    COMMISSIONING /RETRO-COMMISSIONING &ENERGY AUDITS

    PERCEPTION vs. REALITY

    J. Woody Thompson, PE, CxA, CEM, REP, CPMP,CBCP, LEED AP

  • 8/9/2019 5 Commissioning

    2/35

    Session Learning Objectives:

    Commissioning (Cx) & Retro-Commissioning (RCx)What it IS & IS NOT

    Objectives & Benefits

    Systems, Providers, & References

    Cx & RCx ProcessCx & LEED

    Energy Audits / Surveys

    Process & Benefits

  • 8/9/2019 5 Commissioning

    3/35

    The Commissioning Process

    The Commissioning Process is aquality-focused processforenhancing the delivery of a project byverifying and documenting that thefacility and all of its systems andassemblies are planned, designed,

    installed, tested, operated, andmaintained to meet the OwnersProject Requirements.-- ASHRAE Guideline 0-2013: TheCommissioning Process

  • 8/9/2019 5 Commissioning

    4/35

    What is Cx? RCx? ReCx?

    Commissioningis performed specifically to ensure thatthe finished facility operates in accordance with the ownersdocumented project requirements (OPR) and theconstruction documents (BOD).

    Retro-Commissioningis the commissioning processas applied to an existing facility that has never beencommissioned. Focus is on building performance and how toimprove utility/energy consumption.

    Re-Commissioningis the commissioning process asapplied to an existing building that had been commissionedbut no longer meets owners current operational need.

    http://www.nottinghamshire.gov.uk/youthzone/youthzone-getactive/cpd-thinking.gif
  • 8/9/2019 5 Commissioning

    5/35

    More Definitions

    Commissioning Authority / Agent Helps Commissioning Team Implement Cx Process

    Leads, Plans, Schedules, & Coordinates Cx Team

    Hired by Owner (Ideally)

    Commissioning Team

    Owner, DoR, GC & Subs, CxA & Specialists

    All Stakeholders that Implement Commissioning Process

    http://www.nottinghamshire.gov.uk/youthzone/youthzone-getactive/cpd-thinking.gif
  • 8/9/2019 5 Commissioning

    6/35

    Still More Definitions

    Owners Project Requirements (OPR) Written document of project requirements. (NOT the RFP)

    Details how project will be used and operated.

    Basis of Design (BoD)

    Record of how the OPR is met in design.

    Concepts, Calculations, Decisions, and Product Selections

    Commissioning Plan

    Documents Requirements of Commissioning Process Outlines Organization, Schedule, & Resources

    http://www.nottinghamshire.gov.uk/youthzone/youthzone-getactive/cpd-thinking.gif
  • 8/9/2019 5 Commissioning

    7/35

    Even More Definitions

    Commissioning Report Records the Activities & Results of the Cx Process

    Developed from Final Commissioning Plan

    Systems Manual

    Composite Document

    Design & Construction, O&M, Cx, Training, Maintenance, etc.

    Issues & Resolutions Log

    Ongoing Record of Problems/Concerns & Resolutions

    Maintained Throughout Life of Project

    http://www.nottinghamshire.gov.uk/youthzone/youthzone-getactive/cpd-thinking.gif
  • 8/9/2019 5 Commissioning

    8/35

    Enough Definitions

    Monitor Based Commissioning Ongoing Building Energy System Monitoring

    Provides Substantial, Persistent, Energy Savings

    On-Going / Persistent Commissioning

    Post Warranty Continuation of Cx Process

    Improves Performance as Building Evolves

    Positive Feedback Commissioning

    Monitors Critical Aspects of Building Performance

    Predictor of Operational Failure: Safety, Comfort, Efficiency

    http://www.nottinghamshire.gov.uk/youthzone/youthzone-getactive/cpd-thinking.gif
  • 8/9/2019 5 Commissioning

    9/35

    What Cx / RCx IS NOT!

