Cook County ;( 2~ )a Department of Planning & Policy 69 W Washing ton Chicago, IL 60602 Date:06/1 8/2017 Tor Cook County, Purchasing 118 N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & Policy 69 W Washington, Floor 30 Chicano, IL 60602 Locatlonr 1901 W. Harrison Street Chicago, IL 60612 Contract //: 1555-14475.MC6 Contractor: Peschen Autumn Joint Venture work order Title: JHS - Meohanicsl Syslems Capital Renewal/Replacement (Replace 14 Pneumatic Steam Valves on Heat Ex If Revised: CI pete; Your Work Order Proposal has been accepted for the above Work as follows.'ork Order Amount,'100,466.49 Licensing Fee for The Gordian Group (6.00/a of Construction) $5,023.32 Total Amount: MWBE Participation: Funding Source(s) Liquidated Damages: $1 05,489.81 $71,500.00 JHS - Mechanical Systems Capital Renewal/Rsplaceme Liquidated Damages will not apply A notice to proceed will be Issued which will establish the Work Order Start date snd the complellon date. The CCOCPP JOC Coordinator = u"~/~ Eric DavIs, Deputy Director Cook County Department of Capital Planning & Policy Approved By ~ FL Zo/ Irle/7 secre!~~A </eart p- t Dlreclor Date Department of Policy ul>~/iy )3 >!! Date Earl Manning, director <..„ Cook County Department of Capital Planning & Policy 1 r Date Shannon E. Andrews, CPO Office of Chief Procuremsnl Oflicer Date Nolke or proposal Aaaepleaae Page 1 of 1 S/16/2017

Transcript of )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602...

Page 1: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Cook County

;( 2~ )a Department of Planning & Policy

69 W Washing ton

Chicago, IL 60602Date:06/1 8/2017

Tor Cook County, Purchasing

118N. Clark Rm, 1018Chicano, illinois 60602

Work Order Number. 048806.00

From: Cook County Department of Capital Planning & Policy

69 W Washington, Floor 30Chicano, IL 60602

Locatlonr 1901 W. Harrison StreetChicago, IL 60612

Contract //: 1555-14475.MC6

Contractor: Peschen Autumn Joint Venture

work order Title: JHS - Meohanicsl Syslems Capital Renewal/Replacement (Replace 14 Pneumatic Steam Valves on Heat Ex

If Revised: CI pete;

Your Work Order Proposal has been accepted for the above Work asfollows.'ork

Order Amount,'100,466.49Licensing Fee for The Gordian Group(6.00/a of Construction) $5,023.32

Total Amount:

MWBE Participation:

Funding Source(s)

Liquidated Damages:

$105,489.81

$71,500.00

JHS - Mechanical Systems Capital Renewal/Rsplaceme

Liquidated Damages will not apply

A notice to proceed will be Issued which will establish the Work Order Start date snd the complellon date.

The CCOCPP JOC Coordinator

= u"~/~Eric DavIs, Deputy Director

Cook County Department of

Capital Planning & Policy

Approved By~FL Zo/ Irle/7

secre!~~A </eart p-t Dlreclor

DateDepartment of

Policy

ul>~/iy

)3 >!!

Date

Earl Manning, director <..„Cook County Department of

Capital Planning & Policy

1 r

DateShannon E. Andrews, CPOOffice of Chief Procuremsnl Oflicer

Date

Nolke or proposal Aaaepleaae Page 1 of 1

S/16/2017

Page 2: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Cook CountyI~, I~ Department of Planning & Policy

69 W Washington

Chicago, IL 60602

Job Order Number: 046806.00

Job Order Name: JHS ~ Mechanical Systems Capital Renewal/Replacement (Replace 14 Pneumatic Steam Valves On

Heat Exchanger System/Replace of 4 Pressure Reducing Valves)

Job Order Location: 1901 W. Harrison Street, Chicago,(L 60612

Approved Proposal'9100,466.49Contractor: Paschsn Autumn Joint Venture

Construction Duration: 9Weeks

Nouce of Proposal Acceptanoe (NOPA)gCook County Board Approve Documentation If Applicable

County Justigcation/Estimate (Provided by PM)

Contractor Evaluation - Project Development

El contractor's Job Order Proposal Package (sss Below)

Detailed Scope of Work with Project Duration (sighed by Coatrsdor)

Drawings (If applicable)

Project Picture(s) Documenting Existing Conditions

g Detailed construction schedule (If Ap pllcebla)

)('pproved Price Proposal Summary & Detail (sighed by Cocvactor)

M/WBE Subcontractor Esgmate, Disclosure of Retained Parties (argued by ccotrsclor)

X Utllizatlon Plan <sighert by Coatractor)

For Each M/W/D/SBE Subcontractor:

Letter of Intent (sic owl by subcoctrsctor)

Current Certification Letter

Identkgication of Sub-contractor/SubConsultaat Form(ISF Farm)gCOUPE Signatory Form 6 Backup

Non Predarlced/Relmbursabls Back Up (If Applicable)

Special Insurance (If Applicable)

Is Project Within Bond Capacity - Y/N

Purchase Order Package Checklist Page 1 ot \

g/2t/2017

Page 3: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

DEPARTMENT OF CAPITAL PLANNING & POUCY

EARL MANNING

DIRECTOR

69 w. wAsHINGTQN, sUITE 3000 ~ cHIcAGQ, ILuNois 60602 ~ (312l603-0331

TONI PRECKWINKLE

PRESIDENT

Cook County Board

of Commlmlonors

RICHARD BOYIGN

1st Distnct

ROBERT STEELE

2nd District

JERRY BUTLER

3rd District

STANLEY MOORE

4th District

DEBORAH SIMS

5th District

EDWARD M. MOODY

6th District

JESUS G. GARCIA

7th Distrid

June 20, 2017

Mr. Earl Manning, Director

Cook County Department of Capital Planning & Policy

69 W. Washington Street, 30'loorChicago, IL 60602

Re: JHS-Mechanical Systems Capital Renewal Project

Replace 14 Pneumatic Steam Valves on Heat Exchangers System & Replace4 Pressure

Reducing Valves/Work Oder NOPA: .048806.00

Dear Mr. Manning:

John H. Stroger, Jr., Hospital, located at 1901 West Harrison Street in Chicago,

illinois. This facility is approximately 18 years old and requires the replacement of

14-pneurnmatic valves and 4 pressure reducing valves on the heat exchanger

located on the 5'6 floor, due to those components being at the end of their life

cycle.

LUIS ARROYO, Ir.

6th District

PETER N. SILVESTRI

9th Distrio

lf you need any furt directly.

BRIDGET GAINER

10th District

JOHN P. DALEY

11th District

JOHN A FRITCHEY

12th Distnct

Sincerely,

Warrick Graham, Sr.

Project Director

lARRY SUFFREDIN

13th District

GREGG GOSUN

14th Distrkt

TIMOTHY O. SCHNHDER

13th District

JEFFREY R TOBO LSRI

16th District

sEAN M. MOAAJSON

17th District

$ Fiscal Responsibility p Innovative Leadership IIll Transparency at Accountability Ql> Improved Services

Page 4: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

DEPARTMENT OF CAPITAL PLANNING AND POUCY

EARL MANNING

DIRECTOR

69 W. WASHINGTON, SUITE 3000 ~ CHICAGO, ILLINOIS 60602 ~ (312)603-0331

TONI PRECKWINKLE

PRESIDENT

Cook County Board

or Commlmlonens

DATE: June 20, 2017

RICHARD R. BOYKIN

1st District

TO: Shannon E. Andrews, Chief Procurement Officer

Office of the Chief Procurement Officer

ROBERT STEELE

2nd District

JERRY BUTI.ER

3rd Dlstrlo

STANLEY MOORE

4th District

DEBORAH SIMS

6th District

FROM: Warrick Graham, Sr., AIA

Project Director/Department of Capital Planning & Policy

SUBJECT: JHS-Mechanical Systems Capital Renew ProjectReplace 14-Pneumatic Steam Valves on Heat Exchanger System/

Replace 4 Pressure Reducing Valves

Work Order Number —048806.00

EDWARD M. MOODY

6th District

JESUS G. GAROA

7th District

LUIS ARROYO, Jr.

Bth District

PETER N.SILVESTRI

9th District

BRIDGET GAINER

10th District

The cost proposal as presented has been reviewed by The Gordian Group (theJOC coordinator) and me. The prices are fixed prices and/or direct purchasedprices under the JOC program; the quantities have been reviewed & verified by theGordian Group for the pre-established pricing; the final collective package for

pricing of One Hundred Thousand, Four Hundred Sixty Six Dollars and Forty Nine

Cents ($100,466.49) is found to be fair and reasonable.

If you have any questions regarding this issue, you may contact me at 312/603-0311 and/or email: warrick.arahamtmcookcountvil.aov.

JOHN P. DALEY

11th District Sin

JOHN A. FRITCHEY

12th District

LARRY SUFFREDIN

13th District

GREGG GOSUN

14th District

TIMOTHY O. SCHNEIDER

13th Dlstrict

Warrici< Graham, Sr., AIA

Project Director

JEFFREY R TOBOLSKI

16th District

SEAN M. MORRISON

17th District

CC: E. Manmne

S. Lloyd

Q, Rembert, TGG

$ Fiscal Responsibility f Innovative Leadership Transparency Et Accovntability FIFA Improved Services

Page 5: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Cook County

KfgKR I I Department of Planning 6 Policy.Jb~ 1 I 69WWashingtonChicago, IL 60602

Job Order Number:

Job Order Name:

Construction Amount:

046606.00

JHS - Mechanical Systems Capital

Renewal/Replacement (Replace 14Pneumatic Steam Valves On HeatExchanger System/Replace of 4 PressureReducing Valves)

$100,466.49

Contractor. Paschen Autumn Joint Venture

Construction Start Data: 09/06/2017

Construction Completion Date: 11/06/2017

Contractor Evaluation - Project Development I

" 'S..<'t» '.,'.'»"'l / . '"'".'."'"~vj I'a "i ""1 m'fled '." M '"o "'.' '" eraktr tpylrra'.'"'8'"" ' vi"',"""a'"»' ',,ar1 Rate lhe contractor's availability to visit lhe Project site with the owner 1 2 Q g Qs Q

Yes or No, did the Contractor submit lhe first Price Proposal on time7 Vss3 Rate the quality of the first Price Proposal 3 5g 6 g4 Rate lhe quality timeliness of subsequent Price Proposals 3 Kl 6 Q6 Enter the number of pdice proposals submitted for this proiecl 3 1 E] El +4 El Q6 Rate the quality/timeliness of the Contractors Final Package s lK s Q7 Rate the Contractor's overall performance during the Project 1 2 3 g 6 Q

Development phasePoore1, Averagee2 to 4, 6 Excellent.

