8
40.0 P 38.69 E 43.29 P 35.29 E 38.10 1.0 P 37.44 E 41.22 2.34 P 40.33 E 43.14 1.0 1.0 P 33.88 E 36.35 Key to symbols $SS¶G &K¶N¶G Description Drawn Date Rev Rev Status Drawing Number Scale at A1 Eng check Approved Coordination Dwg check Drawn Designed Title Notes Client Reference drawings 0 20 40 10 @ 20 60 Scale 1:1000 PLAN A1 Key Plan NTS CF49 Earthworks Volume - Channel CF49 7RWDO FXW 7RWDO ILOO 7RWDO EDODQFH P3 28.11.14 ADS GL - Issued for Draft ILP (Not Issued) Channel CF49 1:1000 Proposed top of bank - CF49 Existing riparian extents Existing top of bank Proposed riparian extents Batter 1 3 Proposed top of bank Tie into existing levels Proposed Riparian Extents Extent of Cut Extent of Fill Proposed Channel Existing Riparian Extents Existing Top of Bank Piped culvert crossing (refer drawing 0212) 100yr Top of Water Level and Freeboard P4 16.01.15 AMP GL CJA Issued for Exhibition P5 27.01.15 AMP GL CJA Issued for Exhibition P6 19.03.15 MMc GL CJA Issued for Exhibition Proposed Pit and pipe network T F W P:\Parramatta\Projects\33xxxx\334311\06 CAD\6_4 Working drawings\Civil\Autocad\1_IS_Riverstone East\Drawings\Water Cycle\MMD-334311-C-DR-RE-XX-0250.dwg May 11, 2016 - 6:00PM sin55925 Riverstone East Precinct Water Cycle Management Plan Proposed Channel Plan Channel CF49 JT . ADS . GC . GL . GL . CJA . As Shown PRE MMD-334311-C-DR-RE-XX-0250 P7 Level 10, 383 Kent Street Sydney, NSW 2000 Australia PO Box Q1678 QVB Sydney NSW 1230 +61 (0)2 9098 6800 - www.mottmac.com 0RWW 0DF'RQDOG $XVWUDOLD 3W\ /LPLWHG $&1 This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties. Post Exhibition Amendments P7 11.05.16 ADS GL CJA Issued for Post Exhibition Amendments Stormwater channel has been trimmed back and replaced with piped drainage system which is subject to future refinement (1 x 1800 circular pipe or 1 x 1800 x 1500 box culvert) Channel CF49 Typical Section 1:200(H) 1:100(V) 3:1 9:1 3:1 3:1 9:1 3:1 ~7.18m (Varies) ~17.55m (Varies) 100YR TWL (Approx) 2YR TWL (Approx) ~0.9m (Varies) ~1.4m (Varies) 100YR TWL + 0.5m Freeboard (Approx) Riparian Zone Refer Water Cycle Report for detailed calculations Varies to existing within outer Riparian Zone (typ) Varies 1% min 10m 10m Main Channel Creek channel shown as centralised. How ever creek can meander within overall riparian zone to promote a more 'Natural' appearance. Minor 2yr flows to remain as environmental flows to existing creek

Transcript of 3:1 8:1 - Department of Planning and Environment...7RWDO FXW Pñ 7RWDO ILOO Pñ 7RWDO EDODQFH Pñ P3...

  • 4

    0

    .

    0

    P38.69

    E 43.29

    P35.29

    E 38.10

    1.0

    P37.44

    E 41.22

    2

    .

    3

    4

    P40.33

    E 43.14

    1

    .

    0

    1

    .

    0

    P33.88

    E 36.35

    Key to symbols

    DescriptionDrawnDateRev

    RevStatus

    Drawing Number

    Scale at A1

    Eng check

    Approved

    Coordination

    Dwg check

    Drawn

    Designed

    Title

    Notes

    Client

    Reference drawings

    0 20 4010

    @

    20 60

    Scale 1:1000PLAN A1

    Key Plan

    NTS

    CF49

    Earthworks Volume - Channel CF49

    P3 28.11.14 ADS GL -Issued for Draft ILP (Not Issued)

    Channel CF49

    1:1000

    Proposed top of bank

    -

    CF49

    Existing riparian extents

    Existing top of bank

    Proposed riparian extents

    Batter 1

    3

    Proposed top of bank

    Tie into existing levels

    Proposed Riparian Extents

    Extent of Cut

    Extent of Fill

    Proposed Channel

    Existing Riparian Extents

    Existing Top of Bank

    Piped culvert crossing (refer drawing 0212)

