5-cwprs presentation, Sept-18

45
18 Sept.2014 At World Bank office, New Delhi by M.SELVA BALAN Chief Research Officer Hydraulic Instrumentation Division [email protected]; [email protected] Ph.+91 9422530452 WWW.CWPRS.GOV.IN

description

5-cwprs presentation, Sept-18

Transcript of 5-cwprs presentation, Sept-18

Page 1: 5-cwprs presentation, Sept-18

18 Sept.2014 At

World Bank office, New Delhi

by M.SELVA BALAN

Chief Research Officer Hydraulic Instrumentation Division

[email protected]; [email protected] Ph.+91 9422530452

WWW.CWPRS.GOV.IN

Page 2: 5-cwprs presentation, Sept-18
Page 3: 5-cwprs presentation, Sept-18

I. River Engineering

II. Reservoir & Appurtenant Structures

IV.Coastal & Offshore Engineering

VI. Applied Earth Sciences

V.Foundations & Structures

VII. Instrumentation, Testing & Calibration

Main Disciplines

III. River & Reservoir Systems Modeling

For details visit us at: www.cwprs.gov.in

Page 4: 5-cwprs presentation, Sept-18

• Level based Gate control in ATG, Canal

• Multiple discharge control-Mumbai Airport Studies

• Dam Instrumentation

• Sedimentation Studies- IBS

• Bed Profile Recorder- LASER BASED

• RTDSS

• E-flow

• SOFTWARE SUPPORT and Training

• Under HP-I -- IBS and DWLR •HP-II – Canal Model, Training through NWA, E-flow study for HP •Wain Ganga- MP, Tawa reservoir survey, Maharastra

Page 5: 5-cwprs presentation, Sept-18
Page 6: 5-cwprs presentation, Sept-18

6

Products such as these

– STK-2148- This is a trainer kit for learning about ARM7 and LPC2148 in

particular. This has got wide range of peripherals on the board. Here we are using the SM2148 module. It has peripherals like monochrome graphics LCD, alphanumeric LCD,

keys for digital input, LEDs for digital output, 4x4 key pad, I2C based 7segment LED, RTC & EEPROM, SPI EEPROM, relays, stepper motor, RS232, RS484, etc.

Page 7: 5-cwprs presentation, Sept-18
Page 8: 5-cwprs presentation, Sept-18
Page 9: 5-cwprs presentation, Sept-18

0

10

20

30

40

50

60

1 2 3 4 5 6 7 8

Ve

loci

ty (

cm /

se

c)

Velocity Numbers

Actual velocity

Calculated Velocity

Page 10: 5-cwprs presentation, Sept-18

File 2

Original Plot

Using Savitzky-

Golay Filter

Page 11: 5-cwprs presentation, Sept-18

ATG SET UP AT KOPT, MODEL SHOWING CONTROL ROOM, WATER LEVEL SENSOR

AND RADIAL GATE ARRANGEMENT

Page 12: 5-cwprs presentation, Sept-18

ATG OUTPUT CONTROL SCREEN DEVELOPED BYCWPRS

Page 13: 5-cwprs presentation, Sept-18

ATG SOFTWARE- In-house

Page 14: 5-cwprs presentation, Sept-18

ATG SYSTEMS INSTALLED AND MAINTAINED BY INSTRUMENTATION DIVISION AT CWPRS

Cochin port Model

Kandla two end Model

Kandla Estuary Model

Mumbai port Model

Jaigad port Model

Rajapuri Model

Tarapur (BARC) Model

Hoogly Model

Page 15: 5-cwprs presentation, Sept-18

TAIL END WATER LEVEL CONTROL SYSTEM AT DOWNSTREAM OF

RIVER BASED HYDRAULIC MODEL

Radial Gates controlling the water level on the Weir

Site:IHH Poondi, Chennai

Stepper Motor with Gear Box

water level sensing point

Radial Gates

Page 16: 5-cwprs presentation, Sept-18

MULTIPLE RIVER DISCHARGE CONTROL SYSTEM USING SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA)

TECHNIQUE

Page 17: 5-cwprs presentation, Sept-18

GUIDED WAVE RADAR WATER LEVEL SENSOR CONTROL PANEL

RIVER DISCHARGE CONTROL SETUP

Page 18: 5-cwprs presentation, Sept-18

ACTUAL AND REPRODUCED RIVER DISCHARGE HYDROGRAPH WITH WATER LEVEL DATA

Click for video on

Page 19: 5-cwprs presentation, Sept-18

Miniature Propeller-type Current Meters

Water Surface Follower Using Resistance principle

Page 20: 5-cwprs presentation, Sept-18

•contact type •Response time •Calibration

Page 21: 5-cwprs presentation, Sept-18
Page 22: 5-cwprs presentation, Sept-18

Instruments in Over Flow Section No.

