*OCTOBER 2011 PROJECT ENTERED ITS DESIGN PHASE*ADVANCED INDUSTRIAL CLEAN ENERGY MANUFACTURING PRODUCTS CLOSED-LOOP DEVELOPMENT-POLYGENERATION2011 NETL CCS REFERENCE SHELF GUIDELINES http://www.netl.doe.gov/technologies/carbon_seq/refshelf/refshelf.html http://pdf.wri.org/ccs_guidelines.pdf" http://pdf.wri.org/ccs_guidelines.pdf 2011 GLOBAL CCS INSTITUTE: GLOBAL STATUS OF CCShttp://cdn.globalccsinstitute.com/sites/default/files/the_global_status_ccs_2011.pdf" http://cdn.globalccsinstitute.com/sites/default/files/the_global_status_ccs_2011.pdf IEA CCS READY POWER PLANTS REPORT http://www.iea.org/Papers/2007/CO2_Capture_Ready_Plants.pdf

2010 CEQA GUIDELINEShttp://ceres.ca.gov/ceqa/docs/2010_CEQA_Statutes_and_Guidelines.pdf" http://ceres.ca.gov/ceqa/docs/2010_CEQA_Statutes_and_Guidelines.pdf http://ceres.ca.gov/ceqa/guidelines/index.html" http://ceres.ca.gov/ceqa/guidelines/index.html KIMBERLINA CLEAN ENERGY SYSTEMSDURABILITY AND RELIABILITY OF A NEAR ZERO EMISSIONS GAS-FIRED POWER PLANT http://www.energy.ca.gov/2006publications/CEC-500-2006-074/CEC-500-2006-074.PDF" http://www.energy.ca.gov/2006publications/CEC-500-2006-074/CEC-500-2006-074.PDF

AB1925 COUPLED WITH SALINE/EOR/EGR KERN COUNTY CALIFORNIA. http://www.energy.ca.gov/2007publications/CEC-500-2007-100/CEC-500-2007-100-SF.PDF" http://www.energy.ca.gov/2007publications/CEC-500-2007-100/CEC-500-2007-100-SF.PDF ZERO EMISSIONS WILL NEED THE MOST EFFICIENT POWER PLANT http://web.mit.edu/mitei/docs/reports/beer-emissions.pdf" http://web.mit.edu/mitei/docs/reports/beer-emissions.pdf 2011 OECD/IEA 2012 INTERNATIONAL GHG POLICIES(WORKING PAPER)http://www.oecd.org/dataoecd/47/53/48125645.pdf" http://www.oecd.org/dataoecd/47/53/48125645.pdf

2011 CCS COST ESTIMATES FOR NATURAL GAS-FIRED POWER PLANTS (IECM v.6.4 (updated 2011) S.RUBIN, CARNEGIE MELLON UNIVERSITY) http://www.cmu.edu/epp/iecm/rubin/PDF%20files/2011/Rubin-Zhai_NGCC-CCS%20costs_CCS%20Conf_3%20May%202011.pdf 2011 RECENT CCS COST ESTIMATES & REPORTShttp://www.cmu.edu/epp/iecm/rubin/PDF%20files/2011/Rubin_CCS%20cost%20methods%20and%20measures_3-22-11.pdf" http://www.cmu.edu/epp/iecm/rubin/PDF%20files/2011/Rubin_CCS%20cost%20methods%20and%20measures_3-22-11.pdf 2011 GLOBAL CCS INSTITUTE UPDATE. http://cdn.globalccsinstitute.com/sites/default/files/Report%204-Existing%20Carbon%20Capture%20and%20Storage%20Research%20and%20Development%20Networks%20around%20the%20World.pdfhttp://cdn.globalccsinstitute.com/sites/default/files/the_global_status_ccs_2011.pdfhttp://cdn.globalccsinstitute.com/sites/default/files/the_global_status_ccs_2011_3_technology_0.pdf http://cdn.globalccsinstitute.com/sites/default/files/publication_20110419_global-status-ccs_7_costs.pdfhttp://cdn.globalccsinstitute.com/sites/default/files/the_global_status_ccs_2011_5_business_case.pdf 2011 OECD/IEA CCS COST AND PERFORMANCE (WORKING PAPER). http://www.iea.org/papers/2011/costperf_ccs_powergen.pdf" http://www.iea.org/papers/2011/costperf_ccs_powergen.pdf 2010 DOE/EIA COST CCS UPDATE REPORT. http://www.netl.doe.gov/technologies/carbon_seq/refshelf/CCSRoadmap.pdf" http://www.netl.doe.gov/technologies/carbon_seq/refshelf/CCSRoadmap.pdf *2011 DOE/NETL 2010/1396: COST AND PERFORMANCE BASELINE NGCC (2011 FINAL). http://www.netl.doe.gov/energy-analyses/pubs/LR_NGCC_FR_20110325.pdf" http://www.netl.doe.gov/energy-analyses/pubs/LR_NGCC_FR_20110325.pdf http://www.netl.doe.gov/energy-analyses/pubs/LR_PCCFBC_FR_20110325.pdf" http://www.netl.doe.gov/energy-analyses/pubs/LR_PCCFBC_FR_20110325.pdf http://www.netl.doe.gov/energy-analyses/pubs/LR_IGCC_FR_20110511.pdf" http://www.netl.doe.gov/energy-analyses/pubs/LR_IGCC_FR_20110511.pdf http://www.netl.doe.gov/technologies/coalpower/ewr/pubs/CO2CaptureTechUpdate042911.pdfhttp://www.netl.doe.gov/technologies/coalpower/ewr/pubs/CO2Handbook/CO2-Capture-Tech-Update-2011_Front-End%20Report.pdf" http://www.netl.doe.gov/technologies/coalpower/ewr/pubs/CO2Handbook/CO2-Capture-Tech-Update-2011_Front-End%20Report.pdf 2010 DOE/NETL REPORT/1397. http://www.netl.doe.gov/energy-analyses/pubs/NGCC_Retrofit_Analysis.pdf" http://www.netl.doe.gov/energy-analyses/pubs/NGCC_Retrofit_Analysis.pdf 2010 KHESHGI, ET AL, SPE139716-PP. http://www.spe.org/jpt/print/archives/2011/07/21CO2Focus.pdf" http://www.spe.org/jpt/print/archives/2011/07/21CO2Focus.pdf 2010 UK DECC, MOTT McDONALD REPORT. http://www.unido.org/fileadmin/user_media/Services/Energy_and_Climate_Change/Energy_Efficiency/CCS/Cement%20Sector%20Assessment.pdf 2010 CMU CARNEGIE MELLON IECM v.6.4 (S.RUBIN 2011 UPDATED VERSION) http://www.epp.cmu.edu/people/faculty/rubin/index.php?p=2009" http://www.epp.cmu.edu/people/faculty/rubin/index.php?p=2009http://www.netl.doe.gov/publications/proceedings/11/co2capture/presentations/4-Thursday/25Aug11-Rubin-CMU-IECM%20Overview.pdf" http://www.netl.doe.gov/publications/proceedings/11/co2capture/presentations/4-Thursday/25Aug11-Rubin-CMU-IECM%20Overview.pdf2009 EPRI REPORT No. 1017495. http://mydocs.epri.com/docs/CorporateDocuments/Newsletters/GEN/2009.02-03/1h.html 2009 IEAGHG REPORT 2009/TR-3. http://www.iea.org/about/terms_free.asphttp://www.ptrc.ca/siteimages/CCS_Meeting_the_Challenge%20Lower%20Res.pdf" http://www.ptrc.ca/siteimages/CCS_Meeting_the_Challenge%20Lower%20Res.pdf http://www.iea.org/Papers/2007/CO2_Capture_Ready_Plants.pdf" http://www.iea.org/Papers/2007/CO2_Capture_Ready_Plants.pdf 2009 ENCAP REPORT D.1.2.6 http://www.encapco2.org/publications/D-1%202%206%20Public%20Benchmarking%20Report%20Final%20Update.pdf" http://www.encapco2.org/publications/D-1%202%206%20Public%20Benchmarking%20Report%20Final%20Update.pdf 2009 CHEN & RUBIN, ENERGY POLICY. http://www.epp.cmu.edu/people/faculty/rubin/index.php?p=2009" http://www.epp.cmu.edu/people/faculty/rubin/index.php?p=2009 *2010 WORLEY PARSONS (OXYFUEL, POST COMBUSTION, IGCC, NGCC). http://www.ucsusa.org/assets/documents/clean_energy/A_Bright_Future_Technical_Appendix.pdfhttp://www.aemo.com.au/planning/0419-0017.pdf" http://www.aemo.com.au/planning/0419-0017.pdf http://cdn.globalccsinstitute.com/sites/default/files/the_global_status_ccs_2011.pdf" http://cdn.globalccsinstitute.com/sites/default/files/the_global_status_ccs_2011.pdf *2011 GLOBAL CCS INSTITUTE: EFFECTS OF IMPURITIES WITH CCS. https://www.globalccsinstitute.com/sites/default/files/publication_201104_effects_impurities_geological_storage_co2.pdf *2011 McKINSEY & COMPANY: CCS ASSESSING THE ECONOMICS. http://assets.wwf.ch/downloads/mckinsey2008.pdf" http://assets.wwf.ch/downloads/mckinsey2008.pdf *2011 TAKESHI KURAMACHI: CCS INDUSTRIES AND D.E.S POSIBILITIES & LIMITATIONS http://nws.chem.uu.nl/publica/Publicaties%202011/Proefschrift_Kuramochi.pdf" http://nws.chem.uu.nl/publica/Publicaties%202011/Proefschrift_Kuramochi.pdf *2011 SEPT. CSLF STRATEGIC PLAN IMPLEMENTATION REPORT. http://www.ptrc.ca/siteimages/CCS_Meeting_the_Challenge%20Lower%20Res.pdf" http://www.ptrc.ca/siteimages/CCS_Meeting_the_Challenge%20Lower%20Res.pdf http://www.solarenola.com/1/upload/cslf_techology_roadmap.pdf" http://www.solarenola.com/1/upload/cslf_techology_roadmap.pdf *2011 MAY CALIFORNIA COUNCIL ON SCIENCE AND TECHNOLOGY, TO 2050 SUMMARY http://www.ccst.us/publications/2011/2011energy.pdf" http://www.ccst.us/publications/2011/2011energy.pdf *2011 JULY U.S CARBON SEQUESTRATION COUNCIL ON SCIENCE AND TECHNOLOGY. GLOBAL STATUS OF GEOLOGIC TECHNOLOGY DEVELOPMENT. http://www.uscsc.org/Files/Admin/Educational_Papers/Global_Status_of_Geologic_CO2_Storage_Technology_Development_Updated_Final_Edition%5B1%5D.pdf" http://www.uscsc.org/Files/Admin/Educational_Papers/Global_Status_of_Geologic_CO2_Storage_Technology_Development_Updated_Final_Edition%5B1%5D.pdf *2011 FEBRUARY IEA: MODALITIES AND PROCEEDURES FOR INCLUSION OF CO2 CAPTURE AND STORAGE (CCS) IN GEOLOGICAL FORMATIONS AS A PROJECT ACTIVITY UNDER CLEAN DEVELOPMENT MECHANISM (CDM). http://gcep.stanford.edu/pdfs/KPjZOQnaKgBFZIEyZD_d-Q/EdwardRubin.pdf" http://gcep.stanford.edu/pdfs/KPjZOQnaKgBFZIEyZD_d-Q/EdwardRubin.pdf *2011 IEA COST AND PERFORMANCE OF CARBON CAPTURE FROM GAS-FIRED GENERATION http://web.mit.edu/mitei/docs/reports/herzog-meldon-hatton.pdf" http://web.mit.edu/mitei/docs/reports/herzog-meldon-hatton.pdf *2011 JUNE S.699 (U.S CCS) FROM BRIDGETO DESTINATION http://www.cleanskies.org/wp-content/uploads/2011/06/CCS_for_Gas_interim.pdf" http://www.cleanskies.org/wp-content/uploads/2011/06/CCS_for_Gas_interim.pdf *2011 MAY: CEC, BKi, PG&E, LLNL, LBNL: CCS NATURAL GAS FIRED COMBINED CYCLES. http://www.westcarb.org/pdfs/2011_CCS_NGCC_study_Myhre.pdf" http://www.westcarb.org/pdfs/2011_CCS_NGCC_study_Myhre.pdf *2011 COSTS OF LOW CARBON TECHNOLOGIES. (CLIMATE CHANGE) http://hmccc.s3.amazonaws.com/Renewables%20Review/RES%20Review%20Technical%20Annex%20FINAL.pdf http://www.energy.ca.gov/business_meetings/2011_packets/2011-04-20/Item_15/500-10-037_DM.pdf *2009 ADVANCED POST COMBUSTION CO2 CAPTURE http://web.mit.edu/mitei/docs/reports/herzog-meldon-hatton.pdf" http://web.mit.edu/mitei/docs/reports/herzog-meldon-hatton.pdf *2011 MAY DOE/NETL ADVANCED POST COMBUSTION CARBON CAPTURE R&D. http://www.netl.doe.gov/technologies/coalpower/ewr/pubs/CO2Handbook/CO2-Capture-Tech-Update-2011_App-B_Post-Combustion-Solvents.pdf" http://www.netl.doe.gov/technologies/coalpower/ewr/pubs/CO2Handbook/CO2-Capture-Tech-Update-2011_App-B_Post-Combustion-Solvents.pdf *2011 NATIONAL COAL COUNCIL TO DR CHU ENERGY COMMISSION. EXPEDITED CCS DEVELOPMENT: CHALLENGES & OPPORTUNITIES. http://www.jacksonkelly.com/JK/pdf/03_29_11_Final_NCC_Report.pdf" http://www.jacksonkelly.com/JK/pdf/03_29_11_Final_NCC_Report.pdf

