2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal...

74
Date Name Of Division RAB Agr/PO/LOI/WO and Dt MB NO./Page No/ Description of Work/Supply Work Supply Fund Reverved B- 923 27.08.16 CSD-I M/s BEML Ltd New Delhi 319/CPD-III/O- 1/06.04.16 1833/34 Supply of Spares of Bulldozers 1615410.00 B- 925 31.08.16 CSD-I M/s Swastik Enterprises 1474/CPD- I/CF/11.07.16 1749/42 Supply of Eaton makes spares 32117.00 B- 981 05.10.16 CSD-I M/s Shree Shyam Bearing P. Ltd 361/CPD-I/03.03.16 1827/142 Supply of Bearings 22941.00 B- 982 05.10.16 CSD-I M/s Shree Shyam Bearing P. Ltd 1505/CPD-I/13.07.16 1827/1471 Supply of Bearings 52999.00 B- 983 05.10.16 CSD-I M/s United Engineering Works 219/CPD-II/30.04.16 1827/140 Supply of order Works 161964.00 B- 992 15.10.16 CSD-I M/s Mechanical Engg. Co. 709/CPD-III/06.09.16 1718/72 Supply Coupling 196236.00 B- 1059 11.11.16 CSD-I M/s Vidyut Bhawan 821/CPD-I/13.07.16 1949/56 Supply 352036.00 B- 1132 29.12.16 CSD-I M/s Jaisia Industries Pvt. Ltd 1647/CPD-II/07.10.16 1718/74A Supply of Spares 584196.00 B- 1172 12.01.17 CSD-I M/s AtoZ Infra Spares 2380/CSD-I/23.11.16 1925/47 Supply of Spares 63529.00 B- 1185 20.01.17 CSD-I M/s H.B. Polymer Industries P. Ltd 1586/CPD-II/20.10.16 1820/82 Supply of Spares 239795.00 B- 1189 27.01.17 CSD-I M/s Northland Rubber Mills 1099/CPD-II/28.11.16 1833/44 Supply 1686825.00 B- 1192 30.01.17 CSD-I M/s AtoZ Infra Spares 11/BMD-II/12-13 1849/70 Supply 1663.00 B- 1215 15.02.17 CSD-I M/s Jalvid Udyog Kanpur 157/CPD-I/30.01.17 1959/22 Supply 22080.00 B- 1216 15.02.17 CSD-I M/s Jalvid Udyog Kanpur 157/CPD-I/30.01.17 1959/21 Supply 38100.00 B- 1217 15.02.17 CSD-I M/s Jalvid Udyog Kanpur 157/CPD-I/30.01.17 1959/23 Supply 10879.00 B- 1218 15.02.17 CSD-I M/s Jalvid Udyog Kanpur 157/CPD-I/30.01.17 1959/23 Supply 16746.00 B- 1219 15.02.17 CSD-I M/s Jalvid Udyog Kanpur 154/CPD-II/30.01.17 1959/20 Supply 202207.00 B- 1220 15.02.17 CSD-I M/s Industrial Sales & Supply Agency 114/CPD-I/21.01.17 1959/17 Supply 51252.00 B- 1221 15.02.17 CSD-I M/s Industrial Sales & Supply Agency 89/CPD-I/18.01.17 1959/18 Supply 238978.00 B- 1222 15.02.17 CSD-I M/s Technow Engg. Works 156/CPD-I/30.01.17 1959/14 Supply 128116.00 B- 1223 15.02.17 CSD-I M/s Technow Engg. Works 156/CPD-I/30.01.17 1959/13 Supply 73224.00 B- 1224 15.02.17 CSD-I M/s J.K. Engg. Co. 112/CPD-I/18.01.17 1959/18 Supply 39547.00 B- 1227 15.02.17 CSD-I M/s Vinay Trading Corporation 1531/CPD-I/15.07.16 1959/24 Supply 402347.00 B- 1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 B- 1263 09.03.17 CSD-I M/s Saurabh Udyog 92/CPD-III/13.02.17 1958/29 Supply 472243.00 B- 1264 09.03.17 CSD-I M/s Assam Carbon Products 137/CPD-I/28.01.17 1950/28 Supply 269663.00 B- 1283 24.03.17 CSD-I M/s Vidyut Bhawan 108/CPD-I/21.01.17 1948/34 Supply 35609.00 B- 1284 24.03.17 CSD-I M/s Dycon Systems Pvt. Ltd 153/CPD-I/30.01.17 1948/35 Supply 73500.00 0.00 0.00 7569144.00 B- 1308 06.04.17 CSD-I M/s Kaymohan Corporation 2503/CPD-I/19.12.16 1874/105 Supply 7161.00 FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B Reg Index Bill No Name of Firm FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED

Transcript of 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal...

Page 1: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved

B- 923 27.08.16 CSD-I M/s BEML Ltd New Delhi319/CPD-III/O-

1/06.04.161833/34

Supply of Spares of

Bulldozers

1615410.00

B- 925 31.08.16 CSD-I M/s Swastik Enterprises1474/CPD-

I/CF/11.07.161749/42

Supply of Eaton

makes spares

32117.00

B- 981 05.10.16 CSD-I M/s Shree Shyam Bearing P.

Ltd

361/CPD-I/03.03.16 1827/142 Supply of Bearings 22941.00

B- 982 05.10.16 CSD-I M/s Shree Shyam Bearing P.

Ltd

1505/CPD-I/13.07.16 1827/1471 Supply of Bearings 52999.00

B- 983 05.10.16 CSD-I M/sUnited Engineering

Works219/CPD-II/30.04.16 1827/140

Supply of order

Works

161964.00

B- 992 15.10.16 CSD-I M/s Mechanical Engg. Co. 709/CPD-III/06.09.16 1718/72 Supply Coupling 196236.00

B- 1059 11.11.16 CSD-I M/s Vidyut Bhawan 821/CPD-I/13.07.16 1949/56 Supply 352036.00

B- 1132 29.12.16 CSD-I M/s Jaisia Industries Pvt. Ltd 1647/CPD-II/07.10.16 1718/74A Supply of Spares 584196.00

B- 1172 12.01.17 CSD-I M/s AtoZ Infra Spares 2380/CSD-I/23.11.16 1925/47 Supply of Spares 63529.00

B- 1185 20.01.17 CSD-I M/s H.B. Polymer Industries

P. Ltd

1586/CPD-II/20.10.16 1820/82 Supply of Spares 239795.00

B- 1189 27.01.17 CSD-I M/s Northland Rubber Mills 1099/CPD-II/28.11.16 1833/44 Supply 1686825.00

B- 1192 30.01.17 CSD-I M/s AtoZ Infra Spares 11/BMD-II/12-13 1849/70 Supply 1663.00

B- 1215 15.02.17 CSD-I M/s Jalvid Udyog Kanpur 157/CPD-I/30.01.17 1959/22 Supply 22080.00

B- 1216 15.02.17 CSD-I M/s Jalvid Udyog Kanpur 157/CPD-I/30.01.17 1959/21 Supply 38100.00

B- 1217 15.02.17 CSD-I M/s Jalvid Udyog Kanpur 157/CPD-I/30.01.17 1959/23 Supply 10879.00

B- 1218 15.02.17 CSD-I M/s Jalvid Udyog Kanpur 157/CPD-I/30.01.17 1959/23 Supply 16746.00

B- 1219 15.02.17 CSD-I M/s Jalvid Udyog Kanpur 154/CPD-II/30.01.17 1959/20 Supply 202207.00

B- 1220 15.02.17 CSD-I M/sIndustrial Sales &

Supply Agency114/CPD-I/21.01.17 1959/17 Supply

51252.00

B- 1221 15.02.17 CSD-I M/sIndustrial Sales &

Supply Agency89/CPD-I/18.01.17 1959/18 Supply

238978.00

B- 1222 15.02.17 CSD-I M/s Technow Engg. Works 156/CPD-I/30.01.17 1959/14 Supply 128116.00

B- 1223 15.02.17 CSD-I M/s Technow Engg. Works 156/CPD-I/30.01.17 1959/13 Supply 73224.00

B- 1224 15.02.17 CSD-I M/s J.K. Engg. Co. 112/CPD-I/18.01.17 1959/18 Supply 39547.00

B- 1227 15.02.17 CSD-I M/sVinay Trading

Corporation1531/CPD-I/15.07.16 1959/24 Supply

402347.00

B- 1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00

B- 1263 09.03.17 CSD-I M/s Saurabh Udyog 92/CPD-III/13.02.17 1958/29 Supply 472243.00

B- 1264 09.03.17 CSD-I M/s Assam Carbon Products 137/CPD-I/28.01.17 1950/28 Supply269663.00

B- 1283 24.03.17 CSD-I M/s Vidyut Bhawan 108/CPD-I/21.01.17 1948/34 Supply 35609.00

B- 1284 24.03.17 CSD-I M/s Dycon Systems Pvt. Ltd 153/CPD-I/30.01.17 1948/35 Supply 73500.00

0.00 0.00 7569144.00

B- 1308 06.04.17 CSD-I M/s Kaymohan Corporation 2503/CPD-I/19.12.16 1874/105 Supply 7161.00

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

2X110 MW Parichha Thermal Power Project, Parichha (Jhansi)

B Reg

Index Bill

No

Name of Firm

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

Page 2: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

B- 1309 06.04.17 CSD-I M/s Kaymohan Corporation 2503/CPD-I/19.12.16 1874/104 Supply 63452.00

B- 1310 06.04.17 CSD-I M/sAnurag Engineering

Works2504/CPD-I/16-17 1874/107 Supply 88320.00

B- 1311 06.04.17 CSD-I M/sAnurag Engineering

Works2504/CPD-I/16-17 1874/106 Supply 6782.00

B- 1312 06.04.17 CSD-I M/sAnurag Engineering

Works2504/CPD-I/16-17 1874/108 Supply 150906.00

0.00 0.00 316621.00

B- 1405 03.05.17 CSD-I M/s Jain Milla Stor Pvt. Ltd 88/CPD-I/18.01.17 1925/53 Supply 286865.00

B- 1407 03.05.17 CSD-I M/s Jain Milla Stor Pvt. Ltd 113/CPD-I/21.01.17 1925/54 Supply 51063.00

B- 1467 19.05.17 CSD-I M/s Kay Mohan Corporation 2530/CPD-I/16-17 1746/189 Supply of Fastner 0.00 201046.00

B- 1468 19.05.17 CSD-I M/s Kay Mohan Corporation 2512/CPD-II/16-17 1748/190 Supply of Fastner 0.00 176208.00

0.00 377254.00 337928.00

B- 1507 05.06.17 CSD-I M/s U.P. Udyog Aligarh 106/CPD-I/21.01.17 1948/36 Supply of Spares 0.00 487980.00

B- 1534 24.06.17 CSD-I M/s Shri Bhawani Trading

Corpn.

1138/CPD-III/21.12.16 1834/58 Supply of Mach.

Seal

145465.00

B- 1535 27.06.17 CAMD-I M/s Maa Shakti Enterprises Withheld Amount 69296.00

B- 1536 27.06.17 CAMD-I M/s Usha Enterprises 01/CAMD-I/15-16 1909/36 O/H of Diffment

pipes

83626.00

B- 1537 27.06.17 CAMD-I M/s Usha Enterprises 03/CAMD-I/17-18 1909/36 O/H of Pumps 22102.00

B- 1538 27.06.17 CAMD-I M/s Syndicate Engineers 04/CAMD-I/17-18 1909/37B B/D Maint. & O/H

Works

27283.00

B- 1539 27.06.17 CAMD-I M/s Usha Enterprises 06/CAMD-I/15-16 1909/39 Reparing of BCW

Pumps

74516.00

B- 1541 30.06.17 CSD-I M/s Shri Bhawani Trading

Corpn.

656/CPD-II/11.06.17 1828/178 Supply of Mech.

Seal

66035.00

B- 1542 30.06.17 CSD-I M/s A to Z India Spares Pvt.

Ltd

626/CPD-II/04.06.17 1828/180 Fannas make

FBCL Coupling

7832.00

B- 1543 30.06.17 CSD-I M/s Sadan Engg. Works 06/CSD-I/16-18 1874/112 Unloading &

Loading of

Chemicals

43930.00

B- 1544 30.06.17 CHD-III M/s Priyanka Enterprises 11/CHD-III/16-17 2008/61 O/H & Servicesof

LT Modules panals

72482.00

B- 1545 30.06.17 CHD-III M/s Vikas Electricals 10/CHD-III/16-17 2008/62 Rewinding of LT

Motor

20443.00

B- 1546 30.06.17 CHD-III M/s Nosad Constractor 07/CHD-III/16-17 2008/64 Shifting of LT Motor 39567.00

B- 1547 30.06.17 CHD-III M/s Nosad Constractor 12/CHD-III/16-17 2008/64 Shifting & O/H of

LT Motor

36944.00

B- 1548 30.06.17 TMD-I M/s Usha Enterprises 09/TMD-I/17-18 1973/66 Attending System &

Water Leakage

62180.00

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

Page 3: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

B- 1557 30.06.17 CSD-I M/s Vikas Chauda 03/CSD-I/15-16 1947/74 Security 4200.00

B- 1558 30.06.17 CSD-I M/s MAK Construction 08/CSD-I/2017 1947/78 Repairing of Escat

Crain.

21945.00

797846.00 487980.00 0.00

B- 1559 01.07.17 AHD-I M/s S.Kumar & Co. 02/AHD-I/17-18 1887/192 Security 7046.00

B- 1560 01.07.17 AHD-I M/s S.Kumar & Co. 06/AHD-I/16-17 1887/191 Security 2400.00

B- 1561 01.07.17 AHD-I M/s S.Kumar & Co. 08/AHD-I/16-17 1887/191 Security 3548.00

B- 1562 01.07.17 AHD-I M/s Bharati Enterprises 13/AHD-I/15-16 1887/193 Security 59965.00

B- 1563 10.07.17 ECMD-I M/s Shyam Constricition 03/ECMD-I/16-17 1863/90B Security 25524.00

B- 1564 10.07.17 CAMD-I M/s Syndicate Engineers 2 04/CAMD-I/17-18 1908/76 B/D Maint O/H &

Febrication Works

150030.00

B- 1565 10.07.17 CAMD-I M/s Usha Enterprises 2 03/CAMD-I/17-18 1908/77B O/H of BCW

Systems

9715.00

B- 1566 11.07.17 BMD-II M/s Syndicate Engineers 3 15/BMD-II/16-17 2007/39 M&R of Boiler 94329.00

B- 1567 11.07.17 BMD-II M/s MAK Construction 2 33/BMD-II/16-17 2007/42 O/H of Boiler 144342.00

B- 1568 11.07.17 BMD-II M/s Syndicate Engineers 3 20/BMD-II/16-17 2007/44 O&M of Boiler 76503.00

B- 1569 12.07.17 BMD-II M/s MAK Construction 1 30/BMD-II/16-17 2006/06 O/H of Chainpully 87722.00

B- 1570 12.07.17 BMD-II M/s MAK Construction 1 01/BMD-II/16-17 200/10B M&R of Wind Box 314370.00

B- 1574 13.07.17 OGD-I M/s Maa Shakti Enterprises 1 09/OGD-I/17-18 1907/133 M&R of Filter Plant 56303.00

B- 1575 13.07.17 EMD-III M/s R.P. Construction 2 23/EMD-III/16-17 1824/26A O/H of T.F 196708.00

B- 1576 13.07.17 EMD-III M/s R.P. Construction 1 20/EMD-III/16-17 1779/62 O/H of Breaker 246206.00

B- 1577 13.07.17 CHD-III M/s Vikas Electricals 13 10/CHD-III/15-16 2008/69 Rewinding of LT

Motor

131892.00

B- 1578 13.07.17 OGD-I M/s Maa Shakti Enterprises 2 09/OGD-I/17-18 1906/185 O.H & B/D Maint.

Of DM Plant

45325.00

B- 1579 14.07.17 ECMD-II M/s Jamuna Mehar

Enterprises

Withheld Amount 171122.00

B- 1580 14.07.17 BMD-II M/s MAK Construction 2 30/BMD-II/16-17 1786/97 O/H of Chainpully 73058.00

B- 1581 14.07.17 BMD-II M/s MAK Construction 2 32/BMD-II/16-17 1786/98 M&R of ID Fan 112017.00

B- 1582 14.0.17 BMD-II M/s Marfat Construction Withheld Amount 130593.00

B- 1586 15.07.17 EMD-II M/s Vikas Electricals 2 25/EMD-II/16-17 1691/98 M&R of LT

Electrical Systems

54300.00

B- 1587 15.07.17 EMD-II M/s Priya Construction Co. 2 26/EMD-II/16-17 1932/44 M&R of DG Set 36484.00

B- 1589 17.07.17 CPD-II M/s R.P. Construction F 07/CPD-II/17-18 1971/29 Cleaning of VIP G.

House

304045.00

B- 1590 17.07.17 CPD-II M/s Akshat Enterprises Withheld Amount 66424.00

B- 1593 17.07.17 ECMD-II M/s K.S. & Btrothers 3 17/ECMD-II/16-17 1876/44b M&R of Intanal

Water Supply in

Colony

255947.00

B- 1594 17.07.17 CHD-I M/s Priyanka Enterprises 7 11/CHD-I/16-17 1889/93B O/H of B. Dozer 69242.00

B- 1595 21.07.17 BMD-I M/s Tech Thermology 4 23/BMD-I/16-17 1936/79 M&R of Boiler 126779.00

B- 1596 21.07.17 TC&ID-I M/s D.K. & Sons Co. 3 22/TC&ID/16-17 1896/54A O/H of TC&ID 35895.00

Page 4: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

B- 1597 21.07.17 TC&ID-I M/s Industrial Engg.

Enterprises

15/TC&ID/16-17 1896/52B M&R of C&ID 34997.00

B- 1598 21.07.17 EMD-II M/s Nosad Contractor 2 28/EMD-II/16-17 1899/24A O/H of 0.4 KV

Moter

15698.00

B- 1599 21.07.17 EMD-II M/s Vikas Electricals 2 22/EMD-II/16-17 1895/34 Recoinding of

Motor

54803.00

B- 1600 26.07.17 CSD-I M/s Sadan Engg. Works 3 06/CSD-I/16-17 1874/59 Unloading/Loading

& Shifting of Stam

5980.00

B- 1602 27.07.17 EMD-II M/s R.L. Engg. 2 30/EMD-II/16-17 1880/68 O/H of Vanous

Type

109469.00

B- 1606 27.07.17 ECMD-II M/s Shyam Constricition 4 12/ECMD-II/16-17 1765/124 M&R of Stone 246771.00

B- 1607 28.07.17 EMD-I M/s Chhabi Electricals Pvt.

Ltd

387/EMD-I/16-17 1791/33A Serviceing &

Recption fo Bettory

17825.00

B- 1608 28.07.17 EMD-I M/s Nosad Contractor 2 10/EMD-I/15-16 1791/33B Salvaofing &

Laying

90712.00

B- 1609 28.07.17 EMD-I M/s Nosad Contractor 2 11/EMD-I/29.03.16 1791/34A Fabrication of Shet

of HT Motor

69430.00

B- 1610 28.07.17 EMD-I M/s MRP Construction 05/EMD-I/17.02.16 1630/150 Security 9400.00

B- 1611 29.07.17 ECMD-I M/s Shyam Constricition 5 12/ECMD-I/15-16 1765/133 M&R of Stone 386216.00

B- 1612 29.07.17 ECMD-I M/s Sharma Enterprises 06/ECMD-I/14-15 1918/12 Security 41301.00

4170436.00 0.00 0.00

B- 1613 01.08.17 CSD-I M/s Ganesh Sales Services 155/CPD-I/20.01.17 1925/55 Supply 0.00 31463.00

B- 1614 01.08.17 CSD-I M/s Technow Engg. Works 151/CPD-I/30.01.17 1925/107 Supply 0.00 4408.00

B- 1617 08.08.17 TMD-I M/s Marfat Construction Co. 1 09/TMD-I/17-18 1935/131 Insulation Works

of Boiler

204258.00

B- 1619 08.08.17 TMD-I M/s Ideal Flow Control Pvt.

Ltd

1 03/TMD-I/16-17 1973/73 O&M of TG Set 110000.00

B- 1621 09.08.17 BMD-I M/s G.S. Construction Co. 07/BMD-I/16-17 1974/48 Security 24914.00

B- 1622 09.08.17 BMD-I M/s Press Tools Industries 06/BMD-I/16-17 1967/24 Security 54600.00

B- 1623 18.08.17 BMD-II M/s Marfat Construction Co. 8 17/BMD-II/16-17 2000/18 Insulation Works

of Boiler

107289.00

B- 1624 18.08.17 BMD-II M/s Alok Industeries 1 04/BMD-II/17-18 1976/29 M&R of Boiler 350224.00

B- 1627 18.08.17 BMD-II M/s Bharat Mechenical &

Structural Works

Withheld Amount 312227.00

B- 1628 18.08.17 BMD-I M/s U.S. Enterprises 19/BMD-I/15-15 1936/78 Security 81928.00

B- 1629 18.08.17 BMD-I M/s MAK Construction 29/BMD-I/16-17 1797/94 Security 19708.00

B- 1630 18.08.17 BMD-I M/s MAK Construction 04/BMD-I/16-17 1797/94B Security 5308.00

B- 1631 18.08.17 BMD-I M/s MAK Construction 11/BMD-I/14-15 1988/3 Security 97343.00

B- 1632 18.08.17 BMD-I M/s MAK Construction 33/BMD-I/13-14 1988/3 Security 78199.00

B- 1633 18.08.17 ECMD-II M/s Vijay Kumar Gupta 15/ECMD-II.15-16 1864/83 Security 22954.00

B- 1641 21.08.17 AHD-I M/s S.R. Enterprises Withheld Amount 6189.00

Page 5: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

B- 1644 21.08.17 AHD-I M/s Jitendra Verma 08/AHD-I/16-17 1919/197 Security 6588.00

B- 1645 21.08.17 AHD-I M/s Jai Devi Behta 16/AHD-I/16-17 1919/198 Security 3312.00

B- 1646 21.08.17 AHD-I M/s S.Kumar & Co. 15/AHD-I/16-17 1919/198 Security 2400.00

B- 1648 24.08.17 CHD-I M/s Shyam Construction 10/CHD-I/13-14 1983/109 Security 45000.00

B- 1649 24.08.17 EMD-I M/s Harishankar Contractor 15/EMD-I/14-15 1512/22 Security 3276.00

B- 1650 24.08.17 EMD-I M/s Harishankar Contractor 01/EMD-I/12-13 1512/23 Security 13140.00

B- 1652 28.08.17 CPD-II M/s Ashish Enterprises 01/CPD-II/15-16 1939/45 Security 95027.00

B- 1653 28.08.17 CPD-II M/s Ramit Erectors 05/EMD-III/15-16 1939/45 Security 36700.00

B- 1660 31.08.17 CHD-III M/s Nosad Contractor 11 12/CHD-III/15-16 2008/79 O/H & Shifting of

LT Motor

6047.00

B- 1661 31.08.17 CHD-III M/s Nosad Contractor 6 07/CHD-III/16-17 2008/78 Shifting of Motor 32604.00

1719235.00 35871.00 0.00

B- 1662 05.09.17 BMD-II M/s Marfat Construction Co. 2 05/BMD-II/17-18 1953/162 Insulation Works

of Boiler

236036.00

B- 1663 06.09.17 ECMD-I M/s Shyam Construction 6 12/ECMD-II/15-16 1765/136 M&R of Store Shed 53683.00

B- 1665 06.09.17 ECMD-II M/s K.S. & Brothers 19/ECMD-II/15-16 2014/12 Security 109197.00

B- 1666 06.09.17 ECMD-II M/s K.S. & Brothers 46/ECMD-II/14-15 2014/11B Security 49897.00

B- 1667 06.09.17 ECMD-II M/s K.S. & Brothers 11/ECMD-II/10-11 2014/11 Security 24588.00

B- 1669 11.09.17 ECMD-II M/s Avtar Construction Withheld Amount 21444.00

B- 1672 12.09.17 CHD-I M/s Priyanka Enterprises 8 11/CHD-I/16-17 1867/15 O/H of BEML

B.Dozer

109728.00

B- 1673 12.09.17 CHD-I M/s Rohini Tranport Corpn. 11/CHD-I/15-16 1867/21 Security 198907.00

B- 1676 12.09.17 CHD-I M/s Priyanka Enterprises 11/CHD-I/16-17 1867/23B O/H of BEML

B.Dozer

91202.00

B- 1679 14.09.17 CSD-I M/s BEML Ltd 224/CPD-III/11.03.16 1948/46 Supply of Spares 0.00 1050400.00

B- 1681 15.09.17 BMD-II M/s Priyanka Enterprises 2 11/CHD-III/16-17 2008/89 O/H of Contant 19668.00

B- 1682 18.09.17 BMD-II M/s S.K. Engg. Works 1 02/BMD-II/17-18 1981/15 M&R of Air Heater 314094.00

B- 1683 18.09.17 EMD-I M/s Online Bhopal 07/EMD-I/17-18 1759/38 Security 64500.00

B- 1687 22.09.17 CHD-I M/s Krishna Belts Pvt. Ltd 75/CHD-I/13.02.17 2030/02 Maint of Conveyor

Belt

880225.00

B- 1688 22.09.17 CHD-III M/s Nosad Contractor 7 07/CHD-III/16-17 2008/90 Shifting of Motor 27401.00

B- 1689 22.09.17 CHD-III M/s Nosad Contractor 12 12/CHD-III/15-16 2008/91 O/H of Motor 17965.00

B- 1690 22.09.17 CHD-III M/s Vikas Electrical 14 10/CHD-III/15-16 2008/92 Rewinding Motor 179486.00

B- 1691 22.09.17 AHD-I M/s S.R. Enterprises 1 03/AHD-I/17-18 2032/52 Fabrication/Laying

of AH Line

321722.00

B- 1692 27.09.17 CSD-I M/s Satyam Weigning

System

04/CSD-I/17-18 1575/159 Replacement of

Deffence Order

67260.00

2787003.00 1050400.00 0.00

Page 6: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

B- 1694 03.10.17 CHD-I M/s Priyanka Enterprises 3 06/CHD-I/16-17 1872/44 Reparing & O/H of

FID

205000.00

B- 1695 06.10.17 BMD-II M/s Marfat Construction Co. 17/BMD-II/16-17 1999/17A Security 30000.00

B- 1696 06.10.17 BMD-II M/s K.S. Construction 40/BMD-II/16-17 1999/17B Security 18754.00

B- 1697 06.10.17 CSD-I M/s BEML Ltd 203/CPD-III/22.04.17 1718/77A Supply of Spares 0.00 559612.00

B- 1698 07.10.17 CHD-II M/s M.K. Traders 12 10/CHD-II/16-17 2009/81 O/H & O&M of FO

Pump House

76126.00

B- 1700 11.10.17 BMD-I M/s G.S. Construction Co. 28/BMD-I/29.08.17 1028/198 Security 17840.00

B- 1701 11.10.17 BMD-I M/s Puneet Construction 40/BMD-II/17-18 1937/43 Security 22668.00

B- 1702 11.10.17 CHD-III M/s Amit Srivas 12/CHD-III/16-17 1938/45B Security 7084.00

B- 1703 11.10.17 BMD-I M/s Nosad Contractor 14/BMD-I/15-16 1797/94 Security 9875.00

B- 1704 13.10.17 CFA&B

O

M/s Agra Computer 07/CPD-I/15-16 361/14 Security 27776.00

B- 1705 13.10.17 EMD-II M/s Priya Construction Co. 3 26/EMD-II/16-17 1932/47 M&R of Electrical

Eqump.

86664.00

B- 1706 13.10.17 EMD-II M/s Vikas Electrical 3 22/EMD-II/16-17 1895/37 Rewinding of Motor 117552.00

B- 1707 13.10.17 CSD-I M/s Supath Engg. Services

P. Ltd

685/CPD-I/26.08.17 1950/37 Supply of Spares 0.00 50886.00

B- 1708 17.10.17 ECMD-II M/s Shyam Construction 12/ECMD-II/15-16 1765/139 Security 107418.00

B- 1709 17.10.17 ECMD-II M/s Shyam Construction 12/ECMD-II/15-16 1765/140 10% Advance

Withral one time

47014.00

B- 1711 23.10.17 CHD-I M/s Priyanka Enterprises 10 11/CHD-I/16-17 1867/26 O/H of 6 Nos.