Uplift Pressure Pipes 7

Reservoir Water Level Meter 1

Seepage Water Level Meter 2

Extensometers 1

No Stress Strain Meter 4

Pore Pressure Cells 5

Clinometer 3

Stress Meters 8

Plumb Lines 1

Joint Meter 10

Strain Meter Spider 4

Thermometer 30

Foundation Piezometers 11

GUIDANCE, SUPERVISION AND MAINTENANCE OF

Page 23: 5-cwprs presentation, Sept-18

Instruments No.

Uplift Pressure Pipes 5

Reservoir Water Level Meter 1

Seepage Water Level Meter -

Extensometers 1

No Stress Strain Meter 8

Pore Pressure Cells 4

Clinometer 2

Stress Meters 7

Plumb Lines 1

Joint Meter 10

Strain Meter Spider 8

Thermometer 16

Foundation Piezometers 8

INSTRUMENTATION IN NON OVERFLOW SECTION

Page 24: 5-cwprs presentation, Sept-18

UPLIFT PRESSURE METER INSIDE THE GALLERY

STRAIN METER INSTALLATION ON THE DAM BODY

Page 25: 5-cwprs presentation, Sept-18

CLINO-METER CALIBRATION & INSTALLATION

Page 26: 5-cwprs presentation, Sept-18

• To test the readings of all

vibrating wire instruments

installed in dam body

during and after

installation.

• This gives reading

directly in engineering

unit .

• Stores multiple data sets,

which can be downloaded

to a PC for analysis. Courtesy: M/s. Encardio-rite, lucknow, India

Page 27: 5-cwprs presentation, Sept-18

•MICROCONTRLLER BASED SYSTEM

• ACQUIRE APPROX 250 CHANNELS DATA

• ANALYSE THE DATA, PLOT AND PRINT

•TESTED AT FACTORY BY CWPRS AND INSTALLED AT ISP, M.P

Page 28: 5-cwprs presentation, Sept-18

INSTRUMENTATION,CALIBRATION AND TESTING SERVICES

1. Instrumentation: Model, Field and Dam Instruments

2. Data collection

• Hydrographic Bathymetry Survey

• Coastal Data collection

3. Calibration Facilities:

• Current Meter Rating Trolley

• Volumetric Flow Calibration Laboratory

• Gravimetric Flow Calibration Laboratory

4. Testing Facilities:

• Sea Wave Simulation and Testing Facilities

• Tide Simulation and Testing Facilities

• River Hydrograph Simulation

Current Meters Developed at CWPRS

Page 29: 5-cwprs presentation, Sept-18

HYDRAULIC MACHINERY LABORATORY

AREA OF SPECIALIZATION • Calibration of closed conduit flow meters • Performance evaluation and tests on submersible pumps • Assessment of head loss across filters • Field testing of hydro turbines and pumps. • Pumping system design : optimisation and water hammer analysis • Pump sump model studies for flow condition improvement • Upgrading, uprating and life extension of existing hydro power plants • Evolving efficient & cavitation free design for large pumps

Gravimetric Flow Calibration Laboratory Volumetric Flow Calibration Laboratory

Page 30: 5-cwprs presentation, Sept-18

Random Sea Wave Generation

• Simulation of Random Waves in conformity with site specific sea waves • Multichannel data acquisition simultaneously at 16 locations • Use of Servo hydraulics system with fully computerized control

Three Directional Random Sea Wave Generating System at Multipurpose Hanger

Page 31: 5-cwprs presentation, Sept-18

Survey Works:

Kalpakam Atomic Power, --- Cooling Water Intake

Kateri Reservoirs – 2 Nos. --- Silt Estimation

Satanur Reservoir, TN --- Dredging

Indira Sagar Project - M.P --- Volume & Silt Estimation

WBPDCL, Bhirbhum, W.B --- Volume Estimation

Mullai Periyar Reservoir, Kerala– Sedimentation

Kateri Lower lake survey & Dredging – 2013 0nwards

Tawa Reservoir- M.P- survey completed

Bariccha Lake, Indore, Metur, Karanja, MIDC – To be taken up

HYDROGRAPHIC SURVEY

WORKS CARRIED OUT BY CWPRS

Page 32: 5-cwprs presentation, Sept-18

• POSITION FIXING :Global Navigation Satellite Systems (GNSS)

• DEPTH MEASUREMENT

• Shallow Water- LIDAR

• SIDESCAN

• SINGLE BEAM

• MULTIBEAM

• OUTPUTS

Sedimentation, Area elevation, Contour Plots, Volume

calculation, Digital Terrain Model, Topography,

Bathymetry.

