3:1 8:1 - Department of Planning and Environment...7RWDO FXW Pñ 7RWDO ILOO Pñ 7RWDO EDODQFH Pñ P3...
Transcript of 3:1 8:1 - Department of Planning and Environment...7RWDO FXW Pñ 7RWDO ILOO Pñ 7RWDO EDODQFH Pñ P3...
-
4
0
.
0
P38.69
E 43.29
P35.29
E 38.10
1.0
P37.44
E 41.22
2
.
3
4
P40.33
E 43.14
1
.
0
1
.
0
P33.88
E 36.35
Key to symbols
DescriptionDrawnDateRev
RevStatus
Drawing Number
Scale at A1
Eng check
Approved
Coordination
Dwg check
Drawn
Designed
Title
Notes
Client
Reference drawings
0 20 4010
@
20 60
Scale 1:1000PLAN A1
Key Plan
NTS
CF49
Earthworks Volume - Channel CF49
P3 28.11.14 ADS GL -Issued for Draft ILP (Not Issued)
Channel CF49
1:1000
Proposed top of bank
-
CF49
Existing riparian extents
Existing top of bank
Proposed riparian extents
Batter 1
3
Proposed top of bank
Tie into existing levels
Proposed Riparian Extents
Extent of Cut
Extent of Fill
Proposed Channel
Existing Riparian Extents
Existing Top of Bank
Piped culvert crossing (refer drawing 0212)
100yr Top of Water Level and Freeboard
P4 16.01.15 AMP GL CJAIssued for Exhibition
P5 27.01.15 AMP GL CJAIssued for Exhibition
P6 19.03.15 MMc GL CJAIssued for Exhibition
Proposed Pit and pipe network
TFW
P:\Parramatta\Projects\33xxxx\334311\06 CAD\6_4 Working drawings\Civil\Autocad\1_IS_Riverstone East\Drawings\Water
Cycle\MMD-334311-C-DR-RE-XX-0250.dwg May 11, 2016 - 6:00PM sin55925
Riverstone East Precinct
Water Cycle Management Plan
Proposed Channel Plan
Channel CF49
JT .
ADS .
GC .
GL .
GL .
CJA .
As Shown PRE
MMD-334311-C-DR-RE-XX-0250
P7
Level 10, 383 Kent Street
Sydney, NSW 2000
Australia
PO Box Q1678
QVB Sydney NSW 1230
+61 (0)2 9098 6800
-
www.mottmac.com
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
Post Exhibition Amendments
P7 11.05.16 ADS GL CJAIssued for Post Exhibition Amendments
Stormwater channel has been
trimmed back and replaced with
piped drainage system which is
subject to future refinement (1 x
1800 circular pipe or 1 x 1800 x
1500 box culvert)
Channel CF49
Typical Section
1:200(H) 1:100(V)
3
:
1
9
:1
3
:
1
3
:
1
9
:1
3
:
1
~7.18m (Varies)
~17.55m (Varies)
100YR TWL (Approx)
2YR TWL (Approx)
~0.9m
(V
aries)
~1.4m
(V
aries)
100YR TWL + 0.5m
Freeboard (Approx)
Riparian Zone
Refer Water Cycle Report
for detailed calculations
Varies to existing within
outer Riparian Zone (typ)
Varies 1% min
10m 10mMain Channel
Creek channel shown as
centralised. How ever creek
can meander within overall
riparian zone to promote a
more 'Natural' appearance.
Minor 2yr flows to
remain as environmental
flows to existing creek
-
P31.49
E 31.83
P34.76
E 34.48
0
.