BEML Make Bull

Dozer

75166.00

B- 1712 25.10.17 BMD-II M/s MAK Construction Co. 3 32/BMD-II/16-17 2007/57 Replacement/

Reparing works

175760.00

B- 1713 25.10.17 BMD-II M/s Syndicate Engineers 4 20/BMD-II/16-17 2007/59 Maint & Serviceing

Bowl Mill

199196.00

B- 1714 25.10.17 BMD-II M/s Syndicate Engineers 4 15/BMD-II/16-17 2007/62 M&R of Boiler 176475.00

B- 1715 25.10.17 EMD-III M/s R.P. Construction Co. 3 23/EMD-III/16-17 1779/68 O/H of Transformer 80240.00

B- 1716 25.10.17 EMD-III M/s R.P. Construction Co. 2 20/EMD-III/16-17 1779/69 O/H of OCB 204990.00

B- 1717 25.10.17 EMD-III M/s R.P. Construction Co. 1 10/EMD-III/17-18 1824/28 Salvaging/capling

of Conductor Cable

144272.00

B- 1718 25.10.17 EMD-III M/s Ramit Erectors 1 04/EMD-III/17-18 1686/92 Rewinding & O/H of

Lering Fan

304626.00

B- 1722 30.10.17 ECMD-I M/s Vijay Kumar Gupta 3 05/ECMD-I/16-17 1765/138 M&R of Turbine

Hall

0.00

B- 1723 31.10.17 CHD-III M/s Nosad Contractor 13 12/CHD-III/15-16 1854/97 O/H of HT/LT

Motor

28887.00

B- 1724 31.10.17 CHD-III M/s Nosad Contractor 8 07/CHD-III/16-17 1854/98 Shifting of Motor 26781.00

2190164.00 610498.00 0.00

Page 7: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

B- 1725 02.11.17 TMD-I M/s The Indian Thermit

Corp. Ltd

14/TMD-I/17-18 2028/05 M&R of Turbine

Hall

370500.00

B- 1727 03.11.17 ECMD-I M/s S.R. Enterprises 08/ECMD-I/16-17 1878/48 Security 16415.00

B- 1728 03.11.17 ECMD-I M/s Avtar Construction 04/ECMD-I/14-15 1864/98 Security 40068.00

B- 1729 03.11.17 ECMD-I M/s Vijay Kumar Gupta 14/ECMD-I/15-16 1864/97 Security 69917.00

B- 1732 08.11.17 CSD-I M/s Krishan Kumar

Distributors Pvt. Ltd

515/CPD-II/24.11.17 1950/4 Supply of Excide

Make Battery

0.00 175859.00

B- 1733 09.11.17 TMD-I M/s M.K. Traders 1 10/TMD-I/17-18 1935/134 Starm Get Enject 42120.00

B- 1734 09.11.17 TMD-I M/s Marfat Construction Co. 2 09/TMD-I/17-18 1935/135 O&M of TG 159654.00

B- 1735 09.11.17 TMD-I M/s MAK Construction Co. 1 16/TMD-I/17-18 1935/137 Reparing & O/H of

FID

39922.00

B- 1736 13.11.17 CFA&B

O

M/s Sanjog Proffesional

Services

20/CPD-I/2006-07 361/129 Security 25900.00

B- 1742 13.11.17 CHD-III M/s Priyanka Enterprises 3 11/CHD-III/16-17 1938/47 O/H of LT Brikes 92832.00

B- 1745 14.11.17 OGD-I M/s Bareli Engg. Co. 1 11/OGD-I/17-18 1906/190 M&R of DM Plant 509465.00

B- 1746 14.11.17 TMD-I M/s Usha Enterprises 2 09/TMD-I/16-17 1972/73 Attending Strech

water Leakage

21009.00

B- 1747 14.11.17 TMD-I M/s M.K. Traders 1 07/TMD-I/17-18 1772/77 O/H of ESP Valves 19263.00

B- 1751 14.11.17 BMD-II M/s Marfat Construction Co. 2 05/BMD-II/17-18 1952/75 Insulation Works 217009.00

B- 1754 15.11.17 EMD-I M/s Nosad Contractor 1 08/EMD-I/17-18 1688/157 Prevenne Maint. Of

6.6 KV HT Motor

21648.00

B- 1755 15.11.17 EMD-I M/s Nosad Contractor 3 02/EMD-I/15-16 1688/188 O/H of ID Fan

Motor

45017.00

B- 1756 15.11.17 EMD-I M/s Nosad Contractor 3 19/EMD-I/16-17 1404/189 Assemble of ID

Fan Motor

23686.00

B- 1757 15.11.17 EMD-I M/s Nosad Contractor 4 10/EMD-I/15-16 1404/190 Laying of Control

Cable

20609.00

B- 1758 15.11.17 EMD-I M/s Process Maintinance

Enterprises

06/EMD-I/17-18 1404/191 M&r of ABT

Service Maint.

57392.00

B- 1759 15.11.17 EMD-I M/s Shyam Erectors 28/EMD-I/14-15 1630/159 Security 85567.00

B- 1760 15.11.17 EMD-I M/s R.P. Construction Co. 35/EMD-I/14-15 1630/159 Security 27600.00

B- 1761 15.11.17 BMD-II M/s Syndicate Engineers 5 15/BMD-II/16-17 1963/37/ M&R of P.F. Pipe

line of Miling

System

131452.00

B- 1762 15.11.17 BMD-II M/s Syndicate Engineers 5 20/BMD-II/16-17 1963/37 M&R of Bowl Mills 122722.00

B- 1763 15.11.17 BMD-II M/s MAK Construction Co. 3 30/BMD-II/16-17 1763/38 O/H of Chainpully 74964.00

B- 1764 15.11.17 ECMD-I M/s Chanki Construction Co. 06/ECMD-I/15-16 1879/35 Security 5347.00

B- 1765 15.11.17 ECMD-I M/s Chanki Construction Co. 07/ECMD-I/15-16 1879/35 Security 1766.00

B- 1766 17.11.17 CHD-II M/s Hind Udyog 17/CHD-II/16-17 2029/4B Fabrication of

Tripler

77762.00

Page 8: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

B- 1767 17.11.17 BMD-II M/s Syndicate Engineers 20/BMD-II/16-17 1963/39 M&R of Bowl Mills 139500.00

B- 1770 23.11.17 CHD-I M/s Hind Udyog 08/CHD-I/17-18 2002/2 Febrication of

Roller Shat f Pully

System

224683.00

B- 1771 23.11.17 TC&ID M/s R.P. Construction Co. 33/TC&ID/14-45 1896/50A Security 42869.00

B- 1772 23.11.17 TC&ID M/s R.P. Construction Co. 06/TC&ID/15-16 1896/00B Security 35694.00

B- 1773 23.11.17 TC&ID M/s Laxmi Narayan Prajapati 17/TC&ID/16-17 1896/51A Security 4200.00

B- 1774 23.11.17 TC&ID M/s Pooja Electrical Engg. 18/TC&ID/16-17 1896/51B Security 5460.00

B- 1775 23.11.17 TC&ID M/s K.K. Construction 16/TC&ID/16-17 1583/97B Security 19116.00

B- 1776 23.11.17 TC&ID M/s R.K. Construction 26/TC&ID/16-17 1910/77B Security 86500.00

B- 1779 27.11.17 BMD-II M/s Bharti Enterpries 25/BMD-II/16-17 1999/18 Security 91194.00

B- 1780 27.11.17 BMD-II M/s Bharti Enterpries 01/BMD-II/16-17 1999/18B Security 28076.00

B- 1781 27.11.17 BMD-II M/s Bharti Enterpries 12/BMD-II/16-17 1999/19A Security 28076.00

B- 1782 27.11.17 BMD-II M/s Sunrise Engg. &

Contractor

15/BMD-II/17-18 1999/20 Security 40724.00

B- 1785 30.11.17 CSD-I M/s CTR MFG Industries Ltd 1142/CPD-I/O-

1/21.11.17

1820/85 Supply of CTR

Makes Spares

0.00 1023414.00

B- 1786 30.11.17 CSD-I M/s CTR MFG Industries Ltd 1142/CPD-I/O-

1/21.11.17

1820/86 Supply of CTR

Makes Spares

0.00 88500.00

B- 1787 30.11.17 CSD-I M/s ABB India Ltd 1081/CPD-I/O-

1/07.11.17

1833/48 Supply of ABB

Makes Spares

0.00 142085.00

3065698.00 1429858.00 0.00

B- 1791 07.12.17 OGD-I M/s D.K. & Sons Co. 01/OGD-I/17-18 1906/192 Security 56312.00

B- 1792 07.12.17 CHD-I M/s Bharati Enterprises F&F 07/CHD-I/17-18 2005/13 Evocation of Bill

R.C. Bonkers

476198.00

B- 1794 08.12.17 CPD-II M/s Akashat Enterprises 1 41/CPD-II/16-17 1971/57 M&R of VIP Guest

House

51217.00

B- 1796 08.12.17 TC&ID M/s Sanjay Electronics 3 13/TC&ID-I/16-17 1881/65B O/H of Hydra motor

Valves

115688.00

B- 1797 11.12.17 CSD-I M/s Schenck Process Pvt.

Ltd

573/CPD-I/22.04.17 1718/77 Supply of Spares 0.00 772605.00

B- 1798 15.12.17 CHD-III M/s Priyanka Enterprises 4 11/CHD-III/16-17 1853/46 O/H of LT/HT

Brikes

48135.00

B- 1799 15.12.17 CHD-III M/s Nosad Contractor 14 12/CHD-III/15-16 1853/46 O/H of LT Motor 52386.00

B- 1800 15.12.17 CHD-III M/s Nosad Contractor 9 07/CHD-III/16-17 1853/46B Shifting of LT/HT

Motor

49738.00

B- 1801 15.12.17 TMD-I M/s Usha Enterprises 16/TMD-I/15-16 1972/72 Security 29808.00

B- 1802 16.12.17 CSD-I M/s J.Umashankar & Co.

Pvt. Ltd

397/CPD-I/22.06.17 1874/115 Supply of Spares 0.00 72112.00

B- 1803 16.12.17 CSD-I M/s Flowtech Engineers 2573/CPD-I/06.02.16 1874/117 Freight Charges 7436.00

Page 9: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

B- 1806 18.12.17 ECMD-II M/s Jamuna Mehar

Enterprises

3 11/ECMD-II/16-17 1846/73B White Washing of

Resi. Bldg.

313921.00

B- 1808 19.12.17 BMD-II M/s Marfat Construction 4 05/BMD-II/17-18 1963/39B M&R of Boiler 132368.00

B- 1809 19.12.17 BMD-II M/s Marfat Construction 4 05/BMD-II/17-18 1981/17 M&R of Boiler 59555.00

B- 1810 19.12.17 BMD-II M/s MAK Construction Co. 3 33/BMD-II/16-17 1811/30 O/H of Boiler 69251.00

B- 1811 21.12.17 EMD-III M/s T.S. Enterprises 12/EMD-III/16-17 1994/71 Security 91737.00

B- 1812 21.12.17 EMD-III M/s Ramit Erectors 09/EMD-III/16-17 1994/71 Security 49999.00

B- 1814 23.12.17 CFA&BO M/s Manoj Kumar Gupta 1340/CFA&BO/16-17 361/133 Security 8400.00

B- 1815 23.12.17 S&TD M/s Sunrise Engg. &

Contractor

F&F W0903/25.10.17 1998/13A Develoment fo Play

Grand

10620.00

B- 1816 23.12.17 CSD-I M/s Sail Kanpur 1263/CPD-I/19.12.17 1757/10 Supply of Steels 0.00 1277327.00

B- 1818 27.12.17 CAMD-I M/s Syndicate Engineers 3 04/CAMD-I/16-17 1927/14B B/D Maint. O/H &

Febrication Works

98088.00

B- 1819 27.12.17 CAMD-I M/s Usha Enterprises 3 03/CAMD-I/17-18 1927/16 O/H of BCW

Systems

112502.00

B- 1820 27.12.17 EMD-III M/s T.S. Enterprises 25/EMD-III/16-17 1993/82 Security 29174.00

B- 1821 27.12.17 EMD-III M/s Ramit Erectors 24/EMD-III/16-17 1993/82 Security 29362.00

B- 1822 27.12.17 EMD-III M/s R.P. Constrcution 2 20/EMD-III/16-17 1779/74 O./H of Busduct 71349.00

B- 1823 27.12.17 EMD-III M/s R.P. Constrcution 4 23/EMD-III/16-17 1779/77 O/H of Transformer 55224.00

B- 1825 28.12.17 ECMD-I M/s Arvind Singh 09/ECMD-I/16-17 2018/08 Security 2400.00

B- 1826 28.12.17 ECMD-I M/s Arvind Singh 04/ECMD-I/17-18 2018/08 Security 2400.00

B- 1827 28.12.17 ECMD-I M/s Tirupati Construction 12/ECMD-I/16-17 2018/146 Security 25124.00

B- 1828 30.12.17 S&TD M/s Jadaun Bus Services 20/S&TD/16-17 1885/83B Security 136138.00

2184530.00 2122044.00 0.00

B- 1829 04.01.18 EMD-I M/s Nosad Contractor 5 09/EMD-I/16-17 1754/114 M&R of Out Door

System

217993.00

B- 1830 04.01.18 EMD-I M/s Nosad Contractor 5 02/EMD-I/15-16 1754/117 M&R of HT Moter 59091.00

B- 1831 04.01.18 EMD-I M/s Nosad Contractor 1 02/EMD-I/17-18 1754/119 M&R of Out Door

System

28307.00

B- 1832 04.01.18 EMD-I M/s Nosad Contractor 5 10/EMD-I/15-16 1790/10 Cable Salvaring &

Lying of Rake

52725.00

B- 1833 04.01.18 EMD-I M/s Nosad Contractor 4 13/EMD-I/16-17 1871/80 M&R of T.F 101961.00

B- 1834 04.01.18 EMD-I M/s Nosad Contractor 2 02/EMD-I/17-18 1871/81 M&R of Out Door

System

2768.00

B- 1835 06.01.18 BMD-I M/s Mohan Lal Enviro

Engineers

1 43/BMD-I/17-18 1974/52 Preparing of AEAR

of PTPP

33512.00

B- 1836 06.01.18 BMD-I M/s Mohan Lal Enviro

Engineers

2 43/BMD-I/17-18 1974/53 Preparing of AEAR

of PTPP

28792.00

B- 1838 06.01.18 TMD-I M/s Usha Enterprises 08/TMD-I/14-15 1801/162 Security 35624.00

B- 1840 09.01.18 TC&ID M/s Industrial Engg.

Enterprises

1 09/TC&ID/17-18 1636/92B Reconditing & B/D

Maint. Equp.

67500.00

Page 10: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

B- 1841 09.01.18 TC&ID M/s D.K. & Sons Co. 4 22/TC&ID/16-17 1636/79B O/H Repearing &

B/D Maint. Moter

47236.00

B- 1842 09.01.18 TC&ID M/s D.K. & Sons Co. 3 27/TC&ID/16-17 1636/80B Reparing Works 54235.00

B- 1843 09.01.18 TC&ID M/s Industrial Engg.

Enterprises

2 09/TC&ID/17-18 1636/81A Reconditing & B/D

Maint. Equp.

57761.00

B- 1844 10.01.18 ECMD-II M/s Sadan Engg. Works 31/ECMD-II/15-16 1790/93 Security 25994.00

B- 1845 10.01.18 ECMD-I M/s K.S.& Brothers 3 16/ECMD-I/16-17 2011/94 M&R of Doors &

Window of Colony

329075.00

B- 1849 12.01.18 EMD-II M/s Instrument Care Group 20/EMD-II/16-17 1898/29B Security 40501.00

B- 1851 12.01.18 CHD-I M/s Priyanka Enterprises 13 11/CHD-I/16-17 1867/38A O/H of Verious

parts of Bull Dozer

88924.00

B- 1852 15.01.18 EMD-I M/s Nosad Contractor 3 10/EMD-I/15-16 1984/33 Staring Cable lying

from switch yard

1668.00

B- 1853 15.01.18 EMD-I M/s Nosad Contractor 3 13/EMD-I/16-17 1984/31 M&R of

Transformer

23138.00

B- 1854 15.01.18 EMD-I M/s Nosad Contractor 4 09/EMD-I/16-17 1984/34 M&R of Switchyard 2309.00

B- 1855 15.01.18 EMD-I M/s Nosad Contractor 3 02/EMD-I/17-18 1984/35 M&R of Switchyard 30886.00

B- 1856 15.01.18 EMD-I M/s Nosad Contractor 4 02/EMD-I/17-18 1984/37 M&R of Switchyard 238008.00

B- 1857 15.01.18 EMD-II M/s Priya Construction Co. 3 26/EMD-II/16-17 1932/51 M&R of Electrical

Equip.

84102.00

B- 1858 15.01.18 EMD-II M/s R.L. Engg. Works F&F 06/EMD-II17-18 1880/71 Supply &

Installation of

Exhanit Fan

81828.00

B- 1859 15.01.18 EMD-II M/s R.L. Engg. Works F&F 30/EMD-II/16-17 1880/74 M&R of Electrical

Equip.

112240.00

B- 1860 17.01.18 EMD-II M/s Ramit Erectors 2 04/EMD-II/17-18 1994/76 Internal Electrical

of Resi. Bldg.

108013.00

B- 1861 20.01.18 EMD-II M/s Nosad Contractor 3 28/EMD-II/16-17 1899/25B O/H of 0.4 KV LT

Motor

22302.00

B- 1862 20.01.18 CSD-I M/s Globe Enterprises 331/CPD-I/16-17 1959/28 Supply 0.00 8889.00

B- 1863 20.01.18 CSD-I M/s Globe Enterprises 331/CPD-I/16-17 1959/85 Supply 0.00 26696.00

B- 1864 20.01.18 CSD-I M/s Globe Enterprises 1007/CPD-I/17-18 1959/36 Supply 0.00 357608.00

B- 1866 23.01.18 CSD-I M/s AAR Sellar Tredco 1313/CPD-I/17-18 1965/24 Supply of Electrical

Items

0.00 92049.00

B- 1869 23.01.18 ECMD-II M/s Akashat Enterprises 1 14/ECMD-II/17-18 1911/33 M&R of Colony 207910.00

B- 1870 23.01.18 ECMD-II M/s Ashish Enterprises 1 13/ECMD-II/17-18 1893/51 M&R of Colony 55090.00

B- 1871 24.01.18 ECMD-II M/s Vikas Electricals 3 23/EMD-II/16-17 2040/06 Emegency B/D

Maint. Of LT Equp.

225617.00

Page 11: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

2465110.00 485242.00 0.00

B- 1872 03.02.18 CFA&B

O

M/s Manoj Kumar Gupta 559/CFA&BO/16-17 361/141 Security 8400.00

B- 1873 03.02.18 EMD-II M/s Priya Construction Co. 1 13/EMD-II/17-18 1945/30 P/M & O/H of LT

Motors

154629.00

B- 1875 05.02.18 EMD-I M/s Awasthi Motor Winding

Works

06/EMD-I/15-16 1630/158 Security 16460.00

B- 1876 05.02.18 EMD-I M/s Awasthi Motor Winding

Works

37/EMD-I/12-13 1630/158 Security 403600.00

B- 1877 05.02.18 EMD-I M/s Awasthi Motor Winding

Works

33/EMD-I/15-16 1630/ Security 88073.00

B- 1879 08.02.18 CPD-II M/s Jamuna Mehar

Enterprises

1 04/CPD-II/17-18 1939/54A Misc. Civil Works 211537.00

B- 1881 08.02.18 CSD-I M/s Commercial Enterprises 1344/CPD-I/10.01.18 1799/106 Supply of Bearing 0.00 52386.00

B- 1882 08.02.18 CSD-I M/s Trade India Corporation 1343/CPD-I/10.01.18 1977/107 Supply of Bearing 0.00 6230.00

B- 1883 08.02.18 CSD-I M/s Sadan Engg. Works 1 07/CSD-I/17-18 1745/196 Unloading/Loading

of Machine

57036.00

B- 1884 08.02.18 CSD-I M/s Sadan Engg. Works 4 06/CSD-I/16-17 1745/196 Unloading/Loading

of Machine

9204.00

B- 1885 09.02.18 EMD-I M/s Nosad Contractor 5 02/EMD-I/17-18 1984/40 M&R of Electrical

Equip.

3916.00

B- 1886 09.02.18 EMD-I M/s Nosad Contractor 6 02/EMD-I/17-18 1984/41 M&R of Electrical

Equip.

11051.00

B- 1887 09.02.18 EMD-I M/s Nosad Contractor 5 13/EMD-I/16-17 1985/29 Drawing of

Transformer

13076.00

B- 1889 13.02.18 CSD-I M/s Sadan Engg. Works 06/CSD-I/16-17 1746/197 Security 25512.00

B- 1890 13.02.18 CSD-I M/s Sadan Engg. Works 07/CSD-I/15-16 1746/197 Security 24455.00

B- 1891 16.02.18 CHD-III M/s Priyanka Enterprises 5 11/CHD-III/16-17 1853/50B O/H of LT Motor 22093.00

B- 1892 16.02.18 CHD-III M/s Nosad Contractor 15 12/CHD-III/15-16 1853/51 O/H of LT Motor 56584.00

B- 1893 16.02.18 CHD-III M/s Nosad Contractor 10 07/CHD-III/16-17 1853/51 Motor Shifting 49553.00

B- 1894 17.02.18 CSD-I M/s Hind Udyog 1797/CPD-II/20.12.17 1820/90 Supply 0.00 161896.00

B- 1895 19.02.18 ECMD-II M/s Ajeet Singh Enterprises 56/CWCD-II/15.02.18 150/196 Security 26587.00

B- 1896 19.02.18 CANCEL

BY

0.00

B- 1897 19.02.18 ECMD-II M/s Ashish Enterprises 1 24/ECMD-II/17-18 1912/20 White Washing in

Colony

291740.00

B- 1898 19.02.18 ECMD-II M/s Jamuna Mehar

Enterprises

1 22/ECMD-II/17-18 1846/77 White Washing in

Colony

286109.00

B- 1899 20.02.18 EMD-I M/s Nosad Contractor 4 19/EMD-I/16-17 1987/59 Shifting of Motor 41636.00

B- 1900 20.02.18 EMD-I M/s Nosad Contractor 6 02/EMD-I/15-16 1987/61 O/H of 6.6 KV

Motor

19699.00

B- 1901 20.02.18 EMD-I M/s Nosad Contractor 5 02/EMD-I/17-18 1987/62 M&R of Switch

Yard

25705.00

Page 12: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

B- 1902 20.02.18 EMD-I M/s Nosad Contractor 6 02/EMD-I/17-18 1987/69 M&R of Switch

Yard

31531.00

B- 1903 20.02.18 EMD-I M/s Nosad Contractor 1 09/EMD-I/17-18 1987/70 M&R of HT/LT

Motor

6079.00

B- 1904 20.02.18 EMD-I M/s Nosad Contractor 2 09/EMD-I/17-18 1987/53 M&R of HT/LT

Motor

8139.00

B- 1906 27.02.18 CSD-I M/s Technow Engg Work 1404/CPD-I/24.01.18 1947/86 Supply of

Consumable

0.00 12980.00

1892404.00 233492.00 0.00

B- 1907 07.03.18 OGD-I M/s Maa Shakti Enterprises 26/OGD-I/13-14 1906/194 Security 84720.00

B- 1908 07.03.18 OGD-I M/s Maa Shakti Enterprises 22/OGD-I/16-17 1906/194 Security 48649.00

B- 1909 07.03.18 OGD-I M/s Maa Shakti Enterprises 15/OGD-I/16-17 1906/193 Security 34998.00

B- 1911 09.03.18 ECMD-II M/s Vijay Kumar Gupta 2 826/ECMD-II/11-12 1892/169B M&R of N/R Bldg.

in colony

520517.00

B- 1912 09.03.18 ECMD-II M/s Basant Bahar

Restaurent

Ag. No.07/ECMD-II-12 1877/17 Security 80943.00

B- 1913 09.03.18 ECMD-II M/s Akshat Enterprises 2 14/ECMD-II/17-18 1911/35 M&R of Door &

Window

102696.00

B- 1914 12.03.18 ECMD-II M/s Puneet Construction 03/ECMD-II/17-18 1878/54B Security 21344.00

B- 1915 14.03.18 CSD-I M/s Technow Engg Work 1265/CPD-I/19.12.17 1925/68 Supply 0.00 11725.00

B- 1916 14.03.18 CSD-I M/s Jalvid Udyog 1143/CPD-I/21.11.17 1925/66 Supply 0.00 278557.00

B- 1917 14.03.18 CSD-I M/s Technow Engg Work 1444/CPD-I/21.11.17 1925/67 Supply 0.00 49737.00

B- 1918 14.03.18 CSD-I M/s Jalvid Udyog 1264/21.11.17 1925/59 Supply 0.00 18025.00

B- 1921 16.03.18 CHD-III M/s Priya Construction co. 1 10/CHD-III/17-18 1853/52 Rewinding of LT

Motor

142542.00

B- 1922 16.03.18 CHD-III M/s Nosad Contractor 11 07/CHD-III/16-17 1853/53 M&R of Motor

Shifting

114202.00

B- 1923 19.03.18 CHD-I M/s Priyanka Enterprises 1 11/CHD-I/17-18 1872/51 O/H of Fuel

Injection Pump

Bulldozer

26576.00

B- 1924 19.03.18 CHD-I M/s S.K. Engg. Works 2 20/CHD-I/16-17 2029/02 O/H of Various gen

Battery

48740.00

B- 1925 20.03.18 EMD-I M/s GE T&D India Ltd 1 660/EMD-I/22.11.17 1986/06 Deputation of

Service of

Equipment

113280.00

B- 1926 20.03.18 EMD-I M/s GE T&D India Ltd 2 660/EMD-I/22.11.17 1986/07 Deputation of

Service of

Equipment

21948.00

B- 1927 20.03.18 CSD-I M/s Astech Marketing Pvt.

Ltd

248/CPD-II/16.02.18 1897/109 Supply 0.00 1551692.00

B- 1928 20.03.18 CSD-I M/s Sail Kanpur 1312/CPD-I/02.01.18 1957/11 Supply 0.00 250750.00

B- 1929 20.03.18 ECMD-II M/s B.P. Singh & co. 2 29/ECDM-II/16-17 2013/7 M&R of Colony

Plant

42000.00

Page 13: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

1403155.00 2160486.00 0.00

B- 1936 03.04.18 CHD-I M/s Rohini Transport Corpn. 1 09/CHD-I/16-17 1883/99B Security 27099.00

B- 1937 03.04.18 CHD-I M/s Rohini Transport Corpn. 1 17/CHD-I/15-16 1883/99 Security 27750.00

B- 1938 03.04.18 CHD-I M/s Rohini Transport Corpn. 1 10/CHD-I/16-17 1883/98B Security 29092.00

B- 1939 03.04.18 CHD-I M/s Rohini Transport Corpn. 1 16/CHD-I/15-16 1883/98 Security 48970.00

B- 1941 05.04.18 CPD-II M/s Jamuna Mehar

Enterprises

2 04/CPD-II/26.04.17 1939/ Misc. Civil Works

at VIP Guest

House

361504.00

B- 1942 06.04.18 ECMD-I M/s Akshat Enterprises 06/ECMD-I/17-18 1878/55 Security 25405.00

B- 1946 11.04.18 EMD-III M/s Ramit Erectors 3 04/EMD-III/08.01.18 1994/87 Rewinding Building

& Lighting

119581.00

B- 1947 13.04.18 CHD-III M/s Priyanka Enterprises 6 11/CHD-III/30.03.17 1853/55 O/H of LT Breakers 68470.00

B- 1948 13.04.18 CHD-III M/s Priya Construction co. 2 10/CHD-III/06.01.18 1853/55B Rewinding of LT

Motor

180104.00

B- 1949 13.04.18 EMD-III M/s R.P. Construction co. 1 01/EMD-III/07.04.18 1758/102 Laying Glanding &

Termination of

Power Cable

109953.00

B- 1950 13.04.18 EMD-III M/s Krishna Enterprises 1 02/EMD-III/07.04.18 1686/101 Faciliding of Power

& Control Cable

with Laying

112690.00

B- 1951 13.04.18 EMD-III M/s R.P. Construction co. 1 18/EMD-III/20.01.18 1779/79 Febrication &

Erection of New

M.S. Fening

112808.00

B- 1952 13.04.18 CHD-III M/s Amit Srivas 1 06/CHD-III/06.09.17 1854/99B Security 7084.00

B- 1953 13.04.18 CHD-III M/s Nosad Contractor 1 12/CHD-III/06.04.18 1854/99B Security 43854.00

B- 1959 20.04.18 C&ID-I M/s S.R. Construction F 06/C&ID-I/05.05.16 1875/46B Security 32544.00

B- 1961 21.04.18 TMD-I M/s M.K. Traders 2 07/TMD-I/17-18 1972/98 Revision/

Overhauling of H.P.

Valve of Size

22364.00

B- 1962 23.04.18 EMD-I M/s Nosad Contractor 6 10/EMD-I/28.03.16 2016/22B Annula Rake for

Contract saivaging

12272.00

B- 1965 24.04.18 EMD-II M/s Priya Construction co. 1 14/EMD-II/17-18 1953/55 Electrical

Brekdown Maint.

46343.00

1387887.00 0.00 0.00

B- 1966 01.05.18 BMD-II M/s MAK Construction Co. 4 33/BMD-II/06.10.16 1962/61 Overhauling &

Serviceing

27930.00

Page 14: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

B- 1967 01.05.18 BMD-II M/s Syndicate Engineers 7 20/BMD-II/06.08.16 1962/62 Break

Down/Preventing

49696.00

B- 1971 05.05.18 ECMD-II M/s Shiv Mahadev Engg.

Works

33/ECMD-II/18.01.18 1920/41 Security 28898.00

B- 1974 08.05.18 EMD-III M/s Krishna Enterprises 1 15/EMD-III/22.12.17 2050/2A Reparing &

Overhauling

157566.00

B- 1975 08.05.18 C&ID-I M/s D.K. & Sons Co. 5 22/C&ID-I/03.01.17 1910/83 Reparing &

Overhauling

76834.00

B- 1976 08.05.18 C&ID-I M/s D.K. & Sons Co. 6 22/C&ID-i/03.01.17 1910/83B Reparing &

Overhauling

52953.00

B- 1977 09.05.18 CPD-I M/s AARSELLER TREDCO 1313/CPD-I/02.01.18 1799/111 Supply of 0.4KV LT

Module

0.00 59118.00

B- 1978 09.05.18 CPD-I M/s AARSELLER TREDCO 1313/CPD-I/02.01.18 1799/111 Supply of 0.4KV LT

Module

0.00 82187.00

B- 1979 14.05.18 EMD-I M/s Nosad Contractor 2 08/EMD-I/09.10.16 1793/86A Preventive & Maint. 42112.00

B- 1980 14.05.18 EMD-I M/s Nosad Contractor 7 10/EMD-I/28.03.16 1793/80B Cable Salvaging 1670.00

B- 1981 14.05.18 EMD-I M/s Easun Royralle Limited F 145/EMD-I/25.03.14 1793/81A Erection Lesting &

Comm.

