Page 4 Of 5 5.0 UTILITIES Fuel Gas Design Pressure Barg Operating Pressure Barg Design Temperature °C Operating Temperature °C Heating Value Btu / Scf Mass Density kg/m3 Instrument Air Design Pressure Barg Operating Pressure Barg Design Temperature °C Operating Temperature °C Dewpoint °C Nitrogen Nitrogen bottles shall be used to supply Nitrogen for blanketing (if required) Electrical Electrical loads KW * VTA: Vendor To Advise OnSpec Engineering Solutions Disouq Field Development Project Process Datasheet Fuel Gas Package The following utilities are available on site, Vendor to advise on quantity requirements. The following are utility conditions 12.0 4 - 6 80.0 40.0 1000-1095 4.9 12.0 8.0 80.0 35 - 50 -40.0 VTA*
-
Upload
elsayed-amer -
Category
Documents
-
view
212 -
download
0
description
asdasd
Transcript of 4
-
Page 4 Of 5
5.0 UTILITIES
Fuel Gas
Design Pressure Barg
Operating Pressure Barg
Design Temperature C
Operating Temperature C
Heating Value Btu / Scf
Mass Density kg/m3
Instrument Air
Design Pressure Barg
Operating Pressure Barg
Design Temperature C
Operating Temperature C
Dewpoint C
Nitrogen
Nitrogen bottles shall be used to supply Nitrogen for blanketing (if required)
Electrical
Electrical loads KW
* VTA: Vendor To Advise
OnSpec Engineering Solutions
Disouq Field Development Project
Process Datasheet
Fuel Gas Package
The following utilities are available on site, Vendor to advise on quantity requirements. The following are utility conditions
12.0
4 - 6
80.0
40.0
1000-1095
4.9
12.0
8.0
80.0
35 - 50
-40.0
VTA*