HUAWEI TECHNOLOGIES Co., Ltd.

Antenna System (on Tower)Installation Standard Model

Issue: 03Part Number: 31504647Date: 2009-03-25

Page 2: 31504647-Antenna System (on Tower) Installation Standard Model(03)

1

Installation Tools

Phillips screwdriver(M4 / M6)

Open-end wrench (13 mm -- 32 mm)

Some of the installation tools can be adjusted to fit to the site situation.

Flat-head screwdriver (M4 / M6)

Snap-off knife Adjustable wrench

Cable cutter Diagonal pliers Pincer pliers Hacksaw

Ladder

Measuring tape Steel tape Compass Inclinometer Fixed pulley

Color ring tapeInsulation tape Waterproof tape VSWR tester

Feeder cutter

File

Brush Heat blowerRope

Page 3: 31504647-Antenna System (on Tower) Installation Standard Model(03)

2

Antenna System Installation Procedure

1. This guide describes the procedure for installing three directional antennas (with main and diversity and using fixed-length jumpers) on a tower that is 40 m high. 40 m feeders are used for the installation.

2. Four installers are required for the installation. Two installers should be qualified for climbing the tower.

Start

End

00:00-00:10Assemble the antenna

00:25-00:55Lift the antenna

00:55-01:45Install the antenna

00:55-01:45Make feeder connectors

02:15-02:45Fix feeder fasteners

01:45-02:15Lift the feeder

02:45-05:25Install and ground outdoor feeders

05:25-05:45Install feeders into the equipment room

05:45-06:25Install indoor feeders and jumpers

06:25-06:40Check the antenna system

00:10-00:25Connect jumpers to the

Antenna

02:15-02:45Connect feeders to

jumpers of the antenna

Page 4: 31504647-Antenna System (on Tower) Installation Standard Model(03)

3

Standard Model of Antenna System Installation

Page 5: 31504647-Antenna System (on Tower) Installation Standard Model(03)

4

1 Assemble the Antenna Installers: A\B\C\D (10 minutes)

a Assemble the support

b Fix the support onto the antenna

1. The antenna described in this guide is an 800 M FET antenna of Huawei. For installation of other antennas, see the relative manuals.

2. The assembly of three antennas is complete on the ground.

Assemble the upper support Assemble the lower support

Page 6: 31504647-Antenna System (on Tower) Installation Standard Model(03)

5

Wrap three layers of waterproof tape

Wrap three layers of insulation tape

Fix cable ties

1. When wrapping the tape, ensure that the upper layer covers more than 50% of the lower layer. Wrap each layer around the jumpers tightly. Before wrapping the waterproof tape, stretch the tape till the width of the tape becomes 1/2 of the original.

2. Wrap the metal connector using waterproof tape with extended lengths about 20 mm, and wrap the waterproof tape using insulation tape with extended lengths about 10 mm.

2 Connect Jumpers to the AntennaInstallers: A\B\C\D (15 minutes)

a Connect jumpers

1. Use six jumpers with fixed length.

2. (Optional) If no jumper with a fixed length is available, cut a jumper into proper lengths and fix DIN male connectors to both ends of the jumpers.

b Stick color rings

c Seal the connectors

Ensure that the color rings are in the correct direction and positions. Wrap the jumpers with 2 or 3 layers of tape to make the color rings. The distance between neighboring color rings is 10 mm to 15 mm.

Optional

Finished

Page 7: 31504647-Antenna System (on Tower) Installation Standard Model(03)

6

3 Lift the Antenna Installers: A\B\C\D (30 minutes)

1. Installers A and B climb onto the tower. Installer B fixes the fixed pulley onto the support of the tower platform and puts the lifting rope through the fixed pulley.

2. Installer D uses plastic bags or tape to wrap the jumper connectors and then coils the jumpers. Fasten the lifting rope to the upper support of the antenna and the traction rope to the lower support.

3. Installer C pulls down the lifting rope, and installer D pulls the traction rope outwards to prevent the antenna from hitting the tower.

4. Installers A and B hold the antenna and unfasten the ropes.

5. After three antennas are lifted onto the platform, do not remove the fixed pulley, because the feeder needs to be lifted later.