Comments:

Project Director:

Contractor Evaiueiian - Pmiect Development Page 1 o/18/18/201/

Page 6: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

u.i,r

'",o Cook County

Deparlmenl of Planning 8, Policy"',:~',,:TJ.'9W Washington

,~user,, ChiCagO, IL 60602rl'ob Order Contract

Cook County Department of Capital Planning & Policy

Work Order Number: 048806.00

Contractor: Paschen Autumn Joint Venture

Date: 16 June 2017

Work Order Title: JHS - Mechanical Systems Capital Renewal/Replacement (Replace 14 Pneumatic Steam Valves On Hest Ex

Project Scope Status: 0 PrsllmlnsrV Q Revised (j Final

Pogoelng Is the scope of work for the shove Project Number. All requirements necessary to eccomptish the work tasks sst lorlh twlow ches be

considered

part

of

thi scope of work .

Demolish/remove the existing 4 (Four) pressure reducing valves/14 (Fourteen) Pneumatic valves and furnish/install newvalves/accessories. Please be sure to complete the following items: Install 4 New Pressure Reducing Valves, including theirbypasses and gauges (Located on the 5th floor) & Instali 14 New Johnson Controls Reverse Acting/Pneumatic SteamValves, replace them with Direct Acting/Pneumatic Steam Valves (Located on the 5th floor). Malarial Note: Be sure toinclude - Insulation, labeling and supports as necessary - Piping modifications as necessary - Pneumatic line

modifications/replacement ss required - New material snd equipment must comply with all applicable codes. - Clean up andlegally dispose of demolished material and equipment - Integrate all nsw apphcable equipment into existing Building

Automation System (Johnson Controls)

Brief Scope of Work:

Demolish/remove the existing 14 (Fourteen) Pneumatic valves on Heat Exchanger System/4 (Four) pressurereducing valves and furnish/install new valves/accessories.

Specific Submlttsls Required:

Sketches and Drawings:

Material Submittals;

Scheduling Requirements:

Price Proposal Dus Date: 05/24/2017

Estimated Construction Start; 09/06/1 7

Estimated Construction Completion: 11/06/17

Special Conditions

Special instructions:

Comments:

Liquidated Damages will not apply

Dote: Psschen Autumn Joint venture

(tie&D(te

ecfWork

Detailed Scope Of Work Psge1 of 1

S/lafggtr

Page 7: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

1

IIIItII

1

1

I

pF

k)

'ea

lI l4i~

1I fi

),J

11lg:

ll p

Page 8: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

A

I .El 111$'lli18

g

T1

« Jl

,I:f"4

5'-"i!

f,.j'Plge

II IIII'!'c H g

~5k.

Page 9: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

OCW

Page 10: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

O ~g,a

$ 5s2.'~2

O

g,

4

o

0 D.'C

a KFg~F3

fC

IIf f~<l

f5

Page 11: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Job Order ContractAPPROVED - Price Proposal Summary - DSI

Date:

Cont/aet Number.

Job Order Number:

Job Order Title:

Contractor.

Proposal Value:

P/oposal Name:

June 09, 2017

1555-M475-MC6

048806.00

JHS - Mechanical Systems Capital Renewal/Replacement (Replace 14 Pneumatic Steam Valves On Heat

Exchanger Syslem/Replace of4 Pressure Reducing Valves)

Paschen Autumn Joint Venture

8100,466.49JHS - Mechanical Systeno Capital Renewal/Replacement fRsplsce t4 Pneumatic Steam Vahes On Heat Exchanger System/Replace of

01 - Generef Requirementat

02- Existing Conditions:

06 - Metals:

10- Specialties:

22 - Plumbing:

23 - Heating, Ventilating, And Air.conditioning lHVAC):

26 - Electricah

Pro pose I Tote IThis proposal total represents Ihs correct total fcr the proposal. Any discrepancy between gne totals,sub.totals and the proposal total ls due tc rounding of Ihe Sne totals and sub.totals.

811,404.11

8377.92

81,&06.06

8866,60

$18,811.47367,239.14

8271.29

8100,486.49

opoaal: 0.00%

Contractor Project Manager

(I(binDate

Pnce Proposal Summary - CSI Page t of f

6/9/26 t 7

Page 12: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Job Order ContractAPPROVED - Price Proposal Detail - CS(

Date: June 09,2017

Contract Number: 1555-14475-MC6

Job Order Number: 048806.00

Job Order Tltlei JHS - Mechanical Systems Capital RenewayRepfscement (Replace 14 Pneumatic Steam Valves On HealExchanger System/Replace of 4 Pressure Redudng Valves)

Contractori Paschen Autumn Joint Venture

Proposal Valuer $100,466.49proposal Name: JHS —Mechanical Systems capital Renewal/Replacement (Replace 14 Pneumatic Steam Valves On Heat Exchanger SystarrAdjustment Factor(s) Used: 0.8589-Normal Working Hours

Reca 061Number

lg( - General Reguiramenta

1 01 22 20 Dc 0024

UOM Description

HR

Installation

plumbsrFor tasks not inoludsd in the Construction Task Csteloga and ssdirected by owner orllir.

Quantity Unit Price Fsdor

x $8449 x D.aasg8.0D

Line Total

$580 55

Total

$580.55

Catsgory1: Ptumbing

ussr Nota Plumber hours lo account for drain down of plumbing system ss rsqvirsc for instaselion of new raduungvalval.

2 Dl 22 20 OD 0031 HR steam / pipe FittarFor leaks not included in the ccnstructfon Task catalogs sndas rrirsctsd by owner only

Quantity Unit Pdics Fedor

fnstsllstron IBOD x $84.77 D.aaag-User Nate: Steam fltlsr hours account for hol laps of mechanical system es required for inuelfslioa of nsw reducing

valves.

$1,184.94

Total

$1,164.94

Categoryit Nlechanlcal

3 01 22 23 000121

Cstegory11 Mechenlcsf

4 01 22 23 Oc 0880

Category1I Mechanical

5 D1 31 33 OD ODD4

VVK 375 CFM Diesel powered portable Air Compressor

Quantity Unit Price Fador

DAY 1-1/2 Ton CaPacily,a'To10'Bed,x x2FlatBed Truckl/Vllh Full-Time Truck

Driver

Quanbty Unit Pnra Fsdor

Instaaation 100 x S879 34 x 0 8589

Ussr Note; Truck for tlw movemsnt of mechanical materials to and frdlt the hospital.

EA Mhvnum Labor Cost, 3 Person Crew Size

Installation 2.0D x $828.02 x 0.8389

Umr Noun Provide compressor to blow out valves as required for Instsaslioo of nsw pnsvma$ c valves.

$1,078 81

Total

$1,078.81

$383 49

Total

$583.49

$830.83

Instsaation

Quantity

1.00 x

Unit Price Fsdor

$987.32 x o.ssae =Total

$830.83

Categoryt: Plumbing

8 01 31 33 DC 0004

User Nota Mi ~ imvm labor charge for plumbing conbactor to gst pmpsr bsdgno / medical taxiing per hospkslrequirements,

EA Minimum Labor Cost, 3 Person Crew Size $830.83

Instalfskon

Quantity

1.00

Unfi Price Factor

$987.32 x 0.8589

Total

$830.83

Categoryli Mechanics(

User Nota Miminvm labor charge for macha areal contractor to get proper hedging / medical tssllnp par hospital

rsqvirsmanb.

Price Proposal Dstsfl - CSI Page I of 128/9/2017

Page 13: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Price Proposal Detail - CSI Continues..

Job Order Number:

Job Order Title:

Reruf CSI Number

jgt - General Requirements

7 01 31 33 OOODD4

Mod. UOM Description

EA Minimum Labor Cost, 3 Person Crew Size

Line Total

$830.83

Category1I Electrical

8 01 66 19 000003

Quantity Unit Price Factor

Installation 1.00 x $967.32 x 0.8589Ussr Note: Miminum labor charge for eledrlcal conhactor to gel proper hedging I medical testing per hospital

requirements.

CY Moving Materie Vis Elevator, Per CY Of Malerislguentity equals materialvolume If mora Ihan one elevator is used, lhe quantity Is factored by lhenumber of trwisfers.

Quantity Ung Price Ftkricr

InstaOsuon 15 00 x $5.10 x 0 6589

User Nots: Moving of new valves, insulaDon, piping, tools, end equipment Woughout hospital.

Total

$830.83

Total

$65.71

$6571

Categoryt: Mechanical

9 01 68 19 000007

Installation 36.0D $403 x 0.8589

CY Handling Material For Over 125'sr CY Of Matwial Per 125'For delivery,

demolidon or misceDsneous moving r8quired bY owner.

Quantity Unit Price Factor

$124.61

Total

$124.61User Nots: Moiiing of new valves, Insulation, piping, tools, end equipment throughout hospital

1S CY x 250 LF per 125 LF 36 CY

Cetegory1: Mechanical

10 01 66 18 ODDDD7 CY

InstaOation

Handling Mate net For Over 125'er CY Of Material Per 125'For deDveiy,dsmolitcn or miscelhneous moving required by owner.

Quantity Unit Price Factor

15.0D x $403 x 0.8589

Total

$51.92

$51.92

User Nota: provide removal of dsmolison debris from the existing valves, piping, and insulation.15 cY of material handled25D LF 15 CY.

Cetegory1t Mechanical

11 01 88 19 000010 CY Rubbish Handling Via Elevator, Per CY Ol MsterielCluen5ty equals malarialvolume limes bulk factor. If more than one elevator is used, Ihs quantity isfactored by the number of transfers.

Quanbty Unit Price Factor

InstaOetion 15OO x $4.63 x 0.8589 ~

user Note; Provide removal of demolidon debris from the existing valves, plpktg, and insulation

Total

$59.65

$59.65

Calegory1: Mechanical

12 01 74 19 000015

Category1: Demolition

13 01 91 13 000002

EA 20 CY Dumpster (3 Ton) "Construction Debris" Includes delivwy of dumpster,rental cost, pick-up cost hauling, and disposal fee. Non-hazanlous maleriaL

Quantity Unit Price Farrior

InslaOelion 1.0O x $484 40 x 0 8509

ussr Notes Provide dumPster for dsmolison debris born the existing valves, PIPing, and Insulation.

HR Commissioning- Fire Protecdon Sprinkler Systems

$396.87

Total

$398.87

$871.23

Instsostlon

Quanrity

6.Do

Unit Pnce Factor

x $169.06 x 0.8589

Total

$871.23

Cetegory1: Mechanical

User Nots: Commissioning ktdudes shutting down and turning on of Sm protection system and smokes for durauon ofwelding. 3 days of welding x 2 hours per day 8 hours total.