2
P34.98
E 36.24
Key to symbols
DescriptionDrawnDateRev
RevStatus
Drawing Number
Scale at A1
Eng check
Approved
Coordination
Dwg check
Drawn
Designed
Title
Notes
Client
Reference drawings
0 20 4010
@
20 60
Scale 1:1000PLAN A1
Key Plan
NTS
Channel CF40
1:1000
CF40
Earthworks Volume - Channel CF40
-
CF40
Existing riparian extents
Existing top of bank
Existing riparian extents
3
:
1
8
:1
2
:
1
2
:
1
8
:1
3
:
1
Channel CF40
Typical Section
1:200(H) 1:100(V)
Refer Water Cycle Report
for detailed calculations
~5.91m (Varies)
~13.91m (Varies)
~0.8m
(V
aries)
~1.3m
(V
aries)
Riparian Zone
100YR TWL (Approx)
2YR TWL (Approx)
Varies to existing within
outer Riparian Zone (typ)Varies 1% min
10m 10mMain Channel
Creek channel shown as
centralised. How ever creek
can meander within overall
riparian zone to promote a
more 'Natural' appearance.
Transition channel to existing
to avoid disturbance of highly
significant Aboriginal Heritage
Area. Riparian corridor to
transition to exisitng
P3 28.11.14 ADS GL -Issued for Draft ILP (Not Issued)
P4 16.01.15 AMP GL CJAIssued for Exhibition
P5 27.01.15 AMP GL CJAIssued for Exhibition
P6 19.03.15 MMc GL CJAIssued for Exhibition
Proposed Riparian Extents
Extent of Cut
Extent of Fill
Proposed Channel
Existing Riparian Extents
Existing Top of Bank
Piped culvert crossing (refer drawing 0212)
100yr Top of Water Level and Freeboard
Proposed Pit and pipe network
TFW
P:\Parramatta\Projects\33xxxx\334311\06 CAD\6_4 Working drawings\Civil\Autocad\1_IS_Riverstone East\Drawings\Water
Cycle\MMD-334311-C-DR-RE-XX-0250.dwg May 11, 2016 - 6:00PM sin55925
Riverstone East Precinct
Water Cycle Management Plan
Proposed Channel Plan
Channel CF40
JT .
ADS .
GC .
GL .
GL .
CJA .
As Shown PRE
MMD-334311-C-DR-RE-XX-0251
P7
Level 10, 383 Kent Street
Sydney, NSW 2000
Australia
PO Box Q1678
QVB Sydney NSW 1230
+61 (0)2 9098 6800
-
www.mottmac.com
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
Post Exhibition Amendments
P7 11.05.16 ADS GL CJAIssued for Post Exhibition Amendments
Stormwater channel has been
trimmed back and replaced with
piped drainage system which is
subject to future refinement (1 x
1800 circular pipe or 1 x 1800 x
1500 box culvert)
-
P26.25
E 26.37
P26.41
E 28.08
0.2
3
.
3
6
.
1
P31.58
E 32.63
P32.26
E 34.14
P32.60
E 34.79
1
.
0
6
.1
0
.
5
P34.01
E 35.03
2
.3
P34.11
E 35.97
0.5
P35.05
E 36.47
2
.
9
2
.
5
3
0
.
0
P29.50
E 29.56
0
.
