LECTURE NO.3
RESPONSIBILITIES OF PARTICIPANTS
Building Construction Technology I
International Burch university
Architecture department
Sarajevo
Course : Building Construction Technology I
Date : xx / xx / xxxx
Professor : Prof.dr.Nerman Rustempasic
Assistant : M.Sc. Ahmed El Sayed
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
2/26
INTRODUCTION
Today we will define the responsibilities of Construction
participants.
Participants in the Construction process are:
investor
Contractor
Engineer of construction site
Chief engineer of construction site
Designer (Architect or Civil Engineer )
The supervisory authority
Reviser
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
3/26
THE INVESTOR - DEFINITION
Investor is a legal or physical person in whose
name is built (the building structures).
Design, control and validation projects, construction and
technical supervision over building investor must entrust
parties eligible to perform these activities prescribed by The
Law.
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
4/26
THE INVESTOR RESPONSIBILITIES
Design, control, validation of projects, construction and technical
supervision over Construction must entrusted to persons
registered for performing these activities.
Appointing a chief designer (when there are two or moredesigners).
for Revising projects to authorized an reviser, if necessary.
Obtain evidence of the right to construct at a particular property
Obtain decision on constructing conditions / location / building
permit
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
5/26
THE INVESTOR RESPONSIBILITIES
Appointing a contractor responsible to harmonization of
work when participating in the construction two or more
contractors.
Before the start of construction to obtain an act authorizing
the construction and report the start construction (the survey
project + (un) approved major project); report the start of
building to constructing body and a building inspection not
later than 8 days before the start / continuation of work aftera break longer than three months.
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
6/26
THE INVESTOR RESPONSIBILITIES
Provide technical supervision over of construction orreconstruction.
Appoint a chief supervisor (if there is more than adequate
supervisory engineers waist for individual papers).
investor who is also the contractor must entrust technicalsupervision over construction to another person who isregistered for technical supervision.
Person that is investor for residential or residential-commercialbuilding whose construction (brutto) area does not exceed 400m2 , for its own purposes can design it by himself and performconstruction supervision, if has the appropriate professional
qualifications.
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
7/26
THE INVESTOR RESPONSIBILITIES
Must allow timely review of the work, on the demand of thedesigner.
If the realization/execution project has not made by the engineerof the main project, the investor is required before the start of
construction or performance of specific components to providerealization project or its parts to obtain opinions on therealization Project and its compliance with the main project.
Also is required to enable The Reviser timely control of works.
To obtain Survey project of the building until the start ofconstruction works.
To ensure building, the neighboring buildings and areas in thecase of interruption of works
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
8/26
THE INVESTOR RESPONSIBILITIES
Obtain technical amendment documentation (or new), if thechanges in structure affect the technical properties essential tobuilding.
Obtain usage permit for the building, which is issued aftersuccessful completion of technical inspection on the building bythe construction body.
Permanently preserve relevant documents and projects for the
construction of with the amendments marked and changes aslong as the building exists
Must act in accordance with the decisions of inspectionduring construction
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
9/26
THE INVESTOR ACTIVITIES DURING THE
PREPARATION WORKS
Securing sources for investment
Definition and assignment of research works
Assignment of making investment studies
Rating investment study and make a final investment decision
Obtain building land
Defining the project task for the preparation of projectdocumentation
Assignment of project documentation
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
10/26
THE INVESTOR ACTIVITIES DURING
CONSTUCTION WORKS
Assignment of construction, installation and finishing works
Supply (taking over) and installation of plant, equipment anddevices
Organize monitoring and directing the realization of investmentproject
The execution of contractual obligations undertaken towards
contractors
The final calculation of the Construction Contract
Obtaining the use permit
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
11/26
THE INVESTOR ACTIVITIES DURING THE USAGE
OF THE BUILDING
The building can only be used in a manner compliant to its
purpose
The organization of the test operation (testing functioning of
the building, plant, equipment and devices)
Development of current and investment maintenance of the
building
Investment maintenance of the building
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
12/26
THE CONTRACTOR - DEFINITONS
The contractoris a person who builds or performing works
on buildings.
Building or performing individual works in the building can
do a person registered for performing this activity.
Contractor shall appoint site engineer or manager of
works as a responsible person who leads all or some of the
works on construction.