    100yr Top of Water Level and Freeboard

    P4 16.01.15 AMP GL CJAIssued for Exhibition

    P5 27.01.15 AMP GL CJAIssued for Exhibition

    P6 19.03.15 MMc GL CJAIssued for Exhibition

    Proposed Pit and pipe network

    TFW

    P:\Parramatta\Projects\33xxxx\334311\06 CAD\6_4 Working drawings\Civil\Autocad\1_IS_Riverstone East\Drawings\Water

    Cycle\MMD-334311-C-DR-RE-XX-0250.dwg May 11, 2016 - 6:00PM sin55925

    Riverstone East Precinct

    Water Cycle Management Plan

    Proposed Channel Plan

    Channel CF49

    JT .

    ADS .

    GC .

    GL .

    GL .

    CJA .

    As Shown PRE

    MMD-334311-C-DR-RE-XX-0250

    P7

    Level 10, 383 Kent Street

    Sydney, NSW 2000

    Australia

    PO Box Q1678

    QVB Sydney NSW 1230

    +61 (0)2 9098 6800

    -

    www.mottmac.com

    This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.

    We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.

    Post Exhibition Amendments

    P7 11.05.16 ADS GL CJAIssued for Post Exhibition Amendments

    Stormwater channel has been

    trimmed back and replaced with

    piped drainage system which is

    subject to future refinement (1 x

    1800 circular pipe or 1 x 1800 x

    1500 box culvert)

    Channel CF49

    Typical Section

    1:200(H) 1:100(V)

    3

    :

    1

    9

    :1

    3

    :

    1

    3

    :

    1

    9

    :1

    3

    :

    1

    ~7.18m (Varies)

    ~17.55m (Varies)

    100YR TWL (Approx)

    2YR TWL (Approx)

    ~0.9m

    (V

    aries)

    ~1.4m

    (V

    aries)

    100YR TWL + 0.5m

    Freeboard (Approx)

    Riparian Zone

    Refer Water Cycle Report

    for detailed calculations

    Varies to existing within

    outer Riparian Zone (typ)

    Varies 1% min

    10m 10mMain Channel

    Creek channel shown as

    centralised. How ever creek

    can meander within overall

    riparian zone to promote a

    more 'Natural' appearance.

    Minor 2yr flows to

    remain as environmental

    flows to existing creek

  • P31.49

    E 31.83

    P34.76

    E 34.48

    0

    .

    2

    P34.98

    E 36.24

    Key to symbols

    DescriptionDrawnDateRev

    RevStatus

    Drawing Number

    Scale at A1

    Eng check

    Approved

    Coordination

    Dwg check

    Drawn

    Designed

    Title

    Notes

    Client

    Reference drawings

    0 20 4010

    @

    20 60

    Scale 1:1000PLAN A1

    Key Plan

    NTS

    Channel CF40

    1:1000

    CF40

    Earthworks Volume - Channel CF40

    -

    CF40

    Existing riparian extents

    Existing top of bank

    Existing riparian extents

    3

    :

    1

    8

    :1

    2

    :

    1

    2

    :

    1

    8

    :1

    3

    :

    1

    Channel CF40

    Typical Section

    1:200(H) 1:100(V)

    Refer Water Cycle Report

    for detailed calculations

    ~5.91m (Varies)

    ~13.91m (Varies)

    ~0.8m

    (V

    aries)

    ~1.3m

    (V

    aries)

    Riparian Zone

    100YR TWL (Approx)

    2YR TWL (Approx)

    Varies to existing within

    outer Riparian Zone (typ)Varies 1% min

    10m 10mMain Channel

    Creek channel shown as

    centralised. How ever creek

    can meander within overall

    riparian zone to promote a

    more 'Natural' appearance.