*2011 POWERSPAN ECO/ECO2 LOW COST CCS SYSTEM http://deq.state.wy.us/out/downloads/Carbon%20Capture%20-%20Alix.pdf" http://deq.state.wy.us/out/downloads/Carbon%20Capture%20-%20Alix.pdf*2010 INVESTMENT DECISIONS FOR BASELOAD POWER PLANTS http://www.netl.doe.gov/energy-analyses/pubs/InvestmtDecsnsBsldPP4.pdf" http://www.netl.doe.gov/energy-analyses/pubs/InvestmtDecsnsBsldPP4.pdf*2011 ENERGY POLICIES http://ideas.repec.org/s/eee/enepol2.html" http://ideas.repec.org/s/eee/enepol2.html

DOE/NETL FEB-2011 CCS SYSTEMS AND MILESTONES >2015 http://www.usea.org/Programs/EUPP/globallowcarbonworkshop/Mar1/Scott_Smouse__Improved_Efficiency_of_Fossil_Fuel_Generation.pdf http://www.osti.gov/bridge/purl.cover.jsp?purl=/832867-RIVgs7/native/" http://www.osti.gov/bridge/purl.cover.jsp?purl=/832867-RIVgs7/native/

2011 Co2 CAPTURE IN INDUSTRIES AND DISTRIBUTED GENERATION SYSTEMSPOSSIBILITIES AND LIMITATIONS http://nws.chem.uu.nl/publica/Publicaties%202011/Proefschrift_Kuramochi.pdf

2009 NERC RELIABILITY INTEGRATING HIGH LEVELS OF VARIABLE RESOURCES http://www.nerc.com/files/IVGTF_Report_041609.pdf AB900, SB292, SB226 CEQA CATEGORICAL EXEMPTIONSAB900 ALL ENVIRONMENTAL LEADERSHIP DEVELOPMENT PROJECTS >$100,000,000, SHALL BE CERTIFIED WITHIN THIRTY (10,000MW WIND and SOLAR >2020 ftp://ftp.cpuc.ca.gov/gopher-data/environ/tehachapi_renewables/PEA/Appendices/Appendix_B.pdf http://energy.tms.org/docs/pdfs/Advance_Electricity_Storage_Overview.pdf

NERC ACCOMMODATING HIGH LEVELS OF VARIABLE GENERATIONhttp://www.nerc.com/files/IVGTF_Report_041609.pdf" http://www.nerc.com/files/IVGTF_Report_041609.pdf

MAPS EPA 8-HOUR OZONE NON-ATTAINMENT AREAS http://www.epa.gov/oar/oaqps/greenbk/map8hrnm.html" http://www.epa.gov/oar/oaqps/greenbk/map8hrnm.html

2011 ICO2N Integrate CO2 networkPerspectives on Conducting Cost Analysis of CO2 Capture technologies http://www.ico2n.com/wp-content/uploads/2010/07/ICO2N-Review-Conducting-CO2-Capture-Analyses.pdf2011 CSLF TECHNOLOGY ROADMAPhttp://www.cslforum.org/publications/documents/CSLF_Technology_Roadmap_2011.pdf" http://www.cslforum.org/publications/documents/CSLF_Technology_Roadmap_2011.pdfGENERATING RESOURCES AND ENERGY STORAGEhttp://www.nwcouncil.org/energy/powerplan/6/draft/Ch6_090309.pdfCOSTS AND RISKS OF CARBON CAPTURE AND STORAGEhttp://igitur-archive.library.uu.nl/dissertations/2007-0403-200425/full.pdf" http://igitur-archive.library.uu.nl/dissertations/2007-0403-200425/full.pdfEIA NATURAL GAS PIPELINES 2011http://www.eia.gov/pub/oil_gas/natural_gas/analysis_publications/ngpipeline/western.html" http://www.eia.gov/pub/oil_gas/natural_gas/analysis_publications/ngpipeline/western.html2011 DOCUMENTS FOR CARBON CAPTURE AND SEQUESTRATIONhttp://www.climatechange.ca.gov/carbon_capture_review_panel/documents/" http://www.climatechange.ca.gov/carbon_capture_review_panel/documents/--------------------------------------------------------------------------------------------------------------------------------------

