50 years - · PDF file02 KDS 50 years of solid experience KDS is the leading member of the...
Transcript of 50 years - · PDF file02 KDS 50 years of solid experience KDS is the leading member of the...
02
K D S
50 years of solid experience
KDS is the leading member of the
KDS Business Group. The company
was founded on the basis of a state
company that started its activity
in 1964. In 1992, after privatization,
it was registered with the State
Register as stock company Kauno
dujotiekio statyba.
The company takes pride in its
50-year experience of gas and oil
pipeline, gas compressor and distri-
bution station, boiler plant con-
struction, district heating, potable
and wastewater network design and
installation and residential property
development.
KDS Business Group unites 10
companies of diverse business
profiles ranging from industrial
construction to residential devel-
opment and to recreational facil-
ities. The Group’s annual turnover
amounts to EUR 60 million and in
total there are almost 300 people
working for these companies.
03
KDS has expanded its activities to the residen-
tial sector and implemented several successful
apartment building projects in Vilnius and in
the resort town of Palanga. Numerous fuel
base reconstruction projects for the Lithuanian
Railways were also completed.
In cooperation with LMR Drilling GmbH, KDS
implemented the first stage of the strategic
NordBalt Submarine Cable Connection be-
tween Sweden and Lithuania, installing protec-
tive 400 kV cable casing pipes DN300 (2x800 m
and 2x1700 m). The second stage is currently
being implemented in joint cooperation with
another Lithuanian contractor and KDS is
performing land cable laying operations (a total
of 13 km of 400 kV cable within the territory of
Lithuania).
KDS utilizes its own construction and instal-
lation machinery and benefits from its huge
transportation vehicle depot: pipe-layers, ex-
cavators, earthmovers, heavy-duty trucks, off-
road and pipe transportation vehicles, welding
aggregates, compressors and pipe bending
machines, to name a few. As a result of recent
cooperation with Magnatech Pipeline Equip-
ment BV, modern automatic welding equipment
was also acquired.
When choosing materials, KDS relies upon cer-
tified manufacturers with established experi-
ence and appreciated know-how.
In therecentyears, Major KDS projects
for 2014-2015:
• Construction of the strategically
important Gas Transmission Pipeline
Klaipėda-Kuršėnai. Length: approx. 111
km, diameter: 800 mm, MOP: 5.4 MPa.
• Panevėžys Gas Distribution Station
Reconstruction. Maximum capacity:
50 000 nm³/h.
• Reconstruction of Ukmergė Boiler
Plant No. 1. The project includes
installation of a new 6,5 MW biofuel
boiler, a 1,3 MW economizer and all
other necessary equipment.
• Raseiniai Area DN250 District
Heating Supply Network
Modernization.
• Construction of three luxurious
seaside residence buildings in the
resort of Palanga.
• Installation of Water Distribution
Networks in the Towns of Ukmergė
and Anykščiai. Diameter: DN160-
DN200, total length: 40 km.
05
2014-2015
Panevėžys Gas Distribution Station Reconstruction
Maximum capacity: 50 000 nm³/h.
Client: AB Amber Grid, Lithuania.
2011-2012
Girininkai Gas Distribution Station Reconstruction
Inlet pressure: 20-55 bar, outlet pressure: 10 bar,
maximum capacity: 45 000 nm³/h.
Client: AB Lietuvos dujos, Lithuania.
2009-2010
Jauniūnai Gas Compressor Station
The project was significant to the entire Republic of
Lithuania as the gas compressor station increased the
gas pipeline capacity in the territory of Lithuania and
enabled the full supply to the national network as well
as transit to Kaliningrad.
The main functions of the station include gas clean-
ing, gas compression and gas cooling. The station is
equipped with three compressors, 11,5 MW each. Min-
imum inlet pressure: 28 bar, maximum outlet pressure:
55 bar. Gas transfer rate: 1,3 million m³/h.
Client: AB Lietuvos dujos, Lithuania.
2009
Šakiai Gas Distribution Station Reconstruction
Gas metering station expansion to 470 000 nm³/h.
Client: AB Lietuvos dujos, Lithuania.
2008
Zapyškis Gas Distribution Station Reconstruction
Inlet pressure: 20-55 bar, outlet pressure: 3 bar, maxi-
mum capacity: 3000 nm³/h.
Client: AB Lietuvos dujos, Lithuania.
2011-2012
Vilnius Fuel Base Reconstruction
The reconstruction project was awarded by the
Lithuanian Confederation of Industrialists as the
“Product of the Year 2012”.
The old aboveground and underground fuel reservoirs
were replaced and the total number was increased to
eight: 6x83m³ reservoirs + 2 interim and fuel transfer
reservoirs. New tank-car loading and unloading units as
well as a new railway branch were constructed. A new
technological pipeline was designed and installed and so
was a new and completely automated system. Contami-
nants were removed from the soil in the area.