Pnce Proposal Detail - CSI Page 2 of 126/9i2017

Page 14: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Price Proposal Detail - CSlContinues�..

Job Order Number;

Job OrderTkle,'sc¹

CSI Number

)01 - General Requirements

/4 01 91 13 DDOD04

Mod. UOM Description

HR Commissioning - HVAC/Me;hanicel Systems

Line Total

$3,931 84

fnstellslkm

Quantity Unit Pdce Fsclix

24.00 x $19O.74 x 0.8589

Total

$3,931.84

User Nots: Mechenicaf commissioriing to pnroml celibrelion and aran up of 14 new valves.

Category1I Mechanloal8 hou/s psr day x 3 days = 24 hours

Subtotal for 01 - General Requirements:

l02 - Existing Conditions

15 02 89 00 OOOD04

Category1: Mechanical

sF pns!/c shooting For sepsraiion Banier

Quantity Unit Price Fact/a

Installation 1,000.00 x $0.44 x D 8589

Use/koln Provide and install Plestb sheeting for temPora/y barrier. 10 R high x100 LF 1000 SF

$11,404.11

I$377.92

Total

$377.92

Subtotal for 02 - Existing Conditions:

)05 - Metals

EA16 05 05 19 OD D148 I/2" Balt Diameter, Zinc Plated Steel, Muai-Set Dro/»ln Anchor

$377.02

$914 83

Instailalicn

Qusnttty

58.0D

Unit Prlta

$19,02 x

Feucr

0.8589

Total

$914.83

User Nots: provide end install anchors to support hangers

Cstegory1I Mechanical

/T 05 05 19 00 0146

2 boer per hanger x 28 hangers = 56 boils

0168 EA For»50 To 100, Deduct -$87 08

Installation

Quantity

56 00

Unit Price

$-1 81 0.8589

Tots l

$-57 06

Categorytt Mechanical

18 05 05 19 D00185 EA 1/2" Chemical Adhesive For Bolt, Dowel Or Threaded Rod

Qusniily Unit Pros

Installation 5800 x $15.62 x

Deer Nolei provide end install chemical sdhenvs for anchors for hangers.

Factor

0.8589

$751 3D

Total

$751.3D

Category1I Mechanicai

19 05 05 19 000185

Cstegory1: Mechanical

Instsllsbon

QuanUty

56OD x

0168 EA For»5D To 100, Deduor

Unit Price

$-1.52 x

Factor

0.8589

-$73.11

Total

$-73.1 1

Subtotal for 05 - Metals:

lt0 - Specialties

$1,505.56

Price Proposal Detail - CSI Page 3 of 126/9/201T

Page 15: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Price Proposal Detail - CSI Continues..

Job Onler l4umber:

Job Outer Title:

Race CUI Number

(40 - Specialties

Mod. UDM Description Line Total

20 10 44 19 000002

User Note

Category1r Mechanical

EA Drop Type Fire Blanket cabinet (JL Indurkiss 2FB)includes 4 62'x 84, 3-1/2

pound, processed wool Urs blsnksL

Quantity Unit Prlos Farxor

Installation 40D x $249.33 x 0.8589

Provide fire bkrnket for to protect exhhng conditions during welding.

$856 80

Total

$856.60

Subtotal tor 10 - Specialties:

l22 - Plumbing

$666.60

21 22 01 ID 810015

Installation 4.0D x $5700 x 0 8589

1-1/2" Diameter x 6" Stainless Steel Pipe Repair Clamp. Double Bolllnciudes

neoprene gasket

QuanUty Unit Price Farxor

$195 83

Total

$195.83

User Note: Provide and install pipe damps wilh gaskets st sech end of redto/ng valve.

Category1I Plumbing

22 22 01 10 610017

2 clamps per valve x 2 valves ~ 4 valves

2-1/z Diameter x 6 slwniess steel pipe Repair clamp, Double Bclllnuudes

neoprene casket$314.08

Instsl/stirs

Quantity Unit Price Ferror

4,00 6a1,42 x 08589 e

Total

$3t4.08

User Note: Provide snd install pips damp» with gaskets at each end of reducing valve.

Categorytl Plumbing2 demos per valve x 2 valves 4 valves

23 22 01 10 61 0017 EA

Installstlcn

2 I/2" Diameter x 6"Slmnless Steel pips Repair Clamp, Double Boltlncludes

neoprene casketQuanUty Unit Prios Fsuor

18.00 x $91.42 x 0.8569 ~

$1,413.37

Tclal

$1,413.37

Deer Note: Prowde and install pipe clamps with gaskets st each end of pneumatic valves

Cstegory11 Mechanical

24 22 01 10 610018

2 clamps per valve x 9 valves = 18 valves

EA 3"Diameter x8" Stainless Steel Pips RspsirClsmp, Double Boltlndudes

neoprene gasketQuantry Unit Prim

Factor'nstallation

10.0D x $10536 0 8569

User Note: Provide end insieh pipe clamps with gaskets et each end of pneumatic velvet

$904.94

Total

$904.94

Category1: Igechanlcal

25 22 DT 19 000048

Category1: Plumbing

2 demps per valve x 5 valves 10valves

ty

installation 20.00 x $14.17 xDemolition 20.00 x $3.29 x

User Note/ Remove and <eplsoe insuleUon on pmssure reducing valves.

0.85890.8589

LF t-t/p Diameter P/ps, 2"Thick, Fiberglass Insulation Vdm All Service Jacket

tASJlQusnti Unit Price Faclw Total

$243.41

$56 34

$299 78

Price Proposal Detail - CSI Page 4 ot126/9/2017

Page 16: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Price Proposal Detail - CSI Continues..

Job Order Numbsn

Job Order Tltlsf

Race Csl Number

(22 - Plumbing

26 22 07 19 0000'IB

Mod.

0037

UOBI Dascriiptlon

LF For SinolaLayarOfFeeFlnish,Add

Line Total

$945

Category1r Plumbing

Instehatlon

Quantity

20.00 x

Unit Price

BD.55 x

Tolsl

$9.45

27 22 07 19 00 D048

Category11 Plumbing

D038

Installation 20.DD $2.67 x

LF For Work In Reslricled Workinp Space, Add

Quantity Unit Pric Fsclof

0.8589

Total

$45,87

$45.87

28 22 07 19 DD 0050 LF 2-1/2" Diameter Pipe, 2" Thick, Fiberglass Insulahon With Ah Senses Jacket

(ASJ)

$324.64

Category1I Plumbing

29 22 07 18 D00050

Cetegoryi: Plumbing

30 22 07 19 000050

0037 LF For Single Layer Of Fsa Finish, Add

Qushtily Unit Price

lnstahation 20.00 x $0.62 x

0038 I.F For Work ln Restriixed Working space, Add

Quantity Unit Pikxf

Instahetlon 20.00 x $15.45 xDemolition 20.00 $346 x

user N elm Remove and replace Insulation on pressuts redudng velinm.

0.85890.8589

Feuor

0.8589

Total

$265.40$59.44

Tolal

$10.65

$10 85

$49.3D

Category11 Plumbing

Instahalion

0ualitity

20.0D It

Unit Price

$2.67 D.BMIB

Total

$49.30

31 22 11 16 000144

Categoryl: Plumbing

EA t-t/2' Close, Schedule 40 Galvanized Steel Nipple

Quantity Unit Price

Instahetion 4.00 x $14.68 x

user Nels: Provide and instah nippfes for redudng valves

Fsmor

0.8589

Tolsl

$50.37

$50 37

32 22 11 16 DD 0144 0008 EA For Work In Raslncled Working Space, Add $13.50

Categolyt: Plumbing

Instahstlon

Quantity Unit Prloa

4.0D $3.93 x

Famer

D.8589

Total

$13.50

33 22 11 16 DD 0146

Cetegory1: Plumbing

34 22 11 16 00 0148

EA 2-1/2" x Close, Schedule 40 Galvanized Steell4lppie

Quantity Unit Price

0008 EA For Wark ln Restrictad Working Space, Add

Installation 4.00 x $27.47 x

User Note: Provide and inshd nlpplas for isducinp valves,

Factor

D.8589

Total

$94.38

$94.38

$21.61

Calegoryl: Plumbing

Instshation

Quantity

4.DD

unit Pnce

x $8MI x

Fador

0 8589

Total

$21 61

Price Proposal Delah - CSI Page 5 of 126/9/2017

Page 17: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Price Proposal Detail - CSI Cont/nues..

Job Order Number.

Job order Tlge:

Rec¹ CSI Number

122 - Plumbing

35 22 11 16 000146

Category1: Mechanic sf

36 22 11 16 000146

Mod. UOM Description

EA 2-1/1' Close, Schedule no Galvanized Slasl Nipple

Quantity Unit Price

Insts0sdon 18.00 x $27.47 z

User Note: Provide nnd Insist nipples for pneumesc valves.

0008 EA For work In Restrided Working Space, Add

Fador

D.8589

Line Total

$424.6il

Tolsl

$424.89

$9'7.24

Installation

Quantity

18.00

Unit Price

$829 x

Fsctix

0.8589 ~

Total

$97.24Category1f Mechanical

37 22 11 16 000147 EA 3"x Close, Scnedufe40 Galvanized Steel Nipple

Unit Pnce

$33.16 x

Qusn0ty

instaDstion 800 x

Ussr Note: Provide and irelsn nipplss for pneumatic valves.

Fsdor

0.8589

$227 85

Total

$227.85

Category1: Mechanical

38 22 11 16 DD 0147 0008 EA For Work In Restricted Working Space, Add $52.29

Inste0etion

Quantity

8.00

Unit Price

x $7.81 x

Factor

0 8589

Total

$52.29Category1r Mechanical

39 22 11 18 000268 EA 1.1/2', 125 LB, Galvanized Cast Iron FlenBS $431.58

Installation

Quantity

4.OD x

Unit Price

$125.62 x

Fsdor

D.8569

Total

$431.58

Category1I Plumbing

User Notu Provkle end install aances for reducing valves.

40 22 11 16 00 0266 0008 EA For Work In Restridsd Workinu SPacs, Add $61.91

Category11 Plumbing

InslsDetion

Quaritity

4.00 x

Unit Price

$18.02 x

Fader

D.8589

Total

$61.91

41 22 11 16 00 0270

Category1I Mechanical

42 22 11 16 DD 0270

EA 2-1/2", 125 LB, Galvanized Cast Iron Flange

Quantity Unit Price

Installation 18.00 x $139.97 x

User Nota, Provide and instab flangss for pneumatic valves.

