33409 - Floridafire house field office renovation bid blank exhibit "c" - pay items page 1 of 14...

14
FIRE HOUSE FIELD OFFICE RENOVATION BID BLANK EXHIBIT "C" - PAY ITEMS Page 1 of 14 PROJECT: WEST PALM BEACH OPERATIONS. FlRE HOUSE OFFICE RENOVATION 900 FLORIDA MANGO. WEST PALM BEACH FL, 33409 DATE: BASE BID ITEM I ITEM NO I DESCRIPTION UNIT GENERAL REQUIREMENTS QTY 1 2 3 4 5 PAY ITEM TOTAL PERMIT FEES TEMPORARY UTILITIES DAILY AND FINAL CLEAN-UP DUMPSTER 20 CY SCAFFOLDING EXTERIOR WORK LS LS LS LS LS 1 1 1 1 1 6 7 8 9 SUBTOTAL FOR ITEMS 1-9 $ SUBTOTAL - WRITTEN I N WORDS E A EA E A REMOVE EXIST. BURGLAR PROTECTION BARS AND PATCH REMOVE EXIST. DOUBLE DOOR AND FRAME AND REPLACE WITH NEW DOUBLE HOLLOW METAL DOOR AND FRAME INSTALL NEW DOUBLE DOOR HARDWARE REMOVE EXIST. ENTRY DOOR AND FRAME AND REPLACE WITH NEW HOLLOW METAL DOOR AND FRAME 7 2 2 1

Transcript of 33409 - Floridafire house field office renovation bid blank exhibit "c" - pay items page 1 of 14...

Page 1: 33409 - Floridafire house field office renovation bid blank exhibit "c" - pay items page 1 of 14 project: west palm beach operations. flre house office renovation 900 florida mango.west

FIRE HOUSE FIELD OFFICE RENOVATION BID BLANK

EXHIBIT "C" - PAY ITEMS Page 1 of 14

PROJECT: WEST PALM BEACH OPERATIONS. FlRE HOUSE OFFICE RENOVATION 900 FLORIDA MANGO. WEST PALM BEACH FL, 33409

DATE:

BASE BID

ITEM I ITEM NO I DESCRIPTION

UNIT

GENERAL REQUIREMENTS

QTY

1

2

3

4

5

PAY ITEM TOTAL

PERMIT FEES

TEMPORARY UTILITIES

DAILY AND FINAL CLEAN-UP

DUMPSTER 20 CY

SCAFFOLDING

EXTERIOR WORK

LS

LS

LS

LS

LS

1

1

1

1

1

6

7

8

9

SUBTOTAL FOR ITEMS 1-9 $

SUBTOTAL - WRITTEN IN WORDS

E A

EA

E A

REMOVE EXIST. BURGLAR PROTECTION BARS AND PATCH

REMOVE EXIST. DOUBLE DOOR AND FRAME AND REPLACE WITH NEW DOUBLE HOLLOW METAL DOOR AND FRAME

INSTALL NEW DOUBLE DOOR HARDWARE

REMOVE EXIST. ENTRY DOOR AND FRAME AND REPLACE WITH NEW HOLLOW METAL DOOR AND FRAME

7

2

2

1

Page 2: 33409 - Floridafire house field office renovation bid blank exhibit "c" - pay items page 1 of 14 project: west palm beach operations. flre house office renovation 900 florida mango.west

FIRE HOUSE FIELD OFFICE RENOVATION BID BLANK

EXHIBIT "C" - PAY ITEMS Page 2 of 14

ITEM I ITEM NO I DESCRIPTION

UNIT

10

11

12

13

14

15

16

17

l8

19

QTY PAY ITEM TOTAL

SUBTOTAL - WRITTEN IN WORDS

EXTERIOR WORK

INSTALL NEW DOOR HARDWARE (ENTRY)

