Transcript of 36CBM-SK-RB
-
7/31/2019 36CBM-SK-RB
1/13
FOSHAN COTO KILN CO., LTD. NO.: COTO120329SA
Page 1 of 13
FOSHAN COTO KILN CO., LTD.
3/F Xiabeipu No.29, Jihua RD4, Foshan City, Guangdong Province, China
Tel: 86-757-82709857 Fax: 86-757-82709851 Email: [email protected]
36363636CBCBCBCBMMMM ShuttleShuttleShuttleShuttle kiln forkiln forkiln forkiln forRefractory brickRefractory brickRefractory brickRefractory brick
DESIGN NUMBER: COTO120329SA
DATE: MAR.29, 2012.VALIDITY: 45 DAYS.
Manufacturer & Contractor
FOSHAN COTO KILN CO., LTD.
-
7/31/2019 36CBM-SK-RB
2/13
FOSHAN COTO KILN CO., LTD. NO.: COTO120329SA
Page 2 of 13
FOSHAN COTO KILN CO., LTD.
3/F Xiabeipu No.29, Jihua RD4, Foshan City, Guangdong Province, China
Tel: 86-757-82709857 Fax: 86-757-82709851 Email: [email protected]
SALES CONDITIONDELIVERY TIME: At sellers factory within 50 days after the contact is coming
into force.
PACKING: Included
It covers:
-Storing of the goods waiting to be shipped;
-Preparation and packing of the goods;
The materials will have to be kept by buyer in covered and
guarded areas. All the precautionary measures necessary
for the correct preservation of the materials will to be
taken, waiting for its installation.
INSTALLATION: It includes the following phases:
-Positioning of the equipment in conformity with the plant
layout;
-Possible unpacking;
-Assembling of what is necessary for the completion;
-Connection with the various electrical, pneumatic uses or
other;
-Adjustment of the equipment; (levels; running way of the
motors;
-Installation of the safety devices;
-Idling test of the equipment.
What above-mentioned produces the subscription of the
installation End Certificate.
-Installation work finish with 45 days.
START UP: Include
It includes the actions necessary to put the plant in
-
7/31/2019 36CBM-SK-RB
3/13
FOSHAN COTO KILN CO., LTD. NO.: COTO120329SA
Page 3 of 13
FOSHAN COTO KILN CO., LTD.
3/F Xiabeipu No.29, Jihua RD4, Foshan City, Guangdong Province, China
Tel: 86-757-82709857 Fax: 86-757-82709851 Email: [email protected]
operation until the achievement of the production
contractual terms.
What above-mentioned produces the Acceptance
Certificate of the Plant.
Possible parts excluded from the commissioning due to
lacks can be indicating in the same certificate.
TRAINING: Included
It is the training phase of the Customer personnel.
QUALITY GUARANTEE: The seller shall guarantee the goods is completely
brand-new and shall conform to the technical specification
as stipulated in this contract.
The mechanical guarantee of the contract equipment is 12
months after the commissioning date, or 18 months from
the date of picking up goods in case the commissioning
date, or 18 months from the date of picking up goods in
case the commissioning cannot be finished due to Buyer
fault, during the Guarantee period, if the accessory(ies) of
equipment(s) is/are damaged, the Seller will replace or
repair. (except the Buyer improper use and tear wear
parts).
PAYMENT: 30% as down payment the contract comes into force after
receiving the down payment by the seller;
70% by an Irrevocable Letter of Credit at sight; payable
against shipping documents.
Or other way to be agreed.
REMARK: During machines installation and commissioning the
following costs incurred by Technicians of the Seller shall
be borne by the Buyer.
-
7/31/2019 36CBM-SK-RB
4/13
FOSHAN COTO KILN CO., LTD. NO.: COTO120329SA
Page 4 of 13
FOSHAN COTO KILN CO., LTD.
3/F Xiabeipu No.29, Jihua RD4, Foshan City, Guangdong Province, China
Tel: 86-757-82709857 Fax: 86-757-82709851 Email: [email protected]
-Board and lodging,
-Laundry,
-Pocket money,
-Local Transportation
-Round way air ticket.
EXCLUSIONS: Not included in the supply:
-Transport and lifting equipment on site, with their
operator, and also the crane for the assembling.
-Brickwork and civil engineering works to be performed
according to our drawing.
-Auxiliary services (Natural gas, compressed air, electricity,
grounding, etc..), main emergency generator, water
treatment plant and relative drawings.
-All the pipelines, included the chimneys, for the auxiliary
services and relative drawings and possible insulation.
