5-Capacity Improvements and Wet Weather Storage

download 5-Capacity Improvements and Wet Weather Storage

of 79

Transcript of 5-Capacity Improvements and Wet Weather Storage

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    1/79

    Capacity Improvements and

    Wet Weather Storage

    Prepared by

    Michael N. Young, P.E.

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    2/79

    Michael N. Young, P.E.

    BS in Civil Engineering - University of Illinois

    MS in Environmental Engineering University of

    Illinois

    Wheaton Office Principal/Branch Manager - RJNGroup, Inc. Since 2008

    19 Years Experience in Wastewater Collection and

    Treatment

    ACEC-IL - MWRDGC Committee Member

    Project Director or Manager of Five Capacity

    Improvement or Storage Projects in Past 2 Years

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    3/79

    Why Address Inflow and Infiltration?

    Basement Backups, SSOs, & CSOs

    Regulatory or District Pressures

    Chronic Problem Areas

    Lift Station or WWTP Capacity CMOM

    Proactive Small Steps

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    4/79

    Comprehensive Sanitary Program

    Existing Conditions Flow Monitoring

    Mapping Updates, GPS Locating, and GISIntegration

    Modeling of Sewer System

    Evaluate Capacity Improvements and StorageOptions

    Comprehensive SSES & Flow Balancing

    Public Sector Rehabilitation

    Private Sector Flow Reduction Post-Rehabilitation Flow Monitoring

    Long-Term Sewer System O & M - CMOM

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    5/79

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    6/79

    Reduce Flow - Flow Balance

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    7/79

    Level 1 Rehabilitation

    Public Sector Manhole defects

    Mainline defects

    Cross connections

    Private Sector Direct sump pumps

    Diverter valves

    Downspouts

    Cleanouts Window Well Covers

    Possibly other area drains or combination sumps

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    8/79

    Level 2 Rehabilitation

    Combination Sumps

    Unsealed Sanitary Sumps

    Area Drains

    Tributary drainage area

    Options to remove

    Driveway drains

    Difficult, but major source

    Does it drain street?

    Stairwell drains

    Window wells not cost effective

    Various other

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    9/79

    Level 3 Rehabilitation

    Laterals Pilot area

    Pre-inspections

    Full or short?

    All or some? Cost sharing?

    Storm rehab?

    Foundation Drains

    Prevalence? Isolate to manageable area

    Combine with overhead sewer?

    Cost sharing?

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    10/79

    Increase Capacity

    Treatment Facility Expansions

    Very expensive to treat Clean water

    Wet-Weather Facilities

    Major improvements due to new regulations? Lift Station / Force Main Capacity

    Sewer Capacity

    Sewer Upsize

    Relief Sewer Flow Diversion

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    11/79

    Capacity Improvements - Considerations

    Frequency and Severity of Backups

    Downstream Capacity

    Interceptor

    WWTP Downstream control?

    Flow Monitoring and Modeling

    Regulatory Limitations

    Best Option When Feasible Immediate improvement

    Get flow out of system

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    12/79

    Villa Park Background and Study

    Central Combined (Partially Separated)

