ITD Cementation India Limited Mail National Plastic Building A-Subhash Road, Parpanje B Scheme Vile Pale ( East), Mumbai - 400057 India Phone +91 22 5693 1600 – 1609 Fax +91 22 5693 1627 – 1628 To, The Project Manager, ITD Cementation India Ltd. Vibhuti Khand, Gomati Nagar Lucknow, U.P. DATE Our Reference No. Our Contact Direct Line 14 th Mar 2014 31913 CF/ ITD /_02 _/2013 Horosit Saha +91 9717296000 Sub: South Side Soil Retaining Works for Proposed Five Star Hotel Project at Lucknow .Submission of Purchase order & Invoice of 6mm MS plate (Liner) & 10mm Ms Plate (Insert Plate). Kind Attention: Mr. Vivek Sinha (Project Manager) Dear Sir, We are here by submitting you the attached details of Purchase order & Invoice of 6mm MS plate (Liner), 10mm Ms Plate (Insert Plate) & 32mm TMT Bar for our piling work at South Side Soil Retaining Works for Proposed Five Star Hotel Project at Lucknow, Uttar Pradesh. This is for your kind information and record please. Thanking you and assuring you of our best services at all the times. Yours faithfully, For ITD Cementation India Ltd, ____________________ Horosit Saha

description

OFFICE

Transcript of 31913 Cf

To,

ITD Cementation India LimitedMailNational Plastic BuildingA-Subhash Road, Parpanje B SchemeVile Pale ( East), Mumbai -400057IndiaPhone+91 22 5693 1600 1609Fax+91 22 5693 1627 1628SiteITD Cementation India LimitedGhaziabad Flyover Project, Pratap vihar Ghaziabad, Uttar Pradesh

ITD Cementation India LimitedMailNational Plastic BuildingA-Subhash Road, Parpanje B SchemeVile Pale ( East), Mumbai -400057IndiaPhone+91 22 5693 1600 1609Fax+91 22 5693 1627 1628SiteITD Cementation India LimitedGhaziabad Flyover Project, Pratap vihar Ghaziabad, Uttar Pradesh

To, The Project Manager,ITD Cementation India Ltd.Vibhuti Khand, Gomati NagarLucknow, U.P.

DATEOur Reference No.Our ContactDirect Line

14th Mar 201431913 CF/ ITD /_02_/2013Horosit Saha+91 9717296000

Sub: South Side Soil Retaining Works for Proposed Five Star Hotel Project at Lucknow .Submission of Purchase order & Invoice of 6mm MS plate (Liner) & 10mm Ms Plate (Insert Plate).

Kind Attention: Mr. Vivek Sinha (Project Manager)

Dear Sir,

We are here by submitting you the attached details of Purchase order & Invoice of 6mm MS plate (Liner), 10mm Ms Plate (Insert Plate) & 32mm TMT Bar for our piling work at South Side Soil Retaining Works for Proposed Five Star Hotel Project at Lucknow, Uttar Pradesh.

This is for your kind information and record please.

Thanking you and assuring you of our best services at all the times.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Horosit Saha(Authorised Signatory)

Encls. : As Above. Co

To, The Project Manager,ITD Cementation India Ltd.Division-2, Ghaziabad Flyover Project,Pratap Vihar, Ghaziabad, U.P.

DATEOur Reference No.Our ContactDirect Line

1st July 201329213 CF/ ITD /_04_/2013 Horosit Saha+91 9717296000

Sub: Construction of Six Lane Link Road between NH-24 by pass & NH-58 at Ghaziabad Including ROB (Excluding Railway portion) on Delhi Howrah Rail Track in the State Of Uttar Pradesh .Submission of Initial Lateral Load test Report.

Kind Attention: Mr. Sarfaraj Hussain (Project Manager)

Dear Sir,

We are here by submitting you the Initial Lateral Load Test report and field result of Pile No. TP-01 which was conducted on Dated-28.06.2013 for our piling work at Ghaziabad Flyover project under Ghaziabad Development Authority (GDA), Ghaziabad, Uttar Pradesh.

