S.No. Items Qty. Rate/Unit
1 2 3 4
1 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in over areas
foundation trenches or drains ( not exceeding 1.5 m in width or 10 Sqm on plan) including dressing of sides
and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus
excavated soil asdirected, with in lead of 50 m. All Kind of soil.
(PWD S.O.R. 2.6.1 p.4)1700.00 107.00/Cum
2 Excavation work in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including
dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and
disposal of surplus excavated soils as directed,within a lead of 50m.
Ordinary Rock (S.O.R. 2.7.3. Hard rock(blasting probhited)
450.00 364.00/Cum
3 Providing and laying in foundation, plinth and under floor cement concrete with 40 mm. nominal size
graded stone aggregates including ramming in layer and curing complete excluding cost of form work. (C)
M-10
(PWD S.O.R. 4.1.2.3 p. 15)
150.00 2833/Cum
4 Filling from available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layer
not exceeding 20 cm. in depth consolidating each deposited layer by ramming and watering with a leadupto 50 m. and lift upto 1.5m.
(PWD S.O.R. 2.24 p. 7)
105.00 49.00/Cum
5 Providing and laying in position specified grade of reinforced cement concrete (with 20mm nominal size
graded stone aggregate) excluding the cost of centering, shuttering and reinforcement all work up to plinth
level. M-20 Nominal mix.
(S.O.R. 5.1.1 p. 20)
870.00 3936/Cum
6 Providing and placing in position cold twisted steel and hot rolled deformed steel reinforcement for R.C.C.
work including cutting, bending, binding etc. complete as per drawings including cost of binding wire and
including all wastages etc. complete.
(PWD S.O.R. 8 p. 24)
GORISHANKAR CONSTRUCTION KHASRA -
1414,1415/1 ,AT VILLAGE DATIYA,
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
2/98
S.No. Items Qty. Rate/Unit
1 2 3 4
7600.00 42.00/Kg
6 Kota / cuddapah stone slab flooring over 20 mm (average) thick base laid over and jointed with grey
cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing
complete with base of cement mortar 1 : 4 (1 cement : 4 sand) : 11.23.1 25 mm thick. .
PWD S.O.R.11.23.1 p. 83
960.00 670.00/Sqm
7 Marble stone flooring wi th 16 mm thick marble stone (sample of marble shall be approved by Engineer-in-
charge) over 20 mm (average) thick base of cement mortar 1:4 (1 cement:4 sand)laid and jointed with grey
cement slurry including rubbing and polishing complete with : (Area of Slabs over 0.50sqm) . Udaipur /Baroda green marble. Extra for marble stone flooring in treads of steps and risers using single length up to
2.00 meter.
PWD S.O.R. 11.21.5 p. 83 + 11.22 p. 83
40.00 1099/Sqm
8 6 mm thick cement plaster 1 : 3 (1 cement : 3 sand) finished with a floating coat of neat cement and a
thick coat of lime wash on top of wall when dry for bearing of R.C.C. slab and beam.
(S.O.R.13.9 p. 99)
710.00 100.00/Sqm
9 12 mm thick cement plaster on brick wall. In Cement Mortar 1:6 (1 Cement : 6 Sand)
(PWD S.O.R. 13.1.2 p. 99)
200.00 80.00/Sqm
10 Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: (a)
New work (two or more coats)
(PWD S.O.R. 13.48.1 p. 104)
Qty. same as (6mmplaster + 12mm plaster) 290.00 46.00/Sqm
395.00 11882/Each
TOTAL ESTIMATED COST Rs. TEN LACS ONLY.
TOTAL(A)
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
3/98
S.No. Items Qty. Rate/Unit
1 2 3 4
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
4/98
S.No. Items Qty. Rate/Unit
1 2 3 4
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
5/98
S.No. Items Qty. Rate/Unit
1 2 3 4
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
6/98
S.No. Items Qty. Rate/Unit
1 2 3 4
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
7/98
S.No. Items Qty. Rate/Unit
1 2 3 4
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
8/98
S.No. Items Qty. Rate/Unit
1 2 3 4
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
9/98
S.No. Items Qty. Rate/Unit
1 2 3 4
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
10/98
S.No. Items Qty. Rate/Unit
1 2 3 4
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
11/98
S.No. Items Qty. Rate/Unit
1 2 3 4
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
12/98
S.No. Items Qty. Rate/Unit
1 2 3 4
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
13/98
S.No. Items Qty. Rate/Unit
1 2 3 4
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
14/98
S.No. Items Qty. Rate/Unit
1 2 3 4
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
15/98
S.No. Items Qty. Rate/Unit
1 2 3 4
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
16/98
S.No. Items Qty. Rate/Unit
1 2 3 4
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
17/98
S.No. Items Qty. Rate/Unit
1 2 3 4
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
18/98
Amount
5
181900.00
163800.00
424950.00
5145.00
3424320.00
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
19/98
Amount
5
319200.00
643200.00
43960.00
71000.00
16000.00
13340.00
4693390.00
10000205.00
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
20/98
Amount
5
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
21/98
Amount
5
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
22/98
Amount
5
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
23/98
Amount
5
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
24/98
Amount
5
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
25/98
Amount
5
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
26/98
Amount
5
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
27/98
Amount
5
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
28/98
Amount
5
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
29/98
Amount
5
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
30/98
Amount
5
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
31/98
Amount
5
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
32/98
Amount
5
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
33/98
Amount
5
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
34/98
Amount
5
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
35/98
.No Items No. L B
1 2 3 4 5A WORK UP TO STILT FLOOR LVL.
1 Earth work in excavation by mechanical means (Hydraulic excavator) /
manual means in over areas foundation trenches or drains ( not
exceeding 1.5 m in width or 10 Sqm on plan) including dressing of sides
and ramming of bottoms, lift up to 1.5 m, including getting out the
excavated soil and disposal of surplus excavated soil asdirected, with in
(PWD S.O.R. 2.6.1 p.4)
Total 1 1770.00
2 Excavation work in foundation trenches or drains not exceeding 1.5 m in
width or 10 sqm on plan including dressing of sides and ramming of
bottoms lift upto 1.5 m, including getting out the excavated soil and
disposal of surplus excavated soils as directed,within a lead of 50m.