    North and South Separate Systems

    Consistent Annual Flow Reduction

    Wet-Weather Facilities

    Closing Ordinance

    Isolated Issues

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    13/79

    Villa Park Sanitary Master Plan

    Flow Monitoring

    Hydraulic Model

    Public Sector SSES

    Evaluate Wet-Weather Facility Operation

    Focus South Villa

    Flow reduction

    Lift station upgrades

    Capacity improvements

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    14/79

    Villa Park - Existing Conditions

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    15/79

    Villa Park Proposed w/o LS Upgrade

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    16/79

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    17/79

    Villa Park Solution

    Flow Reduction Point repairs and lining

    MH rehab

    Multi-year Closing Ordinance

    Myrtle Relief Sewer

    Existing backyard sewer kept as local sewer

    Upsize from 10 to 12

    Other minor flow diversions to minimize creek crossings

    South Villa LS Capacity Improvements

    Added second force main, but not pump upgrades

    May need in future if new annexation

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    18/79

    Villa Park

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    19/79

    Wheaton - Background

    Regional Basement Backups

    Significant Public Sector Rehab

    2006 Joint Study District and City

    Large scale overview

    Flow monitoring and skeletal modeling

    District interceptor upgrades

    City focus on Basins 1, 3, and 4

    City Basin 4

    Capacity improvements

    40% flow reduction target

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    20/79

    Wheaton Study and Options

    Basin 4 Focused Study

    Local flow monitoring and modeling

    Public SSES Smoke, MH and TV

    Private SSES BI, Dye and Lateral TV Comprehensive flow balance

    Flow Reduction

    Complete Level 1 and Level 2

    Laterals vs. Foundation Drains

    Lateral Rehab Pilot

    Refined Capacity Improvements

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    21/79

    Wheaton Flow Balance

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    22/79

    Wheaton Flow Reduction

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    23/79

    Wheaton - Solution

    Pilot Results

    ~30% flow reduction

    Some Level 2 remains

    Lining challenges Full Scale Program

    Level 1 and 2 removal

    Lateral lining

    Capacity improvements

    Coordination w/ District

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    24/79

    Palatine - Background

    Basement Backups Specific Location

    Level 1 Flow Reduction

    Improvement, But Backups Persist

    Level 2 and 3 Defects

    Overload System Downstream

    Options:

    Local storage Level 2 and 3 Flow Reduction

    Other?

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    25/79

    Palatine Study and Options

    Study

    Problem and system understanding

    Interceptor options

    Flow Monitoring and Modeling Interceptor history research

    Rohlwing Interceptor - Overloaded

    Brockway Interceptor - Underloaded

    Area Originally Intended for Brockway

    Submit Report Findings

    Coordination with MWRD

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    26/79

    Palatine Reallocation Area

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    27/79

    Palatine - Solution

    Flow Diversion

    MWRD ConceptualApproval Population Equivalency

    Flow Mitigation

    Village Mitigation

    Preliminary Design

    Interceptor Connection Deep Sewer On Grade

    Final Design

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    28/79

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    29/79

    Palatine - Trenchless Construction

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    30/79

    Palatine - Trenchless Construction

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    31/79

    Des Plaines - Background

    Basement Backups

    Regional severe storm only

    Local moderate also

    Some Level 1 Removal Limited Local Capacity

    All Options:

    Upsize local interceptor

    Divert flow

    Local storage

    More flow reduction

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    32/79

    Des Plaines Study and Options

    Study

    Problem and system understanding

    Interceptor options

    Flow monitoring and modeling

    Severe capacity limitations

    Flow reduction only likely not sufficient

    Submit Report Findings

    Coordination with MWRD

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    33/79

    Downstream Control

    Basin

    Severity of

    DS Control Pipe Size

    DS Control

    Minimum

    Flow Depth

    DS Control

    Minimum

    Precipitation

    Flow

    Restriction

    Discrete 3-Yr,

    2-Hr PF

    Max Flow

    Depth

    Down-

    stream

    System

    (Inches) (Inches) (Inches) (mgd) (Feet)

    DES-1

    MOST

    SEVERE 15 8 0.45 0.8 OR LESS 6.5 7.2 DES-2

    DES-2 SEVERE 18 12 0.55 1.5 9.0 8.8 DES-4

    DES-3 SEVERE 12 15 0.65 1.0 - 1.5 6.9 10.1 DES-4

    DES-4 SEVERE 24 12.5 0.55 2.5 2.5 9.3 DES-6

    DES-5 MODERATE 18 9 0.40 2.5 - 4.0 5.8 8.6 DES-6

    DES-6 NONE 28 UNKNOWN UNKNOWN

    NONE UP TO

    3.6 3.8 2.5 MWRD

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    34/79

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    35/79

    Des Plaines Flow Diversion

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    36/79

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    37/79

    Proposed Conditions - South

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    38/79

    Storage

    Significant Downstream Control High excess flows

    Limited interceptor capacity

    Reverse flow

    Limited treatment capacity

    Quick Solution Needed

    Above Ground Storage Upgrade existing pump station

    New pump station

    Below Ground Regional open land and deep sewers

    Local oversize and/or parallel sewers

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    39/79

    Storage - Considerations

    Frequency and Severity of Backups

    Downstream Capacity Reverse Flow?

