4 - HK Electric Development of Lamma GRS
Transcript of 4 - HK Electric Development of Lamma GRS
April 2013
Development of HK Electric Gas Receiving Facilities at LammaLammaPresentation for “How does Natural Gas Re shape the Low CarbonPresentation for How does Natural Gas Re-shape the Low Carbon Economy / Energy Market” - Ir Y.L. Kwan, HK Electric
Development of HK Electric GasDevelopment of HK Electric Gas Receiving Facilities at Lamma● Introduction● Major Features of GRS● GRS Development in Phases● GRS Reliability Improvement Work
2
Lamma Power Generation (1982-2013)Stage I L1-3 : 250 MW x 3 (1982-84)Stage II L4-6 : 350 MW x 3 (1987-92)Stage III L7-8 : 350 MW x 2 (1995-97)
8 Coal-Fired Units 2,500 MW
GT1 : 55 MW (1978)GT2,3,4,6 : 125 MW x 4 (1989-90)
5 Oil-Fired Open Cycle GT Units 555 MW
2 Gas/Oil Dual Fired GT57CC : 345 MW (2002) 345 MW2 Gas/Oil Dual -Fired CCGT Units
GT57CC : 345 MW (2002)L9 : 335 MW (2006)
Lamma Wind: 0.8MW (2006)TFPV : 1MW (2013)
345 MW335 MW
Renewable Energy 2 MW
3,737 MWTotal Installed Capacity :TFPV : 1MW (2013)
3Lamma
Gas Supply to Lamma Power Station LNG from Australia and Qatar are blended and stored in Guangdong Dapeng LNG Terminal
LNG LNG TerminalTerminal
Blended gas is ifi d d
92km
gasified and delivered via 92km
SubmarineGas Pipeline
Unloading of LNGUnloading of LNGUnloading of LNGUnloading of LNG
submarine pipeline and landed at GRS
4Lamma ExtensionLamma Extension
Unloading of LNGUnloading of LNGUnloading of LNGUnloading of LNG of LMX
Gas Receiving Station (GRS)- Located at south west of Lamma
Power Station Extension
- Receives natural gas from Mainland via a 92 km submarine pipeline operating at a pressure of around 80 bar
- Controls gas supply to Unit 9 at a gas pressure of around 40 bar and to GT57 at around 28 barand to GT57 at around 28 bar
- Fenced off as a Natural Gas
GRS
5Controlled Area
Major Features of GRS Pig Receiver• Receive pigs launched p g
from Shenzhen for cleaning and inspection of the submarine pipeline
Pig Launcher Inlet Valve
ESDV Pig Receiver
Natural Gas
Gas Filter Gas Meter Gas Heater Pressure ESDV GTGas Filter Gas Meter Gas Heater PressureRegulatingStation
ESDVUnit
LNGTerminal
SubseaPipeline
GRSBoundary
Flare Stack
6GRS Schematic Diagram
Major Features of GRS
Pig Launcher Inlet Valve
ESDV Pig Receiver
Natural Gas
Gas Filter Gas Meter Gas Heater Pressure ESDV GT
Flaring and Venting System• Blowdown of the 92km
submarine gas pipeline inGas Filter Gas Meter Gas Heater PressureRegulatingStation
ESDVUnitsubmarine gas pipeline in
case of emergency or maintenance
LNGTerminal
SubseaPipeline
GRSBoundary
Flare Stack• No continuous purging of
natural gas through the flare stack during normal
7GRS Schematic Diagram
goperation
Emergency Shut Down Valves• Incoming and outgoing ESDV are
Major Features of GRS• Incoming and outgoing ESDV are
provided
• Shutdown gas supply from theShutdown gas supply from the LNG Terminal in case of emergency
Pig Launcher Inlet Valve
ESDV Pig Receiver
Natural Gas
Gas Filter Gas Meter Gas Heater Pressure ESDV GTGas Filter Gas Meter Gas Heater PressureRegulatingStation
ESDVUnit
LNGTerminal
SubseaPipeline
GRSBoundary
Flare Stack
8GRS Schematic Diagram
Major Features of GRS
Pig Launcher Inlet Valve
ESDV Pig Receiver
Natural Gas
Gas Filter Gas Meter Gas Heater Pressure ESDV GTGas Filter Gas Meter Gas Heater PressureRegulatingStation
ESDVUnit
Gas Filter• Remove solid particles
larger than 5µm in sizes
LNGTerminal
SubseaPipeline
GRSBoundary
Flare Stack
larger than 5µm in sizes from the incoming natural gas
9GRS Schematic Diagram
Major Features of GRS
Pig Launcher Inlet Valve
ESDV Pig Receiver
Natural Gas
Gas Filter Gas Meter Gas Heater Pressure ESDV GTGas Filter Gas Meter Gas Heater PressureRegulatingStation
ESDVUnit
Gas Metering System
LNGTerminal
SubseaPipeline
GRSBoundary
Flare Stack
• Ultrasonic gas metering stream to measure the volumetric f f