PRESENTED BYSundance Hybrid Power Solutions Inc.110 West C Street # 2102San Diego, CA 92101 S.2921 CALIFORNIA DESERT BILL MAY 2010 http://www.gpo.gov/fdsys/pkg/CHRG-111shrg61623/html/CHRG-111shrg61623.htm" http://www.gpo.gov/fdsys/pkg/CHRG-111shrg61623/html/CHRG-111shrg61623.htm 2009 GLOBAL CCS INSTITUTE EXISTING CARBON CAPTURE & STORAGEhttp://cdn.globalccsinstitute.com/sites/default/files/Report%204-Existing%20Carbon%20Capture%20and%20Storage%20Research%20and%20Development%20Networks%20around%20the%20World.pdf

*CES CLEAN ENERGY SYSTEMS CCS OXY-COMBUSTION TECHNOLOGYhttp://www.cleanenergysystems.com/technology.html" http://www.cleanenergysystems.com/technology.html

*JULY 2010 CARBON CAPTURE: A TECHNOLOGY ASSESSMENThttp://www.cnie.org/NLE/CRSreports/10Aug/R41325.pdf" http://www.cnie.org/NLE/CRSreports/10Aug/R41325.pdf

*EIA 2011 ANNUAL ENERGY OUTLOOK*http://www.eia.gov/forecasts/aeo/index.cfm" http://www.eia.gov/forecasts/aeo/index.cfm

CLIMATE ACTION DOCUMENTS ABOUT CARBON CAPTURE & STORAGEhttp://www.climatechange.ca.gov/carbon_capture_review_panel/documents/

DECEMBER 2010 DOE/NETL CARBON DIOXIDE CAPTURE AND STORAGE RD&D ROADMAPhttp://www.netl.doe.gov/technologies/carbon_seq/refshelf/CCSRoadmap.pdf" http://www.netl.doe.gov/technologies/carbon_seq/refshelf/CCSRoadmap.pdfhttp://www.westcarb.org/resources_links.html#techroadmaps" http://www.westcarb.org/resources_links.html#techroadmaps

DECEMBER 2010 FORGING A CONCENSUS ON INTERCONNECTIONShttp://www.energy.ca.gov/publications/displayOneReport.php?pubNum=CEC-500-2010-031" http://www.energy.ca.gov/publications/displayOneReport.php?pubNum=CEC-500-2010-031 http://www.energy.ca.gov/publications/displayOneReport.php?pubNum=CEC-500-2010-030" http://www.energy.ca.gov/publications/displayOneReport.php?pubNum=CEC-500-2010-030

*NETL TECHNOLOGIES AND COST AND PERFORMANCE STUDIES 2011 http://www.netl.doe.gov/technologies/coalpower/gasification/pubs/market.html http://www.netl.doe.gov/energy-analyses/pubs/deskreference/index.html" http://www.netl.doe.gov/energy-analyses/pubs/deskreference/index.htmlhttp://www.netl.doe.gov/energy-analyses/baseline_studies.html" http://www.netl.doe.gov/energy-analyses/baseline_studies.html

2011 IEA COST AND PERFORMANCE OF CO2 CAPTURE FROM POWER GENERATIONhttp://w.info.com/ClickHandler.ashx?ru=http%3a%2f%2fwww.iea.org%2fpapers%2f2011%2fcostperf_ccs_powergen.pdf&coi=239138&cop=main-title&c=us.infoflag&ap=13&npp=8&p=0&pp=5&pvaid=4ae699345c684699984fd8de5e0de6b9&ep=5&euip=66.74.232.110&app=1&hash=6812BC2741EF0211201DBEC22A7553CD

LMS100 INTERCONNECTION FEASIBILITY STUDYhttp://www.oatioasis.com/BHCT/BHCTdocs/BHCT-G4_Feasibility_Study_Report_070709.pdf" http://www.oatioasis.com/BHCT/BHCTdocs/BHCT-G4_Feasibility_Study_Report_070709.pdf

FERC ON-LINE 2011 http://elibrary.ferc.gov/idmws/search/fercadvsearch.asp" http://elibrary.ferc.gov/idmws/search/fercadvsearch.asp SEPTEMBER 2011 CHALLENGES FACING COMBINED HEAT AND POWER TODAY http://www.energysolutionscenter.org/assets/1/News/ACEEE_State_by_State_Assessment_Sept_2011.pdf http://www.cpuc.ca.gov/PUC/energy/DistGen/rule21.htm" http://www.cpuc.ca.gov/PUC/energy/DistGen/rule21.htm

LCBF 2015-2020 USA LARGEST CHP-COGENERATION PLANTLCBF COST PLUS CREZ: CPUC CEC MUST TAKE MAXIMUM RETI-CREZ at/ATC. (Optimized Deliverability to Load Centers)CPUC GUARANTEED IRR/ROE MAXIMUM CREZ-RETI CAPACITY APPROVED GENERATION COTRACTS.

SMART GRID SUPPORT: ADVANCED ZERO EMISSIONS LOAD BALANCING TRETPhttp://docs.cpuc.ca.gov/efile/A/138423.pdf" http://docs.cpuc.ca.gov/efile/A/138423.pdf STRATEGICALLY LOCATED CREZ-RETI DRECP-ENVIRONMENTAL JUSTICEhttp://www.energy.ca.gov/2006publications/CEC-500-2006-074/CEC-500-2006-074.PDF

*DIRECT DELIVERY AND ACCESS TO L.A BASIN AND CRITICAL PATHS 26 AND 15*ADVANCED CCS READY 600 MW ZERO EMISSIONS http://www.iea.org/Papers/2007/CO2_Capture_Ready_Plants.pdf" http://www.iea.org/Papers/2007/CO2_Capture_Ready_Plants.pdf Hybrid Flexible Power/Fuel Renewable Oxy-Combined Clean Heat and Power Polygeneration 2015-2020 (OXY-CCHPP)Cal-Cement CO2 Pipeline: CCS/EOR/SALINE at Kimberlina Kern County, CA. http://www.iea.org/papers/2011/costperf_ccs_powergen.pdf +400 MW Coupled Hybrid Advanced Energy Storage SCE TEHACHAPI ENERGY STORAGE PROJECThttp://asset.sce.com/Documents/Environment%20-%20Smart%20Grid/0910_TSP.pdfhttp://www.sce.com/NR/sc3/tm2/pdf/2482-E.pdf

SEPTEMBER 2009 PG&E 300MW CENTRAL VALLEY ENERGY STORAGE CAES https://www.pge.com/regulation/SmartGridTechnologies/Pleadings/PGE/2009/SmartGridTechnologies_Plea_PGE_20090929-01.pdf" https://www.pge.com/regulation/SmartGridTechnologies/Pleadings/PGE/2009/SmartGridTechnologies_Plea_PGE_20090929-01.pdf

*First Phase Of Four (4) Separately Developed Phases*Advanced Waste Heat Recovery and Combined Heat and Powerhttp://www.energy.ca.gov/wasteheat/documents/index.html

Enabling >10,000 MW Intermittent/Variable Wind and Solar >2020 E3 33% RPS http://nplnews.com/library/windenergy/Renew_Energy_12_08.pdf" http://nplnews.com/library/windenergy/Renew_Energy_12_08.pdfhttp://www.energy.ca.gov/2010publications/CEC-500-2010-012/index.htmlhttp://www.cpuc.ca.gov/NR/rdonlyres/932CFFAA-0610-474E-905D-30CD1D76C651/0/InputsandAssumptions_UPDATE.pdfhttp://www.energy.ca.gov/reti/documents/index.html" http://www.energy.ca.gov/reti/documents/index.htmlhttp://www.energy.ca.gov/publications/displayOneReport.php?pubNum=CEC-500-2010-010" http://www.energy.ca.gov/publications/displayOneReport.php?pubNum=CEC-500-2010-010

***>2015 ENABLING CONGESTION RELIEF CRITICAL PATHS 26 AND 15 (N/S-S/N) http://nietc.anl.gov/documents/docs/DOE_Congestion_Study_2006_Western_Analysis.pdf http://www.westgov.org/wieb/electric/2005workplan/Tplan&exp/03-15-06drftWCAS.pdf" http://www.westgov.org/wieb/electric/2005workplan/Tplan&exp/03-15-06drftWCAS.pdf

