1
AFTC and Airworthiness
Process Changes
412th Test Wing
Wayne Hale
412 TENG/ENI
661.275.4461
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Approved for public release; distribution is unlimited.412TW-PA-14184
War-Winning Capabilities … On Time, On Cost
13 May 2015
![Page 2: 412 Test Wing - ITEA · AFTC and Airworthiness Process Changes 412th Test Wing Wayne Hale 412 TENG/ENI 661.275.4461 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Approved](https://reader033.fdocuments.in/reader033/viewer/2022042317/5f05a4af7e708231d413fb85/html5/thumbnails/2.jpg)
2
Overview
• Introduction
• What is MIL-HDBK-516C, Airworthiness
Certification Criteria
• Processes
• What Has Changed
• New Forms
– T-2 Modification Airworthiness Impact
Determination and Preliminary Hazard Analysis
– T-2 Modification Airworthiness Compliance
– Military Flight Release
• This should give a high level view to set up a
risk and airworthiness assessment exercise
![Page 3: 412 Test Wing - ITEA · AFTC and Airworthiness Process Changes 412th Test Wing Wayne Hale 412 TENG/ENI 661.275.4461 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Approved](https://reader033.fdocuments.in/reader033/viewer/2022042317/5f05a4af7e708231d413fb85/html5/thumbnails/3.jpg)
3
Introduction
• 2010, the Air Force mandated Independent
Airworthiness (IAW) assessment program.
– AFI 62-601, USAF Airworthiness
– Based on MIL-HDBK-516C
• IAW requires all aircraft go through a rigorous
independent assessment prior to the aircraft
released for first flight.
• IAW program requires aircraft modifications go
through a similar assessment.
– T-2 Mod process now includes a more robust
design and review process using MIL-HDBK-
516C.
![Page 4: 412 Test Wing - ITEA · AFTC and Airworthiness Process Changes 412th Test Wing Wayne Hale 412 TENG/ENI 661.275.4461 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Approved](https://reader033.fdocuments.in/reader033/viewer/2022042317/5f05a4af7e708231d413fb85/html5/thumbnails/4.jpg)
MIL-HDBK-516C 12 December 2014
• Required per AFI 62-601
• Based on MIL-HDBK-516C
– Arranged by aircraft subsystems
– Used to Determine Airworthiness Criteria
• Tailored Airworthiness Certification Criteria
• Modification Airworthiness Certification Criteria
– References DoD Specifications and Standards
– References NATO and FAA Documents
– References other Non-Government Publications
• Represents System Engineering Approach
4
![Page 5: 412 Test Wing - ITEA · AFTC and Airworthiness Process Changes 412th Test Wing Wayne Hale 412 TENG/ENI 661.275.4461 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Approved](https://reader033.fdocuments.in/reader033/viewer/2022042317/5f05a4af7e708231d413fb85/html5/thumbnails/5.jpg)
Current T-2 Mod Process
• Previous T-2 Mod Process per Operating Instructions
5
T-2 Mod
Requirements
Mod Process
Selection
Brief Appropriate
CCB/DRB Board
Receive CCB
ApprovalInstall T-2
Modification
Accomplish Mod
System Checks
Flight
Release
MEA/CCB
Authority
Modification Engineering Authority/MEA
Configuration Control Board/CCB
Design Review Board/DRB
![Page 6: 412 Test Wing - ITEA · AFTC and Airworthiness Process Changes 412th Test Wing Wayne Hale 412 TENG/ENI 661.275.4461 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Approved](https://reader033.fdocuments.in/reader033/viewer/2022042317/5f05a4af7e708231d413fb85/html5/thumbnails/6.jpg)
Airworthiness Process
• Airworthiness process per AFI 62-601
6
Mod
Requirements
Determine
Airworthiness
Impact
Develop certification
criteria per MIL-HDBK-
516C
Evaluate verification
activities per the MACC
by Chief Engineer
Risk acceptance by
appropriate authority
Aircraft
released on
MTC/MFR
Modification Airworthiness Compliance Criteria/MACC
Military Type Certificate/MTC
Military Flight Release/MFR
![Page 7: 412 Test Wing - ITEA · AFTC and Airworthiness Process Changes 412th Test Wing Wayne Hale 412 TENG/ENI 661.275.4461 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Approved](https://reader033.fdocuments.in/reader033/viewer/2022042317/5f05a4af7e708231d413fb85/html5/thumbnails/7.jpg)
How to Integrate Processes
• Generated many questions
– How do we integrate?