548640.00

B- 1982 14.05.18 EMD-I M/s Nosad Contractor 9 02/EMD-I/29.07.17 1987/79 Maint. Work

220/132KV

32830.00

B- 1983 14.05.18 EMD-I M/s Nosad Contractor 3 09/EMD-I/03.11.17 1987/81 P&BO Maint. 75906.00

B- 1984 14.05.18 EMD-I M/s Nosad Contractor 8 10/EMD-I/28.03.16 1987/84 Salvaging & Cable

Laying

6528.00

B- 1985 14.05.18 ECMD-II M/s Sultan Singh 192/ECMD-II/31.03.17 1877/47 Security 9389.00

B- 1986 14.05.18 ECMD-II M/s Pushpendra Singh 04/ECMD-II/06.06.17 1877/52 Security 7855.00

B- 1987 14.05.18 ECMD-II M/s Sultan Singh 19/ECMD-II/22.09.17 1877/52 Security 8918.00

B- 1989 15.05.18 EMD-II M/s Priya Construction co. 2 13/EMD-II/17-18 1945/32 P.M. HD Motor

Control

74131.00

B- 1990 15.05.18 EMD-II M/s Sadan Engineering

Works

F 06/EMD-III/2017-18 2047/7 Overhauling &

Serviceing

48387.00

B- 1991 15.05.18 CHD-III M/s Vikas Electricals 10/CHD-III/28.01.16 1854/100 Security 88200.00

B- 1992 15.05.18 CHD-III M/s Nosad Contractor 1 04/CHD-III/10.05.18 1853/57 Overhauling &

Serviceing

24784.00

B- 1994 17.05.18 CHD-III M/s Priyanka Enterprises 7 11/CHD-III/30.03.17 1853/56B O/H LT/Breker 33318.00

B- 1995 17.05.18 EMD-I M/s Nosad Contractor 4 09/EMD-I/03.11.17 1985/35 Preventing &

Breadown

7218.00

B- 1996 17.05.18 EMD-I M/s Nosad Contractor 10 02/EMD-I/26.07.17 1985/37 Annaul rake caron

footh

96237.00

B- 1997 17.05.18 EMD-I M/s Nosad Contractor 5 09/EMD-I/03.11.17 1985/41 Preventing &

Breadown

21679.00

B- 1998 17.05.18 BMD-II M/s Jha Construction 34/BMD-II/15.10.16 1999/20B Security 41253.00

B- 1999 23.05.18 CAMD-I M/s Rahul Gupta & Co. 1 08/CAMD-I/15.03.18 1927/17B Work of Repairing 28771.00

Page 15: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

B- 2000 23.05.18 CAMD-I M/s Usha Enterprises 4 03/CAMd-I/17-18 1927/18A Maint. Of CT Fans 99600.00

B- 2002 24.05.18 CPD-III M/s Elecon Engineering

Company Ltd

38/CPD-III/06.02.18 1718/83 Supply 0.00 1825101.00

B- 2003 24.05.18 CPD-III M/s Hems Corporation 117/CPD-III/20.04.18 1718/82B Supply 0.00 141030.00

B- 2007 28.05.18 BMD-II M/s Bharat Mechnical &

Strucal Woks

6 07/BMD-II/24.08.17 1952/93 Break Down Maint. 239223.00

B- 2009 28.05.18 BMD-II M/s Maarfat Construction 05/BMD-II/16.08.17 1952/97 Insulation Works 91640.00

B- 2010 28.05.18 CPD-I M/s Globe Enterprises 331/CPD-I/16-17 1995/23 Supply 0.00 44875.00

B- 2011 31.05.18 TMD-I M/s Maarfat Construction 3 09/TMD-I/07.05.18 1935/144 Insulation Works 116556.00

2138722.00 2152311.00 0.00

B- 2013 01.06.18 CPD-III M/s BEML Limited 84/CPD-III/02.04.18 1834/65 Supply 0.00 881785.00

B- 2014 01.06.18 CPD-III M/s BEML Limited 83/CPD-III/02.04.18 1834/65-66 Supply 0.00 1656497.00

B- 2015 01.06.18 CPD-III M/s BEML Limited 142/CPD-III/03.05.18 1834/64-65 Supply 0.00 1563557.00

B- 2016 01.06.18 CPD-III M/s BEML Limited 82/CPD-III/02.04.18 1834/66-67 Supply 0.00 1441465.00

B- 2018 02.06.18 CSD-I M/s Satyam Weighing

Sysetem

1 03/CSD-I/01.06.17 1796/90A AMC of Electronic 11210.00

B- 2019 02.06.18 CPD-II M/s K.S. & Brothers 1 18/CPD-II/21.02.18 1930/84B Recption Care

Taking

273428.00

B- 2021 02.06.18 ECMD-II M/s Vijay Kumar Gupta 24/ECMD-II/09.12.16 1943/70B Security 148880.00

B- 2022 02.06.18 CPD-I M/s Aarseller Tredco 1313/CPD-I/02.01.18 1949/84 Supply 0.00 162250.00

B- 2023 05.06.18 EMD-III M/s Ramit Erectors 1&F 19/EMD-III/27.01.18 1994/91 Inprovmit in

Protection

314146.00

B- 2024 05.06.18 EMD-III M/s Ramit Erectors 3&F 04/EMD-III/20.06.17 1994/98 Rewinding & O/H 64463.00

B- 2026 05.06.18 ECMD-II M/s Kanha Construction 1 45/ECMD-II/21.03.18 1929/78 Annual M/R of

Residental

206886.00

B- 2029 06.06.18 CHD-II M/s Schenck Process India

Pvt. Ltd

F 09/CHD-II/2016-17 2038/55 AMC 132750.00

B- 2030 06.06.18 CHD-II M/s Kanha Construction 2 12/CHD-II/2011-17 2020/22 Qulity uproting 315414.00

B- 2031 08.06.18 CPD-II M/s Jamuna Mehar

Enterprises

3 04/CPD-II/26.04.18 1939/65 Civil Woks 286981.00

B- 2032 08.06.18 BMD-II M/s Syndicate Engineers 8 20/BMD-II/06.08.16 2007/78 Break Down Maint. 39204.00

B- 2033 08.06.18 BMD-II M/s Syndicate Engineers 6 15/BMD-II/27.07.16 2007/78 Mant. Of Pulove 52392.00

B- 2034 08.06.18 BMD-II M/s MAK Construction Co. 4 32/BMD-II/06.10.16 2007/80 Break Down Maint. 49221.00

B- 2035 11.06.18 CHD-III M/s Priyanka Enterprises 7 11/CHD-III/30.03.17 1853/58 O/H LT/Breker 56383.00

B- 2036 11.06.18 CHD-III M/s Priya Construction co. 3 10/CHD-III/06.01.18 1853/58B Rewinding of LT 215232.00

B- 2037 11.06.18 CHD-III M/s Nosad Contractor 2 04/CHD-III/10.05.18 1853/ Shifting & O/H 57740.00

B- 2038 12.06.18 ECMD-I M/s Ravindra Singh & co. 10/ECMD-I/20.17-18 1878/55B Security 10359.00

B- 2040 13.06.18 CPD-I M/s Globe Enterprises 331/CPD-I/12.05.17 1925/72 Supply 0.00 25166.00

B- 2041 13.06.18 CPD-I M/s Globe Enterprises 331/CPD-I/12.05.17 1925/73B Supply 0.00 1947.00

B- 2042 13.06.18 CPD-I M/s Globe Enterprises 331/CPD-I/12.05.17 1925/71 Supply 0.00 10229.00

B- 2043 14.06.18 ECMD-II M/s M.K. Traders 1&F 10/ECMD-II/09.05.18 2013/9B M&R Special 12000.00

B- 2046 18.06.18 ECMD-II M/s Vijay Kumar Gupta 3 16/ECMD-II/07.10.17 1892/73B M&R of Non

Residential

125869.00

B- 2047 19.06.18 EMD-II M/s Vikas Electrical 5 22/EMD-II/26.12.16 1895/43 Rewinding of LT 199898.00

Page 16: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

B- 2048 19.06.18 EMD-II M/s Vikas Electrical 4 22/EMD-II/26.12.16 1895/40 Rewinding of LT 21711.00

B- 2049 19.06.18 CHD-I M/s Hind Udyog 3 08/CHD-I/16.03.18 2002/5 Fabrication Round 173050.00

B- 2050 19.06.18 CHD-I M/s Harsh & Brothers 07/CHD-I/27.08.17 1872/57A Security 26060.00

B- 2051 19.06.18 CHD-I M/s Priyanka Enterprises 1 03/CHD-I/05.06.18 1872/56B Annual Contract

O/H

247243.00

B- 2052 19.06.18 CHD-I M/s Priyanka Enterprises 2 11/CHD-I/13.03.18 1872/58 Annual Contract

O/H

432238.00

B- 2054 21.06.18 CHD-II M/s Bharti Enterprises 1&F 01/CHD-II/07.05.18 97/194-95 Redaimives Psc

Railway

313795.00

B- 2055 22.06.18 BMD-II M/s Harsh & Brothers 05/BMD-II/04.08.15 1999/21 Security 17800.00

B- 2056 22.06.18 BMD-II M/s Harsh & Brothers 04/BMd-II/20.05.16 1999/21B Security 5113.00

B- 2058 22.06.18 CHD-I M/s Priyanka Enterprises 2&F 07/CHd-I/19.08.16 1867/52 Overhauling 1581677.00

B- 2059 23.06.18 CPD-I M/s R.S.P. Oversease Pvt. 402/CPd-I/22.06.17 1828/185 Supply 0.00 5141.00

B- 2060 23.06.18 EMD-I M/s Saentecs Process

Control

1&F 10/EMD-I/03.11.17 1987/85 Overhauling 908820.00

B- 2061 23.06.18 EMD-I M/s Singh & Singh

Electricals

2 12/EMD-I/17.05.18 1984/51 Supply 0.00 773859.00

B- 2062 25.06.18 CHD-IV M/s Hind Udyog 3 06/CHD-IV/12.07.17 2029/11 Repairing Works 274464.00

B- 2063 26.06.18 CPD-I M/s Ranjana Rakesh

Corporation

54/CPD-I/17-18 1949/85 Supply 0.00 1150500.00

B- 2064 29.06.18 ECMD-II M/s Jamuna Mehar

Enterprises

1 36/ECMD-II/19.01.18 2011/21B White Wash

Painting

142268.00

B- 2065 29.06.18 ECMD-II M/s Jamuna Mehar

Enterprises

1 35/ECMD-II/19.01.18 2014/20 White Wash

Painting

202523.00

6919218.00 7672396.00 0.00

B- 2068 02.07.18 CHD-II M/s Pawan Kumar 07/CHD-II/20.08.15 2009/104 Security 28144.00

B- 2069 02.07.18 C&ID-I M/s D.K. & Sons Co. L/F 22/C&ID-I/03.01.17 1896/55B Overhauling &

Repairing

15203.00

B- 2070 02.07.18 C&ID-I M/s D.K. & Sons Co. L/F 27/C&ID-I/22.02.17 1896/56A Repairing &

Serviceing

61620.00

B- 2071 02.07.18 C&ID-I M/s Industrial Engineering

Enterprises

3 09/C&ID-I/25.08.17 1896/57A Reconting &

Breakd

67500.00

B- 2073 03.07.18 CPD-III M/s Priyanka Enterprises 118/CPD-III/20.04.18 1820/94 Supply 0.00 369140.00

B- 2074 03.07.18 CPD-III M/s Escorts Railway

Equipment Quision

116/CPD-III/20.04.18 1820/92 Supply 0.00 117600.00

B- 2075 07.07.18 EMD-III M/s Sadan Engineering

Works

1 04/EMD-III/25.05.18 2048/6A Maint. Of Coly Arer 205827.00

B- 2076 07.07.18 BMD-II M/s Syndicate Engineers 9 20/BMD-II/06.08.16 1962/76 Break Down Maint. 47294.00

B- 2077 07.07.18 BMD-II M/s Syndicate Engineers 7 15/BMD-II/27.07.16 1962/78 Maint. Works 43365.00

B- 2078 07.07.18 BMD-II M/s MAK Construction Co. 5 33/BMD-II/06.10.16 1962/80 Overhauling 47200.00

B- 2079 07.07.18 BMD-II M/s MAK Construction Co. 4 32/BMD-II/06.10.16 1962/81 Break Down Maint. 58646.00

B- 2081 11.07.18 ECMD-II M/s Vijay Kumar Gupta 19/ECMD-II/07.10.16 1992/76 Security 122613.00

B- 2082 11.07.18 CHD-III M/s Nosad Contractor 3 04/CHD-III/10.05.18 1853/60 Motor Shifting 56094.00

B- 2083 12.07.18 EMD-II M/s Instrument Care Group 3 07/EMD-II/10.10.17 1898/33B Up Keeping Works 121684.00

B- 2084 12.07.18 EMD-II M/s Vikas Electrical 2 24/EMD-II/16-17 2040/19 P.M. LT Motor 308539.00

B- 2085 12.07.18 CHD-IV M/s Hind Udyog 17/CHD-IV/15.12.16 2029/11 Security 60637.00

B- 2086 13.07.18 EMD-II M/s Electrical & Instrument

Engineers

2 16/EMD-II/05.02.18 2036/13 Up Keeping Works 121142.00

Page 17: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

B- 2087 13.07.18 CPD-II M/s BEML Limited 281/CPD-III/23.06.18 1954/87 Supply 0.00 1172006.00

B- 2088 13.07.18 CPD-III M/s BEML Limited 279/CPD-III/23.06.18 1954/88 Supply 0.00 1820571.00

B- 2089 18.07.18 EMD-III M/s Priya Construction Co. 1 16/EMD-III/20.07.18 2050/3B O/H Revinding 125395.00

B- 2090 19.07.18 CPD-I M/s Eckhardt Steel & Allous 2505/CPD-I/19.12.16 1827/162 Supply 0.00 3993.00

B- 2094 20.07.18 CHD-I M/s Hind Udyog 08/CHD-I/21.09.17 2002/9 Febrication 325088.00

B- 2095 21.07.18 CPD-III M/s BEML Limited 306/CPD-III/07.07.18 1820/94 Supply 0.00 1747239.00

B- 2096 21.07.18 TMD-I M/s Zenith Engineers 01/TMD-I/2018-19 2026/22B Repairing &

Serviceing

107330.00

B- 2097 21.07.18 CHD-II M/s SCHENCK Process

Solution India Pvt. Ltd

02/CHD-II/17.05.18 2009/124 Serviceingh 110920.00

B- 2098 24.07.18 ECMD-II M/s K.S. & Brothers 29/ECMD-II/12.12.17 1845/55B Water Supply 425178.00

2459419.00 5230549.00 0.00

B- 2099 01.08.18 ECMD-II M/s Akram Enterprises 1 11/ECMD-II/21.06.18 1939/69 Serviceing &

Repairing

70226.00

B- 2100 01.08.18 ECMD-II M/s Sharma Enterprises 12/ECMD-II/26.11.15 1777/86B Security 22175.00

B- 2101 01.08.18 ECMD-II M/s Sharma Enterprises 13/ECMD-II/28.11.15 1777/86B Security 47241.00

B- 2102 01.08.18 ECMD-II M/s Shiv Mahadev Engg.

Works

33/ECMD-II/18.03.17 1777/86A Security 24477.00

B- 2103 01.08.18 CPD-I M/s Trade India Corporation 1706/CPD-I/05.10.15 1948/73 Supply 0.00 157442.00

B- 2104 01.08.18 CPD-I M/s Trade India Corporation 1706/CPD-I/05.10.15 1948/73 Supply 0.00 10084.00

B- 2105 01.08.18 CPD-I M/s Trade India Corporation 1706/CPD-I/05.10.15 1948/73 Supply 0.00 10084.00

B- 2107 04.08.18 TMD-I M/s M.K. Traders 3 07/TMD-I/2017-18 1972/119 Overhauling 24973.00

B- 2108 07.08.18 CFA&BO M/s Manoj Kumar Gupta 332/CFA&BO/28.03.18 361/166 Security 4200.00

B- 2109 07.08.18 CHD-I M/s S.K. Engineering Works 3 20/CHD-I/16-17 2021/03 Overhauling 39000.00

B- 2110 07.08.18 C&ID-I M/s R.K. Construction 01/C&ID-I/17.05.17 1636/93A Security 23900.00

B- 2111 07.08.18 C&ID-I M/s D.K. & Sons Co. 1 02/C&ID-I/22.05.18 1881/69B Cutting & Repairing 24970.00

B- 2112 07.08.18 C&ID-I M/s D.K. & Sons Co. 1 03/C&ID-I/22.05.18 1881/70 Overhauling 28724.00

B- 2113 07.08.18 C&ID-I M/s Industrial Engineering

Enterprises

4 09/C&ID-I/25.08.17 1881/71B Repairing &

Serviceing

73662.00

B- 2114 08.08.18 TMD-I M/s Ajanta Engineering

Works

1 17/TMD-I/17-18 1802/187 Maint. & Reparing 185228.00

B- 2115 08.08.18 CPD-I M/s Manoj Kumar Gupta 03/CPD-I/10.06.14 1654/104 Security 4200.00

B- 2116 09.08.18 ECMD-II M/s Bharti Enterprises 1&F 18/ECMD-II/12.07.18 1790/95 Levelling &

Dressing

321324.00

B- 2117 09.08.18 ECMD-II M/s S.R. Enterprises 1&F 19/ECMD-II/13.06.18 1790/95B Levelling &

Dressing

289899.00

B- 2118 09.08.18 CPD-II M/s T.S. Enterprises 2 15/CPD-II/05.02.18 1939/68 Annula Maint. 111046.00

B- 2119 10.08.18 CHD-I M/s Priyanka Enterprises 2 03/CHD-I/05.06.18 1872/68 Overhauling 130620.00

B- 2120 10.08.18 CHD-I M/s Priyanka Enterprises 1&F 06/CHD-I/26.06.18 1872/64B Tramporation 80325.00

B- 2121 13.08.18 CHD-III M/s Nosad Contractor 4 04/CHD-III/10.05.18 1853/62B O/H Shifting 75123.00

B- 2122 18.08.18 ECMD-II M/s Shiv Mahadev Engg.

Works

18/ECMD-II/16.10.17 1920/45 Security 28662.00

Page 18: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

B- 2123 18.08.18 ECMD-II M/s Sadan Engineering

Work

1 48/ECMD-II/21.03.18 1893/56 Cleaning of Spectic

Tank

116770.00

B- 2124 18.08.18 ECMD-II M/s Sadan Engineering

Work

1 47/ECMD-II/21.03.18 1893/57 MR of Spectic Tank 119806.00

B- 2125 18.08.18 ECMD-II M/s Sadan Engineering

Work

2&F 47/ECMD-II/21.03.18 1893/57B MR of Spectic Tank 71882.00

B- 2126 18.08.18 ECMD-II M/s Sadan Engineering

Work

2&F 48/ECMD-II/21.03.18 1893/58 MR of Spectic Tank 34435.00

B- 2127 18.08.18 CSD-I M/s Pushpendra Singh 02/CSD-I/24.06.16 1969/41 Security 6480.00

B- 2128 18.08.18 CSD-I M/s Vikas Chauda 03/CSD-I/16.03.16 1969/42 Security 4200.00

B- 2129 18.08.18 CSD-I M/s Vikas Chauda 08/CSD-I/16.03.16 1969/41 Security 4200.00

B- 2130 18.08.18 CSD-I M/s Vikas Chauda 05/CSD-I/01.09.17 1969/43 Security 4200.00

B- 2131 18.08.18 CSD-I M/s Vikas Chauda 05/CSD-I/25.01.17 1969/43 Security 4200.00

B- 2132 18.08.18 CSD-I M/s Harish Chandra

Vishwkarma

06/CSD-I/27.11.17 1969/44 Security 6480.00

B- 2133 18.08.18 CSD-I M/s Urmil Singh 08/CSD-I/18.01.18 1969/44 M&R Misc. Civil 1800.00

B- 2136 21.08.18 ECMD-II M/s Sharma Enterprises 11/ECMD-I/30.12.15 1765/151 Mant. Of PF Pipe 38941.00

B- 2137 21.08.18 BMD-II M/s Syndicate Engineers 8 15/BMD-II/27.07.16 1963/51 Overhauling of

Chain

67797.00

B- 2138 21.08.18 BMD-II M/s MAK Construction 4 30/BMD-II/06.10.16 1963/50 Breakdown/ Prep. 46280.00

B- 2139 21.08.18 BMD-II M/s Syndicate Engineers 10 20/BMD-II/06.08.16 1963/ Complete

Overhauling

210829.00

B- 2140 24.08.18 EMD-II M/s Nosad Contractor 4 28/EMD-II/25.11.16 1899/27A Complete

Overhauling

4500.00

B- 2141 24.08.18 EMD-II M/s Nosad Contractor 5 28/EMD-II/25.11.16 1899/29A Complete

Overhauling

52698.00

B- 2142 24.08.18 EMD-II M/s Nosad Contractor 6 28/EMD-II/25.11.16 1899/30B Security 67182.00

B- 2143 24.08.18 TMD-I M/s Usha Enterprises 10/TMD-I/14-15 1802/189 Security 17333.00

B- 2144 24.08.18 TMD-I M/s Usha Enterprises 17/TMD-I/15-16 1802/190 Security 66028.00

B- 2145 28.08.18 C&ID-I M/s D.K. & Sons Co. 2 02/C&ID-I/22.05.18 1896/59 Cutting & Repairing 25349.00

B- 2146 28.08.18 C&ID-I M/s D.K. & Sons Co. 2 03/C&ID-I/22.05.18 1896/59B Overhauling 20848.00

B- 2148 28.08.18 CAMD-I M/s D.K. & Sons Co. 07/CAMD-I/19.11.16 1926/50 Security 3077.00

B- 2149 28.08.18 CAMD-I M/s Usha Enterprises 06/CAMD-I/15-16 1926/50B Security 44322.00

B- 2150 28.08.18 CPD-II M/s Ramanna Safety &

Systems

05/CPD-II/03.03.16 1926/49B Security 27112.00

B- 2151 28.08.18 CPD-II M/s Ramanna Safety &

Systems

04/CPD-II/03.03.16 1926/49 Security 93220.00

B- 2152 28.08.18 CAMD-I M/s Usha Enterprises 01/CAMD-I/02.01.15 1926/50 Security 68688.00

B- 2153 28.08.18 CPD-III M/s J.K. Engg. Co. 364/CPD-III/27.06.18 1833/60 Supply 0.00 945436.00

B- 2154 28.08.18 CHD-IV M/s Hind Udyog 06/CHD-IV/12.07.17 2029/12B Reparing 123694.00

B- 2155 28.08.18 CHD-IV M/s Hind Udyog 03/CHD-IV/09.08.18 2029/14 Febrication 157680.00

Page 19: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

B- 2156 29.08.18 ECMD-II M/s Bharti Enterprises 06/ECMD-II/28.04.18 2012/21B Levelling &

Dressing

178167.00

B- 2157 29.08.18 ECMD-II M/s Kanha Construction 45/ECMD-II/21.03.18 3217/84B M&R Residirtial 212891.00

3511064.00 1123046.00 0.00

B- 2159 04.09.18 BMD-II M/s Marfat Construction 6 05/BMD-II/16.08.17 1952/112 Insulation Works 143286.00

B- 2160 04.09.18 BMD-II M/s Bharat Mechnical &

Structural Works

4 07/BMD-II/28.05.18 1952/110 Breakdown

Maintinance

178669.00

B- 2162 10.09.18 CHD-II M/s M.K. Traders 7 15/CHD-II/20.11.17 2009/68 Maintence & O/H 131654.00

B- 2163 10.09.18 ECMD-II M/s Akshat Enterprises 3&f 14/ECMD-II/04.10.17 1911/39b M&R of Door 378373.00

B- 2164 11.09.18 ECMD-II M/s Jamuna Meher 11/ECMD-II/14.07.16 2014/20 Security 122073.00

B- 2165 11.09.18 CHD-III M/s Nosad Contractor 5 04/CHD-III/10.05.18 1853/63 O/H of LT Motor 66045.00

B- 2166 11.09.18 ECMD-II M/s S.K. Engineering Works 2&F 07/ECMD-II/12.05.18 2013/11b M&R Colony Area 75068.00

B- 2167 11.09.18 ECMD-II M/s Sadan Engineering

Work

1&F 42/ECMD-II/13.03.18 1866/65B Hire Charg. JCB 129600.00

B- 2168 13.09.18 CSD-I M/s Sadan Engineering

Work

2 07/CSD-I/23.12.17 1991/59 Unloading &

Shifting

27301.00

B- 2169 13.09.18 CPD-I M/s J. Umashankar & Co. P.

Lt

460/CPD-I/26.07.18 1991/62 Supply 0.00 178926.00

B- 2170 14.09.18 CHD-I M/s Hind Udyog 5 08/CHD-I/17-18 2002/12 Febrication

Reparing

213372.00

B- 2171 14.09.18 EMD-I M/s Nosad Contractor 11 02/EMD-I/26.07.17 1985/46 Annual Maintinance 7734.00

B- 2172 14.09.18 EMD-I M/s Nosad Contractor 12 02/EMD-I/26.07.17 1985/47 Annual Maintinance 8584.00

B- 2173 14.09.18 EMD-I M/s Nosad Contractor 6 09/EMD-I/03.11.17 1985/49 Preventing 4118.00

B- 2174 22.09.18 CPD-II M/s Ashish Enterprises 7 08/CPD-II/31.10.15 1789/79 O/M of 3.0 MLD 437627.00

B- 2175 22.09.18 CPD-II M/s Ashish Enterprises 8&F 08/CPD-II/31.10.15 1789/81 O/M of 3.0 MLD 152026.00

B- 2177 22.09.18 C&ID-I M/s Karishna Enterprises 02/C&ID-I/20.04.16 1910/84B Security 44400.00

B- 2178 22.09.18 C&ID-I M/s D.K. & Sons 22/C&ID-I/27.10.16 1910/85A Security 28731.00

B- 2179 22.09.18 C&ID-I M/s D.K. & Sons 27/C&ID-I/22.02.18 1910/85B Security 19921.00

B- 2180 22.09.18 C&ID-I M/s MRP Construction 28/C&ID-I/30.03.17 1933/26B Security 40830.00

B- 2181 22.09.18 BMD-I M/s Goga Jaharbeer

Construction

27/BMD-I/29.02.16 1798/83B Security 81077.00

B- 2182 24.09.18 EMD-II M/s Priya Construction 2 14/EMD-II/17-18 1932/61 Electrical

Breakdown

118043.00

B- 2184 24.09.18 BMD-II M/s Bharat Mechnical &

Structural Works

5 07/BMD-II/24.08.17 1953/166 Breakdown

Maintinance

105158.00

B- 2185 24.09.18 EMD-II M/s Priya Construction F 13/EMD-II/17-18 1945/34 P.M. & O/H LT

Motor

71201.00

B- 2186 24.09.18 ECMD-II M/s Akshat Enterprises 2 25/ECMD-II/11.12.17 2011/24 M&R Door &

Window

222444.00

B- 2187 25.09.18 CPD-I M/s Mohan Corpotation 404/CPD-I/23.07.18 1990/22 Supply for Fastner 0.00 17346.00

B- 2189 25.09.18 S&TD M/s Jadaun Bus Service 29/S&TD/07.10.17 2035/12 Security 186750.00

Page 20: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

B- 2190 26.09.18 CPD-I M/s Asha Printing Press 165/CPD-I/18.05.18 1925/78 Supply 0.00 11201.00

B- 2191 26.09.18 CPD-I M/s Jalvid Udyog 989/CPD-I/09.08.18 1925/78 Supply 0.00 12980.00

B- 2192 26.09.18 CPD-I M/s Fludomat Limited 284/CPD-III/23.06.18 1833/60 Supply 0.00 341881.00

2994085.00 562334.00 0.00

B- 2194 03.10.18 CPD-I M/s Anurag Engineering 405/CPD-I/23.07.18 1991/63 Supply 0.00 66316.00

B- 2195 04.10.18 CHD-II M/s Bharti Enterprises 735/CHD-II/04.09.18 1958/148 Security 56570.00

B- 2196 04.10.18 CHD-II M/s Balram Engineers 805/CHD-II/22.09.18 1958/148 Security 85893.00

B- 2197 04.10.18 CHD-II M/s Balram Engineers 135/CHD-II/21.02.17 1958/149 Security 111100.00

B- 2198 05.10.18 S&TD M/s S.G.L. 29/S&TD/01.12.12 1836/82 Security 5000.00

B- 2199 05.10.18 S&TD M/s S.G.L. 04/S&TD/27.06.14 1836/82 Security 4200.00

B- 2200 05.10.18 S&TD M/s S.G.L. 34/S8TD/10.04.13 1836/82 Security 4200.00

B- 2201 05.10.18 S&TD M/s S.G.L. 20/S&TD/11.11.14 1836/82 Security 4200.00

B- 2202 05.10.18 S&TD M/s Jadaun Bus Service 14/S&TD/27.06.16 1836/36B Security 21681.00

B- 2203 05.10.18 S&TD M/s Electrical &

Instrumentation

Engineers

14/S&TD/24.09.14 1836/36B Security 50400.00

B- 2204 05.10.18 S&TD M/s Electrical &

Instrumentation

Engineers

18/S&TD/12.10.15 1836/36B Security 50400.00

B- 2205 05.10.18 S&TD M/s MAK Construction 08/S&TD/05.05.17 1836/36B Security 22500.00

B- 2206 05.10.18 S&TD M/s Brijendra Kumar 24/S&TD/20.10.15 1836/83 Security 5000.00

B- 2207 05.10.18 S&TD M/s Brijendra Kumar 10/S&TD/28.05.16 1836/83 Security 5000.00

B- 2208 05.10.18 S&TD M/s Brijendra Kumar 35/S&TD/16.12.16 1836/83 Security 5000.00

B- 2209 05.10.18 S&TD M/s Jadaun Bus Service 28/S&TD/07.10.17 1836/83 Security 24638.00

B- 2210 05.10.18 S&TD M/s Sadan Engineering

Work

01/S&TD/09.03.17 1836/83 Security 8247.00

B- 2211 05.10.18 S&TD M/s Lakshmi Narayan

Prajapati

48/S&TD/24.01.18 1836/83 Security 4200.00

B- 2213 09.10.18 CHD-IV M/s Hind Udyog 2 03/CHD-IV/09.08.18 2029/15 Fab of Tipper 51082.00

B- 2214 09.10.18 CHD-III M/s Priyanka Enterprises 3 11/CHD-III/30.03.11 1853/64B O/H & LT Brekers 9164.00

B- 2215 10.10.18 ECMD-I M/s Vijay Kumar Gupta 14/ECMD-I/26.10.17 2017/62 Security 5508.00

B- 2216 10.10.18 ECMD-I M/s Vijay Kumar Gupta 02/ECMD-I/17-18 1878/56B Security 4392.00

B- 2217 10.10.18 ECMD-I M/s Vijay Kumar Gupta 12/ECMD-I/08.09.17 1878/56 Security 28502.00

B- 2218 10.10.18 ECMD-I M/s Vijay Kumar Gupta 01/ECMD-I/18.04.17 2052/43 Security 59836.00

B- 2219 11.10.18 ECMD-

III

M/s Jai Devi 01/ECMD-III/28.06.17 1917/69 Security 7047.00

B- 2220 11.10.18 ECMD-

III

M/s Jai Devi 02/ECMD-III/02.01.18 1917/70 Security 7008.00

B- 2221 11.10.18 TMD-I M/s Maarfat Construction 4 09/TMD-I/17-18 1935/153 Insulation Works 107288.00

B- 2222 11.10.18 CAMD-I M/s Syndicate Engineers 4 04/CAMD-I/14.06.17 1927/19 Breakdowan Maint. 198541.00

B- 2223 12.10.18 CPD-II M/s Simplex Switchgear P.

