Page 4 Of 5 5.0 UTILITIES Fuel Gas Design Pressure Barg Operating Pressure Barg Design Temperature °C Operating Temperature °C Heating Value Btu / Scf Mass Density kg/m3 Instrument Air Design Pressure Barg Operating Pressure Barg Design Temperature °C Operating Temperature °C Dewpoint °C Nitrogen Nitrogen bottles shall be used to supply Nitrogen for blanketing (if required) Electrical Electrical loads KW * VTA: Vendor To Advise OnSpec Engineering Solutions Disouq Field Development Project Process Datasheet Fuel Gas Package The following utilities are available on site, Vendor to advise on quantity requirements. The following are utility conditions 12.0 4 - 6 80.0 40.0 1000-1095 4.9 12.0 8.0 80.0 35 - 50 -40.0 VTA*

description

asdasd

Transcript of 4

  • Page 4 Of 5

    5.0 UTILITIES

    Fuel Gas

    Design Pressure Barg

    Operating Pressure Barg

    Design Temperature C

    Operating Temperature C

    Heating Value Btu / Scf

    Mass Density kg/m3

    Instrument Air

    Design Pressure Barg

    Operating Pressure Barg

    Design Temperature C

    Operating Temperature C

    Dewpoint C

    Nitrogen

    Nitrogen bottles shall be used to supply Nitrogen for blanketing (if required)

    Electrical

    Electrical loads KW

    * VTA: Vendor To Advise

    OnSpec Engineering Solutions

    Disouq Field Development Project

    Process Datasheet

    Fuel Gas Package

    The following utilities are available on site, Vendor to advise on quantity requirements. The following are utility conditions

    12.0

    4 - 6

    80.0

    40.0

    1000-1095

    4.9

    12.0

    8.0

    80.0

    35 - 50

    -40.0

    VTA*