    Transition channel to existing

    to avoid disturbance of highly

    significant Aboriginal Heritage

    Area. Riparian corridor to

    transition to exisitng

    P3 28.11.14 ADS GL -Issued for Draft ILP (Not Issued)

    P4 16.01.15 AMP GL CJAIssued for Exhibition

    P5 27.01.15 AMP GL CJAIssued for Exhibition

    P6 19.03.15 MMc GL CJAIssued for Exhibition

    Proposed Riparian Extents

    Extent of Cut

    Extent of Fill

    Proposed Channel

    Existing Riparian Extents

    Existing Top of Bank

    Piped culvert crossing (refer drawing 0212)

    100yr Top of Water Level and Freeboard

    Proposed Pit and pipe network

    TFW

    P:\Parramatta\Projects\33xxxx\334311\06 CAD\6_4 Working drawings\Civil\Autocad\1_IS_Riverstone East\Drawings\Water

    Cycle\MMD-334311-C-DR-RE-XX-0250.dwg May 11, 2016 - 6:00PM sin55925

    Riverstone East Precinct

    Water Cycle Management Plan

    Proposed Channel Plan

    Channel CF40

    JT .

    ADS .

    GC .

    GL .

    GL .

    CJA .

    As Shown PRE

    MMD-334311-C-DR-RE-XX-0251

    P7

    Level 10, 383 Kent Street

    Sydney, NSW 2000

    Australia

    PO Box Q1678

    QVB Sydney NSW 1230

    +61 (0)2 9098 6800

    -

    www.mottmac.com

    This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.

    We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.

    Post Exhibition Amendments

    P7 11.05.16 ADS GL CJAIssued for Post Exhibition Amendments

    Stormwater channel has been

    trimmed back and replaced with

    piped drainage system which is

    subject to future refinement (1 x

    1800 circular pipe or 1 x 1800 x

    1500 box culvert)

  • P26.25

    E 26.37

    P26.41

    E 28.08

    0.2

    3

    .

    3

    6

    .

    1

    P31.58

    E 32.63

    P32.26

    E 34.14

    P32.60

    E 34.79

    1

    .

    0

    6

    .1

    0

    .

    5

    P34.01

    E 35.03

    2

    .3

    P34.11

    E 35.97

    0.5

    P35.05

    E 36.47

    2

    .

    9

    2

    .

    5

    3

    0

    .

    0

    P29.50

    E 29.56

    0

    .

    2

    P29.68

    E 30.80

    Key to symbols

    DescriptionDrawnDateRev

    RevStatus

    Drawing Number

    Scale at A1

    Eng check

    Approved

    Coordination

    Dwg check

    Drawn

    Designed

    Title

    Notes

    Client

    Reference drawings

    0 20 4010

    @

    20 60

    Scale 1:1000PLAN A1

    Key Plan

    NTS

    Channel CF38

    1:1000

    CF38

    CF24

    Channel CF24

    1:1000

    Earthworks Volume - Channel CF38

    Earthworks Volume - Channel CF24

    -

    -

    CF24

    Existing top of bank

    Proposed riparian extents

    Existing top of bank

    Proposed riparian extents

    Proposed top of bank

    Existing top of bank

    Batter 1

    2

    3

    :

    1

    8

    :1

    2

    :

    1

    2

    :

    1

    8

    :1

    3

    :

    1

    ~6.34m (Varies)

    ~14.34m (Varies)

    ~0.9m

    (V

    aries)

    ~1.4m

    (V

    aries)

    100YR TWL (Approx)

    2YR TWL (Approx)

    Riparian Zone

    Channel CF38

    Typical Section

    1:200(H) 1:100(V)

    Varies to existing within

    outer Riparian Zone (typ)

    100YR TWL + 0.5m

    Freeboard (Approx)

    Refer Water Cycle Report

    for detailed calculations

    8

    :1

    2

    :

    1

    2

    :

    1

    8

    :1

    ~0.7m

    (V

    aries)

    ~1.2m

    (V

    aries)

    ~5.31m (Varies)

    ~13.31m (Varies)

    100YR TWL (Approx)

    2YR TWL (Approx)

    Varies to existing within

    outer Riparian Zone (typ)

    Riparian Zone

    100YR TWL + 0.5m

    Freeboard (Approx)

    Channel CF24

    Typical Section

    1:500(H) 1:100(V)

    Refer Water Cycle Report

    for detailed calculations

    Varies 1% min

    Varies 1% min

    10m 10m

    10m 10mMain Channel

    Creek channel shown as

    centralised. How ever creek

    can meander within overall

    riparian zone to promote a

    more 'Natural' appearance.

    Main Channel

    Creek channel shown as

    centralised. How ever creek

    can meander within overall

    riparian zone to promote a

    more 'Natural' appearance.