Ltd

965/CPD-II/12.01.17 1954/94 Supply 0.00 1682856.00

B- 2225 22.10.18 EMD-III M/s Krishna Enterprises 2 15/EMD-III/22.12.17 2050/5B Reparing & O/H 188387.00

B- 2227 24.10.18 CHD-I M/s Priyanka Enterprises 3 03/CHD-I/05.06.18 1872/79 Overhauling 246942.00

Page 21: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

B- 2230 26.10.18 CHD-IV M/s Hind Udyog 14 06/CHD-IV/12.07.17 2029/16 Reparing &

Rounding

97896.00

B- 2232 26.10.18 EMD-I M/s Nosad Contractor 9 10/EMD-I/28.03.16 2016/31A Ent Termination 1670.00

B- 2233 26.10.18 CHD-I M/s Priyanka Enterprises 16/CHD-I/28.01.17 1972/82B Security 263811.00

B- 2234 26.10.18 CHD-I M/s Priyanka Enterprises 15/CHD-I/28.01.17 1972/81B Security 166575.00

B- 2235 26.10.18 CHD-I M/s Priyanka Enterprises 13/CHD-I/13.03.18 1972/82B Security 6900.00

B- 2236 27.10.18 CPD-II M/s Pooja Computer 38/CPD-II/27.08.16 361/ Security 31200.00

B- 2237 29.10.18 EMD-II M/s Instument Care Group 07/EMD-II/17-18 1898/37A Security 41344.00

B- 2238 29.10.18 TMD-I M/s Usha Enterprises 19/TMD-I/15-16 1972/110 Security 38625.00

B- 2239 29.10.18 TMD-I M/s Harsh & Brothers 06/TMD-I/15-16 1972/111 Security 6550.00

B- 2240 29.10.18 TMD-I M/s Usha Enterprises 18/TMD-I/15-16 1972/111 Security 42513.00

B- 2241 31.10.18 EMD-III M/s T.S.Enterprises 06/EMD-III/11.07.18 1994/114 Rewinding of Built 264814.00

2343824.00 1749172.00 0.00

B- 2242 01.11.18 CHD-I M/s S.K. Engineering Works 4 20/CHD-I/18.03.17 2021/04 Reparing

Recondition

238892.00

B- 2243 02.11.18 CPD-II M/s Jamuna Mahar

Enterprises

04/CPD-II/26.04.17 1970/126 Security 79632.00

B- 2244 02.11.18 CPD-II M/s S.R. Enterprises 33/CPD-II/05.05.16 1970/126 Security 18929.00

B- 2245 02.11.18 CPD-II M/s Ramit Erectors 02/CPD-II/22.03.17 1970/127 Security 38143.00

B- 2246 02.11.18 CPD-II M/s Shiv Mahadev Engg.

Works

16/CPD-II/07.02.18 1970/127 Security 24572.00

B- 2247 02.11.18 CPD-II M/s Shiv Mahadev Engg.

Works

10/CPD-II/28.03.16 1970/128 Security 28377.00

B- 2248 02.11.18 CPD-II M/s Shiv Mahadev Engg.

Works

11/CPD-II/16.03.18 1970/128 Security 26814.00

B- 2249 02.11.18 BMD-II M/s P.K. Enterprises 9F 27/BMD-II/06.10.16 1999/25 Removal Fly Ash 66341.00

B- 2250 02.11.18 BMD-II M/s M.K. Traders 7F 22/BMD-II/23.08.16 1999/24 Attending Fault 108459.00

B- 2251 02.11.18 BMD-II M/s Bharat Mechnical &

Structural

6 07/BMD-II/24.08.17 1999/26 Breakdowan Maint. 92048.00

B- 2252 02.11.18 BMD-II M/s Bharti Enterprises 8 08/BMD-II/25.08.17 1953/175 Tranfer to A List

4246/17.11.18

151503.00

B- 2253 05.11.18 CSD-I M/s Satyam Weighting

System

272/CSD-I/24.03.18 1716/145 Service Maint. 11210.00

B- 2254 14.11.18 C&ID M/s D.K. & Sons Co. 3 03/C&ID/22.05.18 1896/61A Overhauling 27384.00

B- 2255 14.11.18 C&ID M/s D.K. & Sons Co. 3F 02/C&ID/22.05.18 1896/64B Cutting & welding 34117.00

B- 2256 14.11.18 C&ID M/s D.K. & Sons Co. 4F 03/C&ID/22.05.18 1896/65A Overhauling 23901.00

B- 2257 14.11.18 C&ID M/s D.K. & Sons Co. 1 09/C&ID/15.10.18 1896/67A Reparing &

Serviceing

22431.00

B- 2258 15.11.18 TMD-I M/s Thermal India Engineers 1&F 03/TMD-I/20.08.18 1972/136 Inpection &

Dismatling

312336.00

B- 2259 15.11.18 TMD-I M/s Turbo Tech Engineering 1&F 05/TMD-I/18-19 1972/137 Replecement of

Lydratech

85860.00

B- 2260 15.11.18 TMD-I M/s M.K. Traders 4 07/TMD-I/17.07.17 1972/139 Overhauling 32119.00

Page 22: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

B- 2261 16.11.18 EMD-II M/s Vikas Electricals 1 17/EMD-II/17-18 2073/4 Breakdowan Maint. 384545.00

B- 2262 16.11.18 EMD-II M/s Electrical &

Instrumentation

Engineers

09/EMD-II/16-17 1800/121 Security 50222.00

B- 2263 16.11.18 AHD-I M/s Desein Private Limited 492/AHD-I/05.10.16 2032/160 O/M of Ash

Handiling

308736.00

B- 2264 16.11.18 AHD-I M/s Desein Private Limited 492/AHD-I/05.10.16 2032/161 O/M of Ash

Handiling

296288.00

B- 2265 16.11.18 AHD-I M/s Desein Private Limited 492/AHD-I/05.10.16 2032/163 O/M of Ash

Handiling

298776.00

B- 2267 17.11.18 CHD-III M/s Priyanka Enterprises 10 11/CHD-III/30.03.17 1853/65B O/H of LT Breker 51605.00

B- 2268 17.11.18 CHD-III M/s Priya Construction 4 10/CHD-III/06.01.18 1853/66 Rewinding of LT

Motor

152102.00

B- 2269 17.11.18 CHD-III M/s Nosad Contractor 6 04/CHD-III/10.05.18 1853/67 Shifting o/H of LT

Motor

22532.00

B- 2270 17.11.18 TMD-I M/s Usha Enterprises 3 09/TMD-I/31.01.17 1972/139 Transfer from Alist

4222/15.11.1830815.00

B- 2271 17.11.18 ECMD-II M/s Jamuna Mahar

Enterprises

2&F 35/ECMD-II/19.01.18 2014/22 M&R of Colony 348236.00

B- 2272 19.11.18 CPD-II M/s Ewit Infotech 990/CPD-I/09.08.18 1925/81 Door Fram 214760.00

B- 2273 19.11.18 C&ID M/s Industrial Engg.

Enterprises

5 09/C&ID/25.10.17 1896/66A Reconding Brek

Down

64240.00

B- 2274 19.11.18 CPD-III M/s Sanjog Professional

Service

05/CPD-III/17.05.17 371/177 Security 22620.00

B- 2275 27.11.18 CHD-I M/s Bharat Mechnical &

Structural

1&F 02/CHD-I/16-17 2031/01 Fabrication 670828.00

B- 2276 27.11.18 C&ID M/s Sadan Engineering

Works

3 07/C&ID-I/23.12.17 1874/119 Unloading 33817.00

B- 2277 27.11.18 CHD-IV M/s Hind Udyog 4 06/CHD-IV/12.07.17 2029/ Replecement &

Repairng

118672.00

B- 2278 27.11.18 ECMD-II M/s Jamuna Mahar

Enterprises

2 36/ECMD-II/19.01.18 2011/35 White Washing 320753.00

B- 2279 27.11.18 ECMD-II M/s R.P. Construction 2 41/ECMD-II/13.03.18 1876/63 Tranfer to A list

4271/27.11.1857437.00

B- 2280 27.11.18 CPD-I M/s Technow Engineering

Works

1158/CPD-I/01.11.18 1959/57 Consumable 6567.00

B- 2281 27.11.18 CPD-III M/s BEML Limited 727/CPD-III/15.06.13 1833/62 Supply 0.00 18433.00

B- 2282 27.11.18 CPD-III M/s BEML Limited 470/CPD-III/21.05.14 1833/63 Supply 0.00 130574.00

B- 2283 27.11.18 CPD-III M/s BEML Limited 31/CPD-III/14.01.15 1833/64 Supply 0.00 8155.00

B- 2284 28.11.18 CHD-I M/s Priyanka Enterprises 3 11/CHD-I/13.03.18 1872/84 Annual Contant 931512.00

B- 2285 30.11.18 EMD-III M/s T.S. Enterprises 06/EMD-III/11.07.18 1994/124 Overhauling 99768.00

5907899.00 157162.00 0.00

B- 2286 04.12.18 CPD-II M/s Mtandt Ltd 1278/CPD-II/01.12.18 1995/28 Supply 0.00 1165336.00

Page 23: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Date Name Of

Division

RAB Agr/PO/LOI/WO and Dt MB

NO./Page

No/

Description of

Work/Supply

Work Supply Fund Reverved Reg

Index Bill

No

Name of Firm

B- 2287 04.12.18 BMD-II M/s P.K. Enterprises 03/BMD-II/23.06.18 1963/54B Security 13050.00

B- 2288 04.12.18 BMD-II M/s P.K. Enterprises 06/BMD-II/20.09.18 1963/54B Security 8700.00

B- 2289 05.12.18 BMD-II M/s P.K. Enterprises 27/BMD-II/06.10.16 1999/27 Security 56617.00

B- 2290 05.12.18 EMD-II M/s Suresh Pal Singh 08/EMD-II/07.11.17 1964/125 Security 6552.00

B- 2291 07.12.18 AHD-I M/s Desein Private Limited 492/AHD-I/05.10.16 2057/59 Maint. Of ASP 308736.00

B- 2292 07.12.18 AHD-I M/s R.B. Engg. Works 1 04/AHD-I/23.10.18 2057/64 Opration of ESP 81222.00

B- 2293 10.12.18 ECMD-II M/s Bharti Enterprises 2 06/ECMD-II/28.04.18 2012/24 Levelling & Dresser 170041.00

B- 2294 10.12.18 ECMD-II M/s Jaya Enterprises 174/CWCD-

II/14.04.14

1683/197 Security 36179.00

B- 2295 11.12.18 CPD-I M/s Mashel Electric 1049/CPD-I/09.10.18 1950/83 Supply 0.00 2774287.00

B- 2296 12.12.18 EMD-III M/s Ramit Erectors 19/EMD-III/27.01.18 1994/109 Security 29125.00

B- 2297 12.12.18 EMD-III M/s T.S. Enterprises 12/EMD-III/25.09.17 1994/114 Security 26920.00

B- 2298 12.12.18 EMD-III M/s Ramit Erectors 04/EMD-III/20.06.17 1994/120 Security 50345.00

B- 2299 13.12.18 CHD-III M/s Priyanka Enterprises 11 11/CHD-III/30.03.17 1853/69 Ranning Bill 29594.00

B- 2300 13.12.18 CHD-I M/s Priyanka Enterprises 1 10/CHD-I/22.11.18 1872/98 Ranning Bill 89250.00

B- 2301 15.12.18 EMD-I M/s Nosad Contractor 7 09/EMD-I/03.11.17 2055/22 Work Bill 33590.00

B- 2302 15.12.18 EMD-I M/s Nosad Contractor 8 09/EMD-I/03.11.17 2055/23 Work Bill 96288.00

B- 2303 15.12.18 EMD-I M/s Nosad Contractor 9 09/EMD-I/03.11.17 2055/25 Work Bill 6993.00

B- 2304 15.12.18 EMD-I M/s Nosad Contractor 10 09/EMD-I/03.11.17 2055/26 Work Bill 96288.00

B- 2305 15.12.18 EMD-I M/s Nosad Contractor 2 18/EMD-I/15.03.18 2055/27 Work Bill 14968.00

B- 2306 15.12.18 EMD-I M/s Nosad Contractor 3 18/EMD-I/15.03.18 2055/28 Work Bill 9978.00

B- 2307 15.12.18 EMD-I M/s Nosad Contractor 13 02/EMD-I/26.07.17 2055/33 Work Bill 76411.00

B- 2308 15.12.18 EMD-I M/s Nosad Contractor 14 02/EMD-I/26.07.17 2055/34 Work Bill 111643.00

B- 2309 15.12.18 EMD-I M/s Nosad Contractor 15 02/EMD-I/26.07.17 2055/32 Work Bill 40894.00

B- 2310 15.12.18 CPD-II M/s Pradeep Kumar 155/CPD-II/23.10.17 1970/ Security 4200.00

B- 2311 15.12.18 CPD-II M/s Pradeep Kumar 58/CPD-II/26.1.18 1970/ Security 4200.00

B- 2312 15.12.18 CPD-II M/s Uttam Chandra Gupta 899/CPD-II/01.07.17 1970/ Security 4200.00

B- 2313 15.12.18 CPD-II M/s Uttam Chandra Gupta 03/CPD-II/02.01.17 1970/ Security 4200.00

B- 2314 15.12.18 CPD-II M/s Uttam Chandra Gupta 12/CPD-II/02.01.18 1970/ Security 4200.00

1414384.00 3939623.00 0.00

G.Total 50337699.00 27640095.00 8223693.00

Dy. Chief Accounts Officer

Page 24: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

SL NO.

1 04/17 0.00 0.00 0.00 0.00 0.00

2 05/17 0.00 0.00 377254.00 377254.00 377254.00

3 06/17 0.00 797846.00 487980.00 1285826.00 1285826.00

4 07/17 0.00 4170436.00 0.00 4170436.00 4170436.00

5 08/17 0.00 1719235.00 35871.00 1755106.00 1755106.00

6 09/17 0.00 2787003.00 1050400.00 3837403.00 3837403.00

7 10/17 0.00 2190164.00 610498.00 2800662.00 2800662.00

8 11/17 0.00 3065698.00 1429858.00 4495556.00 4495556.00

9 12/17 0.00 2184530.00 2122044.00 4306574.00 4306574.00

10 01/18 0.00 2465110.00 485242.00 2950352.00 2950352.00

11 02/18 0.00 1892404.00 233492.00 2125896.00 2125896.00

12 03/18 0.00 1403155.00 2160486.00 3563641.00 3563641.00

0.00 22675581.00 8993125.00 31668706.00 31668706.00

1 04/18 0.00 1387887.00 0.00 1387887.00 1387887.00

2 05/18 0.00 2138722.00 2152311.00 4291033.00 4291033.00

3 06/18 0.00 6919218.00 7672396.00 14591614.00 14591614.00

4 07/18 0.00 2459419.00 5230549.00 7689968.00 7689968.00

5 08/18 0.00 3511064.00 1123046.00 4634110.00 4634110.00

6 09/18 9221371.00 2994085.00 562334.00 3556419.00 12777790.00

7 10/18 133553.00 2343824.00 1749172.00 4092996.00 4226549.00

8 11/18 6365296.00 5907899.00 157162.00 6065061.00 12430357.00

9 12/18 2475242.00 1414384.00 3939623.00 5354007.00 7829249.00

18195462.00 29076502.00 22586593.00 51663095.00 69858557.00

TOTAL 18195462.00 51752083.00 31579718.00 83331801.00 101527263.00

Dy Chief Accounts Officer Chief Engineer (L-I)

2X110 MW

SUPPLY

LIST B

WORK

PARICHHA THERMAL POWER PROJECT

PARICHHA (JHANSI)

PENDING LIABILITY AS ON 15.12.2018

LIST AMONTH TOTAL

(List B)

TOTAL

(List A+B)O&M

Page 25: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

List "A" 18195462.00

Work 51752083.00

O&M 31579718.00

OH U#1 0.00

OH U#2 0.00

Cap 0.00

OH U#1 0.00

OH U#2 0.00

O&M 0.00

Total 101527263.00

Sr. Accounts Officer Chief Engineer (L-I)

Total

Liability

2x110 MW

List "B" P.I.

After Receipt

Parichha Thermal Project, Parichha (Jhansi)LIABILITY AS ON 15.12.18

Page 26: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

LIST "A" LIST "B" TOTAL

1 04/17 6782467.00 8982713.00 15765180.00

2 05/17 8094594.00 9310949.00 17405543.00

3 06/17 11769914.00 5138186.00 16908100.00

4 07/17 10624913.00 5648194.00 16273107.00

5 08/17 2169717.00 4561898.00 6731615.00

6 09/17 17074696.00 6600746.00 23675442.00

7 10/17 8383969.00 4509665.00 12893634.00

8 11/17 9199582.00 8031203.00 17230785.00

9 12/17 13155579.00 8165819.00 21321398.00

10 01/18 5723057.00 5149316.00 10872373.00

11 02/18 6049835.00 2749578.00 8799413.00

12 03/18 7413794.00 6937836.00 14351630.00

106442117.00 75786103.00 182228220.00

1 04/18 18568115.00 4172113.00 22740228.00

2 05/18 12317012.00 5980863.00 18297875.00

3 06/18 6920936.00 16452965.00 23373901.00

4 07/18 8790977.00 9882380.00 18673357.00

5 08/18 11008208.00 5000256.00 16008464.00

6 09/18 16656315.00 3915659.00 20571974.00

7 10/18 13945012.00 5495581.00 19440593.00

8 11/18 8776198.00 6385787.00 15161985.00

9 12/18 2475242.00 5354007.00 7829249.00

99458015.00 62639611.00 162097626.00

TOTAL 205900132.00 138425714.00 344325846.00

Dy. Chief Accounts Officer

PARICHHA THERMAL POWER PROJECT

PARICHHA (JHANSI)

Total Liability entered into Register "A" & "B" w.e.f.

01-04-17 to 15-12-18

SL NO.MONTH

2x110 MW

Page 27: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Reg Inde

x

Bill No & Date

Date Name Of Division

RAB Agr/PO/LOI/WO and Dt MB NO./Page

No/

Date of Measur.

Description of Work/Supply Work

O&M OH U#3 OH U#4 Cap OH U#3 OH U#4 O&MB- 243 06.07.15 CSD-II M/S Vinay Trading Corporation 977/CPD-I/O-I/05.06.15 267/117 10.06.15 Supply 106080.00B- 294 27.07.15 CSD-II M/S Atlas Copco Compressure 1022/CPD-I/O-I/12.06.15 192/93 22.07.15 Supply 374885.00B- 299 27.07.15 CSD-II M/S Mic & Mac Engg. Works 928/CPD-III/O-I/17.11.14 192/95A 23.12.14 Supply 50388.00

TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00B- 353 10.08.15 CSD-II M/S Industrial Sales & Supply

Agencies1194/CPD-I/O-1/07.07.15 376/44 21.07.15 Supply 32154.00

B- 370 13.08.15 CSD-II M/S Techweld 987/CPD-I/O-1/06.06.15 411/27 13.07.15 Supply O#4 288150.00TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 456 23.09.15 CSD-II M/S A to Z Infraspares Pvt Ltd 1191/CPD-I/O-1/07.07.15 268/96 08.07.15 Supply 76634.00B- 457 23.09.15 CSD-II M/S A to Z Infraspares Pvt Ltd 1191/CPD-I/O-1/07.07.15 268/96B 08.07.15 Supply 3222.00

TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 520 30.10.15 CSD-II M/S Kay Mohan Corporation 1604/CPD-I/O-1/15.09.15 427/28 12.10.15 Supply 20162.00TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 552 06.11.15 CSD-II M/S Ocean Wires & cables 1098/CPD-I/O-1/01.10.14 411/38 20.04.15 Supply 390452.00B- 576 18.11.15 CSD-II M/S Jain Mill Stores Pvt Ltd 1055/CPD-I/O-1/18.06.15 376/48 13.07.15 Supply 126046.00B- 578 18.11.15 CSD-II M/S Jain Mill Stores Pvt Ltd 1193/CPD-I/O-1/07.07.15 376/49 24.09.15 Supply 265041.00B- 584 18.11.15 CSD-II M/S Jalvid Udyog 1160/CPD-I/O-1/02.07.15 376/51A 14.07.15 Supply 15960.00B- 614 26.11.15 CSD-II M/S Steel Authority of India Ltd. 1585/CPD-I/O-1/11.09.15 242/80 23.11.15 Supply 779196.00

TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 649 14.12.15 CSD-II M/S Atlas Copco (India) Ltd. 2148/CPD-II/O-1/04.11.15 409/73 25.11.15 Supply 1113963.00B- 659 19.12.15 CSD-II M/S Mohan Lal 1536/CPD-I/O-I/03.09.15 445/8 Supply 1776037.00

TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 680 11.01.16 CSD-II M/S Omega Engineering works 2301/CPD-II/O-1/14.12.15 386/140 24.12.15 Supply 112576.00B- 683 11.01.16 CSD-II M/S T.R.F. Limited 920/CPD-III/O-1/17.12.15 386/142 22.12.15 Supply 2340900.00B- 685 11.01.16 CSD-II M/S Amco Industries 2302/CPD-II/O-1/14.12.15 386/144 23.12.15 Supply 457288.00B- 701 21.01.16 CSD-II M/S Kay Mohan Corpn 1535/CPD-I/O-1/03.09.15 411/41 19.11.15 Supply 44940.00B- 708 21.01.16 CSD-II M/S Hitachi Hi Rel Power Electronics

Pvt Ltd1960/CPD-I/O-1/11.12.15 411/46 14.01.16 Supply 368112.00

B- 718 21.01.16 CSD-II M/S Instant Engineers 170/CPD-III/O-1/27.03.15 445/04 15.12.15 Supply 28652.00TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 752 02.02.16 CSD-II M/S Jain Mills Stores (P) Ltd. 1873/CPD-I/O-1/18.11.15 267/162 19.12.15 Supply 159825.00B- 755 02.02.16 CSD-II M/S Mahendra Consultants 1754/CPD-II/O-1/05.01.16 267/164 05.01.16 Supply 14280.00B- 756 02.02.16 CSD-II M/S Indian Rubber Products 1124/CPD-I/O-1/18.06.15 267/165 05.01.16 Supply 207844.00B- 757 02.02.16 CSD-II M/S Indian Rubber Products 1124/CPD-I/O-1/18.06.15 267/167 05.01.16 Supply 41976.00B- 759 02.02.16 CSD-II M/S Mohan Lal 59/CPD-I/O-1/11.01.16 267/168 21.01.16 Supply 58409.00B- 768 03.02.16 CSD-II M/S Shree Shyam Bearing Pvt. Ltd 1986/CPD-I/O-1/18.12.15 427/37 02.02.16 Supply 40898.00B- 769 03.02.16 CSD-II M/S Anurag Engg. Works 1605/CPD-I/O-1/15.09.15 427/40 02.02.16 Supply 33524.00

TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 818 02.03.16 CSD-II M/S Mohan Lal 59/CPD-I/O-1/11.01.16 341/65-66 Supply 27995.00

B- 821 02.03.16 CSD-II M/S Jalvid Udyog 58/CPD-I/11.01.16 341/68-69 Supply 51786.00

B- 822 02.03.16 CSD-II M/S Sail Kanpur 194/CPD-I/05.02.16 460/2 Supply 79716.00B- 829 10.03.16 CSD-II M/S Instant Engineers 71/CPD-III/29.01.16 445/16-17 Supply 1045122.00

B- 842 28.03.16 CSD-II M/S Net Cascade Automation (P) Ltd 258/CPD-I/O-1/24.09.12 411/47 10.03.16 Supply 64093.00

B- 844 28.03.16 CSD-II M/S Durg India Intrumentation (P) Ltd

141/CPD-I/O-1/05.01.16 411/47 26.02.16 Supply 255273.00

B- 847 28.03.16 CSD-II M/S Amco Industries 2808/CPD-II/O-1/29.02.16 386/151 01.03.16 Supply 60767.00

FUND RESERVED

FUND RESERVEDFUND RESERVED

Fund Reserved Amount

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

2X210 MW Parichha Thermal Extension Project, Parichha (Jhansi)B

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

Name of Firm Supply

P. I. After Receipt

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 1

Page 28: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 848 28.03.16 CSD-II M/S Amco Industries 2807/CPD-II/O-1/29.02.16 386/150 01.03.16 Supply 1001920.00B- 858 29.03.16 AHD-II M/S India Engg. Works 1 09/AHD-II/15-16/11.01.16 459/9 04.03.16 Election/LayingB- 869 30.03.16 CSD-II M/S Electronics & Electricals 804/CPD-III/O-1/30.06.13 237/171 21.08.15 Supply 104049.00

TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 44 20.04.16 CSD-II M/S Electonics & Electircals 72/CPD-III/O-1/29.01.16 192/100 10.02.16 Supply 0.00 182628.00B- 45 20.04.16 CSD-II M/S MEM Industries 358/CPD-I/O-1/03.03.16 192/100 12.03.16 Supply 0.00 36500.00B- 49 23.04.16 CSD-II M/S Rajat Associates 364/CPD-I/O-1/03.03.16 406/33B 09.03.16 Supply 0.00 1607.00

TOTAL 0.00 220735.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 95 02.05.16 EMD-IV M/S MRP Construction Co. F 11/EMD-IV/14-15/12.02.15 442/50 18.01.16 B/D Maintinance 25471.00B- 114 02.05.16 CSD-II M/S K.S. Brothers 487/CPD-I/O-1/28.03.16 445/23 02.04.16 Supply 149383.00B- 115 02.05.16 CSD-II M/S Jalvid Udyog 2216/CPD-I/O-1/11.12.13 445/24 24.02.16 Supply 0.00 21936.00B- 118 02.05.16 CSD-II M/S Uttam Sales Corporation 399/CPD-I/O-1/09.03.16 445/26 12.03.16 Supply 0.00 201188.00B- 119 02.05.16 CSD-II M/S MEKASTER Engineering Service 110/C&ID-III/28.03.16 445/28 04.04.16 Supply 0.00 302897.00

B- 130 06.05.16 CSD-II M/S DSA Enterprises 2239/CPD-II/O-1/27.11.15 412/158 21.03.16 Supply 0.00 51458.00B- 132 11.05.16 CAMD-II M/S Singh Metal Castings 12/CAMD-II/15-16 Supply 0.00 366325.00B- 157 23.05.16 CSD-II M/S Genuine Filters 2566/CPD-II/06.02.16 426/42 12.05.16 Supply 0.00 262178.00B- 159 23.05.16 CSD-II M/S Authntic System & Technologies 54/CPD-I/O-1/11.01.16 411/49 11.02.16 Supply 0.00 24147.00

B- 160 23.05.16 CSD-II M/S Goodwill Governer Services 691/CPD-I/O-1/26.04.16 411/50 28.04.16 Supply 0.00 119850.00B- 162 23.05.16 CSD-II M/S Uniflow Marketing 156/CPD-I/O-1/27.04.16 449/10 02.05.16 Supply 0.00 636791.00B- 164 23.05.16 CSD-II M/S P.K. Enterprises 176/CPD-II/O-1/27.04.16 450/12 09.05.16 Supply 0.00 1257270.00B- 166 23.05.16 CSD-II M/S Pix Transmission Ltd 1467/CPD-I/O-1/19.08.15 267/186 14.05.16 Supply 144462.00B- 167 23.05.16 CSD-II M/S Aditya Enterprises 2895/CPD-II/O-1/10.03.16 267/187 23.03.16 Supply 0.00 229572.00B- 185 31.05.16 CSD-II M/S J.K. Engg. Co. 2953/CPD-II/O-1/19.03.16 466/05 25.04.16 Supply 0.00 648737.00B- 186 31.05.16 CSD-II M/S J.K. Engg. Co. 2953/CPD-II/O-1/19.03.16 466/05 25.04.16 Supply 0.00 1405386.00B- 187 31.05.16 CSD-II M/S Balaji Corporation 152/CPD-II/O-1/27.04.16 466/06 28.05.16 Supply 0.00 1312693.00B- 188 31.05.16 CSD-II M/S Uniflow Marketing 370/CPD-II/O-1/13.05.16 466/08 18.05.16 Supply 0.00 1986798.00B- 189 31.05.16 CSD-II M/S Uniflow Marketing 371/CPD-II/O-1/13.05.16 466/07 13.05.16 Supply 0.00 2191188.00

TOTAL 174854.00 11162876.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 193 01.06.16 CSD-II M/S Udit Engineers 583/CPD-I/O-1/11.04.16 386/155 25.04.16 Supply 0.00 586094.00B- 194 01.06.16 CSD-II M/S Unimech Lifting Equipments Pvt.

