    S.No. Items Qty. Rate/Unit

    1 2 3 4

    1 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in over areas

    foundation trenches or drains ( not exceeding 1.5 m in width or 10 Sqm on plan) including dressing of sides

    and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus

    excavated soil asdirected, with in lead of 50 m. All Kind of soil.

    (PWD S.O.R. 2.6.1 p.4)1700.00 107.00/Cum

    2 Excavation work in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including

    dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and

    disposal of surplus excavated soils as directed,within a lead of 50m.

    Ordinary Rock (S.O.R. 2.7.3. Hard rock(blasting probhited)

    450.00 364.00/Cum

    3 Providing and laying in foundation, plinth and under floor cement concrete with 40 mm. nominal size

    graded stone aggregates including ramming in layer and curing complete excluding cost of form work. (C)

    M-10

    (PWD S.O.R. 4.1.2.3 p. 15)

    150.00 2833/Cum

    4 Filling from available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layer

    not exceeding 20 cm. in depth consolidating each deposited layer by ramming and watering with a leadupto 50 m. and lift upto 1.5m.

    (PWD S.O.R. 2.24 p. 7)

    105.00 49.00/Cum

    5 Providing and laying in position specified grade of reinforced cement concrete (with 20mm nominal size

    graded stone aggregate) excluding the cost of centering, shuttering and reinforcement all work up to plinth

    level. M-20 Nominal mix.

    (S.O.R. 5.1.1 p. 20)

    870.00 3936/Cum

    6 Providing and placing in position cold twisted steel and hot rolled deformed steel reinforcement for R.C.C.

    work including cutting, bending, binding etc. complete as per drawings including cost of binding wire and

    including all wastages etc. complete.

    (PWD S.O.R. 8 p. 24)

    GORISHANKAR CONSTRUCTION KHASRA -

    1414,1415/1 ,AT VILLAGE DATIYA,

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    2/98

    S.No. Items Qty. Rate/Unit

    1 2 3 4

    7600.00 42.00/Kg

    6 Kota / cuddapah stone slab flooring over 20 mm (average) thick base laid over and jointed with grey

    cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing

    complete with base of cement mortar 1 : 4 (1 cement : 4 sand) : 11.23.1 25 mm thick. .

    PWD S.O.R.11.23.1 p. 83

    960.00 670.00/Sqm

    7 Marble stone flooring wi th 16 mm thick marble stone (sample of marble shall be approved by Engineer-in-

    charge) over 20 mm (average) thick base of cement mortar 1:4 (1 cement:4 sand)laid and jointed with grey

    cement slurry including rubbing and polishing complete with : (Area of Slabs over 0.50sqm) . Udaipur /Baroda green marble. Extra for marble stone flooring in treads of steps and risers using single length up to

    2.00 meter.

    PWD S.O.R. 11.21.5 p. 83 + 11.22 p. 83

    40.00 1099/Sqm

    8 6 mm thick cement plaster 1 : 3 (1 cement : 3 sand) finished with a floating coat of neat cement and a

    thick coat of lime wash on top of wall when dry for bearing of R.C.C. slab and beam.

    (S.O.R.13.9 p. 99)

    710.00 100.00/Sqm

    9 12 mm thick cement plaster on brick wall. In Cement Mortar 1:6 (1 Cement : 6 Sand)

    (PWD S.O.R. 13.1.2 p. 99)

    200.00 80.00/Sqm

    10 Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: (a)

    New work (two or more coats)

    (PWD S.O.R. 13.48.1 p. 104)

    Qty. same as (6mmplaster + 12mm plaster) 290.00 46.00/Sqm

    395.00 11882/Each

    TOTAL ESTIMATED COST Rs. TEN LACS ONLY.

    TOTAL(A)

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    3/98

    S.No. Items Qty. Rate/Unit

    1 2 3 4

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    4/98

    S.No. Items Qty. Rate/Unit

    1 2 3 4

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    5/98

    S.No. Items Qty. Rate/Unit

    1 2 3 4

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    6/98

    S.No. Items Qty. Rate/Unit

    1 2 3 4

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    7/98

    S.No. Items Qty. Rate/Unit

    1 2 3 4

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    8/98

    S.No. Items Qty. Rate/Unit

    1 2 3 4

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    9/98

    S.No. Items Qty. Rate/Unit

    1 2 3 4

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    10/98

    S.No. Items Qty. Rate/Unit

    1 2 3 4

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    11/98

    S.No. Items Qty. Rate/Unit

    1 2 3 4

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    12/98

    S.No. Items Qty. Rate/Unit

    1 2 3 4

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    13/98

    S.No. Items Qty. Rate/Unit

    1 2 3 4

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    14/98

    S.No. Items Qty. Rate/Unit

    1 2 3 4

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    15/98

    S.No. Items Qty. Rate/Unit

    1 2 3 4

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    16/98

    S.No. Items Qty. Rate/Unit

    1 2 3 4

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    17/98

    S.No. Items Qty. Rate/Unit

    1 2 3 4

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    18/98

    Amount

    5

    181900.00

    163800.00

    424950.00

    5145.00

    3424320.00

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    19/98

    Amount

    5

    319200.00

    643200.00

    43960.00

    71000.00

    16000.00

    13340.00

    4693390.00

    10000205.00

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    20/98

    Amount

    5

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    21/98

    Amount

    5

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    22/98

    Amount

    5

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    23/98

    Amount

    5

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    24/98

    Amount

    5

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    25/98

    Amount

    5

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    26/98

    Amount

    5

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    27/98

    Amount

    5

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    28/98

    Amount

    5

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    29/98

    Amount

    5

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    30/98

    Amount

    5

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    31/98

    Amount

    5

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    32/98

    Amount

    5

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    33/98

    Amount

    5

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    34/98

    Amount

    5

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    35/98

    .No Items No. L B

    1 2 3 4 5A WORK UP TO STILT FLOOR LVL.

    1 Earth work in excavation by mechanical means (Hydraulic excavator) /

    manual means in over areas foundation trenches or drains ( not

    exceeding 1.5 m in width or 10 Sqm on plan) including dressing of sides

    and ramming of bottoms, lift up to 1.5 m, including getting out the

    excavated soil and disposal of surplus excavated soil asdirected, with in

    (PWD S.O.R. 2.6.1 p.4)

    Total 1 1770.00

    2 Excavation work in foundation trenches or drains not exceeding 1.5 m in

    width or 10 sqm on plan including dressing of sides and ramming of

    bottoms lift upto 1.5 m, including getting out the excavated soil and

    disposal of surplus excavated soils as directed,within a lead of 50m.