0008 EA For Work ln Restricfed Workfno Space, Add

Factor

o.eseo

$2,163 06

Total

$2,163.98

$336 26

Instaaakon

Quantity

18.0D x

Unit Price

$21.75

Factor

0 85S9

Total

$336.28Category1: MeChanlcal

43 22 11 16 00 0270

Category1r Plumbing

EA 2.1/1', 125 LB, Galvanized Cast Iron Flange

Quantity Unit Price

Inststetion SOD x $13097 xUssr Nots: Provide and insts0 Danges for redudng valves.

Feciof

0.8589

Total

$480.88

$480.88

Price Proposal Detail - CSI Psoe6of126/9/2017

Page 18: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Price Proposal Detail - CSl Continues..

Job Order Number:

Jab Order Title:

Race CSI Number

t22 ~ Plumbing

Mod. UDIN Descrlplon Line Total

44 22 11 16 000270 0008 EA For Work ln Restricted Working Specs, Add $74.72

Category1t Plumbing

Installation

Quanrh

4.DO

Unh Price

$21 75

Fsctof Total

$74.72

45 22 11 16 000270 0006 EA For Work In Resfricted Working Space, Add $74.72

Categoryl: Plumbing

Installation

Qusntlb

4.00

Unit Price

$21.75 x 0.8589

Total

ST4.72

45 22 11 16 ODD271

Categorylt Idechsnlcal

47 22 11 18 DO 0271

EA 3", 125 LB, Galvanized Cast iron Flange

Quantlv/ Unit Pric

0008 EA for Work ln Rsslnclad Working Space, Add

Instaeatlon 8.00 x $173.96 x

User Note Provide and install flanges fcr Pneurnatrcvalves.

Fador

o eleg

$1,19531

'Total

$1,195.31

lice.sl

Instsraticn

Quantity

8 DO

Unit Price

$27.60 x

Fsclor

0.8569 ~

To!al

$18965

Category1t Mechanical

46 22 63 13 7D OOID EA 1/2" xl/2" Double Zona Valve AssemblytNithGatges

Instaltstion

Demolition

Qushtity

8.0D

5.00

Unit Price

$364 75 x$89.62 x

User Note: provide and inslae gauges for radudng valves 2 gauges psr vase.

(Amico VSU-M-D505)

Factor

0.85890 8589

$3,258 6D

Total

$2,643.69$815.11

Category1t Plumbing

49 22 63 13 700011

Deice exl stmg gauges

EA 1/2 x 3/4" Double Zona Valve Assembly With Gauges (Amlco VSU-M47507) sl,s93.es

Instellatiori

Demolition

Quankty Urut pnce

1400 x $4os.6a14.00 x se4,79

Fador

oalae =

oaaee =

Total

$4,853.85$1,13981

User Note: Provide and insteg gauges for pnsunw5c valves

Cetegory1: MechanicalDemo existing gauges,

Subtotal for 22 - Plumbing:

[23 - Heating, Ventilating, And Air<ondftioning {HVAC)

50 23 01 20 000043

Cstegory1I Mechanloal

EA Shul Down Existing fnterhr Piping Syslemlnciudes bck ourriag out end average

line uadng. Use when valves sre greater then 25'rom work. When lhe

shutmfi valves for mull pie lines 9m located with a 1ll'adius, ihs iluenlily used

shall be cne.Cluantity Unit Price Factor

Inslallefion 1400 x $172.26 x o.alee =

ussr Nota, Shut down piping system to replace sech pneumatic valve.

$ 18,811AT

I$2,071.3!I

Total

$2.071.36

Pnca Proposal Dstae - CSI Page 7 of 126/9/201 7

Page 19: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Price Proposal Detail ~ CSI Continues..

Job Order Number:

Job Order Title;

Rec¹ CSI Number Mod. UDM Description Line Total

l23 - Heagng, Vent))sting, And Atr<ondittnning (HVAC)

51 23 01 20 00 0043

Category1: Plumbing

52 23 05 23 00 0278

shul Down Existing Interior piping systemlndudcs lock ouuteg out and average

Ime tmdng. Use when valves are greater then 25 from work. Vlhen Inc

shut-og valves for multipfs l(nes srs located wilh ~ 10'adius, ths qmmsiy used

shell be one.Quantity Unif Price Fsdrx

Installation 4.OO x $172.26 x

User Note: Shut down pfpng system to replace sech pressure redudng valve.

0 8589

$2,893.79 x

$138.45 x

900 x900 x

0.85fre

oases =

lmitssafion

Demolition

User note; Remove and inslas nev pneumatic valves.

EA 2.1I2"Cast Iran Body, Flanged, Float Valve, Sncts Sos\ad With Arm 866 And

Bracket

Quantity Unit Pros Fsclof

$501,62

Total

$591.82

$23,438.52

Total

$22,369.29$1,070.23

catsgotyt: Mechanical

53 23 05 23 00 0279

Categoiyt: Mechanics)

54 23 05 2S 00 0064

Installation

Demolition

5005 00

$3,484.90 x

$157.33 x

User Nolei Remove end install new pneumatic valves.

EA 2"Steel Clevis Hanger, stat Top (Cooper 8-Line 83108)

Installation

Quantriy

18.00 x

Unit Price

$2739 x

EA 3"Cast Iran Body, Flsngsd, Float Valve, SingfeSsatad With

Bracket

Quantity Unit Price

Arm Ball And

Fecfor

0 6589

o.e56s-

Factor

oa5ao =

$15,841.58

Tof el

$14,965.90$675 65

$423 45

Total

$423.45

user Note: provide end «istsa hangers lo support pneumatic valves.

2 hangers per valve x 9 valves = 18 hangers.

Categoiyt: Igechsnicsf

55 23 05 23 00 0064 0477 EA Fcr Work ln Rsstdcted Workinc SPace, Add $61 01

Instaeetion

Quantity

1600 x

Unit Price

$524 x

Fador

o.sses =Total

$81.01

Catsgofytr Mechanical

56 23 05 28 00 0088 EA 3" Steel Clevis Hsncer, Flat Top (Cooper 8-Line 9310e) $105.99

Instaasfion

Quantity

4.OO x

Uml Pnce

$30.85 x

Factor

0.8588

Total

$105.99

Ussr Note: provde and insles hangers to support pneumalic valves

Category11 Mechanics)

57 23 03 29 00 0068

Category1; Blechanical

2 hangers per valve x 2 valves 4 hanoem.

0477 EA For Work In Restricted Working Specs, Add

Quantity Unsl rice

Installation 4.00 x $555 x

Factcf

0 8589

$1907

Total

$19.07

Price Proposal Detail - GSI Page 8 of 126/9r201 7

Page 20: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Price Proposaf Detail - CSf Continues..

Job Dnler Number:

Job Order This:

Rsco CSINumser Mod. UOM Description Line Total

)23 - Heaging, Ventilating, And Air-Conditioning iHVAC)

56 23 05 29 000066 EA 4" Steel Clevis Hangar, Flat Top (Cooper B-Line B3109)

Quantity Unit Price

Installation 8.00 x $3617 x

User Nots: Provide end install hangers lo support pneumatic valves.

$188.40

Total

$185.40

Categoqr1r Mechanical

69 23 05 29 00 OD68

2 hangers per valve x 3 valves = 6 hangers.

0477 EA For Work In Restricted Working Space, Add $32.41

Installation

QUSCTM Unit PriceFactor'DO

x $6.29 x 0 8589

Total

$32 41

Categoqrtt Mechanical

60 23 OS 29 DO 067D

User Note:

EA 6"Outside Diameter, 18 Gauge Insulation pmtsa'nn Shield, 12"Lenglh

Quantity Unit Pnce Fsctix

InstaDstion e.oo 6 I e.13 x 0.8589

Dsmotlion S.OO $2.24 x 0.8589

Remove and replace insulation for pneumatic piping.

3157.48

Total

$140.15$17.32

Category1: Mechanical

61 23 05 29 000670 0477 EA For Work In Restricted Workln0 SPace, Add $17.32

Installation

Quanay

9.DO x

Unit Price

$2.24 x

Fsdcf

0.8589 ~

Total

$1 7.32

Cetsgoryt: Nlschsnical

62 23 05 29 DD 0671

Unit PriceQuantity

InslsDation

Dsmo6ticn

5.0D x6.DD

321.13 x

82.29 x

Ussr NOta Remove and replace insulation lor pneumatic piping.

Fedor

0.85890.8689

EA 8"Outside Diameter. 16 Gauge Insulation Protedicn Shield, 18'ength 3100 55

Total

$90.74

$9.83

Category1I Mechanical

63 23 05 29 ODO671 0477 EA For Work In Restricted Wurlung Space, Add

Installation

Quantity

SDO x

Unit Price

$229 x

Fsctcf

o.8sOa

Total

$9 53

Category1I Nlechanlcsl

84 23 05 63 000015

Category1t Plumbing

EA 6"Outside Diameter SnstnOC Plastic Marker

Quantity Unit t'rice

lnsta0atlcii 2.0D x $1731 x

User Nate; Provide and inslsa pipinc identification over Insulation.

Fador

D 8589

Total

$29.74

529 T4

86 23 05 53 OODD18

Category1I Mechanical

EA 7'utside Diameter SnspOC Plssdc Marker

Quantity Unit Price

Instansuon 11.0D x $ 17.SI x

user Nota; provide end inshn piping kfentiOcascn over insulation

Factor

0.8589

$185,43

Total

$155.43

Pnce Proposal OslaD - CSI Page 0 of 126l9/2017

Page 21: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Price Pfopoeaf Detag ~ Cgl Continuea..

Job Order Number:

Job Order Title:

Race CSI Number Mod. UOM Description Line Total

l23- Heating, Ventilating, And Air-Conditioning (HVAC)

66 23 05 53 OD 0018

Category1I Plumbing

67 23 05 53 OOD017

EA 7'utside Diameter Srmp-On Plastic Marker

Quantity Unit Pres

Installation 200 x $17.51

User Note: Provide and install piping idenlieoation aver insulation.

EA O'utside Diameter Snap-On Plastic Marker

Quantity Unit Puca

Installation 3.00 $20.30 x

User Note; Provide and insug piping identification over insulation.

Fsdor

0.856e

Faces

0.8589 ~

Total

$30.05

Total

$52.31

$30.08

$52.31

Categorytf Mechanical

60 23 05 53 000040

Cstegory1: Mechanical

69 23 05 53 00 0040

2 Diameter IdentigcsOon Tag, Brass

Quantity Unn Pnce

InsmDetion 1400 x $8.19 x

User Nota Provide and install 14 Identification tegs for pneumatic valves.

