HUAWEI TECHNOLOGIES CO., LTD.
Wireless hardware installation key point
Orange Project_JordanV1.4
This document including most frequently mistakes has made during site installation
and swap.
If you have any questions and suggestion regarding installation and swap,
please feedback
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
2/431
1Contents
1. Cabinet1.1 Cabinet location
1.2 Equipment layout in BTS and TP cabinet of scenario 1
2. Main equipment2.1 RRU Installation principle
2.2 MRFU Install Position Principle
2.3 The mounting ears and cable claw of DCDU -12B
2.4 Sensor installation in TP48200A power cabinet
2.5 AC input power cable installation
2.6 Battery installation in TP48200A power cabinet
2.7 TP48200A Power System Commissioning
3. Antenna&feeder system3.1 Distinguish the right port of New antenna
3.2 Use double screws to fix Wireless ANT on mast/pole
3.4 Color ring principle for jumper
3.5 How to measure the azimuth of ANT
3.6 How to adjust the down-tilt of ANT
4. DC power distribution
4.1 The TP48200A MCB distribution for DCDU4.2 The DCDU distribution for RRU
5. Cable installation5.1 Cable route at outdoor cabinets
5.2 Monitor cable from TP to BBU
5.3 Transmission cable from MW IDU to BTS
5.4 Install AISG cable from ANT to RRU
5.5 Hoist RRU fiber
6. Grounding6.1 cabinet & RRU grounding
6.2 RRU Power cable grounding
6.3 7/8feeder grounding
7. Waterproof7.1 The connector of jumper waterproofed
7.2 7/8feeder grounding waterproofed
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
3/432
cabinet
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
4/43
800mm
3
1.1 The base &cabinet installation on concrete
BTS3900A & TP48200A cabinet on concrete must be 40-150mmaway from each other, make sure the door of cabinet can beopened normally.
The cable between two cabinetsneed to use PVC Pipe, to protectcable from damage !!!
50mm
2 cabinet at same level
BTS39 A TP482 A
BTS39 A TP482 A
BTS at Left TP at Right
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
5/434
1.2 Equipment layout of scenario 1 (1/3)
General view
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
6/43
1.2 Equipment layout of scenario 1 (2/3)
5
The equipment layout in BTS3900A cabinet
DCDU-12A for
BBU and Fan
BBU3910
DCDU-12B for3G and 4G RRU
1DCDU-12B maximumsupport 6 RRU, In casemore than 6RRUs, mustadd another DCDU-12Bhere.
DCDU-12A for
MRFU power
MR
FUd
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
7/43
1.2 Equipment layout of scenario 1 (3/3)
6
The equipment layout in TP48200A cabinet
DDF for E1s
DCDU-12B for RTN power
RTN location
AC/DC Breaker
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
8/437
Main equipment
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
9/438
2.1 RRU Install Position Principle
If have space on mast/ tower, each sector install 2 RRUs, one is 3G RRU,
another is 4G RRU
If no enough space on mast/ tower, 3 RRUs can be combined, they are same
frequency . the other 3RRUs also be combined.
One RRU is 1800M_4Ganother is 2100M_3G
Same frequency 18 M_4G
4G
4G
4G
Same frequency 21 M_3G
3G 3G 3G
Using joint bar connect
each RRU
Using joint bar connect each RRU
4G
3G
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
10/439
2.2 MRFU Install Position Principle
MRFU module for 2G, install at the low rack of BTS3900A cabinet
If the sector of 2G is 1
3, MRFU install as below:
If the sector of 2G is 46, MRFU install as below:
1
2
3
1 2 3 4 5
6
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
11/4310
2.3 The mounting ears and cable claw of DCDU -12B
Before install the DCDU-12B in BTS&TP cabinet, must adjust the mounting ear to moveforward, and install cable claw at DCDU-12B right side
The material of DCDU-12B :
Cable claw for DCDU-12BMounting ear
Mounting ear
Cable claw for DCDU-12B
Move forward Move forward
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
12/43
2.4 Lamp & Sensor installation inTP48200A cabinet
11
Sensor Installation Layout
Water Sensor
Lamp
Smoke Sensor
Temperature
and Humidity
Sensor
Sensor Cable Port
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
13/43
2.4 Lamp installation(1/4)
12
Installing a lamp
Procedure:
Install a lamp on the fastener on the right of the cabinet.
Connect the negative (-) lamp power cable for the lamp to the 10A (C10)load circuit breaker.
Connect the positive (+) lamp power cable to the RTN+ busbar.
