3g Parameter

46
---------- Forwarded message ---------- From: Anugya Jain <[email protected] > Date: Thu, 14 Aug 2014 10:59:40 +0530 Subject: Fwd: Fwd: Fwd: RE: 3G New Sites / Sectors Audit To: [email protected] Hi Sir, As discussed please find the list of the check points for Upcoming new SCFT sites with below details and required inputs. * License Check-by using the "Invh" command need to check all the necessary license are available with feature activated script are with enclosed report. * Nbr List audit need to be done post site on aired,ensure up to 3rd-Tire no missing Nbr captured based on MIPT & Handover matrices. * Golden Radio Parameter audit for Node-b & RNC level,Golden parameter with recommended values enclosed with report. * As per New PSC plan*(plan already shared with the respective team)*SCFT site must be have the updated PSC's, and up to the 3rd Tire wont be any PSC Conflict. * LAC/RAC/URA Audit as per Plan provided by the planing team must be same,during the SCFT LAC/RAC/URA must be same based on neighboring sites & Geographical location. * Major KPI(RRC CS/PS,RAB Speech/HSDPA,DCR,IRAT CS/PS & Traffic & Data Download must be >0) must be under threshold KPI tracker formate enclosed herewith KPI threshold values. * RSSI of the Cell must be>-90 (dBm). Reporting format; Site MO Type of Site RNC Status SCFT Completion Date License Status Nbr Audit Radio Parameter Audit PSC Audit LAC/RAC/URA Audit KPI RSSI

description

3g parameter of ericsson

Transcript of 3g Parameter

Page 1: 3g Parameter

---------- Forwarded message ----------From: Anugya Jain <[email protected]>Date: Thu, 14 Aug 2014 10:59:40 +0530Subject: Fwd: Fwd: Fwd: RE: 3G New Sites / Sectors AuditTo: [email protected]

Hi Sir,As discussed please find the list of the check points for Upcoming new SCFT sites with below details and required inputs.

* License Check-by using the "Invh" command need to check all the necessary license are available with feature activated script are with enclosed report. * Nbr List audit need to be done post site on aired,ensure up to 3rd-Tire no missing Nbr captured based on MIPT & Handover matrices. * Golden Radio Parameter audit for Node-b & RNC level,Golden parameter with recommended values enclosed with report. * As per New PSC plan*(plan already shared with the respective team)*SCFT site must be have the updated PSC's, and up to the 3rd Tire wont be any PSC Conflict. * LAC/RAC/URA Audit as per Plan provided by the planing team must be same,during the SCFT LAC/RAC/URA must be same based on neighboring sites & Geographical location. * Major KPI(RRC CS/PS,RAB Speech/HSDPA,DCR,IRAT CS/PS & Traffic & Data Download must be >0) must be under threshold KPI tracker formate enclosed herewith KPI threshold values. * RSSI of the Cell must be>-90 (dBm).

Reporting format;

Site MO Type of Site RNC Status SCFT Completion Date LicenseStatus Nbr Audit Radio Parameter Audit PSC Audit LAC/RAC/URAAudit KPI RSSIRRC RAB DCR IRAT Traffic/Download7737 UDLFP3B New Site DLGGN01 SCFT Completed 10-Jul-14 activeok discrepancies found ok ok ok ok high ok ok ?

RNC Parameters;

*Parameter Name* *Recommonded Value*qhyst2 2nInSyncInd 3aseDlAdm 400

Page 2: 3g Parameter

aseUlAdm 350pwrAdm 80sf8Adm 0sf4AdmUl 0usedFreqThresh2dEcno -15usedFreqThresh2dRscp -108sRatSearch 2numHsPdschCodes 5numHsScchCodes 2codeThresholdPdu656 1nOutSyncInd 10pwrOffset 15sf8AdmUl 8increasedRachCoverageEnabled 1eulServingCellUsersAdm According to license capacityhsdpaUsersAdm According to license capacityprimarycpichpower maximumtransmissionpower According to license capacitydlcodeadm 85

RBS Parameter

*Parameter Name* *Recommoneded Value*antennaSupervisionThreshold 50maxNumHsPdschCodes 14maxHsRate 400cqiAdjustmentOn TRUEfeatureState16Qam 1featureState64Qam 1featureStateHsdpaFlexibleScheduler 1featureStateHsdpaDynamicCodeAllocation 1queueSelectAlgorithm 1eulMaxShoRate 6016eDchCapability 1FeatureStateEnhancedLayer2 1featureStateEul2msTti 1featureStateDlPowerControlEul 1featureStateGrake 1eulMaxOwnUuLoad 80eulMaxAllowedSchRate 5760eulNonServHwRate 1024invh License Checkget . Maxtot Power Settingaltk Alarms checkget . numhscoderesources Codes Checklh ru fui get vswr VSWR Check