Ordinary Rock (S.O.R. 2.7.3. Hard rock(blasting probhited)
Footing - F1 41 4.20 4.20
Footing - F2 15 2.70 2.70
Footing - CF1 1 6.20 1.75
Retaining Wall 1 169.00 0.90
3 Providing and laying in foundation, plinth and under floor cement
concrete with 40 mm. nominal size graded stone aggregates including
ramming in layer and curing complete excluding cost of form work. (C)
-(PWD S.O.R. 4.1.2.3 p. 15)
Footing - F1 41 4.20 4.20
Footing - F2 15 2.70 2.70
Footing - CF1 1 6.20 1.75
Retaining Wall 1 169.00 0.90
Total Floor area 1 1770.00
4 Filling from available excavated earth (excluding rock) in trenches,
plinth, sides of foundation etc. in layer not exceeding 20 cm. in depth
consolidating each deposited layer by ramming and watering with a lead
(PWD S.O.R. 2.24 p. 7)
ESTIMATE FOR CONSTRUCTION OF PROPOSED HOTEL BUILDI
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
36/98
5 Providing and laying in position specified grade of reinforced cement
concrete (with 20mm nominal size graded stone aggregate) excluding
the cost of centering, shuttering and reinforcement all work up to
plinth level. M-20 Nominal mix.
(S.O.R. 5.1.1 p. 20)
FOOTINGS
Footing - F1 41 4.00 4.00
Footing - F2 15 2.50 2.50
Footing - CF1 1 6.00 1.55
Retaining Wall 1 169.00 0.70
TIE BEAM
Total 1 557.00 0.30Lift wall -1 1 17.40 0.15
Lift wall -2 2 9.20 0.15
Retaining Wall 1 169.00 0.15
COLUMNS UP TO STILT FLOOR LVL.
C1 41 0.60 0.80
C2 14 0.40 0.80
C3 7 0.20 0.40
BEAMS UP TO STILT FLOOR LVL.
Total 1 663.00 0.60
SLAB
At Basement Floor Lvl. 1 1770.00
At Stilt Floor Lvl. 1 1770.00
STAIRCASE UP TO STILT FLOOR LVL.
Flight 6 3.50 1.50
Steps 30 1.50 0.30
Landing 3 1.50 3.00
6 Providing and placing in position cold twisted steel and hot rolled
deformed steel reinforcement for R.C.C. work including cutting, bending,binding etc. complete as per drawings including cost of binding wire and
(PWD S.O.R. 8 p. 24)
7 Centering and shuttering including Strutting, staging.propping etc.
Complete and including its removal of form for
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
37/98
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
38/98
STAIRCASE UP TO STILT FLOOR LVL.
Flight 6 3.50 1.50
Steps 30 1.50 0.30
Landing 3 1.50 3.00
11 Kota / cuddapah stone slab flooring over 20 mm (average) thick base
laid over and jointed with grey cement slurry mixed with pigment to
match the shade of the slab including rubbing and polishing
complete with base of cement mortar 1 : 4 (1 cement : 4 sand) :
PWD S.O.R.11.23.1 p. 83
BASEMENT FLOOR
Total 1 1770.00
12 Marble stone flooring wi th 16 mm thick marble stone (sample of marbleshall be approved by Engineer-in-charge) over 20 mm (average) thick
base of cement mortar 1:4 (1 cement:4 sand)laid and jointed with grey
cement slurry including rubbing and polishing complete with : (Area of
Slabs over 0.50sqm) . Udaipur / Baroda green marble. Extra for marble
stone flooring in treads of steps and risers using single length up to
PWD S.O.R. 11.21.5 p. 83 + 11.22 p. 83
UP TO STILT FLOOR LVL
Staircase No. - 1,2,3 - Landing 3 3.50 1.50
Staircase No. - 1,2,3 - Steps 60 1.50 0.45
Skirting 3 20.00 0.15
13 6 mm thick cement plaster 1 : 3 (1 cement : 3 sand) finished with a
floating coat of neat cement and a thick coat of lime wash on top of wall
when dr for bearin of R.C.C. slab and beam.(S.O.R.13.9 p. 99)
UP TO STILT FLOOR LVL
TOTAL 1 1770.00
14 12 mm thick cement plaster on brick wall. In Cement Mortar 1:6 (1Cement : 6 Sand(PWD S.O.R. 13.1.2 p. 99)
UP TO STILT FLOOR LVL
On retaining wall 1 169.00
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
39/98
15 Wall painting with plastic emulsion paint of approved brand and
manufacture to give an even shade: (a) New work (two or more coats)
(PWD S.O.R. 13.48.1 p. 104)
Qty. same as (6mmplaster + 12mm plaster)
16 Preconstruction curative Cum. preventive antitermite treatment of the
building under construction by providing (i) surface reatment by
spreading emul sion over the pl inth area before aying the base concrete
under floors @ 5.0 litres/Sqm.(ii) Pumping the emul sion in plinth
masonry on fi lling side at f loor unction @ 7.5 li tres/Sqm. (iii )
Pumping the emul sion from outer side of the plinth below ground
alround the masonry @ 5.0 litres/Sqm as per I.S. 8944 Emulsion.