Page 8: 31504647-Antenna System (on Tower) Installation Standard Model(03)

7

4 Install the Antenna Installers: A\B (50 minutes)

a Install the antenna on a pole

b Make the waterproof curve of jumpers

Do not overtightenthe screws of the upper and lower supports. But the screws can not be too loose, or the antenna may slide.

c Adjust the azimuth of the antenna

The operation must be performed by two personnel. The personnel under the tower use the compass at the position where is 10 m to 20 m away from the tower. The personnel on the tower adjust the antenna. After the azimuth reaches the requirement, tighten screws of the upper and lower supports.

Bind the jumpers at several positions on the pole and tower platform.

Page 9: 31504647-Antenna System (on Tower) Installation Standard Model(03)

8

4 Install the Antenna Installers: A\B (50 minutes)

d Adjust the downtilt angle of the antenna

Before adjusting the downtilt angle, adjust the angle of the inclinometer to the desired angle. Push or pull the antenna till the bead in the inclinometer is located in the middle horizontally. After the downtilt angle reaches the requirement, tighten screws of the scale.

Push the antenna forward and backward till the scale is adjusted properly. After the downtilt angle reaches the requirement, tighten screws of the scale.

Turn the adjustment tool until it aligns with the scale on the ruler.

Method 1: Using the scale on the upper support

Method 2: Using the inclinometer

Method 3: Adjust the electrical downtilt angle (only for the MET antenna)

Page 10: 31504647-Antenna System (on Tower) Installation Standard Model(03)

9

5 Make Feeder Connectors Installers: C\D (50 minutes)

a Cut feeders

b Make feeder connectors / Stick color rings

1. Fix a DIN female connector to one end of the feeder.

2. Stick color rings at one end of the feeder. Ensure that the first color ring is at the position 200 mm away from the feeder connector.

3. Stick color rings at the other end of the feeder. Ensure that the first color ring is at the position 200 mm away from the feeder end.

Measure and cut six feeders (40 m), unwind the feeders, make feeder connectors, and stick color rings to the feeders on the ground.

Cut feeders according to the length identifiers on the feeders.

Rotate the feeder cutter till the inner and outer conductors are completely cut.

Page 11: 31504647-Antenna System (on Tower) Installation Standard Model(03)

10

6 Lift the Feeder Installers: A\B\C\D (30 minutes)

1. Installer D wraps the feeder connectors with plastic bags and tape, fasten the lifting rope to the feeders at the position 0.4 m away from the feeder connectors and fasten the traction rope at the position 4.4 m away from the feeder connectors.

2. Installer C pulls down the lifting rope, and installer D pulls the traction rope outwards to prevent the feeders from hitting the tower.

3. Installers A and B hold the feeders, unfasten the ropes, and fasten the feeders onto the tower platform to prevent them from falling down to the ground.

4. After six feeders are lifted onto the tower one by one, installer B removes the fixed pulley.

Page 12: 31504647-Antenna System (on Tower) Installation Standard Model(03)

11

8 Fix Feeder Fasteners Installers: C\D (30 minutes)

Do not tighten the bolts, so that feeders can go through the bolts.

7 Connect Feeders to Jumpers of the AntennaInstallers: A\B (30 minutes)

On the tower platform, connect the feeders and jumpers with the same color rings. Seal the connectors.

Wrap three layers of waterproof tape

Wrap three layers of insulation tape

Fix the cable ties

Finished

1. The installation spacing of the clips for the feeder (7/8 inch) is 1.5 m to 2 m. The installation spacing of the clips for the feeder (larger than 7/8 inch) can be extended.

2. If multiple rows of feeder fasteners need to be fixed, arrange the fasteners properly to keep a neat appearance.

Page 13: 31504647-Antenna System (on Tower) Installation Standard Model(03)

12

9 Install and Ground Outdoor FeedersInstallers: A\B\C\D (160 minutes)

Stick color rings to the feeders within 1 m from the position where the feeders leave the tower.

Feeders should be fixed from top to bottom. Sort out the feeders and fix them through feeder fasteners. Install feeder grounding clips at the grounding point of the feeders and then fix the feeders.