Page 3: 3g Parameter

rbs Pwd

Major Radio KPI's;

** ** *1.6* *400 m-600 m* *Max 10% OFFSET WRT Neigh* *Max 10% OFFSET WRTNeigh* *Max 10% OFFSET WRT Neigh* *Max 10% OFFSET WRT Neigh* *Max 10%OFFSET WRT Neigh* *Max 10% OFFSET WRT Neigh* *>=98.5%* *>=98.5%**>=97.5%* *>=97.5%* *>=97.5%* *<=1.5%* *<=1.5%* *>=98%* *>25**>=94%* *>100* *>=94%* *<-80*MO Date SHO OVERHEAD PROP DELAY CS RRC ATT W.R.T NBRS PS RRC ATTW.R.T NBRS RAB ATT W.R.T NBRS CS TRAFFIC( ERLANGS) DATA DOWNLOADDATA UPLOAD CS RRC SUCCESS RATE PS RRC SUCCESS RATE RAB SUCCESS RATESPEECH RAB SUCCESS RATE HSDPA RAB SUCCESS RATE EUL DCR VOICE DCRHSDPA SHO SUCCESS RATE IRAT ATT CS(BBH) IRAT SUCCESS RATE CS IRATATT PS IRAT SUCCESS RATE PS RSSIMLCMRGX 3/19/2014

26 262 1116 2.04 506.02 *36.81* 100 97.71 100 81.33 77.560 1.18 99.73 8 62.5 0 #DIV/0

Regards..Aditya Pratap Singh

-------- Original Message --------Subject: RE: 3G New Sites / Sectors AuditDate: Fri, 1 Aug 2014 10:50:23 +0530From: Fasel Mustafa <[email protected]>To: Sandeep Bansal <[email protected]>, Aditya Pratap Singh<[email protected]>, Anugya Jain <[email protected]>CC: Sanjay Chawla <[email protected]>, Maninder Singh S<[email protected]>, Mukesh Somani <[email protected]>, Rupesh Shrivastav <[email protected]>, Praveen Kumar Tiwari P <[email protected]>, Prasoon Tiwari <[email protected]>, Sukisha Kanwar <[email protected]>, Sanjeev Mahrolia XM <[email protected]>

Can u share the details so that can be taken care of

Page 4: 3g Parameter

Regards

*From:*Sandeep Bansal*Sent:* Thursday, July 31, 2014 7:46 PM*To:* Aditya Pratap Singh; Anugya Jain*Cc:* Sanjay Chawla; Maninder Singh S; Mukesh Somani; Rupesh Shrivastav; Praveen Kumar Tiwari P; Prasoon Tiwari; Sukisha Kanwar; Fasel Mustafa; Sanjeev Mahrolia XM*Subject:* RE: 3G New Sites / Sectors Audit

Hi Aditya,

Can you please share details of radio parameter discrepancies so that it will be taken care next time.

Site

MO

Type of Site

RNC

Status

SCFT Completion Date

Nbr Audit

Radio Parameter Audit

5451

Page 5: 3g Parameter

UBURARE

New Site

DLEVK07

SCFT Completed

1-Jul-14

Nbrs missing

discrepancies found

5424

UDLTPURQ

Sector Addition

DLEVK07

SCFT Completed

Page 6: 3g Parameter

17-Jul-14

Nbrs missing

discrepancies found

11021

UASVHHB

New Site

DLEVK07

SCFT Completed

16-Jul-14

ok

discrepancies found

602

Page 7: 3g Parameter

UMUKNGRQ

Sector Addition

DLEVK07

SCFT Completed

22-Jul-14

Nbrs missing

discrepancies found

10967

URMGRJP

New Site

DLEVK07

SCFT Completed

Page 8: 3g Parameter

18-Jul-14

ok

discrepancies found

1689

UMAYFLDQ

Sector Addition

DLEGN04

SCFT Completed

22-Jul-14

Nbrs missing

discrepancies found

4215

Page 9: 3g Parameter

UINDRAPQ

Sector Addition

DLEVK08

SCFT Completed

23-Jul-14

ok

discrepancies found

1989

UGURS56Q

Sector Addition

DLEGN04

SCFT Completed

Page 10: 3g Parameter

4-Jul-14

Nbrs missing

discrepancies found

Regards

Sandeep

*From:*Aditya Pratap Singh*Sent:* Thursday, July 31, 2014 5:03 PM*To:* Fasel Mustafa; Sanjeev Mahrolia XM; Anugya Jain*Cc:* Sandeep Bansal; Sanjay Chawla; Maninder Singh S; Mukesh Somani; Rupesh Shrivastav; Praveen Kumar Tiwari P; Prasoon Tiwari; Sukisha Kanwar*Subject:* Re: 3G New Sites / Sectors Audit

Hi Sir,Please find the enclosed new Sites audit report for DLEVK07,DLEVK08,DLEGN04RNC's site got on aired in July-14 month,details reports are enclosed here with.Item highlighted are being taking care by the Operation team.

