P1 3D EXPERIENCE for Infrastructure & China Customer Stories Kevin ZHU Technical Director Construction, Cities & Territories Industry Dassault Systèmes CHINA

Transcript of 3DEXPERIENCE for Infrastructure & China Customer Stories

Page 1: 3DEXPERIENCE for Infrastructure & China Customer Stories

P1

3DEXPERIENCE for Infrastructure& China Customer Stories

Kevin ZHU

Technical Director

Construction, Cities & Territories Industry

Dassault Systèmes CHINA

Page 2: 3DEXPERIENCE for Infrastructure & China Customer Stories

P2

Dassault Systèmes

Infrastructure Solution & Customer Stories

Summary

Topics

Page 3: 3DEXPERIENCE for Infrastructure & China Customer Stories

P3

EMEAR

Headquarters

ParisAMERICAS

Headquarters

Boston ASIA-OCEANIA

Headquarters

Shanghai

17,000 PASSIONATE PEOPLE130 nationalities / 181 sitesOne global R&D / 64 labs Game changing 3DEXPERIENCE solutions

250,000 ENTERPRISE CUSTOMERS11 industries in 140 countries, 25m Users

LONG-TERM DRIVENRevenue: [+10%] €3,551M non IFRSOperating Margin: 32%EPS: [+20% since 2017] 3.11€

12,600 PARTNERSSoftware, Technology & Architecture, Content & Online Services, Sales, Consulting & System Integrators, Education, Research

Dassault Systèmes: The 3DEXPERIENCE Company

Page 4: 3DEXPERIENCE for Infrastructure & China Customer Stories

P4

Our Legacy

19893D DMUDigital Mock-up

19813DDesign

19993D PLMProduct LifecycleManagement

20123DEXPERIENCE®

platformBusiness Experience

Page 5: 3DEXPERIENCE for Infrastructure & China Customer Stories

P5

Our Projects in China

Page 6: 3DEXPERIENCE for Infrastructure & China Customer Stories

P6

Location

Daxing District, BeijingDate

2011–2019Client

Beijing New Airport

Headquarters (BNAH)Size

700,000m2 total floorarea

1450m diameterCapacity

45 mppa

72 mppa with Satellite

Beijing New AirportTerminal Building

Zaha Hadid Architects

Page 7: 3DEXPERIENCE for Infrastructure & China Customer Stories

P7

Page 8: 3DEXPERIENCE for Infrastructure & China Customer Stories

P8

Longest Span Asymmetrical Cable-Stayed Bridge

Tender 3 total length is about 2km

Main bridge is about 1km

Includes the Bali LRT extension line

Danjiang Bridge, Taipei

Zaha Hadid Architects

Sinotech Engineering

Page 9: 3DEXPERIENCE for Infrastructure & China Customer Stories

P9

Page 10: 3DEXPERIENCE for Infrastructure & China Customer Stories

P10

Anti-Coronavirus Project

Wuhan Leishenshan Hospital

• In order to resolve the emergence request from Wuhan City for the accommodation of coronavirus patients, China government decide to build 2 epidemic diseases hospital ,called “ HUO SHEN SHAN “ and “LEI SHEN SHAN”.

• This top national project is requested to complete in 12 days @ China speed

• 1,000+ construction worker with 24 hours in the work site

• Nearly 1,500 beds of each hospital to accommodate of coronavirus patients

Page 11: 3DEXPERIENCE for Infrastructure & China Customer Stories

P11

Anti-Coronavirus Project

Wuhan Leishenshan Hospital

• Protect medical staffs’ health:

– Disclosure indoor airflow @ HVAC ventilation

– Provide 3D transient pollution dispersion

– Optimize ventilation layouts

– Evaluate concentration from toilet, buffer room

四种通风方案比较

Page 12: 3DEXPERIENCE for Infrastructure & China Customer Stories

P12

Dassault Systèmes & China Highlights

Infrastructure Solution & Customer Stories

Summary

Topics

Page 13: 3DEXPERIENCE for Infrastructure & China Customer Stories

P13

3DEXPERIENCE Twins for Digital WorldPlanet

Country

City

Building (BIM)

Product

Material

Lifecycle

Scales

Design Process ServiceSimulation Manfr

Page 14: 3DEXPERIENCE for Infrastructure & China Customer Stories

P14

Infrastructure Solutions on 3DEXPERIENCE

Terra

inB

uild

ing

& C

ivilE

qu

ipm

en

t

Pro

j. Mg

mt

Visu

aliza

tion

Sim

ula

tion

City

Co

nstru

ction

Page 15: 3DEXPERIENCE for Infrastructure & China Customer Stories

P15

Engineer ready-to-deliver infrastructure with knowledge based design

Civil Infrastructure Engineering

01-Project Coordination and Review• Project management provides deliverables-based project

management that links product development data to a

project to enable real-time monitoring and assessment.