Page 14: 31504647-Antenna System (on Tower) Installation Standard Model(03)

13

9 Install and Ground Outdoor FeedersInstallers: A\B\C\D (160 minutes)

a Strip the feeders

b Install grounding clips of the feeders

Install the metal jacket

Seal the joint points (three layers of waterproof tape + three layers of insulation tape)

Bind the grounding cables

Fix grounding cables to the grounding bar

Metal jacket of the grounding clip of the feeder

The stripped part of the feeder should have the same length as the metal jacket of the grounding clip.

Page 15: 31504647-Antenna System (on Tower) Installation Standard Model(03)

14

10 Install Feeders into the Equipment RoomInstallers: A\B\C\D (20 minutes)

a Lead the feeder

c Stick color rings

Feeders should be led into the equipment room by one person in the equipment room and one person outside to avoid damage to equipment.

b Make the waterproof curve

d Seal the feeder window

Stick color rings to the feeders at the position 1 m away from the feeder window.

After putting all feeders through the feeder window, screw the fasteners to seal the feeder window

Page 16: 31504647-Antenna System (on Tower) Installation Standard Model(03)

15

11 Install Indoor Feeders and JumpersInstallers: A\B\C\D (40 minutes)

a Make indoor feeder connectors

b Make indoor jumper connectors

1. Cut the redundant indoor feeders and ensure that the length of each indoor feeder is about 1 m. Remove all the color rings.

2. Fix DIN female connectors to the feeders. Stick the same color rings as the original ones at the position 200 mm away from the feeder connectors.

1. After length of the jumpers to be distributed is determined, cut six jumpers and fix DIN male connectors to both ends of the jumpers.

2. Stick color rings corresponding to the sectors at one end of the jumper (connected to the feeder) at the position 200 mm away from the jumper connector.

d Bind the indoor jumpersc Connect feeders and jumpers

Connect the feeders to the jumpers with the same color rings.

Route the jumpers along the indoor cable rack and bind the jumpers with cable ties.

Page 17: 31504647-Antenna System (on Tower) Installation Standard Model(03)

16

12 Check the Antenna System Installers: A\B\C\D (15 minutes)

Ensure that the connectors of feeders and jumpers are installed securely and correctly.

Ensure that feeders and jumpers are in good conditions.

Each feeder is connected to the jumper with the same color rings.

Proper grounding measures are taken at three positions on the outdoor feeders.

The antenna should be installed at the position as specified by the design and securely fixed to the pole.

Antenna

No unnecessary adhesive tape or cable tie is left on the feeders and jumpers.

Waterproof curves are made for jumpers at the antenna side and outdoor feeders near the feeder window.

Ensure that all outdoor connectors are sealed for waterproof purpose and that the sequence of wrapping taps is correct.

Color rings are sticked to the correct positions.

Feeders are distributed neatly without any cross. No bare conductor inside the feeders is exposed.

Feeder and jumper

The antenna should be in the protection range of the lightning rod (within the tilt angle of 45o under the lightning rod).

In the forward direction of the antenna, the antenna is not obstructed by the tower body.

The error of the antenna azimuth should not be bigger than 5o, and the error of the tilt angle should not be bigger than 0.5o.

Use a VSWR tester to measure the VSWR at the indoor jumper. The VSWR should be less than 1.5 or the value required by the project.

VSWR of the

antenna system

RequirementItem

After the installation is complete, check the antenna system according to the following table. Then, correct the items that do not meet the requirements.

Page 18: 31504647-Antenna System (on Tower) Installation Standard Model(03)

17

Appendix 1 Stick Color Rings

b Stick color rings

a Positions for color rings

Wrap the color ring tape in the same direction and wrap two to three layers for each color ring. The distance between neighboring color rings is 10 mm to 15 mm.

1. By sticking color rings of different colors and different quantities to the feeders and jumpers, you can distinguish sectors and RF paths.