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
13/26
THE CONTRACTOR RESPONSIBILITIES
Must build in accordance with the act which authorized theconstruction
Build with quality in accordance with the main and detailed design on theway to meet the essential requirements for building
Must draw up a written declaration of executed works and the buildingmaintenance conditions
Apply the material, equipment and products with the proven quality
(with document from the manufacturer or a certificate of productconformity)
Provide evidence of the quality of construction, embedded productsand equipment (under the provisions of the laws and requirements of the
main project)
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
14/26
THE CONTRACTOR RESPONSIBILITIES
Properly dispose the construction waste generated during the works on
the site
investor shall appoint main contractor responsible for the harmonization
of work if you participate in the construction a several contractors
Contractor shall appoint the site engineer (graduated engineer with 5
years of work experience and passed the professional exam), site
engineer (graduated engineer with five years experience or an engineer
with 5 years experience, all with professional exam), or site manager(High School Diploma with 5 years experience working with professional
exam), which lead the construction
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
15/26
THE CONTRACTOR RESPONSIBILITIES
Make a study of safety at work and organize the construction site
Enclose the site and prevent uncontrolled access for the unemployed
Mark the construction site with prescribed markings and trafficsigns
For temporary occupation of public traffic area he must obtain prior
approval of the competent authorities and enterprises
For temporary occupation of the neighboring ground he must obtain a
prior approval from the owner, according to special laws
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
16/26
THE CONTRACTOR RESPONSIBILITIES
Temporary facilities to be constructed in accordance with the
regulations on protection measures against fire and explosion, health
and safety and all other measures to protect human health and the
environment
Remove all temporary structures before obtaining the use permit
Make plan of common temporary and temporary work sites
Inform the labor inspection authorities about the start of works (8days before the start of works), i.e.: type of the intended works, staff and
schedule, and responsible persons
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
17/26
THE ENGINEER OF CONSTUCTION SITE
Site engineer and work manager are responsible for theimplementation of obligations under the Act.
If participate in the construction two or more contractors, the investordetermines the contractor responsible for the harmonization of work and
who appoints the site engineer.
The main contractor must perform at least half the work necessary forconstruction and the building.
The main site engineer is responsible for the completeness andharmonization of works, for the harmonization of the implementation ofobligations under the Act, and also coordinates the implementation ofregulations which regulate safety and health of workers duringconstruction works.
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
18/26
THE CHIEF ENGINEER OF CONSTUCTION SITE
... can be both engineer of the site and one of the contractors or
manager of work for a particular type of work.
The main site engineer, site engineer and head of work may be persons
who are eligible for performing these tasks under a special law.
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
19/26
THE DESIGNER
... a natural person who under a special law has the right to use
professional title licensed architect or engineer.
The designer is responsible to design a projects that fulfill the prescribed
conditions, in particular, to design a project to comply with the building
location permit, to meets the essential requirements for the
building and to comply with the provisions of this Law and specialregulations.
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
20/26
THE DESIGNER - RESPONSIBILITIES
The designer is responsible that the projects are to meet the
requirements made by the Law on spatial Planning and Building Act and
special laws and regulations
If participate in the design of a several designers, investor appoints the
designer who is responsible for the completeness and interconnection
compliance of projects.
The right to perform the design under the Law on spatial Planning and
Construction has just the person with the professional titlelicensedarchitect orlicensed engineer.
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
21/26
THE DESIGNER - RESPONSIBILITIES
The designer can not be an employee of the person who is the
contractor on the same construction
The designer has to Correspond to that the preliminary/Conceptual and
main, and all other projects are made according to the requirements of
building regulations, respecting:
Essential requirements for the building
Regional planning solutions for construction work
The conditions of special regulations that affect the design solutions
Technical requirements (technical regulations and standards)
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
22/26
THE SUPERVISOR AUTHORITY
investor is obliged to provide professional construction supervision
according to the Law
If the investor does not have authorized engineers for the supervision,
he must contract with supervision organization that has a licensed
engineer.
This organization will appoint a supervisor (s)
supervising engineer is an individual who under a special law has the
right to use professional title of licensed architect or licensed
Engineer and implement on behalf of the investor
an expert supervision of construction if it meets the requirements
of construction who under a special law and regulations adopted
pursuant to that Act.
The supervising engineer can not be an employee of person who is the
contractor on the same building.
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
23/26
THE SUPERVISOR AUTHORITY - RESPONSIBILITIES
In carrying out supervision of construction works supervising
engineer shall:
Supervise the construction to be in accordance with the decision on
building conditions, confirmed main project, and building permit, the
Act and special regulations,
Determine whether the survey of the building done by the person
authorized to conduct tasks of state survey and Real Property
Cadastre under a special law,
Determine whether the contractor meets the requirements for
performing construction activities that are regulated by special law,
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
24/26
THE SUPERVISOR AUTHORITY - RESPONSIBILITIES
Define the implementation of control procedures in respect of
conformity assessment and quality evidence of certain parts thebuilding by an authorized person who is not involved in the
implementation process of issuing the documents and evidence to all
parts of the building and performed for the works that are in progress
in certain cases when such an obligation,
Without delay to supply investors with all information about the
defects and irregularities before the construction phase, while
investors and building inspections and other inspections about the
measures undertaken,
Make a final report on the performance of the building.
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
25/26
THE REVISER
Reviser is a natural person authorized to control the project.
Reviser is responsible for the project or part of the project for
which he spent his control and gave a positive report thatmeets the requirements of the Law, special laws and
regulations made under the law, technical specifications and
rules of profession regarding controlled properties.
-
7/28/2019 3-responsibilitiesofparticipants-120405124236-phpapp02
26/26
THANK YOU