(1Chlorpyrifos: 19 water) with five years service guarantee
(S.O.R. 2.31 p.8)
Total floor area 1 1770.00
B WORK IN SUPERSTRUCTURE
17 Reinforced cement concrete work in walls ( any thickness) including
attatched pilasters, plinth and string courses, fillets, columns, pillars,
posts and struts suspended floor roof slab, beams etc. up to floor two
level excluding cost of centering, shuttering, finishing and
reinforcement. M20 Nominal mix ( with 20 mm nominal size graded
(PWD S.O.R. 5.2.1 p. 20)
COLUMN STILT FLOOR LVL. TO 3rd FLOOR LVL.C1 41 0.60 0.80
C2 14 0.40 0.80
C3 7 0.20 0.40
COLUMN 3rd FLOOR.LVL. TO TERRACE
C1 31 0.60 0.80
C2 10 0.40 0.80
C3 7 0.20 0.40
LIFT
Lift wall -1 1 17.40 0.15
Lift wall -2 2 9.20 0.15
COLUMN TO TERRACE TO MUMMTY LVL.Column - C3 8 0.20 0.40
FLOOR BEAMS UP TO 3rd FLOOR LVL.
TOTAL 3 663.00 0.60
FLOOR BEAMS 3rd FLOOR LVL. TO TERRACE
TOTAL 4 550.00 0.60
FLOOR BEAMS TERRACE TO MUMMTY
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
40/98
TOTAL 2 24.00 0.20
SLAB UP TO 3rd FLOOR LVL.
TOTAL 3 1770.00
SLAB 3rd FLOOR LVL.TO TERRACE
TOTAL 4 1200.00
SLAB OF MUMMTYTOTAL 2 6.00 6.00
LINTEL UP TO TERRACE LVL.
D 3 2.70 0.20
D1 32 1.50 0.20
D2 121 1.20 0.20
D3 110 1.10 0.20
W 8 1.50 0.20
W1 225 1.50 0.20
V 125 0.90 0.20
LINTEL BEND UP TO TERRACE LVL.
TOTAL 1 1200.00 0.20
18 Reinforced cement concrete work in beams,suspended floors, roofs,
having slope of any degree landings, balconies, shelves, chajjas, lintels,
bands, plain windows sills, staircases and spiral staircases up to floor
two level excluding cost of centering, shuttering, finishing and
reinforcement in concrete grade. M20 Nominal mix ( with 20 mm
nominal size graded stone aggregate)
(PWD S.O.R. 5.3.1 p. 20)
STAIRCASE STILT FLOOR LVL.TO 3rd FLOOR LVL.Flight 18 3.50 1.50
Steps 90 1.50 0.30
Landing 9 1.50 3.00
STAIRCASE 3rd FLOOR LVL.To TERRACE
Flight 16 3.50 1.50
Steps 120 1.50 0.30
Landing 12 1.50 3.00
19 Providing and placing in position cold twisted steel and hot rolled
deformed steel reinforcement for R.C.C. work including cutting, bending,
binding etc. complete as per drawings including cost of binding wire and
including all wastages etc. complete.
(PWD S.O.R. 8 p. 24)
20 Centering and shuttering including Strutting, staging.propping etc.
Complete and including its removal of form for
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
41/98
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
42/98
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
43/98
(S.O.R. 6.11.2 p. 28)
STILT FLOOR 1 105.00
1st FLOOR 1 115.00
2nd FLOOR 1 120.00
3rd FLOOR 1 320.00
4th FLOOR to 6th FLOOR 3 420.00
DEDUCTION
D 3 2.40
D1 32 1.20
D2 121 1.00
D3 109 0.80
V 122 0.60
25 Providing & fixing 16mm thick gang saw cut mirror polished premoulded
and polished machine cut for kitchen platforms vanity counters, window
sills, facias and similar locations of required size of approved shade,
colour and texture laid over 20mm thick base cement mortar 1:4
(1Cement : 4 Sand) with joints treated with white cement mixed with
matching pigment, epoxy touch ups, including rubbing, curing, moulding
and polishing to edge to give high gloss finish etc. complete at all levels
(Sample to be got approved by Engineer-In-Charge. Granite of any
(a) Area of slab up to 0.50 sqm but not less than 0.30 sqm.(S.O.R. 8.2.2.1 p. 38)
For Lift
Lift No. 2&3 16 2.30 2.10
Lift No.1 6 5.80 2.10
26 Providing & fixing 16mm thick gang saw cut mirror polished premoulded
and polished machine cut for kitchen platforms vanity counters, window
sills, facias and similar locations of required size of approved shade,
colour and texture laid over 20mm thick base cement mortar 1:4
(1Cement : 4 Sand) with joints treated with white cement mixed with
matching pigment, epoxy touch ups, including rubbing, curing, moulding
and polishing to edge to give high gloss finish etc. complete at all levels
(Sample to be got approved by Engineer-In-Charge. Granite of any
(b) Area of slab over 0.50 sqm
(S.O.R. 8.2.2.2 p. 38)
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
44/98
Kitchen Platform
Stilt 1 8.00 0.75
1st Floor 1 22.80 0.75
27 Providing and laying 1st quality Ceramic glazed wall tiles conforming to
IS : 15622 (6-7 mm thickness)of aooroved make in all colours, shades
except burgundy, bottle green, black of any size as approved by
Engineer-In_Charge in skirting, risers of steps and dados over 12mm
thick bed of cement mortar 1:3 (1cement : 3 sand) and jointing with grey
cement slurry @ 3.3 kg per sqm. including pointing in white cement
mixed with pigment of matching shade complete.
PWD S.O.R. 11.31 p. 84
Kitchen dado 1 35.00 1.50
Service & bar Counter 1 50.00 1.50
Toilet stilt floor 1 17.80 2.10Toilet 1st floor 2 16.10 2.10
Toilet 2nd floor 2 16.10 2.10
Toilet 3rd floor 20 7.10 2.10
Toilet 4th floor 30 7.10 2.10
Toilet 5th floor 30 7.10 2.10
Toilet 6th floor 30 7.10 2.10
28 Marble stone flooring wi th 16 mm thick marble stone (sample of marble
shall be approved by Engineer-in-charge) over 20 mm (average) thick
base of cement mortar 1:4 (1 cement:4 sand)laid and jointed with grey
cement slurry including rubbing and polishing complete with : (Area of
Slabs over 0.50sqm) . Udaipur / Baroda green marble. Extra for marble
stone flooring in treads of steps and risers using single length up to
PWD S.O.R. 11.21.5 p. 83 + 11.22 p. 83
STAIRCASE UP TO TERRACE
STAIRCASE UP TO STILT FLOOR LVL.
