED 2022 $16,276 $4,069 $0 $20,345

TOTAL COST: $16,276 $4,069 $0 $20,345

Route NA Project Description LEVEL OF EFFORT FOR TRANSPORTATION ALTERNATIVES PROGRAM FY 2023

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069280 TAP LVOE () SPECIAL UNCLASSIFIED 2023 $16,276 $4,069 $0 $20,345

TOTAL COST: $16,276 $4,069 $0 $20,345

Route NA Project Description LEVEL OF EFFORT INTERSTATE RESURFACING FY 2020

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069846 STATE RESURFACING

LVOE ()SPECIAL UNCLASSIFIED 2020 $171,000 $19,000 $0 $190,000

TOTAL COST: $171,000 $19,000 $0 $190,000

Route NA Project Description LEVEL OF EFFORT INTERSTATE RESURFACING FY 2021

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069847 STATE RESURFACING

LVOE ()SPECIAL UNCLASSIFIED 2021 $171,000 $19,000 $0 $190,000

TOTAL COST: $171,000 $19,000 $0 $190,000

Route NA Project Description LEVEL OF EFFORT INTERSTATE RESURFACING FY 2022

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069848 STATE RESURFACING

LVOE ()SPECIAL UNCLASSIFIED 2022 $171,000 $19,000 $0 $190,000

TOTAL COST: $171,000 $19,000 $0 $190,000

Route NA Project Description LEVEL OF EFFORT INTERSTATE RESURFACING FY 2023

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069849 STATE RESURFACING

LVOE ()SPECIAL UNCLASSIFIED 2023 $171,000 $19,000 $0 $190,000

TOTAL COST: $171,000 $19,000 $0 $190,000

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

201 of 206

HIGHWAY PROJECTS - STATEWIDESTIP PLAN: 2020 - Original

Page 202: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description PRIORITIZING INTERSTATE MAINTENANCE PROJECTS FY-20 AND FY-21

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070236 IM NR20 (901) SPECIAL UNCLASSIFIED 2020 $367 $41 $0 $408

TOTAL COST: $367 $41 $0 $408

Route NA Project Description ACCELERATING SAFETY ACTIVITIES PROGRAM (ASAP)

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070667 ASAP NR20 (900) SPECIAL SAFETY IMPROVEMENTS 2019 $20 $5 $0 $25

TOTAL COST: $20 $5 $0 $25

Route NA Project Description STATE/CONSULTANT SUPPORT SERVICES FOR LOCAL TRANSPORTATION BUREAU PROJECTS STATEWIDE, FY 2020 AND FY 2021

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070834 STPAA SP20 (900) SPECIAL UNCLASSIFIED 2020 $162 $40 $0 $202

TOTAL COST: $162 $40 $0 $202

Route NA Project Description FUNDING FOR A US FISH AND WILDLIFE SERVICE (USFWS) POSITION TO PROVIDE PRIORITY REVIEWS FOR DOT PROJECTS FY 2020 - FY 2021

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070880 STPAA NR20 (902) SPECIAL UNCLASSIFIED 2020 $400 $100 $0 $500

TOTAL COST: $400 $100 $0 $500

Route NA Project Description FUNDING FOR A US FISH AND WILDLIFE SERVICE (USFWS) POSITION TO PROVIDE PRIORITY REVIEWS FOR DOT PROJECTS FY 2022 - FY 2023

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070881 STPAA NR20 () SPECIAL UNCLASSIFIED 2022 $408 $102 $0 $510

TOTAL COST: $408 $102 $0 $510

Route NA Project Description FUNDING FOR A US ARMY CORPS OF ENGINEERS (USACE) POSITION TO PROVIDE PRIORITY REVIEWS FOR DOT PROJECTS FY 2020 - FY 2021

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070882 STPAA NR20 (903) SPECIAL UNCLASSIFIED 2020 $400 $100 $0 $500

TOTAL COST: $400 $100 $0 $500

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

202 of 206

HIGHWAY PROJECTS - STATEWIDESTIP PLAN: 2020 - Amendment # 1

Page 203: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description FUNDING FOR A US ARMY CORPS OF ENGINEERS (USACE) POSITION TO PROVIDE PRIORITY REVIEWS FOR DOT PROJECTS FY 22-23

