3 Energy-CWRD by R. Stroem 15Feb2013
-
Upload
butch-d-de-la-cruz -
Category
Documents
-
view
218 -
download
0
Transcript of 3 Energy-CWRD by R. Stroem 15Feb2013
-
7/29/2019 3 Energy-CWRD by R. Stroem 15Feb2013
1/13
Business Opportunity FairCentral and West Asia - Energy
Rune Stroem
Director, CWEN
Email: [email protected]
Manila
20-21 March 2013
-
7/29/2019 3 Energy-CWRD by R. Stroem 15Feb2013
2/13
Central and West Asia Dept CWRD
President
VP-KM
ERD
OIST
OREI
RSDD
VP-O1
CWRD
SARD
VP-O2
EARD
PARD
SERD
VP-PC
OCO
PSOD
VP-FR
CTL
ORM
TD
VP-AC
BPMSD
OAS
OGC
OSFMD
SEC
MDG
ADB
-
7/29/2019 3 Energy-CWRD by R. Stroem 15Feb2013
3/13
Director General
K. Gerhaeusser
EnergyUrban
Developmentand Water
Transport andCommunications
Environment,Natural
Resources andAgriculture
PublicManagement,
FinancialSector, and
Trade
RegionalCooperation
and OperationsCoordination
Deputy DirectorGeneral
H. Wang
Resident Missions
Portfolio,Results,
Safeguards andSocial Sector
Unit
CWRD
Energy Division - CWEN
-
7/29/2019 3 Energy-CWRD by R. Stroem 15Feb2013
4/13
Energy DivisionCWEN: Who are we?
Director
R. Stroem
PrincipalEnergy
Specialist
F.Kawawaki
Project Analysts:
A. Deguito, D. Garcia, L. Malazo, M. Favis, M. Soriano, A. Aguilar
Assistants:
L. Roces, R. Benavidez, F. Golez, C. Peralta, F. Tuliao
PrincipalEnergy
Specialist
J. Liston
SeniorEnergy
SpecialistT. Luo
SeniorEnergy
SpecialistL. Mtched-
lishvili
EnergySpecialist
K.Mitsuhashi
EnergySpecialist
C. Tiangco
EnergySpecialistA. Aleem
YoungProfessional
P. Koh
Head, ProjectAdministration Unit
J. Hwang
EnergySpecialist
B.Chansavat
EnergySpecialist
L. Lu
-
7/29/2019 3 Energy-CWRD by R. Stroem 15Feb2013
5/13
CWRD Countries
Central Asian Republics
Kazakhstan
Kyrgyz Rep.Tajikistan
TurkmenistanUzbekistan
South West Asia
AfghanistanPakistan
SouthCaucuses
ArmeniaAzerbaijanGeorgia
-
7/29/2019 3 Energy-CWRD by R. Stroem 15Feb2013
6/13
CWRD Countries
Central Asian Republics
South West Asia
SouthCaucuses
~100% electrificationfossil fuel/hydro resource rich=export potential
high losses/low energy efficiency
old generation/transmission/distribution assets
low level of electrification
net energy importers
high losses/low energy efficiency
old generation/transmission/distribution assets
-
7/29/2019 3 Energy-CWRD by R. Stroem 15Feb2013
7/13
CWEN Business Lines
Infrastructure Development Power generation/transmission/distribution
Renewable energy (wind/solar/hydro)
Energy efficiency/loss reduction (supply/demand)
Gas well rehabilitation/pipeline Supervisory Control and Data Acquisition (SCADA)
and Energy Management Systems (EMS)
Sector Reform/Modernization
Sector Restructuring
Unbundling and/or bundling Financial Recoveries
Regional Cooperation
Central Asia Regional Economic Cooperation (CAREC)
Regional Power Master Plan
-
7/29/2019 3 Energy-CWRD by R. Stroem 15Feb2013
8/13
Ongoing Loans/Grants and Pipeline
Power EE/
LossRed.
RE Reform/
Modernize
Gas
Gen Trans Dist
Afghanistan 1 4 1 1
Armenia 1
Azerbaijan 1 1Georgia 1
Kazakhstan 1
Kyrgyz Rep. 1 1
Pakistan 1 4 3 2 2Tajikistan 1 2 1
Turkmenistan 1
Uzbekistan 2 1 1 1
Regional AFG-TAJ - 1
-
7/29/2019 3 Energy-CWRD by R. Stroem 15Feb2013
9/13
Ongoing Technical Assistance and Pipeline
Power EE/
LossRed.
RE Reform/
Modernize
Gas
Gen Trans Dist
Afghanistan 1 1
Armenia 1 1
AzerbaijanGeorgia 1
Kazakhstan 2
Kyrgyz Rep. 1 1
PakistanTajikistan
Turkmenistan 2
Uzbekistan 1 1 1 1
RegionalTAPI Phase 3, TKM-AFG, CAREC
-
7/29/2019 3 Energy-CWRD by R. Stroem 15Feb2013
10/13
Ongoing Projects in Figures
Country Loans & Grants TA
$million Projects $million Projects
Afghanistan 630.5 8 1.5 1
Armenia 0.7 1
Azerbaijan 160.0 1
Georgia 48.0 1 1.2 1Kazakhstan 1.0 1
Kyrgyz Rep. 100.0 2 1.0 1
Pakistan 1,554.6 8
Tajikistan 176.7 2Turkmenistan
Uzbekistan 977.5 3 6.6 5
Regional 4.8 3
Total 3,647.3* 24 16.8 13
*Active Portfolio
-
7/29/2019 3 Energy-CWRD by R. Stroem 15Feb2013
11/13
Opportunities
A. Direct with CWEN
Consulting services for project preparatory andadvisory technical assistance
Firms
Individuals
Consulting services for project implementation
Usually firms
Individual consultants, for example, for:
Diagnostic studies
Advisor on reform
Procurement assistance
-
7/29/2019 3 Energy-CWRD by R. Stroem 15Feb2013
12/13
Opportunities
B. Direct with CWEN Countries
Design
Civil works Equipment supply
Installation
Supervision consultant
-
7/29/2019 3 Energy-CWRD by R. Stroem 15Feb2013
13/13
Issues for your consideration
Unique, challenging countries
Experts with regional experience (incl. language)
Keep up with developments in the region
Weak planning, implementing capacity
Project preparation at times start from scratch
Comprehensive support required
Need to be flexible
Diverse needs and dynamic changes
Keep in touch with project officers
Check CSRN