    P3 28.11.14 ADS GL -Issued for Draft ILP (Not Issued)

    P4 16.01.15 AMP GL CJAIssued for Exhibition

    P5 27.01.15 AMP GL CJAIssued for Exhibition

    P6 19.03.15 MMc GL CJAIssued for Exhibition

    CF38

    Proposed Riparian Extents

    Extent of Cut

    Extent of Fill

    Proposed Channel

    Existing Riparian Extents

    Existing Top of Bank

    Piped culvert crossing (refer drawing 0212)

    100yr Top of Water Level and Freeboard

    Proposed Pit and pipe network

    TFW

    P:\Parramatta\Projects\33xxxx\334311\06 CAD\6_4 Working drawings\Civil\Autocad\1_IS_Riverstone East\Drawings\Water

    Cycle\MMD-334311-C-DR-RE-XX-0250.dwg May 11, 2016 - 6:00PM sin55925

    Riverstone East Precinct

    Water Cycle Management Plan

    Proposed Channel Plan

    Channel CF38 and CF24

    JT .

    ADS .

    GC .

    GL .

    GL .

    CJA .

    As Shown PRE

    MMD-334311-C-DR-RE-XX-0252

    P7

    Level 10, 383 Kent Street

    Sydney, NSW 2000

    Australia

    PO Box Q1678

    QVB Sydney NSW 1230

    +61 (0)2 9098 6800

    -

    www.mottmac.com

    This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.

    We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.

    Post Exhibition Amendments

    P7 11.05.16 ADS GL CJAIssued for Post Exhibition Amendments

    Stormwater channel has been

    trimmed back and replaced with

    piped drainage system which is

    subject to future refinement (2 x

    1800 circular pipe or 2 x 1800 x

    1500 box culvert)

  • 4

    0

    .

    0

    31.36

    33.41

    0.5

    32.97

    E 34.60

    2

    .

    3

    34.08

    E 36.03

    1

    .

    4

    35.50

    E 37.75

    1.5

    37.38

    E 39.68

    6.0

    38.22

    E 40.62

    0.7

    2.4

    3

    0

    .

    0

    23.59

    E 26.66

    27.41

    E 30.50

    0

    .3

    28.00

    E 30.39

    0.5

    1

    .

    7

    30.35E 35.36

    8.7

    0.5

    0

    .

    5

    5

    0

    .

    0

    43.22

    E 44.81

    47.20

    E 48.45

    4.0

    Key to symbols

    DescriptionDrawnDateRev

    RevStatus

    Drawing Number

    Scale at A1

    Eng check

    Approved

    Coordination

    Dwg check

    Drawn

    Designed

    Title

    Notes

    Client

    Reference drawings

    0 20 4010

    @

    20 60

    Scale 1:1000PLAN A1

    Channel CF05 (Continuation)

    1:1000

    Key Plan

    NTS

    CF05

    F o r C

    o n t i n u a t i o n R

    e f e r B

    e l o w

    Channel CF05

    1:1000

    Inset 'A'

    1:1000

    F o r C

    o n t i n u a t i o n R

    e f e r A

    b o v e

    F o r C

    o n t i n u a t i o n R

    e f e r I n s e t 'A

    '

    Earthworks Volume - Channel CF05

    -

    CF05

    Existing riparian extents

    Existing top of bank

    Proposed riparian extents

    Batter 1

    3

    Proposed top of bank

    Proposed top of bank

    Proposed riparian extents

    Existing top of bank

    Existing riparian extents

    Existing top of bank

    3

    :

    1

    8

    :1

    3

    :

    1

    3

    :

    1

    8

    :1

    3

    :

    1

    ~5.87m (Varies)

    ~13.87m (Varies)

    100YR TWL + 0.5m

    Freeboard (Approx)

    100YR TWL (Approx)

    2YR TWL (Approx)

    Varies to existing within

    outer Riparian Zone (typ)

    Riparian Zone

    Channel CF05

    Typical Section

    1:200(H) 1:100(V)

    ~0.8m

    (V

    aries)

    ~1.3m

    (V

    aries)

    Refer Water Cycle Report

    for detailed calculations

    Varies 1% min

    10m 10mMain Channel

    Creek channel shown as

    centralised. How ever creek

    can meander within overall

    riparian zone to promote a

    more 'Natural' appearance.