    Ordinary Rock (S.O.R. 2.7.3. Hard rock(blasting probhited)

    Footing - F1 41 4.20 4.20

    Footing - F2 15 2.70 2.70

    Footing - CF1 1 6.20 1.75

    Retaining Wall 1 169.00 0.90

    3 Providing and laying in foundation, plinth and under floor cement

    concrete with 40 mm. nominal size graded stone aggregates including

    ramming in layer and curing complete excluding cost of form work. (C)

    -(PWD S.O.R. 4.1.2.3 p. 15)

    Footing - F1 41 4.20 4.20

    Footing - F2 15 2.70 2.70

    Footing - CF1 1 6.20 1.75

    Retaining Wall 1 169.00 0.90

    Total Floor area 1 1770.00

    4 Filling from available excavated earth (excluding rock) in trenches,

    plinth, sides of foundation etc. in layer not exceeding 20 cm. in depth

    consolidating each deposited layer by ramming and watering with a lead

    (PWD S.O.R. 2.24 p. 7)

    ESTIMATE FOR CONSTRUCTION OF PROPOSED HOTEL BUILDI

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    36/98

    5 Providing and laying in position specified grade of reinforced cement

    concrete (with 20mm nominal size graded stone aggregate) excluding

    the cost of centering, shuttering and reinforcement all work up to

    plinth level. M-20 Nominal mix.

    (S.O.R. 5.1.1 p. 20)

    FOOTINGS

    Footing - F1 41 4.00 4.00

    Footing - F2 15 2.50 2.50

    Footing - CF1 1 6.00 1.55

    Retaining Wall 1 169.00 0.70

    TIE BEAM

    Total 1 557.00 0.30Lift wall -1 1 17.40 0.15

    Lift wall -2 2 9.20 0.15

    Retaining Wall 1 169.00 0.15

    COLUMNS UP TO STILT FLOOR LVL.

    C1 41 0.60 0.80

    C2 14 0.40 0.80

    C3 7 0.20 0.40

    BEAMS UP TO STILT FLOOR LVL.

    Total 1 663.00 0.60

    SLAB

    At Basement Floor Lvl. 1 1770.00

    At Stilt Floor Lvl. 1 1770.00

    STAIRCASE UP TO STILT FLOOR LVL.

    Flight 6 3.50 1.50

    Steps 30 1.50 0.30

    Landing 3 1.50 3.00

    6 Providing and placing in position cold twisted steel and hot rolled

    deformed steel reinforcement for R.C.C. work including cutting, bending,binding etc. complete as per drawings including cost of binding wire and

    (PWD S.O.R. 8 p. 24)

    7 Centering and shuttering including Strutting, staging.propping etc.

    Complete and including its removal of form for

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    37/98

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    38/98

    STAIRCASE UP TO STILT FLOOR LVL.

    Flight 6 3.50 1.50

    Steps 30 1.50 0.30

    Landing 3 1.50 3.00

    11 Kota / cuddapah stone slab flooring over 20 mm (average) thick base

    laid over and jointed with grey cement slurry mixed with pigment to

    match the shade of the slab including rubbing and polishing

    complete with base of cement mortar 1 : 4 (1 cement : 4 sand) :

    PWD S.O.R.11.23.1 p. 83

    BASEMENT FLOOR

    Total 1 1770.00

    12 Marble stone flooring wi th 16 mm thick marble stone (sample of marbleshall be approved by Engineer-in-charge) over 20 mm (average) thick

    base of cement mortar 1:4 (1 cement:4 sand)laid and jointed with grey

    cement slurry including rubbing and polishing complete with : (Area of

    Slabs over 0.50sqm) . Udaipur / Baroda green marble. Extra for marble

    stone flooring in treads of steps and risers using single length up to

    PWD S.O.R. 11.21.5 p. 83 + 11.22 p. 83

    UP TO STILT FLOOR LVL

    Staircase No. - 1,2,3 - Landing 3 3.50 1.50

    Staircase No. - 1,2,3 - Steps 60 1.50 0.45

    Skirting 3 20.00 0.15

    13 6 mm thick cement plaster 1 : 3 (1 cement : 3 sand) finished with a

    floating coat of neat cement and a thick coat of lime wash on top of wall

    when dr for bearin of R.C.C. slab and beam.(S.O.R.13.9 p. 99)

    UP TO STILT FLOOR LVL

    TOTAL 1 1770.00

    14 12 mm thick cement plaster on brick wall. In Cement Mortar 1:6 (1Cement : 6 Sand(PWD S.O.R. 13.1.2 p. 99)

    UP TO STILT FLOOR LVL

    On retaining wall 1 169.00

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    39/98

    15 Wall painting with plastic emulsion paint of approved brand and

    manufacture to give an even shade: (a) New work (two or more coats)

    (PWD S.O.R. 13.48.1 p. 104)

    Qty. same as (6mmplaster + 12mm plaster)

    16 Preconstruction curative Cum. preventive antitermite treatment of the

    building under construction by providing (i) surface reatment by

    spreading emul sion over the pl inth area before aying the base concrete

    under floors @ 5.0 litres/Sqm.(ii) Pumping the emul sion in plinth

    masonry on fi lling side at f loor unction @ 7.5 li tres/Sqm. (iii )

    Pumping the emul sion from outer side of the plinth below ground

    alround the masonry @ 5.0 litres/Sqm as per I.S. 8944 Emulsion.