2. Principle for color rings: Planning -> Sticking -> Checking

Positions for color rings:1. 200 mm away from outdoor

jumper connectors2. 200 mm away from outdoor

feeder connectors3. Within 1 m from the position

where the feeder leaves the tower

4. 1 m away from the feeder window before the feeder enters the equipment room

5. 200 mm away from indoor feeder connectors

6. 200 mm away from indoor jumper connectors

Finished

Page 19: 31504647-Antenna System (on Tower) Installation Standard Model(03)

18

Appendix 1 Stick Color Rings

c Configuration of color rings

Blue, one ringBlue, two rings3

Yellow, one ringYellow, two rings2

Red, one ringRed, two rings1

DiversityMainSector

Blue, three ringsBlue, four rings3

Yellow, three ringsYellow, four rings2

Red, three ringsRed, four rings1

Diversity (antenna 2)Main (antenna 2)Sector

If two antennas share the same site, the configuration of the second antenna is as follows:

Typical configuration

Other configurations

One white ring + one blue ringOne white ring + two blue rings3

One white ring + one yellow ringOne white ring + two yellow rings2

One white ring + one red ringOne white ring + two red rings1

Diversity (antenna system 2)Main (antenna system 2)Sector

If multiple antenna systems share the same site, the configuration of the second antenna system is as follows:

If an antenna system has six sectors, the color rings for sectors 4, 5, and 6 are purple, orange, and green respectively.

Page 20: 31504647-Antenna System (on Tower) Installation Standard Model(03)

19

a DIN Connector

b

Difference between male and female connectors

Thread:

Internal thread (male)

Central conductor:

Pin conductor (male)

Socket conductor (female)

b N Connector

c Difference between connectors

Difference between DIN and N connectors

Size: N connector are smaller than DIN connector.

Appendix 2 DIN / N Connector

DIN straight connector (female)DIN straight connector (male) DIN angle connectors (male)

N angle connector (male) N straight connector (male)

N connector

DIN connector

External thread (female)

Page 21: 31504647-Antenna System (on Tower) Installation Standard Model(03)

20

Appendix 3 Make the Jumper Connector

a

b

DIN straight male connector

This appendix describes the procedure for making the DIN straight male connectors of HuaXing to jumpers. How to make other connectors, see relative manuals.

Finished

Cut the jumper

Install the heat-shrinkable tube and O-ring seal

Page 22: 31504647-Antenna System (on Tower) Installation Standard Model(03)

21

Appendix 3 Make the Jumper Connector

c

d e

Fix the rear and front sockets

Fasten the front and rear sockets shrink the heat-shrinkable tube

Keep the wrench unmoved

Page 23: 31504647-Antenna System (on Tower) Installation Standard Model(03)

22

Appendix 4 Make the Feeder Connector

DIN straight female connector

7/8" feeder

This appendix describes the procedure for making the DIN straight female connectors of Andrew to 7/8" feeders. How to make other connectors, see relative manuals.

a Strip the feeder

b Cut the feeder

b Cut the feeder

Rotate the feeder cutter till the inner and outer conductors are completely cut.

Cut the broken covering of the feeders.

Page 24: 31504647-Antenna System (on Tower) Installation Standard Model(03)

23

Appendix 4 Make the Feeder Connector

c Fix the O-ring seal d Fix the rear socket

e Stretch the conductor of the feeder

Insert the feeder into the feeder cutter, rotate the cutter to stretch the outer conductor. Use a hand to draw the rear socket, ensure that the rear socket does not come off from the feeder.

f Fix the front socket g Fasten the front and rear sockets

Keep the wrench unmoved

Page 25: 31504647-Antenna System (on Tower) Installation Standard Model(03)

24

Appendix 5 Install Accessories on RET Antenna

b Install the SBT

a Install the RCU

Adjust the electrical downtilt to 0°

RET antenna and accessories

RCU AISG control cable (0.5 m)

SBTRET antenna (bottom)

The following describes how to install the RCU of Huawei and the SBT of Kathrein on the 800 M RET antenna.

Page 26: 31504647-Antenna System (on Tower) Installation Standard Model(03)

25

Appendix 5 Install Accessories on RET Antenna

d Seal the connectors

c Install the AISG control cable

Seal the two connectors shown in this figure.

e Install jumpers