3G Optimization Phase
Overview
Progress
3G KPI Launch Summary
Bottlenecks/Issues
Support
Impact of 3G Network on 2G Network
Summary
-
8/11/2019 3G Optimization Progress & Issues - North - 26th June 2014
3/22
North Region
-
8/11/2019 3G Optimization Progress & Issues - North - 26th June 2014
4/22
Vendor 3G Total Sites
ALU 281
HUW 321
-
8/11/2019 3G Optimization Progress & Issues - North - 26th June 2014
5/22
Vendor On-Air
ALU 30
Vendor On-Air
HUW 123
-
8/11/2019 3G Optimization Progress & Issues - North - 26th June 2014
6/22
Regional Tracker ALU Progress
Vend
or
BSS
Installation
Antenna
Installatio
n Report
SSV On-Air
City Done Submitted Submitted Status
ALU Islamabad &Rawalpindi
44 44 23 30
Vendor
BSS
Installation
Antenna
Installation
Report
SSV On-Air
City Done Submitted Submitted Status
HUW Islamabad &Rawalpindi
176 102 20 123
Regional Tracker HUW Progress
-
8/11/2019 3G Optimization Progress & Issues - North - 26th June 2014
7/22
Cluster Wise
-
8/11/2019 3G Optimization Progress & Issues - North - 26th June 2014
8/22
Cluster Wise - ALU
3G Optimization Progress Summary ALU
City Total Sites No of ClusterSite
Survey
Sites
Integrated
Sites
OnAirSSV Done
SSV
Report
Submit
SSV
Approval
2G
KPIs/alarm
s Report
Submit
2G Pre
Cluster
Report
2G Pre-Post
Cluster
Report
2G Pre-Post
Cluster
Acceptance
3G Cluster
Report
3G Cluster
Acceptance
RWP 26 RWP CL1 24 0 0 0 0 0 0 1 0 0 0 0
RWP 29 RWP CL2 25 0 0 0 0 0 0 1 0 0 0 0
RWP 21 RWP CL3 21 0 0 0 0 0 0 1 0 0 0 0
RWP 28 RWP CL4 28 23 23 17 17 0 23 1 0 0 0 0
RWP 7 RWP CL8 7 7 7 6 6 0 7 1 0 0 0 0
ISB 13 ISB CL1 12 0 0 0 0 0 0 1 0 0 0 0
PSH 20 PSH CL1 11 0 0 0 0 0 0 1 0 0 0 0
PSH 19 PSH CL2 13 0 0 0 0 0 0 1 0 0 0 0
PSH 21 PSH CL3 1 0 0 0 0 0 0 1 0 0 0 0
PSH 44 PSH CL4 0 0 0 0 0 0 1 0 0 0 0
PSH 41 PSH CL5 0 0 0 0 0 0 1 0 0 0 0
ISB/PSH 29 Motorway 0 0 0 0 0 0 0 0 0 0 0
PSH 12 0 0 0 0 0 0 0 0 0 0 0
Summary 310 142 30 30 23 23 0 30 11 0 0 0 0
-
8/11/2019 3G Optimization Progress & Issues - North - 26th June 2014
9/22
Cluster Wise - HUW
3G Optimization Progress Summary HUW
CityTotal
SitesCluster ID
Sites
Integrated
Sites
OnAirSSV Done
SSV
Submitted
SSV
Approval
Post
Installatio
n reports
2G
KPIs/alarm
s Report
Submit
2G Pre
Cluster
Report
2G Pre-
Post
Cluster
Report
2G
Pre-
Post
Cluster
Acceptance
3G
Cluster
Report
3G Cluster
Acceptance
Islamabad
47 ISB_CL1_HU 38 36 36 35 4 24 0 0 0 0 0 0
35 ISB_CL2_HU 18 14 14 9 2 10 0 0 0 0 0 0
19 ISB_CL3_HU 17 16 16 16 0 6 0 0 0 0 0 0
21 ISB_CL4_HU 7 6 6 1 0 7 0 0 0 0 0 0
31 ISB_CL5_HU 12 11 11 6 6 5 1 1 1 0 0 0
9 ISB_CL6_HU 9 9 9 9 8 8 1 1 1 0 0 0
Rawalpindi
39 RWP_CL1_HU 15 14 14 2 1 12 0 0 0 0 0 0
22 RWP_CL2_HU 10 7 7 1 1 7 0 0 0 0 0 0
45 RWP_CL3_HU 11 10 10 1 0 12 0 0 0 0 0 0
29 RWP_CL4_HU 0 0 0 0 0 7 0 0 0 0 0 0
Abbottabad24 Cluster 1 0 0 0 0 0 0 0 0 0 0 0 0
Motorway 16 Cluster 1 0 0 0 0 0 0 0 0 0 0 0 0
Summary 337 12 137 123 123 80 22 98 2 2 2 0 0 0
-
8/11/2019 3G Optimization Progress & Issues - North - 26th June 2014
10/22
Accessibility
ISB Cluster 1
-
8/11/2019 3G Optimization Progress & Issues - North - 26th June 2014
11/22
Accessibility
ISB Cluster 3
-
8/11/2019 3G Optimization Progress & Issues - North - 26th June 2014
12/22
Retainability
ISB Cluster 1
-
8/11/2019 3G Optimization Progress & Issues - North - 26th June 2014
13/22
Retainability
ISB Cluster 3
-
8/11/2019 3G Optimization Progress & Issues - North - 26th June 2014
14/22
Inter-operability
ISB Cluster 1
ISB Cluster 3
-
8/11/2019 3G Optimization Progress & Issues - North - 26th June 2014
15/22
CS Service Traffic Ratio
ISB Cluster 1
ISB Cluster 3
-
8/11/2019 3G Optimization Progress & Issues - North - 26th June 2014
16/22
PS Service Traffic Ratio
ISB Cluster 1
ISB Cluster 3
-
8/11/2019 3G Optimization Progress & Issues - North - 26th June 2014
17/22
LOW THROUGHPUT DUE TO TXN BACKHAUL
Low HSDPA Throughput observed on some sites and issue was escalated last week.
Some action was performed and improvement observed in those sites. Site 9216
still having low DL/UL throughput
-
8/11/2019 3G Optimization Progress & Issues - North - 26th June 2014
18/22
ALU Equipment Shortage:
Due to ALU equipment shortage, there has been a halt in the progress of 3G
commercial on-air in Rawalpindi City.
SSV Approval Huawei 3G Land
Delay in SSV approvals as change in 2G KPI trend is observed after NodeB
Installation
-
8/11/2019 3G Optimization Progress & Issues - North - 26th June 2014
19/22
2G KPI Degradation in ISB city due to BSS Installation
2G KPIs of no of sites have been affected the after HUW BSS installation in
Islamabad City.
North optimization team has conducted random audits of sites where HUW has
completed BSS installations and a detailed report is shared with HQ
-
8/11/2019 3G Optimization Progress & Issues - North - 26th June 2014
20/22
Backhaul capacity verification should be done to ensure that it is not acting as
bottleneck for throughput. HQ should push the Backhaul vendor to ensure
committed backhaul data rates are actually available for NodeBs.
Explanation regarding 2G KPI impact required from Vendor
-
8/11/2019 3G Optimization Progress & Issues - North - 26th June 2014
21/22
The presentation contains detailed progress and issues of North region which
contains no of On-aired 3G sites in North region as well.
-
8/11/2019 3G Optimization Progress & Issues - North - 26th June 2014