Ltd.404/CPD-III/O-1/04.05.16 386/154 09.05.16 Supply 145204.00

B- 196 01.06.16 CSD-II M/S Amco Industries 2995/CPD-II/O-1/29.03.16 386/156 07.04.16 Supply 0.00 386921.00B- 197 01.06.16 CSD-II M/S Dyanmic Power Service 2996/CPD-II/O-1/29.03.16 386/157 08.04.16 Supply 0.00 1307218.00B- 203 04.06.16 CHD-III M/S Priya Construction co. 8 04/CHD-III/15-16/29.06.15 432/78 04.06.16 Rewainding of LT Motor 111799.00B- 206 08.06.16 CSD-II M/S Akshat Enterprises 844/CPD-I/O-1/13.5.16 341/78 20.05.16 Supply 90818.00B- 207 08.06.16 CSD-II M/S J.K. Engg. Co. 819/CPD-I/O-1/10.05.16 341/78 18.05.16 Supply 108788.00B- 208 08.06.16 CSD-II M/S Indian Rubber Product 71/CPD-I/O-1/13.01.16 341/78 26.02.16 Supply 53187.00B- 214 20.06.16 CHD-IV M/S J.S. Enterprises SEC 12/CHD-IV/15/16/27.03.15 439/48 09.06.16 Security 7548.00B- 215 20.06.16 CHD-IV M/S J.S. Enterprises SEC 14/CHD-IV/15-16/28.09.15 309/97 09.06.16 Security 16512.00B- 221 21.06.16 CSD-II M/S Allusion Constrols Pvt. Ltd 471/CPD-I/O-1/21.03.16 349/195 04.04.16 Supply 160300.00B- 222 21.06.16 CSD-II M/S Atlas Copco India Ltd 1579/CPD-I/O-1/14.09.15 445/31 02.06.16 Supply 374885.00B- 236 28.06.16 CSD-II M/S Kay Mohan Corporation 853/CPD-I/O-1/13.05.16 466/12 06.06.16 Supply 13440.00B- 237 28.06.16 CSD-II M/S K.S. & Brothers 529/CPD-I/O-1/04.04.16 411/51 15.06.16 Supply 14259.00B- 238 28.06.16 CSD-II M/S K.S. & Brothers 722/CPD-I/O-1/03.05.16 411/52 11.05.16 Supply 128069.00B- 240 28.06.16 CSD-II M/S Aditya Enterprises 723/CPD-I/O-1/03.05.16 411/53 11.05.16 Supply 240335.00B- 241 28.06.16 CSD-II M/S K.S. & Brothers 530/CPD-I/O-1/04.04.16 411/52 15.06.16 Supply 7330.00

TOTAL 135859.00 3616848.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 245 11.07.16 CHD-III M/S Priya Construction co. F 04/CHD-III/15-16/29.06.15 211/67 04.06.16 Rewainding of LT Motor 41745.00B- 260 13.07.16 CSD-II M/S Anurag Engg Works 854/CPD-I/O-1/13.05.16 450/14 25.05.16 Supply 0.00 69959.00B- 261 13.07.16 CSD-II M/S Anurag Engg Works 968/CPD-I/O-1/25.05.16 450/17 10.06.16 Supply 0.00 184868.00B- 262 13.07.16 CSD-II M/S Anurag Engg Works 968/CPD-I/O-1/25.05.16 450/18 10.06.16 Supply 0.00 163174.00B- 278 20.07.16 CSD-II M/S GE India Industrial P Ltd 308/CPD-I/25.02.16 237/182 01.06.16 Supply 0.00 373212.00B- 280 20.07.16 CSD-II M/S Electronics & Electrical Pvt. Ltd. 1017/CPD-I/01.06.16 237/184 23.06.16 Supply 0.00 185519.00

TOTAL 41745.00 976732.00 0.00 0.00 0.00 0.00 0.00 0.00

FUND RESERVED

FUND RESERVEDFUND RESERVED

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 2

Page 29: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 297 02.08.16 EMD-V M/S R.L.Engineering Sec 74/EMD-V/14-15/10.10.14 292/83 21.07.16 Security 54289.00B- 298 02.08.16 EMD-V M/S R.L.Engineering Sec 41/EMD-V/14-15/24.11.14 292/83 21.07.16 Security 66286.00B- 301 02.08.16 CSD-II M/S Balaji Corporation 736/CPD-II/O-1/02.07.16 466/17 07.07.16 Supply 193243.00B- 303 02.08.16 CSD-II M/S Globus Engineers 583/CPD-II/O-1/10.06.16 466/16 22.07.16 Supply 152967.00B- 304 02.08.16 CSD-II M/S Globus Engineers 496/CPD-II/O-1/30.08.16 466/15 21.07.16 Supply 1023566.00B- 309 02.08.16 CSD-II M/S Supath Engineering Services Pvt.

Ltd.1006/CPD-I/O-1/01.06.16 411/54 11.06.16 Supply 858524.00

B- 310 02.08.16 CSD-II M/S Elecon EPC Project Ltd. 804/CPD-I/O-1/30.10.15 411/54 18.01.16 Supply 668084.00B- 311 02.08.16 CSD-II M/S Trilok chand & sons 1018/CPD-I/O-1/01.06.16 411/56 27.06.16 Supply 76460.00B- 322 10.08.16 CSD-II M/S L.D.R.Engineers 592/CPD-II/O-1/13.06.16 426/46 07.07.16 Supply 691461.00B- 323 10.08.16 CSD-II M/S R.S.P. overseas pvt. Ltd. 489/CPD-1/O-1/28.03.16 426/47 10.04.16 Supply 44370.00B- 324 10.08.16 CSD-II M/S Amalgamated Industial

Composites(Pvt.) Ltd.297/CPD-II/O-1/22.03.16 426/48 04.05.16 Supply 1130702.00

B- 328 10.08.16 CSD-II M/S Vikas Chauda 822/CPD-II/O-1/13.07.16 426/52 25.07.16 Supply 40041.00B- 329 10.08.16 CSD-II M/S Vikas Chauda 822/CPD-II/O-1/13.07.16 426/51 25.07.16 Supply 105600.00B- 330 10.08.16 CSD-II M/S Vikas Chauda 822/CPD-II/O-1/13.07.16 426/51 25.07.16 Supply 1014077.00B- 337 11.08.16 CHD-IV M/S Shiva Construction Sec 03/CHD-IV/15-16/08.05.16 384/99 30.07.16 Security 74832.00B- 339 16.08.16 CSD-II M/S Leading Edge Technocrat 485/CPD-II/O-1/28.05.16 450/28 02.07.16 Supply 1185126.00B- 343 16.08.16 CSD-II M/S Indian Rubber Product 1270/CPD-I/O-1/20.06.16 376/57 23.06.16 Supply 4081.00B- 344 16.08.16 CSD-II M/S AtoZ Insfraspares PVT. LTD. 1283/CPD-I/O-1/20.06.16 376/56 24.06.16 Supply 282870.00B- 345 16.08.16 CSD-II M/S AtoZ Insfraspares PVT. LTD. 1285/CPD-I/O-1/20.06.16 376/56 24.06.16 Supply 67357.00B- 346 16.08.16 CSD-II M/S Industrial Sales & Supply Agency 821/CPD-I/O-1/10.05.16 376/57 18.05.16 Supply 57887.00

B- 347 16.08.16 CSD-II M/S Jain Mill Stores PVT. LTD. 820/CPD-I/O-1/10.05.16 376/57 22.06.16 Supply 386484.00B- 348 16.08.16 CSD-II M/S Jalvid Udyog 1510/CPD-I/O-1/13.07.16 376/58 25.07.16 Supply 150652.00B- 349 16.08.16 CSD-II M/S Jalvid Udyog 1510/CPD-I/O-1/13.07.16 376/58 25.07.16 Supply 119400.00B- 350 16.08.16 CSD-II M/S Hetal Impex 663/CPD-II/O-1/22.06.16 376/58 06.07.16 Supply 529740.00B- 354 22.08.16 CSD-II M/S Simplex Switchgear Pvt.Ltd. 1438/CPD-I/O-1/30.06.16 237/187 04.07.16 Supply 11733.00B- 357 22.08.16 CSD-II M/S Uttam Sales Carporation 1165/CPD-I/O-1/13/06.16 237/188 17.06.16 Supply 95785.00B- 360 22.08.16 CSD-II M/S Goodwill Governor Services 964/CPD-I/O-1/25.05.16 237/191 28.07.16 Supply 119850.00B- 361 22.08.16 CSD-II M/S S.S.Jayaswal & Brothers 1437/CPD-I/O-1/30.06.16 237/191 04.08.16 Supply 195894.00B- 372 22.08.16 EMD-IV M/S Elcetrical & Instrumentation

Engineers.09/EMD-IV/15-16, 18.09.15 270/65 08.08.16 Security 11898.00

B- 373 23.08.16 CHD-IV M/S Trigard Constructions. 07/CHD-IV/14-15, 18.12.14 164/95 22.08.16 Replacement of slew Bearing 538624.00B- 380 30.08.16 CSD-II M/S R.S Industries 1473/CPD-I/11.07.16 449/17 19.08.16 Supply 701312.00B- 382 30.08.16 CSD-II M/S Authentic System & Technologies 587/CPD-III/13.06.16 449/17 02.08.16 Supply 284747.00

B- 386 30.08.16 CSD-II M/S Amco Industries 562/CPD-II/OI/09.06.16 374/150 18.06.16 Supply 666436.00TOTAL 745929.00 10858449.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 391 01.09.16 EMD-V M/S Simplex Switchgear Pvt.Ltd. 5 177/CWCD-IV/13-14/24.10.13 352/77 16.08.16 Annual Maintenance 28052.00B- 393 01.09.16 EMD-V M/S Elcetrical & Instrumentation

Engineers.SEC 200/CWCD-IV/13-14/30.12.13 352/81 12.07.16 Security 31589.00

B- 394 01.09.16 CHD-IV M/S Trigard Construction SEC 10/CHD-IV/15-16/25.08.15 164/96 29.08.16 Security 29593.00B- 395 01.09.16 CHD-IV M/S Trigard Construction SEC 06/CHD-IV/15-16/29.06.15 164/95 29.08.16 Security 29593.00B- 396 01.09.16 CHD-IV M/S Trigard Construction SEC 22/CHD-IV/15-16/17.02.16 384/100 29.08.16 Security 28200.00B- 397 05.09.16 CHD-III M/S Awasthi Motor Winding Works. II 09/CHD-III/15-16/15.12.15 211/71 03.09.16 Rewainding & Installation 220346.00

B- 398 05.09.16 CHD-III M/S Priya Const. &Co. F 06/CHD-III/15-16/16.11.15 211/72 03.09.16 OH& Re Installation 183529.00B- 400 07.09.16 CSD-II M/S K.S.& Brothers 1272/CPD--I/OI 20.06.16 411/58 23.06.16 Supply 799915.00B- 401 07.09.16 CSD-II M/S S.K.Engineering 1166/CPD--I/OI 13.06.16 411/58 08.07.16 Supply 677678.00B- 402 07.09.16 CSD-II M/S Uttam Sales Carporation 513/CPD--II/OI 01.06.16 411/59 05.06.16 Supply 205819.00B- 403 07.09.16 CSD-II M/S Siddhi Vinayak Engg. 843/CPD--I/OI 13.05.16 411/61 07.06.16 Supply 229863.00B- 404 07.09.16 CSD-II M/S Limitorque India Limited 1076/CPD--I/OI 27.09.14 411/63 22.07.16 Supply 2229.00B- 405 07.09.16 CSD-II M/S Ashbond Engineers (Pvt) Ltd. 1170/CPD--I/OI 15.10.14 411/65 09.08.16 Supply 15300.00B- 406 07.09.16 CSD-II M/S Goodwill Governor Services 1536/CPD--I/OI 15.07.16 411/64 26.07.16 Supply 404288.00B- 409 07.09.16 CSD-II M/S Javid udyog 1761/CPD--I/OI 04.08.16 411/66 27.08.16 Supply 143219.00B- 412 09.09.16 BMD-III M/S Zenith Engineers III 02/BMD-III/16-17/26.04.16 283/99 12.07.16 B/D Maintinance of Boiler 15933.00B- 421 09.09.16 BMD-III M/S Shradha Engineering &Co. VIII 12/BMD-III/15-16/06.10.16 392/84 14.07.16 Repairing of Flue gas path 31595.00B- 423 09.09.16 BMD-III M/S Anita SEC 17/BMD-III/15-16/30.01.16 392/85 04.07.16 Security 7046.00

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 3

Page 30: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 432 16.09.16 TMD-II M/S Bharti Enterprises SEC 03/CWCD-III/13-14/05.04.14 235/56 02.08.16 Security 88659.00B- 434 16.09.16 CSD-II M/S Swastik Enterprises 1434/CPD-I/O-I/30.06.16 445/39 02.08.16 Supply 31646.00B- 436 16.09.16 CSD-II M/S K.S.& Brothers 1696/CPD-I/O-I/30.07.16 445/40 09.08.16 Supply 851721.00B- 437 16.09.16 CSD-II M/S K.S.& Brothers 1821/CPD-I/O-I/12.08.16 445/41 18.08.16 Supply 587062.00B- 439 16.09.16 CSD-II M/S Goodwill Governor Services 1537/CPD-I/O-I/15.07.16 445/43 26.07.16 Supply 1820860.00B- 442 20.09.16 CSD-II M/S Balaji Corporatian 1124/CPD--II/O-I/ 17.08.16 406/37 25.08.16 Supply 152130.00B- 444 20.09.16 CSD-II M/S Amalgamated Industrial

Composites Pvd. Ltd.824/CPD--II/O-I/ 13.07.16 406/38 26.08.16 Supply 911525.00

B- 445 20.09.16 CSD-II M/S Veerangna Enterprises 662/CPD--II/O-I/ 22.06.16 406/38 23.07.16 Supply 382200.00B- 450 20.09.16 CSD-II M/S OM Shri Sai Ram Global Inpex 710/CPD--II/O-I/ 30.06.16 466/22 06.07.16 Supply 1029452.00B- 451 20.09.16 CSD-II M/S Shree Shyam Bearing Pvt. Ptd. 1105/CPD--I/O-I/ 08.06.16 446/22 29.08.16 Supply 6014.00B- 452 20.09.16 CSD-II M/S Shree Shyam Bearing Pvt. Ptd. 1505/CPD--I/O-I/ 13.07.16 466/23 29.08.16 Supply 229801.00B- 456 23.09.16 EMD-IV M/S Shri Pooran Singh SEC 18/EMD-IV/15-16/02.01.16 292/87 08.09.16 Security 8235.00B- 458 23.09.16 AHD-II M/S India Engg. Works I 05/AHD-II/16-17/27.07.16 459/26 13.07.16 Repairing of Grinding Rolls 26781.00B- 459 23.09.16 AHD-II M/S Hi Tek NDT Services SEC 15/BMD-III/14-15/21.03.15 302/42 26.07.16 Security 199936.00B- 460 23.09.16 AHD-II M/S Tech Thermology SEC 20/BMD-III/15-16/10.02.16 302/41 26.07.16 Security 11336.00B- 462 24.09.16 CSD-II M/S Jalvid Udyog 1834/CPD-I/16-17/17.08.16 267/195 12.09.16 Supply 145930.00B- 463 24.09.16 CSD-II M/S Industrial Sales& Supply

Agencies1840/CPD-I/O-I/17.08.16 267/194 15.09.16 Supply 92689.00

B- 464 24.09.16 CSD-II M/S Indiana Sales 1820/CPD-I/O-I/12.08.16 267/196 15.09.16 Supply 140262.00B- 465 24.09.16 CSD-II M/S Jalvid Udyog 1173/CPD-II/O-I/24.08.16 267/195 12.09.16 Supply 80850.00B- 470 24.09.16 CSD-II M/S Power Engineers 977/CPD-II/O-I/30.07.16 449/25 05.09.16 Supply 1580416.00

940423.00 10520869.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 481 13.10.16 C&ID-III M/S Net Cascade Automation Pvt. Ltd 09/C&ID-III/14-15/25.03.15 456/20 20.07.16 Installation&Commissning 225750.00

B- 482 14.10.16 BMD-III M/S Sunrise Engg.& Contractor III 05/BMD-III/16-17/13.05.16 302/42 31.08.16 Preventive B/D Maintinance 3266.00B- 483 14.10.16 BMD-III M/S Sunrise Engg.& Contractor IV 06/BMD-III/16-17/13.05.16 302/43 22.07.16 Preventive B/D Maintinance 21258.00B- 484 15.10.16 CHD-IV M/S Shiva Construction F 18/CHD-IV/15-16/07.01.16 458/29 03.10.16 Rubber Logging 204004.00B- 489 15.10.16 ECM&EMD M/S India Engg. Works I 11/ECM&EMD/16-17/20.09.16 439/52 30.08.16 Cleaning of Jungle 30245.00B- 490 15.10.16 ECM&EMD M/S Sadan Engg. Works I 08/ECM&EMD/16-17/12.09.16 362/63 02.09.16 Cleaning of Drain 196319.00B- 491 15.10.16 CPD-II M/S Electrical&Instrumentation

EngineerI&F 07/C&ID-III/16-17/04.08.16 344/106 13.09.16 Fabrication & Suppuly 65477.00

B- 493 18.10.16 EMD-V M/S Priya construction Co. I 07/EMD-V/15-16/05.08.16 316/68 02.09.16 Repairing & Rawainding 789006.00B- 497 20.10.16 CSD-II M/S Elecon Engineering Co. Ltd. 442/CPD-II/O-I/25.05.16 427/48 24.09.16 Supply 54480.00B- 513 24.10.16 CSD-II M/S Vikas Chauda 2044/CPD-I/O-I/14.09.16 411/71 05.10.16 Supply 233479.00B- 515 24.10.16 CSD-II M/S K.S.& Brothers 1923/CPD-I/O-I/29.08.16 411/70 02.09.16 Supply 14259.00B- 523 25.10.16 CHD-II M/S Shipra Industries 1019/CPD-II/O-I/03.08.16 450/38 22.09.16 Supply 676347.00B- 526 26.10.16 BMD-III M/S Gaurabh Engg. Works (P) Ltd. SEC 05/BMD-III/13-14/01.01.14 392/60 25.03.15 Security 14931.00B- 527 29.10.16 BMD-IV M/S Ramji Rajpoot SEC 09/BMD-IV/15-16/30.01.16 403/158 26.09.16 Security 4200.00

1554456.00 978565.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 547 11.11.16 CSD-II M/S Actuators India 2078/CPD-I/O-I/21.09.16 486/09 18.10.16 Supply OH-3 393329.00B- 549 11.11.16 CSD-II M/S Balaji Corporation 1851/CPD-I/O-I 374/167 25.08.16 Supply 138107.00B- 560 22.11.16 CSD-II M/S Technow Engineering Works 2091/CPD-I/O-I/22.09.16 485/06 29.09.16 Supply 3693.00B- 561 22.11.16 CSD-II M/S Technow Engineering Works 2091/CPD-I/O-I/22.09.16 485/07 29.09.16 Supply 26049.00B- 562 22.11.16 CSD-II M/S Industrial Sales& Supply

Agencies2165/CPD-I/O-I/14.10.16 485/08 17.10.16 Supply 484270.00

B- 563 22.11.16 CSD-II M/S Jalvid Udyog 2090/CPD-I/O-I/22.09.16 485/08 14.10.16 Supply 305286.00B- 564 22.11.16 CSD-II M/S Jalvid Udyog 2090/CPD-I/O-I/22.09.16 485/09 14.10.16 Supply 49750.00B- 565 22.11.16 CSD-II M/S Jalvid Udyog 1406/CPD-II/O-I/26.09.16 485/10 03.10.16 Supply 97776.00B- 567 22.11.16 CSD-II M/S J.K.Engineering Co. 1838/CPD-I/O-I/17.08.16 485/15 24.08.16 Supply 68841.00B- 568 22.11.16 CSD-II M/S Jain Mill Stores Pvt. Ltd. 1839/CPD-I/O-I/17.08.16 485/17 05.11.16 Supply 103127.00B- 570 22.11.16 CSD-II M/S Flowtech Engineers 1580/CPD-II/O-I/20.10.16 485/18 02.11.16 Supply 945894.00B- 571 22.11.16 CSD-II M/S Flowtech Engineers 1580/CPD-II/O-I/20.10.16 485/20 02.11.16 Supply 886725.00B- 572 22.11.16 CSD-II M/S Shri Kant SEC 08/CSD-II/15-16/05.03.16 466/30 05.11.16 Security 6622.00B- 573 22.11.16 CSD-II M/S Shri Kant SEC 07/CSD-II/15-16/01.02.16 466/30 05.11.16 Security 1080.00B- 574 28.11.16 ECM&EMD M/S S.Kumar &Co. SEC 22/CWCD-IV/12-13/29.05.12 363/126 16.09.16 Security 23239.00B- 575 28.11.16 CSD-II M/S Amco Industries 1701/CPD-I/O-I/30.07.16 411/71 06.08.16 Supply 416625.00B- 576 28.11.16 CSD-II M/S Hitpro Engineering Co. 1744/CPD-I/O-I/03.08.16 411/72 08.11.16 Supply 203044.00B- 577 28.11.16 CSD-II M/S Aditya Enterprises 2186/CPD-I/O-I/14.10.16 411/73 18.11.16 Supply 133494.00B- 580 30.11.16 CSD-II M/S Smap Engineers Pvt. Ltd. 818/CPD-II/O-I/13.07.16 448/29 12.09.16 Supply 128991.00

TOTAL

TOTAL

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 4

Page 31: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 581 30.11.16 CSD-II M/S Smap Engineers Pvt. Ltd. 818/CPD-II/O-I/13.07.16 449/30 12.09.16 Supply 1011514.00B- 585 30.11.16 CSD-II M/S Fluid Power seals 2087/CPD-I/O-I/22.09.16 449/32 01.11.16 Supply 9731.00B- 588 30.11.16 CSD-II M/S Shiv Mahadev Engg. Works SEC 07/CSD-II/14-15/10.04.14 238/193 20.10.16 Security 4200.00B- 589 30.11.16 CSD-II M/S Shiv Mahadev Engg. Works SEC 01/CSD-II/15-16/04.04.14 238/193 20.10.16 Security 4200.00B- 590 30.11.16 CSD-II M/S Shiv Mahadev Engg. Works SEC 06/CSD-II/15-16/05.10.14 238/192 20.10.16 Security 4200.00

43541.00 5012917.00 393329.00 0.00 0.00 0.00 0.00 0.00

B- 591 02.12.16 C&ID-II M/S Laxmi Narayan Prajapati SEC 02/C&ID-II/15-16/04.06.15 328/33 16.11.16 Security 4200.00B- 592 02.12.16 C&ID-II M/S Laxmi Narayan Prajapati SEC 02/C&ID-II/16-17/18.04.16 328/34 16.11.16 Security 2400.00B- 593 02.12.16 C&ID-II M/S Laxmi Narayan Prajapati SEC 10/C&ID-II/16-17/22.10.16 328/34 16.11.16 Security 2400.00B- 595 05.12.16 CHD-III M/S Priya Construction Co. Ist 08/CHD-III/16-17/03.11.16 432/126 03.12.16 Rewaineling of LT Mator 222470.00B- 600 07.12.16 CSD-II M/S Krishan Kumar Distributors Pvt.

Ltd484/CPD-III/0-I/18.05.16 445/48 31.05.16 Supply 48253.00

B- 601 07.12.16 CSD-II M/S Electronics & Elcetricals 2010/CPD-I/0-I/12.09.16 445/46 19.09.16 Supply 47824.00B- 602 07.12.16 CSD-II M/S R.N.S. Automation 1922/CPD-I/0-I/29.08.16 445/47 03.09.16 Supply 328094.00B- 604 08.12.16 CSD-II M/S Shipra Industries 1336/CPD-II/O-I/14.09.16 386/170 09.10.16 Supply OH-3 783989.00B- 606 08.12.16 CSD-II M/S Raviraj Engineering co. 2040/CPD-I/O-I/14.09.16 386/171 19.10.16 Supply O&M 94100.00B- 609 08.12.16 C&ID-II M/S Kapatia Instrument Erector SEC 05/C&ID-III/15-16/25.05.16 456/19 29.08.16 Security 19981.00B- 610 08.12.16 C&ID-II M/S Kapatia Instrument Erector F 06/C&ID-III/15-16/28.08.15 456/24 02.11.16 Servicing OH of OLCTC 32646.00B- 612 15.12.16 C&ID-II M/S Unique Construction I&F 09/C&ID-II/16-17/30.09.16 452/16 09.11.16 Modification in Power & cantrol 134421.00

B- 613 16.12.16 TMD-II M/S Thermal India Engineers 6th 02/TMD-II/16-17/11.04.16 447/47 03.11.16 Break Down Maintinanc& Servicing

41920.00

B- 614 16.12.16 AHD-II M/S India Engineers Works 3rd 10/AHD-II/11.01.16 459/33 17.08.16 Repering of …………….. 59338.00B- 615 16.12.16 AHD-II M/S Balram Engineers 4th 11/AHD-II/14.01.16 459/33B 22.09.16 Lefting and shiting of clerev Transf. to A-

1038/07.02.17B- 616 17.12.16 CHD-III M/S Awasthi Motor Winding IIIrd 09/CHD-III/15-16/15.12.16 211/73 07.12.16 Repairing 189145.00B- 618 17.12.16 CHD-III M/S MRP Construction 12th 07/CHD-III/15-16/15.12.15 211/75 15.12.16 Preventing Maintenences 17464.00B- 621 21.12.16 CAMD-II M/S Shiv Mahadev Engineering Works I&F 07/CAMD-II/16-17/13.06.16 468/5 25.10.16 Coleaning of 28700.00

B- 623 21.12.16 CAMD-II M/S Zenith Engineers I&F 20/CAMD-II/14-15/31.03.15 468/6+7 16.09.16 Security 36570.00B- 624 21.12.16 CAMD-II M/S Zenith Engineers I&F 21/CAMD-II/14-15/31.03.15 468/7+8 Security 31102.00B- 626 21.12.16 EMD-V M/S S K Enterprises Ist 07/EMD-V/15-16/09.10.15 275/41A 01.12.16 Security 20300.00B- 627 21.12.16 BMD-III M/S O.S Contractor Ist 13/BMD-III/15-16/06.10.15 346/31 15.12.15 Supply and fixing 121042.00B- 630 22.12.16 EMD-V M/S Priya Const. Ist 03/EMD-V/15-16/04.07.15 316/70 30.11.16 Repariung Wainding 102849.00B- 631 22.12.16 EMD-V M/S D.K & Sons Co. SEC 16/EMD-V/15-16/02.01.16 316/70B 21.10.16 Security 19143.00B- 632 22.12.16 CSD-II M/S Trident Precision International 863/CPD-III/O-1/26.09.16 386/176 23.11.16 Security 311174.00

B- 633 22.12.16 CSD-II M/S Geeta Enterprises 949/CPD-III/O-1/26.09.16 386/177 14.12.16 Security 245700.00B- 634 22.12.16 CSD-II M/S Geeta Enterprises 967/CPD-III/O-1/30.09.16 386/176 14.12.16 Security 307650.00B- 635 29.12.16 CSD-II M/S Amco Industries 1518/CPD-II/O-1/13.10.16 409/92 19.10.16 Supply 1468205.00B- 637 29.12.16 CSD-II M/S Amco Industries 561/CPD-II/O-1/09.06.16 409/93+94 18.06.16 Supply 212783.00B- 640 29.12.16 CSD-II M/S Jay Pee 563/CPD-II/O-1/09.06.16 409/96+97 14.07.16 Supply 18665.00B- 641 29.12.16 CSD-II M/S EPE Process Filters &