    Construction Administration / Quality Control

    Bunch of Tests at the end of Construction

    Maintenance Contract

    Energy Audit / Study

    HVAC Test and Balance

    http://www.istockphoto.com/file_thumbview_approve/9206198/2/istockphoto_9206198-do-not-symbol.jpghttp://www.istockphoto.com/file_thumbview_approve/9206198/2/istockphoto_9206198-do-not-symbol.jpg
  • 8/9/2019 5 Commissioning

    10/35

    Objectives of Cx / RCx

    Implement Quality-Verification Practices for Design & Construction Owners Project Requirements (OPR) are Being Met By the Basis of

    Design (BOD) & Construction

    Provide Documentation & Tools to Improve Quality of Deliverables

    Verify Coordination Between Owner, Designers, and Builders

    Verify and Document that Building & Integrated Systems PerformProperly

    Verify that O&M Staff are Trained

    ENSURING THE OWNER GETS

    WHAT THEY PAID FOR!

    http://www.google.com/imgres?imgurl=http://have-a-nice-day.org/happy/images/Smiley%20Face%20(flat).jpg&imgrefurl=http://have-a-nice-day.org/happy/Smiley%20Face%20(flat).html&usg=__dH_gzL1igNesYgGInsPaOT9WDlw=&h=1800&w=1800&sz=143&hl=en&start=11&zoom=1&itbs=1&tbnid=NcreDsGXlmu9OM:&tbnh=150&tbnw=150&prev=/images?q=smiley+face&hl=en&rls=com.microsoft:*&biw=1280&bih=846&tbm=isch&ei=mtUhTpqfHYTZgQfK8cW-Cwhttp://ian.umces.edu/imagelibrary/albums/userpics/12789/normal_ian-symbol-positive.png
  • 8/9/2019 5 Commissioning

    11/35

    Benefits of Cx / RCx

    Higher Quality Product that Leads to Better Owner, A/E &Contractor Reputations

    Confident O&M Staff inMaintaining Facility

    Budget Savings in Capital & Operations

    Healthy Building which Improves Occupant Productivity

    Less Conflicts / Litigation

    http://www.google.com/imgres?imgurl=http://info.instantis.com/Portals/37019/images/resource%20management%20benefits.jpg&imgrefurl=http://info.instantis.com/enterprise-ppm-blog/bid/55468/Resource-Management-Maturity-Model-Benefits&usg=__VBYV1_lepPXCBJUMEOhJbF1Do0A=&h=346&w=347&sz=54&hl=en&start=4&zoom=1&itbs=1&tbnid=qAde4yUSfUqvvM:&tbnh=120&tbnw=120&prev=/images?q=benefits&hl=en&rls=com.microsoft:*&biw=1259&bih=842&tbm=isch&ei=4tUhTrHsGsTdgQeAls2-Cw
  • 8/9/2019 5 Commissioning

    12/35

    Cx / RCx Systems

    HVAC system and associated controls Electrical lighting and power

    Plumbing systems

    Building envelope

    Renewable energy systems

    Refrigeration systems

    Industrial process system

    Life safety & fire protection systems Security systems

    JUST ABOUT ANYTHING!

    http://www.google.com/imgres?imgurl=http://thejourneyofbuildingourfamily.files.wordpress.com/2011/05/certified-stamp.gif&imgrefurl=http://thejourneyofbuildingourfamily.wordpress.com/tag/licensing/&usg=__VUBhBmdz71EyyeVu-Eq11DJZu7U=&h=3750&w=5000&sz=612&hl=en&start=4&zoom=1&itbs=1&tbnid=KxN4sWDxgc6znM:&tbnh=113&tbnw=150&prev=/images?q=certified&hl=en&rls=com.microsoft:*&biw=1259&bih=842&tbm=isch&ei=QdYhToHlEMTbgQfUuuG-Cw
  • 8/9/2019 5 Commissioning

    13/35

    What is a CertifiedCx / RCx Provider?

