![Page 1: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/1.jpg)
4 -1
Activity-Based Activity-Based CostingCosting
CHAPTERCHAPTER
![Page 2: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/2.jpg)
4 -2
1. Discuss the importance of unit costs.2. Describe functional-based costing
approaches.3. Explain why functional-based costing
approaches may produce distorted costs.4. Explain how an activity-based costing system
works for product costing.
ObjectivesObjectivesObjectivesObjectives
After studying this After studying this chapter, you should chapter, you should
be able to:be able to:
After studying this After studying this chapter, you should chapter, you should
be able to:be able to:
continuedcontinuedcontinuedcontinued
![Page 3: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/3.jpg)
4 -3
5. Provide a detailed description of how activities can be grouped into homogeneous sets to reduce the number of activity rates.
6. Describe activity-based customer and supplier costing.
ObjectivesObjectivesObjectivesObjectives
![Page 4: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/4.jpg)
4 -4
Unit cost is the total cost associated with the units produced divided by the
number of units produced.
Unit cost is the total cost associated with the units produced divided by the
number of units produced.
Inventory valuation
Income determination
Providing input to a variety of decisions such as pricing, make or buy, and accept or reject special orders
Unit cost is used for--
![Page 5: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/5.jpg)
4 -5
Product cost is often defined as the sum of direct materials, direct
labor, and manufacturing overhead. This definition is required for external financial reporting.
Product cost is often defined as the sum of direct materials, direct
labor, and manufacturing overhead. This definition is required for external financial reporting.
![Page 6: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/6.jpg)
4 -6
Cost measurement consists of determining the dollar amounts of direct materials, direct labor, and
overhead used in production.
Cost measurement consists of determining the dollar amounts of direct materials, direct labor, and
overhead used in production.
![Page 7: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/7.jpg)
4 -7
The process of associating the costs, once measured, with the units produced is
called cost assignment.
The process of associating the costs, once measured, with the units produced is
called cost assignment.
![Page 8: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/8.jpg)
4 -8
Two possible measurement systems are actual costing and normal costing.
Measurement SystemsMeasurement SystemsMeasurement SystemsMeasurement Systems
Actual costing assigns the actual costs of direct materials, direct labor, and overhead to products.
Normal costing assigns the actual costs of direct materials and direct labor to products; however, overhead cots are assigned to products using predetermined rates.
![Page 9: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/9.jpg)
4 -9
Measurement SystemsMeasurement SystemsMeasurement SystemsMeasurement Systems
A predetermined overhead rate is a rate
based on estimated data.
A predetermined overhead rate is a rate
based on estimated data.
Budgeted (estimated) cost
Estimated activity usage
![Page 10: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/10.jpg)
4 -10
Examples of Unit-Level DriversExamples of Unit-Level DriversExamples of Unit-Level DriversExamples of Unit-Level Drivers
Units produced
Direct labor hours
Direct labor dollars
Machine-hours
Direct material dollars
![Page 11: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/11.jpg)
4 -11
Units (of
driver)
Time
Theoretical
Practical
Normal
Expected actual
![Page 12: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/12.jpg)
4 -12
Functional-Based Costing: Plantwide RateFunctional-Based Costing: Plantwide Rate
Overhead CostsOverhead Costs
Assign CostsAssign Costs
Plantwide PoolPlantwide Pool
Assign CostsAssign Costs
ProductsProducts
Direct Tracing
Stage One: Pool Formation
Unit-Level Driver
Stage Two: Costs Assigned
![Page 13: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/13.jpg)
4 -13
Belring, Inc.Belring, Inc. produces two telephones: a cordless and a regular model. The company has the following actual and budgeted data:
.
Budgeted overhead$360,000Expected activity (DLH)100,000Actual activity (DLH)100,000Actual overhead$380,000
![Page 14: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/14.jpg)
4 -14
Predetermined Overhead Rate =
Belring, Inc.
Budgeted (estimated) cost
Estimated activity usage
Predetermined Overhead Rate =
$360,000
100,000 DLHPredetermined Overhead Rate = $3.60 per DLH
![Page 15: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/15.jpg)
4 -15
The total overhead assigned to actual
production is called applied overhead.