Accumulators Pvt. Ltd.723/CPD-II/O-1/02.07.16 409/97 12.09.16 Supply 91821.00

B- 642 29.12.16 CSD-II M/S Amco Industries 560/CPD-II/O-1/09.06.16 409/98 18.06.16 Supply 2932650.00B- 650 30.12.16 BMD-III M/S Zenith Engineers IV 02/BMD-III/16-17/26.04.16 455/20B+2

1A23.09.16 Break Down Maintinanc& 11384.00

B- 657 30.12.16 CSD-II M/S Uniflow Marketing 1777/CPD-II/O-1/15.11.16 428/88 17.11.16 Supply 70343.00B- 658 30.12.16 CSD-II M/S Thermoserve Cop. 1780/CPD-II/O-1/15.11.16 428/88 22.11.16 Supply 937252.00B- 659 30.12.16 CSD-II M/S Mechfield Corporation 1781/CPD-II/O-1/15.11.16 428/89 25.11.16 Supply 416074.00

3430204.00 5197859.00 783989.00 0.00 0.00 0.00 0.00 0.00

B- 661 02.01.17 ECM&EMD M/S Vijay Kumar Gupta Cont. II 12 ECM&EMD/16-17/22.12.16 420 22.12.16 M/R of Civil Work 156675.00B- 662 03.01.17 CAMD-II M/S Balram Engineers Contractor &

SupplierI 03/CAMD-II/16-17/11.05.16 297/62 01.10.16 B/D Maintinance of Fixed Fire

System56957.00

B- 669 10.01.17 CSD-II M/S Vidyut Bhawan 1200/CPD-II/O-1/30.08.16 411/75 27.10.16 Supply 53180.00B- 671 10.01.17 CSD-II M/S Saurabh Udyog 2084/CPD-I/O-1/14.09.16 411/77 21.09.16 Supply 267709.00B- 672 10.01.17 CSD-II M/S Saurabh Udyog 2084/CPD-I/O-1/14.09.16 411/76 21.09.16 Supply 625077.00B- 676 10.01.17 CSD-II M/S Vibhuh Power & Energy Solution 1475/CPD-II/O-1/11.07.16 411/79 19.08.16 Supply 67015.00

B- 677 10.01.17 CHD-III M/S Nosad Contractor I 07/CHD-III/16-17/28.09.16 208/81 04.01.17 OH of HT/LT Motor 12661.00B- 678 10.01.17 CHD-III M/S Priya Construction Co. III 08/CHD-III/16-17/03.11.16 208/83 04.01.17 Rewainding of LT Motor 38679.00B- 679 11.01.17 CHD-IV M/S Hind Udyog III 26/CHD-IV/15-16/31.03.16 458/36 02.01.17 Repairing & reconditioning 108211.00

TOTAL

TOTAL

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 5

Page 32: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 680 11.01.17 CHD-IV M/S Hind Udyog I 15/CHD-IV/16-17/05.12.16 458/38 02.01.17 Repairing & reconditioning 317997.00B- 682 12.01.17 CSD-II M/S Mohan Lal 405/CPD-III/O-1/04.05.16 386/178 14.06.16 Supply 173502.00B- 683 12.01.17 CSD-II M/S Omega Engineering Works 2997/CPD-II/O-1/29.03.16 386/177 09.04.16 Supply 226195.00B- 684 12.01.17 CSD-II M/S S.Traders & Manufactures 407/CPD-III/O1/O-1/04.05.16 386/179 10.06.16 Supply 3305.00B- 687 12.01.17 CSD-II M/S Amco Industries 1186/CPD-II/O-1/29.08.16 386/181 23.09.16 Supply 290785.00B- 688 12.01.17 CSD-II M/S New Allenberry Works 788/CPD-III/O-1/19.08.16 386/182 24.08.16 Supply 1328443.00B- 689 12.01.17 CSD-II M/S New Allenberry Works 780/CPD-III/O-1/12.08.16 386/182 19.08.16 Supply 2306576.00B- 691 12.01.17 CSD-II M/S New Allenberry Works 960/CPD-III/O-1/29.09.16 386/184 03.10.16 Supply 2767884.00B- 692 12.01.17 CSD-II M/S T.R.F.Limited 1032/CPD-III/O-1/22.10.16 386/184 26.10.16 Supply 2908912.00B- 693 12.01.17 CSD-II M/S Geeta Enterprises 967/CPD-III/O-1/30.09.16 386/185 23.12.16 Supply 509250.00B- 694 12.01.17 CSD-II M/S Geeta Enterprises 949/CPD-III/O-1/20.09.16 386/186 23.12.16 Supply 245700.00B- 695 12.01.17 ECM&EMD M/S India Engg. Works II 11/ECM&EMD/16-17/20.09.16 439/56 03.11.16 Cleaning of Jungle 58160.00B- 696 12.01.17 ECM&EMD M/S India Engg. Works III 11/ECM&EMD/16-17/20.09.16 439/59 04.01.17 Cleaning of Jungle 31183.00B- 697 12.01.17 CHD-IV M/S Hind Udyog SEC 21/CHD-IV/15-16/09.01.17 384/100 09.01.17 Security 27585.00B- 698 12.01.17 CHD-IV M/S Hind Udyog SEC 08/ CHD-IV/15-16/10.08.15 384/100 09.01.17 Security 54108.00B- 699 12.01.17 TMD-II M/S Shiv Mahadev Engg. I&F 26/TMD-II/16-17/27.12.16 447/50 31.12.16 Conditioning &prevention of

rusting of ESV168906.00

B- 705 13.01.17 CSD-II M/S Mandal Engineering Corporation 406/CPD-III/O-1/04.05.16 409/104 05.08.16 Supply O&M 36720.00

B- 707 13.01.17 CSD-II M/S Smap Engineers Pvt. Ltd. 1887/CPD-II/O-1/02.12.16 466/41 02.01.17 Supply O&M 778922.00B- 708 13.01.17 CSD-II M/S Smap Engineers Pvt. Ltd. 1908/CPD-II/O-1/03.12.16 466/41 05.01.17 Supply O&M 554278.00B- 709 17.01.17 CAMD-II M/S Usha Enterprises Sec 26/CWCD-IV/14-15 390/43 09.01.17 Security 76809.00B- 710 17.01.17 CAMD-II M/S Usha Enterprises Sec 55/CWCD-IV/14-15/30.07.16 390/43 09.01.17 Security 44921.00B- 711 17.01.17 CAMD-II M/S Usha Enterprises Sec 05/CAMD-II/14-15 390/43 Security 28500.00B- 713 17.01.17 CSD-II M/S AtoZ Infraspares Pvt. Ltd. 2380/CPD-I/PTPP/O-1/23.11.16 412/195 15.12.16 Supply OH3 53846.00

B- 714 17.01.17 CSD-II M/S AtoZ Infraspares Pvt. Ltd. 2379/CPD-I/PTPP/O-1/23.11.16 412/194, 195

15.12.16 Supply OH3 129649.00

B- 715 17.01.17 CSD-II M/S AtoZ Infraspares Pvt. Ltd. 2380/CPD-I/PTPP/O-1/23.11.16 412/196 15.12.16 Supply OH3 54578.00

B- 718 17.01.17 CSD-II M/S Uttam Sales Corporation 2498/CPD-I/PTPP/O-1/19.12.16 445/52 20.12.16 Supply O&M 3180.00

B- 719 17.01.17 CSD-II M/S Aditya Enterprises 2499/CPD-I/PTPP/O-1/19.12.16 445/53 22.12.16 Supply O&M 28854.00

B- 720 17.01.17 CSD-II M/S Bee Gee Associates 2531/CPD-I/PTPP/O-1/22.12.16 491/1,2 06.01.17 Supply OH3 193457.00

B- 721 19.01.17 C&ID-II M/S Process Instrumentation Works Sec 222/CWCD-IV/14-15/22.03.14 328/36 10.01.17 Security 814000.00

B- 729 25.01.17 CSD-II M/S GEE BEE Enterprises 947/CPD-III/O-1/26.09.16 376/65 17.10.16 Supply 12331.00B- 733 25.01.17 CSD-II M/S S. Traders & manufactures 2070/CPD-II/O-1/26.12.16 374/170 02.01.17 Supply 348840.00B- 734 25.01.17 CSD-II M/S Amco Industries 1066/CPD-II/O-1/09.08.16 374/172 19.08.16 Supply 66660.00B- 735 25.01.17 CSD-II M/S Amco Industries 1071/CPD-II/O-1/09.08.16 374/172 19.08.16 Supply 7979.00B- 736 25.01.17 CSD-II M/S Amco Industries 1068/CPD-I/O-1/09.08.16 374/171 19.08.16 Supply 47308.00B- 737 28.01.17 EMD-V M/S Shri Uday Singh Sec 02/EMD-V/14-15/23.06.14 413/47 15.12.16 Security 6588.00B- 738 28.01.17 EMD-V M/S Shri Uday Singh Sec 03/EMD-V/14-15/13.11.14 413/48 15.12.16 Security 13928.00B- 739 28.01.17 EMD-V M/S Shri Uday Singh Sec 19/EMD-V/15-16/11.01.16 413/48 15.12.16 Security 5688.00B- 740 28.01.17 EMD-V M/S Shri Sangram Singh Sec 04/EMD-V/14-15/13.11.14 413/50 20.01.17 Security 2269.00B- 744 28.01.17 EMD-V M/S Priyanka Enterprises Sec 187/CWCD-IV/13-14/15.11.13 413/51 20.01.17 Security 78000.00B- 745 28.01.17 EMD-V M/S Shri Pooran Singh Sec 05/EMD-V/16-17/08.07.16 413/54 25.01.17 Security 8190.00B- 747 31.01.17 C&ID-II M/S Electrical & Instrumetrical Engg. I & F 07/C&ID-II/15-16/02.01.16 453/12B 26.12.16 Security 25723.00

Total 2373811.00 13658605.00 193457.00 0.00 0.00 0.00 0.00 0.00

B- 748 03.02.17 EMD-V M/S R.L. Engineering 32/EMD-IV/CF/30.01.17 443/39B 09.10.15 Security 49674.00B- 749 03.02.17 EMD-V M/S R.L. Engineering 31/EMD-V/CF/30.01.17 443/39B+4

0A11.01.16 Security 66353.00

B- 750 03.02.17 EMD-V M/S R.L. Engineering 33/EMD-V/CF/30.01.17 443/40A 28.12.15 Security 6696.00B- 752 03.02.17 CSD-II M/S Shipra Industrces Tn.N

o. 013207/CPD-II/107/2016/O-1/28.12.16

449/35 16.01.17 Ruffer Expansiaxlains 305550.00

B- 753 03.02.17 CSD-II M/S Shipra Industries Tn.No. 012

2072/CPD-II/122/2016/O-1/26.12.16

449/34 16.01.17 Ruffer Expansiaxlains 302402.00

B- 755 07.02.17 EMD-V M/S Priya Const. Co. SEC 68/CWCD-V/14-15/10.10.14 352/83 13.01.17 Security 131181.00B- 756 07.02.17 EMD-V M/S M.R.P Construction SEC 398/EMD-V/30.09.15 352/83 09.01.17 Security 58635.00

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 6

Page 33: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 757 07.02.17 EMD-V M/S M.R.P Construction SEC 07/EMD-V/21.11.14 352/83 09.01.17 Security 39420.00B- 758 07.02.17 EMD-V M/S Vikas Electricals SEC 24/EMD-V/14-15/10.10.14 352/83 09.01.17 Security 30672.00B- 759 07.02.17 EMD-V M/S Priya Const. Co. SEC 68/CWCD-V/14-15/10.10.14 352/84 13.01.17 Security 131200.00B- 760 07.02.17 EMD-V M/S Priya Const. Co. SEC 03/EMD-V/15-16/04.07.15 352/84 13.01.17 Security 119527.00B- 761 07.02.17 EMD-V M/S Priya Const. Co. SEC 03/EMD-V/15-16/04.07.15 352/84 13.01.17 Security 149923.00B- 762 07.02.17 EMD-V M/S Vikas Electricals SEC 09/EMD-V/15-16/02.11.15 352/85 13.01.17 Security 12600.00B- 764 07.02.17 EMD-V M/S Priya Const. Co. SEC 518/CWCD-V/04.06.14 352/85 13.01.17 Security 22262.00B- 765 07.02.17 EMD-V M/S R.P.Consrruction SEC 03/CWCD-V/16-17/17.05.16 352/85 13.01.17 Security 28860.00B- 766 07.02.17 EMD-V M/S Priya Const. Co. SEC 10/EMD-V/14-15/18.02.15 352/87 25.01.17 Security 47501.00B- 767 07.02.17 EMD-V M/S Priyanka Enterprises SEC 04/EMD-V/15-16/09.07.15 352/86 25.01.17 Security 65280.00B- 768 07.02.17 EMD-V M/S Priyanka Enterprises SEC 19/EMD-V/14-15/30.05.14 352/86 25.01.17 Security 62776.00B- 770 07.02.17 EMD-IV M/S Nosad Constructor 6 11/EMD-IV/15-16/22.09.14 471/73 12.01.17 Break Down Maintinance 49636.00B- 771 07.02.17 CHD-III M/S Nosad Constructor II 07/CHD-III/16-17/28.09.16 432/135 04.02.17 OH of HT/LT Mator 35563.00B- 772 07.02.17 CSD-II M/S Altas Capco Compresor

Technigul sales813/CPD-I/O-1/10.05.16 486/11 30.01.17 Supply 378489.00

B- 773 07.02.17 CSD-II M/S Shri Bhawani Trading Co. 56/CPD-I/O-1/12.01.17 491/02 23.01.17 OH-3 Supply 11898.00B- 775 07.02.17 CSD-II M/S Vijay Enginering 1842/CPD-II/O-1/22.11.16 466/43 15.01.17 Supply O&H 2169708.00B- 776 07.02.17 CSD-II M/S Vijay Enginering 1841/CPD-II/O-1/22.11.16 466/44 15.01.17 OH-3 Supply 573836.00B- 777 07.02.17 CSD-II M/S Thermaserve Corp. 2050/CPD-III/O-1/22.12.16 466/45 27.12.16 OH-3 Supply 908567.00B- 778 07.02.17 CSD-II M/S Thermaserve Corp. 2050/CPD-III/O-1/22.12.16 466/45 27.12.16 OH-3 Supply 594245.00B- 779 07.02.17 CSD-II M/S Thermaserve Corp. 2051/CPD-II/O-1/22.12.16 466/46 27.12.16 OH-3 Supply 1235175.00B- 780 07.02.17 CSD-II M/S Thermaserve Corp. 2051/CPD-II/O-1/22.12.16 466/47 27.12.16 OH-3 Supply 881626.00B- 782 07.02.17 CSD-II M/S Ashbond Engineers P. Ltd 2327/CPD-II/O-1/09.11.16 411/80 30.12.16 OH-3 Supply 788007.00B- 785 07.02.17 CSD-II M/S Vikas Chauda 2502/CPD-I/O-1/19.12.16 411/83 13.11.17 Supply O&M 15435.00B- 786 07.02.17 CSD-II M/S Kaltron Contrals 2326/CPD-II/O-1/09.11.16 411/83 11.01.17 Supply O&M 20765.00B- 787 07.02.17 CSD-II M/S Trilok Chand&Sons 2500/CPD-I/O-1/19.12.16 411/84 20.12.16 Supply O&M 126374.00B- 788 07.02.17 CSD-II M/S Atlas Copco Compressor

Technige Sales2086/CPD-I/O-1/22.09.16 411/85 29.09.16 Supply O&M 378489.00

B- 789 07.02.17 CSD-II M/S Krishan Kumar Distribwar 86/CPD-I/O-1/18.01.17 411/86 20.01.17 Supply O&M 70346.00B- 794 14.02.17 CSD-II M/S Jalvid Udyog 2495/CPD-I/O-1/16.12.16 412/196 27.12.16 Supply 231994.00B- 795 14.02.17 CSD-II M/S Jalvid Udyog 2495/CPD-I/O-1/16.12.16 412/197 27.12.16 Supply 247521.00B- 796 14.02.17 CSD-II M/S Jalvid Udyog 2495/CPD-I/O-1/16.12.16 412/198 27.12.16 Supply 143629.00B- 797 14.02.17 CSD-II M/S Asan Engineers P. Ltd 2421/CPD-I/O-1/28.11.16 492/01 08.12.16 Supply 267791.00B- 799 14.02.17 CSD-II M/S Chanki Construction Co. SEC 04/CSD-II/15-16 427/54 27.01.17 Security 34015.00B- 800 17.02.17 CHD-III M/S Delhi ACB Services Centre I&F 2024/CPD-I/O-I/28.12.15 323/97 15.02.17 Supply & Retrofiting 259600.00B- 801 17.02.17 CHD-IV M/S Hind Udyog 8 04/CHD-IV/16-17/27.05.16 458/40 04.02.17 Repauring & Reconditioning 159900.00B- 802 17.02.17 CHD-IV M/S Hind Udyog IV 26/CHD-IV/15-16/31.03.16 458/41 05.02.17 Repauring & Reconditioning 192205.00B- 803 17.02.17 CHD-IV M/S Hind Udyog I 17/CHD-IV/16-17/15.12.16 458/43 07.02.17 Fabrication Work 206011.00B- 804 20.02.17 CSD-II M/S Industrial Sales & Supply

Agencees89/CPD-I/O-I/18.01.17 341/107 27.01.17 Supply 107394.00

B- 805 20.02.17 CSD-II M/S Industrial Sales & Supply Agencees

114/CPD-I/O-I/21.01.17 341/108 27.01.17 Supply 60990.00

B- 806 20.02.17 CSD-II M/S Industrial Sales & Supply Agencees

114/CPD-I/O-I/21.01.17 341/109 27.01.17 Supply 237525.00

B- 807 20.02.17 CSD-II M/S Globe Enterprises 37/CPD-I/O-I/10.01.17 341/110 21.01.17 Supply 219061.00B- 808 20.02.17 CSD-II M/S Globe Enterprises 37/CPD-I/O-I/10.01.17 341/111 21.01.17 Supply 181307.00B- 809 20.02.17 CSD-II M/S Technow Engineering Works 32/CPD-I/O-I/09.01.17 341/112 20.01.17 Supply 26554.00B- 810 20.02.17 CSD-II M/S Technow Engineering Works 32/CPD-I/O-I/09.01.17 341/113 20.01.17 Supply 49719.00B- 811 20.02.17 CSD-II M/S J.K.Engineering Co. 112/CPD-I/O-I/21.01.17 341/114 24.01.17 Supply 599506.00B- 812 20.02.17 CSD-II M/S J.K.Engineering Co. 112/CPD-I/O-I/21.01.17 341/116 24.01.17 Supply 89040.00B- 813 20.02.17 CSD-II M/S Technow Engineering Works 156/CPD-I/O-I/30.01.17 341/117 05.02.17 Supply 2622.00B- 815 20.02.17 CSD-II M/S Jalvid Udyog 157/CPD-I/O-I/30.01.17 341/118 07.02.17 Supply 54804.00B- 816 20.02.17 CSD-II M/S Jalvid Udyog 157/CPD-I/O-I/30.01.17 341/119 07.02.17 Supply 10717.00B- 820 27.02.17 AHD-II M/S India Engg. Works F 10/AHD-II/15-16/11.01.16 459/37 27.10.16 Fabrication & Repairing 101655.00B- 821 28.02.17 C&ID-III M/S Instrument Care Group SEC 154/CWCD-IV/11-12/26.08.13 402/48 31.12.16 Security 54432.00B- 822 28.02.17 C&ID-III M/S Bharti Enterprises SEC 06/C&ID-III/14-15/07.01.15 418/34 31.12.16 Security 30870.00B- 824 28.02.17 CSD-II M/S AIA Engineering Limited 740/CPD-II/O-I/02.07.16 426/68 03.02.17 Supply 4384024.00B- 828 28.02.17 CSD-II M/S Kay Mahan Corporation 2530/CPD-I/O-I/22.12.16 426/72 27.12.16 Supply 270043.00B- 829 28.02.17 CSD-II M/S Goodwill Governer Services 2262/CPD-I/O-I/26.10.16 237/197 20.01.17 Supply 124550.00

2754399.00 10468397.00 4993354.00 0.00 0.00 0.00 0.00 0.00

O&M OH U#3 OH U#4 Cap OH U#3 OH U#4 O&MB- 835 07.03.17 CSD-II M/S Instrument Care Group 08/EPED-II/2x250/25.08.14 402/49 31.12.16 Security 42840.00

TOTAL

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 7

Page 34: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 837 08.03.17 CHD-III M/S Nosad Constructor III 07/CHD-III/16-17/28.09.16 432/146 04.03.17 OH of H.T./L.T. Motor 121291.00B- 840 09.03.17 ECM&EMD M/S Govind Construction Co. SEC 13/ECM&EMD/16-17/20.10.16 425/60 03.03.17 Security 28495.00B- 842 20.03.17 C&ID-III M/S Shiv Mahadev Engg. Works Sec 17/C&ID-III/15-16/31.03.16 461/72 07.01.17 Security 12900.00B- 843 20.03.17 C&ID-III M/S Laxmi Narayan Prajapati Sec 14/C&ID-III/15-16/18.01.16 461/74 25.01.17 Security 8400.00B- 844 20.03.17 C&ID-III M/S Laxmi Narayan Prajapati Sec 15/C&ID-III/15-16/18.01.16 461/74 25.01.17 Security 8400.00B- 845 20.03.17 EMD-IV M/S Nosad contractor F 11/EMD-IV/15-16/22.09.15 201/80 18.02.17 Preventine B/D Maintinance 56526.00B- 846 20.03.17 BMD-IV M/S O.S.Constructor II 16/BMD-IV/15-16/31.03.16 231/87 03.09.16 Insullation Work 14847.00B- 847 20.03.17 BMD-IV M/S Usha Enterprises I 11/BMD-IV/16-17/02.02.17 278/58 21.12.16 Maintiance of Dewatering Pump 12810.00

B- 850 21.03.17 CHD-IV M/S Hind Udyog IV 04/CHD-IV/16-17/27.05.16 458/44 06.03.17 Reparing & Reconditionig 56213.00B- 851 21.03.17 CHD-IV M/S Hind Udyog III 15/CHD-IV/16-17/05.12.16 458/46 08.03.17 Reparing & Reconditionig 150372.00B- 852 21.03.17 CHD-IV M/S Hind Udyog III 17/CHD-IV/16-17/15.12.16 458/47 09.03.17 Fabrication 206168.00B- 853 21.03.17 CHD-IV M/S Shiva Construction Sec 18/CHD-IV/15-16/07.01.16 458/48 17.03.17 Security 63351.00B- 854 21.03.17 CSD-II M/S Supath Engineering Services P.

Ltd115/CPD-I/O-I/21.01.17 411/87 13.02.17 Supply OH 3 6203.00

B- 855 21.03.17 CSD-II M/S Instrumentation Limited 2463/CPD-I/O-I/13.12.16 411/87 31.01.17 Supply OH 3 115781.00B- 856 21.03.17 CSD-II M/S Instrumentation Limited 2469/CPD-I/O-I/13.12.16 411/88 31.01.17 Supply OH 3 925300.00B- 859 21.03.17 CSD-II M/S Jalvid Udyog 116/CPD-I/O-I/21.01.17 411/91 03.02.17 Supply OH 3 224430.00B- 860 21.03.17 CSD-II M/S Aarseller Tredco 2075/CPD-II/O-I/26.12.16 411/92 16.03.17 Supply O&M 96942.00B- 861 21.03.17 CSD-II M/S Uttam Sales Corporation 174/CPD-II/O-I/28.01.17 411/92 01.02.17 Supply O&M 95767.00B- 862 21.03.17 CSD-II M/S Assam Carbon Product Limited 138/CPD-I/O-I/28.01.17 411/93 16.03.17 Supply O&M 202013.00

B- 863 21.03.17 CSD-II M/S Ganesh Sales & Services 155/CPD-I/O-I/30.01.17 485/33 20.03.17 Supply O&M 3150.00B- 864 21.03.17 CSD-II M/S Jain Mill Stores Pvt. Ltd 89/CPD-I/O-I/18.01.17 485/34 20.03.17 Supply O&M 228986.00B- 865 21.03.17 CSD-II M/S Jain Mill Stores Pvt. Ltd 113/CPD-I/O-I/21.01.17 485/35 20.03.17 Supply OH 3 520438.00B- 866 21.03.17 CSD-II M/S Jain Mill Stores Pvt. Ltd 113/CPD-I/O-I/21.01.17 485/36 20.03.17 Supply OH 3 270041.00B- 867 21.03.17 CSD-II M/S Jain Mill Stores Pvt. Ltd 113/CPD-I/O-I/21.01.17 485/37 20.03.17 Supply OH 3 414759.00B- 868 21.03.17 CSD-II M/S Jalvid Udyog 31/CPD-I/O-I/09.01.17 485/37 230.03.17 Supply OH 3 202056.00B- 869 21.03.17 CSD-II M/S Jalvid Udyog 31/CPD-I/O-I/09.01.17 485/38 20.03.17 Supply OH 3 27388.00B- 874 27.03.17 CSD-II M/S Multimetals Limited Kota 1366/CPD-II/O_I/21.09.16 409/105 10.12.16 Supply OH 3 4625181.00B- 875 27.03.17 CSD-II M/S Jay Pee Machining Industries 1067/CPD-II/O_I/09.08.16 409/106 20.08.16 Supply OH 3 535592.00B- 876 27.03.17 CSD-II M/S Jay Pee Machining Industries 1070/CPD-II/O_I/09.08.16 409/108 20.08.16 Supply OH 3 636136.00B- 877 27.03.17 CSD-II M/S Jay Pee Machining Industries 1065/CPD-II/O_I/09.08.16 409/109 20.08.16 Supply OH 3 718962.00B- 878 27.03.17 CSD-II M/S Jay Pee Machining Industries 1185/CPD-II/O-I/09.08.16 409/111 22.09.16 Supply OH 3 698364.00B- 879 27.03.17 CSD-II M/S New Allenberry Works 919/CPD-III/O-I/22.09.16 409/113 27.09.16 Supply O&M 2537247.00B- 883 27.03.17 CSD-II M/S Jay Pee Machining Industries 1587/CPD-II/O-I/20.10.16 409/119 23.11.16 Supply OH 3 369249.00B- 884 28.03.17 C&ID-II M/S Shiv Mahadev Engg. Works I&F 13/C&ID-II/16-17/13.02.17 453/14 06.03.17 Fabrication & Erection 191805.00B- 886 30.03.17 CSD-II M/S Ocean wires & Cables P. Ltd 1760/CPD-I/O-I/04.08.16 237/198 27.08.16 Supply OH3 717599.00B- 887 30.03.17 CSD-II M/S Simplex Switchgear P. Ltd 2027/CPD-I/O-I/14.09.16 237/199 14.09.16 Supply OH3 198894.00B- 890 31.03.17 TMD-II M/S Tharmal India Engineers 7 02/TMD-II/16-17/11.04.16 447/60 24.01.17 Servicing of Various pump 62332.00

1036750.00 3164105.00 11206373.00 0.00 0.00 0.00 0.00 0.00

B- 1 03.04.17 C&ID-II M/S UniQue Construction SEC 04/C&ID-II/16-17 452/17 22.03.17 Security 22875.00B- 2 03.04.17 C&ID-II M/S Thermal India Engineers I&F 14/C&ID-II/16-17/13.02.17 452/18 21.12.16 Fabrication & Erection 929585.00B- 4 03.04.17 CSD-II M/S Balaji Corporation 220/CPD-II/O-I/07.02.17 374/184 25.03.17 Supply O&M 461160.00B- 6 03.04.17 CSD-II M/S NeelKanth Power System Pvt. Ltd 221/CPD-II/O-I/07.02.17 374/184 24.03.17 Supply O&M 1112197.00

B- 17 12.04.17 BMD-III M/S Zenith Engineers V 02/BMD-III/16-17/26.04.16 302/49B 10.02.17 B/D Maintinance 21331.00B- 18 12.04.17 BMD-III M/S Sunrise Engg. & Contractor IV 05/BMD-III/16-17/13.05.16 302/50 10.02.17 B/D Maintinance 47906.00B- 21 13.04.17 AHD-II M/S India Engg. Works II 05/AHD-II/15-16/27.07.16 459/44 06.02.17 Reparing & Grinding Rolls 101084.00B- 22 13.04.17 AHD-II M/S Hind Udyog I 14/AHD-II/16-17/27.07.16 459/44 06.12.16 Repairing of ESP 64015.00B- 24 13.04.17 CHD-III M/S Priya Construction Co. I 10/CHD-III/16-17/08.02.17 208/88 05.04.17 OH & Re-insullation 322372.00B- 25 13.04.17 CHD-III M/S Nosad Contractor 4 07/CHD-III/16-17/28.09.16 208/89 05.04.17 OH of HT/LT Motors 58928.00B- 26 13.04.17 CHD-III M/S Priya Construction Co. III 08/CHD-III/16-17/03.11.16 208/89 05.04.17 Rewainding of LT motor 49497.00B- 27 13.04.17 CHD-III M/S MRP Construction I 09/CHD-III/16-17/08.02.17 208/90 05.04.17 Rewainding of LT motor 63255.00B- 28 15.04.17 CHD-IV M/S Hind Udyog F 04/CHD-IV/16-17/27.05.16 458/49 27.03.17 Repairing & Reconditioning 79730.00B- 29 15.04.17 CHD-IV M/S Shiva Construction I 21/CHD-IV/16-17/01.03.17 458/51 01.04.17 Rubber legging 294447.00B- 30 15.04.17 CHD-IV M/S Hind Udyog V 26/CHD-IV/15-16/31.03.16 458/52 01.04.17 Repairing & Reconditioning 379894.00B- 31 15.04.17 CHD-IV M/S Hind Udyog III 15/CHD-IV/16-17/05.12.16 458/53 01.04.17 Repairing & Reconditioning 123664.00B- 32 15.04.17 CHD-IV M/S Hind Udyog V 17/CJD-IV/16-17/15.12.16 458/54 03.04.17 Fabrication 371333.00B- 33 17.04.17 BMD-III M/S Bharat Mechanical & Structural