    Certified Building Commissioning Professional (CBCP) -AEE

    Commissioning Process Management Professional

    (CPMP) - ASHRAE Commissioning Authority (CxA) ACG

    Certified Commissioning Provider (CCP) BCA

    Commissioning Accredited Professional (CxAP)

    University of Wisconsin Madison Qualified Commissioning Administrator (QCA) NEBB

    Certified Commissioning Supervisor (CCS) - TABB

    http://www.google.com/imgres?imgurl=http://thejourneyofbuildingourfamily.files.wordpress.com/2011/05/certified-stamp.gif&imgrefurl=http://thejourneyofbuildingourfamily.wordpress.com/tag/licensing/&usg=__VUBhBmdz71EyyeVu-Eq11DJZu7U=&h=3750&w=5000&sz=612&hl=en&start=4&zoom=1&itbs=1&tbnid=KxN4sWDxgc6znM:&tbnh=113&tbnw=150&prev=/images?q=certified&hl=en&rls=com.microsoft:*&biw=1259&bih=842&tbm=isch&ei=QdYhToHlEMTbgQfUuuG-Cw
  • 8/9/2019 5 Commissioning

    14/35

    Qualified Cx / RCx Provider Attributes

    Ability to Work with Multi-Disciplined Team

    Good Communicator / Diplomat

    Organized

    Ample Field Experience

    Understanding of the A/E and Contractor Requirements

    Ability to Define Optimal Operating Procedures for

    Building Systems

    http://www.google.com/imgres?imgurl=http://www.healthcarereformmagazine.com/upload/articles/pursuing-the-promise-of-care-coordination-with-qualified-credentialed-professionals.jpg&imgrefurl=http://www.healthcarereformmagazine.com/article/pursuing-the-promise-of-care-coordination-with-qualified-credentialed-professionals.html&usg=__tK4foHpd4LR5EWLNiH_I0y3rIXc=&h=336&w=344&sz=21&hl=en&start=17&zoom=1&itbs=1&tbnid=RlENpVIKr0m3tM:&tbnh=117&tbnw=120&prev=/images?q=qualified+professional&hl=en&rls=com.microsoft:*&biw=1259&bih=842&tbm=isch&ei=gtYhTuuKDMeRgQeBr9W-Cw
  • 8/9/2019 5 Commissioning

    15/35

    Cx / RCx References

    ASHRAE Guideline 0-2013 (replaced 0-2005)

    ASHRAE Guideline 1.1-2007 (replaced 1-1996)

    ASHRAE Standard 202-2013

    ACG Commissioning Guideline

    NEBB Procedural Standards for Building Systems

    Commissioning

    SMACNA HVAC Commissioning Guideline

    Portland Energy Conservation, Inc. (PECI)

    *NUMEROUS OTHERS!

    http://www.google.com/imgres?imgurl=http://www.oralchelation.net/images/bs00554_.jpg&imgrefurl=http://www.oralchelation.net/&usg=__i1SURKymED8cV4q5S3UjIflYdkw=&h=364&w=417&sz=16&hl=en&start=18&zoom=1&itbs=1&tbnid=h6wghqRLs3CxEM:&tbnh=109&tbnw=125&prev=/images?q=references&hl=en&rls=com.microsoft:*&biw=1259&bih=842&tbm=isch&ei=ydYhTqmsI83pgAfl1sy-Cw
  • 8/9/2019 5 Commissioning

    16/35

    The Commissioning (Cx) Process

    The commissioning process involves activities that areintegrated into every phase of the project . . .

    NOT CONSTRUCTION ADMINISTRATION!

    NOT JUST TESTING AT THE END!