2
P29.68
E 30.80
Key to symbols
DescriptionDrawnDateRev
RevStatus
Drawing Number
Scale at A1
Eng check
Approved
Coordination
Dwg check
Drawn
Designed
Title
Notes
Client
Reference drawings
0 20 4010
@
20 60
Scale 1:1000PLAN A1
Key Plan
NTS
Channel CF38
1:1000
CF38
CF24
Channel CF24
1:1000
Earthworks Volume - Channel CF38
Earthworks Volume - Channel CF24
-
-
CF24
Existing top of bank
Proposed riparian extents
Existing top of bank
Proposed riparian extents
Proposed top of bank
Existing top of bank
Batter 1
2
3
:
1
8
:1
2
:
1
2
:
1
8
:1
3
:
1
~6.34m (Varies)
~14.34m (Varies)
~0.9m
(V
aries)
~1.4m
(V
aries)
100YR TWL (Approx)
2YR TWL (Approx)
Riparian Zone
Channel CF38
Typical Section
1:200(H) 1:100(V)
Varies to existing within
outer Riparian Zone (typ)
100YR TWL + 0.5m
Freeboard (Approx)
Refer Water Cycle Report
for detailed calculations
8
:1
2
:
1
2
:
1
8
:1
~0.7m
(V
aries)
~1.2m
(V
aries)
~5.31m (Varies)
~13.31m (Varies)
100YR TWL (Approx)
2YR TWL (Approx)
Varies to existing within
outer Riparian Zone (typ)
Riparian Zone
100YR TWL + 0.5m
Freeboard (Approx)
Channel CF24
Typical Section
1:500(H) 1:100(V)
Refer Water Cycle Report
for detailed calculations
Varies 1% min
Varies 1% min
10m 10m
10m 10mMain Channel
Creek channel shown as
centralised. How ever creek
can meander within overall
riparian zone to promote a
more 'Natural' appearance.
Main Channel
Creek channel shown as
centralised. How ever creek
can meander within overall
riparian zone to promote a
more 'Natural' appearance.
P3 28.11.14 ADS GL -Issued for Draft ILP (Not Issued)
P4 16.01.15 AMP GL CJAIssued for Exhibition
P5 27.01.15 AMP GL CJAIssued for Exhibition
P6 19.03.15 MMc GL CJAIssued for Exhibition
CF38
Proposed Riparian Extents
Extent of Cut
Extent of Fill
Proposed Channel
Existing Riparian Extents
Existing Top of Bank
Piped culvert crossing (refer drawing 0212)
100yr Top of Water Level and Freeboard
Proposed Pit and pipe network
TFW
P:\Parramatta\Projects\33xxxx\334311\06 CAD\6_4 Working drawings\Civil\Autocad\1_IS_Riverstone East\Drawings\Water
Cycle\MMD-334311-C-DR-RE-XX-0250.dwg May 11, 2016 - 6:00PM sin55925
Riverstone East Precinct
Water Cycle Management Plan
Proposed Channel Plan
Channel CF38 and CF24
JT .
ADS .
GC .
GL .
GL .
CJA .
As Shown PRE
MMD-334311-C-DR-RE-XX-0252
P7
Level 10, 383 Kent Street
Sydney, NSW 2000
Australia
PO Box Q1678
QVB Sydney NSW 1230
+61 (0)2 9098 6800
-
www.mottmac.com
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
Post Exhibition Amendments
P7 11.05.16 ADS GL CJAIssued for Post Exhibition Amendments
Stormwater channel has been
trimmed back and replaced with
piped drainage system which is
subject to future refinement (2 x
1800 circular pipe or 2 x 1800 x
1500 box culvert)
-
4
0
.
0
31.36
33.41
0.5
32.97
E 34.60
2
.
3
34.08
E 36.03
1
.
4
35.50
E 37.75
1.5
37.38
E 39.68
6.0
38.22
E 40.62
0.7
2.4
3
0
.
0
23.59
E 26.66
27.41
E 30.50
0
.3
28.00
E 30.39
0.5
1
.
7
30.35E 35.36
8.7
0.5
0
.
5
5
0
.
