    Installation Instructions

    4 ft CompactLine Antennas (with E-Mount)

    SB, SBX (All Freq. Excepted 142) NMT 480-08(e)

    These Installation Instructions are valid for antennas in the following version:

    Reflector 1.2 m (4 ft)

    Single orDual polarization

    Pipe mount for installation on pipe 114 mm

    Antenna offset to the left or to the right

    Standard installation on114 mm pipe with offset to the left Safety collar for an easier installation

    2 spindles for fine adjustment ofElevationof 15 andAzimuth 5 Reflector with shroud, shroud aperture covered by a rigid radome

    200 km/h version : With sway bar 27 mm x 1.35 m(mandatory)

    It is important to mount the antenna exactly as described in this installation instruction.The installed antenna shall be inspected once per year by qualified personnel.

    RFS disclaims any responsibility for the result of improper or unsafe installation.This installation instruction has been written for qualified, skilled personnel.We reserve the right to alter details, especially with respect to technical improvement.

  • 7/27/2019 4ft Antenna SB4 Reflector Installation(NMT480-08)

    2/11

    NMT 480-08e 2/11

    1. Tools required for installation(Tools are not included with antenna)

    Hoisting device for 100 daN Shackle(s), roll(s), pulley(s) and lifting accessories

    Torque wrench from 0 to 50 Nm 2 strong ropes (approx. Length 1.5x tower high)

    Wrenches for hexagon bolts : 1 strong rope or cable (approx. Length 2.5x tower high)

    M5(8), M6(10), M8(13), M10(17) Water balance, compass, cutter, tape measure

    Key for socket screw : M3(2.5)

    (values in brackets=openings of spanners)

    2. Antenna Offset(Overview)

    Offsetright

    Rotate the reflector and thetower mount 180

    Reflector TOP mark aligned withantenna BOTTOM

    Reflector TOP mark alignedwith antenna TOP

    Offsetleft

  • 7/27/2019 4ft Antenna SB4 Reflector Installation(NMT480-08)

    3/11

    NMT 480-08e 3/11

    3. Assembly of the shroud

    3.1 Nut and bolts detail for the shroud assembly

    3.2 Reflector orientation depending of the antenna offset

    23 screws M5x1223 sl nuts M5

    (2x) 23 washers 5.3 15

    Shroud panels / Reflectorrim Assembly

    Shroud panelsjunction assembly

    Shroud / Reflector r imAssembly for the2 holes 90 fromthe antenna TOP

    2 screws M5x16

    (2x) 2 washers 5.3 15(2x) 2 serrated lock washers 5.3

    2 sl nuts M5

    (3x) 3 screws M5x12(3x) 3 sl nuts M5

    (3x) 6 washers 5.3 15

    Packing

    cove

    r

    Packing

    cove

    r

    AntennaVerticalAxis

    AntennaVerticalAxis

    Shroud / Reflector orientation for anantenna Offset Right

    Shroud / Reflector orientation for anantenna Offset Left

    Reflector TOPmark in opposition with

    1st shroud panel

    Reflector TOPMark aligned

    with the 1st shroud panel

    Note : The TOP mark is visible on the outer face of the reflector.

  • 7/27/2019 4ft Antenna SB4 Reflector Installation(NMT480-08)

    4/11

    NMT 480-08e 4/11

    3.3 Shroud panels & RF braid installation

    The shroudassembly junction mustbe aligned with the

    antenna bottom hole

    ReflectorTOP Mark

    The shroudassembly junctionmust be alignedwith the antennabottom hole

    ReflectorTOP mark

    ReflectorTOP markon thesame side

    Reflector TOP markat the opposite side.

    Middle hole ofthe shroud panelaligned with the holeof the reflector rimfacing the TOP mark

    Middle hole of the

    shroud panel, alignedwith the hole of thereflector rim facing theTOP mark at theopposite side

    Antenna TOPshroud panel, when

    the antenna isinstalled on pipe

    Antenna TOPshroud panel when

    the antenna isinstalled on pipe

    For an optimal antenna performance, please respect carefully thepositions and the assembly order of the shroud panels. Take aspecial care of the reflectors TOP position for the assembly of the1

    stshroud panel.