@Sanjeev;Request you to please take care the site getting on aired onwards to avoid the such discrepancies.

Site

MO

Type of Site

RNC

Page 11: 3g Parameter

Status

SCFT Completion Date

License Status

Nbr Audit

Radio Parameter Audit

PSC Audit

LAC/RAC Audit

KPI

RSSI

RRC

RAB

DCR

IRAT

Page 12: 3g Parameter

Traffic/Download

5451

UBURARE

New Site

DLEVK07

SCFT Completed

1-Jul-14

active

Nbrs missing

discrepancies found

ok

ok

Page 13: 3g Parameter

ok

ok

ok

ok

ok

ok

5424

UDLTPURQ

Sector Addition

DLEVK07

SCFT Completed

17-Jul-14

active

Page 14: 3g Parameter

Nbrs missing

discrepancies found

ok

ok

ok

ok

ok

ok

ok

ok

11021

UASVHHB

Page 15: 3g Parameter

New Site

DLEVK07

SCFT Completed

16-Jul-14

active

ok

discrepancies found

ok

ok

ok

ok

ok

Page 16: 3g Parameter

ok

ok

ok

602

UMUKNGRQ

Sector Addition

DLEVK07

SCFT Completed

22-Jul-14

active

Nbrs missing

discrepancies found

ok

Page 17: 3g Parameter

ok

ok

ok

ok

ok

ok

ok

10967

URMGRJP

New Site

DLEVK07

SCFT Completed

Page 18: 3g Parameter

18-Jul-14

active

ok

discrepancies found

ok

ok

ok

ok

ok

ok

ok

ok

1689

Page 19: 3g Parameter

UMAYFLDQ

Sector Addition

DLEGN04

SCFT Completed

22-Jul-14

active

Nbrs missing

discrepancies found

ok

ok

ok

ok

Page 20: 3g Parameter

ok

ok

ok

ok

10979

USHBDDR

New Site

DLEVK07

SCFT Completed

24-Jul-14

active

ok

Page 21: 3g Parameter

ok

ok

ok

ok

ok

ok

ok

ok

ok

4215

UINDRAPQ

Sector Addition

DLEVK08

Page 22: 3g Parameter

SCFT Completed

23-Jul-14

active

ok

discrepancies found

ok

ok

ok

ok

ok

INDRAPQ 60% success

ok

Page 23: 3g Parameter

ok

1989

UGURS56Q

Sector Addition

DLEGN04

SCFT Completed

4-Jul-14

active

Nbrs missing

discrepancies found

ok

ok

Page 24: 3g Parameter

ok

EUL 80% success

ok

ok

ok

ok

Best Regards;

Aditya Pratap Singh

Specialist-Network Engineering

+91-8800894132

On 07/30/2014 05:55 PM, Fasel Mustafa wrote:

+ Sukisha

Regards

*From:*Aditya Pratap Singh *Sent:* Tuesday, July 29, 2014 5:29 PM *To:* Fasel Mustafa; Sanjeev Mahrolia XM; Anugya Jain; Sandeep Bansal *Cc:* Sanjay Chawla; Maninder Singh S; Mukesh Somani; Rupesh Shrivastav; Praveen Kumar Tiwari P; Prasoon Tiwari *Subject:* Re: 3G New Sites / Sectors Audit

Hi Sir, Please find the enclosed new Sites audit report for GGN cluster site got on aired in July-14 month,details reports are enclosed here with.

Page 25: 3g Parameter

Item highlighted are being taking care by the Operation team.

Thanks to Anugya efforts putting on New Site to do the audit and get this corrected.

@Sanjeev;Request you to please take care the site getting on aired onwards to avoid the such discrepancies.