-Anchor bars for foundations and various walled parts.
-Hydraulic and lubrication oil.
-Consumption material for the installation.
-E.M.F. feeding positions will be indicated on the general
definitive layout. The tension must be within a maximum
limit of variation of 10%. The feeding lines of the electric
panels must be protected with differential security breaker
with adequatesensitivity, as foreseen by the norms in force.
The European reference norm is the EN60204-1.
-Skilled and unskilled labor for the plant installation.
-The installation shall be carried out with the use of
workmen (masons, mechanics, electricians and unskilled
workers) made available by the customer.
-
7/31/2019 36CBM-SK-RB
5/13
FOSHAN COTO KILN CO., LTD. NO.: COTO120329SA
Page 5 of 13
FOSHAN COTO KILN CO., LTD.
3/F Xiabeipu No.29, Jihua RD4, Foshan City, Guangdong Province, China
Tel: 86-757-82709857 Fax: 86-757-82709851 Email: [email protected]
-The work direction shall be carried out by our technicians.
-Skilled and unskilled labor for the plant start-up.
-The start-up and the commissioning of the plant shall be
done together with the customers personnel (workers and
skilled technicians). The co-ordination is carried out by our
technicians.
-Anything else not expressly indicated herein.
VALIDITY OF THE OFFER: 45 days.
Technical designation
I. Main performance and parameter
1Product: Refractory brick
2
Kiln valid inner dimension: 36m
3
3Kiln inner size: 6760mm (W) X3040mm (L) X 1600mm (H)
4Size of products: 610*350*80mm
5The size of kiln car (surface): 2800mm (W) X 2160mm (L)
6Fuel: Nature Gas (Heat value: 8300kcar/ m3)
7Firing temperature: 1400, the maximum temperature 1500
8Firing cycle: 20-30h (normal temperature till maximum fired
temperature) The user can adjust the firing cycle
according their production capacity and quality
demand. The user should ensure their kiln facility can
endure with this firing cycle.
9Firing atmosphere: Oxidation
-
7/31/2019 36CBM-SK-RB
6/13
FOSHAN COTO KILN CO., LTD. NO.: COTO120329SA
Page 6 of 13
FOSHAN COTO KILN CO., LTD.
3/F Xiabeipu No.29, Jihua RD4, Foshan City, Guangdong Province, China
Tel: 86-757-82709857 Fax: 86-757-82709851 Email: [email protected]
10Production capacity: about 1000 pcs / kiln
The real loaded capacity should according the
product size and its loading method in the car. The
user can test the product on the ground for how it
can load product to get the best loading density.
11Temperature deviation: 5 (in maximum temperature)
12Control system: Temperature auto-control, pressure auto-control.
13Refractory structure of the kiln: Fibre cotton & brick.
14
Exhaust style: Mechanical exhaust
15Spray gun: 8 pcs of high speed isothermal spray gun
16Railway: One lane inside the kiln, One lanes outside the kiln
17Heat exchanger: Use the waste heat for heating the combustion air.
The temperature of combustion air can raise to 100-150.
18No. of car: 6 cars (3 kiln car inside the kiln, 3 cars outside)
19Fan: One combustion fan, one exhausting fan, made of stainless steel.
II. Kiln construction
1Kiln Module
a) The kiln adopt module construction, each module include the
burner, flue, cooling break, sand sealing, rail , kiln wall refractory
material, the kiln install in plant site.
Steel for kiln body:
1. Side frame: 70*50*3, 50*50*2.5mm square tube
2. Kiln door: 12#, 10# U-steel, and square tube
3. Railway: 12kg steel rail
4. Heat exchanger: Hest resist Stainless steel, #304
5. Kiln car: 10# U-steel, 10# square tube, 50mm angle steel
-
7/31/2019 36CBM-SK-RB
7/13
FOSHAN COTO KILN CO., LTD. NO.: COTO120329SA
Page 7 of 13
FOSHAN COTO KILN CO., LTD.
3/F Xiabeipu No.29, Jihua RD4, Foshan City, Guangdong Province, China
Tel: 86-757-82709857 Fax: 86-757-82709851 Email: [email protected]
6. Kiln face plate: 1.5mm A3 cold plate, 4 sides edgefold, with
paint.
b) The shell of the kiln use the good quality steel board and tighten
channel steel, square tube make into the module, all the steel
material on the kiln shell with high temperature durable paint.