    PROGRAM DESIGN CONSTRUCTION ACCEPTANCE WARRANTY

  • 8/9/2019 5 Commissioning

    17/35

    Commissioning: Program Phase

    Define Project Scope

    Identify Owners Project Requirements

    Develop Budget for Commissioning

    Establish Commissioning Plan

    PROGRAM DESIGN CONSTRUCTION ACCEPTANCE WARRANTY

  • 8/9/2019 5 Commissioning

    18/35

    Commissioning: Design Phase

    Verify Basis of Design With Owners ProjectRequirements

    Review Design Documents for Completeness andLong-term System Integrity/Maintenance

    Create Checklists and CommissioningRequirements

    Define Training Requirements

    Update Commissioning Plan

    PROGRAM DESIGN CONSTRUCTION ACCEPTANCE WARRANTY

  • 8/9/2019 5 Commissioning

    19/35

    Commissioning: Construction Phase

    Update Commissioning Plan

    Verify Submittals With Design Documents

    Develop Detailed Test Procedures and Data Forms

    Verify That Systems Comply With DesignDocuments

    Develop Systems Manual for Operation andMaintenance

    PROGRAM DESIGN CONSTRUCTION ACCEPTANCE WARRANTY

  • 8/9/2019 5 Commissioning

    20/35

    Commissioning: Acceptance Phase

    Manage Functional Performance Testing

    Verify Training of Operations & Maintenance(O&M) Personnel

    Maintain Issue Logs

    Convene Lessons Learned Workshop

    Deliver System Manual

    PROGRAM DESIGN CONSTRUCTION ACCEPTANCE WARRANTY

  • 8/9/2019 5 Commissioning

    21/35

    Commissioning: Warranty Phase

    Verify Seasonal Testing of Facility Systems

    Verify Continuing O&M Personnel Training

    Conduct Periodic Performance Evaluations ofSystems & Assemblies

    Deliver Final Systems Manual

    PROGRAM DESIGN CONSTRUCTION ACCEPTANCE WARRANTY

  • 8/9/2019 5 Commissioning

    22/35

    The Retro-Commissioning (RCx) Process

    The retro-commissioning process involves activities that areintegrated into every phase of the project . . .

    NOT A MAINTENANCE CONTRACT!

    NOT JUST AN ENERGY STUDY!

    PRE-PLANNING PLANNING INVESTIGATION IMPLEMENT HAND-OFF

  • 8/9/2019 5 Commissioning

    23/35

    Retro-Commissioning:Pre-Planning Phase

    Identify Possible Candidate Buildings

    Collect Utility Data & Evaluate

    Generate Energy Star Portfolio Manager Energy Performance

    Rating

    Select Candidate Building(s)

    Define Project Goals & Objectives (OPR)

    PRE-PLANNING PLANNING INVESTIGATION IMPLEMENT HAND-OFF

    http://www.google.com/imgres?imgurl=http://patentlawcenter.pli.edu/wp-content/uploads/2010/10/man-question-mark.jpg&imgrefurl=http://patentlawcenter.pli.edu/2010/10/04/what-is-prior-art/man-question-mark/&usg=__MElEOct9NZOVrrgiC7WNXtzT07w=&h=359&w=286&sz=11&hl=en&start=9&zoom=1&itbs=1&tbnid=RtcmX_DtJpu3_M:&tbnh=121&tbnw=96&prev=/images?q=question+mark&hl=en&rls=com.microsoft:*&biw=1259&bih=842&tbm=isch&ei=Z9chTuXWFYuugQeWkry-Cw
  • 8/9/2019 5 Commissioning

    24/35

    Retro-Commissioning: Planning Phase

    Perform Facility Interviews & Walk-through

    Confirm Project Goals & Objectives (OPR)

    Submit Draft RCx Plan for Owner Review

    Submit Final RCx Plan

    PRE-PLANNING PLANNING INVESTIGATION IMPLMENT HAND-OFF

    http://www.google.com/imgres?imgurl=http://www.mdp.state.md.us/images/OurWork/planning-1.jpg&imgrefurl=http://www.mdp.state.md.us/OurWork/localplanning.shtml&usg=__iPZqWdKSVqEQDancq853Wg1x5NQ=&h=348&w=577&sz=44&hl=en&start=2&zoom=1&itbs=1&tbnid=Q_td-1ppMbR03M:&tbnh=81&tbnw=134&prev=/images?q=planning&hl=en&rls=com.microsoft:*&biw=1259&bih=842&tbm=isch&ei=EdchTpnKJtG_gQfFgcm-Cw
  • 8/9/2019 5 Commissioning