    (1Chlorpyrifos: 19 water) with five years service guarantee

    (S.O.R. 2.31 p.8)

    Total floor area 1 1770.00

    B WORK IN SUPERSTRUCTURE

    17 Reinforced cement concrete work in walls ( any thickness) including

    attatched pilasters, plinth and string courses, fillets, columns, pillars,

    posts and struts suspended floor roof slab, beams etc. up to floor two

    level excluding cost of centering, shuttering, finishing and

    reinforcement. M20 Nominal mix ( with 20 mm nominal size graded

    (PWD S.O.R. 5.2.1 p. 20)

    COLUMN STILT FLOOR LVL. TO 3rd FLOOR LVL.C1 41 0.60 0.80

    C2 14 0.40 0.80

    C3 7 0.20 0.40

    COLUMN 3rd FLOOR.LVL. TO TERRACE

    C1 31 0.60 0.80

    C2 10 0.40 0.80

    C3 7 0.20 0.40

    LIFT

    Lift wall -1 1 17.40 0.15

    Lift wall -2 2 9.20 0.15

    COLUMN TO TERRACE TO MUMMTY LVL.Column - C3 8 0.20 0.40

    FLOOR BEAMS UP TO 3rd FLOOR LVL.

    TOTAL 3 663.00 0.60

    FLOOR BEAMS 3rd FLOOR LVL. TO TERRACE

    TOTAL 4 550.00 0.60

    FLOOR BEAMS TERRACE TO MUMMTY

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    40/98

    TOTAL 2 24.00 0.20

    SLAB UP TO 3rd FLOOR LVL.

    TOTAL 3 1770.00

    SLAB 3rd FLOOR LVL.TO TERRACE

    TOTAL 4 1200.00

    SLAB OF MUMMTYTOTAL 2 6.00 6.00

    LINTEL UP TO TERRACE LVL.

    D 3 2.70 0.20

    D1 32 1.50 0.20

    D2 121 1.20 0.20

    D3 110 1.10 0.20

    W 8 1.50 0.20

    W1 225 1.50 0.20

    V 125 0.90 0.20

    LINTEL BEND UP TO TERRACE LVL.

    TOTAL 1 1200.00 0.20

    18 Reinforced cement concrete work in beams,suspended floors, roofs,

    having slope of any degree landings, balconies, shelves, chajjas, lintels,

    bands, plain windows sills, staircases and spiral staircases up to floor

    two level excluding cost of centering, shuttering, finishing and

    reinforcement in concrete grade. M20 Nominal mix ( with 20 mm

    nominal size graded stone aggregate)

    (PWD S.O.R. 5.3.1 p. 20)

    STAIRCASE STILT FLOOR LVL.TO 3rd FLOOR LVL.Flight 18 3.50 1.50

    Steps 90 1.50 0.30

    Landing 9 1.50 3.00

    STAIRCASE 3rd FLOOR LVL.To TERRACE

    Flight 16 3.50 1.50

    Steps 120 1.50 0.30

    Landing 12 1.50 3.00

    19 Providing and placing in position cold twisted steel and hot rolled

    deformed steel reinforcement for R.C.C. work including cutting, bending,

    binding etc. complete as per drawings including cost of binding wire and

    including all wastages etc. complete.

    (PWD S.O.R. 8 p. 24)

    20 Centering and shuttering including Strutting, staging.propping etc.

    Complete and including its removal of form for

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    41/98

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    42/98

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    43/98

    (S.O.R. 6.11.2 p. 28)

    STILT FLOOR 1 105.00

    1st FLOOR 1 115.00

    2nd FLOOR 1 120.00

    3rd FLOOR 1 320.00

    4th FLOOR to 6th FLOOR 3 420.00

    DEDUCTION

    D 3 2.40

    D1 32 1.20

    D2 121 1.00

    D3 109 0.80

    V 122 0.60

    25 Providing & fixing 16mm thick gang saw cut mirror polished premoulded

    and polished machine cut for kitchen platforms vanity counters, window

    sills, facias and similar locations of required size of approved shade,

    colour and texture laid over 20mm thick base cement mortar 1:4

    (1Cement : 4 Sand) with joints treated with white cement mixed with

    matching pigment, epoxy touch ups, including rubbing, curing, moulding

    and polishing to edge to give high gloss finish etc. complete at all levels

    (Sample to be got approved by Engineer-In-Charge. Granite of any

    (a) Area of slab up to 0.50 sqm but not less than 0.30 sqm.(S.O.R. 8.2.2.1 p. 38)

    For Lift

    Lift No. 2&3 16 2.30 2.10

    Lift No.1 6 5.80 2.10

    26 Providing & fixing 16mm thick gang saw cut mirror polished premoulded

    and polished machine cut for kitchen platforms vanity counters, window

    sills, facias and similar locations of required size of approved shade,

    colour and texture laid over 20mm thick base cement mortar 1:4

    (1Cement : 4 Sand) with joints treated with white cement mixed with

    matching pigment, epoxy touch ups, including rubbing, curing, moulding

    and polishing to edge to give high gloss finish etc. complete at all levels

    (Sample to be got approved by Engineer-In-Charge. Granite of any

    (b) Area of slab over 0.50 sqm

    (S.O.R. 8.2.2.2 p. 38)

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    44/98

    Kitchen Platform

    Stilt 1 8.00 0.75

    1st Floor 1 22.80 0.75

    27 Providing and laying 1st quality Ceramic glazed wall tiles conforming to

    IS : 15622 (6-7 mm thickness)of aooroved make in all colours, shades

    except burgundy, bottle green, black of any size as approved by

    Engineer-In_Charge in skirting, risers of steps and dados over 12mm

    thick bed of cement mortar 1:3 (1cement : 3 sand) and jointing with grey

    cement slurry @ 3.3 kg per sqm. including pointing in white cement

    mixed with pigment of matching shade complete.

    PWD S.O.R. 11.31 p. 84

    Kitchen dado 1 35.00 1.50

    Service & bar Counter 1 50.00 1.50

    Toilet stilt floor 1 17.80 2.10Toilet 1st floor 2 16.10 2.10

    Toilet 2nd floor 2 16.10 2.10

    Toilet 3rd floor 20 7.10 2.10

    Toilet 4th floor 30 7.10 2.10

    Toilet 5th floor 30 7.10 2.10

    Toilet 6th floor 30 7.10 2.10

    28 Marble stone flooring wi th 16 mm thick marble stone (sample of marble

    shall be approved by Engineer-in-charge) over 20 mm (average) thick

    base of cement mortar 1:4 (1 cement:4 sand)laid and jointed with grey

    cement slurry including rubbing and polishing complete with : (Area of

    Slabs over 0.50sqm) . Udaipur / Baroda green marble. Extra for marble

    stone flooring in treads of steps and risers using single length up to

    PWD S.O.R. 11.21.5 p. 83 + 11.22 p. 83

    STAIRCASE UP TO TERRACE

    STAIRCASE UP TO STILT FLOOR LVL.