***ENABLING 2010-2020 EXPIRED DIRTY COAL POWER IMPORTS 18,435MW. (REF. PG. 48) http://www.energy.ca.gov/2011publications/CEC-150-2011-002/CEC-150-2011-002.pdf ***ENABLING EPA 316(b) OTC ENVIRONMENTALLY DESTRUCTIVE POLLUTING GENERATORS http://nepis.epa.gov/Exe/ZyNET.exe/P1009K7T.TXT?ZyActionD=ZyDocument&Client=EPA&Index=2006+Thru+2010&File=D%3A\ZYFILES\INDEX+DATA\06THRU10\TXT\00000023\P1009K7T.TXT&User=anonymous&Password=anonymous&ImageQuality=r85g16%2Fr85g16%2Fx150y150g16%2Fi500&Display=hpfrw&Back=ZyActionS&MaximumPages=5&Query=fname%3D%22P1009K7T.TXT%22

*Enabling >2,000,000-AF Antelope Valley Water Bank and Recharge http://www.usbr.gov/mp/nepa/documentShow.cfm?Doc_ID=5038http://www.water.ca.gov/irwm/docs/ResourcesLinks/Submitted_Applications/P84_Round1_Implementation/Antelope%20Valley%20-%20East%20Kern%20Water%20Agency/Att3_IG1_AntelopeValley_WorkPlan_1of1.pdfhttp://avwaterplan.org/" http://avwaterplan.org/APRIL 2011 CEC 500-2010-023 CONJUNCTIVE USE OF RESERVOIR AND AQUIFERhttp://www.energy.ca.gov/publications/displayOneReport.php?pubNum=CEC-500-2010-023 *Enabling $100,000,000 MILLION DOLLARS, CLEAN ENERGY MANUFACTURING PRODUCTS, COMPONENTS USED FOR RENEWABLE GENERATION, ENERGY EFFICIENCY, OR FOR PRODUCTION OF CLEAN ALTERNATIVE FUEL VEHICLES.

STATE CERTIFICATION SHALL BE LESS THAN THIRTY (2020 AB32 GHG REDUCTIONS, ENABLING >10,000MW WIND/SOLAR, >2,000,000AF WATER BANK.

SMART GRID INTEGRATED ADVANCED CLEAN POWER AND CLEAN WASTE HEAT PROCESS.AB900 >$100,000,000 ) 40,000 cubic meters ( m3 ) / day x 6 = 200,000 cubic meters ( m3 ) / day raw , process , and potable water for the industrial needs in the city of Lancaster and the Heavy Industrial Sector adjoining the current city limits . This translates to an aggregate capacity of 44 Million Imperial Gallons per Day (MIGD). The LMS 100 is unique in that it integrates features of both GE s frame and aero-derivative CTG systems and is capable of rapid starts , with the ability to quickly ramp electrical output from low to full - power . Each of the LMS 100 CTG s will be equipped with water injection capability to reduce emissions of nitrogen oxides ( Nox ) , selective catalytic reduction ( SCR ) to further reduce Nox emissions , and an oxidation catalyst to reduce carbon monoxide ( CO ) emissions .The emission reduction equipment will be contained within a housing that terminates at the 90 - foot tall CTTG exhaust stacks. A 39 - foot tall, 5 - cell mechanical - draft cooling tower extending approximately 211 feet in length will meet plant cooling needs.

Electrical TransmissionThe electric power produced by the facility will be transmitted to the electrical grid through the on - site 34. 5 kV and 66 kV double circuit transmission lines in tandem on the same pole that will utilize a Step - Up Transformer to connect with SCE Segment 3 Corridor affording access to the 500 kV SCE Bulk Transmission Lines , which is currently rated for 220 kV . In a southerly direction from our site s Main Generator Station , in the city of Lancaster , are to be two ( 2 ) Switching Substations , known as the Antelope Gateway Switching Station with 500 - 230 - 66 kV Transmission Lines . The second one will be newly acquired by the year 2013, as a 230 - 66 kV Transmission Line Switching Substation. Both will be intertied from our site. Adjacent to our site in a westerly direction is the Sage Brush Power Output Transmission Corridor with a double circuit transmission line at 230 kV. Adjacent to that in a westerly direction are the LADWP 230 kV, 500 kV Barren Ridge/Haskell-Rinaldi and nearby LADWP 800-100KV-DC North-South http://www.ladwp.com/ladwp/cms/ladwp014594.jsp" http://www.ladwp.com/ladwp/cms/ladwp014594.jsp Transmission Lines Corridors. In a northerly direction from our site is an intertie switching substation between the Antelope Gateway and Windhub Substations where Antelope # 1 has 500 - 230 - 66 kV Transmission Lines and #2 has 230 - 66kV Transmission Lines both in the city of Lancaster and Windhub 500-230-66KV Transmission Lines. Inside the TRETP site there are Corridor accesses to multiple 500-230 - 66 kV Transmission Lines. Our site includes corridor access for direct transmission inside (expanded) TRADING HUB CRITICAL PATH - 26 and PATH - 15 (N - S / S - N) via the VINCENT GATEWAY and ANTELOPE GATEWAY Switching Substations for congestion remediation and mitigation FERC 890 OATT ATC firm dispatch and firm re-dispatch. PATH - 26 is overloaded more than 1000 hours annually, after the 500 kV upgrade the overloading reduced to more than 200 hours / year. Current capacity rating is N - S 4000 MW / S - N 3000 MW , with the upgrade added expansion of the 500 kV Transmission Line , the cumulative rating for (expanded) TRADING HUB CRITICAL PATH - 26 + PATH - 15 increases to 8,500 MW from the current 7,000 MW, includes firming and stabilizing the transmission grid. http://www.caiso.com/242a/242ae729af70.pdf

Additional EquipageIn order to enhance maximum usage of the proposed site, it has been determined to help stabilize the power grid it has been decided to install 400 MW coupled battery backup systems. This system will be provided by A123 Inc.-24M Inc. Semi-Solid Advanced Hybrid Li-Ion Batteries Coupled Smart Grid Advanced Hybrid Stabilization Systems. http://www.uschamber.com/sites/default/files/about/2011-04-15-Hsieh_USC_ETRA_Public.pdf http://www.electricitystorage.org/images/uploads/static_content/technology/resources/ESA_TR_5_11_EPRIStorageReport_Rastler.pdfhttp://storagealliance.org/resources/CES_Storage_Coalition_Submission_Final.pdf http://energyenvironment.pnnl.gov/ei/pdf/Chemical%20Reviews.pdf http://www.storagealliance.org/presentations/CESA_SEMI_Presentation_2011-7-11.pdf ICEPAG 2011 NEW SMART GRID INTEGRATED RELIABILITY OPTIONS AND APPLICATIONS. http://uc-ciee.org/downloads/ICEPAG%202011%20Renewable%20Grid%20Integration%20Brown.pdf Other considerations which will enhance the project installation of a 66KV portable sub/switching station on the property expanded with a 230KV substation-switchyard.

Natural Gas SupplyNatural Gas will be delivered to the CPW Plant System Site via a 32 - inch diameter pipeline, 10 Miles in length running along Tehachapi Road and connecting to one or more of three (3) existing pipelines gas transmission suppliers. Either the FERC NG pipeline at HWY - 110 tie and Cal - Cement : the Kern River, El Paso, Mojave, All American, PG&E line # 400-401 Pipelines in the northerly direction 8-15 miles from the site , and/or the FERC NG - pipeline at HWY - 110 and Ave - M in Lancaster : SO - CAL FERC NG - pipeline in the southerly direction 11-15 miles from the site , which are both 32 pipe connections , and / or the SEMPRA SO CAL CITY GATE PIPELINE ( 8 P / L ) 8 - inch pipe connection at 110th & Ave F, which is located 4-miles in a southerly direction from the site.

Water Supply and DischargeFor generating raw water and industrial process and potable water through the MEDi Desalination Plant within the CPW Plant System two or more supply wells are to connect to the brackish/impaired aquifer inside the 1,000,000 acre feet (AF) Feed Site. Water Pumps will transport the water to feed Raw Water to AVEK and LADWP. There will be an easement dedication at the subject site for 48 inch AVEK dual capacity RAW water transmission to a proposed facility nearby to AVEK - Antelope Valley East Kern water district and LADWP 36 inch dual capacity pipelines. The LADWP (#2) Owens Valley Canal and SWRD - SWP AQUADUCT are near the subject site and inside the one (1) million acre feet water / recharge aquifer water banking hydrological region. SWRCB has proclaimed the Antelope Valley Aquifer as a priority designated primary groundwater resource for the remediation / mitigation and susceptibility to pollutants ARSENIC, SALT and NUTRIENTS. The comprehensive final water laboratory reports from USGS GAMA and SWRCB were completed 2008.Power plant 600 MW cooling water needs can be supplied via 32 Rosamond reclaimed water pipeline located 11/2 miles north on a major county highway, at (110th West) and Gaskell Rd. Intended usage is for Rosamond Western Development (500,000) acre feet recharge bank. Antelope Valley is part of the >2,000,000 acre feet cumulative LADWP, Lancaster, Palmdale, AVEK/Rosamond Development recharge bank project. In addition there is a LACSD 32 reclaimed water pipeline on major county highway which is located 5 miles east of the subject site at Highway B and 60th Street West. This pipeline is used to recharge the Antelope valley Aquifer with expansion delivery capacity exceeding 16,000.000 gallons daily. At subject site Highways B and 110th W LADWP dual capacity 36 and AVEK 48 dual capacity water transport (proposed) pipelines. Per California DWR project transfer agreement the entire >15,000 acres water bank recharge Western Development/Rosamond Water district shall have open access for the public consumers benefit and use in Kern County.