2012-2013
Kaunas Fuel Base Reconstruction
The old fuel bases were dismantled and replaced, four
new 80 m³ underground fuel reservoirs, a brand new
technological pipeline, new oil storage and fuel pumping
units and fully automated systems were designed and
installed.
2012-2013
Vaidotai Fuel Base Reconstruction
The old oil pumping station was dismantled; one of the
three 3000 m³ fuel reservoirs was replaced with two 1000
m³ reservoirs. A new technological pipeline and fire safe-
ty systems were designed and installed, as were the two
new railway branches. New completely automatic and
self-sufficient tank-car loading and unloading systems
and fuel pumping units were installed.
2013-2014
Gas Transmission Pipeline
Szczecin-Lwówek
Diameter: DN700, MOP: 8,4 MPa,
total length: 38,6 km.
Client: Sp. Z.o.o ZRUG, Poland.
2012-2013
Construction of Gas Transmission Pipeline
Branch from Tauragė Gas Distribution Station
to Klaipėda Gas Distribution Station No. 2 and
Klaipėda Gas Distribution Station
Diameter: DN400, MOP: 5,5 MPa, total length:
35,9 km including construction of two DN400
valve fields.
Client: AB Amber Grid, Lithuania.
Gaspipelines
Gas distribution and gas compressor stations
Lithuanian Railways fuel bases
Project references
2011-2012
Gas transmission pipeline Kolnik-Gdansk
Diameter: DN500, MOP: 8,4 MPa,
total gas pipeline length: 6,5 km.
Client: Sp. Z.o.o. ZRUG, Poland.
2009
Gas Transmission Pipeline Šakiai-Kaliningrad
and Šakiai Gas Distribution Station
Diameter: DN700, MOP: 5,5 MPa, total length: 18,6
km including construction of valve fields and gas
metering station expansion to 470 000 nm³/h.
Client: AB Lietuvos dujos, Lithuania.
Total length of medium pressure gas distribu-
tion pipelines constructed in the territory of
Lithuania - approx. 181 km.
04
K D S
06 07
2013
First stage of the NordBalt Submarine Cable Connection
Installation of DN300 protective cable casing pipes (two
800 m strings for the outfall and two 1700 m strings for the
lagoon crossing) which were later installed under the
Curonian lagoon via HDD.
Client: LMR Drilling GmbH, Germany.
2014-present
Second stage of the NordBalt Submarine Cable Connection
Land cable laying operations, a total of 13 km within the
territory of Lithuania.
Client: ABB AB HVC, Sweden.
• Trinapolis Apartment Building in Vilnius,
a total of 43 388 m².
• Žirgų takas Apartment Complex in the resort
town of Palanga, a total of 4406 m².
• Smilčių trio Seaside Apartment Complex in the
resort town of Palanga, a total of 2583 m².
www.smilciutrio.lt/en
KDS is based in Kaunas, Lithuania,
and performs its operations within
entire national territory and the
neighboring countries. The current
number of our employees is 200.
Each and every one of us rep-
resents the spirit of the company:
drive, commitment, and perfect
awareness of our unlimited
potential to grow. We dedicate
our utmost attention to selecting
the most diversely experienced,
skilled and talented people,
knowing that a great team is key
to ensuring our success and im-
provement.
KDS is certified by the Lithuanian Certifi-
cation Center of Building Products (SPSC),
Public Institution Technical Supervision
Service (TPT) and State Energy Inspec-
torate Under the Ministry of Energy of the
Republic of Lithuania.
In January 1997, TÜV Thüringen e.V award-
ed KDS with ISO 9001 certificate, making it
the first quality system certificate issued
to a Lithuanian construction company at
that time. ISO 9001 audits are performed
every year and this allows for constant
improvement of the quality control sys-
tem. The company is currently operating
according to ISO 9001:2008.
In 2005, the environmental man-
agement standard ISO 14001:2004
was also introduced, as were the
OHSAS 18001:2007 in 2010 and
ISO 3834-2:2005 in 2014.
Also in 2014, KDS became quali-
fied by the Scandinavian Achilles
Joint Qualification System (JQS).
In total, KDS has already constructed and reconstructed:
• 60 km of potable water networks
• 80 km of wastewater networks
• 25 wastewater pumping stations and treatment plants
Potable and wastewatersupply systems Employees
Certifications, Licenses,Approvals
Utilities
Residential property development
AB Kauno dujotiekio statyba
Elektrėnų g. 7
LT-51193 Kaunas
Lithuania
Tel. +370 37 451970
Fax +370 37 797673
www.kds.lt