DISCONNECT AND REMOVE EXISTING WALL MOUNTED LIGHT FIXTURE

DISCONNECT AND REMOVE EXISTING EXTERIOR RECEPTACLE

DISCONNECT AND REMOVE EXISTING WIREWAY

EXISTING FPL & CO. TO BE REMOVED

INSTALL NEW FPL & CO. METER

INSTALL NEW SAFETY SWITCH

ALLOWANCE FOR FPL CONNECTION

INSTALL NEW EXTERIOR WALL MOUNTED LIGHT FIXTURE. INCLUDE MOTION DETECTOR AND PHOTO CELL CONTROL

PAINT EXTERIOR DOORS (AT ENTRANCE AND BACK DOUBLE DOOR)

SUBTOTAL FOR ITEMS 10-19 $

E A

EA

E A

LS

E A

E A

E A

LS

E A

EA

1

2

1

1

1

1

1

1

4

3

Page 3: 33409 - Floridafire house field office renovation bid blank exhibit "c" - pay items page 1 of 14 project: west palm beach operations. flre house office renovation 900 florida mango.west

FIRE HOUSE FIELD OFFICE RENOVATION BID BLANK

EXHIBIT "C" - PAY ITEMS Page 3 of 14

ITEM I ITEM NO I DESCRIPTION

PAY ITEM TOTAL UNIT

20

2 1

22

23

24

25

26

27

28

29

30

QTY

SUBTOTAL - WRllTEN IN WORDS

-

1ST FLOOR OFFICE

REMOVE EXISTING WINDOWS AND REPLACE WlTH NEW WINDOWS ("NUAIR 9000 SERIES ALUMINUM HUNG)

REMOVE WATER PUMPING SYSTEM, PATCH AND REPAIR FLOOR

REMOVE ACOUSTIC CEILING TILES AND COMPONENTS

INSTALL NEW ACOUSTIC CEILING TILE WITH R-19 INSULATION BOARD

WALL 1x2 PT WOOD FRAMING STRIPS

R=4.1 RIGID INSULATION BOARD

DRYWALL TAPED AND FINISHED (518" GYPSUM BOARD)

REMOVE STORM DRAIN AND HORIZONTAL PIPE ABOVE 1ST FLOOR

ALUMINUM THRESHOLD

INSTALL FIRE EXTINGUISHER WITH CABINET

REMOVE EXISTING ELECTRICAL PANELS

SUBTOTAL FOR ITEMS 20-30 $

EA

HR

SF

SF

SF

SF

SF

LF

E A

E A

E A

5

8

610

610

1094

1094

1261

14

3

1

2

Page 4: 33409 - Floridafire house field office renovation bid blank exhibit "c" - pay items page 1 of 14 project: west palm beach operations. flre house office renovation 900 florida mango.west

FIRE HOUSE FIELD OFFICE RENOVATION BID BLANK

EXHIBIT "C" - PAY ITEMS Page 4 of 14

ITEM I ITEM NO I DESCRIPTION

UNIT

3 1

32

33

34

35

36

37

38

39

40

4 1

QTY PAY ITEM TOTAL

SUBTOTAL - WRITTEN IN WORDS

1ST FLOOR OFFICE

INSTALL NEW ELECTRICAL PANEL BOARD

DISCONNECT AND REMOVE ALL LIGHTING AND POWER WIRING AND INSTALL NEW WIRING AND ELECTRICAL CONDUIT

VOLUMETRIC RECESSED FLUORESCENT LIGHT FIXTURE (2x4)

INSTALL TELEPHONEIFAX OUTLET

WIRING FOR NEW TELEPHONEIFAX OUTLET

INSTALL NEW QUAD RECEPTACLES (12OV)

INSTALL NEW DUPLEX RECEPTACLE (12OV)

INSTALL NEW SPECIAL PURPOSE OUTLET

INSTALL CEILING MOUNTED MOTION SENSORS

WNYL WALL BASE

PAINT (WALLS AND DOORS)