This is for your kind information and record please.

Thanking you and assuring you of our best services at all the times.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Horosit Saha(Authorized Signatory)

Encls. : As Above. Co

To, The Project Manager,ITD Cementation India Ltd.Division-2, Ghaziabad Flyover Project,Pratap Vihar, Ghaziabad, U.P.

DATEOur Reference No.Our ContactDirect Line

10th July 201329213 CF/ ITD /_05_/2013 Horosit Saha+91 9717296000

Sub: Construction of Six Lane Link Road between NH-24 by pass & NH-58 at Ghaziabad Including ROB (Excluding Railway portion) on Delhi Howrah Rail Track in the State Of Uttar Pradesh .Submission of RA Bill for the work done on Month of June.

Kind Attention: Mr. Sarfaraj Hussain (Project Manager)

Dear Sir,

We are here by submitting you the RA Bill-3 against the work done on 1st June to 30th June of an Amount of Rs. 8253940.55 (Rupees Eighty Two Lakh(s) Fifty Three Thousand Nine Hundred Forty and paise Fifty Five only) for our piling work at Ghaziabad Flyover project.

We would therefore request you to release the Billed amount at the earliest.

Thanking you and assuring you of our best services at all the times.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Horosit Saha(Authorized Signatory)

Encls. : As Above. Co

Centre (Through mail)

To, The Project Manager,ITD Cementation India Ltd.Division-2, Ghaziabad Flyover Project,Pratap Vihar, Ghaziabad, U.P.

DATEOur ContactDirect Line

16th August 2013 Horosit Saha+91 9717296000

Sub: Construction of Six Lane Link Road between NH-24 by pass & NH-58 at Ghaziabad Including ROB (Excluding Railway portion) on Delhi Howrah Rail Track in the State Of Uttar Pradesh .Request Letter for JCB.

Kind Attention: Mr. Sarfaraj Hussain (Project Manager)

Dear Sir,

We are here by requesting you to kindly please arrange a JCB which will be used for Load Test work in the Test pile near Eco Park at Ghaziabad Flyover project.

This is for your information and record.

Thanking you and assuring you of our best services at all the times.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Horosit Saha(Authorized Signatory)

To, The Project Manager,ITD Cementation India Ltd.Division-2, Ghaziabad Flyover Project,Pratap Vihar, Ghaziabad, U.P.

DATEOur ContactDirect Line

16th July 2013 Horosit Saha+91 9717296000

Sub: Construction of Six Lane Link Road between NH-24 by pass & NH-58 at Ghaziabad Including ROB (Excluding Railway portion) on Delhi Howrah Rail Track in the State Of Uttar Pradesh .Request Letter for JCB.

Kind Attention: Mr. Sarfaraj Hussain (Project Manager)

Dear Sir,

We are here by requesting you to kindly please arrange a JCB which will be used for Area Development work for your piling work near Eco Park at Ghaziabad Flyover project.

This is for your information and record.

Thanking you and assuring you of our best services at all the times.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Horosit Saha(Authorized Signatory)

To, The Project Manager,ITD Cementation India Ltd.Division-2, Ghaziabad Flyover Project,Pratap Vihar, Ghaziabad, U.P.

DATEOur Reference No.Our ContactDirect Line

13th November 201329213 CF/ ITD / 16 / 2013 Horosit Saha+91 9717296000

Sub: Construction of Six Lane Link Road between NH-24 by pass & NH-58 at Ghaziabad Including ROB (Excluding Railway portion) on Delhi Howrah Rail Track in the State Of Uttar Pradesh .Submission of Internal Advise for the work done on Month of October & November -13.

Kind Attention: Mr. Sarfaraj Hussain (Project Manager)

Dear Sir,

We are here by submitting you the Internal Advise-07 & final against the work done on 1st October to 8th November of an Amount of Rs. 5808202.12 (Rupees fifty eight Lakh(s) Eight Thousand two Hundred two and paisa twelve only) for our piling work at Ghaziabad Flyover project.

We would therefore request you to release the Billed amount, and also release the previous deducted amount at the earliest.