0
43.22
E 44.81
47.20
E 48.45
4.0
Key to symbols
DescriptionDrawnDateRev
RevStatus
Drawing Number
Scale at A1
Eng check
Approved
Coordination
Dwg check
Drawn
Designed
Title
Notes
Client
Reference drawings
0 20 4010
@
20 60
Scale 1:1000PLAN A1
Channel CF05 (Continuation)
1:1000
Key Plan
NTS
CF05
F o r C
o n t i n u a t i o n R
e f e r B
e l o w
Channel CF05
1:1000
Inset 'A'
1:1000
F o r C
o n t i n u a t i o n R
e f e r A
b o v e
F o r C
o n t i n u a t i o n R
e f e r I n s e t 'A
'
Earthworks Volume - Channel CF05
-
CF05
Existing riparian extents
Existing top of bank
Proposed riparian extents
Batter 1
3
Proposed top of bank
Proposed top of bank
Proposed riparian extents
Existing top of bank
Existing riparian extents
Existing top of bank
3
:
1
8
:1
3
:
1
3
:
1
8
:1
3
:
1
~5.87m (Varies)
~13.87m (Varies)
100YR TWL + 0.5m
Freeboard (Approx)
100YR TWL (Approx)
2YR TWL (Approx)
Varies to existing within
outer Riparian Zone (typ)
Riparian Zone
Channel CF05
Typical Section
1:200(H) 1:100(V)
~0.8m
(V
aries)
~1.3m
(V
aries)
Refer Water Cycle Report
for detailed calculations
Varies 1% min
10m 10mMain Channel
Creek channel shown as
centralised. How ever creek
can meander within overall
riparian zone to promote a
more 'Natural' appearance.
P3 28.11.14 ADS GL -Issued for Draft ILP (Not Issued)
P4 16.01.15 AMP GL CJAIssued for Exhibition
P5 27.01.15 AMP GL CJAIssued for Exhibition
P6 19.03.15 MMc GL CJAIssued for Exhibition
Proposed Riparian Extents
Extent of Cut
Extent of Fill
Proposed Channel
Existing Riparian Extents
Existing Top of Bank
Piped culvert crossing (refer drawing 0212)
100yr Top of Water Level and Freeboard
Proposed Pit and pipe network
TFW
P:\Parramatta\Projects\33xxxx\334311\06 CAD\6_4 Working drawings\Civil\Autocad\1_IS_Riverstone East\Drawings\Water
Cycle\MMD-334311-C-DR-RE-XX-0250.dwg May 11, 2016 - 6:01PM sin55925
Riverstone East Precinct
Water Cycle Management Plan
Proposed Channel Plan
Channel CF05
JT .
ADS .
GC .
GL .
GL .
CJA .
As Shown PRE
MMD-334311-C-DR-RE-XX-0253
P7
Level 10, 383 Kent Street
Sydney, NSW 2000
Australia
PO Box Q1678
QVB Sydney NSW 1230
+61 (0)2 9098 6800
-
www.mottmac.com
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
Post Exhibition Amendments
P7 11.05.16 ADS GL CJAIssued for Post Exhibition Amendments
-
41.34
E 43.74
0.2
41.80
E 44.08
1
.
2
42.30
E 44.54
0
.
5
44.50 E 46.46
1.5
49.10
E 51.02
1.7
1.7
51.10
E 52.80
11.3
Key to symbols
DescriptionDrawnDateRev
RevStatus
Drawing Number
Scale at A1
Eng check
Approved
Coordination
Dwg check
Drawn
Designed
Title
Notes
Client
Reference drawings
0 20 4010
@
20 60
Scale 1:1000PLAN A1
Key Plan
NTS
CA14
Channel CA14
1:1000
Channel CA14 (Continuation)
1:1000
F o r C
o n t i n u a t i o n R
e f e r B
e l o w
F o r C
o n t i n u a t i o n R
e f e r A
b o v e
Earthworks Volume - Channel CA14
-
CA
14
Existing riparian extents
Proposed riparian extents
Existing top of bank
Proposed top of bank
Existing riparian extents
Proposed riparian extents
Existing top of bank
Proposed top of bank
Batter 1
3
3
:
1
8
:1
3
:
1
3
:
1
8
:1
3
:
1
~9.42m (Varies)
~17.42m (Varies)
Riparian Zone
100YR TWL (Approx)
2YR TWL (Approx)
Varies to existing within
outer Riparian Zone (typ)
~1.2m
(V
aries)
~1.7m
(V
aries)
100YR TWL + 0.5m
Freeboard (Approx)
Channel CA14
Typical Section
1:200(H) 1:100(V)
Refer Water Cycle Report
for detailed calculations
Varies 1% min
10m 10mMain Channel
Creek channel shown as
centralised. How ever creek
can meander within overall
riparian zone to promote a
more 'Natural' appearance.