The total overhead assigned to actual
production is called applied overhead.
Applied overhead
=Overhead rate x
Actual activity output
![Page 16: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/16.jpg)
4 -16
Belring, Inc.Applied overhead
= Overhead rate x Actual activity output
= $3.60 x 100,000 DLH
= $360,000
![Page 17: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/17.jpg)
4 -17
Cordless Regular
Prime costs $ 78,000 $ 738,000
Overhead costs:
$3.60 x 10,000 36,000 ---
$3.60 x 90,000 --- 324,000
Total manufacturing costs $114,000 $1,062,000
Units produced 10,000 100,000
Unit cost $ 11.40 $ 10.62
Belring, Inc.Per-Unit CostPer-Unit Cost
![Page 18: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/18.jpg)
4 -18
Overhead CostsOverhead Costs
Assign CostsAssign Costs
Assign CostsAssign Costs Assign CostsAssign Costs
ProductsProducts ProductsProducts
Stage One: Pool Formation
Unit-Level Drivers
Stage Two: CostsAssigned
Functional-Based Costing Department RatesFunctional-Based Costing Department Rates
Department A PoolDepartment A Pool Department B PoolDepartment B Pool
AllocationDirect Tracing
Driver Tracing
![Page 19: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/19.jpg)
4 -19
Budgeted overhead $252,000$108,000
Departmental DataDepartmental DataDepartmental DataDepartmental Data
Belring, Inc.FabricationFabrication Assembly Assembly
Expected and actual usage (dlh):
Cordless 7,0003,000
Regular 13,000 77,000
20,00080,000
Expected and actual usage (mh.):
Cordless 4,0001,000
Regular 36,0009,000
40,00010,000
![Page 20: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/20.jpg)
4 -20
Belring, Inc.Applied overhead
= ($6.30 x actual mh) + ($1.35 x actual dlh)
= ($6.30 x 40,000) + ($1.35 x 80,000)
= $360,000
= $252,000 + $108,000
![Page 21: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/21.jpg)
4 -21
Belring, Inc.
Per-Unit Cost: Departmental RatesPer-Unit Cost: Departmental RatesPer-Unit Cost: Departmental RatesPer-Unit Cost: Departmental Rates
CordlessRegular
Prime costs $ 78,000$ 738,000
Overhead costs:($6.30 x 4,000) + ($1.35 x 3,000)
29,250 ---
($6.30 x 36,000) + (1.35 x 77,000) --- 330,750
Total manufacturing costs $107,250$1,068,750
Units produced 10,000 100,000
Unit cost $ 10.73$ 10.69
![Page 22: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/22.jpg)
4 -22
Symptoms of an Outdated Symptoms of an Outdated Functional Cost SystemFunctional Cost System
Symptoms of an Outdated Symptoms of an Outdated Functional Cost SystemFunctional Cost System
1. The outcome of bids is difficult to explain.
2. Competitors’ prices appear unrealistically low.
3. Products that are difficult to produce show high profits.
4. Operational managers want to drop products that appear profitable.
5. Profit margins are difficult to explain.
ContinuedContinuedContinuedContinued
![Page 23: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/23.jpg)
4 -23
Symptoms of an Outdated Symptoms of an Outdated Functional Cost SystemFunctional Cost System
Symptoms of an Outdated Symptoms of an Outdated Functional Cost SystemFunctional Cost System
6. The company has a highly profitable niche all to itself.
7. Customers do not complain about price increases.
8. The accounting department spends a lot of time supplying cost data for special projects.
9. Some departments are using their own accounting system.
10. Product costs change because of changes in financial reporting regulations.
![Page 24: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/24.jpg)
4 -24
Non-unit activity drivers are factors that measure the consumption of non-unit activities by products and
other cost objects.
Non-unit activity drivers are factors that measure the consumption of non-unit activities by products and
other cost objects.
![Page 25: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/25.jpg)
4 -25
Product diversity means that the products consume overhead activities
in systematically different proportions.
Product diversity means that the products consume overhead activities
in systematically different proportions.