EA 2"Diameter IdentiTicslion Tag, Brass

D.8589

$98.48

Total

$98 48

$14 D7

Cstegory1: Plumbing

TD 23 05 53 00 D042

Cstegory1: Plumbing

EA 1-1/2" Diameter Idensfcsfion Teg, Brass

Quantity Unit Pnce Factor

Installation 200 x $7.70 x 0.8589

User Nof»; provide and install idsnlificason valve for two (2) pressure reducing valves.

Quantity Unit Price Fedor

)nstagallon 2.00 x $8.19 x 0.6589

User Note; Provide end Install idensflcstion valve for two (2) Pressure reducing valves.

Total

$14 07

Total

$13.23

$13.23

7/ 23 09 23 000431

Category1I Mechanical

72 23 09 23 000463

Ue moo

EA

5 Ul, 4 Bl, 3 AO, 2 Trlec DO, 4 Relay DO ExPansfcn I/O Module (JohnsonControls LP-XM07X11-OODC)

Quantxy Umt Pnce FadorInstallation 14,00 x $479.62 x 0 6589provue and insfas controls for pneumabc valves.

EA

BAG net MS/f P 4-Point I/O Module With 4 Bl, Fieb Controller Bus And SensorActuator Sus Support (Johnson Controls MS(OM1710 0)

Quantity Unit Price Factor

Installation 14.00 x $504 38 x D.8589

Prowds and Install controller for each pneumatic valve,

$8,D84.97

Total

$5,054.97

$5,767.24

Total

$5,767.24

Category1: Mechanical

73 23 21 16 000189

Instsllefion

Demolition

1-1/2'crewed Ends, cast Iron Body, Extsmasy piloted, steam pressureRegulating And Reduce/0 Valve

Quanlity Unit Price Feuor

2.0D x $1,200 79 x 0 65892.0D x $19.38 x o.e58e

$2,09f!.01

Total

$2,082.72

$33 29

Cstegory1: Plumbing

Pncs Proposal Detail - CSI

User Nolo: Demolish and mmcvs two (2) existing pressure redudng valves

Provide and install twc (2) pressure mduding valves.

Page 10 of 126/9/2017

Page 22: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Price Proposal t)stall - CSI Continues..

Job Order Number:

Job Order Tige:

Reea CSI Number Mod. UOM Description Line Total

)23 - Heating, Ventilating, And Air-Conditioning (HVAC)

74 23 21 16 00 0189 0139 EA For Work In Restrided Working Space, Add $49.94

Category1i Plumbing

75 23 21 16 00 0192

Installation

EA

InslsDaticn

Demolition

Qusn5ty Urlt Price Factor

2.0D x $2907 x 0.8589

Fsdof

$1,883.10 x

$38.12 x

2-1 (2" Flanged, cast Imn Body, Exlemsty pilraed, steam pmssum Regulating

And Rsdudng Valve

Quantity Unit Price

2.00 x 0.85692.00 x 0.8589

Total

$49.94

O'A,30 0.27

Total

$3,234,79$65.48

User Nots: Demolah and mmove two (2) exis5ng pressure reducing valves.

Category1: Plumbing

Te 23 21 16 00 D192

provide snd inane two (2) pressure reducin9 valves.

0139 EA For work ln Rsstrcled Working space, Add $98.22

Categoqr1r Plumbing

Inslallaaon

Quantity Unit Prke Fedor

2.00 x $57.18 x 0.8569

Total

$98.22

77 23 22 13 00 0010 LF 2 Steam Or Condensate Pipe, 8" Case liliilh No Return Line $3,981.31

IndalaODh

Demolition

Quantity

72.OO x72.00

Unit Puce

$68.44 x

$7.64 x

Faclof

0.96890.8589

Total

$3,490.29

$491.02

User Note: Demolish and replace pneumatic tubing for sech pneumatic valve.

Category1I Mechanical

Te 23 22 13 00 DD'l1

e valves x 8 LF per valve = 72 LF

LF 3"Steam Or Condensate Pipe, 8" Cess With No Rs'turn Line $2,600.06

Installation

Demouion

Quantity Unk Price

40 00 $66.14 x40.0D x $9.54 x

Factor

0 8589

0 8589

Total

$2,272.31

$327.76

User Note: Demolish and mpbce pneumatic (ubing for eadl pneumatic valve.

Categoryt: Inechanlcat5 valves x 8 LF per valve = 40 LF

Subtotal for 23 - Heating, Ventgatlng, And Air<onditioning (HVAC)l

l26 - Electrical

$67,239.14

79 26 05 19 13 D004

InstsDalion

Dsmoliticn

Splice, 3-Condudor

Quanaty

14.004.0D

unit Price

$20.69 x

$5.55 x

Fedcf

0,8589

0.8589

$271.29

Total

$248.79

$22.50

User Note: Disconnect and rsconned slectncal for each pneumatic valve.

Category1r Electrical

Subtotal for 26 - Ele ctrl cab

Proposal Total

$Z71.29

$100,466.49

Prrce Proposal Detail - CSI Pace 11 of 126/9/2017

Page 23: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Price Proposal Detail - CSI Continues..

Job Order Number:

Job Order Title:

This proposal total represents Ihs ooneot lofal tor the proposal. Any discrepancy between line iotas,sub-totals snd the proposal total is due to rounding of the ana totals and suhtotata

The Percent of NPP on this Pro poaah 0 00'/

Paine Proposal Detail - Cgl Page 12 of f2arei2017

Page 24: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

WOrk Order Number: 640606.00

Work Order Tide; JHS - 5/lechanlcal Systems Capital Renewal/Rsp(scemsnt (Replace 14Pneumatic Steam Valves On Hest Exchanger System/Replace of 4Pressure Reducing Valves)

Job Order Contract

Contractor: Cook County - F.H Paechsn

Date: June 15, 2017

!I r=SUbCOntraCtOi antt',ll/f/WBE„Estimate,"i

31 .. i,= le

Following Is the proposed list of minority owned, woman owned end non-minority subcontractors snd material suppliers proposed for

the above Work Order. This estimate is submitted with our final Work Order Proposal in ths amount of $100,466.40.

Contractor

/autumn Donslruceon

Brendanburger Plumbing Inc

Trades - S Subcontractor; M: Material Supplier

M/INBE's. M, M/nonty; W Women; N: Non M/WBE

Ouaes Trade

S

M/W/SBE

St tusTotal $

551,5aa ca

51a,aoa.aa

$71.600.00

551,5aa.oa

ina,aoo.aa

61.21%

$71,$00.05 71.17%

M/W/SBE 5 '/ of Pro/ect

Total MBE Subcontractor Participation Scheduled

Total MBE Supplier Perticipadon Scheduled

Total WBE Subcontractor Participation ScheduledTotal WBE Supplier Partlc/patton Scheduled

Total M/WBE Participation Scheduled

$10,0DD.DD

$0.00

$61,5DD.DD

$0.00

$71,6DD.SO

g gST ~$10,000.00

0.00% 9.05%

61 21 / ~$61 500 DD

0.00% 61 21%

71.17%

MSE Total

WBE Total

(Contractor) Project Manager

Subcontractor and MWBE Estimate Page 1 of 1

5/15/2a17

Page 25: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Cook County

Office of Planning & Policy

69 W Washington

Chicago, IL 60602

Sub-Order Total: $100,466.49

A. Definitions nnd Disclosure Reouirsmenls

As used herein, lhe term "Contra ctm" means a person or srility who has My tonlrecl lease whh lhs ceunty of cook.

Pursanl to Execug e Order g7-I svmy dly centred end lease must be accompanied by s disdo euro statement Providing certain Informedon and acorn eye, tabby ste,accounfants. consultants, subcontractors,and other persons

The Contractar Is not required to dscfom employees who sw pakf solely Ihrough the Contractors regular payrml.

Oats: June 15, 2017

'Lobbpst'eans any penmn (e) who for compensation or an behalf of any person other Ihen himself undenakee lo in du ence any l ape ladve nr sdmini stra don action, m (b)any perl ar whose duties as an employee ef arm ther Includes undertaking lo Influence anv legislative or edmlnislrsgvs ection.

8, certlgcntlon

Contractor hereby ceni fice as follower

This Disdosure relates to the following transaction.

p ident no mar 04880s og 1Hs - Mechanical systems espial Renewal/Replacemant (Replace 14 pr sumac c steam valves on Heel Exchanger System/Replace of

3, Name of Contradon cook County. F H. Paschen

EAcH AND EvERY etta may, lobbdsi, accountant consunent, subcontractor, or other person retained or snsdpalsd to be retained by Ihe cantrector with respect In

or in connecuon with tire cent am or lease is listed below

(attach adddonsl pages If scessaryj

Name

BUSINESS

ADDRESS

MSE

WB'6

or Non

RelstlonShlp

(attorney,tobbyist,subcontractor,atc.)

FEE(lndlcme

whether paid

sr est/mated)

BrandenburgerPlumblng Inc 3245 W. 111)IIChicago, IL, 60655

Autumn Consfruction

MBE

WSE

Subcontractor

Subcontractor

610,000.00 Est.

561.500.00 Est.

CHECK HERE IF NO SUCH PERSONS HIIVE BEEN RETAINED OR ARE AMICIPATED TO BE RETAINED

4. Ths conuactor Understands and agrees Ihat the dty may rely on Ihe Information provided'herein end Ihet provalng any false incmnplele or Ineccurence Informalmn

shall consiiluls defauli under the contract and msy result m lsnnirshon of the contract or lease

The Contrador understands and agrees that in any case In whbh the Contractor h uncerlam whether e d sdmmre is required under the Execubve order the Cenlrador

must edhsr ask the city whether disdosure is required or mesa the dhciosure

Under the ps nettles of perjury, I cerbty Ihat I em aulhanxed to execute Ibis Dlsdocure on bshe/f of ths contractor Ihst Ihs hforme lion disclosed herefn is true and

co an has been withheld.

6/1 6/2017

Signature Date

Anthony Izzi

Name (Type or Prinl)

Subscnbed and sworn lo before me

th t(II( dayof ~0 I lWh imd/ni/)I4Xaaublic Signature

/X'eneral Manager

Title

OFFIQAt, lLIAuaEFr:hatt((Le/

'-"iTARY PUBLIC -STATE QF (LLNO)S. V I'rihlMIRRIDN PVPIRFC 17NL1/1A

Page I of I

6/I 5/201 7

Page 26: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

MBE/WBE UTILIZATION PLAN - FORM 1

BIDDER/PROPOSER HEREBY STATES Ihal afi MBE/WBE firms induded in this Plan ars certaed MBEs/WBEs by at least one of the entilies listed in the GeneralConditions —Section 19.

l. BIDDER/PROPOSER MBE/WBE STATUS: (chsckthe appropriaie line)

Bidder/Proposer is a certified MBE or WBE firm. (If so, attach copy of current Letter of Cerlificaticn)

Bidder/Proposer is a Joint Venture and one or more Joint Venture partners are csrlihed MBEs or WBEs. (If so, attach copies cf Letter(s) o(Cerlificalion, a copy of Joint Venture Agreement dearly describing the role of Ihe MBE/WBE firm(s) and ils ownership interest in ihe JointVenture and a compfeted Joint Venlure Affldavfi —svsfiable online at www.cookcocntvil.oov/contradcomcliance)

Bidder/Proposer is nol a certified MBE or WBE firm, nor a Joint Venfure with MBEM/BE partners, hul will utilize MBE and WBE firms either

directly or indimctly in the performance of Ihe Contract (Ifso, complete Sedions 9 below and the LeNer(s) of Intent —Form 2).