    Steps 20 1.50 0.45

    Landing 1 1.50 3.00

    STAIRCASE STILT FLOOR LVL.TO 3rd FLOOR LVL.

    Steps 180 1.50 0.45

    Landing 9 1.50 3.00

    STAIRCASE 3rd FLOOR LVL.To TERRACE

    Steps 240 1.50 0.45

    Landing 12 1.50 3.00

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    45/98

    SKIRTING 8 20.00 0.15

    29 Providing and laying polished vitrified floor tiles in different sizes of 10

    mm thickness with water absorbtion's less than 0.08% and confirming

    to IS 15622 of approved make in all colours and shades, laid on 20 mm

    thick cement mortar 1:4 (1 cement :4 sand) including grouting the joints

    with white cement and matching pigments etc. complete.

    (a) Size of tiles 50x50 cm.

    PWD S.O.R. 11.34.2 p. 85

    STILT FLOOR

    BMC 1 3.50 27.80

    1 8.80 6.00

    Waiting 1 8.50 8.80

    Staff 1 4.00 7.60Kit. 1 3.50 4.40

    Pass. 1 8.20 1.50

    Maint. 1 4.10 2.90

    1 3.05 4.50

    Unifor. 1 3.00 4.50

    A/c 1 3.50 4.50

    Main. 1 4.50 4.50

    Plant 1 5.80 4.50

    Rec. 1 12.08 6.05

    FIRST FLOOR

    Bank 1 13.70 45.80

    Rest. 1 15.78 14.50

    1 8.60 17.15

    S/C 1 8.60 5.30

    Bar. 1 6.20 9.30

    Kit. 1 209.00 1.00

    Rec. 1 251.16 1.00

    AHU 1 7.48 6.00

    Ser. 1 6.00 3.05Toi. 2 6.00 3.35

    Office 1 6.00 6.80

    SECOND FLOOR

    Office 1 13.50 34.60

    Hall 1 17.00 10.80

    1 13.50 6.00

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    46/98

    Banq 1 24.30 21.60

    Ser. 1 69.00 1.00

    Atrium 1 312.80 1.00

    S/c 1 7.48 6.00

    Ser. 1 6.00 3.05

    Toi. 2 4.70 3.50

    Pass. 1 6.80 1.50

    THIRD FLOOR

    Swim. Pool 1 593.15 1.00

    Health 1 13.20 15.90

    Atrium 1 265.50 1.00

    Rooms 14 3.35 6.30

    S/c 1 7.50 6.00

    House 1 6.00 3.05

    S/c 1 6.00 5.10Rooms 2 7.80 3.35

    Rooms 2 9.05 3.35

    Rooms 2 10.50 3.35

    Pass. 1 2.50 20.70

    FOURTH FLOOR

    Rooms 2 3.30 9.05

    Rooms 2 3.30 7.80

    Pass. 1 17.00 2.50

    Atrium 1 204.50 1.00

    Rooms 20 3.35 6.30

    S/c 1 7.50 6.00

    House 1 6.00 3.05

    S/c 1 6.00 5.10

    Rooms 2 7.80 3.35

    Rooms 2 9.05 3.35

    Rooms 2 10.50 3.35

    Pass. 1 2.50 20.70

    FIFTH FLOOR

    Rooms 2 3.30 9.05Rooms 2 3.30 7.80

    Pass. 1 17.00 2.50

    Atrium 1 204.50 1.00

    Rooms 20 3.35 6.30

    S/c 1 7.50 6.00

    House 1 6.00 3.05

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    47/98

    S/c 1 6.00 5.10

    Rooms 2 7.80 3.35

    Rooms 2 9.05 3.35

    Rooms 2 10.50 3.35

    Pass. 1 2.50 20.70

    SIXTH FLOOR

    Rooms 2 3.30 9.05

    Rooms 2 3.30 7.80

    Pass. 1 17.00 2.50

    Atrium 1 204.50 1.00

    Rooms 20 3.35 6.30

    S/c 1 7.50 6.00

    House 1 6.00 3.05

    S/c 1 6.00 5.10

    Rooms 2 7.80 3.35Rooms 2 9.05 3.35

    Rooms 2 10.50 3.35

    Pass. 1 2.50 20.70

    30 Providing and laying polished vitrified floor tiles in different sizes of 10

    mm thickness with water absorbtion's less than 0.08% and confirming

    to IS 15622 of approved make in all colours and shades, laid on 20 mm

    thick cement mortar 1:4 (1 cement :4 sand) including grouting the joints

    with white cement and matching pigments etc. complete.

    (a) Size of tiles AS per Engineer In Charge

    PWD S.O.R. 11.34.1 p. 85

    UP TO TERRACE LVL.

    Skirting 1 6100.00 0.15

    31 Kota / cuddapah stone slab flooring over 20 mm (average) thick base

    laid over and jointed with grey cement slurry mixed with pigment to

    match the shade of the slab including rubbing and polishing

    complete with base of cement mortar 1 : 4 (1 cement : 4 sand) :

    PWD S.O.R.11.23.1 p. 83

    Baement 1 1700.00

    Skirting 1 170.00 0.15

    Stilt floor

    Parking for BMC 1 13.70 11.40

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    48/98

    Porch 1 15.10 13.95

    1 6.00 8.80

    Parking for Hotel 1 9.50 34.90

    1 15.10 12.35

    32 6 mm thick cement plaster 1 : 3 (1 cement : 3 sand) finished with a

    floating coat of neat cement and a thick coat of lime wash on top of wall

    when dry for bearing of R.C.C. slab and beam.