Steps 20 1.50 0.45
Landing 1 1.50 3.00
STAIRCASE STILT FLOOR LVL.TO 3rd FLOOR LVL.
Steps 180 1.50 0.45
Landing 9 1.50 3.00
STAIRCASE 3rd FLOOR LVL.To TERRACE
Steps 240 1.50 0.45
Landing 12 1.50 3.00
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
45/98
SKIRTING 8 20.00 0.15
29 Providing and laying polished vitrified floor tiles in different sizes of 10
mm thickness with water absorbtion's less than 0.08% and confirming
to IS 15622 of approved make in all colours and shades, laid on 20 mm
thick cement mortar 1:4 (1 cement :4 sand) including grouting the joints
with white cement and matching pigments etc. complete.
(a) Size of tiles 50x50 cm.
PWD S.O.R. 11.34.2 p. 85
STILT FLOOR
BMC 1 3.50 27.80
1 8.80 6.00
Waiting 1 8.50 8.80
Staff 1 4.00 7.60Kit. 1 3.50 4.40
Pass. 1 8.20 1.50
Maint. 1 4.10 2.90
1 3.05 4.50
Unifor. 1 3.00 4.50
A/c 1 3.50 4.50
Main. 1 4.50 4.50
Plant 1 5.80 4.50
Rec. 1 12.08 6.05
FIRST FLOOR
Bank 1 13.70 45.80
Rest. 1 15.78 14.50
1 8.60 17.15
S/C 1 8.60 5.30
Bar. 1 6.20 9.30
Kit. 1 209.00 1.00
Rec. 1 251.16 1.00
AHU 1 7.48 6.00
Ser. 1 6.00 3.05Toi. 2 6.00 3.35
Office 1 6.00 6.80
SECOND FLOOR
Office 1 13.50 34.60
Hall 1 17.00 10.80
1 13.50 6.00
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
46/98
Banq 1 24.30 21.60
Ser. 1 69.00 1.00
Atrium 1 312.80 1.00
S/c 1 7.48 6.00
Ser. 1 6.00 3.05
Toi. 2 4.70 3.50
Pass. 1 6.80 1.50
THIRD FLOOR
Swim. Pool 1 593.15 1.00
Health 1 13.20 15.90
Atrium 1 265.50 1.00
Rooms 14 3.35 6.30
S/c 1 7.50 6.00
House 1 6.00 3.05
S/c 1 6.00 5.10Rooms 2 7.80 3.35
Rooms 2 9.05 3.35
Rooms 2 10.50 3.35
Pass. 1 2.50 20.70
FOURTH FLOOR
Rooms 2 3.30 9.05
Rooms 2 3.30 7.80
Pass. 1 17.00 2.50
Atrium 1 204.50 1.00
Rooms 20 3.35 6.30
S/c 1 7.50 6.00
House 1 6.00 3.05
S/c 1 6.00 5.10
Rooms 2 7.80 3.35
Rooms 2 9.05 3.35
Rooms 2 10.50 3.35
Pass. 1 2.50 20.70
FIFTH FLOOR
Rooms 2 3.30 9.05Rooms 2 3.30 7.80
Pass. 1 17.00 2.50
Atrium 1 204.50 1.00
Rooms 20 3.35 6.30
S/c 1 7.50 6.00
House 1 6.00 3.05
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
47/98
S/c 1 6.00 5.10
Rooms 2 7.80 3.35
Rooms 2 9.05 3.35
Rooms 2 10.50 3.35
Pass. 1 2.50 20.70
SIXTH FLOOR
Rooms 2 3.30 9.05
Rooms 2 3.30 7.80
Pass. 1 17.00 2.50
Atrium 1 204.50 1.00
Rooms 20 3.35 6.30
S/c 1 7.50 6.00
House 1 6.00 3.05
S/c 1 6.00 5.10
Rooms 2 7.80 3.35Rooms 2 9.05 3.35
Rooms 2 10.50 3.35
Pass. 1 2.50 20.70
30 Providing and laying polished vitrified floor tiles in different sizes of 10
mm thickness with water absorbtion's less than 0.08% and confirming
to IS 15622 of approved make in all colours and shades, laid on 20 mm
thick cement mortar 1:4 (1 cement :4 sand) including grouting the joints
with white cement and matching pigments etc. complete.
(a) Size of tiles AS per Engineer In Charge
PWD S.O.R. 11.34.1 p. 85
UP TO TERRACE LVL.
Skirting 1 6100.00 0.15
31 Kota / cuddapah stone slab flooring over 20 mm (average) thick base
laid over and jointed with grey cement slurry mixed with pigment to
match the shade of the slab including rubbing and polishing
complete with base of cement mortar 1 : 4 (1 cement : 4 sand) :
PWD S.O.R.11.23.1 p. 83
Baement 1 1700.00
Skirting 1 170.00 0.15
Stilt floor
Parking for BMC 1 13.70 11.40
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
48/98
Porch 1 15.10 13.95
1 6.00 8.80
Parking for Hotel 1 9.50 34.90
1 15.10 12.35
32 6 mm thick cement plaster 1 : 3 (1 cement : 3 sand) finished with a
floating coat of neat cement and a thick coat of lime wash on top of wall
when dry for bearing of R.C.C. slab and beam.