    25/35

    Retro-Commissioning:Investigation Phase

    RCx Plan Presented to Key Facility Staff

    Conduct In-Depth Building Investigation

    Submit Findings Log & Energy Savings Calculations to Owner

    Owner Selects Energy Conservation Measures to Implement

    Submit Final RCx Investigation Report w/ Recommended

    Implementation Measures

    PRE-PLANNING PLANNING INVESTIGATION IMPLEMENT HAND-OFF

    http://www.google.com/imgres?imgurl=http://www.lawyerbrooks.com/investigation.jpg&imgrefurl=http://www.lawyerbrooks.com/investigation.html&usg=__Pp2Cy-lxlm8ptBHAwJT2mOwMBAc=&h=370&w=600&sz=49&hl=en&start=1&zoom=1&itbs=1&tbnid=e0lrk2cl3HaqiM:&tbnh=83&tbnw=135&prev=/images?q=investigation&hl=en&rls=com.microsoft:*&biw=1259&bih=842&tbm=isch&ei=o9chTryPOs3TgQewiMi-Cw
  • 8/9/2019 5 Commissioning

    26/35

    Retro-Commissioning:Implementation Phase

    Submit Implementation Plan (similar to Cx Plan)

    Energy Conservation Measures & Improvements are Made

    Verify Pre-Functional Performance Testing

    Conduct Functional Performance Testing

    PRE-PLANNING PLANNING INVESTIGATION IMPLEMENT HAND-OFF

    http://www.google.com/imgres?imgurl=http://campaigns.realpage.com/realworld/files/2011/04/implementation.jpg&imgrefurl=http://campaigns.realpage.com/realworld/keys-to-a-successful-implementation/&usg=__jevWiIehW0_W3RNF6KBHCp7OBC8=&h=314&w=467&sz=13&hl=en&start=2&zoom=1&itbs=1&tbnid=3jzVF1yp5Hiy-M:&tbnh=86&tbnw=128&prev=/images?q=implementation&hl=en&rls=com.microsoft:*&biw=1259&bih=842&tbm=isch&ei=49chTp2BKY7UgAeFt8G-Cw
  • 8/9/2019 5 Commissioning

    27/35

    Retro-Commissioning: Hand-Off Phase

    Verify Seasonal Testing of Facility Systems

    Verify O&M Personnel Training

    Conduct Lessons Learned Workshop

    Conduct Periodic Performance Evaluations of Systems &

    Assemblies

    Deliver Final Retro-Commissioning Report (Systems Manual)

    PRE-PLANNING PLANNING INVESTIGATION IMPLEMENT HAND-OFF

    http://www.google.com/imgres?imgurl=http://1.bp.blogspot.com/-Kw-JZ_En1AY/TdwOQmZM0aI/AAAAAAAAAJ8/N2yu9ZB88XY/s1600/handoff.jpg&imgrefurl=http://trishaleaver.blogspot.com/2011/05/hand-off.html&usg=__5P8JSwCODAupUX0SV0FLu_ZNtfM=&h=254&w=469&sz=24&hl=en&start=1&zoom=1&itbs=1&tbnid=du8bzMzM2Hh4lM:&tbnh=69&tbnw=128&prev=/images?q=hand-off&hl=en&rls=com.microsoft:*&biw=1259&bih=842&tbm=isch&ei=GNghTqSyM4zpgAfcg8y-Cw
  • 8/9/2019 5 Commissioning

    28/35

    LEED v4 Fundamental Commissioning EA PreReq Fundamental Commissioning and Verification

    Systems Commissioned: HVAC&R & Associated Controls Plumbing: Domestic Hot Water &

    Associated Controls Interior & Exterior Lighting Controls Electrical Service & Distribution Renewable Energy Systems Option: Envelope, Life Safety, Comm/Data,

    Fire Protection/Alarm, Process Equipment

    Review OPR, BoD & Design / Verify Agreement Write Cx Specs Develop & Implement Cx Plan Verify Pre-Functional & Functional Performance Tests Issue Final Report / Systems Manual

  • 8/9/2019 5 Commissioning

    29/35

  • 8/9/2019 5 Commissioning

    30/35

    What is an EnergyAudit / Survey?

