SITE SURVEY REPORT
QM-GEN-25, Rev.1
Ref. : 4251-SVR-T357-001
To : Bang-on O. (Project Engineer)
From : Sawit J. (Civil Engineer)
Date : 03 Sep 2013Subject : SITE SURVEY REPORT 001
Project :DETAIL ENGINEERING SERVICE FOR SEND VCM EMISSIONS TOINCINERATION PROJECT
Project No : 4251
1.0 GENERAL
Prepared By : Sawit J. (TET, RBO)
Date of the visit : 30 Aug 2013
Time of the visit : 9.00 to 16.00
Client : VINYTHAI PUBLIC COMPANY LIMITED
Person Contacted: Khun Anex P. (VNT)
Site Location : RAYONG
2.0 PURPOSE OF THE VISIT
To check and verify the proposed areas to confirm the feasibility, obstruction and
interference free.
3.0 FINDINGS
New blower, heat exchanger and separator will be installed on new steel structure
in PCP area.
New 16 pipe will be routed on existing pipe racks and bridges from PCP area to
existing incinerators in VCM area.
4.0 AREAS OF CONCERNS (if any)
None
-
7/22/2019 4251 SVR T357 001_Civil Site Survey Report
2/10
Page 2 of 10
SITE SURVEY REPORT
QM-GEN-25, Rev.1
5.0 CONCLUSIONS
After performing site survey, we found that
PCP area, existing stair will be demolished then replacing by the new steel structure.
(Fig. 1)
PCP area, the new blower will be installed at existing gravel area. So, new paving
and spill wall will be constructed after installing of the new blower. (Fig. 2)
PCP area, existing manhole will be relocated to any suitable area. (Fig. 1)
PCP area, new analyzer house will be constructed next to the new blower. (Fig. 3)
Spaces of existing pipe racks and bridges are available for the new 16 pipe.
(Fig. 4 to 12)
VCM area, new special pipe supports will be constructed for the new 16 pipe to
incinerators. (Fig. 13 to 14)
VCM area, two existing filters will be relocated for connecting the new 16 pipe
to existing line, so new foundations of the filters are required. The new
foundations are considered as additional work. (Fig. 15 to 16)
6.0 REFERENCES
None
-
7/22/2019 4251 SVR T357 001_Civil Site Survey Report
3/10
Page 3 of 10
SITE SURVEY REPORT
QM-GEN-25, Rev.1
7.0 ATTACHMENTS
Fig. 1
Fig. 2
Existing manhole will be relocated to any suitable area.
Existing stair will be demolished
New structure will be constructed for new separator and heat exchanger.
Existing spill wall
will be demolished.
New spill wall and paving
will be constructed.
New foundation of blower
will be constructed.
-
7/22/2019 4251 SVR T357 001_Civil Site Survey Report
4/10
Page 4 of 10
SITE SURVEY REPORT
QM-GEN-25, Rev.1
Fig. 3
Fig. 4
The proposed area for new analyzer house.
New 16 pipe will be routed on existing racks.
-
7/22/2019 4251 SVR T357 001_Civil Site Survey Report
5/10
Page 5 of 10
SITE SURVEY REPORT
QM-GEN-25, Rev.1
Fig. 5
Fig. 6
New 16 pipe will be routed on existing racks.
PCP area.
VCM area.
PCP area.
VCM area.
New 16 pipe will be routed on existing racks.
-
7/22/2019 4251 SVR T357 001_Civil Site Survey Report
6/10
Page 6 of 10
SITE SURVEY REPORT
QM-GEN-25, Rev.1
Fig. 7
Some supports will be added on pipe rack for new 16 pipe
Option 1 Extend from existing columns.
Option 2 Add new supports beside pipe sleepers.
Fig. 8
New 16 pipe will be routed on existing racks.PCP area.
VCM area.
New 16 pipe will be routed on existing racks.
PCP area.
VCM area.
-
7/22/2019 4251 SVR T357 001_Civil Site Survey Report
7/10
Page 7 of 10
SITE SURVEY REPORT
QM-GEN-25, Rev.1
Some supports will be added on pipe rack for new 16 pipe
Option 1 Extend from existing columns.
Option 2 Add new supports beside pipe sleepers.
Fig. 9
Fig. 10
New 16 pipe will be routed on existing racks.
VCM area.
PCP area.
New 16 pipe will be routed on existing racks.
VCM area.
PCP area.
-
7/22/2019 4251 SVR T357 001_Civil Site Survey Report
8/10
Page 8 of 10
SITE SURVEY REPORT
QM-GEN-25, Rev.1
Fig. 11
Fig. 12
New 16 pipe will be routed on existing racks.
VCM area.
PCP area.
New 16 pipe will be routed on existing racks.
PCP area.
VCM area.
-
7/22/2019 4251 SVR T357 001_Civil Site Survey Report
9/10
Page 9 of 10
SITE SURVEY REPORT
QM-GEN-25, Rev.1
Fig. 13
Fig. 14
New 16 pipe will be routed on existing racks.
Special pipe supports will be constructed for
new 16 pipe.
Incinerators.
Special pipe supports will be constructed for
new 16 pipe.
New 16 pipe will be routed on existing racks.
Incinerators.
-
7/22/2019 4251 SVR T357 001_Civil Site Survey Report
10/10
Page 10 of 10
SITE SURVEY REPORT
QM-GEN-25, Rev.1
Fig. 15
Fig. 16
Existing filter will be relocated.
New location of filter.
Existing filter will be relocated.
New location of filter.