Direct Parlfcipation of MBE/WBE Firms Indirect Participation of MBE/WBE Firms

NOTE: Where goals have not been achieved through direct partidpatlon, Bidder/Proposer shall include documentation outlining efforts toachieve Direct Participation at the time of Bid/Proposal submission. Indirect Partfcipation will only be considered after all efforts toachieve Direct Participation have been exhausted. Only after wriNen documentation of Good Faith Efforts ls received will IndirectParticipation be considered.

MBEs/WBEs that will perform as subcontractors/supphers/consultants include Ihe fofiowing

I«E~~Fhm Autumn Construction Services, Inc.

Addm„. 449 Eisenhower Lane South, Lombard, IL 60148susan .n

el

so�n@a�u�tu�m�n�con�stru�cti�on�

.corn

Contact person. SLISan NelSOnPhrrne

630 588 9585

Dollar Amount Penicipation $

Percent Amount of Participation:

*Letter of Intent attached?'Current Letter of Cerlrication aNached?

YesYes~ No

No

MBEAYBEFI rBrandenburger Plumbing, Inc.

A«,, 3245 W. 111th Street, Chicago, IL 60655

, „, keithb(Ibrandenburgerplumbing.corn

d p „. Keith Brandenburgerph „773779 8350

Dollar Amount Participation; $

Percent Amount of Participation:

*Letter of Intent attached? Yes*Current LeNerof Certificalion attached? Yes~ No

A//ech additional sheets as needed.

'etter(s) of Intent and current Letters of Certification must be submitted at the time of bid.

M/VVBE Utilization Plan —Form 1 Revised: D1/29/2014

Page 27: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

MBE/WBE LEITER OF INTENT ~ FORM 2

M/WBE Ilmi: Autumn Construction Services, Inc.: Cerlllying Agency; Citv of Chicano

Contact Person: Susan Nelson

Address: 449 Eisenhower Lans South

City/State; Lombard IL 2ip, 60148

Phone; 630-588.9585 Fmc 630.588-9586

CerNcagon Expiration Dale: 10-15-2017

Ethnfrdty; Caucasian

Bid/Pmpossl/Contract ¹:FEIN¹: 36<035882

Emag; susan.nslsonLmsutumnconstructlhn,corn

Psrbcipalion: X Dkact Indirect

Will ihs M/WBE firm be subcontrecbng any of the goodsor Nines of ibis contract lo another grm7

No X Yes- Rease ailacli explanagon. proposed Subcontractor(s). Johnson Controtsi Inc.

'he

undersigned M/WEE is prepared lo provide Ihs foilowfng Commodities/Senrlcss for Ihe above named Pro)act/ Contract fl/

mors space 0 needed lo furbr deeense howBE Rnn'e proposed scope o/norh ond/or peymsnr schsdore, el/sea addi//oner sheers)

Remove and replace steam control valves st (14 ) locations

'Indicate the Dollar Amount, Psrcenleue, end the Terms of Pavment for ihe sbovedescdbed Commodities/ Services:S61,500.00/ Lu'mii Sum

THE UNDERSIGNED PARllES AGREE that Ibis Loiter of Intent v/ll become a bInding Subcontract Agreement for Ihe above

work, condlgoned upon (I) the Bidder/Proposer's mcslpl of a slgiisd conhact fiorn Ihe county of cook; (2) Undersigned

Subconbactor remaining compgsnt wih ag relevant cradengals, codes, ordinahces and statutes rerprired by Contrac(or, Cook

County, end the Stale lo pargdpate as a M BE/WBE lirm ior Ihe above work, The Undersigned ParUes do also cergfy that they

did not affix their signatures to thfs document unlg ag ruses under Dascrtpgon of Sarvhe/Suppl and Fee/Cost were completed.

us,M~ )uk~Sign alura (hhWBEI Signature (Pr/ms Bfdder ocsr)

Susan Nelson Anthonv IzziPrint Name Print Name

Autumn Construction ServIces, Inc.

Finn Name

06/12/2017Date

Subscribed snd sworn before me

thb 12t"dsyof June . ,2032,

~gggo ~~.ii A 2&HM~g5

L '""'"'""""""""""I

M/WBE letter of Intent- Form 2

Paschrhn Autumn JVFirm Name

6/16/2017. Dale

Subscribed and swum before me

Ihls+dayof Mp¹-~,20+7tl I pP ill Wn/~

UEAL

29/14

Page 28: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

NOV)) 0 Z6(S

DEPARTMENT QF PROCUREMENT SERVICESCITY OF CHICAGO

Susan NelsonAutumn Construction Services, Inc,449 Eisenhower Lane SouthLombard, IL 60148

Dear Susan Nelson: REVISED

We are pleased to Inform you that Autumn Construction Services, Inc. Is certified as aWomen-Owned Business Enterprise ("WBE")by the City of Chicago ("City"). This WBEcertification is valid until 10/15/2017; however your firm's certification must be revalldatedannually. In the past the City has provided you with an annual letter confirming yourcertification; such letters will no longer be issued. As a consequence, we require you to beeven more diligent in filing your Annual No-Change Affidavit 60 days before your annualanniversary date.

It is now your responsibility to check the City's certiffication directory and verify yourcertification status. As a condition of continued certification during the five year periodstated above, you must file an annual No-Change Affidavit. Your firm's annual No-ChangeAffidavit is due by 10/15/2017. Please remember, you have an affirmative duty to file yourNo-Change Affidavit 60 days prior to the date of expiration. Failure to file your annual No-Change Affidavit may result in the suspension or rescission of your certification.

Your firm's five year certification wil( expire on &/15/2017. Ycu have an affirmative duty tofile for receriification 60 days prior to the date of the five year anniversary date. Therefore,you must file for recertification by 10/15/2017.

It is important to note that you also have an ongoing affirmative duty to notify the City of anychanges in ownership or control of your firm, or any other fact affecting your firm's eligibilityfor certification within 10 days of such change. These changes may include but are notlimited to a change of address, change of business structure, change in ownership orownership structure, change of business operations, gross receipts and or personal networth that exceed the program threshold. Failure to provide the City with timely notice ofsuch changes may result in the suspension or rescission of your certification. In 'addition,

you may be liable for civil penalties under Chapter 1-22, "False Claims", of the MunicipalCode of Chicago.

121 NORTH LASALLE STREET, ROOIVI 806, CHICAGO ILLINOIS 60602

Page 29: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Autumn Construction Services, Inc. Page 2 of 2

Please note —you shalt be deeined io have had your certification lapse and will be ineligibleto participate as a WBE if you fall to'.~ File your annual No-Change Affidavi within the required time period;o Provide financial or other records requested pursuant to an audit within the required

time period;~ Notify the City of any changes affecting your firm's certification within 10 days of such

change, or~ File your recertification within the required time period.

Please be reminded of your contractual obligation to cooperate with the City with respect toany reviews, audits or investigation of its contracts and affirmative action programs. Westrongly encourage you to assist us in maintaining the integrity of our programs by reportinginstances or suspicions of fraud or abuse to the City's Inspector General atchicagolnspectorgeneral.org, or 866-IG-TIPLINE (886448 4754).

Be advised that if you or your firm is found to be involved ln certification, bidding and/orcontractual fraud or abuse, the City will pursue decertification and debarment. In addition toany other penalty imposed by law, any person who knowingly obtains, or knowingly assistsanother in obtaining a contract with the City by falsely representing the individual or entity,or the individual or entity assisted is guilty of a misdemeanor, punishable by incarceration inthe county jail for a period not to exceed six months, or a fine of not less than $5,000 andnot more than $10,000 or both.

Your firm's name will be listed in the City's Directory of Minority and Women-OwnedBusiness Enterprises in the specialty area(s) of:

NAICS Code(s):236220- Construction Management, Commercial and Institutional Building238220 —Mechanical Contractors541330 —Engineering Design Services541620- Environmental Consulting Services

Your firm's pai(icipalion on City contracts wiil be credited oniy toward Women-OwnedBusiness Enterprise goals in your area(s) specialty. While your participation on Citycontracts is not limited to your area of specialty, credit toward goals will be given only forwork that is self-performed and providing a commercially useful function that is done in theapproved specialty category.

Thank you for your interest in the City's Minority and Women-Owned Business Enterprise(MBE/WBE) Program.

Sincerel

RichFirst DRB/do

Page 30: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …
Page 31: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

MBBWBE LETTER OF INTENT ~ FORM 2

RBIandenburgerPlumbtng iflccI I

C(tyof ChicagoM/WBE FlrmI'ertifying Agency:

pKeithR.BrandenburgerContact Person: Certificatkm Expiration Date:

3245 W. 111th Street HispanicAddress.'thnicity:Chicago 60655

Gty/State: 'ip: Bid/Proposal/Contract ¹:(773) 779-8350 (773) 779-8354 38-3716859

Phone: Fam FEIN M

[email protected]

Pertldpation: It Direct Indirect

Wit the M/WBE firm be subcontracting any of the goods'or services of this contract to another firm'I

X No Yes-Pleaseattachexplenation. Proposed sublntractor(s):

The undersigned M/WBE Is prepared to provide the following Commodities/Services tor the above named Project/ Contract (//

mors space rc needed Ic roily describe MAVBE Firm's proposed scope o/ xorir sndrcr psymerd schedule, sftcch sdd/Irons/ cheers)

Remove and install (4) new Domestic Water Pressure Reducing Valves - Plumbing

Indicate the Doser Amount, Percentaae, and the Tenne of Pavmsnt for Ihe above.described Ccmmodifiec/ Services:

Ten Thousand and 00/100 Dollars - ($10,000.00)

Signature (Pr/me Bidder/prop/i)

Anthonv IzziPrint Name

Paschen Autumn JVFirm Name

PrintNsme

Brandenburger Plumbing, inc

'Firm Name

June 9, 20176/16/2017

Date

Subscribed end sworn before me

Date

Subscribsd and sworn before me

thisgdayof~ W,20 ~j thisLY dayof c ~.,20+,Notary Public drNZ<+ V ~ Notary PubllcMhlhF1I 4 W A

