4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong,...

26
GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

Transcript of 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong,...

Page 1: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

GST – Class NKHong Kong, Nov. 2015

1

4th Green Technologies Seminar

Hong Kong, Nov. 2015

Page 2: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

• The EIB at a glance

• Facts & figures

• Approach to the Waterborne Transport Sector

• Due diligence process

• EIB products

Content

2

Page 3: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

• EU’s long-term lending bank set up in 1958 by the Treaty of Rome

• Providing finance and expertise for sound and sustainable investment projects

• More than 90% of lending is within the EU

• Shareholders: 28 EU Member States

Investing in Europe’s growth

The EIB at a glance

3

Page 4: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

The EIB Group

Provides finance and expertise for sound and sustainable investment

projects that promote EU policy objectives

Specialist provider of risk finance to benefit

innovative SMEs

4

Page 5: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

The EIB at a glance

• Largest multilateral lender and borrower in the world• Raise our funds on the international capital markets• Pass on favourable borrowing conditions to clients (large

amounts, broad range of currencies, long maturities, attractive interest rates)

• Catalyst for participation of other banking or financial partners• Some 440 projects each year in over 160 countries• Headquartered in Luxembourg and some 30 local

offices• Around 2 100 staff:

• Not only finance professionals, but also engineers, sector economists and socio-environmental experts

• More than 50 years of experience in financing projects

5

Page 6: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

• The EIB at a glance

• Facts & figures

• Approach to the Waterborne Transport Sector

• Due diligence process

• EIB products

Content

6

Page 7: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

Total lending in 2013

The world’s largest multilateral lender

7

Page 8: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

EIB Lending to the Transport sector2002-2013: EUR 160.95 billion

8

Page 9: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

EIB Lending to Waterborne Transport

9

Page 10: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

Benefits of EIB financing

Long term loans at attractive interest rates (fixed/floating)

Signalling effect and quality stamp (technical expertise)

Co-financing with house banks preferred

No cross selling & hold to maturity strategy

Large amounts – up to 50% of eligible costs

10

Page 11: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

Summary• EIB offers loans for financing of a broad range of tangible and intangible

investments

• Bilateral and intermediated loans depending on the project, borrower and final beneficiary

• Long-term senior investment loans (corporate & project finance)

• Financing for up to 50% of project cost

• Long maturity matching economic life of project assets

• EIB financing offers financial value-added (AAA/Aaa/AAA rating)

• Signalling Effects: Due to the Bank’s reputation for its prudent lending policy and its strong market/technology know-how, the EIB provides learning/signalling effects for other Banks

11

Page 12: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

• The EIB at a glance

• Facts & figures

• Approach to the Waterborne Transport Sector

• Due diligence process

• EIB products

Content

12

Page 13: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

Approach to Waterborne Transport Sector

• Projects must be in line with:• EU objectives (White paper, CEF, TEN-T policy)

• Convergence • SMEs and mid-cap enterprises• Environmental sustainability (incl. sustainable transport)• Knowledge Economy (incl. R&D)• Trans-European Networks (TENs) • Sustainable, competitive and secure energy

• EIB’s Transport Lending Policy (updated in Dec. 2011):• Development of TEN’s• Reduction of greenhouse gas emissions (GHG) and Climate

Adaptation• RDI and energy efficiency

13

Page 14: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

Background for intervention in waterborne transport sector

•Ports form the main gateway to international trade for the EU and thedemand for waterborne transport is expected to increase in the future.•Sea ports and intermodal logistics centers have a key role to play in theimprovement of an integrated and sustainable global supply chainsystem.•On the European coasts, safe and efficient entry points into Europeanmarkets are needed to avoid unnecessary traffic crossing Europe.•Reliable and diversified intermodal connections with the hinterland arecritical to facilitate the flow of goods and reduce transport time and costs.•Inland waterway transport is particularly indicated for goods transport,allowing for the safe transport of large consolidated freight volumes.•Inland waterway transport remains the most energy-efficient and climatefriendly of all modes of transport.

EIB Transport Lending Policy (2011)

14

Page 15: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

• Motorways of the Sea projects (infrastructure and vessel components)• Vessels and port facilities on routes part of the Motorways of the Sea

network

• New vessels• In the EU: vessels with EU flag to be operated on « eligible routes »,

originating or ending on a EU country, during the loan life.• Short sea shipping: vessels operating on routes aimed at modal shift from

road to maritime transport.• Convergence: vessel operations solely aimed at development region

assistance.• Remote community support where no viable alternate to shipping is

available (EU island community support).• Replacement of older, less energy efficient or more polluting vessels.

N.B. The EIB pays special attention that the ships it finances use best availabletechnologies and that promoters use sound environmental managementpractices.

• Vessel and Equipment R&D• R&D to enhance ship environmental performance and energy efficiency

(ship hull, propulsion, power plants, waste treatment, electric motors, etc.).