WorksIV 11/BMD-III/16-17/24.10.16 459/09 13.03.17 Break Down Maintinance 58512.00

B- 38 20.04.17 CHD-III M/S Priya Construction Co. SEC 04/CHD-III/15-16/29.06.15 432/148 01.04.17 Security 60000.00

TOTAL

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 8

Page 35: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 39 20.04.17 CHD-III M/S Instrument Care Group SEC 01/CHD-III/16-17/13.04.16 432/148 01..04.17 Security 24970.00B- 40 20.04.17 CHD-III M/S Priya Construction Co. SEC 06/CHD-III/15-16/16.11.15 432/149 01.04.17 Security 47877.00B- 41 20.04.17 CHD-III M/S Akshat enterprises SEC 04/CHD-III/16-17/14.05.16 432/149 01.04.17 Security 22488.00B- 42 20.04.17 CHD-III M/S Awosthi Motor Winding SEC 09/CHD-III/16-17/15.12.16 432/150 12.04.17 Security 77749.00B- 43 20.04.17 CHD-III M/S Nosad Contractor SEC 08/CHD-III/31.03.15 432/147 01.04.17 Security 88062.00B- 45 20.04.17 BMD-III M/S Sunrise Engg. & Contractor VI 06/BMD-III/16-17/13.09.16 454/07 03.01.17 Preventinc & B/D Mointinance 12777.00

B- 46 20.04.17 BMD-III M/S O.S. Contractor I 15/BMD-III/16-17/02.01.17 454/7B 05.10.16 Supply & Insullation 106365.00B- 48 21.04.17 C&ID-II M/S Uniqul Construction I&F 08/C&ID-II/16-17/30.09.16 318/26 14.12.16 Modification Work 107591.00B- 50 21.04.17 TMD-II M/S Thermal India Engineers I&F 28/TMD-II/16-17/23.03.17 359/49 31.12.16 Insullation Work 36800.00B- 52 22.04.17 BMD-III M/S O.S. Contractor III 15/BMD-III/16-17/02.01.17 346/33 21.03.17 Supply of Insullation Pads 55552.00B- 56 22.04.17 BMD-III M/S Bharatmechanical & Structural

WroksSEC 07/BMD-III/15-16/15.07.16 392/91 18.04.17 Security 156882.00

B- 57 22.04.17 BMD-III M/S Sunrise Engg. & Contractor VII 06/BMD-III/16-17/13.05.17 454/81 20.02.17 Break Down Maintinance 77529.00B- 60 24.04.17 CSD-II M/S Vibhuh Power & Energy Solution 109/CPD-I/O-I/21.01.17 445/53 27.02.17 Supply 78152.00

B- 61 24.04.17 CSD-II M/S Naren Electronics Company 147/CPD-I/O-I/30.01.17 445/54 02.02.17 Supply 25516.00B- 63 26.04.17 C&ID-II M/S Vadim Insfrastructure P. Ltd 14/C&ID-II/14-15/18.02.15 452/185 27.03.17 Security 24526.00B- 65 28.04.17 CAMD-II M/S Govind Yadav SEC 10/CAMD-II/15-16/20.06.16 416/39 28.11.16 Security 2400.00B- 66 28.04.17 CAMD-II M/S Jahangir Enterprises SEC 20/CAMD-II/15-16/05.11.16 416/40 08.03.17 Security 73068.00B- 67 28.04.17 CAMD-II M/S Ramji Rajpoot SEC 20/CAMD-II/22.09.16 416/41 22.03.17 Security 2800.00B- 69 28.04.17 CAMD-II M/S Govind Yadav SEC 23/CAMD-II/15-16/17.12.15 388/55 12.01.17 Security 2400.00B- 70 28.04.17 CAMD-II M/S Press Tool Industries Pvt. Ltd SEC 03/CAMD-II/13-14/ 388/55 06.04.17 Security 95498.00B- 71 29.04.17 C&ID-II M/S Vadim Infrastructure Pvt. Ltd. SEC 15/C&ID-II/14-15/18.02.15 328/41 26.04.17 Security 5900.00B- 72 29.04.17 C&ID-II M/S Vadim Infrastructure Pvt. Ltd. SEC 15/C&ID-II/14-15/18.02.15 328/41 27.03.17 Security 52910.00

3960655.00 1838942.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 73 02.05.17 CSD-II M/S KVM Engineers Pvt. Ltd 189/CPD-II/O-I/31.01.17 409/125 25.03.17 Supply 40646.00B- 74 02.05.17 BMD-IV M/S MAK Const. Co. I&F 09/BMD-IV/16-17/16.01.17 417/70 23.11.16 Repairing of R.C.Feeder 235620.00B- 75 02.05.17 BMD-IV M/S Nosad Contractor I&F 10/BMD-III/16-17/24.10.16 417/71 11.02.17 Maintinance & Repairing 137788.00B- 78 02.05.17 BMD-IV M/S O.S. Contractor SEC 01/BMD-IV/15-16/25.04.15 274/56 04.02.16 Security 72304.00B- 79 05.05.17 BMD-III M/S Tech Thermology I&F 17/BMD-III/16-17/25.03.17 436/36 25.03.17 Complete Disposal of Ash 302505.00B- 80 05.05.17 BMD-III M/S Tech Thermology I&F 18/BMD-III/16-17/25.03.17 436/37 25.03.17 Replacement of Coal

Compartment184972.00

B- 82 05.05.17 CSD-II M/S Power Engineers 478/CPD-II/O-I/03.04.17 450/55 24.04.17 Supply O&M 338556.00B- 83 05.05.17 CSD-II M/S Geeco Enercon Pvt. Ltd 1983/CPD-II/O-I/15.12.16 450/56 26.04.17 Supply OH-3 702462.00B- 84 08.05.17 CHD-III M/S Priya Construction Co. 8th 08/CHD-III/16-17/03.11.16 208/94 05.05.17 Rewainoling of LT Mators 64118.00B- 85 08.05.17 CSD-II M/S Shreya Automation &

Technochem Pvt. Ltd85/CPD-I/O-I/18.01.17 491/03 05.05.17 Supply O&M 811422.00

B- 87 08.05.17 CSD-II M/S Supath Engineering Services P. Ltd

490/CPD-II/O-I/06.04.17 411/95 06.05.17 Supply O&M 954759.00

B- 88 08.05.17 CSD-II M/S Supath Engineering Services P. Ltd

490/CPD-II/O-I/06.04.17 411/96 06.05.17 Supply O&M 148951.00

B- 89 08.05.17 CSD-II M/S Supath Engineering Services P. Ltd

491/CPD-II/O-I/06.04.17 411/97 06.05.17 Supply O&M 53967.00

B- 90 15.05.17 EMD-V M/S Priya Construction Co. III 07/EMD-V/16-17/05.08.16 316/72 22.03.17 Repair & Rewainding 163669.00B- 91 17.05.17 EMD-V M/S Priyanka Enterprises SEC 135/CWCD-IV/13-14/15.07.13 304/93 22.03.17 Security 17646.00B- 93 20.05.17 CSD-II M/S Shiv Mahadev Engg. Works 6 11/EMD-V/15-16/06.12.16 352/90 12.04.17 Security 7838.00B- 94 20.05.17 EMD-V M/S Simplex Switchgear P. Ltd SEC 177/CWCD-IV/13-14/24.10.13 351/19 04.02.17 Anualnaintinance 28750.00B- 95 20.05.17 EMD-V M/S Yadav Measurements SEC 18/EMD-IV/15-16/26.03.16 394/62 01.05.17 Security 29100.00B- 96 20.05.17 EMD-IV M/S MRP Constructions SEC 12/EMD-IV/14/15/20.03.15 395/72 10.01.17 Security 85180.00B- 97 20.05.17 EMD-IV M/S MRP Constructions SEC 71/CWCD-IV/14-15/10.10.14 395/73 10.01.17 Security 7775.00B- 99 20.05.17 EMD-IV M/S MRP Constructions SEC 15/EMD-IV/15-16/30.10.15 395/73 10.01.17 Security 7309.00B- 100 20.05.17 EMD-IV M/S MRP Constructions SEC 42/CWCD-IV/14-15/09.07.14 395/73 10.0117 Security 44758.00B- 101 20.05.17 EMD-V M/S MRP Constructions I 22/EMD-IV/16-17/06.02.17 351/20 13.02.17 OH & Servicing 34488.00B- 102 20.05.17 EMD-V M/S Nosad Constractor I&F 14/EMD-V/16-17/29.10.16 351/21 10.02.17 Fabrication & Insulation 46006.00B- 103 22.05.17 TMD-II M/S Mid Chem Technology SEC 19/TMD-II/14-15/11.03.15 446/08 24.04.17 Security 155000.00B- 105 22.05.17 TMD-II M/S Thermal India Engineers SEC 14/TMD-II/15-16/07.09.15 446/08 04.05.17 Security 239225.00B- 106 22.05.17 TMD-II M/S Thermal India Engineers F 02/TMD-II/16-17/11.04.16 447/71 08.04.17 Break Down Maintinance 122918.00B- 107 22.05.17 TMD-II M/S Thermal India Engineers I&F 30/TMD-II/16-17/08.05.17 447/73 03.03.17 Fabrication & Welding 157550.00B- 108 26.05.17 EMD-IV M/S Techno Syndicate SEC 10/EMD-IV/14-15/12.01.15 473/23 04.03.17 Security 53840.00B- 109 26.05.17 EMD-IV M/S Shiv Mahadev Engg. Works SEC 02/EMD-IV/16-17/07.04.16 473/33 09.03.17 Security 13100.00B- 110 26.05.17 EMD-IV M/S Santosh Engineers SEC 06/EMD-IV/15-16/14.08.16 473/34 10.04.17 Security 65000.00B- 111 26.05.17 CSD-II M/S Instrumentation Limited 2089/CPD-II/O-1/27.12.16 409/129 20.03.17 Supply 404445.00

TOTAL

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 9

Page 36: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 113 26.05.17 CSD-II M/S Multitech Engineer 457/CPD-II/O-1/30.03.17 409/130 16.05.17 Supply 399618.00B- 114 28.05.17 CSD-II M/S Simplex Switchgear P. Ltd 132/CPD-III/O-1/17.03.17 492/2 27.03.17 Supply 13290.00B- 115 28.05.17 CHD-IV M/S Hind Udyog F 26/CHD-IV/16-17/31.03.16 504/1 25.05.17 Repairing & Reconditioning 17509.00

2293968.00 3165654.00 702462.00 0.00 0.00 0.00 0.00 0.00B- 119 04.06.17 CAMD-II M/S Usha Enterprises I&F 30/CAMD-II/16-17/28.02.17 390/46 28.02.17 Replacement of ACW Pipeline 115390.00

B- 120 04.06.17 CAMD-II M/S Usha Enterprises SEC 07/CWCD-IV/11-12 390/48 25.05.17 Security 20328.00B- 121 04.06.17 CAMD-II M/S Usha Enterprises SEC 105/CWCD-IV/12-13 390/48 25.05.17 Security 50178.00B- 122 04.06.17 CAMD-II M/S Usha Enterprises SEC 195/CWCD-IV/13-14 390/50 25.05.17 Security 22800.00B- 123 04.06.17 CAMD-II M/S Usha Enterprises SEC 08/CWCD-IV/11-12 390/49 25.05.17 Security 58800.00B- 124 04.06.17 CAMD-II M/S Usha Enterprises I&F 26/CAMD-II/16-17/26.12.16 390/49 24.12.16 Fabrication & Repairing 103752.00B- 126 04.06.17 CAMD-II M/S Hind Udyog I&F 25/CAMD-II/16-17 310/56 27.01.17 Fabrication 243588.00B- 127 04.06.17 CAMD-II M/S Hind Udyog I&F 11/CAMD-II/16-17/08.07.16 310/57 28.06.16 Rewainding of Motor 23462.00B- 128 04.06.17 CAMD-II M/S Hind Udyog I&F 12/CAMD-II/16-17/08.07.16 310/57 15.10.16 Fabrication 150609.00B- 129 04.06.17 CAMD-II M/S Hind Udyog I&F 27/CAMD-II/16-17/03.02.17 310/58 18.02.17 Fabrication 487750.00B- 130 04.06.17 CAMD-II M/S Press Tool Industries Pvt. Ltd SEC 15/CAMD-II/13-14 310/58 Security 102136.00B- 131 04.06.17 CAMD-II M/S Press Tool Industries Pvt. Ltd SEC 29/CAMD-II/15-16 310/59 Security 28028.00B- 132 04.06.17 CAMD-II M/S Press Tool Industries Pvt. Ltd SEC 26/CAMD-II/15-16 310/59 Security 84600.00B- 134 06.06.17 CHD-III M/S Priya Const. Co. F 10/CHD-III/16-17/08.02.17 432/164 05.06.17 OH & Reinsulation 185364.00B- 135 06.06.17 CHD-III M/S Priya Const. Co. 9 08/CHD-III/16-17/03.11.17 432/165 05.06.17 Rewainding of Motor 16604.00B- 136 06.06.17 CHD-III M/S Nosad Constractor 5 07/CHD-III/16-17/2809.16 432/167 05.06.17 OH of HT Transformer 7106.00B- 137 06.06.17 EMD-IV M/S Nosad Constractor I 12/EMD-IV/16-17/13.10.16 394/58 30.01.17 Breakdown Maintinance 81402.00B- 138 06.06.17 EMD-IV M/S Nosad Constractor III 12/EMD-IV/16-17/13.10.16 394/59 24.01.17 Breakdown Maintinance 100945.00B- 139 06.06.17 EMD-IV M/S Nosad Constractor III 12/EMD-IV/16-17/13.10.16 394/60 24.01.17 Breakdown Maintinance 101998.00B- 140 07.06.17 BMD-IV M/S Thermal India Engineers SEC 12/BMD-IV/14-15/09.02.15 231/92 24.05.17 Security 121060.00B- 141 07.06.17 BMD-IV M/S Thermal India Engineers SEC 02/CWCD-III/13-14/04.04.13 231/92 24.05.17 Security 167121.00B- 142 07.06.17 BMD-IV M/S Thermal India Engineers SEC 11/BMD-IV/10-11/25.10.10 231/93 24.05.17 Security 21164.00B- 144 10.06.17 AHD-II M/S Rajeev Kumar Contactor I&F 13/AHD-II/16-17/15.11.16 451/18 27.11.16 Washing/Cleaning 12515.00B- 145 14.06.17 CSD-II M/S Actuatiors India 134/CPD-III/O-I/17.03.17 491/04 24.04.17 Supply 7980.00B- 147 14.06.17 CSD-II M/S Saurabh Udyog 296/CPD-I/O&I/13.04.17 445/59 01.05.17 Supply 265806.00B- 148 15.06.17 EMD-V M/S Nosad Constractor I&F 21/EMD-IV/16-17/06.02.17 351/22 28.02.17 Checking Repairing 303030.00B- 149 15.06.17 EMD-V M/S Techno Syndicate F 19/EMD-IV/16-17/27.02.17 473/27 15.02.17 Arresting of Transformer oil 270278.00B- 151 19.06.17 CSD-II M/S Nanak Electric Stores 147/CPD-III/O-I/22.03.17 491/05 03.04.17 Supply 57726.00B- 152 21.06.17 OGD-II M/S Jai Dayal Sahu SEC 02/OGD-II/12-13/30.05.12 453/86 23.03.17 Security 3542.00B- 153 21.06.17 OGD-II M/S Jai Dayal Sahu SEC 38/OGD-II/11-12/15.03.12 453/86 23.03.17 Security 4500.00B- 154 21.06.17 CSD-II M/S Avtar Construction SEC 04/CPD-III/14-15/01.11.13 486/22 16.06.17 Security 8100.00B- 155 21.06.17 CSD-II M/S Avtar Construction SEC 12/CPD-III/14-15/25.06.14 486/22 16.06.17 Security 8100.00B- 156 21.06.17 BMD-IV M/S Energo Construction Ltd SEC 08/BMD-IV/15-16/18.01.16 464/76 20.05.17 Security 738000.00B- 159 27.06.17 CSD-II M/S Globe Enterprises 331/CPD-I/16-17/12.05.17 341/127 22.06.17 Supply 82592.00B- 160 27.06.17 CSD-II M/S Globe Enterprises 331/CPD-I/16-17/12.05.17 341/128 22.06.17 Supply 51449.00B- 161 27.06.17 CSD-II M/S J.K.Engineering Co. 33/CPD-I/16-17/09.01.17 341/130 22.06.17 Supply 4444.00B- 164 27.06.17 CSD-II M/S Nosad Contractor I 01/EMD-IV/17-18/28.04.17 471/135 17.06.17 B/D Maintinance of Motor 44394.00B- 165 27.06.17 EMD-IV M/S MPR Construction SEC 02/EMD-IV/15-16/20.04.15 304/95 22.02.17 Security 19740.00B- 166 29.06.17 CSD-II M/S R.S.P Overseas Pvt. Ltd 1110/CPD-I/O-I/07.06.13 428/102 24.05.17 Supply 11868.00B- 169 29.06.17 BMD-III M/S Bharat Mechanical & Structrual

WorksV 11/BMD-III/CF/03.10.16 454/12 20.05.17 Maintinance of Bessure Part 55125.00

B- 170 29.06.17 BMD-III M/S Sunrise Engineers & Contractor VII 06/BMD-III/16-17/31.05.16 454/12 20.05.17 B/D Maintinance 25916.00

B- 171 29.06.17 CHD-IV M/S Shailendra Saxena SEC 23/CHD-IV/15-16/15.03.16 495/12 12.06.17 Security 16068.00B- 172 29.06.17 CHD-IV M/S Rajendra Prasad Kushwaha SEC 20/CHD-IV/16-17/07.02.17 495/12 26.04.17 Security 3671.00B- 173 29.06.17 CHD-IV M/S Shailendra Saxena SEC 11/CHD-V/16-17/27.09.16 495/12 12.06.17 Security 17268.00B- 174 30.06.17 BMD-III M/S Zenith Engineers VII 02/BMD-III/16-17/26.04.16 346/36 21.06.17 B/D Maintinance 2819.00B- 175 30.06.17 BMD-III M/S Sunrise Engineers & Contractor IX 06/BMD-III/16-17/13.05.16 346/36 21.06.17 B/D Maintinance 25482.00

B- 176 30.06.17 BMD-III M/S O.S. Contractor IV 15/BMD-III/16-17/02.01.17 346/37 21.06.17 Supply & Insullation 34041.00B- 177 30.06.17 BMD-III M/S Bharat Mechanical & Structural

WorksVI 11/BMD-III/16-17/24.010.16 281/141 21.06.17 B/D Maintinance 137507.00

B- 179 30.06.17 BMD-III M/S Jahangir Engerprises IV 12/BMD-III/16-17/25.10.16 281/143 21.06.17 B/D Maintinance 11143.00B- 182 30.06.17 AHD-II M/S India Engineering Works F 05/AHD-II/15-16/27.07.16 459/50 30.04.17 Repairing & Grinding Roles 198687.00B- 184 30.06.17 TMD-II M/S Mid Chem Technology I&F 01/TMD-II/17-18/14.06.17 446/09 14.06.17 Removal of Scale of Condenser

tube745137.00

B- 185 30.06.17 AHD-II M/S Hind Udyog II 14/AHD-II/16-17/29.11.16 459/50 30.04.17 Reparing of ESP 80210.00B- 186 30.06.17 CHD-III M/S Priya Const. Co. 10 08/CHD-III/16-17/03.11.16 380/75 29.06.17 Rewainding of LT Motar 162964.00

TOTAL

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 10

Page 37: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 187 30.06.17 CHD-III M/S Nosad Constractor 6 07/CHD-III/16-17/20.09.16 380/75 29.06.17 OH of HT/LT Motar 25187.00B- 188 30.06.17 C&ID-II M/S Nosad Constractor I 11/C&ID-II/16-17/22.10.16 318/28 25.05.17 Misc-Mechanical Work 88068.00B- 190 30.06.17 CAMD-II M/S Bharti Enterprises SEC 19/CAMD-II/14-15 339/42 Security 82322.00B- 191 30.06.17 CAMD-II M/S Balram Engineer Contractor &

SupplierSEC 16/CWCD-IV/14-15 339/42 Security 79156.00

5497155.00 481865.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 193 01.07.17 CSD-II M/S R.S.P Overseas Pvt. Ltd 1507/CPD-I/O-I/13.07.16 466/62 22.06.17 Supply OH3 3175.00B- 194 01.07.17 CSD-II M/S R.S.P Overseas Pvt. Ltd 1108/CPD-I/O-I/08.06.16 466/63 01.06.17 Supply O&M 2201.00B- 195 01.07.17 CSD-II M/S Shree R.N.Metals Ind. Pvt. Ltd 1885/CPD-II/O-I/02.12.16 386/189 23.05.17 Supply O&M 350702.00B- 196 11.07.17 CSD-II M/S Shri Sai Enterprises II 492/CPD-II/O-I/06.04.17 445/61 30.06.17 Supply 248899.00B- 197 11.07.17 BMD-IV M/S Nosad Contractor SEC 10/BMD-IV/O-I/16.01.17 373/99 21.06.17 Maintinance & Repairing 39443.00B- 198 11.07.17 CSD-II M/S Shiv Mahadev Engg. Works SEC 06/CSD-II/16-17/23.11.16 238/195 04.07.17 Security 4200.00B- 199 11.07.17 CSD-II M/S Shrikant SEC 05/CSD-II/16-17 428/110 04.07.17 Security 7084.00B- 202 11.07.17 EMD-IV M/S Nosad Contractor 4 12/ECM&EMD/16-17/13.10.16 394/68 27.05.17 Break Down Maintinance 20928.00B- 203 12.07.17 CHD-III M/S M.R.P. Construction 09/CHD-III/16-17/08.02.17 432/174 01.07.17 Preventive Break

Downmaintinance49422.00

B- 205 13.07.17 EMD-V M/S R.P. Const. Co. 4 03/EMD-V/CF/29.06.17 366/15 06.03.17 Dismantling & Checking 248918.00B- 206 13.07.17 EMD-V M/S Priya Const. Co. II 07/EMD-V/16-17/05.08.16 316/73 29.06.17 Repairing& Rewainding 208872.00B- 207 13.07.17 EMD-V M/S electrical & Instrumentation Engg. I 17/EMD-V/16-17/03.02.17 317/54 30.06.17 OH & Servicing 24197.00B- 208 14.07.17 TMD-II M/S Thermal India Engineers F 33/TMD-II/16-17/17.06.17 410/80 22.06.17 Break Down Maintinance 224301.00B- 210 14.07.17 C&ID-II M/S Voltas Limited I&F 125/CWCD-IV/CF/22.02.13 327/54 13.01.16 Supply, Installation &

Commissioning207142.00

B- 213 17.07.17 CAMD-II M/S Tech Thermology I&F 07/CAMD-II/17-18/03.06.17 311/84 07.06.17 Demering at various points 297948.00B- 215 17.07.17 CAMD-II M/S Jahangir Enterprises I&F 05/CAMD-II/17-18/14.05.17 313/56 19.05.17 Assesment of Under Ground

water Leakege306488.00

B- 216 17.07.17 CAMD-II M/S Hind Udyog I&F 06/CAMD-II/17-18/01.06.17 330/73 01.06.17 Fabrication & Supply 83738.00B- 217 17.07.17 CAMD-II M/S Balram Engineers Contractor &

SupplierII 03/CAMD-II/16-17/11.05.16 468/18 19.06.17 Maintinance of Fixed Fire

Systems171801.00

B- 218 18.07.17 ECM&EMD M/S Abhay Kumar Singh IV 14/ECM&EMD/16-17/15.01.16 438/61 27.06.17 Misc Civil Work 44906.00B- 219 19.07.17 C&ID-III M/S New Fire Engineers Pvt. Ltd I 432/C&ID-III/CF/24.09.16 382/77 22.06.17 Installation Testing &

Commissioning721922.00

B- 220 22.07.17 OGD-II M/S S.G.L. Engg. Industries 08/OGD-II/14-15/12.08.15 423/119 29.05.17 Repairing & Maintenance 19912.00B- 221 22.07.17 CSD-II M/S R.S.P. Overseas Pvt. Ltd 402/CPD-I/O-I/22.06.17 450/67 15.07.17 Supply O&M 89128.00B- 222 22.07.17 CSD-II M/S R.S.P. Overseas Pvt. Ltd 1110/CPD-I/O-I/07.06.13 450/68 15.07.17 Supply O&M 40565.00B- 223 22.07.17 CSD-II M/S R.S.P. Overseas Pvt. Ltd 363/CPD-I/O-I/03.03.16 450/69 15.07.17 Supply O&M 50195.00B- 224 22.07.17 CSD-II M/S R.S.P. Overseas Pvt. Ltd 1707/CPD-I/O-I/03.03.16 450/69 15.07.17 Supply O&M 12176.00B- 225 22.07.17 CSD-II M/S R.S.P. Overseas Pvt. Ltd 1108/CPD-I/O-I/08.06.16 450/70 15.07.17 Supply 25116.00B- 226 22.07.17 CSD-II M/S R.S.P. Overseas Pvt. Ltd 150/CPD-I/O-I/13.07.16 450/70 15.07.17 Supply 20151.00B- 228 26.07.17 CHD-IV M/S Hind Udyog IV 15/CHD-IV/16-17/05.12.16 504/10 30.06.17 Repairing of Electric Shaft 189808.00B- 229 26.07.17 CHD-IV M/S Hind Udyog VII 17/CHD-IV/16-17/15.12.16 504/11 30.06.17 Fabrication of Tippler 436212.00B- 231 27.07.17 CSD-II M/S R.S.P. Overseas Pvt. Ltd 1707/CPD-I/o-i/05.10.15 449/52 21.07.17 Supply 17820.00

3307242.00 856953.00 3175.00 0.00 0.00 0.00 0.00 0.00

B- 236 17.08.17 CSD-II M/S Aarseller Tredco. 549/CPD-I/O-I/28.07.17 411/98 16.08.17 Supply 17818.00B- 237 24.08.17 AHD-II M/S Balram Engineers Contactor &

SupplierSEC 05/AHD-II/15-16/18.08.15 451/19 28.07.17 Security 100262.00

B- 238 24.08.17 AHD-II M/S Energo Construction Limited SEC 04/AHD-II/16-17/18.05.16 451/20 28.07.17 Security 827028.00B- 245 30.08.17 C&ID-II M/S Unique Construction SEC 09/C&ID-II/O-I/30.09.16 452/20 19.08.17 Security 18915.00B- 246 31.08.17 C&ID-II M/S R.P. Construction 12/C&ID-III/16-17/03.11.15 418/36 16.06.17 Security 8880.00B- 247 31.08.17 C&ID-II M/S R.P. Construction SEC 04/C&ID-III/14-15/20.12.14 382/78 16.06.17 Security 9593.00

TOTAL 982496.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 251 01.09.17 C&ID-II M/S Sanjay Electronics SEC 06/C&ID-II/15-16/02.01.16 365/32 21.07.17 Security 35000.00B- 252 01.09.17 C&ID-II M/S Unique Construction SEC 08/C&ID-II/16-17/30.09.16 318/29 21.07.17 Security 10247.00B- 253 04.09.17 CHD-IV M/S Kapatia Instrument Erector SEC 06/CHD-IV/16-17/24.06.16 507/02 18.08.17 Security 5240.00B- 254 04.09.17 CHD-IV M/S Kapatia Instrument Erector SEC 08/CHD-IV/16-17/15.07.16 507/02 18.08.17 Security 52857.00B- 256 07.09.17 CHD-II M/S S.K. Engineering Works IST 07/CHD-II/17-18/01.07.17 503/02 08.07.17 Repairing of pump 171700.00B- 257 07.09.17 CAMD-II M/S Usha Enterprises SEC 26/CWCD-IV/12-13/12.09.17 313/58 30.08.17 Security 22349.00B- 259 14.09.17 EMD-IV M/S Electrical & Instrumentation

EngineersSEC 05/EMD-IV/16-17/08.06.16 304/96 17.08.17 Security 22500.00

B- 260 14.09.17 EMD-IV M/S Nosad Cantactor SEC 11/EMD-IV/15-16/22.09.15 304/96 11.09.17 Security 28796.00B- 261 14.09.17 EMD-IV M/S Nosad Cantactor SEC 07/EMD-IV/14-15/10.12.14 304/96 09.09.17 Security 44958.00B- 262 14.09.17 EMD-IV M/S Nosad Cantactor SEC 08/EMD-IV/15-16/18.09.15 304/96 11.09.17 Security 44864.00B- 264 21.09.17 CSD-II M/S Shrikant SEC 09/CSD-II/15-16/22.08.17 450/74 19.09.17 Security 7084.00

TOTAL

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 11

Page 38: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 265 22.09.17 CHD-III M/S Priya Construction Co. F 08/CHD-III/16-17/03.11.16 211/84 02.09.17 Rewainding of Motors 13110.00B- 266 22.09.17 CHD-III M/S Nosad Contractor 7th 07/CHD-III/16-17/28.09.17 211/83 02.08.17 OH of HT/LT Motor 6054.00