(S.O.R.13.9 p. 99)
UP TO THIRD FLOOR LVL
Total 3 1700.00
UP TO THIRD FLOOR LVL
Total 4 1200.00
Mummty
Total 2 36.00
33 12 mm thick cement plaster on brick wall. In Cement Mortar 1:6 (1
Cement : 6 Sand)
(PWD S.O.R. 13.1.2 p. 99)
STILT FLOOR
BMC 2 34.00
2 13.50
S/C 2 6.70
2 6.00
Parking 2 13.70
2 11.40
Parking 2 24.58
2 34.90
ramp 2 8.80
waiting 2 8.80
2 8.50
maint. 2 7.18
2 4.50Staff 2 4.00
2 7.60
pass. 2 3.50
2 4.40
Toi. 2 4.50
2 4.40
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
49/98
Rec. 2 12.08
2 6.05
AHU 2 3.50
2 2.50
Uni. 2 3.00
2 4.50
A/C 2 3.50
2 4.50
Main. 2 4.50
2 4.50
Plant. 2 5.80
2 4.50
FIRST FLOOR
Bank 2 13.70
2 45.80S/c 2 4.20
1 1.50
Kit 1 94.30
Rec. 1 73.40
Rest. 2 24.30
1 17.15
S/c 2 8.60
2 5.30
S/c 2 7.48
2 6.00
AHU 2 3.50
2 2.50
Ser. 2 6.00
2 3.05
Toi. 4 4.70
4 3.35
pass. 2 6.80
2 1.50
Office 2 6.002 6.80
SECOND FLOOR
Office 2 13.50
2 34.60
S/c 2 4.20
2 3.00
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
50/98
Hall 2 17.00
2 10.80
2 13.50
2 6.00
Ser. 1 48.30
Atrium 1 82.40
Banq. 2 24.40
2 21.60
S/c 2 7.48
2 6.00
Ser. 2 6.00
2 3.05
Toi. 4 4.70
4 3.35
Pass. 2 6.802 1.50
THIRD FLOOR
Health 2 13.20
2 16.00
Rooms 28 3.35
28 6.30
S/c 2 7.50
2 6.00
Atrium 1 71.00
House 2 6.00
2 3.05
S/c 2 6.00
2 5.20
Corr. 2 20.70
2 2.50
Rooms 4 7.80
4 3.35
Rooms 4 9.05
4 3.35Rooms 4 10.50
4 3.35
Toilet 42 2.25
42 1.70
FOURTH FLOOR
Rooms 4 9.05
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
51/98
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
52/98
Corr. 2 20.70
2 2.50
Rooms 4 7.80
4 3.35
Rooms 4 9.05
4 3.35
Rooms 4 10.50
4 3.35
Toilet 60 2.25
60 1.70
SIXTH FLOOR
Rooms 4 9.05
4 3.30
Rooms 4 7.80
4 3.30Pass. 2 17.00
1 2.50
Rooms 40 3.35
40 6.30
S/c 2 7.50
2 6.00
Atrium 1 57.30
House 2 6.00
2 3.05
S/c 2 6.00
2 5.20
Corr. 2 20.70
2 2.50
Rooms 4 7.80
4 3.35
Rooms 4 9.05
4 3.35
Rooms 4 10.50
4 3.35Toilet 60 2.25
60 1.70
Mummty
T otal 4 6.00
4 6.00
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
53/98
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
54/98
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
55/98
41 Providing and fixing aluminium work for doors, windows and ventilators
and partition with extruded built up standard tubular section/
appropriate Z - sections and other sections of approved make
conforming to IS:733, IS:1285 & IS:1868 fix with wawl plugs and
screws or with fixing clips or with expansion hold fasteners including
necessary filling up of gaps at junctions, at top bottom and sides with
required PVC/neoprene felt etc.Aluminium sections shall be smooth, rust
free, straight, mitred and jointed mechanically wherever required
including cleat angle, aluminium snap breading for glazing/panelling, C.P.
brass/ stainless steel screws all complete as per architectural drawings
and the direction of Engineer-In_Charge ( Glazing and paneling to be
paid for seperately.For shutters of doors, windows & Ventilators
including providing and fixinghinges/pivots and making provision for
fixing of fittings whw\erever required including the cost of PVC /
neoprene gasket required ( Fittings shall be paid for seperately)Anodised aluminium ( anodised transparent or dyed torequired shade
according to IS 1868, minimum anodic coating of grade Ac 15)
PWD S.O.R.21.1.2.1 p.182
42 Providing & fixing glazing in aluminium doors, windows & ventilators
shutters and partition etc. with PVC / neoprene gasket etc. complete as
per the architectural drawings and the directions of engineer -in-
charge. (cost of aluminium snap beading shall be paid in basic item) (a)
With glass panes of 4.0 mm thickness (weight not less than 10.0 kg /
NSOR
UP TO F.F. LVL
W 224 1.20
V 122 0.60
43 Providing and fixing bright finished brass butt hinges with necessary
screws etc. complete : 9.72.3 100x85x5.5 mm (heavy type)
PWD S.O.R.9.7.3 p.52
44 Providing and fixing ISI marked aluminium butt hinges ISI marked
anodised (anodic coating not less than grade AC 10 as per IS : 1868)
transparent or dyed to requi red colour or shade with necessary screws
PWD S.O.R.9.95.3 p.54
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
56/98
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
57/98
52 Providing and fixing hand rail of approved size by welding etc. to steel
ladder railing, balcony railing and staircase railing including applying a
priming coat of approved steel primer. (a) M.S. tube. .(PWD S.O.R. 10.24.1 p. 74)
53 Making plinth protection 50mm thick of cement concrete grade M 10
over 75mm bed of dry metal ballast 40mm nominal size well rammed and
consol idated and fi led wi th sand including finishing the top smooth
(with 20mm nominal size graded stone aggregate.)
