3G Single Site Verification Report

3G New Site Verification ReportHUAWEI-HCPT 3G Project(FUNCTIONALITY TEST)

AREATANGERANG

RNCHuawei_Tanggerang

SITE ID103711

SITE NAMEGondrong_3G

Prepared by:Approved by:

HUAWEI RNP TEAM

Name :Date :HCPTRNP

Name :Date :

(FUNCTIONALITY TEST RESULTS)

Site NameGondrong_3GSite Id103711ClutterUrban

Longitude106.69309Latitude-6.19839

Integrated DateSSV DateMarch 03, 2014

AddressJl.Irigasi No.03 RT.03 / RW.04 Kel.Gondrong, Kec.Cipondoh Kab.Tanggerang

1. CELL VERIFICATIONStationary.PositionDTVehicleinfrontofeachsector.

1.1VERIFICATIONSECTOR 1-4SECTOR 2-5SECTOR 3-6SECTOR 7-10SECTOR 8-11

DatabaseMeasuredDatabaseDatabaseMeasuredDatabaseMeasuredMeasuredDatabaseMeasured

Cell ID35311 / 3099135311 / 3099135312 / 3099235312 / 3099235313 / 3099335313 / 3099331443 / 31446 31443 / 3144631444 / 3144731444 / 31447

LAC9909990999099909990999099909 30993990999099909 30993

Scrambling Code64 / 6464 / 6467 / 6767 / 6770 / 7070 / 70379 / 379379 / 379382 / 382382 / 382

RAC9999999999

1.2STATIONARYCALLTESTSECTOR 1-4SECTOR 2-5SECTOR 3-6

CS Voice Call 3GTest Number to 212

CS Voice Call 3G - 3G

CS Video Call

PS Data Call - FTP DL

SERVICESECTOR 1-4SECTOR 2-5SECTOR 3-6

R99 PS Upload Throughput

R99 PS Download Throughput

HSDPA Throughput

HSUPA Throughput

KPI To Reach ReachedRemarks

CPICH Ec/Io (>= -12dB; >=95%)

Drop Call Rate (CS; =95%) (CS; >=95% )

HO Success Rate (>=93%)

ItemVoice Call

Total Call Attempts

Total Blocked Calls

Total Call Drops

Total Handover Attempts

Total Successful Handovers

2. SOFTER HANDOFF TEST (Intracell Handoff)Innercircleroute.DrivefromonesectortoanothersectorofthesameNodeBSite.

BetweenSECTOR1-2SECTOR 3-4SECTOR 3-6

CS Voice Call 3G - Test No.

PS Data Call - FTP DL

3. SOFT HANDOFF TEST (Intercell Handoff)Outercircleroute.DrivefromtargetcelltotargetcellofdifferentNodeBsite.

BetweenSECTOR 1-4SECTOR 2-5SECTOR 3-6

CSVoiceCall3G-TestNo.

PSDataCall-FTPDL

4.CS Inter-RAT HANDOFF TEST (3G to 2G)Outercircleroute.Drivefromtargetcelltotargetcellofdifferentsite.

BetweenSECTOR 1-4SECTOR 2-5SECTOR 3-6

CSVoiceCall3G2G.

5.Predicted Overlay for This Site

6. RSCP Distribution Plot6.1 Idle Mode (Lock SC)

6.2 Dedicated Mode

7. Ec/No Distribution Plot7.1 Idle Mode (Lock SC)

7.2 Dedicated Mode

8. SCPlot8.1 Idle Mode

8.2 Dedicated Mode

Remark :

Spot 1 Spot 2 Spot 3 Spot 4 Spot 5 Spot 6 Spot 7 Spot 8 Spot 9 Spot 10 Spot 11 Spot 12

Spot 13 Spot 14