TECHNOLOGY-

HYDROGRAPHIC SURVEY

GPS (USA), GLONASS (Russia) Galileo (Europe) Compass/Beidou (China-Regional) QZSS (Japan –regional) IRNSS (India –regional)

Light Detection and Ranging, is a remote sensing method that uses light in the form of a pulsed laser to measure ranges (variable distances) to the Earth. These light pulses—combined with other data recorded by the airborne system— generate precise, three-dimensional information about the shape of the Earth and its surface

characteristics.

Page 33: 5-cwprs presentation, Sept-18

• DGPS- Position Fixing.

• Sound Velocity Calibrator.

• ECHOSOUNDER – For Depth.

• LAPTOP –for Data Collection &

Interface.

• SOFTWARE- for Pre Processing,

Data collection, Editing, Analysis

& Reporting.

EQUIPMENTS-

HYDROGRAPHIC SURVEY-Needs upgradation

Page 34: 5-cwprs presentation, Sept-18

TAWA RESERVOIR IBS RESULTS

Page 35: 5-cwprs presentation, Sept-18

GUIDED WAVE RADAR SENSOR

Page 36: 5-cwprs presentation, Sept-18

Time Hrs.

Hourly Discharges in m3/s

PMP

100 year R P 50 year R P

24 Hr 12 Hr 6 Hr 24 Hr 12 Hr 6 Hr 24 Hr 12 Hr 6 Hr

1 23.02 43.10 63.20 17.46 32.69 47.94 15.00 28.07 41.17

2 71.59 122.16 169.12 54.30 92.66 128.29 46.63 79.57 110.17

3 125.02 194.92 253.18 94.84 147.86 192.06 81.44 126.97 164.92

4 239.73 378.48 488.94 181.85 287.10 370.90 156.16 246.54 318.50

5 374.90 567.17 699.43 284.39 430.24 530.56 244.22 369.46 455.61

6 584.13 872.18 1066.23 443.10 661.60 808.81 380.52 568.14 694.55

7 860.18 1260.92 1500.93 652.50 956.48 1138.57 560.34 821.36 977.71

8 1098.72 1534.42 1727.88 833.46 1163.95 1310.72 715.74 999.51 1125.54

9 1388.97 1905.15 2082.58 1053.63 1445.17 1579.79 904.82 1241.01 1356.60

10 1407.20 1732.82 1602.62 1067.46 1314.46 1215.69 916.69 1128.74 1043.93

11 1254.57 1363.73 954.84 951.68 1034.46 724.31 817.26 888.31 621.97

12 1124.79 1133.69 581.35 853.23 859.96 440.99 732.72 738.46 378.69

13 1006.32 921.61 322.33 763.37 699.09 244.49 655.55 600.31 209.98

14 924.59 756.53 160.61 701.37 573.88 121.84 602.31 492.80 104.65

15 838.04 621.46 40.80 635.71 471.45 30.96 545.92 404.81 26.59

16 766.38 517.30 581.35 392.46 499.24 336.97

17 717.59 414.50 544.35 314.47 467.46 270.02

18 653.52 310.14 495.74 235.29 425.72 202.04

19 600.71 199.56 455.68 151.39 391.32 129.98

20 533.71 102.68 404.86 77.88 347.67 66.87

21 542.22 26.09 411.31 19.78 353.22 16.99

Page 37: 5-cwprs presentation, Sept-18
Page 38: 5-cwprs presentation, Sept-18
Page 39: 5-cwprs presentation, Sept-18
Page 40: 5-cwprs presentation, Sept-18
Page 41: 5-cwprs presentation, Sept-18
Page 42: 5-cwprs presentation, Sept-18

HOW LONG TERM SUSTAINABILITY IS POSSIBLE?

• Understand By training/ experience •control over technology •Applicable to Software

Page 43: 5-cwprs presentation, Sept-18
Page 44: 5-cwprs presentation, Sept-18
Page 45: 5-cwprs presentation, Sept-18