3DEXPERIENCE for Infrastructure & China Customer Stories
Transcript of 3DEXPERIENCE for Infrastructure & China Customer Stories
P1
3DEXPERIENCE for Infrastructure& China Customer Stories
Kevin ZHU
Technical Director
Construction, Cities & Territories Industry
Dassault Systèmes CHINA
P2
Dassault Systèmes
Infrastructure Solution & Customer Stories
Summary
Topics
P3
EMEAR
Headquarters
ParisAMERICAS
Headquarters
Boston ASIA-OCEANIA
Headquarters
Shanghai
17,000 PASSIONATE PEOPLE130 nationalities / 181 sitesOne global R&D / 64 labs Game changing 3DEXPERIENCE solutions
250,000 ENTERPRISE CUSTOMERS11 industries in 140 countries, 25m Users
LONG-TERM DRIVENRevenue: [+10%] €3,551M non IFRSOperating Margin: 32%EPS: [+20% since 2017] 3.11€
12,600 PARTNERSSoftware, Technology & Architecture, Content & Online Services, Sales, Consulting & System Integrators, Education, Research
Dassault Systèmes: The 3DEXPERIENCE Company
P4
Our Legacy
19893D DMUDigital Mock-up
19813DDesign
19993D PLMProduct LifecycleManagement
20123DEXPERIENCE®
platformBusiness Experience
P5
Our Projects in China
P6
Location
Daxing District, BeijingDate
2011–2019Client
Beijing New Airport
Headquarters (BNAH)Size
700,000m2 total floorarea
1450m diameterCapacity
45 mppa
72 mppa with Satellite
Beijing New AirportTerminal Building
Zaha Hadid Architects
P7
P8
Longest Span Asymmetrical Cable-Stayed Bridge
Tender 3 total length is about 2km
Main bridge is about 1km
Includes the Bali LRT extension line
Danjiang Bridge, Taipei
Zaha Hadid Architects
Sinotech Engineering
P9
P10
Anti-Coronavirus Project
Wuhan Leishenshan Hospital
• In order to resolve the emergence request from Wuhan City for the accommodation of coronavirus patients, China government decide to build 2 epidemic diseases hospital ,called “ HUO SHEN SHAN “ and “LEI SHEN SHAN”.
• This top national project is requested to complete in 12 days @ China speed
• 1,000+ construction worker with 24 hours in the work site
• Nearly 1,500 beds of each hospital to accommodate of coronavirus patients
P11
Anti-Coronavirus Project
Wuhan Leishenshan Hospital
• Protect medical staffs’ health:
– Disclosure indoor airflow @ HVAC ventilation
– Provide 3D transient pollution dispersion
– Optimize ventilation layouts
– Evaluate concentration from toilet, buffer room
四种通风方案比较
P12
Dassault Systèmes & China Highlights
Infrastructure Solution & Customer Stories
Summary
Topics
P13
3DEXPERIENCE Twins for Digital WorldPlanet
Country
City
Building (BIM)
Product
Material
Lifecycle
Scales
Design Process ServiceSimulation Manfr
P14
Infrastructure Solutions on 3DEXPERIENCE
Terra
inB
uild
ing
& C
ivilE
qu
ipm
en
t
Pro
j. Mg
mt
Visu
aliza
tion
Sim
ula
tion
City
Co
nstru
ction
P15
Engineer ready-to-deliver infrastructure with knowledge based design
Civil Infrastructure Engineering
01-Project Coordination and Review• Project management provides deliverables-based project
management that links product development data to a
project to enable real-time monitoring and assessment.
• Design collaboration and coordination with 3D markup,
designers can communicate with others in a 3D visualized
manner, coordinate changes, and find errors/conflicts in
real-time, crossing different organizations/geolocations.
• Immersive and visual experience creation, visual and
rendering for non-specialists to produce high-end real-time
visualization and interactive photorealistic visuals
04-Systems Design• MEP component authoring, design and deploy
custom or standard parametric MEP components
capable of designing subterranean open-systems for
infrastructure and utilities as well as self-contained
closed building systems.
02-Infrastructure Design• Infrastructure design, including alignment, earthwork, road,
bridge & tunnel, cut & fill, etc.
• Terrain modeling, Import various survey data to build digital
terrain model. Optimized for large point cloud and supporting
Geolocation Coordination Systems and is enhanced with
polyhedral modeling for earthworks.
03-Structures Engineering• Concrete component design and best tool for 3D
rebar modeling with; parametric rebar templates,
associative design referring to concrete surface, and
export to BVBS format for digital fabrication.
• Metallic Structure Design, design steel structural
systems using standardized members or engineer
complex box girder structures integrating with
manufacturing, simulation, and Weight and Balance.
05-Construction Process Engineering• Construction engineering, process simulation for;
assembly, sub-assembly and construction methods based
on the project model.
P16
China Railway Design Corporation• China’s leading engineering company for railway & transit survey, design, consulting and general contractor.
• 4,600+ employees, Tianjin, China. A child company of China Railway Corporation (CRC)
• Ranking #6 in ENR Top Chinese Design Firms, #56 in ENR Top Global Design Firms in 2017.
• Designed 1/3 of China’s operating railway mileages, ~40% of China’s high-speed railway mileages.