    Flow Monitoring and Modeling Critical

    Regulatory Limitations

    Storage Details

    Available locations

    Gravity or pumped flow

    System overflow Cleaning and maintenance

    Odor control

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    40/79

    Fresh Express - Background

    Industrial Facility

    Wash and process fruits and vegetables

    Current wastewater flow: 400,000 gpd

    Potential wastewater flow: 700,000 gpd

    Current Facility - Combined Sewer System

    Proposed Facility - Streamwood

    Separate sewer system

    Limited capacity

    I/I concerns

    No negative impact

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    41/79

    Fresh Express Study and Options

    Initial Desktop Study

    Capacity analysis

    Potential, but more information needed

    Second Study - Flow Monitoring and Modeling Check Dry- and Wet-Weather Capacity

    Options

    2 Mile Force Main: No Village Restrictions

    Mile Force Main: Address Capacity Limitations

    Additional MWRD Requirements

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    42/79

    Fresh Express Route Options

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    43/79

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    44/79

    Fresh Express Volume Risk Analysis

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    45/79

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    46/79

    Elmhurst Study and Options

    Study Citywide flow monitoring

    Hydraulic model skeletal with detailed areas

    Smoke Testing and MH Inspection

    Resident surveys from storm event

    Review of 1988 building inspection record

    All Available Options Needed

    Capacity improvements

    Storage

    Flow reduction

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    47/79

    Elmhurst Flow Analysis

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    48/79

    Elmhurst Storage Volume

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    49/79

    Balancing Storage and Flow Reduction

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    50/79

    Elmhurst Solution

    Local Focus Area Lift station upgrades

    Influent line upsize from 18 to 24 and increase slope

    Dry- and wet-weather pumps and force mains

    Wet-weather FM to 2 million gallon storage tank Regional and Full City Improvements

    Level 1 and 2 plus select Level 3 flow reduction

    Long-term flow monitoring

    Enhanced closing ordinance

    New construction requirements

    Overhead sewer cost sharing program

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    51/79

    Elmhurst Capacity and Storage

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    52/79

    Elmhurst Open Cut

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    53/79

    Elmhurst Trenchless

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    54/79

    Elmhurst Trenchless

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    55/79

    Glenview - Background

    1 Square Mile Target Area

    Basement Backups

    Full Road Reconstruction

    MWRD Tributary Area Limited Capacity Downstream

    Limited Storage Options

    Flow Reduction

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    56/79

    Glenview Study and Options

    Previous Study

    Flow monitoring

    Storage not cost effective

    Flow reduction

    Road Reconstruction in Design

    More Basement Backups

    Review Previous Study

    Review flow monitoring

    New model

    Storage and flow reduction options

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    57/79

    Glenview Storage vs. Flow Reduction

    Rain Event Recurrence

    Interval I/I Reduction (%)Amount of Storage Required

    (gal)