    Do not tighten bolted joints before RF braid installation, completeshroud assembly, and radome distance check !

    1st

    shroud panel / Reflector pos ition foran antenna installation Offset Right

    1st

    shroud panel / Reflector posi tion foran antenna installation Offset Left

    RF braid installationprincip le (section view)

    Keep agap for

    RF braidinstall

    RF braid

    Reflector

    Shroudpanels

    2nd

    shroud panel / Reflector pos ition foran antenna installation Offset Right

    2nd

    shroud panel / Reflector pos ition foran antenna installation Offset Left

  • 7/27/2019 4ft Antenna SB4 Reflector Installation(NMT480-08)

    5/11

    NMT 480-08e 5/11

    4. Assembly of the radome

    The shroud junction must be alignedwith the antenna vertical axis

    The shroud junction must be alignedwith the antenna vertical axis

    3rd

    shroud panel / Reflector pos ition foran antenna installation Offset Right

    3rd

    shroud panel / Reflector pos ition foran antenna installation Offset Left

    RF braid ins tallation and shroud panels t ightening

    - Position the radome over the shroud (drain holetowards the bottom when the antenna is installed).

    - Fix the radome with 4 screwshandtight every 90around the circumference.

    - Fix the remaining screws and handtighten.

    -Tighten all screws.

    RF braid installationprinciple (section view)

    Shroud panels

    Insert the RFbraid in the gapbetween theshroud and theinternal reflector

    Reflector

    Bolted joints

    Gap

    Before completetightening of the shroud

    panels, check the distancebetween the last panel thread

    inserts for the 3 shoud paneljunctions (to insure an easy

    installation of the radome)RF braid

    262 mm

    Drain hole atthe antenna bottom(toward the ground

    when antenna isinstalled)

    Drain hole atthe antenna bottom(toward the ground

    when antenna isinstalled)

    OffsetRight

    OffsetLeft

    15 screws M5x2015 curved washers B5

    15 washers 5.3 15

  • 7/27/2019 4ft Antenna SB4 Reflector Installation(NMT480-08)

    6/11

    NMT 480-08e 6/11

    5. Assembly of the mount

    For easy operation of the bolted joints, and correct torque tightening, Anti Seize Installation Paste must be applied to all threads of bolts and fine adjustment spindles.After this, keep the lubricated threads free of dust and dirt! (a Torque Table is attachedfor specifications)

    5.1

    5.2

    5.3

    5.4

    ConnectingSupportMount

    SteelU-Mount

    4 ft

    2 SL screws M10x252 washers 10.5 30

    4 screws M8x254 SL washers A84 nuts M8

    5.5

    Turn the antenna to install it carefully on theshroud rim with the reflector facing down on theplywood packing cover.

    ELEVATIONfine adjustmentSpindle M10x1002 brass nuts M10

    2 washers 10.5

  • 7/27/2019 4ft Antenna SB4 Reflector Installation(NMT480-08)

    7/11

    NMT 480-08e 7/11

    6. Feed Installation

    Refer to Feed Installation Instructions joined.

    7. Azimuth safety collar installation on pipe support

    Note that the installation of the antenna should be accomplished by qualified personnels,and well trained person in fair climatic conditions (In any case, always respect the safetyregulation in effect in the country).

    Activities involving the use of pulleys, ropes, carabiners and others accessories to hoistantennas and associated products are inherently dangerous. You are responsible foryour own actions and decisions. The use of hoisting systems must be done by qualifiedand skilled personnel.

    Always use certified and controlled equipments, and be sure to respect the breaking loadand the working load limit of each element (pulleys, ropes, carabiners).

    RFS disclaims any responsibility in case of non repect of these warnings..