    (S.O.R.13.9 p. 99)

    UP TO THIRD FLOOR LVL

    Total 3 1700.00

    UP TO THIRD FLOOR LVL

    Total 4 1200.00

    Mummty

    Total 2 36.00

    33 12 mm thick cement plaster on brick wall. In Cement Mortar 1:6 (1

    Cement : 6 Sand)

    (PWD S.O.R. 13.1.2 p. 99)

    STILT FLOOR

    BMC 2 34.00

    2 13.50

    S/C 2 6.70

    2 6.00

    Parking 2 13.70

    2 11.40

    Parking 2 24.58

    2 34.90

    ramp 2 8.80

    waiting 2 8.80

    2 8.50

    maint. 2 7.18

    2 4.50Staff 2 4.00

    2 7.60

    pass. 2 3.50

    2 4.40

    Toi. 2 4.50

    2 4.40

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    49/98

    Rec. 2 12.08

    2 6.05

    AHU 2 3.50

    2 2.50

    Uni. 2 3.00

    2 4.50

    A/C 2 3.50

    2 4.50

    Main. 2 4.50

    2 4.50

    Plant. 2 5.80

    2 4.50

    FIRST FLOOR

    Bank 2 13.70

    2 45.80S/c 2 4.20

    1 1.50

    Kit 1 94.30

    Rec. 1 73.40

    Rest. 2 24.30

    1 17.15

    S/c 2 8.60

    2 5.30

    S/c 2 7.48

    2 6.00

    AHU 2 3.50

    2 2.50

    Ser. 2 6.00

    2 3.05

    Toi. 4 4.70

    4 3.35

    pass. 2 6.80

    2 1.50

    Office 2 6.002 6.80

    SECOND FLOOR

    Office 2 13.50

    2 34.60

    S/c 2 4.20

    2 3.00

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    50/98

    Hall 2 17.00

    2 10.80

    2 13.50

    2 6.00

    Ser. 1 48.30

    Atrium 1 82.40

    Banq. 2 24.40

    2 21.60

    S/c 2 7.48

    2 6.00

    Ser. 2 6.00

    2 3.05

    Toi. 4 4.70

    4 3.35

    Pass. 2 6.802 1.50

    THIRD FLOOR

    Health 2 13.20

    2 16.00

    Rooms 28 3.35

    28 6.30

    S/c 2 7.50

    2 6.00

    Atrium 1 71.00

    House 2 6.00

    2 3.05

    S/c 2 6.00

    2 5.20

    Corr. 2 20.70

    2 2.50

    Rooms 4 7.80

    4 3.35

    Rooms 4 9.05

    4 3.35Rooms 4 10.50

    4 3.35

    Toilet 42 2.25

    42 1.70

    FOURTH FLOOR

    Rooms 4 9.05

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    51/98

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    52/98

    Corr. 2 20.70

    2 2.50

    Rooms 4 7.80

    4 3.35

    Rooms 4 9.05

    4 3.35

    Rooms 4 10.50

    4 3.35

    Toilet 60 2.25

    60 1.70

    SIXTH FLOOR

    Rooms 4 9.05

    4 3.30

    Rooms 4 7.80

    4 3.30Pass. 2 17.00

    1 2.50

    Rooms 40 3.35

    40 6.30

    S/c 2 7.50

    2 6.00

    Atrium 1 57.30

    House 2 6.00

    2 3.05

    S/c 2 6.00

    2 5.20

    Corr. 2 20.70

    2 2.50

    Rooms 4 7.80

    4 3.35

    Rooms 4 9.05

    4 3.35

    Rooms 4 10.50

    4 3.35Toilet 60 2.25

    60 1.70

    Mummty

    T otal 4 6.00

    4 6.00

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    53/98

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    54/98

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    55/98

    41 Providing and fixing aluminium work for doors, windows and ventilators

    and partition with extruded built up standard tubular section/

    appropriate Z - sections and other sections of approved make

    conforming to IS:733, IS:1285 & IS:1868 fix with wawl plugs and

    screws or with fixing clips or with expansion hold fasteners including

    necessary filling up of gaps at junctions, at top bottom and sides with

    required PVC/neoprene felt etc.Aluminium sections shall be smooth, rust

    free, straight, mitred and jointed mechanically wherever required

    including cleat angle, aluminium snap breading for glazing/panelling, C.P.

    brass/ stainless steel screws all complete as per architectural drawings

    and the direction of Engineer-In_Charge ( Glazing and paneling to be

    paid for seperately.For shutters of doors, windows & Ventilators

    including providing and fixinghinges/pivots and making provision for

    fixing of fittings whw\erever required including the cost of PVC /

    neoprene gasket required ( Fittings shall be paid for seperately)Anodised aluminium ( anodised transparent or dyed torequired shade

    according to IS 1868, minimum anodic coating of grade Ac 15)

    PWD S.O.R.21.1.2.1 p.182

    42 Providing & fixing glazing in aluminium doors, windows & ventilators

    shutters and partition etc. with PVC / neoprene gasket etc. complete as

    per the architectural drawings and the directions of engineer -in-

    charge. (cost of aluminium snap beading shall be paid in basic item) (a)

    With glass panes of 4.0 mm thickness (weight not less than 10.0 kg /

    NSOR

    UP TO F.F. LVL

    W 224 1.20

    V 122 0.60

    43 Providing and fixing bright finished brass butt hinges with necessary

    screws etc. complete : 9.72.3 100x85x5.5 mm (heavy type)

    PWD S.O.R.9.7.3 p.52

    44 Providing and fixing ISI marked aluminium butt hinges ISI marked

    anodised (anodic coating not less than grade AC 10 as per IS : 1868)

    transparent or dyed to requi red colour or shade with necessary screws

    PWD S.O.R.9.95.3 p.54

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    56/98

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    57/98

    52 Providing and fixing hand rail of approved size by welding etc. to steel

    ladder railing, balcony railing and staircase railing including applying a

    priming coat of approved steel primer. (a) M.S. tube. .(PWD S.O.R. 10.24.1 p. 74)

    53 Making plinth protection 50mm thick of cement concrete grade M 10

    over 75mm bed of dry metal ballast 40mm nominal size well rammed and

    consol idated and fi led wi th sand including finishing the top smooth

    (with 20mm nominal size graded stone aggregate.)