• Design collaboration and coordination with 3D markup,

designers can communicate with others in a 3D visualized

manner, coordinate changes, and find errors/conflicts in

real-time, crossing different organizations/geolocations.

• Immersive and visual experience creation, visual and

rendering for non-specialists to produce high-end real-time

visualization and interactive photorealistic visuals

04-Systems Design• MEP component authoring, design and deploy

custom or standard parametric MEP components

capable of designing subterranean open-systems for

infrastructure and utilities as well as self-contained

closed building systems.

02-Infrastructure Design• Infrastructure design, including alignment, earthwork, road,

bridge & tunnel, cut & fill, etc.

• Terrain modeling, Import various survey data to build digital

terrain model. Optimized for large point cloud and supporting

Geolocation Coordination Systems and is enhanced with

polyhedral modeling for earthworks.

03-Structures Engineering• Concrete component design and best tool for 3D

rebar modeling with; parametric rebar templates,

associative design referring to concrete surface, and

export to BVBS format for digital fabrication.

• Metallic Structure Design, design steel structural

systems using standardized members or engineer

complex box girder structures integrating with

manufacturing, simulation, and Weight and Balance.

05-Construction Process Engineering• Construction engineering, process simulation for;

assembly, sub-assembly and construction methods based

on the project model.

Page 16: 3DEXPERIENCE for Infrastructure & China Customer Stories

P16

China Railway Design Corporation• China’s leading engineering company for railway & transit survey, design, consulting and general contractor.

• 4,600+ employees, Tianjin, China. A child company of China Railway Corporation (CRC)

• Ranking #6 in ENR Top Chinese Design Firms, #56 in ENR Top Global Design Firms in 2017.

• Designed 1/3 of China’s operating railway mileages, ~40% of China’s high-speed railway mileages.

– Beijing – Tianjin High Speed Railway (the first 350 km/h railway in the world)

– Beijing – Shanghai High Speed Railway

– Beijing – Hong Kong Railway

– Beijing South Station & Shanghai Hongqiao Station

• Setup a BIM Center of 50 dedicated engineers from various disciplines.

• Choose 3DEXPERIENCE as the 3D Platform since 2015.

Page 17: 3DEXPERIENCE for Infrastructure & China Customer Stories

P17

Multi-Disciplinary Workflow in Railway Design

Survey & Geology

AlignmentCivil

StructureSystems Economy

“Before-Station” “After-Station”

• Collect survey & geology data from existing sources

• Field survey & investigation

• Terrain / geology modeling

• Horizontal alignment design

• Vertical alignment design

• Subgrade• Track• Bridge• Tunnel• Drainage• Station Yard• Building

• Electrical• Communication &

Signal• Environment• Mechanical

• Quantity takeoff• Cost estimation

Page 18: 3DEXPERIENCE for Infrastructure & China Customer Stories

P18

Beijing-Shenyang Line (6.44km). 2015

BIM in Action

• 1st Project in 3DEXPERIENCE

• 1st Experience of 3D design collaboration

• 3D modeling without BIM information

Page 19: 3DEXPERIENCE for Infrastructure & China Customer Stories

P19

Yang-Da Line (44km). 2016

BIM in Action

• 1st Full-disciplinary railway BIM modeling: 6 stations; 20 bridges; 9 tunnels; 19km subgrade.

• 1st Project with BIM information (CR-IFC)

Page 20: 3DEXPERIENCE for Infrastructure & China Customer Stories

P20

BIM in Action

Indonesia Jakarta-Bandung Railway, 2017

• 1st Overseas project

• BIM as required by client

Beijing-Xiong’an Line (90km / 3 months). 2017

• BIM practice from conceptual to detailed design

• 1st Project using BIM for owner approval.

• 1st Project that BIM model is submitted to owner.

Page 21: 3DEXPERIENCE for Infrastructure & China Customer Stories

P21

Voice of Customer

Page 22: 3DEXPERIENCE for Infrastructure & China Customer Stories

P22

Mu-Jia Railway LineThe biggest 3DEXPERIENCE Railway

• 370km High-Speed Railway in Northeast China, from Mudanjiang to Jiamusi / 5 months

• One of two “Smart Railways” selected by CRC.