– Beijing – Tianjin High Speed Railway (the first 350 km/h railway in the world)
– Beijing – Shanghai High Speed Railway
– Beijing – Hong Kong Railway
– Beijing South Station & Shanghai Hongqiao Station
• Setup a BIM Center of 50 dedicated engineers from various disciplines.
• Choose 3DEXPERIENCE as the 3D Platform since 2015.
P17
Multi-Disciplinary Workflow in Railway Design
Survey & Geology
AlignmentCivil
StructureSystems Economy
“Before-Station” “After-Station”
• Collect survey & geology data from existing sources
• Field survey & investigation
• Terrain / geology modeling
• Horizontal alignment design
• Vertical alignment design
• Subgrade• Track• Bridge• Tunnel• Drainage• Station Yard• Building
• Electrical• Communication &
Signal• Environment• Mechanical
• Quantity takeoff• Cost estimation
P18
Beijing-Shenyang Line (6.44km). 2015
BIM in Action
• 1st Project in 3DEXPERIENCE
• 1st Experience of 3D design collaboration
• 3D modeling without BIM information
P19
Yang-Da Line (44km). 2016
BIM in Action
• 1st Full-disciplinary railway BIM modeling: 6 stations; 20 bridges; 9 tunnels; 19km subgrade.
• 1st Project with BIM information (CR-IFC)
P20
BIM in Action
Indonesia Jakarta-Bandung Railway, 2017
• 1st Overseas project
• BIM as required by client
Beijing-Xiong’an Line (90km / 3 months). 2017
• BIM practice from conceptual to detailed design
• 1st Project using BIM for owner approval.
• 1st Project that BIM model is submitted to owner.
P22
Mu-Jia Railway LineThe biggest 3DEXPERIENCE Railway
• 370km High-Speed Railway in Northeast China, from Mudanjiang to Jiamusi / 5 months
• One of two “Smart Railways” selected by CRC.
• Owner ask all contractors to work on 3DEXPERIENCE:
– CRDC completed Design Model (LOD 300) in CATIA, and submitted on Apr 15th.
– 9 contractors are using CATIA to develop Construction Model (LOD 400) on top of CRDC model.
– ALL people working on same 3DEXPERIENCE Platform.
• “Digital Twin” (LOD 500) will be delivered with the Real when construction is done.
P23
F
F
F
F
佳木斯-业主JIAMUSIOwner
……
牡丹江-业主MUDANJIANG
Owner
天津-中国铁设TIANJING-CRDC
DA
F
F
F
F
F
F
F
FF
合肥-中铁四局HEFEI-CTCE
太原-中十二局TAIYUAN-CR12BG
贵阳-中铁五局GUIYANG-CR5BG
北京-中铁十九局BEIJING-CR19BG
武汉-中铁十一局WUHAN-CR11BG
济南-中铁十四局JINAN-CR14BG
上海-中铁上海局SHANGHAI-SCEC
西安-中铁一局XI AN-CRFG
北京-中铁二十二局BEIJING-CR22BG
One Model for Everyone
One Platform for Collaboration
One Standard for Data Management
Connected Everywhere
Mu-Jia Railway Line
Collaboration Platform
P24
Mu-Jia Line: LOD400 modeling
CR05BG• Bridge structure modeling
with 3D rebar
• Construction facilities
• Pre-fab beam (rebar+ tendon)
• Subgrade with side slope
• Quantity takeoff
P25
Mu-Jia Line: LOD400 modeling
CR14BG• Tunnel content catalog
• Tunnel ring templates
• Tunnel entrance modeling
• Quantity take-off
P26
Mu-Jia Line: LOD400 modeling
CR11BG• Bridge beam modeling
with rebar
• Construction facilities
• Construction process simulation (in plan)
P27
Virtual Construction
3DEXPERIENCE DELMIA
Schedule
3D Model
Animation
EXPORT
IMPORT
Process
simulation
Resource optimizationProcess planning
ResourcesMS Project, Primavera…
P28
Nujiang Bridge (Dali-Ruili Railway)
Case Study:
China Railway 18th Bureau Group
• Main span is 490m, the largest span of four-lines railway steel arch bridge in the world.
• Choose 3DEXPERIENCE DELMIA for virtual construction
– Simulate construction process
– Analysis key equipment usage
– Clash detection in installation
– Wind Impact
– Use VR for review & approval
P29
P30
P31
P32
P33
Process Planning & Simulation
P38
Dassault Systèmes – SuperMap Strategic Partnership
Technology
Market
Sales
P39
Import 3DEXPERIENCE Model into SuperMap
P40
Dassault Systèmes & China Highlights
Infrastructure Solution & Customer Stories
Summary
Topics
P41
3DEXPERIENCE for Infrastructure Lifecycle
DESIGN TEAM SUPPLY TEAM CONSTRUCTION TEAM OPERATIONS TEAM
Digital Mockup
Design Review
SimulationConstruction
Execution
Lifecycle Management
BIM Data
IFC Data
Fabrication
Data Installation
Data
Work
Packages
Work
Breakdown
Structure
Virtual
Building
Models
Building
Operating
System
Smart
Usage
DataSmart BEM
Content
Building Lifecycle Management Platform
P42