SUBTOTAL FOR ITEMS 31- 41 $

E A

LS

E A

E A

LF

E A

E A

E A

E A

LF

SF/EA

1

1

8

11

142

11

2

1

2

98

126111

Page 5: 33409 - Floridafire house field office renovation bid blank exhibit "c" - pay items page 1 of 14 project: west palm beach operations. flre house office renovation 900 florida mango.west

FIRE HOUSE FIELD OFFICE RENOVATION BID BLANK

EXHIBIT "C" - PAY ITEMS Page 5 of 14

ITEM I ITEM NO I DESCRIPTION

UNIT

42

43

44

45

46

47

48

49

SO

5 1

52

QTY PAY ITEM TOTAL

SUBTOTAL - WRITTEN IN WORDS

1

1

1

1

201

406

203

50

SO

38411

1

1ST FLOOR BATHROOM

REMOVE BATHROOM AND ALL COMPONENTS (WALLS, DOORS, CEILING, AND FIXTURES). PATH AND REPAIR FLOOR

INSTALL NEW SOLID WOOD DOOR

INSTALL NEW DOOR HARDWARE

TRANSITIONAL STRIP

3-518" METAL STUD 25 GAGE

518" GYPSUM WALL BOARD

BAlT INSULATION

METAL STUD 25 GAGE AT CEILING

GYPSUM BOARD CEILING

PAINT WALLS, CEILING, AND DOOR

INSTALL NEW EXHAUST FAN

SUBTOTAL FOR ITEMS 42-52 $

LS

E A

E A

E A

SF

SF

SF

SF

SF

SFIEA

E A

Page 6: 33409 - Floridafire house field office renovation bid blank exhibit "c" - pay items page 1 of 14 project: west palm beach operations. flre house office renovation 900 florida mango.west

FIRE HOUSE FIELD OFFICE RENOVATION BID BLANK

EXHIBIT "C" - PAY ITEMS Page 6 of 14

ITEM I ITEM NO I DESCRIPTION

UNIT

1ST FLOOR BATHROOM

QTY

53

54

55

56

57

58

59

60

PAY ITEM TOTAL

SINGLE HOLLOW METAL DOOR FRAME

DISCONNECT AND REMOVE ALL LIGHTING AND POWER WIRING AND INSTALL NEW WIRING AND ELECTRICAL CONDUIT

2x4 RECESSED FLUORESCENT LIGHT FIXTURE

BATHROOM ACCESSORIES

ALLOWANCE FOR PLUMBING INCLUDING FIXTURES

INSTALL NEW AUTOMATIC LIGHT SWITCH

INSTALL NEW DUPLEX RECEPTACLE (12OV)

INSTALLVINYL WALL BASE

2ND FLOOR OFFICE

E A

LS

E A

LS

LS

E A

E A

LF

1

1

1

1

1

1

1

26

61

62

SUBTOTAL FOR ITEMS 53 - 62 $

SUBTOTAL - WRITTEN IN WORDS

SF

REMOVE EXISTING WINDOWS AND REPLACE WlTH NEW WINDOWS ("NUAIR 9000 SERIES ALUMINUM HUNG)

INSTALL NEW ACOUSTIC CEILING TILE WITH R-19 INSULATION BOARD

2

355

Page 7: 33409 - Floridafire house field office renovation bid blank exhibit "c" - pay items page 1 of 14 project: west palm beach operations. flre house office renovation 900 florida mango.west

FIRE HOUSE FIELD OFFICE RENOVATION BID BLANK

EXHIBIT "C" - PAY ITEMS Page 7 of 14

PAY ITEM TOTAL ITEM I ITEM NO I DESCRIPTION

UNIT

63

64

65

66

67

68

69

70

7 1

72

73

QTY

SUBTOTAL - WRITTEN IN WORDS

2ND FLOOR OFFICE

WALL 1x2 PT WOOD FRAMING STRIPS

DRYWALLTAPED AND FINISHED (518" GYPSUM BOARD)

R=4.1 RIGID INSULATION BOARD

ALUMINUM THRESHOLD

DISCONNECT AND REMOVE ALL LIGHTING AND POWER WIRING AND INSTALL NEW WIRING AND ELECTRICAL CONDUIT

VOLUMETRIC RECESSED FLUORESCENT LIGHT FIXTURE (2x4)