There will be a Zero Liquid Discharge ( ZLD ) due to the utilization of an Electric Deionizer (ED) or a Electric Deionizer Reversal ( EDR ) with a crystallizer system , and the by - product is saleable salt cake that is safe enough to dispose of at your local landfill site . The combined wastewater discharge from the plant will consist of cooling tower blow down, RO rejects, evaporative cooler blow down, CTG intercooler condensation and effluent from the oil-water separator. Sanitary wastes drains are sent to a septic tank and leach field in ground that has been determined to be acceptable by a percolation test.Storm water will be conveyed by overland flow and swales to an infiltration basin located at the southeast corner of the proposed site. The infiltration basin will serve as a storm water treatment facility to manage the quality and quantity of storm water runoff from the proposed site, Transmission corridor, and inside the RETI - CREZ priority transmission corridors.

*SCORING RENEWABLE ENERGY PROJECTS FOR 33% RPS GOALS. http://www.cpuc.ca.gov/NR/rdonlyres/84257CC3-2EA5-422E-90FC-3D9EE485AE1B/0/WhitePaperEnv_Scoring.pdf

FINANCING: Private-Public Activity Bond, DOI-USBR incentives and subsidies $1000 per acre foot capacity (infrastructures), Prop 50 and 84, ARRA 2009 Stimulus, California Water Bond, H.R.1071 $0.68/K.glns-$220/AF and MWD subsidies for alternative water sources ($195-$250/AF-POU). California Water Infrastructure Bond $11Bln

Potential Electricity Off-takers:POTENTIAL POWER PPA OFF TAKERS FOR 600MW LMS100 CHP-COGENERATION* LOCAL CCA REQUEST FOR 600MW LMS100 CHP SUBJECT TO RFP/RFO.1) LADWP BILATERAL AND 2011 RFP/RFO INCLUDES REQUEST FOR GE-LMS100. http://www.lachamber.com/clientuploads/EWE_committee/093011_CombinedAgenda.pdf" http://www.lachamber.com/clientuploads/EWE_committee/093011_CombinedAgenda.pdfhttp://www.ladwpnews.com/go/doc/1475/1206911/ http://www.waterboards.ca.gov/board_info/agendas/2011/jul/071911_7.pdf" http://www.waterboards.ca.gov/board_info/agendas/2011/jul/071911_7.pdf http://www.fbcoem.org/posted/1475/2010_2011_Budget.577955.pdf" http://www.fbcoem.org/posted/1475/2010_2011_Budget.577955.pdfhttp://www.piersystem.com/posted/1643/Final_Board_Solar_Presentation_08_04_09.299169.pdf" http://www.piersystem.com/posted/1643/Final_Board_Solar_Presentation_08_04_09.299169.pdfhttp://www.industry.usa.siemens.com/topics/us/en/solarexchange/west/Documents/11dNicholsSolarExchWestLADWPUCLA61611final.pdf http://www.swrcb.ca.gov/water_issues/programs/ocean/cwa316/saccwis/docs/swrcbpres070511.pdf http://www.energy.ca.gov/2011_energypolicy/documents/2011-06-22_workshop/comments/Los_Angeles_Department_of_Water_and_Power_Comment_TN-61326.pdf * LADWP POWER SYSTEM http://www.piersystem.com/posted/1643/Budget_Presentation_May21.275349.pdf 2) SCPPA 11 CITIES BILATER AND RFP/RFO PUBLICATION INCLUDES LMS100.3) SCE 2011 BILATERAL NEGOTIATIONS AND RFP/RFO VIA PUBLICATION.4) PG&E 2011 BILATERAL NEGOTIATIONS AND RFP/RFO VIA PUBLICATION.5) SDG&E 2011 BILATERAL NEGOTIATIONS AND RFP/RFO VIA PUBLICATION.6) OTHER MUNICIPALITIES ALSO SEEKING RFP/RFO FOR CHP-COGENERATION.Potential Water Off-takers: LADWP, MWD, IOU, LOCAL CCA.*REPLACE/DISPLACE 32% CALIFORNIA OUT OF STATE COAL POWER IMPORTS http://mayor.lacity.org/stellent/groups/ElectedOfficials/@MYR_CH_Contributor/documents/Contributor_Web_Content/LACITY_004714.pdf" http://mayor.lacity.org/stellent/groups/ElectedOfficials/@MYR_CH_Contributor/documents/Contributor_Web_Content/LACITY_004714.pdf *2012 Antelope Valley Integrated Water Plan http://www.avwaterplan.org/" http://www.avwaterplan.org/ *August 18, 2011 California Regulations Related to Drinking Water http://www.cdph.ca.gov/certlic/drinkingwater/Documents/Lawbook/dwregulations-2011-08-18.pdf http://www.cdph.ca.gov/certlic/drinkingwater/Documents/Lawbook/DWstatutes-2011-01-01.pdf

Other Financial Considerations:Financial subsidies and financing mechanism available not to exclude.a) HR1071 alternate water source subsidies of $220 per acre feet produced.b) MWD/LADWP alternate water source subsidies $195-$250 per acre foot.c) Prop 50 and Prop 84 financing and incentive funding for alternate watersource infrastructures and production.d) Approved by Cal. Governor Schwartzenegger eleven billion dollars California water and infrastructure bond financing 2011.e) AB811/474 tax assessed bond financing >1% interest rate for twenty (20yrs).f) AB117 CCA-community choice aggregation incentives and financing.g) CARB CARBON TRUST and AB1555 assistance for renewable and clean GHG reduction technologies AB32 mandates, assisting stakeholders/developers.*Co2 offset credit =$ 30/MT, Waste Heat REC 3.412MMBTU/MWH =$ 35 1/REC.h) DOI-USBR $1,000 per acre foot alternate water source capacity for infrastructures subsidy.i) MACRS five years for qualifying projects, 50% bonus up front ends Dec. 31-2016.

*APPENDIX H MASTER REFERENCE INDEX LIST.DEVELOPED BY CEC, CPUC AND ARB. http://www.arb.ca.gov/regact/2010/res2010/res10h.pdf

*SEPT. 2011 ENERGY AWARE FACILITIES SITING AND PERMITTING GUIDE:http://www.energy.ca.gov/energy_aware_guide/siting.html" http://www.energy.ca.gov/energy_aware_guide/siting.html

*SEPT. 13, 2011 CALIFORNIA FAST TRACK RENEWABLE ENERGY LEGISLATION DRECP. http://documents.jdsupra.com/f1fc4bb7-c6e5-4267-ad7f-88d4d4c460dd.pdf" http://documents.jdsupra.com/f1fc4bb7-c6e5-4267-ad7f-88d4d4c460dd.pdf

*NOV. 2010 BEST MANAGEMENT PRACTICES AND GUIDANCE MANUAL:DESERT RENEWABLE ENERGY PROJECTS. http://documents.jdsupra.com/f1fc4bb7-c6e5-4267-ad7f-88d4d4c460dd.pdf" http://documents.jdsupra.com/f1fc4bb7-c6e5-4267-ad7f-88d4d4c460dd.pdf *INFRASTRUCTURE NEED ASSESSMENTS FOR 2011 INTEGRATED ENERGY PLAN.http://www.energy.ca.gov/2010publications/CEC-200-2010-010/CEC-200-2010-010-SD.PDF" http://www.energy.ca.gov/2010publications/CEC-200-2010-010/CEC-200-2010-010-SD.PDF

*AUG. 2010 CPUC FEED-IN TARIFF DESIGNS CALIFORNIA COMPETITIVE RENEWABLE ENERGY ZONES. http://www.energy.ca.gov/2010publications/CEC-300-2010-006/CEC-300-2010-006.PDF" http://www.energy.ca.gov/2010publications/CEC-300-2010-006/CEC-300-2010-006.PDF

*MAY. 2009 CPUC CALIFORNIA FEED-IN TARIFF DESIGN AND POLICY OPTIONS (PATH # 3 MAX-ATC).http://www.energy.ca.gov/2008publications/CEC-300-2008-009/CEC-300-2008-009-F.PDF" http://www.energy.ca.gov/2008publications/CEC-300-2008-009/CEC-300-2008-009-F.PDF

*MAY 26, 2012 EPA FINAL RULE NSPS ELECTRICITY GENERATION AND REFINERIES GHG LIMITS.http://www.epa.gov/airquality/ghgsettlement.html" http://www.epa.gov/airquality/ghgsettlement.html