    It serves the purpose of identifying where a building or plantfacility uses energy and highlights energy conservationopportunities (ECOs). Albert Thumann

    Detailed examination and analysis of how a facility usesenergy.

    Identifies what the facility pays for that energy.

    Recommends a program for changes in operational practices

    and / or energy consuming equipment.

    http://www.google.com/imgres?imgurl=http://trustedhi.com/sitebuildercontent/sitebuilderpictures/webassets/EnergyAudit.jpg&imgrefurl=http://trustedhi.com/catalog/i50.html&usg=__RkICJdX_bkE5y31C1ZwyftpjQ04=&h=915&w=800&sz=41&hl=en&start=6&zoom=1&itbs=1&tbnid=4NQot6_-JflDZM:&tbnh=147&tbnw=129&prev=/images?q=energy+audit&hl=en&rls=com.microsoft:*&biw=1259&bih=842&tbm=isch&ei=ZNghTp2NM8PZgQe_mMW-Cw
  • 8/9/2019 5 Commissioning

    31/35

  • 8/9/2019 5 Commissioning

    32/35

    ASHRAE Energy Audits

    Level 1 : Lowest Cost Preliminary Opportunity Assessment(POA) Walk through site visit

    Review of Energy Bills (consumption, costs, rate structure)

    Report includes list of Low cost / No cost Opportunities

    Level 2 : includes Level 1, plus Energy use breakdown by system and energy source O& M practices , Constraints, Economic criteria

    List of ECMs recommended for further detailed quantification and analysis

    Level 3 : (Investment grade) Detailed site visit, system performance data gathering

    Level 2 list of ECMs are evaluated in detail. Current costs, potential savings,paybacks

    High level of confidence in economics and schedule of each ECM

  • 8/9/2019 5 Commissioning

    33/35

    Energy Audit Overall Benefits

    Planning Tool to Develop Future Capital InvestmentBudget

    Prioritize Which Facilities Need The Most Attention:Finding the ENERGY PIGS!

    Identify the Immediate Impact on Facility O&M Budget The FIRST Step in the Retro-Commissioning Process!

    http://www.google.com/imgres?imgurl=http://twincitiesrealestate.housingstorm.com/files/2010/09/home-energy-audit.jpg&imgrefurl=http://twincitiesrealestate.housingstorm.com/2010/09/energy-audits-%E2%80%93-the-costs-and-benefits/&usg=__GsJUW9tXCosjqQF_jMqJdvwTpFk=&h=237&w=255&sz=34&hl=en&start=5&zoom=1&itbs=1&tbnid=OLHA_rZ9x9WI5M:&tbnh=103&tbnw=111&prev=/images?q=energy+audit+benefits&hl=en&rls=com.microsoft:*&biw=1259&bih=842&tbm=isch&ei=ydghTtXRHo6tgQemstG-Cw
  • 8/9/2019 5 Commissioning

    34/35

    Audits vs. Retro-CommissioningSimilar but NOT the Same

    Audits - Often Performed in Older Facilities Investigate what's there. Determine how it is performing. Determine

    if it can be improved economically (Energy & Maintenance Savingsoffset capital investment ECMs / ECOs)

    Product is an Implementation Document Similar to RCx Plan.

    RCx Performed on Existing Buildings, relativelynew or old

    Goal Make facility perform As Owner Intended. Ownerscontractor/ maintenance staff usually performs corrective action.

    Product - Properly operating building, with documentation provingsame. Some investment might be necessary.

    QUESTIONS?

    http://www.jrdkirk.com/wp-content/uploads/2010/10/NotEqual.jpghttp://www.jrdkirk.com/wp-content/uploads/2010/10/NotEqual.jpg
  • 8/9/2019 5 Commissioning

    35/35

    QUESTIONS?