P3 28.11.14 ADS GL -Issued for Draft ILP (Not Issued)
P4 16.01.15 AMP GL CJAIssued for Exhibition
P5 27.01.15 AMP GL CJAIssued for Exhibition
P6 19.03.15 MMc GL CJAIssued for Exhibition
Proposed Riparian Extents
Extent of Cut
Extent of Fill
Proposed Channel
Existing Riparian Extents
Existing Top of Bank
Piped culvert crossing (refer drawing 0212)
100yr Top of Water Level and Freeboard
Proposed Pit and pipe network
TFW
P:\Parramatta\Projects\33xxxx\334311\06 CAD\6_4 Working drawings\Civil\Autocad\1_IS_Riverstone East\Drawings\Water
Cycle\MMD-334311-C-DR-RE-XX-0250.dwg May 11, 2016 - 6:01PM sin55925
Riverstone East Precinct
Water Cycle Management Plan
Proposed Channel Plan
Channel CA14
JT .
ADS .
GC .
GL .
GL .
CJA .
As Shown PRE
MMD-334311-C-DR-RE-XX-0255
P7
Level 10, 383 Kent Street
Sydney, NSW 2000
Australia
PO Box Q1678
QVB Sydney NSW 1230
+61 (0)2 9098 6800
-
www.mottmac.com
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
Post Exhibition Amendments
P7 11.05.16 ADS GL CJAIssued for Post Exhibition Amendments
-
P30.60
E 31.71
P31.30
E 31.61
5
.0
0
.2
2
.
7
P31.46
E 32.11
1.3
3.0
P34.24
E 34.86
P35.14
E 35.50
P34.85
E 35.33
Key to symbols
DescriptionDrawnDateRev
RevStatus
Drawing Number
Scale at A1
Eng check
Approved
Coordination
Dwg check
Drawn
Designed
Title
Notes
Client
Reference drawings
0 20 4010
@
20 60
Scale 1:1000PLAN A1
Key Plan
NTS
CA03
Channel CA03
1:1000
Earthworks Volume - Channel CA03
-
CA03
Channel CA03
3
:
1
0%
2
:
1
0% 0%
3
:
1
~8m (Varies)
100YR TWL (Approx)
2YR TWL (Approx)
Varies to existing within
outer Riparian Zone (typ)
~0.6m
(V
aries)
~1.2m
(V
aries)
Channel CA03
Typical Section
1:200(H) 1:100(V)
Refer Water Cycle Report
for detailed calculations
~15.87m (Varies)
P3 28.11.14 ADS GL -Issued for Draft ILP (Not Issued)
P4 16.01.15 AMP GL CJAIssued for Exhibition
P5 27.01.15 AMP GL CJAIssued for Exhibition
P6 19.03.15 MMc GL CJAIssued for Exhibition
Proposed Riparian Extents
Extent of Cut
Extent of Fill
Proposed Channel
Existing Riparian Extents
Existing Top of Bank
Piped culvert crossing (refer drawing 0212)
100yr Top of Water Level and Freeboard
Proposed Pit and pipe network
TFW
P:\Parramatta\Projects\33xxxx\334311\06 CAD\6_4 Working drawings\Civil\Autocad\1_IS_Riverstone East\Drawings\Water
Cycle\MMD-334311-C-DR-RE-XX-0250.dwg May 11, 2016 - 6:01PM sin55925
Riverstone East Precinct
Water Cycle Management Plan
Proposed Channel Plan
Channel CA03
JT .
ADS .
GC .
GL .
GL .
CJA .