10GRS Schematic Diagramflow of natural gas to generating units
Gas Heater• Gas temperature will drop after
Major Features of GRS• Gas temperature will drop after
undergoing pressure reduction at the pressure regulating station due to Joule-Thompson effectdue to Joule Thompson effect
• Gas-fired water bath type heater to heat up natural gas to maintain
Pig Launcher Inlet Valve
ESDV Pig Receiver
o ea up a u a gas o a agas temperature after pressure reduction well above gas dew point for satisfying the
Natural Gas
Gas Filter Gas Meter Gas Heater Pressure ESDV GT
p y grequirement of gas turbine combustion system
Gas Filter Gas Meter Gas Heater PressureRegulatingStation
ESDVUnit
LNGTerminal
SubseaPipeline
GRSBoundary
Flare Stack
11GRS Schematic Diagram
Pressure Reduction Streams• Pressure reduction streams to regulate gas pressure to meet
requirement of the gas turbines
Major Features of GRSrequirement of the gas turbines
• Two streams for each gas turbine: One stream on duty mode and other stream on standby mode which will be cut in automatically inother stream on standby mode which will be cut in automatically in case the duty stream is mal-functioned
• Each stream provided with HIPPS comprising an active regulator a
Pig Launcher Inlet Valve
ESDV Pig Receiver
Each stream provided with HIPPS comprising an active regulator, a monitor regulator, a quick shut off valve, a pressure relief valve and associated vents, valves and fittings
Natural Gas
Gas Filter Gas Meter Gas Heater Pressure ESDV GTGas Filter Gas Meter Gas Heater PressureRegulatingStation
ESDVUnit
LNGTerminal
SubseaPipeline
GRSBoundary
Flare Stack
12GRS Schematic Diagram
Major Features of GRS
Gas Supply Piping•Deliver natural gas from GRS to
Pig Launcher Inlet Valve
ESDV Pig Receiver
ggas turbines
Natural Gas
Gas Filter Gas Meter Gas Heater Pressure ESDV GTGas Filter Gas Meter Gas Heater PressureRegulatingStation
ESDVUnit
LNGTerminal
SubseaPipeline
GRSBoundary
Flare Stack
13GRS Schematic Diagram
GRS Development in Phases2006
Initial DesignS l t l tSupply natural gas to six new gas-fired combined cycle units (L9-L14)( 9 )
Construction of GRS is separated into diff t hdifferent phases:Phase 1 for L9 with provision for L10 & L11; Phase 2 for L12, ; ,L13 & L14
14
GRS Reliability Improvement Work
To L9
Inlet ESDV
Filters MeteringSkid
Water Bath
PressureReduction
OutletESDV
To L9
15GRS Initial Design
Heater Station
GRS Development in Phases2006 2008
Initial DesignS l t l t
Gas Facilities for GT57 G fi dSupply natural gas to
six new gas-fired combined cycle units (L9-L14)
GT57 Gas-fired Combined Cycle PlantInstallation of a ( 9 )
Construction of GRS is separated into diff t h
sta at o o apressure reduction skid for the GT57 combined cycle unit
hi h t ddifferent phases:Phase 1 for L9 with provision for L10 & L11; Phase 2 for L12,
which was converted from existing two simple cycle gas turbines by retrofitting ; ,
L13 & L14y g
a steam bottoming cycle
16
GRS Reliability Improvement Work
To GT57
New PRS Oand Outlet
ESDV for GT57
To L9
MeteringSkid
Water Bath
PressureReduction
OutletESDV
To L9
Inlet ESDV
Filters
17Gas Facilities for GT57 Gas-fired Combined Cycle Plant
Heater Station
GRS Development in Phases2006 2008 2009
Initial DesignS l t l t
Gas Facilities for GT57 G fi d
Additional ESDV and G H tSupply natural gas to
six new gas-fired combined cycle units (L9-L14)
GT57 Gas-fired Combined Cycle PlantInstallation of a pressure reduction
Gas HeaterInstallation of standby gas heater to meet the gas ( 9 )
Construction of GRS is separated into diff t h
p essu e educt oskid for the GT57 combined cycle unit which was converted f i ti t
to eet t e gasrequirement of GT57 so as to satisfy the emission caps from 2010 ddifferent phases:
Phase 1 for L9 with provision for L10 & L11; Phase 2 for L12,
from existing two simple cycle gas turbines by retrofitting a steam bottoming
2010 onwards.
