    LECTURE NO.3

    RESPONSIBILITIES OF PARTICIPANTS

    Building Construction Technology I

    International Burch university

    Architecture department

    Sarajevo

    Course : Building Construction Technology I

    Date : xx / xx / xxxx

    Professor : Prof.dr.Nerman Rustempasic

    Assistant : M.Sc. Ahmed El Sayed

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    2/26

    INTRODUCTION

    Today we will define the responsibilities of Construction

    participants.

    Participants in the Construction process are:

    investor

    Contractor

    Engineer of construction site

    Chief engineer of construction site

    Designer (Architect or Civil Engineer )

    The supervisory authority

    Reviser

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    3/26

    THE INVESTOR - DEFINITION

    Investor is a legal or physical person in whose

    name is built (the building structures).

    Design, control and validation projects, construction and

    technical supervision over building investor must entrust

    parties eligible to perform these activities prescribed by The

    Law.

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    4/26

    THE INVESTOR RESPONSIBILITIES

    Design, control, validation of projects, construction and technical

    supervision over Construction must entrusted to persons

    registered for performing these activities.

    Appointing a chief designer (when there are two or moredesigners).

    for Revising projects to authorized an reviser, if necessary.

    Obtain evidence of the right to construct at a particular property

    Obtain decision on constructing conditions / location / building

    permit

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    5/26

    THE INVESTOR RESPONSIBILITIES

    Appointing a contractor responsible to harmonization of

    work when participating in the construction two or more

    contractors.

    Before the start of construction to obtain an act authorizing

    the construction and report the start construction (the survey

    project + (un) approved major project); report the start of

    building to constructing body and a building inspection not

    later than 8 days before the start / continuation of work aftera break longer than three months.

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    6/26

    THE INVESTOR RESPONSIBILITIES

    Provide technical supervision over of construction orreconstruction.

    Appoint a chief supervisor (if there is more than adequate

    supervisory engineers waist for individual papers).

    investor who is also the contractor must entrust technicalsupervision over construction to another person who isregistered for technical supervision.

    Person that is investor for residential or residential-commercialbuilding whose construction (brutto) area does not exceed 400m2 , for its own purposes can design it by himself and performconstruction supervision, if has the appropriate professional

    qualifications.

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    7/26

    THE INVESTOR RESPONSIBILITIES

    Must allow timely review of the work, on the demand of thedesigner.

    If the realization/execution project has not made by the engineerof the main project, the investor is required before the start of

    construction or performance of specific components to providerealization project or its parts to obtain opinions on therealization Project and its compliance with the main project.

    Also is required to enable The Reviser timely control of works.

    To obtain Survey project of the building until the start ofconstruction works.

    To ensure building, the neighboring buildings and areas in thecase of interruption of works

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    8/26

    THE INVESTOR RESPONSIBILITIES

    Obtain technical amendment documentation (or new), if thechanges in structure affect the technical properties essential tobuilding.

    Obtain usage permit for the building, which is issued aftersuccessful completion of technical inspection on the building bythe construction body.

    Permanently preserve relevant documents and projects for the

    construction of with the amendments marked and changes aslong as the building exists

    Must act in accordance with the decisions of inspectionduring construction

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    9/26

    THE INVESTOR ACTIVITIES DURING THE

    PREPARATION WORKS

    Securing sources for investment

    Definition and assignment of research works

    Assignment of making investment studies

    Rating investment study and make a final investment decision

    Obtain building land

    Defining the project task for the preparation of projectdocumentation

    Assignment of project documentation

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    10/26

    THE INVESTOR ACTIVITIES DURING

    CONSTUCTION WORKS

    Assignment of construction, installation and finishing works

    Supply (taking over) and installation of plant, equipment anddevices

    Organize monitoring and directing the realization of investmentproject

    The execution of contractual obligations undertaken towards

    contractors

    The final calculation of the Construction Contract

    Obtaining the use permit

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    11/26

    THE INVESTOR ACTIVITIES DURING THE USAGE

    OF THE BUILDING

    The building can only be used in a manner compliant to its

    purpose

    The organization of the test operation (testing functioning of

    the building, plant, equipment and devices)

    Development of current and investment maintenance of the

    building

    Investment maintenance of the building

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    12/26

    THE CONTRACTOR - DEFINITONS

    The contractoris a person who builds or performing works

    on buildings.

    Building or performing individual works in the building can

    do a person registered for performing this activity.

    Contractor shall appoint site engineer or manager of

    works as a responsible person who leads all or some of the

    works on construction.

