0 5. Lessons Learned and Countermeasures (1) Safety Countermeasures

Transcript of 5. Lessons Learned and Countermeasures (1) Safety ...€¦ · 3 Further Tsunami Countermeasures at...

Page 1: 5. Lessons Learned and Countermeasures (1) Safety ...€¦ · 3 Further Tsunami Countermeasures at the Kashiwazaki-Kariwa NPS (1) In order to improve emergency safety countermeasures,

0

5. Lessons Learned and Countermeasures

(1) Safety Countermeasures

Page 2: 5. Lessons Learned and Countermeasures (1) Safety ...€¦ · 3 Further Tsunami Countermeasures at the Kashiwazaki-Kariwa NPS (1) In order to improve emergency safety countermeasures,

1

Overview of the Safety Countermeasures at Nuclear Power Stations

The government, NISA instructed electric power companies to implement emergency safety countermeasures based on the lessons learned from the accident. Each electric power company has implemented necessary countermeasures for their own nuclear power stations.

(4) Secure fresh water source for water injection

(7) Secure sea water system function by portable submerged pumps

(5) Secure depressurizing function of PCV

(1) Secure Emergency Power Supply Capability under SBO

Mobile power trucks

(6) Secure depressurizing function of RPV via Safety Relief Valves

(2) Secure water injection into reactors(3) Secure water injection into SFPs

LegendFire protection sys.Make-up water sys.RCIC Power line

Fuel pool cooling sys.

Reactor Clean upWater sys.

Diesel driven fireprotection pumpStand by Liquid

Control System Pump

RCIC pump

Sea

Battery

Control Center

Purified waterTransfer pump

Control Panel

Reactor Building

PCV

Charger

Spent Fuel Pool

RPV

Spare gas cylinder

Reactor Clean up pump

Fuel pool cooling pump

Make-up water pump

Heat Ex

SeaHeat Ex

Submergedpump (portable)

CondensateStorageTank

Fire Truck

Filtered waterTank

Purified waterTank

Containment Vent valveSpare gas cylinder

To Turbine

SRV

Low voltageDistribution PNL

(8) Improve flooding protection capability for buildings

Page 3: 5. Lessons Learned and Countermeasures (1) Safety ...€¦ · 3 Further Tsunami Countermeasures at the Kashiwazaki-Kariwa NPS (1) In order to improve emergency safety countermeasures,

2

Emergency Response HQ

Rubble Clearing VehiclePower Cables

Safety Countermeasures at Nuclear Power Stations (Emergency Response Drills)

Air-cooled and on-board Gas Turbine Generator (4500kVA)

Page 4: 5. Lessons Learned and Countermeasures (1) Safety ...€¦ · 3 Further Tsunami Countermeasures at the Kashiwazaki-Kariwa NPS (1) In order to improve emergency safety countermeasures,

3

Further Tsunami Countermeasures at the Kashiwazaki-Kariwa NPS (1)

In order to improve emergency safety countermeasures, on a mid-and-long term basis, we will implement additional tsunami countermeasures such as accelerating cold shutdown procedures.

Sea

Enforcement of protection for flooding(1)Embankment(2)Protection Wall etc.(3)Water-tight doors in

Reactor Building

Enforcement of power source(1)GT-driven generator truck(2)Emergency high voltage distribution panel(3)Cable from emergency high voltage

panel into Reactor Building

Enforcement of injection and heat removal- Alternative Submerged pump- Alternative Seawater Heat exchanger- Spare hose

Enforcement of water injection and heat removal(2)Reservoir on site.

Others(1) Additional monitoring cars

(2) Additional warehouse for emergency materials on the hill

Prevention of accumulating Hydrogen(1)Top vent on Reactor Building

To RHRTo SFP

Turbine buildingReactor building

Heat exchange building

Off site power line

Filtered water tank

Filtered water tank & Purified water tank

Page 5: 5. Lessons Learned and Countermeasures (1) Safety ...€¦ · 3 Further Tsunami Countermeasures at the Kashiwazaki-Kariwa NPS (1) In order to improve emergency safety countermeasures,

4Water-tight Doors

Further Tsunami Countermeasures at the Kashiwazaki-Kariwa NPS (2)

Alternative Water Injection (8 fire engines) 14 Power Supply Vehicles (500-750kVA) and2 On-board Gas Turbine Generators (4500kVA)

Construction of 10-meter (ASL:15-meter) Seawalls

Present status

After construction

In order to improve emergency safety countermeasures, on a mid-and-long term basis, we will implement additional tsunami countermeasures such as accelerating cold shutdown procedures.