Retrofit of a redundant inlet ; ,
L13 & L14g
cycle ESDV to improve the reliability of gas supply to the gas-fi d ti it
18
fired generating units
GRS Reliability Improvement WorkNew Inlet ESDV
To GT57
New Gas Heater
To L9
MeteringSkid
Water Bath
PressureReduction
OutletESDV
To L9
Inlet ESDV
Filters
19Additional ESDV and Gas HeaterHeater Station
GRS Development in Phases2006 2008 2009
Initial DesignS l t l t
Gas Facilities for GT57 G fi d
Additional ESDV and G H t
GRS Reliability I t W k
2012
Supply natural gas to six new gas-fired combined cycle units (L9-L14)
GT57 Gas-fired Combined Cycle PlantInstallation of a pressure reduction
Gas HeaterInstallation of standby gas heater to meet the gas
Improvement WorkImprovement work to ensure that spurious trip of GRS will not ( 9 )
Construction of GRS is separated into diff t h
p essu e educt oskid for the GT57 combined cycle unit which was converted f i ti t
to eet t e gasrequirement of GT57 so as to satisfy the emission caps from 2010 d
t p o G S otlead to loss of gas supply to both L9 and GT57 while
i t i i fdifferent phases:Phase 1 for L9 with provision for L10 & L11; Phase 2 for L12,
from existing two simple cycle gas turbines by retrofitting a steam bottoming
2010 onwards.
Retrofit of a redundant inlet
maintaining safe, reliable and efficient operation
; ,L13 & L14
gcycle ESDV to improve the
reliability of gas supply to the gas-fi d ti it
20
fired generating units
Necessity for G SGRS Reliability Improvement Work
T i id t i 2010Two incidents in 2010:
● Shutdown of Unit 9 due to failure of electronic components of Pressure Reduction Streams (PRS) control valves.
● Fire computer power failure led to closure of all emergency shutdown valves (ESDV). Gas supply to two g y ( ) ygas-fired combined cycle units L9 and GT57 was cut off.
21
GRS Reliability Improvement Work – Work Scope
● Segregation of gas supply to Unit 9 and GT57 so that failure of a single system will not affect the other systemg y y- Addition of Inlet ESDVs for L9 and GT57 streams- Addition of GT57 Flowmeter and Modification of Flow
Computer System- Addition of 1 Gas Heater- Modification of GRS Control system- Addition of Hardwired Interlock Panel for the GRS Inlet
ESDVs, L9 ESDVs and GT57 ESDVs- Modification of ESDV Control Logic and Configuration
M difi ti f Fi & G D t ti S t22
- Modification of Fire & Gas Detection Systems- Modification of associated pipework
GRS Reliability Improvement Work – Work Scope
● Replacement of Unit 9 Pressure Reduction Skid- Use mechanical instead of electronic control for
t l l f i il d i th t fpressure control valves of similar design as that of GT57 to reduce the reliance on electronic control of Unit 9 gas s ppl s stemUnit 9 gas supply system
23
GRS Reliability Improvement Work
To GT57
Replacement of L9 Pressure Reduction Station
To L9New Gas
MeteringSkid
Water Bath
PressureReduction
IndividualTrain Outlet
To L9
CommonInlet
Filters IndividualTrain Inlet
New Gas Facilities
24GRS Reliability Improvement WorkHeater Station ESDVESDV ESDV
GRS Before Improvement Work
Flow Meter for both Unit 9 and GT57
2 Gas Heaters for Unit 9 and GT57 Unit 9 and GT57
Pressure Reduction Systems
To L9Common gas supply systemL9 gas supply system
25To GT57
GT57 gas supply system
GRS After Improvement Work
26To L9 To GT57Common gas supply systemL9 gas supply systemGT57 gas supply system
GRS After Improvement WorkSeparation of Unit 9 and GT57 fuel gas
supply lines from gas filter outlet header
1 set of ultrasonic flow meter 200 mm in size with a bypass line for GT57 fuel gas
supply line
27To L9 To GT57Common gas supply systemL9 gas supply systemGT57 gas supply system
GRS After Improvement Work
Addition of emergency shutdown valves with bypass valves and partial stroke test devices atbypass valves and partial stroke test devices at
inlets of the 2 ultrasonic flow meters
Removal of interconnection pipes at inlet and outlet of gas heaters
28To L9 To GT57Common gas supply systemL9 gas supply systemGT57 gas supply system
GRS After Improvement Work
1 additional gas heater as a standby heater
29To L9 To GT57Common gas supply systemL9 gas supply systemGT57 gas supply system
GRS After Improvement Work
Replacement of L9 PRS to the type using in GT57
Removal of common header at inlet of Unit 9 and GT57 pressure reduction systems
30To L9 To GT57Common gas supply systemL9 gas supply systemGT57 gas supply system
GRS Reliability Improvement Work - Major equipment● Flow meter Layout
31