INSTALL TELEPHONEIFAX OUTLET

WIRING FOR NEW TELEPHONEIFAX OUTLET

INSTALL NEW QUAD RECEPTACLES (120V)

INSTALL NEW DUPLEX RECEPTACLE (12OV)

INSTALL NEW SPECIAL PURPOSE OUTLET

SUBTOTAL FOR ITEMS 63 - 73 $

SF

SF

SF

E A

LS

E A

E A

LF

E A

E A

E A

751

711

711

1

1

4

5

142

5

4

1

Page 8: 33409 - Floridafire house field office renovation bid blank exhibit "c" - pay items page 1 of 14 project: west palm beach operations. flre house office renovation 900 florida mango.west

FIRE HOUSE FIELD OFFICE RENOVATION BID BLANK

EXHIBIT "C" - PAY ITEMS Page 8 of 14

ITEM I ITEM NO I DESCRIPTION

UNIT

2ND FLOOR OFFICE

QTY

74

75

76

77

78

79

80

8 1

PAY ITEM TOTAL

DISCONNECT AND REMOVE EXISTING AC UNIT

OPENING FOR NEW 1.5 TN MINI SPLIT SYSTEM (AC)

COVER OLD FLOOR DRAIN OPENING WITH 16 GA BREAK METAL

INSTALL NEW 1.5 TN AC MINI SPLIT SYSTEM

INSTALL NEW AUTOMATIC LIGHT SWITCH

INSTALL CEILING MOUNTED MOTION SENSORS

INSTALL VINYL WALL BASE

PAINT (WALLS AND DOORS)

2ND FLOOR - EXISTING STORAGE

E A

LS

LS

LS

E A

E A

LF

SF/EA

1

1

1

1

1

1

79

71111

1

2

SUBTOTAL FOR ITEMS 74 - 83 $

SUBTOTAL - WRllTEN IN WORDS

LS

E A

82

83

INSTALL POWER WIRING AND CONDUIT

SURFACE 4' FLUORESCENT, PENDANT MOUNTED LIGHT FIXTURE

Page 9: 33409 - Floridafire house field office renovation bid blank exhibit "c" - pay items page 1 of 14 project: west palm beach operations. flre house office renovation 900 florida mango.west

FIRE HOUSE FIELD OFFICE RENOVATION BID BLANK

EXHIBIT "C" - PAY ITEMS Page 9 of 14

ITEM I ITEM NO I DESCRIPTION

UNIT

2ND FLOOR - EXISTING STORAGE

QTY

84

PAY ITEM TOTAL

INSTALL NEW DIGITAL TIME SWITCH

3RD FLOOR - EXISTING STORAGE

E A

85

86

87

88

90

91

1

REMOVE EXISTING WINDOWS AND REPLACE WlTH NEW WINDOWS ("NUAIR 9000 SERIES ALUMINUM HUNG)

REMOVE EXISTING DOOR AND FRAME AND REPLACE WlTH NEW HOLLOW METAL DOOR AND FRAME

INSTALL NEW DOOR HARDWARE

ALUMINUM THRESHOLD

DISCONNECT AND REMOVE ALL LIGHTING AND POWER WIRING AND INSTALL NEW WIRING AND ELECTRICAL CONDUIT

SURFACE 4' FLUORESCENT, PENDANT MOUNTED LIGHT FIXTURE

INSTALL NEW AUTOMATIC LIGHT SWITCH

4TH FLOOR - EXISTING STORAGE

E A

E A

E A

E A

LS

E A

E A

2

2

2

1

1

4

1

92

93

SUBTOTAL FOR ITEMS 84 - 93 $

SUBTOTAL - WRl l lEN IN WORDS

EA

E A

REMOVE EXISTING WINDOWS AND REPLACE WlTH NEW WINDOWS ("NUAIR 9000 SERIES ALUMINUM HUNG)