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070883 STPAA NR20 () SPECIAL UNCLASSIFIED 2022 $408 $102 $0 $510

TOTAL COST: $408 $102 $0 $510

Route NA Project Description STATE SUPPORT SERVICES FOR ENVIRONMENTAL DOCUMENT REVIEW FOR VARIOUS PROPOSED AND ONGOING TRANSPORTATION ALTERNATIVE PROJECTS FY 2020 - FY 2021

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071116 TAPAA TA20 (900) SPECIAL UNCLASSIFIED 2020 $40 $10 $0 $50

TOTAL COST: $40 $10 $0 $50

Route NA Project Description ROAD SAFETY REVIEWS FOR VARIOUS SELECTED LOCATIONS ACROSS THE STATE FOR FY 2020 AND FY 2021

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071173 HSIP NR20 (907) SPECIAL SAFETY IMPROVEMENTS 2020 $225 $25 $0 $250

TOTAL COST: $225 $25 $0 $250

Route NA Project Description SAFETY PERFORMANCE FUNCTION (SPF) DEVELOPMENT FOR URBAN 4 LANE 4 LEG DIVIDED SIGNALIZED INTERSECTIONS

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071574 HSIP NR20 () SPECIAL UNCLASSIFIED 2020 $65 $7 $0 $72

TOTAL COST: $65 $7 $0 $72

Route NA Project Description SAFETY PERFORMANCE FUNCTION (SPF) DEVELOPMENT FOR URBAN 4-LANE FREEWAYS, URBAN 6-LANE FREEWAYS, URBAN 4-LANE DIVIDED HIGHWAYS AND URBAN 6-LANE DIVIDED HIGHWAYS

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071575 HSIP NR20 () SPECIAL UNCLASSIFIED 2020 $384 $43 $0 $427

TOTAL COST: $384 $43 $0 $427

Route NA Project Description LOCAL ROAD SAFETY PLAN DEVELOPMENT PHASE I

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071737 HSIP NR20 (913) SPECIAL SAFETY IMPROVEMENTS 2020 $270 $30 $0 $300

TOTAL COST: $270 $30 $0 $300

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

203 of 206

HIGHWAY PROJECTS - STATEWIDESTIP PLAN: 2020 - Original

Page 204: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route NA Project Description DATA COLLECTION AND ASSET EXTRACTION - PILOT PROJECT (MONTGOMERY COUNTY, MACON COUNTY, AND LEE COUNTY)

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071750 HSIP NR20 (914) SPECIAL SAFETY IMPROVEMENTS 2020 $180 $20 $0 $200

TOTAL COST: $180 $20 $0 $200

Route NA Project Description NATIVE AMERICAN CONSULTATION FOR FY 2020-2021

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100059870 PE 2013

100065268 STPAA NR20 (911) SPECIAL UNCLASSIFIED 2020 $146 $36 $0 $182100071553 STPAA NR22 () SPECIAL UNCLASSIFIED 2022 $122 $31 $0 $153

TOTAL COST: $268 $67 $0 $335

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

204 of 206

HIGHWAY PROJECTS - STATEWIDESTIP PLAN: 2020 - Amendment # 1

Page 205: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route CR-NA Project Description HIGH FRICTION SURFACE TREATMENT FOR WEST CENTRAL REGION LOOP RAMPS

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067051 HSIP NR17 (933) CONSTRUCTION SAFETY IMPROVEMENTS 2021 $937 $104 $0 $1,041

TOTAL COST: $937 $104 $0 $1,041

Route CR-NA Project Description UPGRADE PASSIVE WARNING DEVICES AT 178 RR CROSSINGS ON SR,CR AND LR IN FAYETTE AREA INVOLVING CROSSBUCKS,STOP SIGNS,YIELD SIGNS,RETROREFLECTIVE STRIPS ON BACK OF CROSSBUCKS,GATE MECHANISMS,ADVANCE WARNING SIGNS,STRIPING, MARKINGS AND LEGENDS.