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    13/26

    THE CONTRACTOR RESPONSIBILITIES

    Must build in accordance with the act which authorized theconstruction

    Build with quality in accordance with the main and detailed design on theway to meet the essential requirements for building

    Must draw up a written declaration of executed works and the buildingmaintenance conditions

    Apply the material, equipment and products with the proven quality

    (with document from the manufacturer or a certificate of productconformity)

    Provide evidence of the quality of construction, embedded productsand equipment (under the provisions of the laws and requirements of the

    main project)

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    14/26

    THE CONTRACTOR RESPONSIBILITIES

    Properly dispose the construction waste generated during the works on

    the site

    investor shall appoint main contractor responsible for the harmonization

    of work if you participate in the construction a several contractors

    Contractor shall appoint the site engineer (graduated engineer with 5

    years of work experience and passed the professional exam), site

    engineer (graduated engineer with five years experience or an engineer

    with 5 years experience, all with professional exam), or site manager(High School Diploma with 5 years experience working with professional

    exam), which lead the construction

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    15/26

    THE CONTRACTOR RESPONSIBILITIES

    Make a study of safety at work and organize the construction site

    Enclose the site and prevent uncontrolled access for the unemployed

    Mark the construction site with prescribed markings and trafficsigns

    For temporary occupation of public traffic area he must obtain prior

    approval of the competent authorities and enterprises

    For temporary occupation of the neighboring ground he must obtain a

    prior approval from the owner, according to special laws

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    16/26

    THE CONTRACTOR RESPONSIBILITIES

    Temporary facilities to be constructed in accordance with the

    regulations on protection measures against fire and explosion, health

    and safety and all other measures to protect human health and the

    environment

    Remove all temporary structures before obtaining the use permit

    Make plan of common temporary and temporary work sites

    Inform the labor inspection authorities about the start of works (8days before the start of works), i.e.: type of the intended works, staff and

    schedule, and responsible persons

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    17/26

    THE ENGINEER OF CONSTUCTION SITE

    Site engineer and work manager are responsible for theimplementation of obligations under the Act.

    If participate in the construction two or more contractors, the investordetermines the contractor responsible for the harmonization of work and

    who appoints the site engineer.

    The main contractor must perform at least half the work necessary forconstruction and the building.

    The main site engineer is responsible for the completeness andharmonization of works, for the harmonization of the implementation ofobligations under the Act, and also coordinates the implementation ofregulations which regulate safety and health of workers duringconstruction works.

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    18/26

    THE CHIEF ENGINEER OF CONSTUCTION SITE

    ... can be both engineer of the site and one of the contractors or

    manager of work for a particular type of work.

    The main site engineer, site engineer and head of work may be persons

    who are eligible for performing these tasks under a special law.

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    19/26

    THE DESIGNER

    ... a natural person who under a special law has the right to use

    professional title licensed architect or engineer.

    The designer is responsible to design a projects that fulfill the prescribed

    conditions, in particular, to design a project to comply with the building

    location permit, to meets the essential requirements for the

    building and to comply with the provisions of this Law and specialregulations.

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    20/26

    THE DESIGNER - RESPONSIBILITIES

    The designer is responsible that the projects are to meet the

    requirements made by the Law on spatial Planning and Building Act and

    special laws and regulations

    If participate in the design of a several designers, investor appoints the

    designer who is responsible for the completeness and interconnection

    compliance of projects.

    The right to perform the design under the Law on spatial Planning and

    Construction has just the person with the professional titlelicensedarchitect orlicensed engineer.

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    21/26

    THE DESIGNER - RESPONSIBILITIES

    The designer can not be an employee of the person who is the

    contractor on the same construction

    The designer has to Correspond to that the preliminary/Conceptual and

    main, and all other projects are made according to the requirements of

    building regulations, respecting:

    Essential requirements for the building

    Regional planning solutions for construction work

    The conditions of special regulations that affect the design solutions

    Technical requirements (technical regulations and standards)

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    22/26

    THE SUPERVISOR AUTHORITY

    investor is obliged to provide professional construction supervision

    according to the Law

    If the investor does not have authorized engineers for the supervision,

    he must contract with supervision organization that has a licensed

    engineer.

    This organization will appoint a supervisor (s)

    supervising engineer is an individual who under a special law has the

    right to use professional title of licensed architect or licensed

    Engineer and implement on behalf of the investor

    an expert supervision of construction if it meets the requirements

    of construction who under a special law and regulations adopted

    pursuant to that Act.

    The supervising engineer can not be an employee of person who is the

    contractor on the same building.

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    23/26

    THE SUPERVISOR AUTHORITY - RESPONSIBILITIES

    In carrying out supervision of construction works supervising

    engineer shall:

    Supervise the construction to be in accordance with the decision on

    building conditions, confirmed main project, and building permit, the

    Act and special regulations,

    Determine whether the survey of the building done by the person

    authorized to conduct tasks of state survey and Real Property

    Cadastre under a special law,

    Determine whether the contractor meets the requirements for

    performing construction activities that are regulated by special law,

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    24/26

    THE SUPERVISOR AUTHORITY - RESPONSIBILITIES

    Define the implementation of control procedures in respect of

    conformity assessment and quality evidence of certain parts thebuilding by an authorized person who is not involved in the

    implementation process of issuing the documents and evidence to all

    parts of the building and performed for the works that are in progress

    in certain cases when such an obligation,

    Without delay to supply investors with all information about the

    defects and irregularities before the construction phase, while

    investors and building inspections and other inspections about the

    measures undertaken,

    Make a final report on the performance of the building.

  • 7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02

    25/26

    THE REVISER

    Reviser is a natural person authorized to control the project.

    Reviser is responsible for the project or part of the project for

    which he spent his control and gave a positive report thatmeets the requirements of the Law, special laws and

    regulations made under the law, technical specifications and

    rules of profession regarding controlled properties.