    (PWD S.O.R. 4.16 p. 17)

    TOTAL 1 170.00 1.20

    54 40 mm thick stone flooring over 20 mm (average)thick base of cement

    mortar 1:5 (1 cement : 5 sand) including pointing with cement mortar1:2 (1 cement : 2 sand) with an admixture of pigment to match the

    shade of stone. Red sand stone / White sand stone) 11.25.2 Fine

    (PWD S.O.R. 11.25.2 p. 84)

    TOTAL 1 170.00 1.20

    55 Providing and fixing suspended false ceiling which inlcudes providing and

    fixing G.I. channels of size 27x0.5mm thick having one flange of 20mm

    and another flange of 30mm fixed along periphery of the ceiling, screws

    fixed to brick wall/partition with the help of rawl plugs and screws thesuspending G.I. intermediate channels of size 45mmx0.9mm with two

    flanges of 15mm each from the soffit at 1200mm centre in one

    direction with steel G.I. hanger of width 25mmx0.5mm thick fixed to

    soffit with G.I. cleat and steel rawl plugs fastners ceiling G.I. section of

    0.5mm thickness forming hollow knurled wedge of 51.5mm and two

    flanges of 26mm each with lips of 10.5 mm are then fixed to the

    intermidiate channel with the help of connecting G.I. clips dia 2.64 mm

    and in direction perpandicular to the intermidiate channels at 450mm

    Tapered edge Gypsum (12.5mm) will be screw fixed to ceiling section

    with 25mm dry walls screw at 230mm centre to centre. Screw fixing is

    done mechanically either with screw driver or drilling machine with

    suitable attachment. Finally the tapered and square edges of the boards

    are jointed and finished to a blush finish with requisite jointing

    compound, paper tapes, finisher and two coats of primer suitable for

    Gypsum plaster board (as per recommended practices of India Gypsum

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    58/98

    (PWD S.O.R. 12.37.1 p. 94)

    FIRST FLOOR

    Rest 1 16.80 14.50

    1 8.60 17.15

    Bar 1 6.28 9.20

    Rec. 1 216.60

    SECOND FLOOR

    Banq. 1 24.50 21.50

    Rec. 1 216.60

    Hall 1 17.00 10.78

    Rec. 1 13.50 6.00

    THIRD FLOOR

    Rec. 1 231.00

    FOURTH,FIFTH & SIXTH FLOOR

    Rec. 3 170.00

    56 Providing and fixing in position glass of 1.80 X 1.20 M., 6mm thick of

    Saint Gobain/ Moonstone/Glower bell in Blue/ Green/ Gray color of

    Anodized section frame of 44 X 44 mm or 63 x 38mm of Jindal/

    Hindalco/ Brocka make in 12 gauge with clips of 50 x 25 mm with EPDM

    gasket for grip and straightness and 20mm Tape of Birla 3m or

    equivalent. Glass to be sealed by silicon sealant of Dow Growing or

    NSOR

    TOTAL 1 70.00 13.00

    57 Providing and laying integral cement based water proofing treatment

    including preparation of surface as required for treatment of

    roofs,bal conies, terraces etc consi st ing of following operations: a)

    Applying a slurry coat of neat cement using 2.75 kg/sqm. of cement

    admixed with water proofing compound conforming to IS. 2645 and

    approved by Engineer-in-charge over the RCC slab including adjoining wal

    ls upto 300mm height including cleaning the surface beforetreatment.

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    59/98

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    60/98

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    61/98

    62 Providing and fixing white vitreous china pedestal type water

    closet (European type W.C. pan) with seat and lid, 10 litre low

    level white P.V.C. flushing cistern with manually controlled device

    (handle lever), conforming to IS : 7231, with all fittings and fixtures

    complete including cutting and making good the wall s and floors

    wherever requi red : 17.2.1 W.C. pan with ISI marked white solid

    (PWD S.O.R. 17.2.1 p. 133)

    63 Providing and fixing white vitreous china flat back half stall urinal of

    size 580x380x350mm with white PVC automatic flushing cistern,

    with fittings, standard size C.P. brass flush pipe, spreaderswith unions

    and clamps (all in C.P. brass) with waste fitting as per IS : 2556, C.I.

    trap with outlet grating and other couplings in C.P. brass including

    painting of fittings and cutting and making good the walls and floors

    wherever requi red : 17.5.3 Range of three half stall urinals with

    10 litre P.V.C. automatic f lushing ci stern

    (PWD S.O.R. 17.5.3 p. 134)

    64 Providing and fixing white vitreous china wash basin including making all

    connections but excluding the cost of fittings : 17.25.1 Flat back wash

    basin of size 630x450m(PWD S.O.R. 17.25.1 p. 137)

    65 Providing and fixing 600x450 mm beveled edge mirror of superior glass

    (of approved quality) complete with 6 mm thick hard board ground fixedto wooden cleats with C.P. brass screw sand washers complete .

    (PWD S.O.R. 17.31 p. 138)

    66 Providing and fixing PTMT towel rail complete with brackets fixed to

    wooden cleats with CP brass screws with concealed fitting arrangement

    of approved quality and colour. 17.69.1 450MM long towel rail with

    total length of 495mm, 78mm wide and effective height of 88mm,

    (PWD S.O.R. 17.69.1 p. 144)

    67 Providing and fixing C.P. brass bib cock of approved quality confirming

    to IS: 8931 :

    (a) 15 mm nominal bore.

    (PWD S.O.R. 18.49.1 p. 161)

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    62/98

    (b) 20 mm nominal bore

    NSOR

    68 Providing and fixing C.P brass stop cock (concealed) of standard design

    and of approved make confirming to IS : 8931.

    (a) 15 mm nominal bore

    (PWD S.O.R. 18.52.1 p. 161)

    (b) 20 mm nominal bore

    NSOR

    69 Providing and fixing C.P brass pillar cock of standard design and of

    approved make confirming to IS specifications.

    (a) 15 mm nominal bore 125 mm long foam flow.

    (PWD S.O.R. 18.54 p. 162)

    70 Providing and fixing C.P brass base & mixer of standard design and of

    a roved make confirmin to IS s ecifications.(a) 15 mm nominal bore .

    (PWD S.O.R. 18.55 p. 162)

    71 Providing and fixing C.P brass wall mixer of standard design and of

    approved make confirming to IS specifications.

    (a) 15 mm nominal bore .(PWD S.O.R. 18.56 p. 162)

    72 Providing and fixing C.P brass sink mixer of standard design and of

    a roved make confirmin to IS s ecifications.(a) 15 mm nominal bore .

    (PWD S.O.R. 18.57 p. 162)

    73 Providing and fixing Stainless Steel ISI 304 (18/8) kitchen sink as per

    IS 13983 with C.I. brackets and 40 mm stainless steel plug including

    painting of fittings and brackets, cutting and good the walls

    wherever required : 17.10.1 Kitchen sink with drain board

    (PWD S.O.R. 17.10.1 p. 136)

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    63/98

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    64/98

    (a) 15mm dia.

