3 PHASE TSHWANE PREPAID METER … 3 Phase Prepaid...Documents Required for Sub Meter Application:...

3
3 PHASE TSHWANE PREPAID METER APPLICATION FORM APPLICANT DETAILS Name: ______________________________________________________________________ ID No: _____________________________ Cell: ____________________________ W: ____________________________ H: ________________________ Email: _______________________________________________ Fax: ________________________ Postal Address: _______________________________________________________________________________ ________________________________________________________________ Code: _______________________ Complete as accurately as possible SUBURB/ FARM ERF / STAND PORTION / PLOT STREET ADDRESS POLE NO Use of supply: (mark with an “X”) MAIN RESIDENTIAL DWELLING 2 ND DWELLING COMPLEX / FLAT BUSINESS INDUSTRIAL OTHER (Specify) Name of Complex / Business / Industry (where applicable) ___________________________________________ Type of Application: (mark with an “X”) NEW CONNECTION INCREASE IN SUPPLY REPOSITION POINT OF SUPPLY TEMPORATY BUILDERS SUPPLY DOWNGRADE OF EXISTING SUPPLY OTHER (Specify) Existing Connection Info: Existing Municipal Acc No: _________________________ Single Phase _ _ Three Phase _ _ ________Amps (circuit breaker) OR for HT connection _______KVA New / Upgrade / Downgrade Connection Info: Date when supply is required? ________ / ______ / ________ Conventional _ _ Pre-paid _ _ Single Phase _ _ Three Phase _ _ ________Amps (circuit breaker) OR for HT connection _______KVA Authority of Applicant: (mark with an “X”) OWNER TENANT CONTRACTOR CONSULTANT OTHER Signature of Applicant: _______________________ Date: ________ / ______ / ________ DOCUMENTS TO ACCOMPANY THIS APPLICATION: Latest Tshwane Account (paid in full / proof of arrangement made on outstanding amount) Letter of approval for Prepaid Electric to act on your behalf. (Please complete attached form) Copy of ID document

Transcript of 3 PHASE TSHWANE PREPAID METER … 3 Phase Prepaid...Documents Required for Sub Meter Application:...

Page 1: 3 PHASE TSHWANE PREPAID METER … 3 Phase Prepaid...Documents Required for Sub Meter Application: Owner Application + Tenant Info Forms (completed & signed) Copy of ID document Proof

3 PHASE TSHWANE PREPAID METER APPLICATION FORM

APPLICANT DETAILS

Name: ______________________________________________________________________ ID No: _____________________________

Cell: ____________________________ W: ____________________________ H: ________________________ Email: _______________________________________________ Fax: ________________________ Postal Address: _______________________________________________________________________________ ________________________________________________________________ Code: _______________________ Complete as accurately as possible

SUBURB/ FARM

ERF / STAND PORTION / PLOT

STREET ADDRESS

POLE NO

Use of supply: (mark with an “X”)

MAIN RESIDENTIAL DWELLING

2ND DWELLING

COMPLEX / FLAT

BUSINESS INDUSTRIAL OTHER (Specify)

Name of Complex / Business / Industry (where applicable) ___________________________________________ Type of Application: (mark with an “X”)

NEW CONNECTION

INCREASE IN SUPPLY

REPOSITION POINT OF SUPPLY

TEMPORATY BUILDERS SUPPLY

DOWNGRADE OF EXISTING SUPPLY

OTHER (Specify)

Existing Connection Info: Existing Municipal Acc No: _________________________ Single Phase _ _ Three Phase _ _ ________Amps (circuit breaker) OR for HT connection _______KVA New / Upgrade / Downgrade Connection Info: Date when supply is required? ________ / ______ / ________

Conventional _ _ Pre-paid _ _

Single Phase _ _ Three Phase _ _ ________Amps (circuit breaker) OR for HT connection _______KVA Authority of Applicant: (mark with an “X”)

OWNER TENANT CONTRACTOR CONSULTANT OTHER

Signature of Applicant: _______________________ Date: ________ / ______ / ________

DOCUMENTS TO ACCOMPANY THIS APPLICATION:

• Latest Tshwane Account (paid in full / proof of arrangement made on outstanding amount) • Letter of approval for Prepaid Electric to act on your behalf. (Please complete attached form) • Copy of ID document

Page 2: 3 PHASE TSHWANE PREPAID METER … 3 Phase Prepaid...Documents Required for Sub Meter Application: Owner Application + Tenant Info Forms (completed & signed) Copy of ID document Proof

AUTHORISATION LETTER

I, _____________________________ ID No. _______________________ hereby give Prepaid Electric or any of their representatives permission to act on my behalf at City of Tshwane. Name: __________________________ Signature: _______________________ Date: _____/_____/_______

Page 3: 3 PHASE TSHWANE PREPAID METER … 3 Phase Prepaid...Documents Required for Sub Meter Application: Owner Application + Tenant Info Forms (completed & signed) Copy of ID document Proof

Important Information to know when Purchasing Prepaid Meters

When purchasing prepaid meters from Prepaid Electric, make sure your payment is done with the right reference number!

Reference to use: Please use the Customer Acc No on your Invoice

(Please insure that you are invoiced with every purchase – if you are not sure about the reference number, please phone the office).

Please send all proof of payments to: 086 531 2979 or [email protected]

BANK DETAILS OF PREPAID ELECTRIC:

Account Holder: W. Dennison Bank Name: FNB Branch Name: Jacaranda Account Number: 6219 319 0247 Branch Code: (270 553) Reference: Customer Acc No on Invoice

Prices: Pretoria Area – no extra fees included. Johannesburg Area – Additional fee to be calculated p/km & added to meter price. Prepaid Sub Meter (for additional buildings) @ R1800 ea (Single Phase installed) @ R1350 ea (Single/p no installation) @ R3500 ea (3Phase installed) Waiting period for installation = 1-5 days after payment Documents Required for Sub Meter Application: Owner Application + Tenant Info Forms (completed & signed) Copy of ID document Proof of Payment

Municipal Prepaid Meters (for main dwelling of owners) @ R2196 ea (Single Phase installed) @ R5246 ea (3Phase installed) Waiting period for installation = 2-6 weeks after payment Documents Required for Municipal Application: Municipal Application Form (completed & signed) Copy of ID document Latest Account (paid up to date / proof of arrangement) Letter of Approval for Prepaid Electric to act on your behalf Proof of Payment

Other services of Prepaid Electric:

OPEN/CLOSE of Tshwane Accounts: New Acc-Deposit needed (Electricity) @ R540 New Acc-Deposit needed (Water) @ R260 Admin Fees (if Prepaid Electric acts on behalf) @ R250 Downgrades / Upgrades @ R800

Any queries, please contact the office on Tel: 087 150 7902 / 012-333 0177. After Hour Electricity Emergencies: (SMS ONLY) 082 852 7427