3 - Factors - Bridge at Km 3-8 of Kolanalli RS Vallipuram Road Kuranganpallam Odai

download 3 - Factors - Bridge at Km 3-8 of Kolanalli RS Vallipuram Road Kuranganpallam Odai

of 11

Transcript of 3 - Factors - Bridge at Km 3-8 of Kolanalli RS Vallipuram Road Kuranganpallam Odai

  • 7/30/2019 3 - Factors - Bridge at Km 3-8 of Kolanalli RS Vallipuram Road Kuranganpallam Odai

    1/11

    1

    FACTORS

    NAME OF WORK: Construction of Bridge at Km 3/8 of Kolanalli RS Vallipuram road across Kuranganpallam Odai

    Sl.No.

    Description of items Quantity in MT Estimate rateper MT

    Amount Total Project cost Factor

    1 Cement 522.94 MT 4,900.00/MT 25,62,406.00 1,05,30,146.99 2562406/10530146.99 = 0.24

    2 Steel 22.50 MT 39,600.00/MT 8,91,000.00 1,05,30,146.99 891000/10530146.99 = 0.08

    3 Bitumen 7,75,584.64 1,05,30,146.99 775584.64/10530146.99 = 0.07

    4 Materials 25,87,757.92 1,05,30,146.99 2587757.92/10530146.99 = 0.25

    5 Labour 32,78,202.51 1,05,30,146.99 3278202.51/10530146.99 = 0.31

    6 POL 0.05

    Total 1.00

  • 7/30/2019 3 - Factors - Bridge at Km 3-8 of Kolanalli RS Vallipuram Road Kuranganpallam Odai

    2/11

    2

    Adequacy of Cement, Bitumen and Emulsion

    Sl.No

    Description of WorkProbableQuantity

    Adquacy ofCement,Bitumen

    and Emulsion

    1 Vibrated Cement Concrete of grade M10 (Nominal mix) 1:3:6 using 40mm ISS HBG metal forleveling course under footings below sill level 25.50

    Cubicmetre

    194.40kgs/cum

    4.96MT

    2 Vibrated Cement Concrete of grade M15 (Nominal mix 1:2:4) using 40mm ISS HBG metal forfootings of Abutment and wings below sill level 345.00

    Cubicmetre

    291.60kgs/cum

    100.60MT

    3 Vibrated Cement Concrete of grade M15 (Nominal mix 1:2:4) using 40mm ISS HBG metal for fillingthe trenches not occupied by the structure in Abutment and wings below sill level 83.00

    Cubicmetre

    291.60

    kgs/cum

    24.20MT

    4 Vibrated Cement Concrete of grade M15 (Nominal mix 1:2:4) using 40mm ISS HBG metal for substructure of Abutment and wings above sill level 359.00

    Cubicmetre

    291.60kgs/cum

    104.68MT

    5 Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using ISS HBG graded metal for

    footings of Abutment, Piers and Return walls Below sill level dirt wall cum bed block over abutmentand bed block over piers11.00

    Cubic

    metre

    432.00

    kgs/cum

    4.75

    MT

    6 Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using ISS HBG graded metal forDeck slab 243.00

    Cubicmetre

    432.00kgs/cum

    104.98MT

    7 Vibrated reinforced cement concrete M15 (Nominal mix) using crusher ISS, HBG graded metal of40mm for BASE COURSE BELOW APPROACH SLAB and footpath ramp. 8.00

    Cubicmetre

    291.60kgs/cum

    2.33MT

    8 Vibrated reinforced cement concrete M30 (Design mix) using ISS HBG graded metal for approachslab 19.00

    Cubicmetre

    540.00kgs/cum

    10.26MT

    9 Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using IRC HBG graded metal forWearing coat of 75mm uniform thickness over Deck slab and approach slab 335.00

    Squaremetre

    0.0408kgs/sqm

    0.01MT

    10 Vibrated Reinforced Cement Concrete of grade M40 (Design mix) using ISS HBG graded metal forCrash barriers over deck slab 76.00 Runningmetre143.10

    kgs/cum 10.88MT11 Vibrated cement concrete M15 (Nominal mix) using crusher ISS, HBG graded metal of 40mm for

