INSPECTION AND TEST PLAN FOR MECHANICAL WORKS
(EQUIPMENT INSTALLATION)
TECNIMONT IDENTIFICATION CODE
3611-LZ-PQ-PR_000_6_01_0024
Page 2 of 5 Rev. 04
LOCATION PROJECT KNPC IDENTIFICATION CODE
MAA REFINERY, KUWAIT
NEW AGRP / AGRP REVAMP PR-000-6-01-0024
________________________________________________________________________________________________________________ This document is KNPC’s property, and cannot be used by others for any purpose, without prior written consent.
L E G E N D PF - Perform the activity and Full Inspection by Subcontractor H - Hold Point. Request for Inspection is required. The Party shall witness and sign for
acceptance the Inspection request form. Subcontractor is not allowed to proceed in case of Party absence unless permission is given. Furthermore, certification shall be submitted for review (e.g. Laboratory / Third Party Service Company).
W - Witness Point. Request for Inspection is required. The Party shall optionally witness.
Subcontractor can proceed with inspection even if Party is absent. The Party shall sign for acceptance of the witnessed inspection and/or test after reviewing of the relevant Inspection report.
S - Surveillance. Request for Inspection is not required. The Party shall spot witness during job
execution. Subcontractor can proceed whether or not the witnessing Party is present. Certification, if any, shall be spot reviewed.
R - Review of certification / documents A - Approval of documents. 1 - Manufacturer's Certificates to be submitted 2 - Manufacturer’s Certificates Review 3 - Laboratory’s Certificates to be submitted 4 - Laboratory’s Certificates Review SC - Subcontractor: Responsible for execution of works, where applicable. DS - Contractor Discipline Supervisor: Responsible for supervising the Subcontractor’s works or responsible for direct work execution. C - Contractor: QC Inspector of Contractor Tecnimont S.p.A., responsible for Inspection activities.
CP - Company: Means Owner or KNPC Representative
INSPECTION AND TEST PLAN FOR MECHANICAL WORKS
(EQUIPMENT INSTALLATION)
TECNIMONT IDENTIFICATION CODE
3611-LZ-PQ-PR_000_6_01_0024
Page 3 of 5 Rev. 04
LOCATION PROJECT KNPC IDENTIFICATION CODE
MAA REFINERY, KUWAIT
NEW AGRP / AGRP REVAMP PR-000-6-01-0024
________________________________________________________________________________________________________________ This document is KNPC’s property, and cannot be used by others for any purpose, without prior written consent.
INSPECTION AND TEST PLAN
Item Activity
Description Inspection and Test Points
Applicable Specifications / Codes / Standards
Test Record or Documentation
Inspection Responsibility
SC / DS C CP 1.0 General - Inspection of received equipment
Applicable Contract Document Approved Drawing
5213, 5480, 5481 PF H H
- Lifting Plan (for major equipment) Approved lifting plan PF A A
- Request for Inspection and Test 5070 PF H H
2.0 Static Equipment
2.1 Control before installation
- Verification of name plate and tag
Approved Drawing 5207
PF H H
- Anchor bolt location and levelling check PF H H
- Shim plate preparation and levelling check PF H H 2.2 Installation of
equipment - Check of orientation
Applicable Contract Document Approved Drawing
Shell DEP 5207, 5210
PF H H
- Check of alignment PF H H
- Release for grouting PF H H
2.3 Control after installation check
- Grouting of equipment * Approved Drawing Shell DEP
5207 PF H H
- Tightening of anchor bolts PF H H
2.4 Inspection of internals
- Internal cleaning of equipment Applicable Contract Document
Approved Drawing Shell DEP
5210
PF H H
- Installation of internal elements PF H H
- Preliminary Box-up PF H H
2.4 Pressure Test - Pressure test of equipment (when required) Approved Drawing Shell DEP
5074 PF H H
INSPECTION AND TEST PLAN FOR MECHANICAL WORKS
(EQUIPMENT INSTALLATION)
TECNIMONT IDENTIFICATION CODE
3611-LZ-PQ-PR_000_6_01_0024
Page 4 of 5 Rev. 04
LOCATION PROJECT KNPC IDENTIFICATION CODE
MAA REFINERY, KUWAIT
NEW AGRP / AGRP REVAMP PR-000-6-01-0024
________________________________________________________________________________________________________________ This document is KNPC’s property, and cannot be used by others for any purpose, without prior written consent.
