5- Nemo Outdoor 5

download 5- Nemo Outdoor 5

of 18

Transcript of 5- Nemo Outdoor 5

  • 7/28/2019 5- Nemo Outdoor 5

    1/18

    Opening Window

    You can also close this welcome window & then start with open work space

  • 7/28/2019 5- Nemo Outdoor 5

    2/18

    Connect the device

    To add the device-click Measurement-click Add New Device-abovewindows occurs add Phone, Scanner, GPS accordingly.

  • 7/28/2019 5- Nemo Outdoor 5

    3/18

    Phone & Scanner Windows

    Choose Phones from Phone List & Scanners according your work scope

  • 7/28/2019 5- Nemo Outdoor 5

    4/18

    Phone & Scanner Windows

    Choose Phones from Phone List & Scanners according your work scope

  • 7/28/2019 5- Nemo Outdoor 5

    5/18

    Add map in work space

    Right click in the middle of the window. Select Map New

  • 7/28/2019 5- Nemo Outdoor 5

    6/18

    Map

  • 7/28/2019 5- Nemo Outdoor 5

    7/18

    Add route

    Right click in the middle of the window. Select Map New Click Layers on MapInfo MapX V4 Properties

  • 7/28/2019 5- Nemo Outdoor 5

    8/18

    Add route

    Choose Map Layers & Click Add

  • 7/28/2019 5- Nemo Outdoor 5

    9/18

    Add BTS File

    Click Add BTS File Choose BTS Files

  • 7/28/2019 5- Nemo Outdoor 5

    10/18

    Add BTS File

    On BTS Files Tick on Connected Devices

  • 7/28/2019 5- Nemo Outdoor 5

    11/18

    Add BTS File

  • 7/28/2019 5- Nemo Outdoor 5

    12/18

    Before implement SSO, the tools & equipment mustbe prepared first. The tools & equipment are :

    Nemo Outdoor c/w Test Plan

    Scanner set c/w GPS PC Tel UMTS EX 900/2100 2 set UE Nokia N85 1 nos Data Card TM7200

    Tools & Equipment

  • 7/28/2019 5- Nemo Outdoor 5

    13/18

    SSO Preparation

    Before implement SSO, we must prepare and knowthe :

    Map site (Location of the site)

    BTS File The scrambling code (sector code) Path to be taken during mobility

  • 7/28/2019 5- Nemo Outdoor 5

    14/18

    Drive Test

    Single Site Optimization (SSO) is divided by two testwhich is :

    Mobility

    Static

  • 7/28/2019 5- Nemo Outdoor 5

    15/18

    Test that must be done during Mobility is : Swap Verification Define swap sector Round 1 Short Call (60 sec duration in every 10 secidle), Long Call. Round 2 - HSDPA (KPIs value must be 1Mbps)

    Note: Short Call(Lock 3G) & Long Call(Dual Mode, end call after ISHO success) UE to PSTN PSTN Test Number: Northern 0194011111, Central & Southern 0197011111 HSDPA (Lock 3G with 100Mb DL data)

    Mobility

  • 7/28/2019 5- Nemo Outdoor 5

    16/18

    Test that must be done during Static is : AMR Short (Voice Call) UE1 to UE2 VDT Short (Video Call) UE1 to UE2 HSDPAKPIs value must be 3Mbps HSUPA - KPIs value must be 1Mbps HSPA Ping RTT KPIs value must be 100ms

    Note: AMR Short(Lock 3G), VDT Short(Lock 3G), HSDPA (Lock 3G with 30Mb DL data) & HSUPA(Lock 3G with 10Mb UL data) must be done 10 samples per sector HSPA Ping RTT must be done 100 samples per sector with ping 32 bytes

    Static New Site

  • 7/28/2019 5- Nemo Outdoor 5

    17/18

    Test that must be done during Static is : AMR Short (Voice Call) UE1 to UE2 VDT Short (Video Call) UE1 to UE2 SMS MMS HSDPAKPIs value must be 3Mbps HSUPA - KPIs value must be 1Mbps

    Note: AMR Short (Lock to 3G), VDT Short (Lock 3G), & SMS must be done 3 samples per sector HSDPA(Lock 3G with 30Mb DL data) & HSUPA(Lock 3G with 10Mb UL data) must be done 1sample per sector with ping 32 bytes

    Static Modernization

  • 7/28/2019 5- Nemo Outdoor 5

    18/18

    Important The RSCP required is < -70 The EcNo required is < -7The HSDPA KPIs required > 1Mb (Mobility)The HSDPA KPIs required > 3Mb (Static)The HSUPA KPIs required > 1Mb Ping < 100ms Static sample must be 1o sampling Scanning Mode : Pilot Scanning Frequency channel W2100 is 10762, 10737 & 10712 Frequency channel W900 is 3012