*APRIL 2011 OBAMAS RED TAPE ROADMAP http://barrasso.senate.gov/public/_files/4.12.11_Obama_Reg_Roadmap.pdf" http://barrasso.senate.gov/public/_files/4.12.11_Obama_Reg_Roadmap.pdf *2005-06 FERC SCE TEHACHAPI 500KV RENEWABLE ENERGY TRUNKLINES. http://66.147.244.210/~westerz0/wp-content/uploads/2011/02/Tehachapi-Windpower_6-2005.pdf" http://66.147.244.210/~westerz0/wp-content/uploads/2011/02/Tehachapi-Windpower_6-2005.pdf

*TRANSMISSION IN TEHACHAPI: TCSG TEHACHAPI COLLABORATIVE STUDY GROUP 2005. http://barrasso.senate.gov/public/_files/4.12.11_Obama_Reg_Roadmap.pdf" http://barrasso.senate.gov/public/_files/4.12.11_Obama_Reg_Roadmap.pdf

*TRANSMISSION IN TEHACHAPI: TCSG 2006 FINAL STUDY REPORT. ftp://ftp.cpuc.ca.gov/puc/energy/electric/renewableenergy/tehachapi+2nd+report_vol+4+of+5.pdf" ftp://ftp.cpuc.ca.gov/puc/energy/electric/renewableenergy/tehachapi+2nd+report_vol+4+of+5.pdf ftp://ftp.cpuc.ca.gov/puc/energy/electric/renewableenergy/tehachapi+2nd+report_vol+5+of+5.pdf" ftp://ftp.cpuc.ca.gov/puc/energy/electric/renewableenergy/tehachapi+2nd+report_vol+5+of+5.pdf

*SWRCB 316(b) OTC CEC-500-2011-020 http://www.energy.ca.gov/2011publications/CEC-500-2011-020/CEC-500-2011-020.pdf" http://www.energy.ca.gov/2011publications/CEC-500-2011-020/CEC-500-2011-020.pdf http://www.arb.ca.gov/energy/esr-sc/0215-workshop/ab1318_slides_offset_workshop_2_15_2011.pdf

*PIER JULY 2011 INDUSTRIAL, WATER EFFICIENCY CONSOLIDATED ROADMAP. http://www.energy.ca.gov/2011publications/CEC-500-2011-035/CEC-500-2011-035.pdf" http://www.energy.ca.gov/2011publications/CEC-500-2011-035/CEC-500-2011-035.pdf

*UCI IRVINE PIER AUG-2011 ENVIRONMENTALLY PREFERRED ADVANCED DISTRIBUTED GENERATION http://www.energy.ca.gov/2011publications/CEC-500-2011-042/CEC-500-2011-042.pdf" http://www.energy.ca.gov/2011publications/CEC-500-2011-042/CEC-500-2011-042.pdf

*PIER AUGUST 2009 ADVANCED GENERATION ROADMAPhttp://www.energy.ca.gov/2009publications/CEC-500-2009-086/CEC-500-2009-086-D.PDF" http://www.energy.ca.gov/2009publications/CEC-500-2009-086/CEC-500-2009-086-D.PDF

*SB1059 OPEN ACCESS TO ELECTRICITY CORRIDORS AND OWNERSHIP OF TRANSMISSION LINES http://www.energy.ca.gov/sb1059/index.html" http://www.energy.ca.gov/sb1059/index.html

*AB1925 GEOLOGIC CCS CARBON CAPTURE AND SEQUESTRATION REPORT TO THE LEGISLATUREhttp://www.energy.ca.gov/2007publications/CEC-500-2007-100/CEC-500-2007-100-CMF.PDF" http://www.energy.ca.gov/2007publications/CEC-500-2007-100/CEC-500-2007-100-CMF.PDF

*CAISO JANUARY 24, 2011 OVERSUPPLY AND SHORTAGE OF DOWNWARD RAMPING SUPPLY -$500/MWH 2012, -$750/MWH 2013, -$1,000/MWH 2014 BID FLOOR PRICING. http://www.storagealliance.org/whystorage/CAISO_Ramping_Draft_2011-01-14.pdf" http://www.storagealliance.org/whystorage/CAISO_Ramping_Draft_2011-01-14.pdf

*FEBRUARY 17, 2011 COMMENTS OF MEGAWATT STORAGE FARMS ON CAISO CONCEPTUAL TRANSMISSION PLAN http://www.caiso.com/2b2e/2b2ec9a9731e0.pdf" http://www.caiso.com/2b2e/2b2ec9a9731e0.pdf

*CAISO 08/29/2011 RENEWABLES INTEGRATION ROADMAP http://www.caiso.com/Documents/RevisedStrawProposal-RenewablesIntegrationMarketandProductReviewPhase2.pdf

*ICF 2010 PIER FINAL COMBINED HEAT AND POWER MARKET ASSESSMENT http://caiso.com/informed/Pages/StakeholderProcesses/GenerationInterconnectionProceduresPhase2.aspx

SCE TRETP PHASED EXPANSION OF 500KV FERC RENEWABLE ALMOST ALL WIND TRUNKLINES http://www.ceert.org/PDFs/reports/Tehachapi-2006v1.pdf *WITHIN SCE TRETP SEGMENT THREE (3) INCLUDES THREE (3) 500KV RENEWABLE TRUNKLINES BUILDOUT IN THE FOLLOWING PROPOSED PHASES.1) PHASE ONE (1) COMPLETED 2010 SIZED AT 500KV RATED 230KV (PG.53)2) PHASE THREE (3) PLANNED 2013 SIZED AT 500KV (PG.55)3) PHASE FOUR (4) RADIAL TO SCE 2016 SIZED AT 500KV (PG.57)

2012 DOE PERFORMANCE PLAN SUPPLEMENT http://www.cfo.doe.gov/budget/12budget/Content/PerformancePlanSupplement.pdf MDAQMD 8-HOUR OZONE ATTAINMENT PLAN http://docs.cpuc.ca.gov/word_pdf/REPORT/32197.pdf" http://docs.cpuc.ca.gov/word_pdf/REPORT/32197.pdf USGS GAMA 2008 ANTELOPE VALLEY IMPAIRED WATER QUALITY http://pubs.usgs.gov/ds/479/" http://pubs.usgs.gov/ds/479/ JULY 2011 CSLF TECHNOLOGY ROADMAP http://www.cslforum.org/publications/documents/CSLF_Technology_Roadmap_2011.pdf 2011 MIT CCS DATABASE http://sequestration.mit.edu/tools/projects/index.html" http://sequestration.mit.edu/tools/projects/index.html 2009 GLOBAL CCS INSTITUTE http://cdn.globalccsinstitute.com/sites/default/files/Report%204-Existing%20Carbon%20Capture%20and%20Storage%20Research%20and%20Development%20Networks%20around%20the%20World.pdf 2009 ACCELERATING CCS CARBON CAPTURE SEQUESTRATION TECHNOLOGIES http://nws.chem.uu.nl/publica/Publicaties%202011/Proefschrift_van%20Alphen.pdf 2010 ITRON FOR CEC: IMPACTS OF DISTRIBUTED GENERATION http://www.cpuc.ca.gov/NR/rdonlyres/750FD78D-9E2B-4837-A81A-6146A994CD62/0/ImpactsofDistributedGenerationReport_2010.pdf" http://www.cpuc.ca.gov/NR/rdonlyres/750FD78D-9E2B-4837-A81A-6146A994CD62/0/ImpactsofDistributedGenerationReport_2010.pdfUTILITY INCENTIVES FOR CHP-COMBINED HEAT AND POWER http://www.epa.gov/chp/documents/utility_incentives.pdf" http://www.epa.gov/chp/documents/utility_incentives.pdf MARCH 2011 CHP COGENERATION ABSTRACT SUMMARY EPA http://www.pewclimate.org/docUploads/CogenerationCHP.pdf" http://www.pewclimate.org/docUploads/CogenerationCHP.pdf 2011 CALIFORNIA CLEAN ENERGY FUTURE CHP IMPLEMENTATION PLAN http://www.cacleanenergyfuture.org/common/CCEF%20Implementation%20Plan_vFinal_2a.pdf 2011 EPA PARTNERSHIP USCHPA COMBINED HEAT AND POWER CHP http://www.epa.gov/chp/" http://www.epa.gov/chp/ 2011 AUGUST SMUD BUNDLED CHP RATES PPA http://www.smud.org/en/community-environment/solar-renewables/Documents/8-04_FITProcedures.pdf2011 LADWP DISTRIBUTED GENERATION http://www.lapowerplan.org/documents/final_irp/Appendix_G_Distributed_Generation.pdf 2011 UL APPLICATION GUIDE FOR ALTERNATIVE ENERGY EQUIPMENT http://www.ul.com/global/documents/offerings/perspectives/regulators/electrical/newsletters/AlternativeEnergy_AG.pdf 2011 IEPR BROWN 20,000MW CLEAN ENERGY FUTURE http://www.energy.ca.gov/2011_energypolicy/index.html" http://www.energy.ca.gov/2011_energypolicy/index.html 2011 CALIFORNIA RENEWABLE POWER AND ENERGY EFFICIENCY http://www.ferc.gov/market-oversight/othr-mkts/renew/2011/02-2011-othr-rnw-archive.pdf 2011 SEPTEMBER ANTELOPE VALLEY SOLAR RANCH 1 220MW PV PROJECT https://lpo.energy.gov/wp-content/uploads/2010/10/AVSR1-Final-EA-Aug-2011.pdf 2011 (RFB) VRB-VANADIUM REDOX FLOW BATTERIES COST & PERFORMANCE http://eprints.soton.ac.uk/196457/1/er1863-1.pdf" http://eprints.soton.ac.uk/196457/1/er1863-1.pdf