    P3 28.11.14 ADS GL -Issued for Draft ILP (Not Issued)

    P4 16.01.15 AMP GL CJAIssued for Exhibition

    P5 27.01.15 AMP GL CJAIssued for Exhibition

    P6 19.03.15 MMc GL CJAIssued for Exhibition

    Proposed Riparian Extents

    Extent of Cut

    Extent of Fill

    Proposed Channel

    Existing Riparian Extents

    Existing Top of Bank

    Piped culvert crossing (refer drawing 0212)

    100yr Top of Water Level and Freeboard

    Proposed Pit and pipe network

    TFW

    P:\Parramatta\Projects\33xxxx\334311\06 CAD\6_4 Working drawings\Civil\Autocad\1_IS_Riverstone East\Drawings\Water

    Cycle\MMD-334311-C-DR-RE-XX-0250.dwg May 11, 2016 - 6:01PM sin55925

    Riverstone East Precinct

    Water Cycle Management Plan

    Proposed Channel Plan

    Channel CF05

    JT .

    ADS .

    GC .

    GL .

    GL .

    CJA .

    As Shown PRE

    MMD-334311-C-DR-RE-XX-0253

    P7

    Level 10, 383 Kent Street

    Sydney, NSW 2000

    Australia

    PO Box Q1678

    QVB Sydney NSW 1230

    +61 (0)2 9098 6800

    -

    www.mottmac.com

    This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.

    We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.

    Post Exhibition Amendments

    P7 11.05.16 ADS GL CJAIssued for Post Exhibition Amendments

  • 41.34

    E 43.74

    0.2

    41.80

    E 44.08

    1

    .

    2

    42.30

    E 44.54

    0

    .

    5

    44.50 E 46.46

    1.5

    49.10

    E 51.02

    1.7

    1.7

    51.10

    E 52.80

    11.3

    Key to symbols

    DescriptionDrawnDateRev

    RevStatus

    Drawing Number

    Scale at A1

    Eng check

    Approved

    Coordination

    Dwg check

    Drawn

    Designed

    Title

    Notes

    Client

    Reference drawings

    0 20 4010

    @

    20 60

    Scale 1:1000PLAN A1

    Key Plan

    NTS

    CA14

    Channel CA14

    1:1000

    Channel CA14 (Continuation)

    1:1000

    F o r C

    o n t i n u a t i o n R

    e f e r B

    e l o w

    F o r C

    o n t i n u a t i o n R

    e f e r A

    b o v e

    Earthworks Volume - Channel CA14

    -

    CA

    14

    Existing riparian extents

    Proposed riparian extents

    Existing top of bank

    Proposed top of bank

    Existing riparian extents

    Proposed riparian extents

    Existing top of bank

    Proposed top of bank

    Batter 1

    3

    3

    :

    1

    8

    :1

    3

    :

    1

    3

    :

    1

    8

    :1

    3

    :

    1

    ~9.42m (Varies)

    ~17.42m (Varies)

    Riparian Zone

    100YR TWL (Approx)

    2YR TWL (Approx)

    Varies to existing within

    outer Riparian Zone (typ)

    ~1.2m

    (V

    aries)

    ~1.7m

    (V

    aries)

    100YR TWL + 0.5m

    Freeboard (Approx)

    Channel CA14

    Typical Section

    1:200(H) 1:100(V)

    Refer Water Cycle Report

    for detailed calculations

    Varies 1% min

    10m 10mMain Channel

    Creek channel shown as

    centralised. How ever creek

    can meander within overall

    riparian zone to promote a

    more 'Natural' appearance.

    P3 28.11.14 ADS GL -Issued for Draft ILP (Not Issued)

    P4 16.01.15 AMP GL CJAIssued for Exhibition

    P5 27.01.15 AMP GL CJAIssued for Exhibition

    P6 19.03.15 MMc GL CJAIssued for Exhibition

    Proposed Riparian Extents

    Extent of Cut

    Extent of Fill

    Proposed Channel

    Existing Riparian Extents

    Existing Top of Bank

    Piped culvert crossing (refer drawing 0212)

    100yr Top of Water Level and Freeboard

    Proposed Pit and pipe network

    TFW

    P:\Parramatta\Projects\33xxxx\334311\06 CAD\6_4 Working drawings\Civil\Autocad\1_IS_Riverstone East\Drawings\Water

    Cycle\MMD-334311-C-DR-RE-XX-0250.dwg May 11, 2016 - 6:01PM sin55925

    Riverstone East Precinct

    Water Cycle Management Plan

    Proposed Channel Plan

    Channel CA14

    JT .