Eligible projects

15

Page 16: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

Examples of EU Short Sea vessel construction projectsapproved by the EIB

Vessel Project Loan amount (EUR million)

DFDS Scrubber Retrofit (Denmark) 100

Finnlines Scrubber Retrofit (Finland) 100

Balearia Retrofit (Spain) 70

Tallink RO-PAX Ferries (Estonia) 172

Grimaldi RO-PAX (Italy) 600

Fjord Line RO-PAX (Denmark) 55

Godby Shipping RO-RO (Finland) 38

Balearia RO-Pax (Spain) 70

Grimaldi RO-RO (Italy) 180

IMEC (Messina) RO-RO (Italy) 240

VISEMAR RO-PAX (Italy) 100

16

Page 17: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

Example 1 - DFDS Retrofitting

17

Page 18: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

Example 1 - DFDS Retrofitting

• The project comprised:

i. The retrofitting of scrubbers for 18 of the promoter’s vessels for the removal of oxides of sulphur (SOx) emissions from exhaust gases and

ii. The retrofitting of duel fuel LNG engines for 5 vessels.

These retrofitting’s are aimed at compliance with EU regulations for thecontrol of sulphur emissions in the Baltic and North Seas and theEnglish Channel on 1st January 2015. When this legislation comes intoeffect, the maximum sulphur oxide emission from vessels operating inthese areas will be the equivalent of 0.1 % sulphur in the vessel’s fuelcontent.

18

Page 19: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

Example 2 - Fjord Lines ROPAX Ferries

The project comprised the construction of two new ferries, whichwill offer daily services between Bergen, Stavanger, Kristiansand(Norway) and Hirtshals (Denmark). Each vessel has a capacityto carry 1,500 passengers and up to 600 vehicles.

The project ferries have the following specifications:

• Length: 170 meter• Beam: 27,5 meter• Engines: 4 • Engines: 4 x 4 x Rolls Royce Bergen • Cruise speed: 21.5 knots (70% MCR)• Passengers: 1 500• Crew cabins 67 (100 beds)• Passengers cabins 303 (1180 beds)• Deadweight 3620 • Cargo Lane meters: Up to 1 600 meter • Cars/trailers capacity: 600/100

19

Page 20: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

• Projects in the EU•

• Fos 2XL, Marseilles, France (infrastructure for two container terminals)• Kaiserschleuse Bremerhaven, Germany (major maritime lock)• Rotterdam Port Second Maasvlakte (infrastructure for major extension of Port of Rotterdam)• Pireaus Port II (container terminal expansion involving infrastructure and superstructure )• Duisburger Haven• Port of Thessaloniki• Purchase of Ro-ro vessel (Baltic Sea and Western Europe Motorways of the Sea)• Purchase of Ro-pax vessels (Spain-Italy & Italy-Greece Motorways of the Sea)• Spanish ports (Barcelona, Valencia, Cadiz, Bilbao)• Port of Antwerp 2nd Lock Waaslandhaven• Jade Weser Container Terminal• London Gateway• Port of Liverpool River Terminal• Port of Genoa• Fincantieri RDI

Example projects approved by EIB

20

Page 21: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

• The EIB at a glance

• Facts & figures

• Approach to the Waterborne Transport Sector

• Due diligence process

• EIB products

Content

21

Page 22: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

Project Requirements

Projects must:

• Meet at least one of the EIB’s objectives• Be technically sound• Be financially viable• Show an acceptable economic return• Comply with environmental protection and procurement

regulations

22

Page 23: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

• The EIB at a glance

• Facts & figures

• Approach to the Waterborne Transport Sector

• Due diligence process

• EIB products

Content

23

Page 24: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

EIB products

We help catalyse investment

LENDING BLENDING ADVISINGLoans

But also:

Guarantees(trade financing)

Equity participation

Combining EIB finance with EU budget (Project Bond Initiative)

Higher risk projects for innovation (RSFF)

Prepare & implement projects (JASPERS)

Support for public / private partnerships (EPEC)

Attracting FUNDING for long-term growth

24

Page 25: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

EIB products

• Senior debt (>EUR 25m investment)• Lending to public port authorities, private terminal operators, project finance vehicles,

shipping lines• Up to 50% of investment cost• Individual projects / Grouped loans (smaller projects grouped by borrower/sector)

• Intermediated lending (<EUR 25 m investment)• Lending to intermediary bank for on-lending to SMEs and Mid-caps • Up to 50% of investment portfolio cost• Eligible companies (“final beneficiaries”) are autonomous SMEs with less than 250

employees. • Mid-cap businesses (less than 3000 employees).

• Equity • Through participation in port infrastructure funds and equity funds

• Financial instruments under CEF (Debt instruments): EU-EIB risk-sharing instruments

• Project Bond Initiative (PBI) Pilot Phase: provides funded or unfunded subordinated credit enhancement to ensure sufficient rating of the project bonds

• Loan Guarantee for TEN-T (LGTT): provides a guarantee for demand risk over the ramp-up period for TEN-T projects

25

Page 26: 4th Green Technologies GST – Class NK Seminar Hong Kong ...€¦ · GST – Class NK Hong Kong, Nov. 2015 1 4th Green Technologies Seminar Hong Kong, Nov. 2015

For more information

http://www.eib.org/

Mark Clintworth

ShippingProjects Directorate

Phone: (+352) 4379 82690email: [email protected]

European Investment Bank98-100, boulevard Konrad AdenauerL-2950 Luxembourg

26