ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
ELIMINATE 3M
-
7/30/2019 3M NEW1[1]
2/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
3M3M is a Japanese concept derived for shop floorimprovement
It contains 3 elimination activities
Since it starts with letter M it is called as 3M
-
7/30/2019 3M NEW1[1]
3/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
Waste in Value System
-
7/30/2019 3M NEW1[1]
4/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MUDA(WASTE)MUDA stands for eliminating Non Value Addedactivities
-
7/30/2019 3M NEW1[1]
5/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
7 TYPES of MUDA MUDA of Production (Over Production)
MUDA of Waiting
MUDA of Conveyance (Transport) MUDA of Over or Incorrect Processing
MUDA of Stock (Over Stock)
MUDA of Workmen Movement
MUDA of Defects
-
7/30/2019 3M NEW1[1]
6/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MUDA of PRODUCTIONProduction more than requirement Production earlier than requirement
-
7/30/2019 3M NEW1[1]
7/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MUDA of WAITINGMachine breakdown
Die breakage or die problem
Pallet shortage Die set up time (SMED)
-
7/30/2019 3M NEW1[1]
8/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MUDA of CONVEYANCE Panel changing from WIP pallets to DespatchPallets
Operation pending production
Unnecessary movement of fork lifts
Changing panels
from WIP palletto CC pallet
Operation
pendingproduction
-
7/30/2019 3M NEW1[1]
9/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MUDA of CONVEYANCE
Lot size 4000 Nos
Qty/trip 500 Nos
No of trips 8
Lot size 4000 Nos
Qty/trip 2000 Nos
No of trips 2
-
7/30/2019 3M NEW1[1]
10/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MUDA of Over or Incorrect
ProcessingPanels undergoes additional process to satisfy thecustomer requirement
-
7/30/2019 3M NEW1[1]
11/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MUDA of STOCKOil spraying to avoid panel rust Rust cleaning due to panel oil stain
Pallet shortage for less stock items
-
7/30/2019 3M NEW1[1]
12/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MUDA of WORKMEN
MOVEMENTNon value added operator movement
No panel diverterPanel diverter
available
Difficult to pick
the panel
Easy to pick the
panel
-
7/30/2019 3M NEW1[1]
13/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MUDA of DefectsProduction of defective parts
-
7/30/2019 3M NEW1[1]
14/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MURI (Over Burden)MURI stands for any activity that exceeds actual capacityof Equipment or Operators
-
7/30/2019 3M NEW1[1]
15/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MuriOverburdening people results in Safety and Qualityproblems
Overburdening Equipment causes Break Downs andDefects.
-
7/30/2019 3M NEW1[1]
16/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
Use of 2.5 T fork lift instead of 5 T fork lift
Lifting two dies at time with EOT crane
Press over load due to double panel loading in thedie
Double sheet feeding in shearing machine
CORRECTWRONG
2.762 Ton with
2.5T forklift
2.762 Ton with
5T forklift
-
7/30/2019 3M NEW1[1]
17/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
Strain while
moving the pallet
No Strain while
moving the pallet
Two dies lifted at
time
One die lifted at
time
-
7/30/2019 3M NEW1[1]
18/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MURA (Unevenness)MURA stands for any activity that containsinconsistency or ineffective utilization
-
7/30/2019 3M NEW1[1]
19/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
Unevenness results from an irregular productionschedule or fluctuating production volumes due tointernal problems, like downtime or missing parts ordefects.
Muda will be a result of Mura
MURA (Unevenness)
-
7/30/2019 3M NEW1[1]
20/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MURA (Unevenness) Unequal allocation of work to operators The work load for the last operator is not balancedwith other two operators
-
7/30/2019 3M NEW1[1]
21/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
Heijunka (Level out the
Workload)Achieving heijunka is fundamental to eliminatingMura, which is fundamental to eliminating Muri andMuda.
-
7/30/2019 3M NEW1[1]
22/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
Heijunka (Level out the
Workload)Heijunka is the leveling of production by both volumeand product mix
-
7/30/2019 3M NEW1[1]
23/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
Heijunka (Level out the
Workload)It does not build products according to the actual flowof customer orders, which can swing up and downwildly.
It takes the total volume of orders in a period and levelsthem out so the same amount and mix are being madeeach day.
-
7/30/2019 3M NEW1[1]
24/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
Traditional (Unleveled)
Mixed Model Production
(Leveled)
-
7/30/2019 3M NEW1[1]
25/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
4 Benefits of Leveling the
ScheduleFlexibility to make what the customer wants when theywant it
Reduced risk of unsold goods
Balanced use of labor and machines
Smoothed demand on upstream processes and theplants suppliers
-
7/30/2019 3M NEW1[1]
26/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
To sustain Cost Reduction, eliminate these 3M inshop floor.