    ADS .

    GC .

    GL .

    GL .

    CJA .

    As Shown PRE

    MMD-334311-C-DR-RE-XX-0255

    P7

    Level 10, 383 Kent Street

    Sydney, NSW 2000

    Australia

    PO Box Q1678

    QVB Sydney NSW 1230

    +61 (0)2 9098 6800

    -

    www.mottmac.com

    This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.

    We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.

    Post Exhibition Amendments

    P7 11.05.16 ADS GL CJAIssued for Post Exhibition Amendments

  • P30.60

    E 31.71

    P31.30

    E 31.61

    5

    .0

    0

    .2

    2

    .

    7

    P31.46

    E 32.11

    1.3

    3.0

    P34.24

    E 34.86

    P35.14

    E 35.50

    P34.85

    E 35.33

    Key to symbols

    DescriptionDrawnDateRev

    RevStatus

    Drawing Number

    Scale at A1

    Eng check

    Approved

    Coordination

    Dwg check

    Drawn

    Designed

    Title

    Notes

    Client

    Reference drawings

    0 20 4010

    @

    20 60

    Scale 1:1000PLAN A1

    Key Plan

    NTS

    CA03

    Channel CA03

    1:1000

    Earthworks Volume - Channel CA03

    -

    CA03

    Channel CA03

    3

    :

    1

    0%

    2

    :

    1

    0% 0%

    3

    :

    1

    ~8m (Varies)

    100YR TWL (Approx)

    2YR TWL (Approx)

    Varies to existing within

    outer Riparian Zone (typ)

    ~0.6m

    (V

    aries)

    ~1.2m

    (V

    aries)

    Channel CA03

    Typical Section

    1:200(H) 1:100(V)

    Refer Water Cycle Report

    for detailed calculations

    ~15.87m (Varies)

    P3 28.11.14 ADS GL -Issued for Draft ILP (Not Issued)

    P4 16.01.15 AMP GL CJAIssued for Exhibition

    P5 27.01.15 AMP GL CJAIssued for Exhibition

    P6 19.03.15 MMc GL CJAIssued for Exhibition

    Proposed Riparian Extents

    Extent of Cut

    Extent of Fill

    Proposed Channel

    Existing Riparian Extents

    Existing Top of Bank

    Piped culvert crossing (refer drawing 0212)

    100yr Top of Water Level and Freeboard

    Proposed Pit and pipe network

    TFW

    P:\Parramatta\Projects\33xxxx\334311\06 CAD\6_4 Working drawings\Civil\Autocad\1_IS_Riverstone East\Drawings\Water

    Cycle\MMD-334311-C-DR-RE-XX-0250.dwg May 11, 2016 - 6:01PM sin55925

    Riverstone East Precinct

    Water Cycle Management Plan

    Proposed Channel Plan

    Channel CA03

    JT .

    ADS .

    GC .

    GL .

    GL .

    CJA .

    As Shown PRE

    MMD-334311-C-DR-RE-XX-0256

    P7

    Level 10, 383 Kent Street

    Sydney, NSW 2000

    Australia

    PO Box Q1678

    QVB Sydney NSW 1230

    +61 (0)2 9098 6800

    -

    www.mottmac.com

    This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.

    We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.

    Post Exhibition Amendments

    P7 11.05.16 ADS GL CJAIssued for Post Exhibition Amendments

  • 2

    0

    .0

    2

    0

    .

    0

    2

    0

    .0

    30.0

    3

    0

    .

    0

    3

    0

    .

    0

    3

    0

    .0

    3

    0

    .

    0

    3

    0

    .

    0

    3

    0

    .0

    3

    0

    .

    0

    3

    0

    .

    0

    3

    0

    .

    0

    3

    0

    .0

    3

    0

    .

    0

    3

    0

    .

    0

    4

    0

    .

    0

    4

    0

    .

    0

    40.0

    4

    0

    .

    0

    4

    0

    .

    0

    4

    0

    .

    0

    4

    0

    .

    0

    4

    0

    .

    0

    4

    0

    .0

    4

    0

    .

    0

    4

    0

    .

    0

    40

    .0

    4

    0

    .

    0

    4

    0

    .

    0

    4

    0

    .