2 Kiln roof is crown ceiling cotton & brick construction.
Name of material Thickness Max. stable temperature
Mullite Polycrystalline fibre 50mm 1600
JM 28 brick 230mm 1400
High aluminium fibre blanket 25mm 1350
Normal fibre cotton blanket 25mm 1260
Total thickness 330mm
3The total thickness of kiln wall is 515mm, the sticking refractory
and insulated materials as following:
Name of material Thickness Max. stable temperature
Mullite Polycrystalline fibre 50mm 1600
JM 28 brick 230mm 1400
High aluminium light brick 115mm 1350
High pure fibre board 20mm 1350
Aluminium silicate fibre board 50mm 1300
Rock wool 50mm 1250
Total thickness 515mm
4The kiln is single door structure. The construction-work thickness is
430mm, fully cotton, same as kiln wall. While in close, the door and the
wall connected as the tower construction, which is good for sealing the
-
7/31/2019 36CBM-SK-RB
8/13
FOSHAN COTO KILN CO., LTD. NO.: COTO120329SA
Page 8 of 13
FOSHAN COTO KILN CO., LTD.
3/F Xiabeipu No.29, Jihua RD4, Foshan City, Guangdong Province, China
Tel: 86-757-82709857 Fax: 86-757-82709851 Email: [email protected]
air flow.
Name of material Thickness Max. stable temperature
Mullite Polycrystalline fibre 50mm 1600 JM 28 brick 230mm 1400
High aluminium fibre board 100mm 1350
Aluminium silicate fibre board 50mm 1300
Total thickness 430mm
III. Kiln Car Construction
1The kiln car assembled by frame and processed axle assembly (include:
wheel, axle and sealing bearing), will delivery to work site for
installation. There are refractory bricks all around the kiln car surface,
and fill cotton fibre in the middle, cover cotton blanket above. The
refractory will work on site. Also a ceramic rope separates the air on
the kiln car bottom.
2The kiln car frame is made of steel, the kiln car side go through the sand
sealing, avoid the heat flow out from the kiln, all the steel painting with
high-temperature-resist paint.
Include all the wheel, axle, frame and refractory for 20 set of kiln car.
IV. Firing system and control system
1Exhaust system
a) The kiln design in side exhaust, after diluted, it exhausted through
the drain pipe on the top of kiln. If control the kiln pressure properly
the heat could transfer to the product evenly.
b) Through the Programmable controller control the driving air valve
to get the kiln pressure stably, on condition of proper control
system it can get very good iteration.
2Control system
-
7/31/2019 36CBM-SK-RB
9/13
FOSHAN COTO KILN CO., LTD. NO.: COTO120329SA
Page 9 of 13
FOSHAN COTO KILN CO., LTD.
3/F Xiabeipu No.29, Jihua RD4, Foshan City, Guangdong Province, China
Tel: 86-757-82709857 Fax: 86-757-82709851 Email: [email protected]
a) Integrate multil control system is one of the fully automatic
control system on the basic of PLC, this system control all the
function from kiln start to firing completion.
b) Through the software interface writing the procedurer, modify and
save the firing cycle entre into PLC.
c) During operation, the interface can diverse the Chinese and English
version conveniently.
d) The status report.
e) Alarm.
f) Recording the operation files.
g) Long distance inspection.
h) While the computer in fault, the kiln still can work on, but no screen
display, the indicator light on the panel can confirm the kiln running
in good condition or not.
j) The pulse control system:
Controlling each spray nozzle
Controlling the each spray nozzle individual natural gas execute
framework.
Individual air execute framework
Individual thermo valve shut off
Individual ignite and flame detect system
Auto program gas and air ratio system
In each zone with seperate thermocouple and compesated lead.
Atmosphere auto diverse system
-
7/31/2019 36CBM-SK-RB
10/13
FOSHAN COTO KILN CO., LTD. NO.: COTO120329SA
Page 10 of 13
FOSHAN COTO KILN CO., LTD.
3/F Xiabeipu No.29, Jihua RD4, Foshan City, Guangdong Province, China
Tel: 86-757-82709857 Fax: 86-757-82709851 Email: [email protected]
Auto procedure temperature curve system
Auto atmosphere inspect system
Emergency stop at over temperature.
Alarm and warn indicator
Order select and set up operate selection
Display selection switch
Control system includes the safety device, which can make the kiln
recover to safe status.