2011 ENERGY STORAGE ACTIVITIES IN THE UNITED STATES http://www.doe.gov/sites/prod/files/oeprod/DocumentsandMedia/FINAL_DOE_Report-Storage_Activities_5-1-11.pdf http://www.sandia.gov/ess/docs/ARRA_StorDemos_4-22-11.pdf" http://www.sandia.gov/ess/docs/ARRA_StorDemos_4-22-11.pdf http://www.svpvs.org/slides/PARC%20Storage_Smart%20Grid%20ppt%20Aug%2012%20r2.pdf http://www.greentechmedia.com/images/wysiwyg/News/EPRIEnergyStorageOverview%20DanRastler.pdf http://energyenvironment.pnnl.gov/ei/pdf/Chemical%20Reviews.pdf" http://energyenvironment.pnnl.gov/ei/pdf/Chemical%20Reviews.pdf http://www.niplats.com.au/media/articles/Investor---Research/20110719-Ocean-Equities-Vanadium-Sector-Review---July-2011-261/Vanadium-Thematic-Ocean-Equities-Research-July-2011.pdf http://ei.haas.berkeley.edu/c2m/pdf/2011EndofYearSlides/Flow%20Battery.pdf http://mydocs.epri.com/docs/publicmeetingmaterials/1104/4ANZGWRJTYQ/E236208_02._Rastler_Energy_Storage_Technology_Status.pdf http://www.iea.org/work/2011/storage/Item4_CLP.pdf" http://www.iea.org/work/2011/storage/Item4_CLP.pdf http://www.nrel.gov/docs/fy10osti/47547.pdf" http://www.nrel.gov/docs/fy10osti/47547.pdf http://www.cuny.edu/about/resources/sustainability/solar-summit/2011-agenda/HUFF_Storage_Summit11.pdf http://aie.org.au/StaticContent/Images/SYD040411_Presentation_Geoff.pdf" http://aie.org.au/StaticContent/Images/SYD040411_Presentation_Geoff.pdf http://www.energy.ca.gov/2011_energypolicy/documents/2011-04-28_workshop/presentations/05_DOE_Gyuk_by_Kintner-Meyer_IEPR_workshop.pdf" http://www.energy.ca.gov/2011_energypolicy/documents/2011-04-28_workshop/presentations/05_DOE_Gyuk_by_Kintner-Meyer_IEPR_workshop.pdf http://www.iea.org/work/2011/storage/Item4_TEPCO.pdf" http://www.iea.org/work/2011/storage/Item4_TEPCO.pdf

FEASIBILITY VRB FOR DISPATCHABLE POWER http://www.seai.ie/Publications/Renewables_Publications/VRB-ESS-Energy-Storage-Rpt-Final.pdf http://www.seai.ie/Archive1/Files_Misc/REHC03001FinalReport.pdf

2012 CAISO DRECP CREZ KRAMER LUCERN >2000MW NOW ONLY >300MW IN QUEUE (CONFIRMED PRIORITY CREZ) http://www.caiso.com/Documents/CaliforniaEnergyComments_RenewablePortfolioAssumptions_2011-2012TransmissionPlanningProcess.pdf

2012 FUTURE OF LARGE SOLAR IN CALIFORNIA http://www.bren.ucsb.edu/research/documents/solar_report.pdf

2010-2020 CPUC IOU LTPP-LONG TERM PROCUREMENT PLAN http://docs.cpuc.ca.gov/efile/RULINGS/119573.pdf" http://docs.cpuc.ca.gov/efile/RULINGS/119573.pdf

2011 DESERT SUNLIGHT AMENDMENT DRECP CPUC CEQA ADEQUATE http://www.blm.gov/pgdata/etc/medialib/blm/ca/pdf/palmsprings/desert_sunlight.Par.25351.File.dat/DSSF_ROD_%20Final%20ROD.pdf

2011 PIER ENERGYNEThttp://www.energy.ca.gov/2010publications/CEC-500-2010-021/CEC-500-2010-021.PDF

2011 SYNCHROPHASORS ENABLES RENEWABLES PENETRATION IMPROVES GRID RELIABILITY http://www.energy.ca.gov/publications/displayOneReport.php?pubNum=CEC-500-2011-FS-029

2011 NREL RENEWABLES http://www.nrel.gov/applying_technologies/" http://www.nrel.gov/applying_technologies/

2011 POWER PARTNERS LLC. PDV 300MW WIND 5,000-ACRES NORTH OF SUBJECT SITEhttp://www.co.kern.ca.us/planning/pdfs/eirs/PdV/PdV_Ch_03.pdf" http://www.co.kern.ca.us/planning/pdfs/eirs/PdV/PdV_Ch_03.pdf http://www.co.kern.ca.us/planning/pdfs/eirs/PacWind/Volume%20I/10-Bibliography.pdf" http://www.co.kern.ca.us/planning/pdfs/eirs/PacWind/Volume%20I/10-Bibliography.pdf

SCE TRTP SEGMENTS 1-11 http://www.energylegalblog.com/files/FERC%20Transmission%20Incentives%20SCE.pdf http://docs.cpuc.ca.gov/environ/tehachapi_renewables/24_CADFG-10-08-07.pdf" http://docs.cpuc.ca.gov/environ/tehachapi_renewables/24_CADFG-10-08-07.pdf http://www.swrcb.ca.gov/water_issues/programs/cwa401/docs/notices/socaled_notice_draftagenda.pdf

SEMPRA 300MW, SUNPOWER 600MW PV SCE GEN-TIE INTERCONNECTION AGREEMENT http://www3.sce.com/sscc/law/dis/dbattach10.nsf/0/F01CD02EC678FDEE882578E2006EF468/$FILE/110804+ER11-4226+SCE-Sempra_SunPower+Gen-Tie-LA.pdf" http://www3.sce.com/sscc/law/dis/dbattach10.nsf/0/F01CD02EC678FDEE882578E2006EF468/$FILE/110804+ER11-4226+SCE-Sempra_SunPower+Gen-Tie-LA.pdf

SCE DECLARATORY ORDER FERC REQUEST ROLLED IN RATES TWRA TEHACHAPI 500KV http://www3.sce.com/sscc/law/dis/dbattach3e.nsf/0/8825710D00783249882577F400830EFB/$FILE/101209+EL11-10+SCE+Petition+for+Declaratory+VOL+1.pdf" http://www3.sce.com/sscc/law/dis/dbattach3e.nsf/0/8825710D00783249882577F400830EFB/$FILE/101209+EL11-10+SCE+Petition+for+Declaratory+VOL+1.pdf

TRANSMISSION BENEFIT QUANTIFICATIONhttp://ciee-dev.eecs.berkeley.edu/piertrans/documents/TCAM_Final_Report_AppendixB.pdf" http://ciee-dev.eecs.berkeley.edu/piertrans/documents/TCAM_Final_Report_AppendixB.pdf

SWRCB SEGMENTS 1-11 SCE TRTP http://www.swrcb.ca.gov/water_issues/programs/cwa401/docs/certifications/socaled011411.pdf

TRTP SCE CPUC PALEANTOLOGY STUDIES 2010-2011 EXPERT CV. http://www.appliedearthworks.com/staff_files/ArmstrongMatthew%20CV%207-11.pdf" http://www.appliedearthworks.com/staff_files/ArmstrongMatthew%20CV%207-11.pdf

2011 MORGAN STANLEY BUSINESS INVESTMENT MODEL TRANSMISSION PROJECTS http://www.wiresgroup.com/images/Morgan_Stanley_Transmission_Profiles.pdf" http://www.wiresgroup.com/images/Morgan_Stanley_Transmission_Profiles.pdf

LACDPW WATER SYSTEM PLAN FOR LOS ANGELES COUNTY WATERWORKS NO 40 A-VLYhttp://ladpw.org/wwd/avirwmp/docs/14_Dist%2040%20Master%20Plan.pdf" http://ladpw.org/wwd/avirwmp/docs/14_Dist%2040%20Master%20Plan.pdf http://cityplanning.lacity.org/EIR/GlenMixedUseProj/FEIR/Plaza_FEIR/Appendix_Water_Supply_Assessment.pdf