Site

MO

Type of Site

RNC

Status

SCFT Completion Date

License Status

Nbr Audit

Radio Parameter Audit

PSC Audit

Page 26: 3g Parameter

LAC/RAC Audit

KPI

RSSI

RRC

RAB

DCR

IRAT

Traffic/Download

7737

UDLFP3B

New Site

DLGGN01

SCFT Completed

Page 27: 3g Parameter

10-Jul-14

active

ok

discrepancies found

ok

ok

ok

ok

high

ok

ok

HIGH

3288

Page 28: 3g Parameter

UFINANCY

Sector Addition

DLGGN02

SCFT Completed

2-Jul-14

active

Nbrs missing

discrepancies found

ok

ok

ok

ok

Page 29: 3g Parameter

ok

ok

ok

ok

7499

UUNTSEZ

Sector Addition

DLGGN02

SCFT Completed

10-Jul-14

active

Nbrs missing

Page 30: 3g Parameter

discrepancies found

ok

ok

ok

ok

ok

ok

ok

ok

7690

USREHME

New Site

DLGGN02

Page 31: 3g Parameter

SCFT Completed

7-Jul-14

active

ok

ok

ok

ok

ok

ok

ok

ok

ok

Page 32: 3g Parameter

ok

3465

UAMREXPQ

Sector Addition

DLGGN03

SCFT Completed

15-Jul-14

active

ok

discrepancies found

ok

ok

Page 33: 3g Parameter

ok

ok

ok

ok

ok

ok

5919

UGURG40Q

Sector Addition

DLGGN03

SCFT Completed

18-Jul-14

active

Page 34: 3g Parameter

Nbrs missing

discrepancies found

ok

ok

ok

ok

ok

ok

ok

ok

7724

USRWTVH

Page 35: 3g Parameter

New Site

DLGGN03

SCFT Completed

16-Jul-14

active

Nbrs missing

discrepancies found

ok

ok

ok

ok

high

Page 36: 3g Parameter

ok

ok

ok

10929

UDLFGN1

New Site

DLGGN03

SCFT Completed

12-Jul-14

active

Nbrs missing

discrepancies found

ok

Page 37: 3g Parameter

ok

ok

ok

ok

DLFGN1Y 80% success

ok

ok

7392/1

UVPLTE1

New Site

DLGGN03

SCFT Completed

Page 38: 3g Parameter

2-Jul-14

active

ok

discrepancies found

ok

ok

ok

ok

ok

ok

ok

ok

Page 39: 3g Parameter

Best Regards;

Aditya Pratap Singh

Specialist-Network Engineering

+91-8800894132

On 07/25/2014 04:00 PM, Fasel Mustafa wrote:

As discussed , Pls provide the first cut analysis .

Start from GGN

Regards

*From:*Sanjay Chawla *Sent:* Friday, July 25, 2014 3:16 PM *To:* Fasel Mustafa; Praveen Kumar Tiwari P; Prasoon Tiwari *Cc:* Maninder Singh S; Aditya Pratap Singh; Sanjeev Mahrolia XM; Mukesh Somani; Rupesh Shrivastav *Subject:* RE: 3G New Sites / Sectors Audit

Dear Fasel,

SCFT is being taken as part of Cielo project.

Requesting Praveen, Prasoon for providing the same from team. If required, operations team will support as required.

Description: line

*Thanks & Regards*

**

*SANJAY CHAWLA NETWORK ENGINEERING*

Ericsson India Global Services Pvt Ltd Mobile +91 8800337876 [email protected] <mailto:[email protected]> www.ericsson.com <http://www.ericsson.com/>

For more information on our portfolio of learning services please go to:

Page 40: 3g Parameter

http://www.ericsson.com/ourportfolio/ericsson-academy/learning-services This Communication is Confidential. We only send and receive email on the basis of the term set out at www.ericsson.com/email_disclaimer <http://www.ericsson.com/email_disclaimer>

*From:*Fasel Mustafa *Sent:* Friday, July 25, 2014 3:07 PM *To:* Sanjay Chawla *Cc:* Maninder Singh S; Praveen Kumar Tiwari P; Prasoon Tiwari; Aditya Pratap Singh; Sanjeev Mahrolia XM; Mukesh Somani *Subject:* 3G New Sites / Sectors Audit

Dear Sanjay ,

We need to have the audit of the new sites / sectors which came on air recently in terms of scft reports , parameters , features , KPIs , CS/PS Traffic and need to high light the deviations , if any .

Sanjeev Mahrolia will be sharing the list wef 1^st July , appreciate if we can get the response by EOD .

Aside to Sanjeev , As discussed Pls share the details

Regards , Fasel

--(¨`·.·´¨) *Always *`·.¸(¨`·.·´¨) *Keep*(¨`·.·´¨)¸.·´ *Smiling!* `·.¸.·´Cheers´¨) ¸ •´ ¸.•*´¨) ¸.•*¨) (¸.•´ (¸.•* ♥♥♥SanjayThanks and RegardsSanjay Sahni(+919311986783)[email protected]

Page 41: 3g Parameter