Lamp Power Cable (-)
Lamp Power Cable (+)
Lamp
RTN+busbar
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
14/43
2.4 Smoke Sensor installation(2/4)
13
Procedure:
Remove screws that secure the smoke sensor to the right of the cabinet top.
Dismantle smoke sensor base from the sensor, secure the smoke sensor base to
the top of the cabinet by using the removed screws.
Secure the smoke sensor to the base.
Connect one end of the signal cable to the smoke sensor and the other end tothe SMOKE port on the UIM panel.
Installing a Smoke Sensor
Smoke SensorInstallation Location
1
Smoke Sensor Base
2
3
SmokeSensor
Smoke Sensor Port
Smoke Sensor Port
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
15/43
2.4 Water Sensor installation (3/4)
14
Installing a Water Sensor
Procedure:
Put the water sensor in the cable strip in the right part of the cabinet bottom(ensure that the sensor is 5 mm to 10 mm away from the cabinet bottom), and
secure the sensor with a cable tie.
Connect the water sensor signal cable to the WATER port on the UIM panel.
Water Sensor Port
Water Sensor Port
Water Sensor
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
16/43
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
17/43
2.5 AC input power cable installation
16
Procedure:
Lay out an AC input power cable, and route it into the cabinet through thecable hole in the left part of the cabinet bottom.
Find a spare(or new purchase and install) 3*25A(there-phase 25A) AC circuitbreaker in AC box.
Secure the AC input power cable to the corresponding AC input circuit breakers
and terminal.
Installing AC Input Power Cables
Note:
If the AC box cant reuse or re-install 3*25A breaker, only allow to
use single-phase breaker(at least 1*10A) for temporary pre-
commissioning of BTS/MW, But should turn off the existing power
system before swapping, and relocate Huawei power system AC
INPUT to three-phase circuit breaker(3*25A).
3*25ACircuit Breaker
in AC box
AC INPUT
Circuit Breaker
in Power System
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
18/43
2.6 Battery installation
17
Procedure:
Installing Batteries
Remove the insulation cover from thebatteries.
Install copper bars between batteries.
Reinstall the insulation covers onto thetwo batteries in the middle.
Take negative battery cables from the left side of the battery compartment, and
connect the cables to negative battery terminals.
After you install all negative battery cables, take positive battery cables from the
right side of the battery compartment, and connect the cables to positive batteryterminals.
Reinstall the insulation covers onto the batteries on the left and right sides.
Install batteries into thebattery compartment in the
sequence.
Insulation Cover
Copper Bar
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
19/43
2.7 Power System Commissioning(1/2)
18
Procedure:
Measure the input voltage on the AC input circuit breaker. The value shouldrange from 85 V AC to 300 V AC.
Switch on the AC input circuit breaker and measure the output voltage of theAC input circuit breaker. The value should range from 85 V AC to 300 V AC.
Check that the indicators on the rectifiers are steady on.
Measure the voltage between the -48 V busbar and the RTN+ busbar. The valueshould range from -42 V DC to -58 V DC.
1. Connecting the AC Power Supply
Procedure:
2. Setting the Display Language
3. Setting the Date and Time
Main Menu Second Level Menu Third Level Menu Default Value Setting
SettingWizard
Date and Time
Date and Time -Set to the local date
and time.
Time ZoneUTC +08:00
BeijingSet to the local time
zone.
NTP Enable No
Yes/No
NOTE
Set the parameter toYesif you need tosynchronize the SMUtime and the sitenetwork server time.
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
20/43
2.7 Power System Commissioning (2/2)
19
4. Setting Battery Parameters
5. Setting Sensor Parameters
Main
Menu
Second
Level Menu
Third
Level Menu
Fourth
Level Menu
Default
Value
Setting Value
Parameters Settings
Battery
BasicParameters
Battery 1Connected
Yes If 2battery strings are
connected, set Battery 1Connectedto BatteryConnectedto Yes.
Battery 2Connected
Yes
Rated Capacity 150 Ah
Rated capacity of thebatteries in a battery string.
NOTE
The batteries controlled byone circuit breaker or fuseare called a battery string.
OtherParameters InstallationTime - Set to the current date
Main Menu
Second
Level Menu
Third
Level Menu
Fourth
Level Menu
Default Value Setting
ParametersSettings Power System Sensor Config.Para.
Water Sensor None
Set to Yes.
Smoke Sensor None
Ambient Temp.Sensor
None
Ambient Humi.Sensor
None
Procedure:
Switch off AC input circuit breakers.