As Shown PRE
MMD-334311-C-DR-RE-XX-0256
P7
Level 10, 383 Kent Street
Sydney, NSW 2000
Australia
PO Box Q1678
QVB Sydney NSW 1230
+61 (0)2 9098 6800
-
www.mottmac.com
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
Post Exhibition Amendments
P7 11.05.16 ADS GL CJAIssued for Post Exhibition Amendments
-
2
0
.0
2
0
.
0
2
0
.0
30.0
3
0
.
0
3
0
.
0
3
0
.0
3
0
.
0
3
0
.
0
3
0
.0
3
0
.
0
3
0
.
0
3
0
.
0
3
0
.0
3
0
.
0
3
0
.
0
4
0
.
0
4
0
.
0
40.0
4
0
.
0
4
0
.
0
4
0
.
0
4
0
.
0
4
0
.
0
4
0
.0
4
0
.
0
4
0
.
0
40
.0
4
0
.
0
4
0
.
0
4
0
.
0
4
0
.
0
4
0
.
0
4
0
.
0
4
0
.
0
5
0
.
0
5
0
.
0
5
0
.
0
5
0
.
0
5
0
.
0
5
0
.
0
5
0
.
0
5
0
.
0
5
0
.0
5
0
.
0
5
0
.
0
5
0
.0
5
0
.0
5
0
.
0
5
0
.0
5
0
.
0
5
0
.
0
50.0
6
0
.
0
6
0
.0
6
0
.
0
6
0
.
0
6
0
.
0
6
0
.
0
6
0
.0
6
0
.
0
6
0
.0
6
0
.0
7
0
.
0
7
0
.
0
2
5
.0
2
5
.
0
2
5
.
0
2
5
.
0
2
5
.0
2
5
.
0
2
5
.
0
2
5
.
0
3
5
.
0
3
5
.
0
35.0
3
5
.
0
35.0
3
5
.
0
3
5
.0
3
5
.0
3
5
.
0
3
5
.
0
3
5
.
0
3
5
.
0
3
5
.
0
3
5
.0
3
5
.
0
3
5
.
0
3
5
.0
35.0
3
5
.
0
3
5
.
0
45.0
4
5
.
0
4
5
.
0
4
5
.
0
45.0
4
5
.
0
45.0
4
5
.
0
4
5
.0
45.0
4
5
.
0
4
5
.
0
4
5
.
0
4
5
.
0
45.0
4
5
.
0
4
5
.
0
5
5
.
0
5
5
.
0
5
5
.
0
5
5
.
0
5
5
.
0
5
5
.
0
5
5
.
0
5
5
.0
55.0
55.0
6
5
.
0
6
5
.0
6
5
.
0
6
5
.
0
65.0
6
5
.0
6
5
.
0
5
5
.
0
6
0
.
0
4
0
.
0
40.0
4
0
.
0
5
0
.
0
5
0
.
0
50.0
4
5
.
0
4
5
.
0
4
5
.
0
5
5
.
0
5
5
.0
5
5
.
0
4
5
.
0
6
5
.0
25.0
30
.0
3
5
.
0
3
0
.
0
3
5
.
0
40.0
4
0
.
0
4
5
.
0
3
5
.0
25.0
2
0
.