    PCC Parapet over wings 8.00Cubicmetre

    291.60

    kgs/cum

    2.33MT

    12 Vibrated cement concrete M15 (Nominal mix) using 40mm size HBG ISS metal for footings of

    Retaining wall 68.50Cubicmetre

    291.60kgs/cum

    19.97MT

    13 Vibrated cement concrete M15 (Nominal mix) using 40mm size HBG ISS metal for stem of Retaining

    wall 399.60Cubicmetre

    291.60kgs/cum

    116.52MT

    14 Vibrated cement concrete M10 (Nominal mix) using 40mm size HBG ISS metal for culvert &Retaining wall 13.50

    Cubicmetre

    194.40

    kgs/cum

    2.62MT

    15 Vibrated cement concrete M15 (Nominal mix) using 40mm size HBG ISS metal for Culvert &Retaining wall Body wall 47.50

    Cubicmetre

    291.60kgs/cum

    13.85MT

  • 7/30/2019 3 - Factors - Bridge at Km 3-8 of Kolanalli RS Vallipuram Road Kuranganpallam Odai

    3/11

    3

    Sl. Description of Work Probable Adquacy of

    522.94MT

    1 Supply and fabrication of Steel Grade S.240 required for all RCC items of works22.50 Tonne

    22.50MT

    22.50MT

    1 Providing and laying of prime coat using slow setting emulsion bitumen at the rate of 6 kg per 10sqmover the WMM surface 2,161.00

    Squaremetre

    0.60kgs/sqm

    1.30MT

    2 Providing and laying of tack coat using emulsion bitumen at the rate of 2.5kg per 10sqm over theWMM primed surface 2,161.00

    Squaremetre

    0.25kgs/sqm

    0.54MT

    1.84MT

    1 Bituminous macadam of 50mm thickness 108.10 Cubicmetre 76.00kgs/cum 8.22MT2 Providing and laying 25 mm thick compacted Semi dense bituminous concrete

    2,161.00Squaremetre

    3.00kgs/sqm

    6.48MT

    14.70MT

    Adequacy of ISS Metal & Sand

    Sl.No

    Description ofWork

    ProbableQuantity

    Adquacy of ISS MetalSand 0.45cum/cum

    of concreteRequirement per Cum of

    ConcreteTotal requirement

    40mm 20mm 12mm 40mm 20mm 12mm

    1 Vibrated Cement

    Concrete of grade

    M10 (Nominal mix)

    1:3:6 using 40mm

    ISS HBG metal for

    leveling course under

    footings below sill

    level

    25.50Cubicmetre

    0.90Cum

    22.95 Cum 11.48 Cum

  • 7/30/2019 3 - Factors - Bridge at Km 3-8 of Kolanalli RS Vallipuram Road Kuranganpallam Odai

    4/11

    4

    Sl.No

    Description ofWork

    ProbableQuantity

    Adquacy of ISS Metal

    Sand 0.45cum/cumof concrete

    Requirement per Cum ofConcrete

    Total requirement

    40mm 20mm 12mm 40mm 20mm 12mm

    2 Vibrated Cement

    Concrete of grade

    M15 (Nominal mix

    1:2:4) using 40mm

    ISS HBG metal for

    footings of Abutment

    and wings below sill

    level

    345.00Cubicmetre

    0.90Cum

    310.50Cum

    155.25 Cum

    3 Vibrated Cement

    Concrete of grade

    M15 (Nominal mix

    1:2:4) using 40mm

    ISS HBG metal for

    filling the trenches

    not occupied by the

    structure in

    Abutment and wings

    below sill level

    83.00Cubicmetre

    0.90Cum

    74.70 Cum 37.35 Cum

    4 Vibrated Cement

    Concrete of grade

    M15 (Nominal mix

    1:2:4) using 40mm

    ISS HBG metal for

    sub structure of

    Abutment and wings

    above sill level

    359.00Cubicmetre

    0.90Cum

    323.10Cum

    161.55 Cum

    5 Vibrated Reinforced

    Cement Concrete of

    grade M25 (Design

    mix) using ISS HBG

    graded metal for

    footings of

    Abutment, Piers and

    Return walls Below

    sill level dirt wall

    cum bed block over

    abutment and bedblock over piers

    11.00Cubicmetre

    0.63Cum

    0.27Cum

    6.93 Cum2.97Cum

    4.95 Cum

  • 7/30/2019 3 - Factors - Bridge at Km 3-8 of Kolanalli RS Vallipuram Road Kuranganpallam Odai

