04/18/23 1
Universal Design – Remodel Universal Design – Remodel Kitchen and BathKitchen and Bath
Tom Muxie
04/18/23 2
Project GoalsProject Goals
Allow easy wheelchair access and usability.
Design to reflect my style and taste.Non institutional look in all aspects
to maintain maximum resale value.
04/18/23 3
Project GoalsProject Goals
Maximize counter and reachable cabinet space.
Remain within $25,000 budget.Minimize amount of time areas are
unusable .
04/18/23 4
DescriptionDescription
Completely gut existing kitchen and bath. Kitchen – Add custom designed cabinets
and inserts, add valance for new recessed lighting, Add Silestone countertops, relocate some electrical for accessibility, replace vinyl floor in kitchen and dining area with porcelain tile, add tile backsplash, replace sink and faucet, replace existing appliances, replace old baseboard moldings.
04/18/23 5
DescriptionDescription
Bath – Replace shower/tub unit with barrier free shower unit, replace sink and faucet, redo sink drain for more leg room, replace vinyl floor with porcelain tile and replace old baseboard moldings.
04/18/23 6
DescriptionDescription
General work – Replaced all door hardware with lever type handles and replaced all outlet and switch covers to match new design, repaint kitchen, dining area, hallway and bathroom walls and ceilings and add new window treatments.
04/18/23 7
ContractorsContractors
General Contractor – Ralph Rosato, Wenham. Removal of all existing items, added valance, tile work and baseboard moldings. Sub contracted electrical and Silestone countertop work. Also pulled required permits and scheduled work to be done with other contractors to minimize downtime.
04/18/23 8
ContractorsContractors
Cabinet Maker – J.D. Custom Woodworking, Peabody. Design, fabrication and installation of all cabinets and window framing.
Plumber – Jeff VanKnowe, Danvers. All plumbing for new shower unit, bathroom sink, kitchen sink, gas cooktop and waterline for refrigerator.
04/18/23 9
Before and After PhotosBefore and After Photos
Kitchen
Slide out towel rack
04/18/23 10
Before and After PhotosBefore and After Photos
Kitchen
04/18/23 11
Before and After PhotosBefore and After Photos
Kitchen
Pull down shelf from Revashelf
04/18/23 12
Before and After PhotosBefore and After Photos
Kitchen
All lower units pull out completely for easy access to back of unit.
04/18/23 13
Before and After PhotosBefore and After Photos
Kitchen
Repositioned hood control switch
Front access cook top controls
04/18/23 14
Before and After PhotosBefore and After Photos
Kitchen
3 piece faucet unit allows custom positioning.
04/18/23 15
Before and After PhotosBefore and After Photos
Bath
90 degree elbow at drain for added leg room.
Duel water controls. 1 for handheld unit and 1 for the regular shower head. Can run either one or both.
04/18/23 16
Before and After PhotosBefore and After Photos
Bath
04/18/23 17
Before and After PhotosBefore and After Photos
Bath
04/18/23 18
Before and After PhotosBefore and After Photos
HallwayHallway carpet was replaced with tile
for ease of rolling my wheelchair. The thicker the carpet and pad is the more difficult it is to roll and/or turn on. Where desired, Berber type Carpets work best.