Thanking you and assuring you of our best services at all the times.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Horosit Saha(Authorized Signatory)

Encls. : As Above. Co

To, The Project Manager,ITD Cementation India Ltd.Division-2, Ghaziabad Flyover Project,Pratap Vihar, Ghaziabad, U.P.

DATEOur Reference No.Our ContactDirect Line

22nd August 201329213 CF/ ITD /_08_/2013 Horosit Saha+91 9717296000

Sub: Construction of Six Lane Link Road between NH-24 by pass & NH-58 at Ghaziabad Including ROB (Excluding Railway portion) on Delhi Howrah Rail Track in the State Of Uttar Pradesh .Requirement of MS pipe for concrete pipe line.

Kind Attention: Mr. Sarfaraj Hussain (Project Manager)

Dear Sir,

We are here by inform you that, in present site condition our work location is fully water logged. So we required Mild steel pipe of N.B. 40(25 Nos.) for concrete pipe line to transfer concrete for our piling work at Ghaziabad Flyover project.

We would therefore request you to kindly provide the said item for our piling work at earliest.

Thanking you and assuring you of our best services at all the times.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Horosit Saha(Authorized Signatory)

Co

To, The Project Manager,ITD Cementation India Ltd,Pratibha D-wall site, 29313CFDelhi.

DATEOur Reference No.Our ContactDirect Line

23rd August 2013 Horosit Saha+91 9717296000

Sub: Transfer of Mr. Rajeev Ku. Singh to Pratibha site.

Kind Attention: Mr. R.P. Sharma (Project Manager)

Dear Sir,

We are here by inform you that, as per instruction of Mr. Abhay Singh Yadav (By Mail) we are sending Mr. Rajeev Ku. Singh (Tech. Asst.) ERP No.-2868 to your site. He is released from our site on 23rd August 2013 and he will be report to your site immediately.

Note: Out station allowance is cleared up to 31st July.This is for your information and record please.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Horosit Saha(Authorized Signatory)

Cc : Abhay singh Yadav Sandeep Agnihotri

To, The Project Manager,ITD Cementation India Ltd.Division-2, Ghaziabad Flyover Project,Pratap Vihar, Ghaziabad, U.P.

DATEOur Reference No.Our ContactDirect Line

23nd August 201329213 CF/ ITD /_09_/2013 Horosit Saha+91 9717296000

Sub: Construction of Six Lane Link Road between NH-24 by pass & NH-58 at Ghaziabad Including ROB (Excluding Railway portion) on Delhi Howrah Rail Track in the State Of Uttar Pradesh .Requirement of TMT Bar Fe 500 for reinforcement cage making in piling work.

Kind Attention: Mr. Sarfaraj Hussain (Project Manager)

Dear Sir,

We are here by inform you that, we have required TMT Bar Fe 500 for making reinforcement cage in our piling work at Ghaziabad Flyover project. The following quantity of steel dia. wise given below:1) 16mm : 15 MT2) 10mm : 5 MTWe would therefore request you to kindly provide the said item for our piling work at earliest.

Thanking you and assuring you of our best services at all the times.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Horosit Saha(Authorized Signatory)

Co

To, The Project Manager,ITD Cementation India Ltd.Division-2, Ghaziabad Flyover Project,Pratap Vihar, Ghaziabad, U.P.

DATEOur Reference No. Our ContactDirect Line

27th August 201329213 CF/ ITD /_10_/2013 Horosit Saha+91 9717296000

Sub: Construction of Six Lane Link Road between NH-24 by pass & NH-58 at Ghaziabad Including ROB (Excluding Railway portion) on Delhi Howrah Rail Track in the State Of Uttar Pradesh .Submission of Initial Vertical Load test Report for TP-03.

Kind Attention: Mr. Sarafraj Hussain (Project Manager)

Dear Sir,

We are here by submitting you the Report for Initial Vertical Load Test on Pile No. TP-03 which was conducted on Dated-21.08.2013 for our piling work at Ghaziabad Flyover project under Ghaziabad Development Authority (GDA), Ghaziabad, Uttar Pradesh.