    5/11

    5

    Sl.No

    Description ofWork

    ProbableQuantity

    Adquacy of ISS Metal

    Sand 0.45cum/cumof concrete

    Requirement per Cum ofConcrete

    Total requirement

    40mm 20mm 12mm 40mm 20mm 12mm

    6 Vibrated Reinforced

    Cement Concrete of

    grade M25 (Design

    mix) using ISS HBG

    graded metal for

    Deck slab

    243.00Cubicmetre

    0.63Cum

    0.27Cum

    153.09Cum

    65.61Cum

    109.35 Cum

    7 Vibrated reinforced

    cement concrete

    M15 (Nominal mix)

    using crusher ISS,

    HBG graded metal

    of 40mm for BASE

    COURSE BELOW

    APPROACH SLAB

    and footpath ramp.

    8.00Cubicmetre

    0.90Cum

    7.20 Cum 3.60 Cum

    8 Vibrated reinforced

    cement concrete

    M30 (Design mix)

    using ISS HBG

    graded metal for

    approach slab

    19.00Cubicmetre

    0.63Cum

    0.27Cum

    11.97Cum

    5.13Cum

    8.55 Cum

    9 Vibrated Reinforced

    Cement Concrete of

    grade M30 (Design

    mix) using IRC HBG

    graded metal for

    Wearing coat of75mm uniform

    thickness over Deck

    slab and approach

    slab

    335.00

    Squaremetre

    10 Vibrated Reinforced

    Cement Concrete of

    grade M40 (Design

    mix) using ISS HBG

    graded metal for

    Crash barriers over

    deck slab

    76.00Runningmetre

    0.16Cum

    0.07Cum

    11.83Cum

    5.07Cum

    34.20 Cum

  • 7/30/2019 3 - Factors - Bridge at Km 3-8 of Kolanalli RS Vallipuram Road Kuranganpallam Odai

    6/11

    6

    Sl.No

    Description ofWork

    ProbableQuantity

    Adquacy of ISS Metal

    Sand 0.45cum/cumof concrete

    Requirement per Cum ofConcrete

    Total requirement

    40mm 20mm 12mm 40mm 20mm 12mm

    11 Vibrated cement

    concrete M15

    (Nominal mix) using

    crusher ISS, HBG

    graded metal of

    40mm for PCC

    Parapet over wings

    8.00Cubicmetre

    0.90Cum

    7.20 Cum 3.60 Cum

    12 Vibrated cement

    concrete M15

    (Nominal mix) using

    40mm size HBG ISS

    metal for footings of

    Retaining wall

    68.50Cubicmetre

    0.90Cum

    61.65 Cum 30.83 Cum

    13 Vibrated cementconcrete M15

    (Nominal mix) using

    40mm size HBG ISS

    metal for stem of

    Retaining wall

    399.60Cubicmetre

    0.90Cum

    359.64Cum

    179.82 Cum

    14 Vibrated cement

    concrete M10

    (Nominal mix) using

    40mm size HBG ISS

    metal for culvert &

    Retaining wall

    13.50Cubicmetre

    0.90Cum

    12.15 Cum 1.61 Cum

    15 Vibrated cement

    concrete M15(Nominal mix) using

    40mm size HBG ISS

    metal for Culvert &

    Retaining wall Body

    wall

    47.50Cubicmetre

    0.90Cum

    42.75 Cum 21.38 Cum

    1221.84Cum

    183.82Cum

    78.78Cum

    763.52 Cum

  • 7/30/2019 3 - Factors - Bridge at Km 3-8 of Kolanalli RS Vallipuram Road Kuranganpallam Odai

