    Production Management

    Gestão da Produção

    2012/2013

    Course included in

    Master (MSc) in Mechanical Engineering

    Mestrado Integrado em Engenharia Mecânica

    4. Methods Engineering and Process Design

    A3 Report

    Production ManagementGestão da Produção

    [email protected]

    Methods Engineering – A3 Report

    What is the A3 Problem Solving or Report ?

    • Is a Process that applies lean thinking to problem solving.

     – It presents a report in a simple and structured way.

     – It is a waste-free way for report writing and communication.

     – It’s basic blocks provide a nice little template for lean thinking.

    • Jamie Flinchbaugh 2012

     – “By standardizing and making visible the process of identifying problems and

    formulating solutions, individuals and companies can execute to their ideal

    state.”

     – A3 is the international standard name for the paper size 297x420 cm.

     – The concept borne at Toyota to describe the process of getting report-

    writing down to one page.

    2

  • 8/9/2019 4_PM_A3 report.pdf

    2/10

    2

    Production ManagementGestão da Produção

    [email protected]

    Methods Engineering – A3 Report

    3

    Draft example from

    Jamie Flinchbaugh

    (2012)

    Production ManagementGestão da Produção

    [email protected]

    Methods Engineering – A3 Report

    When to use A3 ?

    • Do use A3 when: – Collaboration in thinking is required

     – There is the need to make thinking more visible among the teammembers (or your and someone else’s thinking)

     – There is a gap of knowledge or obvious solutions

    • Do not use A3 when: – There is an obvious solution to implement (you know it..)

     – There is a theoretical solution jus needing to be tested

     – It is used to fit the ongoing work into a report for credit

    • A3 is not: – A research project

     – A magic formula that fits all the problems. There is no standard.

     – A debate about the form of the reports. Is a Process not a Form.

     – A linear way. Pencil and eraser should be used along the process.

     – It is not an individual process. It is to engage people.4

  • 8/9/2019 4_PM_A3 report.pdf

    3/10

    3

    Production ManagementGestão da Produção

    [email protected]

    Methods Engineering – A3 Report

    Standardizing and Simplifying

    5

    Information Flow

    The Four Quadrants of A3 Problem SolvingJamie Flinchbaugh (2012)

    Production ManagementGestão da Produção

    [email protected]

    Methods Engineering – A3 Report

    Types of A3 Reports

    • Proposals, Strategic, Business Planning

     – Environmental Scan

     – SWOT Analysis

     – Vision, Mission, Values

     – Competitor Analysis

     – Radar Chart and Gap Analysis

     – Tree Diagram

     – X-box (X-matrix)

     – Deployment Plan

     – Plan Review Status

    6

  • 8/9/2019 4_PM_A3 report.pdf

    4/10

  • 8/9/2019 4_PM_A3 report.pdf

    5/10

    5

    Production ManagementGestão da Produção

    [email protected]

    Methods Engineering – A3 Report

    Types of A3 Reports

    • Process

     – Problem

    Solving

    9

    Debashis Sarkar 

    2010

    Production ManagementGestão da Produção

    [email protected]

    Methods Engineering – A3 Report

    Basic Steps (not a standard):

    • PLAN

    1. Identify the problem or need

    2. Understand the current situation/state

    3. Develop the goal statement – develop the target state

    4. Perform root cause analysis

    5. Brainstorm/determine countermeasures

    • DO

    6. Create a countermeasures implementation plan

    • CHECK

    7. Check results – confirm the effect

    • ACT

    8. Update standard work

    10The DEMING Cycle

  • 8/9/2019 4_PM_A3 report.pdf

    6/10

    6

    Production ManagementGestão da Produção

    [email protected]

    Methods Engineering – A3 Report

    Examples

    11(Larry Rubrich in reliableplant.com)

    Production ManagementGestão da Produção

    [email protected]

    Methods Engineering – A3 Report

    Examples

    12

  • 8/9/2019 4_PM_A3 report.pdf

    7/10

    7

    Production ManagementGestão da Produção

    [email protected]

    Methods Engineering – A3 Report

    Examples

    13http://www.systems2win.com/

    Production ManagementGestão da Produção

    [email protected]

    Methods Engineering – A3 Report

    Examples

    14

    http://www.coe.montana.edu

  • 8/9/2019 4_PM_A3 report.pdf

    8/10

    8

    Production ManagementGestão da Produção

    [email protected]

    Methods Engineering – A3 Report

    Examples

    15

    http://www.a3thinking.com

    Production ManagementGestão da Produção

    [email protected]

    Methods Engineering – A3 Report

     A3 Format for the Group Project (adaptable)

    • Content

     – THEME:

    • Concise statement of what this A3 report is about.

     – BACKGROUND:

    • Note any contextual or background information necessary to fully

    understand the issue.• Indicate how this problem affects the company’s goals or is related to its

    values.

     – CURRENT CONDITION:

    • Insert a diagram that illustrates how the current process works.

    • Label the diagram so that anyone knowledgeable about the process can

    understand.

    • Note the major problems (we like to put them in storm bursts to set them

    apart)

    • Include quantified measures of the extent of the problem – graphical

    representations are best!16

  • 8/9/2019 4_PM_A3 report.pdf

    9/10

    9

    Production ManagementGestão da Produção

    [email protected]

    Methods Engineering – A3 Report

     A3 Format for the Group Project

    • Content

     – ROOT CAUSE ANALYSIS

    • List the main problem(s)

    • Ask appropriate “why?” questions until you reach the root cause. A rule-

    of-thumb: you haven’t reached the root cause until you’ve asked “why?” at

    least 5 times!

    • List the answers to each why question

    • Use simple analysis tools to identify causes

     – TARGET CONDITION:

    • Define the specific target(s)• Identify how the success will be measured

    • State in measurable or identifiable terms

    • Be concise and explicit

    17

    Production ManagementGestão da Produção

    [email protected]

    Methods Engineering – A3 Report

     A3 Format for the Group Project

    • Content

     – PROPOSED COUNTERMEASURE(S)

    • Insert a diagram that illustrates how the proposed process will work, with

    labels.

    • List the countermeasure(s) that will address the root cause(s) identified.

    • Predict the expected improvement in the measure of interest (specifically

    and quantitatively)

     – IMPLEMENTATION PLAN

    • List the actions which must be done in order to realize the Target

    Condition, along with the individual responsible for the action and a duedate.

    • Add other items, such as cost, that are relevant to the implementation.

     – FOLLOW-UP

    • (A3 process must be followed by the company, not by the group)

    • Give some hints to support the follow-up process

    • Remaining issues that can be anticipated.

    • Ensure ongoing P-D-C-A  18

  • 8/9/2019 4_PM_A3 report.pdf

    10/10

    10

    Production ManagementGestão da Produção

    [email protected]

    Methods Engineering – A3 Report

    Links

    • http://www.leanlearningcenter.com/

    • http://www.reliableplant.com/

    • http://proferoinc.com/

    • http://www.lean.org/

    • http://www.systems2win.com/

    • http://www.a3thinking.com/

    • http://www.coe.montana.edu/ie/faculty/sobek/a3/index.htm

    19