    For aninstallationOffset Left

    For aninstallationOffset Right

    Minimumfree space

    on pipeabove V-Bolt

    345 mm

    V-bolt M102 washers 10.5 304 nuts M10(Take care of theclamp orientation)

    Minimumfree space

    on pipeunder V-bolt

    35 mm Minimumfree spaceon pipe

    above V-Bolt345 mm

    Minimumfree space

    on pipeunder V-bolt

    35 mm

    V-bolt M102 washers 10.5 30

    4 nuts M10(Take care of the

    clamp orientation)

  • 7/27/2019 4ft Antenna SB4 Reflector Installation(NMT480-08)

    8/11

    NMT 480-08e 8/11

    8. Lifting of the antenna & hoisting on the tower(Feed system not shown)

    Strong rope orcable fixed toantenna steel

    mount to avoidcollision with the

    tower structureduring hoisting

    To winch

    Shackle

    Shackle Steelmount

    Principle foran installation

    with a left offset

    Strong rope attached onthe reflector casting

    eye (8.5 mm)with a shackle,

    and linkedto winch

    Strong rope fixedat the tower top.

    The rope is slippingthrough a steel roll or ashackle, which is fixedon the reflector casting

    eye (8.5 mm)

  • 7/27/2019 4ft Antenna SB4 Reflector Installation(NMT480-08)

    9/11

    NMT 480-08e 9/11

    9. Antenna installation on pipe(Feed system not shown)

    10. Azimuth fine adjustment spindle installation

    Screw M10x30Washer 10.5SL nuts M10

    Eye spindle M10x1302 washers 10.52 brass nuts M10

    2 V-Bolts M10

    4 washers 10.5 308 nuts M10

    Antenna installation overthe pre-installed azimuth

    safety collar.

    Do not forget to apply Anti Seize installation paste on V-Bolt threads.It will insure a correct tension for the final V-Bolts torque tightening.

    Principle foran installation

    with a left offset

  • 7/27/2019 4ft Antenna SB4 Reflector Installation(NMT480-08)

    10/11

    NMT 480-08e 10/11

    11. Elevation fine adjustment(Feed system not shown)

    12. Azimuth fine adjustment(Feed system not shown)

    Torque tighten the 2 M10screws (refer to torque table

    joined), then loosen it, turn

    Loosen or tighten M10brass nuts to adjust

    the Elevation

    After complete elevationfine adjustment, torque

    tighten the 2 M10screws

    Principle foran installation

    with a left offset

    After complete Azimuth fine adjustment, lock each first nut of the V-bolts (greased) at thespecific torque, (refer to torque table joined) then tighten the second nut against the firstone using usual wrench (do not use 2 wrenches to fix the second nut). Then tighten the 2brass nuts M10 of the Azimuth spindle.

    Loosen M10 nuts ofthe 2 V-Bolts

    Principle foran installation

    with a left offset

    Loosen or tightenM10 brass nuts toadjust the Azimuth.

  • 7/27/2019 4ft Antenna SB4 Reflector Installation(NMT480-08)

    11/11

    NMT 480-08e 11/11

    2 U-bolts M6/27

    8 nuts M64 washers 6.4

    SL nut M10Washer 10.5

    Screw M10x30SL nut M10Washer 10.5Screw M10x30

    Fixing plateSway bar

    (sway bar kit option for installon pipe structure tower)

    2 SL nuts M102 washers 10.5

    2 screws M10x30

    Configuration withKit : SMA-SKO-48-114

    Typical configurationfor direct mount on

    angle tower structure

    13. Sway bar pre-assembly

    14. Sway bar installation(Feed system not shown)

    15. Final Check

    When the installation of the antenna has been completed, it is necessary to makesure that the installation instructions have been followed in all aspects. It isespecially important to check that all bolted joints have been greased and are torquetightly locked.

    For convenience the fixation of the sway bar on the tower structure must be done after completefine Azimuth & Elevation antenna alignment.

    Sway bar orientationInstallation on the antenna

    25 max

    SL washer A10Screw M10x25

    SL Nut M10Washer 10.5

    Screw M10x25

    Antennacasting ring

    Sway bar clamp

    After sway barpositioning

    torque tightenall bolted joints