REMOVE EXISTING DOOR AND FRAME AND REPLACE WlTH NEW HOLLOW METAL DOOR AND FRAME

2

2

Page 10: 33409 - Floridafire house field office renovation bid blank exhibit "c" - pay items page 1 of 14 project: west palm beach operations. flre house office renovation 900 florida mango.west

FIRE HOUSE FIELD OFFICE RENOVATION BID BLANK

EXHIBIT "C" - PAY ITEMS Page 10 of 14

ITEM I ITEM NO I DESCRIPTION

UNIT

4TH FLOOR - EXISTING STORAGE

QTY

94

95

96

97

98

PAY ITEM TOTAL

INSTALL NEW DOOR HARDWARE

ALUMINUM THRESHOLD

DISCONNECT AND REMOVE ALL LIGHTING AND POWER WIRING AND INSTALL NEW WIRING AND ELECTRICAL CONDUIT

SURFACE 4' FLUORESCENT, PENDANT MOUNTED LIGHT FIXTURE

INSTALL NEW DIGITAL TIME SWITCH

STAIRWELL AREA/ ROOF DECK

E A

E A

LS

E A

E A

99

100

101

lo2

lo3

2

1

1

4

1

SUBTOTAL FOR ITEMS 94 - 103 $

SUBTOTAL - WRllTEN IN WORDS

REMOVE EXISTING DOOR AND FRAME AND REPLACE WITH NEW

HOLLOW METAL DOOR AND FRAME (ROOF ACCESS)

INSTALL NEW DOOR HARDWARE

ALUMINUM THRESHOLD

DISCONNECT AND REMOVE ALL LIGHTING AND POWER WIRING AND INSTALL NEW WIRING AND ELECTRICAL CONDUIT

INSTALL NEW DUPLEX RECEPTACLE WEATHER PROOF, GFI (ROOF

DECK)

E A

E A

E A

LS

E A

1

1

1

1

1

Page 11: 33409 - Floridafire house field office renovation bid blank exhibit "c" - pay items page 1 of 14 project: west palm beach operations. flre house office renovation 900 florida mango.west

FIRE HOUSE FIELD OFFICE RENOVATION BID BLANK

EXHIBIT "C" - PAY ITEMS Page 11 of 14

ITEM I ITEM NO I DESCRIPTION

UNIT

STAIRWELL AREA/ ROOF DECK

QN

104

105

106

107

108

log

110

111

PAY ITEM TOTAL

SUBTOTAL FOR ITEMS 104 - 111 $

SUBTOTAL - WRITTEN IN WORDS

BASE BID GRAND TOTAL $

BASE BID GRAND TOTAL - WRITTEN IN WORDS

SURFACE 4' FLUORESCENT, PENDANT MOUNTED LIGHT FIXTURE

INSTALL CEILING MOUNTED MOTION SENSORS

WALL MOUNTED EMERGENCY LUMINAIRES

EXIT LIGHT

LlGTH SWITCH (2ND FLOOR)

PREP., PRIME, & PAINT 2 COATS STAIR ( RAILINGS, TREAD, AND RISERS)

PAlNT 1ST FLOOR STORAGE ROOM (WALLS, CEILING, AND DOOR)

PAINT EXISTING ENTRY (WALLS, CEILING, FLOOR)

E A

E A

E A

E A

E A

LS

SFIEA

SF/EA

13

9

13

5

1

1

48311

120311

Page 12: 33409 - Floridafire house field office renovation bid blank exhibit "c" - pay items page 1 of 14 project: west palm beach operations. flre house office renovation 900 florida mango.west
Page 13: 33409 - Floridafire house field office renovation bid blank exhibit "c" - pay items page 1 of 14 project: west palm beach operations. flre house office renovation 900 florida mango.west
Page 14: 33409 - Floridafire house field office renovation bid blank exhibit "c" - pay items page 1 of 14 project: west palm beach operations. flre house office renovation 900 florida mango.west