    0

    4

    0

    .

    0

    4

    0

    .

    0

    4

    0

    .

    0

    4

    0

    .

    0

    5

    0

    .

    0

    5

    0

    .

    0

    5

    0

    .

    0

    5

    0

    .

    0

    5

    0

    .

    0

    5

    0

    .

    0

    5

    0

    .

    0

    5

    0

    .

    0

    5

    0

    .0

    5

    0

    .

    0

    5

    0

    .

    0

    5

    0

    .0

    5

    0

    .0

    5

    0

    .

    0

    5

    0

    .0

    5

    0

    .

    0

    5

    0

    .

    0

    50.0

    6

    0

    .

    0

    6

    0

    .0

    6

    0

    .

    0

    6

    0

    .

    0

    6

    0

    .

    0

    6

    0

    .

    0

    6

    0

    .0

    6

    0

    .

    0

    6

    0

    .0

    6

    0

    .0

    7

    0

    .

    0

    7

    0

    .

    0

    2

    5

    .0

    2

    5

    .

    0

    2

    5

    .

    0

    2

    5

    .

    0

    2

    5

    .0

    2

    5

    .

    0

    2

    5

    .

    0

    2

    5

    .

    0

    3

    5

    .

    0

    3

    5

    .

    0

    35.0

    3

    5

    .

    0

    35.0

    3

    5

    .

    0

    3

    5

    .0

    3

    5

    .0

    3

    5

    .

    0

    3

    5

    .

    0

    3

    5

    .

    0

    3

    5

    .

    0

    3

    5

    .

    0

    3

    5

    .0

    3

    5

    .

    0

    3

    5

    .

    0

    3

    5

    .0

    35.0

    3

    5

    .

    0

    3

    5

    .

    0

    45.0

    4

    5

    .

    0

    4

    5

    .

    0

    4

    5

    .

    0

    45.0

    4

    5

    .

    0

    45.0

    4

    5

    .

    0

    4

    5

    .0

    45.0

    4

    5

    .

    0

    4

    5

    .

    0

    4

    5

    .

    0

    4

    5

    .

    0

    45.0

    4

    5

    .

    0

    4

    5

    .

    0

    5

    5

    .

    0

    5

    5

    .

    0

    5

    5

    .

    0

    5

    5

    .

    0

    5

    5

    .

    0

    5

    5

    .

    0

    5

    5

    .

    0

    5

    5

    .0

    55.0

    55.0

    6

    5

    .

    0

    6

    5

    .0

    6

    5

    .

    0

    6

    5

    .

    0

    65.0

    6

    5

    .0

    6

    5

    .

    0

    5

    5

    .

    0

    6

    0

    .

    0

    4

    0

    .

    0

    40.0

    4

    0

    .

    0

    5

    0

    .

    0

    5

    0

    .

    0

    50.0

    4

    5

    .

    0

    4

    5

    .

    0

    4

    5

    .

    0

    5

    5

    .

    0

    5

    5

    .0

    5

    5

    .

    0

    4

    5

    .

    0

    6

    5

    .0

    25.0

    30

    .0

    3

    5

    .

    0

    3

    0

    .

    0

    3

    5

    .

    0

    40.0

    4

    0

    .

    0

    4

    5

    .

    0

    3

    5

    .0

    25.0

    2

    0

    .