Item Activity
Description Inspection and Test Points
Applicable Specifications / Codes / Standards
Test Record or Documentation
Inspection Responsibility
SC / DS C CP
3.0 Rotating Equipment
3.1 Control before installation
- Verification of name plate and tag
Approved Drawing 5208
PF H H
- Anchor bolt location and levelling check PF H H
- Shim plate preparation and levelling check PF H H
3.2 Installation of equipment
- Check of orientation and centering Approved Drawing
Shell DEP 3611-GZ-SG-SP_000_2_58_0001 Manufacturer’s Recommendations
5208, 5209
PF H H
- Tightening of anchor bolts PF H H
- Preliminary alignment (without piping) PF H H
- Release for grouting PF H H
3.3 Grouting - Grouting of equipment * Shell DEP
Manufacturer’s Recommendations 5208 PF H H
3.4 Final Alignment - Piping stresses Approved Drawing Shell DEP
Manufacturer’s Recommendations 5208, 5209
PF H H
- Final alignment (after piping connection) PF H H
4.0 Other Equipment - Miscellaneous equipment Applicable Contract Document Approved Drawing
Shell DEP 3611-GZ-SG-SP_000_2_58_0001
5207, 5208, 5209, 5210 (As applicable)
PF H H
- Package Unit PF H H
* ITP for Civil Works (3611-LZ-PQ-PR_000_6_01_0017) shall also to be followed for Grouting activities
INSPECTION AND TEST PLAN FOR MECHANICAL WORKS
(EQUIPMENT INSTALLATION)
TECNIMONT IDENTIFICATION CODE
3611-LZ-PQ-PR_000_6_01_0024
Page 5 of 5 Rev. 04
LOCATION PROJECT KNPC IDENTIFICATION CODE
MAA REFINERY, KUWAIT
NEW AGRP / AGRP REVAMP PR-000-6-01-0024
________________________________________________________________________________________________________________ This document is KNPC’s property, and cannot be used by others for any purpose, without prior written consent.
SUMMARY OF INSPECTION FORMATS:
5070 – Request for Inspection / Test
5074 – Pressure Test Report
5207 – Mechanical Equipment Installation Inspection Report
5208 – Rotating Equipment Installation Inspection Report
5209 – Mechanical Equipment Alignment Inspection Report
5210 – Record of Dimensional Inspection
5213 – Material Inspection Report
5480 – Checklist for Receiving Stationary Equipment at Site
5481 – Checklist for Receiving Rotating Equipment at Site
PRJ‐QMS 9I‐01‐5070 Rev. 3
KUWAIT NATIONAL PETROLEUM COMPANY PROJECT DEPARTMENT
REQUEST FOR INSPECTION / TEST
Contractor: …TECNIMONT S.p.A..……………. Sub Contractor: …………………………..…….. Project name: …New AGRP/AGRP Revamp… Request No.: …………..……………………… Contract No.: …CA/CSPD/0011.…………………. Date: ……………………….………... Discipline: ………………………………….....…………………………………………………………………………………. Location: …………………………………… ……………………………………………………………………………………
We would request your presence for inspection / test according to the following schedule:
This is to inform you that following inspection / test will be carried out at the scheduled time mentioned below:
Sl.No. Description of Inspection / Test Date / Time Remarks
Requested by: OT Apprd:
____________________ _____________________ ______________________
Contractor’s QC Engineer Const. Engineer-PD (KNPC) Team Leader
Name: ………………………………. Name: ……………………………………
Date: ……………………………… Date: …………………………………….. Date: ……………………………….
Cc: Concerned Team Leaders / PTFLs
____________________________________________________________________________________
Comments: …………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………
__________________________ ____________________________
Insp. Supervisor* Insp. Engineer - PD
Name: Name:
Date: Date:
*Only when inspected by Supervisor
Contractor : Tecnimont SpA. Sub. Contractor : Report No. :
Project Title: New AGRP / AGRP Revamp Contract No. : CA/CSPD/0011 Date :
Equipment / Line No. : Test Package No. :
Design Code : Sheet No. of
NAME : NAME :
DATE : DATE :
TEST PRESSURE :
TEST MEDIUM :
DATE :
TIME STARTED :
HOLDING TIME :
SURFACE TEMPERATURE :
AMBIENT TEMPERATURE :
TEST RESULT : ACCEPTED REJECTED
LINE RELEASED FOR FINAL PAINTING / INSULATION YES NO
NAME : NAME :
DATE : DATE :
NOTE : 1) IN CASE OF PIPING, HIGHLIGHT THE SECTIONS TESTED, IN THE DRAWINGS AND ATTACH.
2) IN CASEOF HEAT EXCHANGERS, MENTION THE TUBE TEST & SHELL TEST PRESSURE IN THE
REMARKS COLUMN.