    7/11

    7

    Bitumen

    Sl.No. Description of items Quantity in MT Estimate rate per MT Amount

    3a Rapid setting Emulsion 1.84 MT 47,450.32/MT 87,308.59

    3b Bitumen 60/70 Grade 14.70 MT 46,821.50/MT 6,88,276.05

    Total 7,75,584.64

    MATERIALS

    Sl.No. Description of items Quantity in MT Estimate rate per MT Amount

    1 40mm ISS metal 1221.84 Cum 616.00/Cum 7,52,653.44

    2 20mm ISS metal 183.82 Cum 858.00/Cum 1,57,717.56

    3 12mm ISS metal 78.78 Cum 792.00/Cum 62,393.76

    4 Sand 763.52 Cum 110.00/Cum 83,987.20

    5 Filter media behind abutments and wings 63.00 Cum 552.00/Cum 34,776.00

    6 Filling behind the abutments and wings 102.00 Cum 115.45/Cum 11,775.90

    7 Binding wire 2.25 MT 400.00/MT 900.00

    8 Providing and fixing 100mm dia PVC SEEPAGE PIPES 78 Nos. 120.00 9,360.00

    9 Providing and fixing Kraft Paper 31.00 Sqm 50.00 1,550.00

    10

    Providing and fixing PVC expansion joint

    5 Nos. 3000.00 15,000.0011

    Providing and fixing of GI DRAINAGE SPOUTS OF 100mmdia

    16.00 Nos. 1200.00 19,200.00

    12Providing and erecting direction and place identificationretroreflectorised sign

    3.84 Sqm 7240.00 27,801.60

    13Supply and fixing of RCC guide posts of size1.20x0.20x0.20m with reflective star stickers

    40.00 Nos. 942.00 37,680.00

    14 Supply and fixing of Delineators 8.00 Nos. 1661.00 13,288.00

    15Providing and fixing of rectro reflectorised cautionarymandatory and informatory sign

    4.00 Nos. 2221.00 8,884.00

    16 Providing and fixing Road stud 100x100mm 60.00 Nos. 332.00 19,920.00

    17 Providing and fixing seepage pipes of 100mm dia PVC pipes 80.00 /RM 120.00 9,600.00

  • 7/30/2019 3 - Factors - Bridge at Km 3-8 of Kolanalli RS Vallipuram Road Kuranganpallam Odai

    8/11

    8

    Sl.No. Description of items Quantity in MT Estimate rate per MT Amount

    18 Supply of NP 3 class RCC hume pipes of 100mm dia 12.50 /RM 2600.00 32,500.00

    19Providing and laying GSB using grading I materials as perMoRTH sand, gravel and any other granular materials forapproach road

    432.10 Cum 781.97 3,37,890.91

    20 Providing and laying Wet Mix Macadam Base Course forapproach road

    540.20 Cum 799.04 4,31,641.41

    21 Bituminous macadam of 50 mm thickness 108.10 Cum 1028.06 1,11,133.29

    22Providing and laying 25 mm thick compacted Semi densebituminous concrete

    2161.00 Sqm 188.85 4,08,104.85

    Total 25,87,757.92

    LABOUR

    Sl.No. Description

    As per sanctioned Estismate

    Quantity Rate Amount

    1 Dismantling the existing RCC in the existing slab culvert165.00

    Cubicmetre

    2083.00 343695.00

    2 Dismantling the existing PCC in the existing slab culvert143.00

    Cubicmetre

    137.00 19591.00

    3 Earth work excavation in all classes of soil except hard rock requiring blasting fordressing the bed up to sill level 576.00

    Cubicmetre

    34.75 20016.00

    4 Earth work excavation in Kankar/soft disintegrated rock not requiring blasting forFOUNDATION OF ABUTMENTS, PIERS AND WINGS 76.00