3Firing system
a) All use the high speed temperature isothermal spray gun. 4 auto
temperature control point. Each 2 spray gun controlled in one
group, 2 spray gun in each firing channel on both side and
up&down, with a labyrinth position. Totally 4 firing channel.
b) All the burner with automatic ignite and fire off protect safety
device. Each burner controlled by its own control system.
c) Main gas station is a whole system with filter, pressure-reducer,
pressure smoother, safely-cut off device. The buyer should provide
good gas with smooth pressure, the gas is controlled by the rate
valve according to the pressure of combustion air.
d) The firing system includes:
Fuel supply pipes; Pressure-reduce station; Pressure smooth;
Filter.
8 sets of high speed temperature isothermal spray gun.
Ignition control box, with solo ignite and shut off safety device.
Each burner equipped with flame detect control and shut valve
-
7/31/2019 36CBM-SK-RB
11/13
FOSHAN COTO KILN CO., LTD. NO.: COTO120329SA
Page 11 of 13
FOSHAN COTO KILN CO., LTD.
3/F Xiabeipu No.29, Jihua RD4, Foshan City, Guangdong Province, China
Tel: 86-757-82709857 Fax: 86-757-82709851 Email: [email protected]
device. While the flame off the burner also will be shut off.
Auto gas-air ratio system, and combustion air
auto-compensation system, ensure the gas fully firing.
Firing system equipped with pressure switch in case avoid the
kiln for over high or low fuel pressure.
Kiln door system
1double door, back to back open.
2
Kiln door open or close by automatic control.
Cooling system
1The cooling blow hole nearby the firing channel.
2Include 8 sets cooling blow hole, by use the combustion pipes.
3Cooling air auto-adjustment according the firing cycle. Air volume
controlled by the inverter.
Air supply system and fan
1One set of combustion fan.
2One set of exhausting fan.
All the fans equip with inverter; all the pipes produced in advance;
combustion pipe and exhausting pipe made of #304 stainless steel.
Railway and kiln car in&out system
Include whole set of auto loading and unloading system, and inside &
outside railway.
Heat exchange system
Nearby the exhausting hole install the heat-resist stainless steel
-
7/31/2019 36CBM-SK-RB
12/13
FOSHAN COTO KILN CO., LTD. NO.: COTO120329SA
Page 12 of 13
FOSHAN COTO KILN CO., LTD.
3/F Xiabeipu No.29, Jihua RD4, Foshan City, Guangdong Province, China
Tel: 86-757-82709857 Fax: 86-757-82709851 Email: [email protected]
exchanger, heating with combustion air, reduce the exhausting heat and
improve the utilization ratio of energy. The exchanger designed by our
company has a large exchange area, high exchange effect, high heat
utilization ratio.
Drawing offered by COTO
1Kiln and around auxiliary euipment layout.
2Foundation and its loading layout.
3Electricity drawing.
4
Spare parts Drawing.
5Kiln and kiln car framework drawing.
Equipment Quotation
No. Name & Spec. QTYUnit price
(USD)
Total
(USD)Remark
1 Shuttle kiln 1 set 104,500.00 109,500.00
2 FOB charge Full set 3,000.00
3Installation
chargeFull set 10,000.00
Totally amount 122,500.00
SAY US DOLLARS ONE HUNDRED AND TWENTY TWO THOUSAND AND FIVE
HUNDRED ONLY.
The responsibility of customer
1Relative Document
- After sign the contract, the customer need to offer following document to
COTO company within 2 weeks.
- Plant layout drawing and section drawing, include the space, pole
position and framework detail.
- The fully parameter of fuel.
-
7/31/2019 36CBM-SK-RB
13/13
FOSHAN COTO KILN CO., LTD. NO.: COTO120329SA
Page 13 of 13
FOSHAN COTO KILN CO., LTD.
3/F Xiabeipu No.29, Jihua RD4, Foshan City, Guangdong Province, China
Tel: 86-757-82709857 Fax: 86-757-82709851 Email: [email protected]
- Firing temperature curve.
- The product on kiln car, and the load quantity of kiln accessor,(quantity
and weigh).
2Equipment
- The safety device with its designation, manufacture and installation
around the kiln.
- Foundation of kiln.
3Others
- Get the promotion from local government for install the machine.
- Design or modify foundation, framework or roof work.
- For special demand at install site, like knock wall, ceiling, roof and
brush work, the buyer need cooperate for that.
- The crane, fork, and tools.
- Offering the fuel, telephone, fax, crew, hardward, hydraulic oil and ECT.
- The water and electric for install site.
- The equipment for keeping stable voltage.
- The mainline send the the main.
- Offer the proper fuel includes the pressure till the kiln.
- During test time offer the crane, kiln accessory, fuel and labor.
- Clear away the install site packing material.