(PWD S.O.R. 4.16 p. 17)
TOTAL 1 170.00 1.20
54 40 mm thick stone flooring over 20 mm (average)thick base of cement
mortar 1:5 (1 cement : 5 sand) including pointing with cement mortar1:2 (1 cement : 2 sand) with an admixture of pigment to match the
shade of stone. Red sand stone / White sand stone) 11.25.2 Fine
(PWD S.O.R. 11.25.2 p. 84)
TOTAL 1 170.00 1.20
55 Providing and fixing suspended false ceiling which inlcudes providing and
fixing G.I. channels of size 27x0.5mm thick having one flange of 20mm
and another flange of 30mm fixed along periphery of the ceiling, screws
fixed to brick wall/partition with the help of rawl plugs and screws thesuspending G.I. intermediate channels of size 45mmx0.9mm with two
flanges of 15mm each from the soffit at 1200mm centre in one
direction with steel G.I. hanger of width 25mmx0.5mm thick fixed to
soffit with G.I. cleat and steel rawl plugs fastners ceiling G.I. section of
0.5mm thickness forming hollow knurled wedge of 51.5mm and two
flanges of 26mm each with lips of 10.5 mm are then fixed to the
intermidiate channel with the help of connecting G.I. clips dia 2.64 mm
and in direction perpandicular to the intermidiate channels at 450mm
Tapered edge Gypsum (12.5mm) will be screw fixed to ceiling section
with 25mm dry walls screw at 230mm centre to centre. Screw fixing is
done mechanically either with screw driver or drilling machine with
suitable attachment. Finally the tapered and square edges of the boards
are jointed and finished to a blush finish with requisite jointing
compound, paper tapes, finisher and two coats of primer suitable for
Gypsum plaster board (as per recommended practices of India Gypsum
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
58/98
(PWD S.O.R. 12.37.1 p. 94)
FIRST FLOOR
Rest 1 16.80 14.50
1 8.60 17.15
Bar 1 6.28 9.20
Rec. 1 216.60
SECOND FLOOR
Banq. 1 24.50 21.50
Rec. 1 216.60
Hall 1 17.00 10.78
Rec. 1 13.50 6.00
THIRD FLOOR
Rec. 1 231.00
FOURTH,FIFTH & SIXTH FLOOR
Rec. 3 170.00
56 Providing and fixing in position glass of 1.80 X 1.20 M., 6mm thick of
Saint Gobain/ Moonstone/Glower bell in Blue/ Green/ Gray color of
Anodized section frame of 44 X 44 mm or 63 x 38mm of Jindal/
Hindalco/ Brocka make in 12 gauge with clips of 50 x 25 mm with EPDM
gasket for grip and straightness and 20mm Tape of Birla 3m or
equivalent. Glass to be sealed by silicon sealant of Dow Growing or
NSOR
TOTAL 1 70.00 13.00
57 Providing and laying integral cement based water proofing treatment
including preparation of surface as required for treatment of
roofs,bal conies, terraces etc consi st ing of following operations: a)
Applying a slurry coat of neat cement using 2.75 kg/sqm. of cement
admixed with water proofing compound conforming to IS. 2645 and
approved by Engineer-in-charge over the RCC slab including adjoining wal
ls upto 300mm height including cleaning the surface beforetreatment.
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
59/98
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
60/98
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
61/98
62 Providing and fixing white vitreous china pedestal type water
closet (European type W.C. pan) with seat and lid, 10 litre low
level white P.V.C. flushing cistern with manually controlled device
(handle lever), conforming to IS : 7231, with all fittings and fixtures
complete including cutting and making good the wall s and floors
wherever requi red : 17.2.1 W.C. pan with ISI marked white solid
(PWD S.O.R. 17.2.1 p. 133)
63 Providing and fixing white vitreous china flat back half stall urinal of
size 580x380x350mm with white PVC automatic flushing cistern,
with fittings, standard size C.P. brass flush pipe, spreaderswith unions
and clamps (all in C.P. brass) with waste fitting as per IS : 2556, C.I.
trap with outlet grating and other couplings in C.P. brass including
painting of fittings and cutting and making good the walls and floors
wherever requi red : 17.5.3 Range of three half stall urinals with
10 litre P.V.C. automatic f lushing ci stern
(PWD S.O.R. 17.5.3 p. 134)
64 Providing and fixing white vitreous china wash basin including making all
connections but excluding the cost of fittings : 17.25.1 Flat back wash
basin of size 630x450m(PWD S.O.R. 17.25.1 p. 137)
65 Providing and fixing 600x450 mm beveled edge mirror of superior glass
(of approved quality) complete with 6 mm thick hard board ground fixedto wooden cleats with C.P. brass screw sand washers complete .
(PWD S.O.R. 17.31 p. 138)
66 Providing and fixing PTMT towel rail complete with brackets fixed to
wooden cleats with CP brass screws with concealed fitting arrangement
of approved quality and colour. 17.69.1 450MM long towel rail with
total length of 495mm, 78mm wide and effective height of 88mm,
(PWD S.O.R. 17.69.1 p. 144)
67 Providing and fixing C.P. brass bib cock of approved quality confirming
to IS: 8931 :
(a) 15 mm nominal bore.
(PWD S.O.R. 18.49.1 p. 161)
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
62/98
(b) 20 mm nominal bore
NSOR
68 Providing and fixing C.P brass stop cock (concealed) of standard design
and of approved make confirming to IS : 8931.
(a) 15 mm nominal bore
(PWD S.O.R. 18.52.1 p. 161)
(b) 20 mm nominal bore
NSOR
69 Providing and fixing C.P brass pillar cock of standard design and of
approved make confirming to IS specifications.
(a) 15 mm nominal bore 125 mm long foam flow.
(PWD S.O.R. 18.54 p. 162)
70 Providing and fixing C.P brass base & mixer of standard design and of
a roved make confirmin to IS s ecifications.(a) 15 mm nominal bore .
(PWD S.O.R. 18.55 p. 162)
71 Providing and fixing C.P brass wall mixer of standard design and of
approved make confirming to IS specifications.
(a) 15 mm nominal bore .(PWD S.O.R. 18.56 p. 162)
72 Providing and fixing C.P brass sink mixer of standard design and of
a roved make confirmin to IS s ecifications.(a) 15 mm nominal bore .