    1-Yr 0 66,200

    1-Yr 20 0

    5-Yr 0 318,300

    5-Yr 15 184,750

    5-Yr 20 165,700

    5-Yr 35 66,200

    5-Yr 50 0

    10-Yr 0 466,400

    10-Yr 20 265,250

    10-Yr 30 188,05010-Yr 50 19,800

    50-Yr 0 1,378,000

    50-Yr 20 685,400

    50-Yr 50 185,750

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    58/79

    Glenview - Solution

    Major Storage Only Not Cost-Effective

    Limited Storage Cost-Effective

    Storage in ROW Road Reconstruction

    Critical elevations Operation and Maintenance

    Utility conflict

    Flow backup into 48 sewers select locations

    Flow Reduction Program Public

    Private

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    59/79

    Glenview Storage

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    60/79

    Wilmette - Background

    Half Combined, Half Separate Systems

    Two Major Separate Sanitary Basins

    Backups Regional and Severe in Major Events

    Backups Isolated Areas in Moderate Events Late 1980s Flow Reduction

    Princeton Basin Control Structure and Storage

    Downstream Control Physical evidence

    Not found in previous flow monitoring

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    61/79

    Wilmette Initial Study

    Detailed Hydraulic Model

    Utilize previous flow monitoring

    Rim and invert survey of all manholes

    Recommendations Address backpitched sewer

    Address two local hydraulic bottlenecks

    Initiate flow reduction Kenilworth Gardens

    More detailed evaluation of Harms Basin Additional flow monitoring

    Capacity and storage options

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    62/79

    Wilmette Localized Bottlenecks

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    63/79

    Wilmette Local Storage

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    64/79

    Wilmette Local Storage

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    65/79

    Wilmette Local Storage

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    66/79

    Wilmette Harms Basin Study

    Longer Term Flow Monitoring

    Various size rain events

    Evidence of downstream control

    Improvement Options Flow reduction

    Public

    Private

    Storage options

    Volume required?

    Side stream sewers in ROW

    Large scale location options

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    67/79

    Major Rain Event

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    68/79

    Model Target Event

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    69/79

    Diagnostics Model Solution

    Number of Properties Subject to Backup by Alternative

    Storm

    Event

    Average # of

    Events Per

    Year

    Existing

    Condition

    1.5

    MG

    3.0

    MG

    4.5

    MG

    5.5

    MG

    8.0

    MG

    11.0

    MG

    9.0 MG

    (P)

    2-Month 6 0 0 0 0 0 0 0 06-Month 2 58 0 0 0 0 0 0 0

    1-Year 1 267 40 38 17 7 7 7 7

    2-Year 0.5 1,213 921 231 113 103 65 65 65

    5-Year 0.2 1,669 1,626 1,651 1,258 373 308 291 308

    10-Year 0.1 1,711 1,680 1,679 1,679 1,553 1,228 1,213 1,178

    25-Year 0.04 1,711 1,700 1,690 1,687 1,678 1,489 1,374 1,362

    50-Year 0.02 1,711 1,711 1,708 1,690 1,690 1,689 1,467 1,677

    100-Year 0.01 1,712 1,712 1,712 1,712 1,712 1,695 1,681 1,700

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    70/79

    Wilmette Harms Basin Solution

    Backflow Prevention / Pump Over Station Check Valve on 36 Interceptor

    1 MGD Pump Station (Flow Set by MWRD)

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    71/79

    Wilmette West Park Storage 5.5 MG Cast-In-Place Concrete Tank

    Sewer Overflow to Tank (No Mechanical / Electrical)

    Provisions for Mixing and Flushing

    Controls Building with Odor Control System

    Pump Station to Pump Out Tank

    Design-Build

    IGA between Village and Park District

    Phase I Excavation start two weeks after approval

    Phase II Tank, Building, Lift Station and Piping

    Field Area complete by September 15, 2015

    Park District Field Turf

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    72/79

    Wilmette West Park Storage

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    73/79

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    74/79

    Wilmette West Park Storage

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    75/79

    Wilmette West Park Storage

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    76/79

    Wilmette Additional Improvements

    Flow Reduction Comprehensive manhole rehabilitation

    Sewer lining

    Private Sector pilot

    Princeton Basin Flow monitoring

    Downstream control

    Detailed Study

    Model options

    Village Only Option

    Regional Option

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    77/79

    Princeton Basin Regional Approach

    Coordination/Teaming with MWRD

    Regional Flow Monitoring

    Hydraulic Modeling

    Downstream Control

    Source

    Combined Sewers

    Options

    Capacity

    Storage

    Flow Reduction

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage

    78/79

    Capacity and Storage

    Fully Understand the Problem Flow monitoring long-term if necessary

    Hydraulic modeling

    Evaluate Capacity Options Downstream control Flow diversion

    Flow Reduction vs. Storage Options for storage

    Compare different ratios

    Combination common for problem areas

  • 8/10/2019 5-Capacity Improvements and Wet Weather Storage