U

THE UNDERSIGNED PARTIES AGREE that this Letter of Intent wtl become a binding Subcontract Agreement for the abovevmrk, condifioned upon (I) the Bidder/Proposer's receipt of a signed contract from the Counly of Cook; (2) Undersigned

Subcontractor rem nl om fiant with all relevant credentials, codes, ordinances 'and statutes required by Contractor, CookCounty, end the e s cipats as a MBBWBE lirm for the above work. Ths Undersigned Parfiss do also cerfify that theydid not a x the o this document until all areas under Description of Servkxd Supply snd Fee/Cost were completed,

Signdture (M/WBE) /F~~'eithR. Bra((5enburger

M/WBE bette

Page 32: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

NOV1V 2014

DEPARTII1ENT OP PRocU REMELT SERvrcP<<

CITY 01<'IIICAGO

Keith BrandenburgerBrandenburger Plumbing Inc.3245 W. 111 St,Chicago IL 60655

Dear Keith Brandenburger:

We are pleased to inform you that Brandenburger Plumbing inc., has been recertified asa Minority-Owned Business Enterprise ("MBE"},by the City of Chicago ("City"). ThisMBE certification is valid until 12/O'I/2019; however your firm's certification must berevalldated annually, In the past the City has provided you with an annual letter confirmingyour certification,'uch letters will no longer be issued. As a consequence, we require youto be even more diligent In filing your annual No-Change Affidavit 60 days before yourannual anniversary date.

it Is now your responsibility to check the City's certification directory and verify yourcertification status. As a condition of continued certification during the five year periodstated above, you must file an annual No-Change Affidavlt. Your firm's annual No-Change Affidavit is due by 12/01/2015, 12/01/2016, 12/01/2017, and 12/01/2018. Pleaseremember, you have an affirmative duty to file your No-Change Afffdavlt 60 days prior tcthe date of expiration. Failure to file your annual No-Change Affidavit may result in thesuspension or rescission of your certification.

Your firm's five year certification will expire on 12/01/2019. You have an affirmative duty tofile for recertificatlon 60 days prior to the date of the five year anniversary date, Therefore,you must file for recertification by10/01/2019.

It is important to note that you also have an ongoing affirmative duty to notify the City of anychanges In ownership or control of your firm, or any other fact affecting your firm's eligibilityfcr certification within 10 days of such change. These changes may include but are notlimited to a change of address, change of business structure, chan'ge In ownership orownership structure, change of business operations, gross receipts and or personal networth that exceed the program threshold. Failure to provide the City with timely notice ofsuch changes may result in the suspension or rescission of your certification, In addition,you may be liable for civil penalties under Chapter 1-22, "False Claims", of the MunicipalCode of Chicago.

12i NORTH LASALLB STR95T, ROOM 806, CHICAGO ILI.INOIS 60602

Page 33: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Brandenburger Plumbing Inc. Page2of2

Please note —you shall be deemed to have had your certification lapse and will beineligible to participate as a MBE if you fail to'.

~ File your annual No-Change Affidavit within the required time period;~ Provide financial or other records requested pursuant to an audit within the required

time period;~ Notify the City of any changes affecting your firm's certification within 10 days of

such change; or~ File your recertification within the required time period.

Please be reminded of your contractual obligation to cooperate with the City with respect tcany reviews, audits or investigation of its contracts and affirmative action programs. Westrongly encourage you lo assist us in maintaining ths integrity of our programs by reportinginstances or suspicions of fraud or abuse to the Ctty's Inspector General atchlcagoinspectorgsnsral.org, or 866-IG-TIPLINE (866-448-4754).

Be advised that if you or your firm is found to be involved in certification, bidding and/orcontractual fraud or abuse, the City will pursue decertification and dsbarmsnt. In additionto any other penalty Imposed by law, any person who knowingly obtains, or knowinglyassists another In obtaining a contract with the City by falsely representing the Individual orentity, or the individual or entity assisted is guilty of a misdemeanor, punishable byIncarceration in the county jail for a period not tc exceed six months, or a fine of not less

, than $5,000 and not more than $10,000 or both.

Your firm's name will be listed In the City's Directory of Minority and Women-OwnedBusiness Enterprises fn the specialty area(s) of:

NAICS Code(e):238210- Plumbing Contractors

Your firm's participation on City contracts will be credited only toward Minority-OwnedBusiness Enterprise, goals in your area(s) specialty. While your participation on Citycontracts is not limited to your area of specialty, credit toward goals will be given only forwork that is self-performed and providing a commercially useful function that Is done in theapproved specialty category,

Thank you for your Interest in the City's Minority and Women-Owned Business Enterprise(MBE/WBE) Program.

Rheeurement Officer

Page 34: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …
Page 35: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

PETITION FOR WAIVER OF MBE/WBE PARTICIPATION - FORM 3

A. BIDDER/PROPOSER HEREBY REQUESTS;

FULL MBE WAIVER FULL WBE WAIVER

[g REDUCTION (PARTIAL MBE and/or WBE PARTICIPATION)

I "<%of Reduction for MBE Participation

% of Reduction for WBE Participation

B.REASON FOR FULL/REDUCTION WAIVER REQUEST

Bidder/Proposer shall check each item applicable to its reason for a ivaiver request. Additionally, supporting

documentation shall be submitted with this request.

(1) Lack of sufficient qualified MBEs and/or WBEs capable of providing the goods or services required

by the contract. (Please explain)

(2) The specifications and necessary requirements for performing the contract make it impossible or

economically infeasible to divide the contract to enable the contractor to utilize MBEs and/or WBEs in

accordance with the applicable participation. (Please explain)

(3) Price(s) quoted by potential MBEs and/or WBEs are above competitive levels and increase cost ofdoing business and would make acceptance of such MBE and/or WBE bid economically impracticable,

taking into consideration the percentage of total contract price represented by such MBE and/or WBEbid. (Please explain)

(4) There are other relevant factors making it impossible or economically infeasible to utilize MBE and/or

WBE firms. (Please explain)

C. GOOD FAITH EFFORTS TO OBTAIN MBE/WBE PARTICIPATION

(1) Made timely written solicitation to identified MBEs and WBEs for utilization of goods and/or services;and provided MBEs and WBEs with a timely opportunity to review and obtain relevant specifications,

terms and conditions of the proposal to enable MBEs and WBEs to prepare an informed response to

solicitation. (Attach of copy written sollcltations made)

(2) Used the services and assistance of the Office of Contract Compliance staff. (Please explain)

(3) Timely notiTied and used the services and assistance of community, minority and women business

organizations. (Attach of copy written solicitations made)

(4) Followed up on initial solicitation of MBEs and WBEs to determine if firms are interested in doing

business. (Attach supporting documentation)

(5) Engaged MBEs & WBEs for direct/indirect participation. (Please explain)

D. OTHER RELEVANT INFORMATION

The project requires the ufilization of two subcontractors to complete the project, of which both

subcontractors utilized are either minority or women owned enterprises. Paschen Autumn JV is aware of the MBE

8 WBE participation goals for the contract (1555-14475-MC6) and will meet or exceed these goals on future work

ordered where possible.

M/VVRE Utnizatlon Plan - Form 3 Revised: 01/29/14

Page 36: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Contract ¹: 1555-14475-MC6

Pop Order kb Q r/ ff If O (o, CrCi

OCPO ONLY:

Cook County Oiscuaiiiicaticn

Office of ths Chief Procurement Officer L I Check Ccmcbte

Identification of Subcontractor/Supplier/Subconeultant Form

The Bidder/Proposer/Respondent ("the Contractor" ) will fully complete and execute and submit an Identificalion ofSubcontractor/Supplier/Subconsultant Form ("ISF")with each Bid, Request for Proposal, and Request forQualification. The Contractor must complete the ISF for each Subcontractor, Supplier or Subconsultant whichshall be used on the Contract. In the event that there are any changes in the utilizaticn of Subcontractors,Suppliers or Subconsultants, the Contractor must file an updated ISF.

Bid/RFP/RFQNo "55 "

Total Bid or Proposal Amount:

Contractor: paschen Autumn Joint Venture

Authorized Contactfor Contractor: Frank Nelson

Email Address(Contractor) fn el so n @fh Peach en .

corn

C m a Address5515N.EastRiverRoad(Contractor):

Date: 6/15/2017

Contract Title: JHS - Mechanical Systems Capital Renewal/Repla

Subcontractor/Supplier/Subconsultant lo be Autumn Construction Services, Inc.added or substitute:Authorized Contact forSubcontractor/Supplier/Susan NelsonSubconsultanbEmail Address(8u bcon Ira cIor)

su san .n e Ison @aatu m n con str u ct ion .com

ss 449 Eisenhower Lens SouthCompany Address(Subcontractor):

City, State andztp (('ontractory Chicago'L 60656

Telephone andFax (ContractorkEstimated Start andCompletion Dates(Contractork

City, State and Zip(Subcontractor) Lombard, IL 60148

Telephone and Fax 630-588-g585(Subcontractor):Estimated Start andCompletion Dates(Subcontractork

Note: Upon request, a copy of all written subcontractor agreements must be provided to the OCPO.

Descriotion of Services or Suoolles

Electrical

Total Price ofSubcontract for

Services or Suoolles

$61,500.00

The subcontract documents will incorporate all requirements of the Contract awarded to the Contractor as applicable.The subcontract will in no way hinder the Subcontractor/Supplier/Subconsultant from maintaining its progress on anyother contract on which it is either a Subcontractor/Supplier/Subconsultant or principal contractor. This disclosure ismade with ths understanding that ths Contractor is not under any circumstances relieved of its abilities andobligations, and is responsible for the organization, performance, and quality of work. This form does not approveany proposed changes, revisions or modifications to the contract approved MBE/WBE Utlllzatlon Plan. Anychanges to the contract's approved MBE/WBE/Utlllzatlon Plan must be submitted to the Office of theContract Compliance.

Paschen Autumn Joint Venture

Contractor

Frank Nelson

Name

Project MSpelker

Title~Prime Contractor Signature

cfu/~~Date

Version 1.0

Page 37: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Contract Fx 1555-14475-MC63o)oOrrfer A Cl 08S'04,057

Cook CountyOffice of the Chief Procurement Officer

Identification of Subcontractor/Supplier/Subconsultant Form

OCPOONLY.'lsouslilicexan

I Check Comsbte

The Bidder/Proposer/Respondent ("the Contractor" ) viill fully complete and execute and submit an Identification ofSubcontractor/Supplier/Subconsultant Form ('ISF")with each Bid, Request for Proposal, and Request forQualification. The Contractor must complete the ISF for each Subcontractor, Supplier or Subconsultantwhlchshall be used on the Contract In the event that there are any changes in the utilization of Subcontractors,Suppliers or Subconsultants, the Contractor must file an updated ISF.