    Cubicmetre

    130.30 9902.80

    5 Earth work excavation in soft rock and dense medium rock not requiring blasting for

    FOUNDATION OF ABUTMENTS, PIERS AND WINGS

    294.00Cubic

    metre

    96.40 28341.60

    6 Earth work excavation in hard rock requiring blasting for FOUNDATION OF ABUTMENTS,PIERS AND WINGS 113.50

    Cubicmetre

    96.40 10941.40

    7 Vibrated Cement Concrete of grade M10 (Nominal mix) 1:3:6 using 40mm ISS HBG metalfor leveling course under footings below sill level 25.50

    Cubicmetre

    526.43 13423.97

    8 Vibrated Cement Concrete of grade M15 (Nominal mix 1:2:4) using 40mm ISS HBG metalfor footings of Abutment and wings below sill level 345.00

    Cubicmetre

    526.43 181618.35

    9 Vibrated Cement Concrete of grade M15 (Nominal mix 1:2:4) using 40mm ISS HBG metalfor filling the trenches not occupied by the structure in Abutment and wings below silllevel

    83.00Cubicmetre

    726.43 60293.69

    10 Vibrated Cement Concrete of grade M15 (Nominal mix 1:2:4) using 40mm ISS HBG metal

    for sub structure of Abutment and wings above sill level 359.00

    Cubic

    metre 1026.43 368488.37

  • 7/30/2019 3 - Factors - Bridge at Km 3-8 of Kolanalli RS Vallipuram Road Kuranganpallam Odai

    9/11

    9

    Sl.No. DescriptionAs per sanctioned Estismate

    Quantity Rate Amount

    11 Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using ISS HBG gradedmetal for footings of Abutment, Piers and Return walls Below sill level dirt wall cum bedblock over abutment and bed block over piers

    11.00Cubicmetre

    1717.00 18887.00

    12 Providing and fixing 100mm dia PVC SEEPAGE PIPES of required length for abutment,wing and return wall 78.00 Numbers 0.00 0.00

    13 Providing and fixing Kraft Paper for full width of deck slab31.00

    Squaremetre

    0.00 0.00

    14 Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using ISS HBG gradedmetal for Deck slab 243.00

    Cubicmetre

    1517.00 368631.00

    15 Providing filter media behind the abutments and wings with clean III graded materials53mm to 600mm thick 63.00

    Cubicmetre

    30.05 1893.15

    16 FILLING BEHIND THE ABUTMENTS AND WINGS with clean good gritty gravel FORFILLING BEHIND THE ABUTMENT AND WINGS. 102.00

    Cubicmetre

    10.00 1020.00

    17Providing and fixing PVC expansion joint

    5.00 Set 0.0018 Supply and fabrication of Steel Grade S.240 required for all RCC items of works 22.50 Tonne 0.00

    19 Vibrated reinforced cement concrete M15 (Nominal mix) using crusher ISS, HBG gradedmetal of 40mm for BASE COURSE BELOW APPROACH SLAB and footpath ramp. 8.00

    Cubicmetre

    676.43 5411.44

    20 Vibrated reinforced cement concrete M30 (Design mix) using ISS HBG graded metal forapproach slab 19.00

    Cubicmetre

    1117.00 21223.00

    21 Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using IRC HBG gradedmetal for Wearing coat of 75mm uniform thickness over Deck slab and approach slab 335.00

    Squaremetre

    71.81 24056.69

    22 Vibrated Reinforced Cement Concrete of grade M40 (Design mix) using ISS HBG graded

    metal for Crash barriers over deck slab 76.00

    Running

    metre 247.78 18830.9023 Vibrated cement concrete M15 (Nominal mix) using crusher ISS, HBG graded metal of

    40mm for PCC Parapet over wings 8.00Cubicmetre

    676.43 5411.44

    24 Providing and fixing of GI DRAINAGE SPOUTS OF 100mm dia as per G.O. 1 Drawing No.SD/205 with grating arrangements at top as shown in the drawing using 12mm x 12mmflats for grating arrangements and 100mm dia drainage spouts projecting at least 300mmbeyond the bottom of deck slab

    16.00 Numbers 0.00

    25 Providing and erecting direction and place identification retroreflectorised sign as perIRC: 67-2010 made of High intensity Grade sheeting vide clause 801.3 3.84

