! ! ! ! ! ! ! Organized by the Ministry of Environment, Forestry and Water Administration of Albania with support from the CPRAC and MEDPOL in the framework of the UNEP Strategic Partnership for the Mediterranean Sea Large Marine Ecosystem (MedPartnership)! PCBs Training workshop in Tirana January 21 st 24 th , 2014

description

 

Transcript of 5 life cycle

Page 1: 5 life cycle

!

!

!

!

!! !

!!

!!

Organized by the Ministry of Environment, Forestry and Water Administration

of Albania with support from the CPRAC and MEDPOL in the framework of the

UNEP Strategic Partnership for the Mediterranean Sea Large Marine

Ecosystem (MedPartnership)!

PCBs Training workshop in Tirana

January 21st – 24th , 2014

Page 2: 5 life cycle

PCBs sound management chapter B part 1

Life cycle management

Page 3: 5 life cycle

Project approach

& Transformers as the main task to

combat PCBs cross contamination

Life time cycle of PCBs transformer

Page 4: 5 life cycle

LIFE CYCLE OF TRANSFORMERS

Page 5: 5 life cycle

The life time of transformers depends: -intention of use -location [open air or in a building] -aggressive air environment corrosion -manufacturing standards [special coating, oil extension tank, buchholz ..]

Life time of transformer

Page 6: 5 life cycle

Life time of oil transformers -between 15 to 25 years ( transmission transformers ) -over 25 years (power transformers)

Life time cycle of PCBs transformer

Page 7: 5 life cycle

Life time of PCBs transformer -because of excellent dielectric properties of PCBs & -chemical resistance again temperature elevations, non solubility in to water .. ~40 years

Life time cycle of PCBs transformer

Page 8: 5 life cycle

During the life time of 40 years on a PCBs transformer may required: -to replace the dielectric oil or - to add in the PCBs oil mineral oil or -to empty the PCBs oil for maintenance

Life time cycle of PCBs transformer

Page 9: 5 life cycle

Reason for PCBs cross contamination - emptying PCBs for repair -using the same pumps and -hoses or the -same oil storage tank -toping oil (add oil) Consider that a PCBs Maintenance FACILITY as “hospital of transformers”

Life time cycle of PCBs transformer Cross contamination

Page 10: 5 life cycle

How and when occurs PCBs cross contamination?

If for each maintenance work

doesn't’ be checked the dielectric oil before!!

PCBs Cross contamination

Page 11: 5 life cycle

Measures to combat cross contamination ?

Oil treatment and transformers maintenance facilities

should develop a system to control cross

contamination

Maintenance facilities of transformers

Page 12: 5 life cycle

Methodology to Control cross contamination?? -Introduce at least: oil test before entering the facility -Analysis should be accurate and quick - If concentration PCBs >50ppm, store the oil in a separate second tank - classified transformer as PCBs should be managed according local legislation as hazardous waste

MAITENANCE OF TRANSFORMERS CROSS CONTAMINATION

Page 13: 5 life cycle

PCBs producers/owners are asking ! How to manage a PCBs transformer /capacitor ? I have to take a decision for replacing or keeping!!

LIFE CYCLE management of transformer

Page 14: 5 life cycle

PCBs Owners-Producers are faced on parameters as: -phase out date of 2025 -evaluate the remaining life time -cost benefit analysis between replacing or decontamination - evaluate the risk arising form the operation of a PCBs transformer (hospital, water sources, forest, school, etc .)

LIFE CYCLE management of transformer

Page 15: 5 life cycle

1st Parameter PCBs phase out date of 2025 Albania governmental commitment against Stockholm convention -Signed 05-12-2001 -Ratified 4-10-2004

LIFE CYCLE management of transformer

Page 16: 5 life cycle

2nd Parameter Evaluation of the remaining life time of transformer considering: -the external condition of transformer [corrosion level, leakages, damages ] -the internal- electrical condition of transformer , [ core , switches, poles/ insulators..]

LIFE CYCLE management of transformer

Page 17: 5 life cycle

3rd Parameter Cost benefit analysis between replacing or decontamination considering: -costs to dispose all PCB -cost to buy new transformer or to decontaminate

LIFE CYCLE management of transformer

Page 18: 5 life cycle

4th Parameter -Evaluate all risk arising from the operation of PCBs transformer. -neighboring activities -location of transformer [school, hospital, Power plant..] -water sources distance [River, lake distances ..]

LIFE CYCLE management of transformer

Page 19: 5 life cycle

5th Parameter (continued) -Risk arising from the operation of PCBs transformer. -explosion [rise temperature, thunderbolt hit.. ] -leakage of PCBs [may contaminate water sources, soil.. ]

LIFE CYCLE management of transformer

Page 20: 5 life cycle

LIFE CYCLE management of transformer

Page 21: 5 life cycle

Transformers Life cycle

Than you very much for your attention

Panos Ioakimidis

[email protected]

[email protected]