LADWP POWER SYSTEM 2009 http://www.piersystem.com/posted/1643/Budget_Presentation_May21.275349.pdf" http://www.piersystem.com/posted/1643/Budget_Presentation_May21.275349.pdf

LADWP BARREN 230KV-500KV ADJACENT TO SUBJECT SUNDANCE.. OXY-CCHPP http://www.ladwp.com/ladwp/cms/ladwp009508.jsp" http://www.ladwp.com/ladwp/cms/ladwp009508.jsp

(NEAR SUBJECT) AUGUST 2011 FINAL ENVIRONMENTAL REPORT SOLAR RANCH ONE https://lpo.energy.gov/wp-content/uploads/2010/10/AVSR1-Final-EA-Aug-2011.pdf" https://lpo.energy.gov/wp-content/uploads/2010/10/AVSR1-Final-EA-Aug-2011.pdf

SCE TERITORY ENDANGERED SPECIES CRITICAL HABITAT REPORT http://wwwt21.sce.com/AIR06SCE04ResponseAppendixB2.pdf" http://wwwt21.sce.com/AIR06SCE04ResponseAppendixB2.pdf

JULY 2011 CULTURAL RESOURCES KERN COUNTY SOLAR PROJECT (NEAR SUBJECT) http://www.co.kern.ca.us/planning/pdfs/eirs/recurrent_desert/4-05_Cultural.pdf" http://www.co.kern.ca.us/planning/pdfs/eirs/recurrent_desert/4-05_Cultural.pdf

(ADJACENT TO SUBJECT SUNDANCE..) NEGATIVE DECLARATION 650MW SOLAR PV WITH TRACKING SYSTEMS ANTELOPE VALLEY SOLAR RENEWABLE RESOURCES GROUP http://www.co.kern.ca.us/planning/pdfs%5Ceirs%5Cav_solar%5Cav_solar_deir_app_AtoE.pdf http://www.co.kern.ca.us/planning/pdfs%5Ceirs%5Cav_solar%5Cav_solar_deir.pdf" http://www.co.kern.ca.us/planning/pdfs%5Ceirs%5Cav_solar%5Cav_solar_deir.pdf

2010 PALMDALE WATER DISTRICT RESOURCES REPORT http://www.palmdalewater.org/PDF/Reports_Studies/Planning/Strategic_Water_Resources.pdf

2011 HIGHWAY 138 HIGH PRIORITY CORRIDOR ANTELOPE VALLEY http://www.dot.ca.gov/dist07/sync/cpimages/file/HDC%20Scoping%20Summary%20Report_Vol1_Discussion.pdf

2011 ALTA OAKCREEK 1500MW PPA SCE NORTH OF SUBJECT SITEttp://www.skypark.org/Documents/Alta_Oak_Creek_Wind.pdf" http://www.skypark.org/Documents/Alta_Oak_Creek_Wind.pdf

SCPPA LADWP RFP RPS BARREN RIDGE http://www.lapowerplan.org/documents/final_irp/Appendix_D_Renewable_Portfolio_Standard.pdf

TEN (10) SMALL SOLAR PROJECTS NORTH FROM 7.5ACRES ON 54-65TH ST WEST http://www.co.kern.ca.us/planning/pdfs/eirs/recurrent_desert/Appendix_A-NOP_and_Comments.pdf

2011 INTEGRATION OF RENEWABLE RESOURCES OPERATIONAL REQUIREMENTS http://www.caiso.com/Documents//Integration-RenewableResources-OperationalRequirementsandGenerationFleetCapabilityAt20PercRPS.pdf

2011 PALMDALE 600MW HYBRID POWER PLANT http://www.energy.ca.gov/sitingcases/palmdale/notices/2011-02-18_Hearing_Order.pdf" http://www.energy.ca.gov/sitingcases/palmdale/notices/2011-02-18_Hearing_Order.pdf

2011 CPUC SOLAR INITIATIVE MAY 2011 UPDATE http://www.suncentricinc.com/downloads/SunCentric_CSI_Report_May_2011.pdf" http://www.suncentricinc.com/downloads/SunCentric_CSI_Report_May_2011.pdf

2011 CALIFORNIA SOLAR STATISTICS http://www.californiasolarstatistics.ca.gov/" http://www.californiasolarstatistics.ca.gov/

EPRI ENERGY STORAGE APPLICATIONS AND ECONOMICS http://www.strategen.com/Perspectives/Strategen_Distributed_Storage_2010-09-16.pdf

ESAAT OCT-2011 PRESENTATION ENERGY STORAGE APPLICATIONS http://www.aqmd.gov/aqmp/2012aqmp/symposium/Panel6-Bining.pdf

http://www.energy.ca.gov/2011_energypolicy/documents/2011-04-28_workshop/presentations/11_EPRI_Rastler_Panel2_IEPR_Applications_and_Economics.pdf" http://www.energy.ca.gov/2011_energypolicy/documents/2011-04-28_workshop/presentations/11_EPRI_Rastler_Panel2_IEPR_Applications_and_Economics.pdf http://www.nyiso.com/public/webdocs/documents/white_papers/wind_management_whitepaper_11202008.pdfhttp://www.iea.org/work/2011/storage/Item2_USDOE.pdf" http://www.iea.org/work/2011/storage/Item2_USDOE.pdf http://www.strategen.com/Perspectives/Strategen_Distributed_Storage_2010-09-16.pdf" http://www.strategen.com/Perspectives/Strategen_Distributed_Storage_2010-09-16.pdf

NETL DOE ARRA SCE TEHACHAPI DOE ENERGY STORAGE STUDY PROJECT http://asset.sce.com/Documents/Environment%20-%20Smart%20Grid/0910_TSP.pdf" http://asset.sce.com/Documents/Environment%20-%20Smart%20Grid/0910_TSP.pdf

http://www.sandia.gov/ess/docs/pr_conferences/2010/gaillac_sce.pdf" http://www.sandia.gov/ess/docs/pr_conferences/2010/gaillac_sce.pdf http://www.sandia.gov/ess/docs/ARRA_StorDemos_4-22-11.pdf" http://www.sandia.gov/ess/docs/ARRA_StorDemos_4-22-11.pdf

http://www.energy.ca.gov/2011_energypolicy/documents/2011-04-28_workshop/presentations/05_DOE_Gyuk_by_Kintner-Meyer_IEPR_workshop.pdf" http://www.energy.ca.gov/2011_energypolicy/documents/2011-04-28_workshop/presentations/05_DOE_Gyuk_by_Kintner-Meyer_IEPR_workshop.pdf http://www.heco.com/vcmcontent/EnergyServices/PCEA/PCEA2011/Workshop%20Presentation/EnergyStorageforGrid.pdf http://www.storagealliance.org/presentations/CESA_OIR_Storage_Project_Examples.pdf" http://www.storagealliance.org/presentations/CESA_OIR_Storage_Project_Examples.pdf

DEC-2010 EPRI WHITE PAPER: ELECTRIC ENERGY STORAGE OPTIONS. PRIMER ON APPLICATIONS, COSTS, AND BENEFITS A TECHNICAL UPDATE.http://www.electricitystorage.org/images/uploads/static_content/technology/resources/ESA_TR_5_11_EPRIStorageReport_Rastler.pdf

MAY 2011 ETHREE E3 INCLUDES LIST OF TAX EQUITY INVESTORS http://www.ethree.com/documents/Solar%20Talk/Solar%20Landscape_05_19_2011_final.pdf

2010 NETL ACCOMPLISHMENTS (2011 PUBLICATION)http://www.netl.doe.gov/publications/others/accomp_rpt/accomp10.pdf" http://www.netl.doe.gov/publications/others/accomp_rpt/accomp10.pdf

2011 DOOSAN DEVELOPMENT OF CARBON CAPTURE LAYOUT FOOT PRINThttp://www.ieaghg.org/docs/General_Docs/PCCC1/Presentations/IEAGHG%201st%20Post%20Combustion%20Capture%20Conference-%20Abu%20Dhabi%20%20Matthew%20Hunt%20fv.pdf

2011 NREL/TP-6A20-50900, DOE DE-AC36-08G028308: WATER CONSUMPTION AND WITHDRAWAL FACTORS FOR ELECTRICITY GENERATING TECHNOLOGIES. http://www.nrel.gov/docs/fy11osti/50900.pdf 2011 NREL/TP-5500-48175, DOE DE-AC36-08G028308: LINE-FOCUS SOLAR PLANT COST REDUCTION PLAN. http://www.ucsusa.org/assets/documents/clean_energy/A_Bright_Future_Technical_Appendix.pdf" http://www.ucsusa.org/assets/documents/clean_energy/A_Bright_Future_Technical_Appendix.pdf 2011 SEPTEMBER WHITE PAPER: NATURAL GAS DEMAND http://downloadcenter.connectlive.com/events/npc091511/Demand-092911.pdf" http://downloadcenter.connectlive.com/events/npc091511/Demand-092911.pdf