(PWD S.O.R. 18.57 p. 162)
73 Providing and fixing Stainless Steel ISI 304 (18/8) kitchen sink as per
IS 13983 with C.I. brackets and 40 mm stainless steel plug including
painting of fittings and brackets, cutting and good the walls
wherever required : 17.10.1 Kitchen sink with drain board
(PWD S.O.R. 17.10.1 p. 136)
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
63/98
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
64/98
(a) 15mm dia.
(PWD S.O.R. 18.10.1 p. 153)
(b) 20mm dia.
(PWD S.O.R. 18.10.2 p. 153)
(c) 40 mm dia.
(PWD S.O.R. 18.10.5 p. 153)
78 Providing and fixing gun metal gate valve with C.I. wheel of approved
ual it (screwed end) :20 mm * (0.75)
(PWD S.O.R. 18.17.2 p. 154)
40 mm * (1.5)(PWD S.O.R. 18.17.5 p. 154)
79 Providing & Laying and jointing glazed stone ware pipes grade "A" with
stuff mixture of cement in Proportion of 1:1 including testing of joints
etc com lete.PWD SOR 19.1.2 p 170
(b) 150 mm dia
80 Providing & Laying cement concrete 1:5:10 ( 1 Cement : 5 Sand : 10
graded stone aggregate 40mm nominal size) around S.W. Pipe including
bed concrete as er standard desi n..PWD SOR 19.2.2 p 170
(b) 150 mm dia
81 Providing and fixing square mouth S.W. gully trap grade A complete with
C.I. grating brick masonry chamber and water tight C.I. cover with
frame of 300x300mm size (in side) the weight of the cover to be not
less than 4.53 Kg. as per standard design. Cement concrete 1:2:4
(PWD SOR I.No.- 19.4.1 p. 170)
(a) 100x100mm. size P type
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
65/98
82 Providing & placing on terrace ( at all floor levels) high designed HDPE
(polyethylene) water storage tank ISI:12701 marked with cover and
suitable locking arrangement and making necessary holes for inlet,
outlet and arrangement and making necessary holes for inlet, outlet and
overflow pipes but without fittings and the base support for tank.
PWD SOR 18.48 p 161
5x2000
83 Constructing brick masonry manholes in cement mortar 1:4(1 cement : 4
sand) R.C.C. top slab with 1 : 2 : 4 (1 Cement : 2 Sand : 4 Graded stone
aggregate, 20 mm nominal size) foundation concrete 1 : 4 : 8 (1 Cement :
4 Sand : 8 Graded stone aggregate, 40 mm nominal size) inside
plastering 12 mm thick with cement mortar 1 : 3 (1 Cement : 3 Sand)
finished with a floating coat of neat cement making channels in cement
concrete 1 : 2 : 4 mix (1 Cement : 2 Sand : 4 Graded stone aggregate, 20
mm nonimal size) neatly finished complete as per standard design with
modular bricks with class desi nation 40.Inside size 90x80 cm and 45 cm deep including C.I. Cover with frame
light duty, 455x610 mm internal diameter total weight of cover and
frame to be not less than 38 kg, weight of cover 23 kg and weight of
PWD SOR 19.7.1 p 171
Chamber 20 Nos
84 Constructing brick masonry manholes in cement mortar 1:4(1 cement : 4
sand) R.C.C. top slab with 1 : 2 : 4 (1 Cement : 2 Sand : 4 Graded stone
aggregate, 20 mm nominal size) foundation concrete 1 : 4 : 8 (1 Cement :
4 Sand : 8 Graded stone aggregate, 40 mm nominal size) inside
plastering 12 mm thick with cement mortar 1 : 3 (1 Cement : 3 Sand)
finished with a floating coat of neat cement making channels in cement
concrete 1 : 2 : 4 mix (1 Cement : 2 Sand : 4 Graded stone aggregate, 20
mm nonimal size) neatly finished complete as per standard design with
modular bricks with class desi nation 40.Inside size 120x80 cm and 90 cm deep including C.I. Cover with frame
medium duty, 500 mm internal diameter total weight of cover and frame
to be not less than 116 kg, weight of cover 58 kg and weight of frame
58 kg.
PWD SOR 19.7.2 p 171
Chamber 20 Nos
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
66/98
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
67/98
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
68/98
200.00
200.00 49.00/Cum 9800.00
0.80 524.80
0.65 60.94
0.65 6.05
0.40 47.32
0.30 50.132.10 5.48
2.10 5.80
2.10 53.24
2.50 49.20
2.50 11.20
2.50 1.40
0.40 159.12
0.15 265.50
0.18 318.60
0.15 4.73
0.15 2.03
0.15 2.03
1567.54 3936/Cum 6169835.47
135357.04 42.00/Kg 5684995.50
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
69/98
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
70/98
31.50
13.50
13.50
58.50 248.00/Sqm 14508.00
1770.00
1770.00 670.00/Sqm 1185900.00
15.75
40.50
9.00
65.25 1099/Sqm 71709.75
1770.00
1770.00 100.00/Sqm 177000.00
2.50 422.50
422.50 80.00/Sqm 33800.00
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
71/98
2192.50 46.00/Sqm 100855.00
1770.001770.00 132.00/Sqm 233640.00
8.50 167.28
8.50 38.08
8.50 4.76
12.00 178.56
12.00 38.40
12.00 6.72
23.00 60.03
23.00 63.48
2.40 1.54
0.40 477.36
0.40 528.00
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
72/98
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
73/98
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
74/98
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
75/98
2.10 220.50
2.60 299.00
2.60 312.00
2.60 832.00
2.60 3276.00
4939.50
2.40 17.28
2.10 80.64
2.10 254.10
2.10 183.12
0.90 65.88
601.02