Switch on the battery circuit breaker, then switch on AC input circuit breakers.
Switch all the circuit breakers to the appropriate status based on site requirements.
Observe the power system for 15 minutes. If no alarm (excluding door alarms) is
generated on the LCD during this period, the voltage and current for batteries andloads are normal.
6. Connecting the Battery Supply
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
21/4320
Antenna&feeder system
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
22/43
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
23/4322
3.2 Use double screws to fix Wireless ANT
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
24/4323
3.3 Color ring principle
Sector A
Blue
900M_GSM 2100M_3G 1800M_4G
TX RX TX RX TX RX
1 2 3 4 5 6
Sector B
Red
900M_GSM 2100M_3G 1800M_4G
TX RX TX RX TX RX
1 2 3 4 5 6
Sector C
Yellow
900M_GSM 2100M_3G 1800M_4G
TX RX TX RX TX RX
1 2 3 4 5 6
Sector D
White
900M_GSM 2100M_3G 1800M_4G
TX RX TX RX TX RX
1 2 3 4 5 6
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
25/4324
3.4 How to measure the azimuth of ANT
Step1: Make the mid-line of compass is same with thedirection of Antenna
Azimut h= the red value found on the compass via theobserving hole
Record the value.
Be sure that the position of compass was put it correctly
Dont test on the tower
Keep more than 2 meters from the tower
Keep the compass in horizontal
Make the compass in same direction with target
antenna
Record and call OMC to confirm the azimuth value of all the sectors
Read the Red number from the observewindow (the first number)
Make the compass same direction withantenna
horizontal
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
26/4325
3.5 How to adjust the down-tilt of ANT
This small triangle using todefine mechanical down tilt
The HW Tri-band antenna length is 2.6 meters, should set mechanical tiltaccording to the marker of L=2.6
Record and call OMC to confirm the M-tilt value of all the sectors
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
27/4326
DC power distribution
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
28/4327
4.1 The TP48200A MCB distribution for DCDU
BATLVDLVD
Note:
IF RRU more than 6pcs, must add one new DCDU-12B_2. It is the red color in the BTScabinet as picture.
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
29/4328
4.2 The RRU Power distribution at DCDU-12B
1DCDU-12B maximum suppor6RRU,iF RRU more than 6pcs,must add one new DCDU-12B.It is the red one DCDU-12B_2
in the picture.
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
30/4329
Cable installation
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
31/4330
5.1 Cable route at cabinet
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
32/43
5.2 Install Monitor cable from TP to BBU
31
The blue cable is monitor cable from TP to BBU
Note:
For temporary scenario, BBUinstall at TP cabinet, the monitorcable from TP to BBU, BBU side
is port
Monitor0
at UPEUboard.
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
33/43
5.3 Transmission cable from MW IDU to BTS
32
OTE:use the RTN950, the transmission
able should connect to the GEectrical port 3 of EG4 board.
Connect to RTN905 GE port3
Connect to RTN950 EG4--GE port3
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
34/4333
5.4 Install AISG cable from ANT to RRU
AISG cable will be installed from 3G RRU 3839 to antenna
AISG cable input
inside the RRU
AISG cable input on
the antenna
3G RRU
AISG cable is waterproof, no need waterproof for connector.
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
35/4334
5.5 Hoist RRU fiber
Do not remove the stretch
sling and protection pipe
when lifting RRU fiber !!
Making asimple wirespool tools
Using wirespool tools
3 fiberstwisttogether
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
36/4335
Grounding
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
37/4336
6.1 Cabinet & RRU grounding
BTS3900A cabinet grounding TP48200A cabinet grounding
RRU grounding
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
38/4337
6.2 RRU power cable grounding (1/2)
The shielding layer of RRU power cable need to grounding usingclip in RRU
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
39/4338
6.2 RRU power cable grounding(2/2)
When RRU power cable through into BTS cabinet, must use 6 in 1 grounding clamp for shieldlayer grounding of RRU power cable !
6 in 1 grounding clamp, 1clamp can fix 6pcs RRU powercable. remove the black cover of power cable, and fix in
clamp
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
40/4339
6.3 7/8feeder grounding
7/8feeder need to grounding at the bottom of tower/mast.
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
41/4340
Waterproof
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
42/4341
7.1 The connector of jumper waterproof
-
7/21/2019 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4_201...
43/43
7.2 7/8feeder waterproof
The shielding layer of 7/8feeder need to grounding at the bottomof tower /mast !!!