    Squaremetre

    0.00

    26 Supply and fixing of RCC guide posts of size 1.20x0.20x0.20m with reflective star stickers40.00 Numbers 0.00

    27 Supply and fixing of Delineators 8.00 Numbers 0.00

  • 7/30/2019 3 - Factors - Bridge at Km 3-8 of Kolanalli RS Vallipuram Road Kuranganpallam Odai

    10/11

    10

    Sl.No. DescriptionAs per sanctioned Estismate

    Quantity Rate Amount

    28 Providing and fixing of rectro reflectorised cautionary mandatory and informatory sign asper IRC 67 -60cm equilateral triangle 4.00 Numbers 0.00

    29 Providing and fixing Road stud 100x100mm 60.00 Numbers 0.00

    30a Excavation including removal and satisfactory disposal of all materials for FORMATIONOF APPROACH ROAD - 97% COMPACTION 5415.00

    Cubicmetre

    60.33 326686.95

    30b Excavation including removal and satisfactory disposal of all materials for FORMATIONOF APPROACH ROAD - 100% COMPACTION 2565.00

    Cubicmetre

    61.73 158337.45

    31 Providing and laying GSB using grading I materials as per MoRTH sand, gravel and anyother granular materials for approach road 432.10

    Cubicmetre

    114.57 49507.52

    32 Providing and laying Wet Mix Macadam Base Course for approach road540.20

    Cubicmetre

    317.77 171659.35

    33 Providing and laying of prime coat using slow setting emulsion bitumen at the rate of 6 kgper 10sqm over the WMM surface 2161.00

    Squaremetre

    111.60 241167.60

    34 Providing and laying of tack coat using emulsion bitumen at the rate of 2.5kg per 10sqmover the WMM primed surface 2161.00 Squaremetre 25.38 54846.18

    35 Bituminous macadam of 50mm thickness108.10 Cubic metre 1058.48 114421.69

    36 Providing and laying 25 mm thick compacted Semi dense bituminous concrete2161.00

    Squaremetre

    54.26 117255.86

    37 Earth work excavation in hard rock requiring blasting for cutting rock portion for formingapproach road 180.00

    Cubicmetre

    246.00 44280.00

    38 Earth work excavation in all classes of soils except hard rock requiring blasting and hardrock requiring blasting for foundation of Retaining walls 456.00

    Cubicmetre

    97.40 44414.40

    39 Earth work excavation in Kankar/soft disintegrated rock not requiring blasting for

    FOUNDATION OF Retaining walls114.00

    Cubic

    metre130.30

    14854.2040 Vibrated cement concrete M15 (Nominal mix) using 40mm size HBG ISS metal for

    footings of Retaining wall 68.50Cubicmetre

    526.43 36060.46

    41 Vibrated cement concrete M15 (Nominal mix) using 40mm size HBG ISS metal for stem ofRetaining wall 399.60

    Cubicmetre

    826.43 330241.43

    42 Providing and fixing seepage pipes of 100mm dia PVC pipes to drain the backfill in theretaining wall 80.00 Numbers 0.00

    43 Earth work excavation in Kankar/soft disintegrated rock not requiring blasting forFOUNDATION OF culvert & Retaining walls 45.00

    Cubicmetre

    130.30 5863.50

    44 Vibrated cement concrete M10 (Nominal mix) using 40mm size HBG ISS metal for culvert& Retaining wall 13.50

    Cubicmetre

    526.43 7106.81

    45 Vibrated cement concrete M15 (Nominal mix) using 40mm size HBG ISS metal for Culvert& Retaining wall Body wall 47.50

    Cubicmetre

    826.43 39255.43

  • 7/30/2019 3 - Factors - Bridge at Km 3-8 of Kolanalli RS Vallipuram Road Kuranganpallam Odai

    11/11

    11

    Sl.No. DescriptionAs per sanctioned Estismate

    Quantity Rate Amount

    46 Supply of NP 3 class RCC hume pipes of 100mm dia12.50

    Runningmetre

    0.00

    47 Hoisting and fixing of 1000mm dia NP3 pipes

    12.50

    Running

    metre 45.35 566.88Total 3278202.51