5 sins of all hands ppt
-
date post
19-Oct-2014 -
Category
Technology
-
view
1.112 -
download
0
description
Transcript of 5 sins of all hands ppt
5 Sins of All hands PPT
Spike Gu
Sep 2nd 2011
Sin #1
Use dark boring color
Team Development | Tactics I
So
ftw
are
te
stin
g t
ec
hn
olo
gy
Knowing software testing
Design decent, effective test design, test cases.
Master software testing methodologies and techniques
Understand software development processes
....
Extend or/and skill-up technical skillset
Automate or semi-automate cases to improve productivity (UI automation and etc.).
Use in-house or commercial tools to improve test coverage and productivity
Performance testing
Code coverage
…
Insight of being more efficient
Understand the API and can use API to save efforts on UI testing.
Leverage API to better automate test cases.
Join development team’s key piece of code review
SW testing tools architect /design,
Automation framework design and enhance.
Team Development | Tactics II
Cu
st
om
er
O
ri
en
te
d
Knowing Customers’ Pains
Learning the issues from customer forums, discussion groups and etc.
Summarize the “to be improved” features / functions.
Initiate end user driven scenario / workflow testing.
....
Resolve Customers’ Issues
Actively participate beta customer issue discussion.
Actively response to customers’ issues.
Production exercise (customer workflow and customer data)
…
Guide Customers’ Engagement
Proactively contribute to blogs and forums face to customers.
Cross-Product workflow and enterprise solution scenarios and case study.
Play SME role in the team to support other function groups.
Sin #2
Use centered picture
with logo
One Team
One Team
Productivity
Sin #3
Flooded with text and
hard to read
Process – Pre Integration/Submission
SWD Desktop Develop Code
Build and Run Tests
Submit Only on Success
---
Expect the completion email
Speak up if you don’t get one!
---
SUCCESS email, continue to
the next task
---
FAILED email, react,
investigate and resolve
Continuous Build/Test System
SCC Submission
Activates upon one or more submission(s)
---
If Build and Tests PASS, update label
Ex. LAST_CLEAN_AIM_BUILD
Send SUCCESS completion email
---
If Build or Tests FAIL, skip label update
Send FAILED completion email.
Result Email
Process – Pre Integration/Submission
SWD Desktop Continuous Build/Test System
Activates upon submission
--- PASS, update label
Send SUCCESS completion email
--- FAIL, skip label update
Send FAILED completion email.
Result Email
SCC
Submission
Submit Only on Success
--- SUCCESS email,
continue
---
FAILED email,
investigate and resolve
Process – General Qualification and Usage
If a build is posted, it is ready for general qualification.
Run tests only if a new build has been posted.
Analyze the results
React to the trends
Add to the test suites
Manual testing keys off automated results
Process – General Qualification and Usage
If a build is posted, it is ready for general
qualification
Run tests only if a new build has been posted
Analyze the results
Add to the test suites
Manual testing keys off automated results
Sin #4
Flooded with unnecessary
information
JayPeak - Large vs. Small Rocks
Pressure Pipes
Large / Extended
Team Workflow
Performance &
Scalability
Survey / Point
Clouds
Legacy Data Migration
DWG-DGN; Model I/O
IM Lifecycle
(UDM, Galileo Export; Map
3D Command rationalization)
Sub- Assembly Composer
(Feature gaps; Usability)
AEC Interoperability
(display of AutoCAD solids,
etc)
Rail Track
Design
(dependent on
rail funding)
Bridge
Sub-
surfaces
Navisworks workflow
(Enable corridor and surface
timeline)
3ds Max Design
(Region connection defects,
export performance, pipes)
API/Partner Support
(Civil 3D-enabled RealDWG ;
API improvements)
Volumes Dashboard
(Usability; feature gaps)
Global H&H
(Translation, local analysis,
F&F of Ipanema workflow)
Action – Determine if/how we will accomplish
“small rock” enhancements
Strategic F&F
(DOTs, country, and key
segment-specific gaps/issues)
JayPeak - Large vs. Small Rocks
Pressure
Pipes
Large
Team
Workflow
Performance
&
Scalability Survey
Point
Clouds
Rail
Track
Design
Bridge
Sub-
surfaces
Sin #5
Chart & Table not aligned
Civil3D - Customer Focused Testing
Production Exercise
Pipes
Transportation Construction
Gold Beta Site(build Customer relationship in China)
Beta 1/2/3
High value customers, more feedbacks.
Gunslinger
Civil 3D Timeline
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
Civil 2012 (Ipanema) 2012SP1
Civil 2013 (JayPeak)
2011 SP2
Stage 1 Stage 2 Stage 3
Project
RTM(3/15)
Project
FC(12/2) Stage 3
FC(11/4)
Thank You
Spike Gu 顾轶群
@顾轶群 slideshare for more exciting to come