– Where do we integrate?
– Will processes change?
– Will responsibilities change or grow?
– Will this add to schedule?
7
![Page 8: 412 Test Wing - ITEA · AFTC and Airworthiness Process Changes 412th Test Wing Wayne Hale 412 TENG/ENI 661.275.4461 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Approved](https://reader033.fdocuments.in/reader033/viewer/2022042317/5f05a4af7e708231d413fb85/html5/thumbnails/8.jpg)
Integrating Processes
Old Terminology
• Major
– High Degree of Technical
Uncertainty
– Affects one or more
areas
• Minor
– All other modifications
New Terminology
• Reportable
– Impact to AW
– High Risk/TAA Approval
• Nonreportable
– Impact to AW
– Lower Risk/Local Approval
• No Impact to
Airworthiness
– Low Risk/Compliant with
MIL-HDBK-516C Standards
8
![Page 9: 412 Test Wing - ITEA · AFTC and Airworthiness Process Changes 412th Test Wing Wayne Hale 412 TENG/ENI 661.275.4461 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Approved](https://reader033.fdocuments.in/reader033/viewer/2022042317/5f05a4af7e708231d413fb85/html5/thumbnails/9.jpg)
Integrating Processes
• Required Many Meetings with Subject Matter
Experts (SME)
– AFLCMC
– AFTC
– SMEs from 412 TW and 96 TW
• Engineering
• Mod/Configuration Management
• SEEK EAGLE
9
![Page 10: 412 Test Wing - ITEA · AFTC and Airworthiness Process Changes 412th Test Wing Wayne Hale 412 TENG/ENI 661.275.4461 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Approved](https://reader033.fdocuments.in/reader033/viewer/2022042317/5f05a4af7e708231d413fb85/html5/thumbnails/10.jpg)
Current T-2 Mod Process
• Where to integrate in T-2 Mod Process
10
T-2 Mod
Requirements
Mod Process
Selection
Brief Appropriate
CCB/DRB Board
Receive CCB
ApprovalInstall T-2
Modification
Accomplish Mod
System Checks
Flight
Release
MEA/CCB
Authority
Risk changes
based on design?
Risk changes found
during install and
system checkout?
Modification Engineering Authority/MEA
Configuration Control Board/CCB
Design Review Board/DRB
![Page 11: 412 Test Wing - ITEA · AFTC and Airworthiness Process Changes 412th Test Wing Wayne Hale 412 TENG/ENI 661.275.4461 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Approved](https://reader033.fdocuments.in/reader033/viewer/2022042317/5f05a4af7e708231d413fb85/html5/thumbnails/11.jpg)
Updated T-2 Mod Process
11
IAW/T-2 Mod
Integration Points
![Page 12: 412 Test Wing - ITEA · AFTC and Airworthiness Process Changes 412th Test Wing Wayne Hale 412 TENG/ENI 661.275.4461 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Approved](https://reader033.fdocuments.in/reader033/viewer/2022042317/5f05a4af7e708231d413fb85/html5/thumbnails/12.jpg)
What Has Changed
• SME’s Recommendations
– Update Preliminary Hazards
– Incorporate AW Determination
– Show Compliance Within MIL-HDBK-516C
• Implementation
– Preliminary Hazards now accomplished by
• AFTC Form 6238 Modification Airworthiness
Impact Determination and Preliminary
Hazard Analysis
12
![Page 13: 412 Test Wing - ITEA · AFTC and Airworthiness Process Changes 412th Test Wing Wayne Hale 412 TENG/ENI 661.275.4461 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Approved](https://reader033.fdocuments.in/reader033/viewer/2022042317/5f05a4af7e708231d413fb85/html5/thumbnails/13.jpg)
What Has Changed
• Make Initial Airworthiness Impact
Assessment
– AFTC Form 6238 T-2 Modification
Airworthiness Impact Determination and
Preliminary Hazard Analysis
13