GRS Reliability Improvement Work - Major equipment● Flow meter arrived to Lamma Extension Site
32
GRS Reliability Improvement Work - Major equipment
● Water Bath Heater Layout
33
GRS Reliability Improvement Work - Major equipment
● Water Bath Heater
34
GRS Reliability Improvement Work - Major equipment
Monitoring RegulatorActive Regulator
Unit 9 Pressure Reduction System Arrangement
Slam Shut Valve (SSV)
35
GRS Reliability Improvement Work - Major equipmentUnit 9 Pressure Reduction System
36
GRS Reliability Improvement Work – Major equipment● Fire and Gas (F&G) Detection System
- Separation of GRS into three major fire zones:
i) Area upstream of gas filter outlet header (common gas supply system)
ii) Area of Unit 9 gas supply system
iii) Area of GT57 gas supply system
- F&G Detection System for Unit 9 gas supply system will trip Unit 9 gas supply
stream if fire or gas is detected, i.e. shutdown of Unit 9 inlet and outlet ESDVs;
similar for GT57
- If both Unit 9 and GT57 ESDVs are tripped, the two main ESDVs upstream of gas
filters will also trip
37
GRS Reliability Improvement Work
To GT57
To L9
MeteringSkid
Water Bath
PressureReduction
IndividualTrain Outlet
To L9
CommonInlet
Filters IndividualTrain Inlet
38Major Fire Zones at GRS
Heater Station ESDVESDV ESDV
GRS Plan View at Initial Operation in 2006
39
GRS Plan View After Upgrade in 2012
WBH 2WBH 3 WBH 2 WBH 1
Main Trunk
GT57 FM
Main Trunk
40
GRS Reliability Improvement Work – Project Key Dates
Contract Award 28/9/2011
Delivery of Major Equipment 1/2012
GRS Outage 27/1/2012 – 23/2/2012
GRS Gas In 24/2/2012
Completion of Testing & End 3/2012Completion of Testing & Commissioning
End 3/2012
41
GRS Reliability Improvement Work – Project Challenges
● All works could only be carried out during a 27 days GRS outage when all
natural gas in the working area are purgednatural gas in the working area are purged
● Time frame from contract award to project completion date was less than 6
monthsmonths.
● Complexity of work associated with the modification of GRS control and F&G
system re-routing of high pressure gas piping stringent statutory approvalsystem, re-routing of high pressure gas piping, stringent statutory approval
procedures and gas safety control requirement
● HK Electric supervision teams working with contractor have overcome all● HK Electric supervision teams working with contractor have overcome all
challenges and hiccups arising during project execution and all works were
completed on time.
42
completed on time.
GRS Reliability Improvement Work – Erection
Welding of Gas Pipingg p g
Site Arrival of Major Equipment
43
GRS Reliability Improvement Work – Erection
Site Welding Preparationg p
Piping Alignment Adjustment
44
GRS Reliability Improvement Work – Erection
Equipment Installationq p
Equipment On Base
45
Gas Safety
● Quantitative Risk Assessment (QRA) and Hazard and Operability (HAZOP)
st dies on all gas facilities to identif and eliminate all possible risksstudies on all gas facilities to identify and eliminate all possible risks
● HK Electric has introduced a Natural Gas Safety Management System to gear
ll d t il d i th d i t ti i i i tiall procedures entailed in the design, construction, commissioning, operation
and maintenance of the gas facilities.
S i l d i d h b i l t d t t f t● Special devised programmes have been implemented to promote safety
awareness among employees and contractors and ensure that all personnel
are fully training in safety requirements and procedureare fully training in safety requirements and procedure.
46
Concluding Remarks
● Fully committed to providing a reliable, cleaner and greener electricity supply
to meet Hong Kong’s po er req irements HK Electric has s ccessf llto meet Hong Kong’s power requirements, HK Electric has successfully
introduced the use of natural gas for power generation since 2006. HK
Electric will ensure the reliable operation of the GRS to supply natural gas toElectric will ensure the reliable operation of the GRS to supply natural gas to
the two gas-fired units for power generation with much lower emissions than
those of the coal-fired unitsthose of the coal fired units.
● Rooted in Hong Kong for over a century as one of the world’s longest-
established electricity companies and dedicated to the city’s sustainable y p y
development in future, HK Electric constantly pursues continual improvement
in its services to supply reliable electricity to its customers in a clean, reliable,
47high-efficiency, environmentally friendly, and affordable manner.
Thank You