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067964 RHCH RR19 (914) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $585 $65 $0 $650

TOTAL COST: $585 $65 $0 $650

Route CR-NA Project Description UPGRADE PASSIVE WARNING DEVICES AT 201 RR CROSSINGS ON SR,CR AND LR IN TUSCALOOSA AREA INVOLVING CROSSBUCKS,STOP AND YIELD SIGNS,RETROREFLECTIVE STRIPS ON BACK OF CROSSBUCKS,GATE MECHANISMS,ADVANCE WARNING SIGNS,STRIPING, MARKINGS AND LEGENDS.

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067965 RHCH RR19 (913) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $585 $65 $0 $650

TOTAL COST: $585 $65 $0 $650

Route I-10 Project Description SOUTHWEST REGION, MOBILE AREA SIGN REPLACEMENT ON I-10, I-65 AND I-165

Project Length in Miles 0.000  Urban Area MOBILE  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100055433 PE 2011 / 100055398 CN 2021

100055398 IM MR15 (901) CONSTRUCTION SIGN REHABILITATION 2021 $5,601 $622 $0 $6,224TOTAL COST: $5,601 $622 $0 $6,224

Route SR-NA Project Description HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENTS ON STATE ROUTES 3,4,5,7,23,25,34,38,53,67,70,74,75,76,79,119,132,139,144,145,149,150,151,155,160, 174,261,269,378 (IN THE BHAM AREA,BLOUNT,ST. CLAIR,SHELBY AND JEFFERSON COUNTIES)

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070820 HSIP MR20 (901) CONSTRUCTION SIGNING 2020 $495 $55 $0 $550

TOTAL COST: $495 $55 $0 $550

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

205 of 206

HIGHWAY PROJECTS - AREAWIDESTIP PLAN: 2020 - Original

Page 206: 5/22/2020 ALABAMA STATEWIDE TRANSPORTATION … · Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal

Route SR-NA Project Description GUARDRAIL FOR WEST CENTRAL REGION ROAD SAFETY ASSESSMENT SITES ON STATE ROUTES 6, 13, 17, 69 AND 269 IN WALKER, WINSTON, PICKENS, AND LAMAR COUNTIES

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071438 HSIP MR20 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $276 $31 $0 $307

TOTAL COST: $276 $31 $0 $307

Route SR-NA Project Description GUARDRAIL FOR WEST CENTRAL REGION ROAD SAFETY ASSESSMENT SITES ON STATE ROUTES 5, 7 AND 13 IN GREENE, SUMTER, AND PERRY COUNTIES

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071439 HSIP MR20 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $303 $34 $0 $337

TOTAL COST: $303 $34 $0 $337

Route SR-NA Project Description HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENTS ON STATE ROUTES 5, 6, 7, 13, 14, 17, 22, 25, 28, 39, 60, 69, 116, 145, 155, 171, 175, 183, 191, 215, 216, 219, 382 IN THE TUSCALOOSA AREA

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066380 SP 2017 / 100068818 CN 2020

100068818 HSIP NR19 (928) CONSTRUCTION SIGNING 2020 $407 $45 $0 $452TOTAL COST: $407 $45 $0 $452

Route SR-NA Project Description HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENTS ON STATE ROUTES 18, 39, 69, 96, 159, 172 IN THE FAYETTE AREA

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066379 SP 2017 / 100068817 CN 2020

100068817 HSIP NR19 (929) CONSTRUCTION SIGNING 2020 $459 $51 $0 $510TOTAL COST: $459 $51 $0 $510

Route SR-NA Project Description HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENTS ON STATE ROUTES 1,4,9,14,15,21,22,38,46,48,49,50,53,63,74,77,115,120,128,144,147,148,200,202,204,229,259,275,281, AND 301 IN THE ALEXANDER CITY AREA

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069610 SP 2019 / 100070569 CN 2020

100070569 HSIP MR20 (900) CONSTRUCTION SIGNING 2020 $476 $53 $0 $529TOTAL COST: $476 $53 $0 $529

6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

206 of 206

HIGHWAY PROJECTS - AREAWIDESTIP PLAN: 2020 - Original