Bid/RFP/RFQ No

'otalBid or Proposal Amount.

Contractor: Paschen Autumn Joint Venture

Authorized Contactfor Contractor: . Frank Nelson

Email Address(Coniractork

[email protected]

Company Address 5515 N. East River Road

(Contractor):

Ciiy, State andZip (Coniractory Chicago, IL 60656

Telephone andFax (Contractor):Estimated Start andCompletion Dates(Contractork

Date: 6/15/2017

Contract Title: JHS - Mechanical Systems Capital Renewal/Re pie

Subcontractor/Supplier/Subconsultant tobe Brandenburger Plumbing, Inc.added or substitute:Authorized Contact forSubcontractor/Supplier/Keith BrandenburgerSubconsultanhEmail AddressI$u bcon 1ra cIo r )

ke ith b@bra n d en b u rg e rP I u m b i ng .com

Com an Addre3245 W. 111th Street

(Subcontractor):

(Subcontractor) 3245 W. 111th Street Chicago, IL 60655-270

Telephone end Fax 773 77g 6350(SubcontractorkEstimated Starl sndCompletion Dates(Subcontractor'k

Note: Upon request, a copy of all written subcontractor agreements must be provided to the OCPO.

Descriutlon of Services or Su on lies

Plumbing

Total Price ofSubcontract for

Services or Suoolies

$10,000.00

The subcontract documents will incorporate all requirements of the Contract awarded to the Contractor as applicabls.The subcontract will in no way hinder the Subcontractor/Supplier/Subconsultant from maintaining its progress on anyother contract on which it is either e Subcontractor/Supplier/Subconsultant or principal contractor. This disclosure is

made with the understanding that the Contractor is not under any circumstances relieved of its abilities andobligations, and is responsible for ths organization, performance, and quality of work. This form does not approveany proposed changes, revisions or modifications to the contract approved MBE/WBE Utillzatlon Plan. Anychanges to the contract's approved MBE/WBE/Utilization Plan must be submitted to the Office of theContract Compliance.

Paschen Autumn Joint Venture

Contractor

Frank Nelson

Name

ProJect Man

""WWIS,Prime Contractor Signature

elr~f~~Date

Version 1.0

Page 38: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Irtial P„iviewer: Final Reviewer: RFP / CONTRACT REVIEW LOG

Contract ¹: 1555-14475 MC6 Project Descriptioiu 2016 JOC PROGRAM

Requisition ¹:

Vendor Name:

10000019615

PASCHEN AUTUMN JOINT VENTURE

Department: jCAPITAL PLANNING A"!D POLICY jDepartment Contact: jSEAMEAH LLOYD

Contract Phone:

Date Req. Rec'd: ~07/11/17Date to Buyer: j07/11/17Date to User for Review:Date Singed-off Rec'd:Advertisement Date:

)Contract Email

Bid Opening: I

Pre-Bid Meeting:Recommendation Letter Rec'd:Compliance Letter Rec'd:

ISEAMEAILLLOYDINCOOKCOUNTYILGOY

Board Approval: Yes

Board Meeting:Item Number:Fact Sheet for CPO:

Contract Term:Contract Amount: S

jRenewal Options: Yes No ¹

Date Intials

07/11/17 CJ,

7I// lE, ~i~c. (X

)6 irI

ASSINGED AND GAVE TO LILLIAN

Notes

2 8///7C- - (Rr~ PCd'6~v 7~/J~IFf ~(n ~O S C-nn

Page 39: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Oat.. I Intials Notes

Page 40: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Carolynn Jones (Procurement)

From:Sent:To:Cc:

Subject:

James Fitzpatrick (Procurement)Monday, July 10, 2017 6:14 PM

Carolynn Jones (Procurement); Jacqueline Taylor (Procurement)Alesia Hawkins (Procurement); Cho Ng (Procurement); Jorge Robics (Sheriff); Lillian Lee

(Procurement)

Req assignments 7/11/17

Hi Carolynn / Jacqueline,

Please complete the following assignments:1. 10000019615to Lillian as a JOC W/0 under 1555-14475 MC6 (Lillian is already working other JOC W/0 under

this contract)2. 10000011467to Jorge as a new contract using 1712-16528

Thank you,

James FitzpatrickOffice of the Chief Procurement Officer118N. Clark St —Room 1018312.603.1490

Page 41: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Page 1 of I

CCG (PL) p I t d R q sitions Report Report Oat: 28-JUH-2017 IO:Ol

CCG (PL)

Report parameters

Aequialtion Numbers Fcom: 10000019615To . IO000019615

Ptlhted Req I 't o 4 R po t Repo t Date: 20-JUN-2017 10;03Page: 2 of 2

Requislt *n: 10000019615Requisition Type: Puccheae Requ tion

Creation Date: 27-JUH-17Deaerlptlon; JNS Hach Systems Cap Renew/Bcpl

N074 To Approvet;Notes:

p epacer: iloyo, SEAHEAU H

App o: HANNIWG, EARLC ncy: USD- Aaplace 14 pneumatic steam valves of Neet Erchangst system

I,ln I,i e Type Item A C t gory Descript 'n Unit guant ty/Amen t U t P ic Line m o nt

Asq eatsNeed By 8Oats Urgent Type Sourc

I GoodsI LUTD, BEAWEAN H

721200DG JOC Work ocder DOLL 0.01 ISuPPliec 8048S06.00 - amount

81D5,489.8110000019615 - PASCUEII AUTUHN JOINt IIEHTUAE - CCP-60656-001 — BLAIR, JRHES

0.01

Distrtbuttonst .01 Allocated To Acco nt: 11569.1031.17825.560108.00000.00000

JuatiflcatiotuNote 7* App

Notes

Total: 0.01

P e o App o als:

6 q ence Dat* Appr ver Act'o N*t

I 27-JUH-17 LIOID, SEAHEAN N2 27-JUN-17 NANNIWG, EARL

Scorn(tApprove

Approval Action (cltola one)

Approve T d Rel t

f ard To:

Hot

Signature:

http: //ccgprod.ccottnty.corn/OA CGI/FNDWRR.exe7temp id=4257416442 6/28/2017

Page 42: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

BUREAU OF HUMAN RESOURCES

VELISHA L. HADDOXBUREAU CHIEF

11BNorth Clark Street, Room 640 ~ Chicago, Illinois 60602 ~ l312) 603-3300

TONI PRECKWINKLE

PRESIDENT

Cook County Board

of Commissioners

TO:

FROM:

COUPE member unions (See attached list)

VIA EMAIL

BHR —Labor Relations

RICHARD R. BOYKIN

ISL DISLI 1st

ROBERT 6 STEELE

2nd Distnct

RE:

DATE:

Notification Pursuant to Extension Agreement

July 11,2017

JERRY BUTLER

3rd Distiict

STANLEY MOORE

4tii DIsti ict

DEBORAH SIMS

5th District

EDLYARD M MOODY

6di Disti icl.

JESUS 6 GARCIA

7 th Distiict

LUIS ARROYO JR

8th Distnct

PETER N SILVESTRI

6th Distnct

BRIDGET GAINER

10th Distnct

JOHN P DALEY

11th Distnct

Pursuant to the Extension Agreement between the Coalition of Unionized Public Employees(COUPE) and the County of Cook, you are hereby notified that the County intends to undertakethe following construction work;

JHS - Mechanical Systems Capital Renewal/Replacement (Replace 14 Pneumatic Steam Valveson Heat Exchanger System/ Replace of 4 Pressure Reducing Valves)

This work will be performed under the Job Order Contracting Agreement referenced above withPaschen Autumn Joint Venture. The General Contractors intends to use two (2) subcontractors forthis project. The name and address of the contractor and subcontractor(s) are as follow:

G ENERAL CONTRACTOR

Paschen Autumn Joint Venture

5515 N. East River Road

Chicago, IL 60656

SUBCONTRACTOR

See Attached Listing

JOHN A FRITCHEY

12th D Stl'ICI

LARRY SUFFREDIN

13th Distnct

Please contact Anita Morris, Labor Liaison Officer at 312-603-3041 if you have any questions orconcerns. Procurement Awarded Contracts can be found at the following link:

www.cookcountvlldaov/procurement.

GREGG GOSLIN

14tii Distnct

TIMOTHY 0 SCHNEIDER

1561 District

Cc: Shannon Andrews, CPO

Margaret Angelucci

Michael Leyden

JEFFREY R. TOBOLSKI

16th Distnct

SEAN M, LIORRISON

I 'tii Distnct

$ Fiscal Responsibility f Innovative Leadership INI Transparency Ek Accountability LY Improved services

Page 43: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

COUPE MEMBER UNIONS

First Name

John

Don

Harrison

Thomas

Joe

Joe

John

John

John

Larry

Mark

Michael

Mike

Paul

Ramon

Last Name

Va lone

Finn

Mailey

Ryan, Jr.

Healy

Rinehart

M anley

Riel

Spiros

McNiff

O'Donnell

Tierney

Lowery

Wende

Williams

E-mail Address

IvaloneC8iuec2.corn

[email protected]

[email protected]

trvanirPcarpentersunion.ore

[email protected]

[email protected]

oocmiaSPsbcelobal,net

[email protected]

[email protected]

[email protected]

[email protected]

mtiernev@ualoca 1130.ore

MLOWERYgabacadc1.ore

paul.wende(Siwlocal63.corn

Comoanv

Elevator Constructors, Local 2

Local 134, IBEW

Pipefitters, Local 597

Carpenters

Loca I 1092

Painters

Plasterers

Boilermakers

830,27, & 14

Ir on workers

830

Plumbers

Bricklayers

Ir on workers

[email protected] Teamsters 700

Ray

Terry

Terry

Thomas

Tim

Tom

Vito

Su88s

O'rien

Shannon

Gavin

Keane

Ryan

Marchese

ravsuees@aotcom

[email protected]

[email protected]

teavinfaualocal130.ore

local17keaneaahotmail.corn

[email protected]

[email protected]

Sheet Metal Workers

Operating Engineers

Bricklayers

Plumbers

Insulators

Carpenters

IAM, 26

Page 44: )3 >!!...Date:06/1 8/2017 Tor Cook County, Purchasing 118N. Clark Rm, 1018 Chicano, illinois 60602 Work Order Number. 048806.00 From: Cook County Department of Capital Planning & …

Sub-Contractors:

1. Autumn Construction Sewices, Inc.449 Eisenhower Lane SouthLombard, IL 60148

2. I3randenburger Plumbing, Inc.3246 W 111'treetChicago, IL 60655