• Owner ask all contractors to work on 3DEXPERIENCE:

– CRDC completed Design Model (LOD 300) in CATIA, and submitted on Apr 15th.

– 9 contractors are using CATIA to develop Construction Model (LOD 400) on top of CRDC model.

– ALL people working on same 3DEXPERIENCE Platform.

• “Digital Twin” (LOD 500) will be delivered with the Real when construction is done.

Page 23: 3DEXPERIENCE for Infrastructure & China Customer Stories

P23

F

F

F

F

佳木斯-业主JIAMUSIOwner

……

牡丹江-业主MUDANJIANG

Owner

天津-中国铁设TIANJING-CRDC

DA

F

F

F

F

F

F

F

FF

合肥-中铁四局HEFEI-CTCE

太原-中十二局TAIYUAN-CR12BG

贵阳-中铁五局GUIYANG-CR5BG

北京-中铁十九局BEIJING-CR19BG

武汉-中铁十一局WUHAN-CR11BG

济南-中铁十四局JINAN-CR14BG

上海-中铁上海局SHANGHAI-SCEC

西安-中铁一局XI AN-CRFG

北京-中铁二十二局BEIJING-CR22BG

One Model for Everyone

One Platform for Collaboration

One Standard for Data Management

Connected Everywhere

Mu-Jia Railway Line

Collaboration Platform

Page 24: 3DEXPERIENCE for Infrastructure & China Customer Stories

P24

Mu-Jia Line: LOD400 modeling

CR05BG• Bridge structure modeling

with 3D rebar

• Construction facilities

• Pre-fab beam (rebar+ tendon)

• Subgrade with side slope

• Quantity takeoff

Page 25: 3DEXPERIENCE for Infrastructure & China Customer Stories

P25

Mu-Jia Line: LOD400 modeling

CR14BG• Tunnel content catalog

• Tunnel ring templates

• Tunnel entrance modeling

• Quantity take-off

Page 26: 3DEXPERIENCE for Infrastructure & China Customer Stories

P26

Mu-Jia Line: LOD400 modeling

CR11BG• Bridge beam modeling

with rebar

• Construction facilities

• Construction process simulation (in plan)

Page 27: 3DEXPERIENCE for Infrastructure & China Customer Stories

P27

Virtual Construction

3DEXPERIENCE DELMIA

Schedule

3D Model

Animation

EXPORT

IMPORT

Process

simulation

Resource optimizationProcess planning

ResourcesMS Project, Primavera…

Page 28: 3DEXPERIENCE for Infrastructure & China Customer Stories

P28

Nujiang Bridge (Dali-Ruili Railway)

Case Study:

China Railway 18th Bureau Group

• Main span is 490m, the largest span of four-lines railway steel arch bridge in the world.

• Choose 3DEXPERIENCE DELMIA for virtual construction

– Simulate construction process

– Analysis key equipment usage

– Clash detection in installation

– Wind Impact

– Use VR for review & approval

Page 29: 3DEXPERIENCE for Infrastructure & China Customer Stories

P29

Page 30: 3DEXPERIENCE for Infrastructure & China Customer Stories

P30

Page 31: 3DEXPERIENCE for Infrastructure & China Customer Stories

P31

Page 32: 3DEXPERIENCE for Infrastructure & China Customer Stories

P32

Page 34: 3DEXPERIENCE for Infrastructure & China Customer Stories

P38

Dassault Systèmes – SuperMap Strategic Partnership

Technology

Market

Sales

Page 35: 3DEXPERIENCE for Infrastructure & China Customer Stories

P39

Import 3DEXPERIENCE Model into SuperMap

Page 36: 3DEXPERIENCE for Infrastructure & China Customer Stories

P40

Dassault Systèmes & China Highlights

Infrastructure Solution & Customer Stories

Summary

Topics

Page 37: 3DEXPERIENCE for Infrastructure & China Customer Stories

P41

3DEXPERIENCE for Infrastructure Lifecycle

DESIGN TEAM SUPPLY TEAM CONSTRUCTION TEAM OPERATIONS TEAM

Digital Mockup

Design Review

SimulationConstruction

Execution

Lifecycle Management

BIM Data

IFC Data

Fabrication

Data Installation

Data

Work

Packages

Work

Breakdown

Structure

Virtual

Building

Models

Building

Operating

System

Smart

Usage

DataSmart BEM

Content

Building Lifecycle Management Platform