PRJ-QMS 9I-01-5074 Rev. 1
CONTRACTOR ENGINEER
CONTRACTOR QC ENGINEER KNPC INSPECTION ENGINEER
MANUFACTURER RANGE ID No. DATE OF CALIBRATION
TEST INSTRUMNMENTS
REMARKS
Kuwait National Petroleum Company
PROJECTS DEPARTMENT
PRESSURE TEST REPORT
Ref. Drawings :
KNPC CONSTRUCTION ENGINEER
Sl. No EQUIPMENT / LINE NO. SPECIFICATIONS
CA/CSPD/0011
Project : NAGRP / AGRP Revamp
Item No :
Item Description : Drawing Ref.
Location :
The Installation of the above Equipment has been Satisfactorily Completed in Accordance with the Drawings and Specifications.
Name :
Name :
Name :
MECHANICAL EQUIPMENTINSTALLATION
INSPECTION REPORT
Projects Department
Kuwait National Petroleum Co.
Project Coordination Group -
Date :
PRJ-QMS 9C-03-5207 Rev. 2
Contract No. :
Serial No. :
4 Grouting
- Check Centering & Alignment
- Check Orientation
3 Erection
- Padding Elevation & Levelling
2
Sign. / Date
Contractor
Vertification of Name Plate & Tag No.
Foundation Check
- Anchor Bolt Location & Levelling
INSPECTION DESCRIPTION
No. DescriptionKNPC
Remarks
1
Contractor Q.C.
Signed : Date :
KNPC Rep.
Contractor Rep.
Date :
Signed : Date :
Signed :
5 Anchor Bolt Tightening / Lock nut Installation
CA/CSPD/0011
Project : NAGRP / AGRP Revamp
Item No :
Item Description : Drawing Ref.
Location :
Name :
Name :
Name :
PRJ-QMS 9C-03-5208 Rev. 2
Contract No. :
Serial No. :
ROTATING EQUIPMENTINSTALLATION
INSPECTION REPORT
Projects DepartmentProject Coordination Group -
Kuwait National Petroleum Co.
Date :
Remarks
5 Check Alignment & Record Reading for Preliminary Alignment (Bare Eqpt.)
4 Anchor Bolt Tightening
3 Confirm Orientation & Centering of the Equipment
- Padding Elevation & Levelling
1
2
Sign. / Date
Contractor
Vertification of Name Plate & Tag No.
Foundation Check
- Anchor Bolt Location & Levelling
6 Grouting
INSPECTION DESCRIPTION
No DescriptionKNPC
Contractor Q.C.
Signed : Date :
KNPC Rep.
Contractor Rep.
Date :
Signed : Date :
The Installation of the above Equipment has been Satisfactorily Completed in Accordance with the Drawings and Specifications.
Signed :
7 Check Alignment & Record Reading for Final Alignment
CA/CSPD/0011
RADIAL DRIVER DRIVEN
00 00
2700 900 2700 900
1800 1800
Maximum Allowed :
Vertical : Vertical :
Horizontal : Horizontal :
RADIAL DRIVER DRIVEN
00 00
2700 900 2700 900
1800 1800
Maximum Allowed :
Signed : Name : Date :
Signed : Name : Date :
Signed : Name : Date :
Contractor Rep.
Contractor QC
KNPC Rep.
2700 2700
1800 1800
900 900
Result
00 00
1800
900
00
Result
Result
B) PIPING STRESSES (Dial Gauge movement while tightening)
Serial No. :
MECHANICAL EQUIPMENTALLIGNMENT INSPECTION
REPORT
Project : New AGRP / AGRP Revamp
Item No. :
Item Description :
Location :
Coupling Type :
2700
Coupling Gap :
Drawing Ref. :
Date :
A) PRELIMINARY ALIGNMENT (BEFORE PIPING CONNECTED)
2700
Result
00
900
PRJ-QMS 9C-03-5209 Rev. 2
Kuwait National Petroleun Co.
Projects Department
Project Coordination Group -
C) FINAL ALIGNMENT (AFTER PIPING CONNECTED)
Contract No :
Suction Discharge
1800
CA/CSPD/0011
Signed: Visual Inspection :
Result of Inspection :
Date of Inspection :
Inspected by :
Witnessed by:
PRJ-QMS 9C-03-5210 Rev. 2
Contractor Representative
KNPC Representative
Kuwait National Petroleun Co.