4338.48 302.80/Sqm 1313691.74
77.28
73.08
150.36 2515/Sqm 378155.40
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
76/98
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
77/98
24.00
420.00 1099/Sqm 461580.00
97.30
52.80
74.80
30.4015.40
12.30
11.89
13.73
13.50
15.75
20.25
26.10
73.08
627.46
228.81
147.49
45.58
57.66
209.00
251.16
44.88
18.3040.20
40.80
467.10
183.60
81.00
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
78/98
524.88
69.00
312.80
44.88
18.30
32.90
10.20
593.15
209.88
265.50
295.47
45.00
18.30
30.6052.26
60.64
70.35
51.75
59.73
51.48
42.50
204.50
422.10
45.00
18.30
30.60
52.26
60.64
70.35
51.75
59.7351.48
42.50
204.50
422.10
45.00
18.30
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
79/98
30.60
52.26
60.64
70.35
51.75
59.73
51.48
42.50
204.50
422.10
45.00
18.30
30.60
52.2660.64
70.35
51.75
8933.81 868/Sqm 7754546.21
915.00
915.00 958/Sqm 876570.00
1700.00
25.50
156.18
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
80/98
210.65
52.80
331.55
186.49
2663.16 670.00/Sqm 1784317.20
5100.00
4800.00
72.00
9972.00 100.00/Sqm 997200.00
2.50 170.00
2.50 67.50
2.50 33.50
2.50 30.00
2.50 68.50
2.50 57.00
2.50 122.90
2.50 174.50
2.50 44.00
2.50 44.00
2.50 42.50
2.50 35.90
2.50 22.502.50 20.00
2.50 38.00
2.50 17.50
2.50 22.00
2.50 22.50
2.50 22.00
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
81/98
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
82/98
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
83/98
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
84/98
3.00 124.20
3.00 15.00
3.00 93.60
3.00 40.20
3.00 108.60
3.00 40.20
3.00 126.00
3.00 40.20
3.00 405.00
3.00 306.00
3.00 108.60
3.00 39.60
3.00 93.60
3.00 39.603.00 102.00
3.00 7.50
3.00 402.00
3.00 756.00
3.00 45.00
3.00 36.00
3.00 171.90
3.00 36.00
3.00 18.30
3.00 36.00
3.00 31.20
3.00 124.20
3.00 15.00
3.00 93.60
3.00 40.20
3.00 108.60
3.00 40.20
3.00 126.00
3.00 40.203.00 405.00
3.00 306.00
2.40 57.60
2.40 57.60
16748.66
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
85/98
2.40 17.28
2.10 80.64
2.10 228.69
2.10 183.12
1.20 322.56
0.90 65.88
898.17
15850.49 80.00/Sqm 1268039.20
8.50 1436.50
14.00 2730.00
2.40 115.20
4281.70 93.00/Sqm 398198.10
25822.49 93.00/Sqm 2401491.57
25822.49 46.00/Sqm 1187834.54
4281.70 59.00/Sqm 252620.30
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
86/98
0.08 0.12
0.08 0.06
0.08 1.08
0.08 0.31
0.08 4.07
0.08 0.97
0.08 3.66
0.08 0.70
10.95 59629/Cum 652866.00
2.40 41.47
2.10 193.54
2.10 609.84
2.10 439.49
1284.34 56.00/Sqm 71922.82
2.40 17.28
2.10 80.64
2.10 254.10
2.10 183.12
535.14 1593/Sqm 852478.02
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
87/98
4000.00 236.00/Kg 944000.00
1.20 322.56
0.90 65.88
388.44 450.00/Sqm 174798.00
210.00 432.00/Each 90720.00
2800.00 67.00/Each 187600.00
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
88/98
300.00 135.00/Each 40500.00
300.00 64.00/Each 19200.00
500.00 59.00/Each 29500.00
530.00 49.00/Each 25970.00
270.00 38.00/Each 10260.00
170.00 710.00/Each 120700.00
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
89/98
5000.00 44.70/Kg 223500.00
4000.00 68.00/Kg 272000.00
204.00
204.00 332.00/Sqm. 67728.00
204.00
204.00 361.00/Sqm. 73644.00
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
90/98
243.60
147.49
57.78
216.60
526.75
216.60
183.26
81.00
231.00
510.002414.08 592.00/Sqm 1429132.99
910.00910.00 2500/Sqm. 2275000.00
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
91/98
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
92/98
25.00 241/Each 6025.00
25.00 422/Each 10550.00
50.00 159/Each 7950.00
50.00 213/Each 10650.00
50.00 268/Each 13400.00
50.00 399/Each 19950.00
400.00 45/Metre 18000.00
400.00 51/Metre 20400.00
5.00 2468/Each 12340.00
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
93/98
120.00 2310/Each 277200.00
10.00 8234/Each 82340.00
125.00 782/Each 97750.00
130.00 717/Each 93210.00
130.00 312/Each 40560.00
125.00 313/Each 39125.00
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
94/98
125.00 350/Each 43750.00
125.00 313/Each 39125.00
125.00 350/Each 43750.00
125.00 501/Each 62625.00
125.00 1637/Each 204625.00
20.00 1893/Each 37860.00
10.00 1637/Each 16370.00
10.00 4885/Each 48850.00
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
95/98
125.00 529/Each 66125.00
350.00 98/Metre 34300.00
500.00 116/Metre 58000.00
100.00 275/Metre 27500.00
350.00 155/Metre 54250.00
500.00 176/Metre 88000.00
100.00 277/Metre 27700.00
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
96/98
50.00 106/Metre 5300.00
40.00 134/Metre 5360.00
50.00 264/Metre 13200.00
10.00 245/Each 2450.00
5.00 399/Each 1995.00
200.00 152.00/Rm 30400.00
200.00 405.00/Rm 81000.00
25.00 935/Each 23375.00
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
97/98
100000.00 5.00/Ltr 500000.00
20.00 5384/Each 107680.00
20.00 11882/Each 237640.00
85823849.93TOTAL (A)
-
7/30/2019 4 COR 92 LACS B1 16 JAN 2011
98/98
12873577.49
TOTAL (B) 98697427.43
8882768.47
TOTAL (C) 107580195.89
3765306.86
111345502.75
111346000
GRAND TOTAL
SAY