This is for your kind information and record please.

Thanking you and assuring you of our best services at all the times.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Horosit Saha(Authorised Signatory)

Encls. : As Above. Co

To, The Project Manager,ITD Cementation India Ltd.Division-2, Ghaziabad Flyover Project,Pratap Vihar, Ghaziabad, U.P.

DATEOur Reference No.Our ContactDirect Line

6th September 201329213 CF/ ITD /_11_/2013 Horosit Saha+91 9717296000

Sub: Construction of Six Lane Link Road between NH-24 by pass & NH-58 at Ghaziabad Including ROB (Excluding Railway portion) on Delhi Howrah Rail Track in the State Of Uttar Pradesh .Submission of Internal Advise for the work done on Month of August-13.

Kind Attention: Mr. Sarfaraj Hussain (Project Manager)

Dear Sir,

We are here by submitting you the Internal Advise-05 against the work done on 1st August to 31th August of an Amount of Rs. 4134699.36 (Rupees Forty One Lakh(s) Thirty Four Thousand Six Hundred Ninety Nine and Thirty Six paise only) for our piling work at Ghaziabad Flyover project.

We would therefore request you to release the Billed amount, and also release the previous deducted amount at the earliest.

Thanking you and assuring you of our best services at all the times.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Horosit Saha(Authorized Signatory)

Encls. : As Above. Co

To, The Project Manager,ITD Cementation India Ltd.Division-2, Ghaziabad Flyover Project,Pratap Vihar, Ghaziabad, U.P.

DATEOur Reference No. Our ContactDirect Line

13th November 201329213 CF/ ITD /_17_/2013 Horosit Saha+91 9717296000

Sub: Construction of Six Lane Link Road between NH-24 by pass & NH-58 at Ghaziabad Including ROB (Excluding Railway portion) on Delhi Howrah Rail Track in the State Of Uttar Pradesh .Submission of Pour cards for Test, Sump & Working Piling.

Kind Attention: Mr. Sarafraj Hussain (Project Manager)

Dear Sir,

We are submitting here with the Pour cards for Test, Sump & Working Piling for our piling work at Ghaziabad Flyover project 29213 CF under Ghaziabad Development Authority (GDA), Ghaziabad, Uttar Pradesh for the period of 16th April 13 to 8th November 13. Total Number of Pour Cards 424. Kindly Return Signed copy of the same at the earliest.

This is for your kind information and record please.

Thanking you and assuring you of our best services at all the times.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Horosit Saha(Authorised Signatory)

Encls. : As Above. Co

To, The Project Manager,ITD Cementation India Ltd.Division-2, Ghaziabad Flyover Project,Pratap Vihar, Ghaziabad, U.P.

DATEOur Reference No.Our ContactDirect Line

5th October 201329213 CF/ ITD /_13_/2013 Horosit Saha+91 9717296000

Sub: Construction of Six Lane Link Road between NH-24 by pass & NH-58 at Ghaziabad Including ROB (Excluding Railway portion) on Delhi Howrah Rail Track in the State Of Uttar Pradesh .Submission of Internal Advise for the work done on Month of September-13.

Kind Attention: Mr. Sarfaraj Hussain (Project Manager)

Dear Sir,

We are here by submitting you the Internal Advise-06 against the work done on 1st September to 30th September of an Amount of Rs. 5729253.04 (Rupees Fifty Seven Lakh(s) Twenty Nine Thousand Two Hundred Fifty Three and Four paise only) for our piling work at Ghaziabad Flyover project.

We would therefore request you to release the Billed amount, and also release the previous deducted amount at the earliest.

Thanking you and assuring you of our best services at all the times.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Horosit Saha(Authorized Signatory)

Encls. : As Above. (6 No. pages) Co

To, The Project Manager,ITD Cementation India Ltd.Division-2, Ghaziabad Flyover Project,Pratap Vihar, Ghaziabad, U.P.