0
30.0
S
ch
o
fie
ld
s
R
oad
G
u
n
t
a
w
o
n
g
R
o
a
d
G
a
r
f
i
e
l
d
R
o
a
d
E
a
s
t
C
l
a
r
k
e
S
t
r
e
e
t
W
i
n
d
s
o
r
R
o
a
d
Windsor
R
o
a
d
T
a
l
l
a
w
o
n
g
R
o
a
d
C
u
d
g
e
g
o
n
g
R
o
a
d
W
o
r
c
e
s
t
e
r
R
o
a
d
R
i
v
e
r
s
t
o
n
e
R
o
a
d
C
r
a
n
b
o
u
r
n
e
S
t
r
e
e
t
B
o
u
n
d
a
r
y
R
o
a
d
Riverstone East
Precinct
C
r
e
e
k
P
o
n
d
s
F
i
r
s
t
B
a
u
l
k
h
a
m
H
i
l
l
s
L
G
A
B
l
a
c
k
t
o
w
n
L
G
A
First
P
o
n
d
s
C
r
e
e
k
T
r
i
b
u
t
a
r
y
Killarney
C
h
a
i
n
o
f
P
o
n
d
s
Trubutary
Key to symbols
DescriptionDrawnDateRev
RevStatus
Drawing Number
Scale at A1
Eng check
Approved
Coordination
Dwg check
Drawn
Designed
Title
Notes
Client
Reference drawings
@
0 100100 20050 300
Scale 1:10000PLAN A1
Riverstone East precinct boundary
Existing road
Flood Response Extents
Point of Refuge
Evacuation Route
P2 26.11.14 DW GL -Issued for Draft ILP
P3 16.01.15 AMP GL CJAIssued for Exhibition
P4 27.01.15 AMP GL CJAIssued for Exhibition
Proposed Stage 1 boundary
Proposed Stage 2 boundary
P5 19.03.15 MMc GL CJAIssued for Exhibition
TFW
P:\Parramatta\Projects\33xxxx\334311\06 CAD\6_4 Working drawings\Civil\Autocad\1_IS_Riverstone East\Drawings\Water
Cycle\MMD-334311-C-DR-RE-XX-0260.dwg May 12, 2016 - 12:06PM sin55925
Riverstone East Precinct
Water Cycle Management Plan
Flood Response Plan
JT .
ADS .
GC .
GL .
GL .
CJA .
1:10000 PRE
MMD-334311-C-DR-RE-XX-0260
P6
Level 10, 383 Kent Street
Sydney, NSW 2000
Australia
PO Box Q1678
QVB Sydney NSW 1230
+61 (0)2 9098 6800
-
www.mottmac.com
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
Post Exhibition Amendments
P6 11.05.16 ADS GL CJAIssued for Post Exhibition Amendments
-
Key to symbols
DescriptionDrawnDateRev
RevStatus
Drawing Number
Scale at A1
Eng check
Approved
Coordination
Dwg check
Drawn
Designed
Title
Notes
Client
Reference drawings
0 20 4010
@
20 60
Scale 1:1000PLAN A1
Key Plan
NTS
Proposed Riparian Extents
Existing Riparian Corridor to be Relocated
New Relocated Riparian Corridor
Existing Riparian Extents
Existing Top of Bank
Riparian Offset Area 2
1:1000
Riparian Offset Area 1
1:1000
Offset area 2
Offset area 1
Existing top of bank
Existing riparian extents
Proposed riparian extents
Existing riparian extents
Existing top of bank
Proposed riparian extents
Riparian corridor
Riparian corridor
0 100502510
@Scale 1:1500PLAN A1
TFW
P:\Parramatta\Projects\33xxxx\334311\06 CAD\6_4 Working drawings\Civil\Autocad\1_IS_Riverstone East\Drawings\Water
Cycle\MMD-334311-C-DR-RE-XX-0270.dwg May 11, 2016 - 6:02PM sin55925
Riverstone East Precinct
Water Cycle Management Plan
Proposed Riparian Corridor
Offset Plan
JT .
ADS .
GC .
GL .
GL .
CJA .
As Shown PRE
MMD-334311-C-DR-RE-XX-0270
P1
Level 10, 383 Kent Street
Sydney, NSW 2000
Australia
PO Box Q1678
QVB Sydney NSW 1230
+61 (0)2 9098 6800
-
www.mottmac.com
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
Post Exhibition Amendments
P1 11.05.16 ADS GL CJAIssued for Post Exhibition Amendments
Validated Watercourse