    (PWD S.O.R. 18.10.1 p. 153)

    (b) 20mm dia.

    (PWD S.O.R. 18.10.2 p. 153)

    (c) 40 mm dia.

    (PWD S.O.R. 18.10.5 p. 153)

    78 Providing and fixing gun metal gate valve with C.I. wheel of approved

    ual it (screwed end) :20 mm * (0.75)

    (PWD S.O.R. 18.17.2 p. 154)

    40 mm * (1.5)(PWD S.O.R. 18.17.5 p. 154)

    79 Providing & Laying and jointing glazed stone ware pipes grade "A" with

    stuff mixture of cement in Proportion of 1:1 including testing of joints

    etc com lete.PWD SOR 19.1.2 p 170

    (b) 150 mm dia

    80 Providing & Laying cement concrete 1:5:10 ( 1 Cement : 5 Sand : 10

    graded stone aggregate 40mm nominal size) around S.W. Pipe including

    bed concrete as er standard desi n..PWD SOR 19.2.2 p 170

    (b) 150 mm dia

    81 Providing and fixing square mouth S.W. gully trap grade A complete with

    C.I. grating brick masonry chamber and water tight C.I. cover with

    frame of 300x300mm size (in side) the weight of the cover to be not

    less than 4.53 Kg. as per standard design. Cement concrete 1:2:4

    (PWD SOR I.No.- 19.4.1 p. 170)

    (a) 100x100mm. size P type

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    65/98

    82 Providing & placing on terrace ( at all floor levels) high designed HDPE

    (polyethylene) water storage tank ISI:12701 marked with cover and

    suitable locking arrangement and making necessary holes for inlet,

    outlet and arrangement and making necessary holes for inlet, outlet and

    overflow pipes but without fittings and the base support for tank.

    PWD SOR 18.48 p 161

    5x2000

    83 Constructing brick masonry manholes in cement mortar 1:4(1 cement : 4

    sand) R.C.C. top slab with 1 : 2 : 4 (1 Cement : 2 Sand : 4 Graded stone

    aggregate, 20 mm nominal size) foundation concrete 1 : 4 : 8 (1 Cement :

    4 Sand : 8 Graded stone aggregate, 40 mm nominal size) inside

    plastering 12 mm thick with cement mortar 1 : 3 (1 Cement : 3 Sand)

    finished with a floating coat of neat cement making channels in cement

    concrete 1 : 2 : 4 mix (1 Cement : 2 Sand : 4 Graded stone aggregate, 20

    mm nonimal size) neatly finished complete as per standard design with

    modular bricks with class desi nation 40.Inside size 90x80 cm and 45 cm deep including C.I. Cover with frame

    light duty, 455x610 mm internal diameter total weight of cover and

    frame to be not less than 38 kg, weight of cover 23 kg and weight of

    PWD SOR 19.7.1 p 171

    Chamber 20 Nos

    84 Constructing brick masonry manholes in cement mortar 1:4(1 cement : 4

    sand) R.C.C. top slab with 1 : 2 : 4 (1 Cement : 2 Sand : 4 Graded stone

    aggregate, 20 mm nominal size) foundation concrete 1 : 4 : 8 (1 Cement :

    4 Sand : 8 Graded stone aggregate, 40 mm nominal size) inside

    plastering 12 mm thick with cement mortar 1 : 3 (1 Cement : 3 Sand)

    finished with a floating coat of neat cement making channels in cement

    concrete 1 : 2 : 4 mix (1 Cement : 2 Sand : 4 Graded stone aggregate, 20

    mm nonimal size) neatly finished complete as per standard design with

    modular bricks with class desi nation 40.Inside size 120x80 cm and 90 cm deep including C.I. Cover with frame

    medium duty, 500 mm internal diameter total weight of cover and frame

    to be not less than 116 kg, weight of cover 58 kg and weight of frame

    58 kg.