DATEOur Reference No. Our ContactDirect Line

5th October 201329213 CF/ ITD /_14_/2013 Horosit Saha+91 9717296000

Sub: Construction of Six Lane Link Road between NH-24 by pass & NH-58 at Ghaziabad Including ROB (Excluding Railway portion) on Delhi Howrah Rail Track in the State Of Uttar Pradesh .Submission of Initial Lateral Load test Report for TP-02 and Routine Vertical Load Test Report for Pile No.-24/261.

Kind Attention: Mr. Sarafraj Hussain (Project Manager)

Dear Sir,

We are here by submitting you the Report for Initial Lateral Load Test on Pile No. TP-02 and Routine Vertical Load Test Report for Pile No. 24/261 which were conducted on Dated-26.09.2013 and 30.09.2013 respectively for our piling work at Ghaziabad Flyover project under Ghaziabad Development Authority (GDA), Ghaziabad, Uttar Pradesh.

This is for your kind information and record please.

Thanking you and assuring you of our best services at all the times.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Horosit Saha(Authorised Signatory)

Encls. : As Above. (2 Nos. Load Test Reports) Co

To, The Project Manager,ITD Cementation India Ltd.Division-2, Ghaziabad Flyover Project,Pratap Vihar, Ghaziabad, U.P.

DATEOur Reference No. Our ContactDirect Line

7th October 201329213 CF/ ITD /_15_/2013 Horosit Saha+91 9717296000

Sub: Construction of Six Lane Link Road between NH-24 by pass & NH-58 at Ghaziabad Including ROB (Excluding Railway portion) on Delhi Howrah Rail Track in the State Of Uttar Pradesh .Submission of Initial Lateral Load test Report for TP-03.

Kind Attention: Mr. Sarafraj Hussain (Project Manager)

Dear Sir,

We are here by submitting you the Report for Initial Lateral Load Test on Pile No. TP-03 which was conducted on Dated-20.09.2013 for our piling work at Ghaziabad Flyover project under Ghaziabad Development Authority (GDA), Ghaziabad, Uttar Pradesh.

This is for your kind information and record please.

Thanking you and assuring you of our best services at all the times.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Horosit Saha(Authorised Signatory)

Encls. : As Above. (1 No. Load Test Report) Co

To, The Project Manager,GM Projects,Arshiya Northern FTWZ Ltd.Vill. Moujpur, Junction Road, Khurja, Dist. Bulland Sahar, U. P. 203131

DATEOur Reference No.Our ContactDirect Line

November 15, 201226912 CF/ 02 /_11__/2012Hemendra Choudhury+91 8191007701

Sub: Pile Foundation Works for Multipurpose Warehouses & Bulk Warehouses of Phase : II at FTWZ, Khurja : Submission of Calibration certificates and Load increment Plan.

Kind Attention : Shri Akhil Jain (GM Projects)

Ref.: Your LOI / WO No. : CJ/ANFL II/Khurja/26/09/12Dated : 26.09.2012 Your Work Order no. : 4700000906 Dated : 03.10.2012

Dear Sir,

Enclosed please find herewith the following documents towards the conducting of pile load test for test.1) Calibration Certificate of LVDT.2) Calibration Certificate of Pressure Gauge (Cap.-700kg/cm2).3) Load Increment Plan for Test pile No.-01.

This is for your kind information and record please.

Thanking you and assuring you of our best services at all the times.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Hemendra Choudhury(Authorised Signatory)

Encls. : As Above.

Communication Centre (Through mail)

To, The Project Manager,GM Projects,Arshiya Northern FTWZ Ltd.Vill. Moujpur, Junction Road, Khurja, Dist. Bulland Sahar, U. P. 203131

DATEOur Reference No.Our ContactDirect Line

November 18, 201226912 CF/ 03 /_11__/2012Hemendra Choudhury+91 8191007701

Sub: Pile Foundation Works for Multipurpose Warehouses & Bulk Warehouses of Phase: II at FTWZ, Khurja: Submission of Calibration certificates of Compressive testing machine & Batching plant.

