    1/14

    Fraunhofer ISE

    CSP Technology

    Value Chain and Cost Analysis for MainComponents and Systems

    Gabriel Morin

    Fraunhofer Institute for Solar EnergySystems ISE, Freiburg, Germany

    CSP manufacturing in MENA

    WorkshopCairo, September 30, 2010

  • 7/31/2019 3 Value Chain Morin

    2/14

    Fraunhofer ISE

    Content

    Technology Overview

    CSP Value Chain

    CSP Cost

    Highlighting of MENA Manufacturing Potential

    Summary

  • 7/31/2019 3 Value Chain Morin

    3/14

    Fraunhofer ISE

    CSP Technologies

    Left: Parabolic Trough collector: 64 MWelpower plant Nevada Solar One; dimensions:collector aperture width 5 m (Morin, 2010)

    Linear Fresnel Collector: 1.4 MWel plant PE1 inMurcia, Spain; dimensions: receiver height abovemirror field: 7 m (Novatec, 2010)

    Solar Tower plant PS10, 11 MWel inSeville, Spain (Abgengoa, 2010)

    Dish Stirling prototype plants of 10 kWel eachin Almera, Spain; diameter 8.5m (DLR, 2010)

  • 7/31/2019 3 Value Chain Morin

    4/14

    Fraunhofer ISE

    CSP Market Shares and Development

    Parabolic Trough today over 90% market share, today

    Other CSP Technologies gaining market shares 20 GW installed CSP capacity by 2020 is feasible

    BUT: Reliable financial and political framework needed !

  • 7/31/2019 3 Value Chain Morin

    5/14

    Fraunhofer ISE

    Working Principle of Parabolic Trough Power Plant(Andasol Example)

  • 7/31/2019 3 Value Chain Morin

    6/14

    Fraunhofer ISE

    Components of Parabolic Trough Power Plants

  • 7/31/2019 3 Value Chain Morin

    7/14

    Fraunhofer ISE

    Collector: Metal Support (Examples)

    Sample Collectors Flagsol Skal-ET 150

    (e.g. Andasol I-III)

    Solargenix SGX-2

    (e.g. Nevada Solar One)

    Structure Torque box design-galvanized steel

    Recycled aluminum orsteel struts and geo hubs

    kg/m peraperture area

    ~ 18.5 kg/m steel ~ 11-12 kg/m aluminum

    Material quality 85% S235JRG214% S355JRG21% X5CrNi 19-10

    6061 T6 aluminum(70-80% recycled content)

    Materials used Equal angles (60%),Plates (10%),Square Tubes (15%),Rods, mills, profiles andfasteners (15%)

    Similar parts

  • 7/31/2019 3 Value Chain Morin

    8/14

    Fraunhofer ISE

    Value Chain in CSP - Overview

  • 7/31/2019 3 Value Chain Morin

    9/14

    Fraunhofer ISE

    Value Chain in CSP Part 1

  • 7/31/2019 3 Value Chain Morin

    10/14

    Fraunhofer ISE

    Value Chain in CSP Part 2

  • 7/31/2019 3 Value Chain Morin

    11/14

    Fraunhofer ISE

    Value Chain in CSP Part 3

  • 7/31/2019 3 Value Chain Morin

    12/14

    Fraunhofer ISE

    Cost Structure of 50 MW PTC plant with 7.5 h storage

  • 7/31/2019 3 Value Chain Morin

    13/14

    Fraunhofer ISE

    Complexity versus Investment-Intensity

  • 7/31/2019 3 Value Chain Morin

    14/14

    Fraunhofer ISE

    Conclusion CSP Components Production in MENA

    Near-term: Low-Investment and Low-Complexity Activities in MENA:

    Collector Assembly

    Collector Installations

    Civil: Groundworks, Collector Foundations, Buildings, Infrastructure

    MENA manufactoring of approximately 17% of plant invest(+ optional EPC, Proj. Management)

    If sustainable MENA-CSP-Markets are given:

    More investment-intensive and more complex CSP-Activities in MENA:

    Mirror Production

    Receiver Production

    Other specialized components and processes

    Local Value Creation: up to 80% of plant invest