![Page 26: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/26.jpg)
4 -26
Units produced per year 10,000 100,000 110,000
Prime costs $78,000 $738,000 $816,000
Direct labor hours 10,000 90,000 100,000
Machine hours 5,000 45,000 50,000
Production runs 20 10 30
Number of moves 60 30 90
Belring, Inc.
Activity Usage Measures
Activity Usage Measures
Product-Costing DataProduct-Costing Data
Cordless Regular Total
![Page 27: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/27.jpg)
4 -27
Activity Activity Cost
Belring, Inc.
Setups $120,000
Material handling 60,000
Machining 100,000
Testing 80,000
Total $360,000
Overhead Activities
Product-Costing DataProduct-Costing Data
![Page 28: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/28.jpg)
4 -28
Belring, Inc.Product Diversity: Consumption RatiosProduct Diversity: Consumption Ratios
Setups 0.67 0.33 Production runs
Material
handling 0.67 0.33 Number of moves
Machining 0.10 0.90 Machine hours
Testing 0.10 0.90 Direct labor hours
Overhead Cordless Regular Activity
Activity Phone Phone Driver a a
b b
c c
d d
20/30 (cordless) and 10/30 (regular)a
![Page 29: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/29.jpg)
4 -29
Belring, Inc.Product Diversity: Consumption RatiosProduct Diversity: Consumption Ratios
Setups 0.67 0.33 Production runs
Material
handling 0.67 0.33 Number of moves
Machining 0.10 0.90 Machine hours
Testing 0.10 0.90 Direct labor hours
Overhead Cordless Regular Activity
Activity Phone Phone Driver a a
b b
c c
d d
60/90 (cordless) and 30/90 (regular)b
![Page 30: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/30.jpg)
4 -30
Belring, Inc.Product Diversity: Consumption RatiosProduct Diversity: Consumption Ratios
Setups 0.67 0.33 Production runs
Material
handling 0.67 0.33 Number of moves
Machining 0.10 0.90 Machine hours
Testing 0.10 0.90 Direct labor hours
Overhead Cordless Regular Activity
Activity Phone Phone Driver a a
b b
c c
d d
5,000/50,000 (cordless) and 45,000/50,000 (regular)c
![Page 31: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/31.jpg)
4 -31
Belring, Inc.Product Diversity: Consumption RatiosProduct Diversity: Consumption Ratios
Setups 0.67 0.33 Production runs
Material
handling 0.67 0.33 Number of moves
Machining 0.10 0.90 Machine hours
Testing 0.10 0.90 Direct labor hours
Overhead Cordless Regular Activity
Activity Phone Phone Driver a a
b b
c c
d d
10,000/100,000 (cordless) and 90,000/100,000 (regular)d
![Page 32: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/32.jpg)
4 -32
Setup rate: $120,000/30 =$4,000 per run
Material-handling rate: $60,000/90 = $666.67 per move
Machining rate: $100,000/50,000 = $2 per MH
Testing rate: $80,000/100,000 = $0.80 per DLH
Belring, Inc.Activity RatesActivity Rates
![Page 33: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/33.jpg)
4 -33
Cordless Regular
Prime costs $ 78,000 $ 738,000
Overhead costs:
Setups 80,000 40,000
Material handling 40,000 20,000
Machining 10,000 90,000
Testing 8,000 72,000
Total manufacturing costs $216,000 $ 960,000
Units produced 10,000 100,000
Unit cost (total costs/units) $ 21.60 $ 9.60
Belring, Inc.Activity RatesActivity Rates
$4,000x
20
$4,000x
10$667
x60
$667x
30$2x
5,000
$2x
45,000$0.80
x10,000
$0.80x
90,000
![Page 34: 4 -1 Activity-Based Costing CHAPTER. 4 -2 1.Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7d1a28abf838c8457d/html5/thumbnails/34.jpg)
4 -34
Plantwide rate $11.40 $10.62
Departmental rate 10.73 10.69
Activity rate 21.60 9.60
Comparison of Unit CostsComparison of Unit CostsComparison of Unit CostsComparison of Unit Costs
Cordless Regular
Belring, Inc.