Projects Department
Project Coordination Group -
Contractor QC
Contract No :
Serial No. :
RECORD OF DIMENTIONAL INSPECTION
Project : New AGRP / AGRP Revamp
Item No. :
Item Description :
Location :
Drawing Ref. :
Date :
Description of Material for Inspection :
Inspection Location: Date of material delivery : Date of Inspection :
Contractor Use
Comments
Contractor's Signature Date :
KNPC Use
Comments
Signature of KNPC Representative Date :
DOCUMENTS ATTACHED :
Transmittal No.
Contract No.
Date
MIR No.
Spec. / Drg. Ref.
Test / Mill Certificates
Copy of Packing list
Copy of Purchase Order
Copy of Invoice stamped by customs
Copy of relevant drawings
TPI Report
Inspection Release Certificate
Item / Qty. req'd. Qty. Delivered
Kuwait National Petroleum Company
PROJECTS DEPARTMENT - PROJECT COORDINATION GROUP -
MATERIAL INSPECTION REPORT
Total Delivered
CA/CSPD/0011
Contractor Use Comments
PRJ-QMS 9C-03-5213 (Sheet 1 of 2) Rev. 3
Contract No. : CA/CSPD/0011 MRIR No. :
Project : New AGRP / AGRP Revamp Date :
CONTRACTOR CONTRACTOR QC KNPC
PRJ-QMS 9C-03-5213 (Sheet 2 of 2) Rev. 3
Sl. No. Description Material QTY (Nos.) Heat No. 1 Heat No. 2 Test Certificate No. Tag No. Remarks
MATERIAL RECEIPT INSPECTION REPORT
CERTIFIED THAT ABOVE MATERIALS HAVE BEEN PROPERLY IDENTIFIED WITH RESPECT TO THE TEST CERTIFICATES AND THAT MATERIALS RECEIVED ANDACCEPTED ARE IN GOOD CONDITION AND MEET THE RELEVANT SPECIFICATIONS. ALL ACCEPTED MATERIALS HAVE BEEN STORED / STACKED.
: New AGRP / AGRP Revamp
: CA/CSPD/0011
Date :
Checking by Engineering Checking by Construction
Spares shall be checked for the following :
Othe items, if any
a. b.
Check the name plate with respect to the drawing
Discipline Engineer Date Discipline Engineer
a. Spares list b. Any damages
Check the equipment for any damages due to transportation, handling, etc.
Check the critical parts of the equipment
Equipment Name :
Part A : The following drawings / documents which are approved by KNPC shall be presented by EPC Contractor along with inpsection request.
Part B : The following items shall be checked at site :
Status
Drawing / Document Yes No Remarks
Copy of latest PO for the equipment
PROJECT TITLE
CONTRACT NO.
CHECKLIST FOR RECEIVING STATIONARY EQUIPMENT AT SITE
Equipment Tag Number :
Kuwait National Petroleun Co. (K.S.C.)
Projects Department
Copy of the latest PO for the spares of the equipment
Latest G.A. drawing of the equipment
Latest name plate drawing for the equipment
Latest data sheet of the equipment
Installation & Maintenance manuals, catalogue copies, etc.
Inspection release certificate by TPI agnecy
Check the equipment with respect to approved G.A. Drawing and PO document
Description Remarks
PRJ-QMS 9C-06-5480 Rev. 0
Date
Discipline Engineer Date Discipline Engineer Date
: New AGRP / AGRP Revamp
: CA/CSPD/0011
Date :
a. b.
a. Spares list b. Any damages
Checking by Engineering Checking by Construction
Spares shall be checked for the following :
Othe items, if any
PRJ-QMS 9C-06-5481 Rev. 0
Discipline Engineer Date Discipline Engineer
PROJECT TITLE
CONTRACT NO.
CHECKLIST FOR RECEIVING ROTATING EQUIPMENT AT SITE
Equipment Tag Number :
Equipment Name :
Part A : The following drawings / documents which are approved by KNPC shall be presented by EPC Contractor along with inpsection request.
Part B : The following items shall be checked at site :
Status
Check the equipment with respect to approved G.A. Drawing and PO document
Kuwait National Petroleun Co. (K.S.C.)
Projects Department -
Drawing / Document Yes No Remarks
Copy of latest PO for the equipment
Copy of the latest PO for the spares of the equipment
Latest G.A. drawing of the equipment
Latest name plate drawing for the equipment
Latest data sheet of the equipment
Installation & Maintenance manuals, catalogue copies, etc.
Inspection release certificate by TPI agnecy
Description Remarks
Date
Check the name plate with respect to the drawing
Check the equipment for any damages due to transportation, handling, etc.
Check the critical parts of the equipment
Discipline Engineer Date Discipline Engineer Date