    PWD SOR 19.7.2 p 171

    Chamber 20 Nos

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    66/98

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    67/98

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    68/98

    200.00

    200.00 49.00/Cum 9800.00

    0.80 524.80

    0.65 60.94

    0.65 6.05

    0.40 47.32

    0.30 50.132.10 5.48

    2.10 5.80

    2.10 53.24

    2.50 49.20

    2.50 11.20

    2.50 1.40

    0.40 159.12

    0.15 265.50

    0.18 318.60

    0.15 4.73

    0.15 2.03

    0.15 2.03

    1567.54 3936/Cum 6169835.47

    135357.04 42.00/Kg 5684995.50

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    69/98

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    70/98

    31.50

    13.50

    13.50

    58.50 248.00/Sqm 14508.00

    1770.00

    1770.00 670.00/Sqm 1185900.00

    15.75

    40.50

    9.00

    65.25 1099/Sqm 71709.75

    1770.00

    1770.00 100.00/Sqm 177000.00

    2.50 422.50

    422.50 80.00/Sqm 33800.00

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    71/98

    2192.50 46.00/Sqm 100855.00

    1770.001770.00 132.00/Sqm 233640.00

    8.50 167.28

    8.50 38.08

    8.50 4.76

    12.00 178.56

    12.00 38.40

    12.00 6.72

    23.00 60.03

    23.00 63.48

    2.40 1.54

    0.40 477.36

    0.40 528.00

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    72/98

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    73/98

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    74/98

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    75/98

    2.10 220.50

    2.60 299.00

    2.60 312.00

    2.60 832.00

    2.60 3276.00

    4939.50

    2.40 17.28

    2.10 80.64

    2.10 254.10

    2.10 183.12

    0.90 65.88

    601.02

    4338.48 302.80/Sqm 1313691.74

    77.28

    73.08

    150.36 2515/Sqm 378155.40

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    76/98

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    77/98

    24.00

    420.00 1099/Sqm 461580.00

    97.30

    52.80

    74.80

    30.4015.40

    12.30

    11.89

    13.73

    13.50

    15.75

    20.25

    26.10

    73.08

    627.46

    228.81

    147.49

    45.58

    57.66

    209.00

    251.16

    44.88

    18.3040.20

    40.80

    467.10

    183.60

    81.00

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    78/98

    524.88

    69.00

    312.80

    44.88

    18.30

    32.90

    10.20

    593.15

    209.88

    265.50

    295.47

    45.00

    18.30

    30.6052.26

    60.64

    70.35

    51.75

    59.73

    51.48

    42.50

    204.50

    422.10

    45.00

    18.30

    30.60

    52.26

    60.64

    70.35

    51.75

    59.7351.48

    42.50

    204.50

    422.10

    45.00

    18.30

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    79/98

    30.60

    52.26

    60.64

    70.35

    51.75

    59.73

    51.48

    42.50

    204.50

    422.10

    45.00

    18.30

    30.60

    52.2660.64

    70.35

    51.75

    8933.81 868/Sqm 7754546.21

    915.00

    915.00 958/Sqm 876570.00

    1700.00

    25.50

    156.18

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    80/98

    210.65

    52.80

    331.55

    186.49

    2663.16 670.00/Sqm 1784317.20

    5100.00

    4800.00

    72.00

    9972.00 100.00/Sqm 997200.00

    2.50 170.00

    2.50 67.50

    2.50 33.50

    2.50 30.00

    2.50 68.50

    2.50 57.00

    2.50 122.90

    2.50 174.50

    2.50 44.00

    2.50 44.00

    2.50 42.50

    2.50 35.90

    2.50 22.502.50 20.00

    2.50 38.00

    2.50 17.50

    2.50 22.00

    2.50 22.50

    2.50 22.00

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    81/98

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    82/98

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    83/98

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    84/98

    3.00 124.20

    3.00 15.00

    3.00 93.60

    3.00 40.20

    3.00 108.60

    3.00 40.20

    3.00 126.00

    3.00 40.20

    3.00 405.00

    3.00 306.00

    3.00 108.60

    3.00 39.60

    3.00 93.60

    3.00 39.603.00 102.00

    3.00 7.50

    3.00 402.00

    3.00 756.00

    3.00 45.00

    3.00 36.00

    3.00 171.90

    3.00 36.00

    3.00 18.30

    3.00 36.00

    3.00 31.20

    3.00 124.20

    3.00 15.00

    3.00 93.60

    3.00 40.20

    3.00 108.60

    3.00 40.20

    3.00 126.00

    3.00 40.203.00 405.00

    3.00 306.00

    2.40 57.60

    2.40 57.60

    16748.66

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    85/98

    2.40 17.28

    2.10 80.64

    2.10 228.69

    2.10 183.12

    1.20 322.56

    0.90 65.88

    898.17

    15850.49 80.00/Sqm 1268039.20

    8.50 1436.50

    14.00 2730.00

    2.40 115.20

    4281.70 93.00/Sqm 398198.10

    25822.49 93.00/Sqm 2401491.57

    25822.49 46.00/Sqm 1187834.54

    4281.70 59.00/Sqm 252620.30

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    86/98

    0.08 0.12

    0.08 0.06

    0.08 1.08

    0.08 0.31

    0.08 4.07

    0.08 0.97

    0.08 3.66

    0.08 0.70

    10.95 59629/Cum 652866.00

    2.40 41.47

    2.10 193.54

    2.10 609.84

    2.10 439.49

    1284.34 56.00/Sqm 71922.82

    2.40 17.28

    2.10 80.64

    2.10 254.10

    2.10 183.12

    535.14 1593/Sqm 852478.02

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    87/98

    4000.00 236.00/Kg 944000.00

    1.20 322.56

    0.90 65.88

    388.44 450.00/Sqm 174798.00

    210.00 432.00/Each 90720.00

    2800.00 67.00/Each 187600.00

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    88/98

    300.00 135.00/Each 40500.00

    300.00 64.00/Each 19200.00

    500.00 59.00/Each 29500.00

    530.00 49.00/Each 25970.00

    270.00 38.00/Each 10260.00

    170.00 710.00/Each 120700.00

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    89/98

    5000.00 44.70/Kg 223500.00

    4000.00 68.00/Kg 272000.00

    204.00

    204.00 332.00/Sqm. 67728.00

    204.00

    204.00 361.00/Sqm. 73644.00

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    90/98

    243.60

    147.49

    57.78

    216.60

    526.75

    216.60

    183.26

    81.00

    231.00

    510.002414.08 592.00/Sqm 1429132.99

    910.00910.00 2500/Sqm. 2275000.00

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    91/98

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    92/98

    25.00 241/Each 6025.00

    25.00 422/Each 10550.00

    50.00 159/Each 7950.00

    50.00 213/Each 10650.00

    50.00 268/Each 13400.00

    50.00 399/Each 19950.00

    400.00 45/Metre 18000.00

    400.00 51/Metre 20400.00

    5.00 2468/Each 12340.00

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    93/98

    120.00 2310/Each 277200.00

    10.00 8234/Each 82340.00

    125.00 782/Each 97750.00

    130.00 717/Each 93210.00

    130.00 312/Each 40560.00

    125.00 313/Each 39125.00

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    94/98

    125.00 350/Each 43750.00

    125.00 313/Each 39125.00

    125.00 350/Each 43750.00

    125.00 501/Each 62625.00

    125.00 1637/Each 204625.00

    20.00 1893/Each 37860.00

    10.00 1637/Each 16370.00

    10.00 4885/Each 48850.00

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    95/98

    125.00 529/Each 66125.00

    350.00 98/Metre 34300.00

    500.00 116/Metre 58000.00

    100.00 275/Metre 27500.00

    350.00 155/Metre 54250.00

    500.00 176/Metre 88000.00

    100.00 277/Metre 27700.00

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    96/98

    50.00 106/Metre 5300.00

    40.00 134/Metre 5360.00

    50.00 264/Metre 13200.00

    10.00 245/Each 2450.00

    5.00 399/Each 1995.00

    200.00 152.00/Rm 30400.00

    200.00 405.00/Rm 81000.00

    25.00 935/Each 23375.00

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    97/98

    100000.00 5.00/Ltr 500000.00

    20.00 5384/Each 107680.00

    20.00 11882/Each 237640.00

    85823849.93TOTAL (A)

  • 7/30/2019 4 COR 92 LACS B1 16 JAN 2011

    98/98

    12873577.49

    TOTAL (B) 98697427.43

    8882768.47

    TOTAL (C) 107580195.89

    3765306.86

    111345502.75

    111346000

    GRAND TOTAL

    SAY