Kind Attention : Shri Akhil Jain (GM Projects)

Ref.: Your LOI / WO No. : CJ/ANFL II/Khurja/26/09/12Dated : 26.09.2012 Your Work Order no. : 4700000906 Dated : 03.10.2012

Dear Sir,

We are here by submitting you the Calibration certificates of compressive testing machine, Batching plant Macon M25 and Batching plant Macon M25-2 for our piling work at your Arshiya Northern FTWZ Ltd. Khurja location.

This is for your kind information and record please.

Thanking you and assuring you of our best services at all the times.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Hemendra Choudhury(Authorised Signatory)

Encls. : 1) Compressive Testing Machine calibration Report. 2) Batching Plant Macon M25 calibration Report. 3) Batching Plant Macon M25-2 calibration Report.

To, The Project Manager,GM Projects,Arshiya Northern FTWZ Ltd.Vill. Moujpur, Junction Road, Khurja, Dist. Bulland Sahar, U. P. 203131

DATEOur Reference No.Our ContactDirect Line

November 19, 201226912 CF/ 01 /_13__/2012Hemendra Choudhury+91 8191007701

Sub: Pile Foundation Works for Multipurpose Warehouses & Bulk Warehouses of Phase: II at FTWZ, Khurja: Submission of 2Nos of pressure Gauge .

Kind Attention : Shri Akhil Jain (GM Projects)

Ref.: Your LOI / WO No. : CJ/ANFL II/Khurja/26/09/12Dated : 26.09.2012 Your Work Order no. : 4700000906 Dated : 03.10.2012

Dear Sir,

We are here by submitting you the Two Nos of pressure gauge of capacity 700kg/cm as you instructed for, at your Arshiya Northern FTWZ Ltd. Khurja location.

We request you to return the same after fulfill of your requirement.

Thanking you and assuring you of our best services at all the times.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Hemendra Choudhury(Authorised Signatory)

Encls. : As above

To, The Project Manager,GM Projects,Arshiya Northern FTWZ Ltd.Vill. Moujpur, Junction Road, Khurja, Dist. Bulland Sahar, U. P. 203131

DATEOur Reference No.Our ContactDirect Line

November 21, 201226912 CF/ 01 /_14__/2012Hemendra Choudhury+91 8191007701

Sub: Pile Foundation Works for Multipurpose Warehouses & Bulk Warehouses of Phase: II at FTWZ, Khurja: Submission of Initial cyclic load increment plan for Test pile-02.

Kind Attention : Shri Akhil Jain (GM Projects)

Ref.: Your LOI / WO No. : CJ/ANFL II/Khurja/26/09/12Dated : 26.09.2012 Your Work Order no. : 4700000906 Dated : 03.10.2012

Dear Sir,

We are here by submitting you the Initial Cyclic Load Increment plan for Test pile No.-TP/02, MPWH-02 towards conducting the pile load test for our piling work at your Arshiya Northern FTWZ Ltd. Khurja location.

Thanking you and assuring you of our best services at all the times.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Hemendra Choudhury(Authorised Signatory)

Encls. : As above

To, The Project Manager,GM Projects,Arshiya Northern FTWZ Ltd.Vill. Moujpur, Junction Road, Khurja, Dist. Bulland Sahar, U. P. 203131

DATEOur Reference No.Our ContactDirect Line

November 27, 201226912 CF/ 01 /_15__/2012Hemendra Choudhury+91 8191007701

Sub: Pile Foundation Works for Multipurpose Warehouses & Bulk Warehouses of Phase: II at FTWZ, Khurja: Minutes of Meeting.

Ref.: Your LOI / WO No. : CJ/ANFL II/Khurja/26/09/12Dated: 26.09.2012 Your Work Order no. : 4700000906 Dated: 03.10.2012

Dear Sir,

We have discussed about the trial mix conducted at site and their cube strength results. Some of the routine pile cube results also witnessed by us and our client. We are enclosing all trial mix results and details of concrete mix design which are used at our site for reference.