    0

    30.0

    S

    ch

    o

    fie

    ld

    s

    R

    oad

    G

    u

    n

    t

    a

    w

    o

    n

    g

    R

    o

    a

    d

    G

    a

    r

    f

    i

    e

    l

    d

    R

    o

    a

    d

    E

    a

    s

    t

    C

    l

    a

    r

    k

    e

    S

    t

    r

    e

    e

    t

    W

    i

    n

    d

    s

    o

    r

    R

    o

    a

    d

    Windsor

    R

    o

    a

    d

    T

    a

    l

    l

    a

    w

    o

    n

    g

    R

    o

    a

    d

    C

    u

    d

    g

    e

    g

    o

    n

    g

    R

    o

    a

    d

    W

    o

    r

    c

    e

    s

    t

    e

    r

    R

    o

    a

    d

    R

    i

    v

    e

    r

    s

    t

    o

    n

    e

    R

    o

    a

    d

    C

    r

    a

    n

    b

    o

    u

    r

    n

    e

    S

    t

    r

    e

    e

    t

    B

    o

    u

    n

    d

    a

    r

    y

    R

    o

    a

    d

    Riverstone East

    Precinct

    C

    r

    e

    e

    k

    P

    o

    n

    d

    s

    F

    i

    r

    s

    t

    B

    a

    u

    l

    k

    h

    a

    m

    H

    i

    l

    l

    s

    L

    G

    A

    B

    l

    a

    c

    k

    t

    o

    w

    n

    L

    G

    A

    First

    P

    o

    n

    d

    s

    C

    r

    e

    e

    k

    T

    r

    i

    b

    u

    t

    a

    r

    y

    Killarney

    C

    h

    a

    i

    n

    o

    f

    P

    o

    n

    d

    s

    Trubutary

    Key to symbols

    DescriptionDrawnDateRev

    RevStatus

    Drawing Number

    Scale at A1

    Eng check

    Approved

    Coordination

    Dwg check

    Drawn

    Designed

    Title

    Notes

    Client

    Reference drawings

    @

    0 100100 20050 300

    Scale 1:10000PLAN A1

    Riverstone East precinct boundary

    Existing road

    Flood Response Extents

    Point of Refuge

    Evacuation Route

    P2 26.11.14 DW GL -Issued for Draft ILP

    P3 16.01.15 AMP GL CJAIssued for Exhibition

    P4 27.01.15 AMP GL CJAIssued for Exhibition

    Proposed Stage 1 boundary

    Proposed Stage 2 boundary

    P5 19.03.15 MMc GL CJAIssued for Exhibition

    TFW

    P:\Parramatta\Projects\33xxxx\334311\06 CAD\6_4 Working drawings\Civil\Autocad\1_IS_Riverstone East\Drawings\Water

    Cycle\MMD-334311-C-DR-RE-XX-0260.dwg May 12, 2016 - 12:06PM sin55925

    Riverstone East Precinct

    Water Cycle Management Plan

    Flood Response Plan

    JT .

    ADS .

    GC .

    GL .

    GL .

    CJA .

    1:10000 PRE

    MMD-334311-C-DR-RE-XX-0260

    P6

    Level 10, 383 Kent Street

    Sydney, NSW 2000

    Australia

    PO Box Q1678

    QVB Sydney NSW 1230

    +61 (0)2 9098 6800

    -

    www.mottmac.com

    This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.

    We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.

    Post Exhibition Amendments

    P6 11.05.16 ADS GL CJAIssued for Post Exhibition Amendments

  • Key to symbols

    DescriptionDrawnDateRev

    RevStatus

    Drawing Number

    Scale at A1

    Eng check

    Approved

    Coordination

    Dwg check

    Drawn

    Designed

    Title

    Notes

    Client

    Reference drawings

    0 20 4010

    @

    20 60

    Scale 1:1000PLAN A1

    Key Plan

    NTS

    Proposed Riparian Extents

    Existing Riparian Corridor to be Relocated

    New Relocated Riparian Corridor

    Existing Riparian Extents

    Existing Top of Bank

    Riparian Offset Area 2

    1:1000

    Riparian Offset Area 1

    1:1000

    Offset area 2

    Offset area 1

    Existing top of bank

    Existing riparian extents

    Proposed riparian extents

    Existing riparian extents

    Existing top of bank

    Proposed riparian extents

    Riparian corridor

    Riparian corridor

    0 100502510

    @Scale 1:1500PLAN A1

    TFW

    P:\Parramatta\Projects\33xxxx\334311\06 CAD\6_4 Working drawings\Civil\Autocad\1_IS_Riverstone East\Drawings\Water

    Cycle\MMD-334311-C-DR-RE-XX-0270.dwg May 11, 2016 - 6:02PM sin55925

    Riverstone East Precinct

    Water Cycle Management Plan

    Proposed Riparian Corridor

    Offset Plan

    JT .

    ADS .

    GC .

    GL .

    GL .

    CJA .

    As Shown PRE

    MMD-334311-C-DR-RE-XX-0270

    P1

    Level 10, 383 Kent Street

    Sydney, NSW 2000

    Australia

    PO Box Q1678

    QVB Sydney NSW 1230

    +61 (0)2 9098 6800

    -

    www.mottmac.com

    This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.

    We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.

    Post Exhibition Amendments

    P1 11.05.16 ADS GL CJAIssued for Post Exhibition Amendments

    Validated Watercourse