![Page 14: 412 Test Wing - ITEA · AFTC and Airworthiness Process Changes 412th Test Wing Wayne Hale 412 TENG/ENI 661.275.4461 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Approved](https://reader033.fdocuments.in/reader033/viewer/2022042317/5f05a4af7e708231d413fb85/html5/thumbnails/14.jpg)
What Has Changed
14
![Page 15: 412 Test Wing - ITEA · AFTC and Airworthiness Process Changes 412th Test Wing Wayne Hale 412 TENG/ENI 661.275.4461 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Approved](https://reader033.fdocuments.in/reader033/viewer/2022042317/5f05a4af7e708231d413fb85/html5/thumbnails/15.jpg)
What Has Changed
15
![Page 16: 412 Test Wing - ITEA · AFTC and Airworthiness Process Changes 412th Test Wing Wayne Hale 412 TENG/ENI 661.275.4461 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Approved](https://reader033.fdocuments.in/reader033/viewer/2022042317/5f05a4af7e708231d413fb85/html5/thumbnails/16.jpg)
What Has Changed
• T-2 Mods Assessed as Impact to
Airworthiness
– Modification Airworthiness Impact
Determination and Preliminary Hazard Analysis
(AFTC Form 6238)
• Determine as Reportable or Nonreportable
– T-2 Modification Airworthiness Compliance
(AFTC Form 6239)
• T-2 Mods Assessed as Reportable
– Use same forms and return to SPM Chief
Engineer and use SPM/Platform process
16
![Page 17: 412 Test Wing - ITEA · AFTC and Airworthiness Process Changes 412th Test Wing Wayne Hale 412 TENG/ENI 661.275.4461 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Approved](https://reader033.fdocuments.in/reader033/viewer/2022042317/5f05a4af7e708231d413fb85/html5/thumbnails/17.jpg)
What Has Changed
17
![Page 18: 412 Test Wing - ITEA · AFTC and Airworthiness Process Changes 412th Test Wing Wayne Hale 412 TENG/ENI 661.275.4461 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Approved](https://reader033.fdocuments.in/reader033/viewer/2022042317/5f05a4af7e708231d413fb85/html5/thumbnails/18.jpg)
What Has Changed
18
![Page 19: 412 Test Wing - ITEA · AFTC and Airworthiness Process Changes 412th Test Wing Wayne Hale 412 TENG/ENI 661.275.4461 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Approved](https://reader033.fdocuments.in/reader033/viewer/2022042317/5f05a4af7e708231d413fb85/html5/thumbnails/19.jpg)
What Has Changed
19
![Page 20: 412 Test Wing - ITEA · AFTC and Airworthiness Process Changes 412th Test Wing Wayne Hale 412 TENG/ENI 661.275.4461 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Approved](https://reader033.fdocuments.in/reader033/viewer/2022042317/5f05a4af7e708231d413fb85/html5/thumbnails/20.jpg)
What Has Changed
• Military Flight Release
– Use for Impact to Airworthiness T-2 Mods
• No Impact to Airworthiness
– Still use AFMC Forms
• AFMC Form 272 Physical Configuration
Inspection (PCI)
• AFMC Form 243 Temporary Release for
Flight (TFR)
• AFMC Form 273 Final Release for Flight
(FFR)
20
![Page 21: 412 Test Wing - ITEA · AFTC and Airworthiness Process Changes 412th Test Wing Wayne Hale 412 TENG/ENI 661.275.4461 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Approved](https://reader033.fdocuments.in/reader033/viewer/2022042317/5f05a4af7e708231d413fb85/html5/thumbnails/21.jpg)
Questions
21
![Page 22: 412 Test Wing - ITEA · AFTC and Airworthiness Process Changes 412th Test Wing Wayne Hale 412 TENG/ENI 661.275.4461 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Approved](https://reader033.fdocuments.in/reader033/viewer/2022042317/5f05a4af7e708231d413fb85/html5/thumbnails/22.jpg)
AFTC and Airworthiness Process Changes
Risk and Airworthiness
Assessment Exercise
22