Thanking you and assuring you of our best services at all the times.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Hemendra Choudhury(Authorised Signatory)

Encls. :

To, The Project Manager,AVP Projects,Arshiya Northern FTWZ Ltd.Vill. Moujpur, Junction Road, Khurja, Dist. Bulland Sahar, U. P. 203131

DATEOur Reference No.Our ContactDirect Line

December 27, 201226912 CF/ 01 /_35__/2012Hemendra Choudhury+91 8191007701

Sub: Pile Foundation Works for Multipurpose Warehouses & Bulk Warehouses of Phase: II at FTWZ, Khurja: Submission of Initial vertical load increment plan for Test pile-03.

Kind Attention : Shri Vijay Singh Raghav (AVP Projects)

Ref.: Your LOI / WO No. : CJ/ANFL II/Khurja/26/09/12Dated : 26.09.2012 Your Work Order no. : 4700000906 Dated : 03.10.2012

Dear Sir,

We are here by submitting you the Initial Vertical Load Increment plan for Test pile No.-TP/03, MPWH-01 towards conducting the pile load test for our piling work at your Arshiya Northern FTWZ Ltd. Khurja location.

Thanking you and assuring you of our best services at all the times.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Hemendra Choudhury(Authorised Signatory)

Encls. : As above

To, The Project Manager,AVP Projects,Arshiya Northern FTWZ Ltd.Vill. Moujpur, Junction Road, Khurja, Dist. Bulland Sahar, U. P. 203131

DATEOur Reference No.Our ContactDirect Line

January 04, 201326912 CF/ 01 /_37__/2012Hemendra Choudhury+91 8191007701

Sub: Pile Foundation Works for Multipurpose Warehouses & Bulk Warehouses of Phase: II at FTWZ, Khurja: Submission of standard deviation report of compressive strength of cubes.

Kind Attention: Shri Vijay Singh Raghav (AVP Projects)

Ref.: Your LOI / WO No. : CJ/ANFL II/Khurja/26/09/12Dated: 26.09.2012 Your Work Order no. : 4700000906 Dated: 03.10.2012

Dear Sir,

We are here by submitting you the standard deviation report of 28 days compressive strength of concrete cubes for the month of November and December for our piling work at your Arshiya Northern FTWZ Ltd. Khurja location.

Thanking you and assuring you of our best services at all the times.

Yours faithfully,

For ITD Cementation India Ltd,

____________________Hemendra Choudhury(Authorised Signatory)

Encls. : As above

To The Site Incharge ILFS, Cuttack Odisha

Kind Attn:- Mr. Onkar Kulkarni (07389905369)

Copy to: Mr.Manish Kumjar/Mr.V.R.Gopakumar/Mr.R.G.Shetty Mr.P.K.Haldar/Mr.P.B.Naik

Subject: Transfer of Mr. Manas Kumar Bidhar-Superintendent (Safety) (S3) (Emp. Code:-2460)

As per transfer order dated 1st January 2013, Mr. Manas Kumar Bidhar , Superintendent (Safety)(Emp. Code:-2460) is releasing from 26912CF (Division-3), Piling and foundation works for Multipurpose Warehouse and Warehouse Phase-II at Arshiya Northern FTWZ Limited, Khurja, Distt:-Bulandshahar, Uttar Pradesh w.e.f. 04.01.2013 after duty hours and informed him to report at ILFS Project, Cuttack for his further assignment.

The following particulars are furnished for your perusal and necessary action.

1. Date of release:04th January 20132. Salary paid upto : By Head Office3. Outstation paid upto :31st December 20124. Advance paid towards Traveling : Nil5. Amount of Recovery:Nil6. Nature of work carried out:Safety7. Furniture issued by Company:N/A8. Ticket arranged by : Self

Regards,

Hemendra Singh ChoudharyProject Manager (Div-3)

Dear Sir, This is to inform you that Our work will be going as normal working day on 16th march (Sunday) instead of Tuesday on 18th march. Tuesday on 18th march is a Local Holiday. Our ready mix concrete suppliers ultratech & RMC India both will not be supplying the RMC at 17 & 18 th march.

In this view of above , we decided 16 march is a working day instead of 18th march. Matter already discussed with client.

Regards;Horosit SahaITD Cemantation India Limited31913 CF,Chartered HotelLucknow,U.PMobile:- +91 9717296000