Height: about 10m(15m above sea level)

about 1m

about 3m

about 2.5m

Width: about 15m

Page 6: 5. Lessons Learned and Countermeasures (1) Safety ...€¦ · 3 Further Tsunami Countermeasures at the Kashiwazaki-Kariwa NPS (1) In order to improve emergency safety countermeasures,

5Cross-section image of Fresh Water Reservoir

Location of Fresh Water Reservoir and Wells Water Pipe Line (Image)Feeding Pipe Line (Image)

Fresh Water Reservoir64 m X 120 m X 6.5 mMax Depth: 4.8 mCapacity: Approx. 20,000 m3 (18,000 m3 effective)

Water PipeMaterial: Abrasion-resistant rubber

(thickness: approx. 8.5 mm)Diameter: Approx. 150 mm (ID)

A-A Cross-section Surface

Overview of Fresh Water Reservoir

Water Pipe (Image)

Example of pressure-proof and abrasion-resistant hose

DiameterApprox. 150 mm

Abrasion-Resistant Rubber(Thickness: approx. 8.5 mm)

Further Tsunami Countermeasures at the Kashiwazaki-Kariwa NPS (3)

Fresh Water Reservoir

Piping

Duct

Water-shielding sheets

Well #2

Water-shielding sheetsASL ASL

Water-shielding sheets Sand receiver Water Pipe

Feeding Pipe

ASLDam Body Dam Body

Well #1

Page 7: 5. Lessons Learned and Countermeasures (1) Safety ...€¦ · 3 Further Tsunami Countermeasures at the Kashiwazaki-Kariwa NPS (1) In order to improve emergency safety countermeasures,

6

Overview of Underground Light Oil Tank

- We have lined up a standing back-up power source in case of SBO; we laid power cables from makeshift metal clad (M/C) switchgear to emergency M/Cs.- We also laid permanent power cables from an air-cooled gas turbine generator vehicle to makeshift M/C.- We installed underground light oil tanks in order to secure fuels for air-cooled gas turbine generator vehicle.

Underground Light Oil Tank

Makeshift Metal Clad Switchgear

Substation Building for Construction

Air-cooled Gas Turbine Generator Vehicle

Tanker

Permanent Cable (already laid out)Makeshift Metal Clad Switchgear ~ Emergency Metal

Clad Switchgear in Each Unit

Permanent Cable (already laid out)Generator Vehicle ~ Makeshift Metal Clad Switchgear

Tank-Type : dual shells tankCapacity : 50,000 litersQuantity : 3 units

Further Tsunami Countermeasures at the Kashiwazaki-Kariwa NPS (4)

Location of Underground Light Oil Tank

Substation Building for Construction

Emergency Car Parking

Page 8: 5. Lessons Learned and Countermeasures (1) Safety ...€¦ · 3 Further Tsunami Countermeasures at the Kashiwazaki-Kariwa NPS (1) In order to improve emergency safety countermeasures,

7

Implementation Status of the Safety Countermeasures at Kashiwazaki Kariwa NPS

Page 9: 5. Lessons Learned and Countermeasures (1) Safety ...€¦ · 3 Further Tsunami Countermeasures at the Kashiwazaki-Kariwa NPS (1) In order to improve emergency safety countermeasures,

8

Implementation Status of the Safety Countermeasures at Kashiwazaki Kariwa NPS

Page 10: 5. Lessons Learned and Countermeasures (1) Safety ...€¦ · 3 Further Tsunami Countermeasures at the Kashiwazaki-Kariwa NPS (1) In order to improve emergency safety countermeasures,

9

(2) Decontamination Efforts

Page 11: 5. Lessons Learned and Countermeasures (1) Safety ...€¦ · 3 Further Tsunami Countermeasures at the Kashiwazaki-Kariwa NPS (1) In order to improve emergency safety countermeasures,

10

Monitoring Efforts towards Decontamination (Cabinet Office, MEXT and TEPCO)

Wide-Area Monitoring Ambient dose rate measurement via monitoring car

The Government have implemented Model Decontamination Project and Expert Dispatch Program that support the development of decontamination plans by municipalities. TEPCO has assigned employees to the Expert Dispatch Program.

Soil Sampling Ambient dose rate measurement

Basic data collection monitoring

Page 12: 5. Lessons Learned and Countermeasures (1) Safety ...€¦ · 3 Further Tsunami Countermeasures at the Kashiwazaki-Kariwa NPS (1) In order to improve emergency safety countermeasures,

11

TEPCO’s Efforts towards DecontaminationFrom November 2011 to April 2012, TEPCO supported Ministry of Environment (MOE) to develop

decontamination plans and conduct detailed monitoring for actual implementation. (approximately 590 man-days of TEPCO employees Implemented the monitoring)TEPCO participated in Cabinet Office’s Model Decontamination Project via radiation management and

work supervision (39 personnel at maximum).TEPCO 36 personnel participated in decontamination of municipal offices by Self Defense Force (SDF),

supporting for monitoring, decontamination technology, drainage water treatment and waste management.TEPCO supported decontamination activities by municipalities in Fukushima. (approximately 650 man-

days of TEPCO employees joined in the activities as of the end of May, 2012)

Decontamination in Ohkuma(Photo: as of Nov.4, 2011)

Assisting Self Defense Force for Decontamination

Page 13: 5. Lessons Learned and Countermeasures (1) Safety ...€¦ · 3 Further Tsunami Countermeasures at the Kashiwazaki-Kariwa NPS (1) In order to improve emergency safety countermeasures,

12

(3) Efforts towards Stable Power Supply

Page 14: 5. Lessons Learned and Countermeasures (1) Safety ...€¦ · 3 Further Tsunami Countermeasures at the Kashiwazaki-Kariwa NPS (1) In order to improve emergency safety countermeasures,

13

Efforts towards Stable Power Supply (Speedy Restoration of Damaged Thermal Power Plants)

Hirono Thermal Power Station

Summer 20111050Joban Nakoso #7-#9

Winter 20112000Souma Kyodo

Summer 20111050Kashima Kyodo

March 20111000Higashiougishima #1

March 2011350Yokohama #8-4

March 2011265Goi #4

March 2011360Chiba #2-1

March 20111050Ohi #1-#3

Summer 20113800Hirono #1-#5

Summer 20111000Hitachinaka #1

Summer 20114400Kashima #1-#6

RestorationCapacity (MW)Power Station

Restoration of damaged Thermal Power Stations

Hitachinaka Thermal Power Station

Page 15: 5. Lessons Learned and Countermeasures (1) Safety ...€¦ · 3 Further Tsunami Countermeasures at the Kashiwazaki-Kariwa NPS (1) In order to improve emergency safety countermeasures,

14

Efforts towards Stable Power Supply (Installation of Emergency Generation Capacity)

Summer 2012800Kashima

Summer 2014450Kashima C.C.

Summer 2011Decommissioned Mar. 2012

250Hitachinaka

Summer 2011330Yokosuka

Summer 2011130Kawasaki

Summer 2011210Ohi

Summer 2014500Chiba C.C.

Summer 2012330 x 1Chiba

Summer 2011330 x 2Chiba

Summer 2011110Sodegaura

Summer 20116Anegasaki

CommissioningCapacity (MW)Location

Emergency Installation Capacity

Installation space

Installation space

Installation space

Chiba Power StationLeft : Unit1

Right : Unit2

Kashima Power StationUnit1 - 6

Yokosuka Power StationUnit3 – 8, GT1 - 2

Page 16: 5. Lessons Learned and Countermeasures (1) Safety ...€¦ · 3 Further Tsunami Countermeasures at the Kashiwazaki-Kariwa NPS (1) In order to improve emergency safety countermeasures,

15

(4)Sharing Knowledge

Page 17: 5. Lessons Learned and Countermeasures (1) Safety ...€¦ · 3 Further Tsunami Countermeasures at the Kashiwazaki-Kariwa NPS (1) In order to improve emergency safety countermeasures,

16

Sharing Knowledge

Mr. Eric BESSONMinister in charge of Industry, Energy and Digital Economy, France

Mr. GoshiHOSONOMinister for the Restoration from and Prevention of Nuclear Accident, Japan

Mr. Yasuhiro SONODA Parliamentary Secretary of Cabinet Office, Japan

Mr. John V. ROOS U.S. Ambassador to Japan

Mr. Yukiya AMANODirector General of the International Atomic Energy Agency

Mr. Gregory JACZKO Chairman, Nuclear Regulatory Commission, US

Mr. Laurent STRICKER Chairman, World Association of Nuclear Operators