464759.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 267 03.10.17 TMD-II M/S Baboolal & Co. SEC 25/TMD-II/16-17/17.12.16 447/84 13.0717 Security 5000.00B- 268 03.10.17 TMD-II M/S Baboolal & Co. SEC 07/TMD-II/16-17/07.06.16 447/84 13.0717 Security 5000.00B- 271 04.10.17 CHD-IV M/S Pravesh Kumar SEC 14/CHD-IV/16-17/05.11.16 480/36 19.09.17 Security 2400.00B- 275 06.10.17 CHD-IV M/S Hind Udyog DST 07/CHD-IV/17-18/10.08.17 504/13 07.09.17 Fabrication 559193.00B- 276 06.10.17 EMD-V M/S Priya Construction Co. F 07/EMD-V/16-17/05.08.16 316/75 12.08.17 Repairing & Rewainding 103571.00B- 277 06.10.17 BMD-IV M/S Usha Enterprises IV 11/BMD-IV/16-17/02.02.17 278/62 01.08.17 Maintinance Of Dewatering

Pumps37249.00

B- 278 06.10.17 BMD-IV M/S Usha Enterprises V 11/BMD-IV/16-17/02.02.17 278/64 31.08.17 Maintinance Of Dewatering Pumps

30834.00

B- 279 09.10.17 EMD-IV M/S Krishan Kumar Distributor Pvt. Ltd

2613/CPD-II/O-I/11.02.16 198/97 03.10.17 Installation& Commissioning 60000.00

B- 280 09.10.17 EMD-IV M/S Nosad Contractor SEC 163/CWCD-IV/13-14/06.09.13 228/89 04.10.17 Security 26532.00B- 281 09.10.17 EMD-IV M/S Nosad Contractor II 01/EMD-IV/17-18/28.04.17 201/88 22.09.17 Break Down Maintinance 73437.00B- 282 09.10.17 EMD-IV M/S Nosad Contractor SEC 16/EMD-IV/15-16/07.12.15 347/67 31.08.17 Security 29645.00B- 283 09.10.17 EMD-IV M/S Nosad Contractor SEC 10/EMD-IV/15-16/19.09.15 347/67 31.08.17 Security 48620.00B- 284 12.10.17 ECM&EMD M/S Sadan Engg. Works Ist 06/ECM&EMD/17-18/ 438/64 01.09.17 Cleaning Of Roofs 340920.00B- 286 12.10.17 ECM&EMD M/S Sadan Engineers F 07/ECM&EMD/17-18/02.05.17 398/59 28.06.17 Cleaning Of Cooling Tower 103846.00B- 288 13.10.17 CSD-II M/S New Allenberry Works 204/CPD-III/O-I/22.04.17 497/13 10.10.17 Supply 1239424.00B- 291 13.10.17 CSD-II M/S T.R.F Ltd 540/CPD-III/O-I/18.04.17 497/15 10.10.17 Supply 1293722.00B- 292 13.10.17 CSD-II M/S Nosad Conteructor III 10/BMD-IV/16-17/16.01.17 500/33 27.08.17 Repairing & Servicing 69448.00B- 293 13.10.17 C&ID-III M/S Temflow Sustems (p) Ltd Ist 36/CPID-III/18.03.16 418/37 18.08.17 Erection Testing &

Commissioning496800.00

B- 295 13.10.17 CAMD-II M/S Rakesh Kumar &Co. SEC 22/CAMD-II/16-17/29.11.16 415/45 12.07.17 Security 7007.00B- 296 13.10.17 CAMD-II M/S India Engineering Works II 01/CAMD-II/17-18/22.02.17 467/47 29.08.17 Maintinance & Repairing 213980.00B- 297 16.10.17 CSD-II M/S Electrocontrols India 544/CPD-I/O-I/27.07.17 486/32 10.10.17 Supply o&m 174166.00B- 299 16.10.17 CSD-II M/S Ceekay Engineers 550/CPD-III/O-I/16.04.14 486/33 11.10.17 Supply o&m 332180.00B- 302 16.10.17 CSD-II M/S Shree Shyam Bearing Pvt Ltd 1705/CPD-I/O-I/05.10.15 406/42 11.10.17 Supply o&m 87726.00B- 303 16.10.17 CSD-II M/S Globe Enterprises 331/CPD-I/16-17/12.05.17 341/142 11.10.17 Supply o&m 10376.00B- 304 16.10.17 CSD-II M/S Globe Enterprises 331/CPD-I/16-17/12.05.17 341/144 11.10.17 Supply o&m 15475.00B- 306 17.10.17 AHD-II M/S Hind Udyog F 14/AHD-II/16-17/29.11.16 488/29 01.09.17 Repairing Pad 134351.00B- 307 17.10.17 AHD-II M/S Garg Engineering & Sons II 01/AHD-II/17-18/30.04.17 488/31 26.08.17 Repairing 23004.00B- 308 24.10.17 CSD-II M/S M.E.M.Industriec 358/CPD-I/O-1/03.01.16 411/100 24.10.17 Supply 45803.00B- 312 25.10.17 CHD-IV M/S Hind Udyog II 07/CHD-IV/17-18/10.08.17 504/41 03.10.17 Fbrication 386202.00B- 313 25.10.17 CHD-IV M/S Hind Udyog V 15/CHD-IV/16-17/05.12.16 504/15 23.10.17 Repairing & Recanditionig 232896.00B- 314 25.10.17 CHD-IV M/S Hind Udyog IX 17/CHD-IV/16-17/15.12.16 504/17 23.10.17 Fbrication 181432.00B- 315 25.10.17 CHD-IV M/S Hind Udyog Ist 06/CHD-IV/17-18/12.07.17 504/19 23.10.17 Repairing & Recanditionig 202235.00B- 317 27.10.17 TMD-II M/S Thermal India Engineers Iind 33/TMD-II/16-17/17.06.17 421/111 10.07.17 Break Down Maintinance 141248.00B- 318 27.10.17 TMD-II M/S Thermal India Engineers IIIrd 33/TMD-II/16-17/17.06.17 421/12 29.08.17 Break Down Maintinance 52738.00

TOTAL 3567588.00 3198872.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 324 01.11.17 CHD-IV M/S Deepak Kumar sec 22/CHD-IV/16-17/17.03.17 495/26 12.10.17 Security 11700.00B- 325 01.11.17 CHD-IV M/S Krishna Kumar sec 23/CHD-IV/16-17/27.03.17 495/26 25.10.17 Security 17820.00B- 327 02.11.17 C&ID-II M/S Shiv Mahadev Engg.Works sec 13/C&ID-II/16-17/13.02.17 453/22 11.09.17 Security 18267.00B- 328 02.11.17 C&ID-II M/S Nosad Contractor II 11/C&ID-II/16-17/22.10.16 453/23 27.09.17 Machanical Work 35765.00B- 332 09.11.17 CHD-III M/S Net Cascade Automation Pvt.

Ltd.sec 464/CHD-III/CF/15.12.15 323/115 17.10.17 Security 18122.00

B- 333 10.11.17 CFA&BO M/S Sanjog Proffessional Services sec 20/CPD-II/16-17/17.06.16 419/115 10.11.17 Security 25900.00

B- 334 13.11.17 AHD-II M/S Anil Kumar Singh sec 18/AHD-II/16-17/03.03.16 498/11 03.10.17 Security 6516.00B- 336 14.11.17 C&ID-II M/S D.K. & Sons sec 09/C&ID-II/15-16/03.03.16 365/33 30.11.16 Security 10998.00B- 337 16.11.17 CAMD-II M/S Usha Enterprises sec 10/CAMD-II/15-16/16.07.15 23/114 06.10.17 Security 31808.00B- 338 16.11.17 CAMD-II M/S Usha Enterprises sec 09/CAMD-II/15-16/16.07.15 23/114 06.10.17 Security 18780.00B- 339 16.11.17 CHD-IV M/S Hind Udyog F 15/CHD-IV/16-17/05.12.16 504/20 13.11.17 Repairing & Reconditioning 856835.00B- 340 16.11.17 CHD-IV M/S Hind Udyog XI 17/CHD-IV/16-17/15.12.16 504/22 13.11.17 Fabrication 129742.00B- 341 16.11.17 CHD-IV M/S Pravesh Kumar X 02/CHD-IV/17-18/24.04.17 480/37 11.11.17 Security 1200.00B- 342 17.11.17 C&ID-III M/S Kapatia Instrument Erector sec 06/C&ID-III/15-16/18.09.15 456/82 10.11.17 Security 48808.00B- 344 21.11.17 CSD-II M/S Shipra Industries 744/CPD-II/O-I/27.05.17 450/77 15.11.17 Supply OH-3 303133.00B- 346 21.11.17 EMD-V M/S R.L. Engineering I&F 09/EMD-V/17-18/09.10.17 414/162 18.10.17 Providing 3ph Supply Source 28999.00B- 347 22.11.17 CHD-III M/S Nosad Construction 8th 07/CHD-III/16-17/28.09.16 513/06 01.11.17 OH Of/ HT/LT Motor 10055.00B- 348 24.11.17 EMD-IV M/S Nosad Contractor III 01/EMD-IV/17-18/28.04.17 201/92 18.11.17 Preventive Break Down

Maintinace55890.00

TOTAL

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 12

Page 39: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

TOTAL 1327205.00 0.00 303133.00 0.00 0.00 0.00 0.00 0.00

B- 349 01.12.17 CSD-II M/S Shipra Industries 742/CPD-II/O-I/27.05.17 497/16 25.08.17 Supply 60474.00B- 350 01.12.17 TMD-II M/S Thermal India Engineers 4th 33/TMD-II/17-18/17.06.17 446/18B 30.09.17 Break Down Maintinance 211211.00B- 351 07.12.17 CHD-IV M/S Shiva Construction II 21/CHD-IV/16-17/01.03.17 507/03 07.11.17 Rubber Logging Of Type

Dimond Grooue238539.00

B- 352 08.12.17 BMD-IV M/S G.S.Construction Co. sec 06/BMD-IV/16-17/10.11.16 279/76 18.11.17 Security 29000.00B- 354 11.12.17 AHD-II M/S Garg Engineering & Sons 3 01/AHD-II/17-18/30.04.17 515/1 15.09.17 Repairins/Welding 27216.00B- 355 12.12.17 C&ID-III M/S Electrical & Instrumentation

Engineerssec 11/C&ID-III/16-17/21.10.16 461/118 14.11.17 Security 4200.00

B- 356 12.12.17 C&ID-III M/S A.K.Construction sec 44/C&ID-III/CF/14.02.17 461/119 14.11.17 Security 990.00B- 357 12.12.17 C&ID-III M/S Electrical & Instrumentation

Engineerssec 07/C&ID-III/16-17/04.08.16 461/119 14.11.17 Security 6253.00

B- 362 12.12.17 BMD-III M/S S.K.Engineering Works VI 10/BMD-III/16-17/24.10.16 281/161 28.08.17 Break Down Maintinance 54700.00B- 363 12.12.17 BMD-III M/S M.K.Treders VII 15/BMD-III/15-16/06.10.16 281/162 28.08.17 Reparing Of Ducts 10917.00B- 365 12.12.17 BMD-III M/S Bharat Mechanical & Structural

WorksVII 11/BMD-III/16-17/24.10.16 281/164 28.08.17 Break Down Maintinance 109943.00

B- 366 12.12.17 BMD-III M/S Zenith Engineers F 02/BMD-III/16-17/26.04.16 474/26 26.08.17 Break Down Maintinance 1059.00B- 367 12.12.17 BMD-III M/S Sunrise Engineers & Contractor X 06/BMD-III/16-17/31.05.16 474/26 27.08.17 Break Down Maintinance 32059.00

B- 368 12.12.17 BMD-III M/S Sunrise Engineers & Contractor V 05/BMD-III/16-17/13.05.16 474/27 27.08.17 Break Down Maintinance 11080.00

B- 369 12.12.17 BMD-III M/S O.S.Contractor V 15/BMD-III/16-17/02.01.17 474/28 28.08.17 Supply Of Insullation 77923.00B- 370 12.12.17 BMD-III M/S S.K.Engineering Works VII 10/BMD-III/16-17/24.10.16 346/42 16.09.16 Break Down Maintinance 30756.00B- 373 12.12.17 BMD-III M/S Bharat Mechanical & Structural

Works8th 11/BMD-III/16-17/24.10.16 346/44 16.09.17 Break Down Maintinance 88128.00

B- 374 12.12.17 BMD-III M/S O.S.Contractor 7 15/BMD-III/16-17/02.01.17 346/44 16.09.17 Supply Of Insullation 29867.00B- 376 14.12.17 C&ID-II M/S Nosad Contractor III 11/C&ID-II/16-17/22.10.16 453/24 27.10.17 Misc. Civil Work 7776.00B- 377 14.12.17 C&ID-II M/S Nosad Contractor IV 11/C&ID-II/16-17/22.10.16 453/25 06.11.17 Misc. Civil Work 49434.00B- 378 16.12.17 CHD-III M/S Nosad Construction 9th 07/CHD-III/16-17/28.09.16 519/05 01.12.17 OH of HT\LT Motor 11635.00B- 381 19.12.17 EMD-IV M/S Hivelm Industries Sec 215/EMD-IV/PTPP/31.05.16 348/28 11.12.17 Security 27659.00B- 382 19.12.17 CHD-IV M/S Trigard Construction Sec 07/CHD-IV/14-15/18.12.14 13.12.17 Security 68369.00B- 383 21.12.17 BMD-III M/S Bharat Mechanical & Structural

WorksIX 11/BMD-III/16-17/24.10.16 455/27 08.11.17 Break Down Maintinance 56700.00

B- 385 27.12.17 AHD-II M/S Garg Engineering & Sons 5th 01/AHD--II/17-18/30.04.17 515/07 16.11.17 Repairing & Reconditioning 22389.00B- 386 27.12.17 AHD-II M/S Garg Engineering & Sons 4th 01/AHD--II/17-18/30.04.17 515/06 09.11.17 Repairing & Reconditioning 31525.00B- 390 27.12.17 CSD-II M/S Trade India Corporation 401/CPD-I/O-I/22.06.17 427/61 14.07.17 Supply 164475.00B- 391 27.12.17 CSD-II M/S R.S.P.Overseas Pvt Ltd. 193/CPD-I/O-I/05.02.16 427/62 03.09.17 Supply 221720.00B- 392 27.12.17 CSD-II M/S R.S.P.Overseas Pvt Ltd. 193/CPD-I/O-I/05.02.16 427/62 23.12.17 Supply 215091.00B- 395 27.12.17 CAMD-II M/S Balram Engineers Contactor &

SupplierI 29/CAMD-II/16-17/28.02.17 468/31 16.10.17 Attending Laekage of Acid 6800.00

B- 396 27.12.17 CAMD-II M/S Balram Engineers Contactor & Supplier

F 03/CAMD-II/16-17/11.05.16 468/28 16.10.17 B\D Maintinance of Fixed Fire System

57532.00

B- 397 28.12.17 BMD-IV M/S Nosad Contractor VI 10/BMD-IV/16-17/16.01.17 500/69 25.11.17 Maintinance & Repairing 122559.00B- 399 28.12.17 BMD-IV M/S Thermal India Engineers 6th 33/TMD-II/16-17/17.06.17 475/20 29.11.17 Break Down Maintinance 376864.00B- 400 28.12.17 BMD-IV M/S Thermal India Engineers 5th 33/TMD-II/16-17/17.06.17 511/4 14.10.17 Break Down Maintinance 35741.00B- 404 30.12.17 CSD-II M/S Chanki Construction Co. Sec 02/CSD-II/16-17/03.02.17 426/78 29.12.17 Security 35136.00B- 405 30.12.17 CSD-II M/S Shiv Mahadev Engg.Works Sec 02/CSD-II/17/22.08.17 426/78 29.12.17 Security 14750.00

1780920.00 769550.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 407 02.01.18 CSD-II M/S Unitech Process Control 305/C&ID-II/22.12.17 487/47 01.01.18 Supply 79438.00B- 411 06.01.18 BMD-III M/S Jha Construction Sec 05/BMD-III/17-18/05.10.17 476/38 08.11.17 Installation Of SKY Climber 19440.00B- 413 06.01.18 BMD-III M/S Jahangir Enterprises VIII 12/BMD-III/16-17/25.10.16 436/47 16.11.17 Break Down Maintinance 16967.00B- 414 06.01.18 BMD-III M/S Bharat Mechanical & Structural

WorksF 11/BMD-III/16-17/24.10.16 436/48 16.11.17 Break Down Maintinance 126043.00

B- 416 06.01.18 BMD-III M/S Jha Construction III 05/BMD-III/17-18/05.10.17 436/50 26.11.17 Operation Of SKY Climber 23868.00B- 418 09.01.18 CHD-IV M/S Rajendra Prasad Kushwaha Sec 01/CHD-IV/17-18/19.04.18 495/36 04.01.18 Security 9900.00B- 420 09.01.18 EMD-IV M/S M.A.K.Construction Ist 09/EMD-IV/17-18/01.12.17 270/66 04.11.17 Packing Of Windows 22892.00B- 421 11.01.18 CSD-II M/S Net Cascade Automation Pvt.Ltd. 997/CPD-I/O-I/13.10.17 491/8 08.01.18 Supply 162049.00

B- 422 12.01.18 CHD-III M/S Nosad Construction 10 07/CHD-II/16-17/28.09.16 513/10 01.01.18 OH Of HT/LT Motor 42929.00B- 423 12.01.18 ECM&EMD M/S S.R. Enterprises Sec 09/ECM&EMD/16-17/12.09.16 214/78 15.09.17 Security 27934.00B- 424 12.01.18 ECM&EMD M/S Arvind Singh Sec 17/ECM&EMD/16-17/05.12.16 214/79 15.09.17 Security 4200.00B- 426 18.01.18 BMD-III M/S R. Electromech Sec 16/BMD-III/15-16/03.11.15 476/28 19.04.17 Security 56427.00

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 13

Page 40: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 431 25.01.18 CSD-II M/S Industrial Sales & Supply Agencies

1471/CPD-II/O-I/09.10.17 426/79 24.01.18 Supply 596927.00

B- 432 25.01.18 CSD-II M/S Commercial Enterprises 1344/CPD-I/O-I/10.01.18 426/80 24.01.18 Supply 92792.00B- 433 25.01.18 CSD-II M/S Trade India Corporation 1343/CPD-I/O-I/10.01.18 426/80 24.01.18 Supply 458088.00

TOTAL TOTAL 350600.00 1389294.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 434 01.02.18 C&ID-II M/S R.K.Construction Sec 08/C&ID-II/15-16/03.03.16 453/26 06.01.18 Security 726000.00B- 438 01.02.18 CSD-II M/S Trade India Corporation 1706/CPD-I/O-I/05.10.15 449/63 31.01.18 Supply 217411.00B- 439 02.02.18 CAMD-II M/S Rakesh Kumar & Co. Sec 02/CAMD-II/17-18/25.04.17 415/57 30.12.17 Security 7046.00B- 440 02.02.18 CAMD-II M/S Shiv Mahadev Engg.Works Sec 08/CAMD-II/17-18/20.07.17 415/58 28.12.17 Security 12265.00B- 447 07.02.18 EMD-V M/S M.A.K.Construction Co. Ist 200/EMD-V/CF/20.06.17 372/28 27.06.17 Repairing & Painting 10613.00B- 448 08.02.18 CHD-III M/S Nosad Contractor 11th 07/CHD-III/16-17/28.09.16 513/13 01.02.18 OH Of H.T LT Motor 41993.00B- 450 12.02.18 CSD-II M/S Net Cascade Automati Pvt. Ltd. 1376/CPD-I/O-I/16.01.18 491/8 09.02.18 Supply 768656.00

B- 453 13.02.18 CSD-II M/S Supath Engineering Services P. Ltd

1298/CPD-I/O-I/22.12.17 445/65 09.02.18 Supply 91133.00

B- 454 13.02.18 TMD-II M/S Thermal India Engineers 7th 33/TMD-II/16-17/17.06.17 475/33 23.12.17 Break Down Maintinance 23704.00B- 455 13.02.18 TMD-II M/S S.K.Engineering Works Sec 18/TMD-II-16-17/18.10.16 475/36 01.02.18 Security 66192.00B- 456 13.02.18 TMD-II M/S G.S.Elevator Sec 17/TMD-II/16-17/18.10.16 511/9 29.01.18 Security 55287.00B- 457 13.02.18 TMD-II M/S Thermal India Engineers Ist 14/TMD-II/17-18/18.01.18 421/122 09.11.17 Overhauling&Maintinance 318600.00B- 458 13.02.18 ECM&EMD M/S Arvind Singh Sec 04/ECM&EMD/16-17/13.06.17 322/70 23.01.18 Security 2400.00B- 459 15.02.18 CSD-II M/S Technow Engineering Works 1265/CPD-I/PTPP/19.12.17 485/98 15.02.18 Supply 26451.00B- 461 16.02.18 C&ID-II M/S Nosad Contractor V 11/C&ID-II/16-17/22.10.16 453/27 23.01.18 Miscellaneous Machanical Work 50416.00

B- 462 16.02.18 C&ID-II M/S Nosad Contractor VI 11/C&ID-II/16-17/22.10.16 453/28 07.02.18 Miscellaneous Machanical Work 37579.00

B- 463 16.02.18 C&ID-II M/S Tech Thermology Ist 03/C&ID-II/17-18/12.12.17 453/30 08.02.18 Cutting Welding & Fixing 25290.00B- 464 20.02.18 BMD-IV M/S Nosad Contractor VII 10/BMD-IV/16-17/16.01.17 500/85 19.01.18 Maintenance & Repairing 23956.00B- 465 20.02.18 BMD-IV M/S O.S. Contractor III 16/BMD-IV/15-16/31.03.16 274/57 24.10.17 Insullation Work 107306.00B- 466 20.02.18 BMD-IV M/S O.S. Contractor IV 16/BMD-IV/15-16/31.03.16 274/59 11.12.17 Insullation Work 53217.00B- 467 20.02.18 BMD-IV M/S Usha Enterprises Sec 45/CWCD-III/13-14/09.12.13 278/68 07.02.18 Security 60881.00B- 468 20.02.18 BMD-IV M/S Usha Enterprises Sec 04/BMD-IV/15-16/10.17.15 278/68 07.02.18 Security 87002.00B- 469 20.02.18 CHD-IV M/S Hind Udyog III 07/CHD-IV/17-18/10.08.17 504/26 09.02.18 Fabrication & Repairing 82010.00B- 470 28.02.18 CSD-II M/S S.G.L. Engg. Industries 08/OGD-II/14-15/12.08.15 435/104 21.07.17 Repairing Of Furniture 30922.00B- 471 28.02.18 CSD-II M/S Shipra Industries 2330/CPD-II/O-I/19.12.15 449/64 24.02.18 Supply OH-4 957274.00B- 472 28.02.18 CSD-II M/S Ideal Flow Control Pvt.Ltd. 03/CPD-II/O-I/01.01.18 449/65 24.02.18 Supply OH-3 568839.00B- 473 28.02.18 CSD-II M/S Simplex Switchgear P. Ltd 144/CPD-II/O-I/30.01.18 449/66 24.02.18 Supply O&M 104030.00B- 474 28.02.18 CSD-II M/S Kay Mohan Corporation 1056/CPD-I/O-I/01.11.17 449/66 24.02.18 Supply O&M 75982.00B- 476 28.02.18 CSD-II M/S Supath Engineering Services P.

Ltd498/CPD-III/O-I 445/70 21.02.18 Supply O&M 3710.00

B- 477 28.02.18 CSD-II M/S Supath Engineering Services P. Ltd

655/CPD-III/O-I/03.06.13 445/70 22.02.18 Supply O&M 66992.00

TOTAL TOTAL 2040090.00 1136954.00 568839.00 957274.00 0.00 0.00 0.00 0.00

B- 479 06.03.18 AHD-II M/S S.R. Enterprises Sec 11/AHD-II/16-17/05.10.16 515/16 20.02.18 Security 20212.00B- 480 06.03.18 AHD-II M/S M.A.K.Construction Co. Sec 08/AHD-II/13-14/29.03.14 488/32 22.09.17 Security 18456.00B- 481 06.03.18 AHD-II M/S M.A.K.Construction Co. Sec 03/AHD-II/13-14/20.06.13 488/33 22.09.17 Security 53855.00B- 482 06.03.18 AHD-II M/S India Engg.Works Sec 182/CWCD-II/14-15/23.05.14 488/34 22.09.17 Security 11921.00B- 483 06.03.18 AHD-II M/S India Engg.Works Sec 51/CWCD-II/14-15/25.07.14 488/34 22.09.17 Security 95550.00B- 486 06.03.18 AHD-II M/S India Engg.Works Sec 19/CWCD-II/13-14/11.06.17 488/36 04.10.17 Security 30487.00B- 487 06.03.18 AHD-II M/S India Engg.Works Sec 22/CWCD-II/13-14/24.04.13 488/37 04.10.17 Security 93903.00B- 488 07.03.18 CSD-II M/S Trade India Corporation 1546/CPD-IO-I/24.02.18 426/83 07.03.18 Supply O&M 894098.00B- 491 08.03.18 CHD-IV M/S Shiva Construction F 05/CHD-IV/15-16/27.06.15 507/05 05.03.18 Fabrication 176632.00B- 493 13.03.18 CSD-II M/S Nosad Contractor 12th 07/CHD-III/16-17/28.09.16 513/16 01.03.18 OH Of H.T LT Motor 24464.00B- 494 14.03.18 CSD-II M/S Levcon Instruments Pvt.Ltd. 58/CPD-I/O-I/12.01.17 486/43 09.03.18 Supply O&M 13287.00B- 500 14.03.18 CSD-II M/S Jalvid Udyog 1143/CPD-I/O-I/21.11.17 485/105 09.03.18 Supply 16485.00B- 501 14.03.18 CSD-II M/S Jalvid Udyog 1264/CPD-I/O-I/19.12.17 485/106 09.03.18 Supply 38350.00B- 502 14.03.18 CSD-II M/S Technow Engg.Works 1404/CPD-I/O-I/24.01.18 485/106 09.03.18 Supply 253101.00B- 504 17.03.18 CSD-II M/S Aditya Enterprises 1277/CPD-I/O-I/20.12.17 445/72 15.03.18 Supply 387811.00B- 506 17.03.18 CHD-III M/S Priya Constrution Ist 10/CHD-II/17-18/06.01.18 519/17 01.03.18 Rewainding Of Motor 244446.00B- 507 19.03.18 EMD-V M/S Electrical & Instrumentation

EngineersF 17/EMD-V/16-17/03.02.17 317/56 19.01.18 Overhauling & Servicing 49047.00

B- 508 19.03.18 BMD-III M/S Anita Sec 07/BMD-III/16-17/04.06.16 436/53 09.01.18 Security 14092.00B- 509 19.03.18 BMD-III M/S Anita Sec 04/BMD-III/17-18/19.06.17 436/53 09.01.18 Security 7046.00

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 14

Page 41: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 514 20.03.18 CHD-II M/S Rambali Singh Contractor Ist 17/CHD-II/17-18/15.01.18 2038/30 17.01.18 Providing & Laying 60mm Thick Factory

328101.00

B- 517 26.03.18 CSD-II M/S Govardhan Controls 1358/CPD-I/O-I/12.01.18 492/40 24.03.18 Supply 148888.00B- 520 26.03.18 CAMD-II M/S Balram Engineers Contractor &

SuppliarsSec 03/CAMD-II/16-17/11.05.16 416/79 16.02.18 Security 27114.00

B- 521 26.03.18 CAMD-II M/S Jahangir Enterprises Sec 23/CAMD-II/16-17/29.11.16 416/80 15.02.18 Security 50938.00B- 524 28.03.18 CSD-II M/S Aditya Enterprises 568/CPD-III/O-I/05.12.17 491/16 03.03.18 Supply 364841.00

TOTAL TOTAL 1634075.00 1729050.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 1 03.04.18 EMD-IV M/S S.M. Enterprises Sec 03/EMD-IV/17-18/29.05.17 517/6A 10.03.18 Security 1200.00B- 2 03.04.18 CSD-II M/S Bee Gee Associates 1409/CPD-I/O-I/24.01.18 493/9 28.03.18 Supply O&M 265776.00B- 4 05.04.18 CHD-III M/S Nosad Contractor F 07/CHD-III/16-17/28.09.16 513/18 13.03.18 Overhauling of HT/LT Motor 2693.00B- 7 13.04.18 CSD-II M/S Balaji Corporation 292/CPD-II/O-I/28.02.18 466/82 09.04.18 Supply B- 8 13.04.18 CSD-II M/S Jalvid Udyog 302/CPD-II/O-I/05.03.18 466/82 09.04.18 Supply 229704.00B- 9 13.04.18 CSD-II M/S Simplex Switchgear P. Ltd 301/CPD-II/O-I/05.03.18 466/83 09.04.18 Supply 130293.00B- 10 13.04.18 CSD-II M/S Incom Power P. Ltd. 418/CPD-II/O-I/28.03.18 466/84 09.04.18 Supply 880822.00B- 11 13.04.18 CSD-II M/S Incom Power P. Ltd. 419/CPD-II/O-I/28.03.18 466/85 11.04.18 Supply 957254.00B- 12 13.04.18 CSD-II M/S Shrikant Sec 1614/CSD-II/PTPP/28.08.17 466/88 11.04.18 Security 7084.00B- 13 14.04.18 CHD-III M/S S.R. Construction Sec 03/CHD-III/16-17/17.05.16 513/19 03.04.18 Security 29296.00B- 14 14.04.18 CHD-III M/S Computer Solution Sec 11/CHD-III/17-18/20.02.18 513/19 10.04.18 Security 1200.00B- 15 14.04.18 CHD-III M/S S.R. Constructions Sec 01/CHD-III/17-18/18.04.17 513/19 10.04.18 Security 28143.00B- 16 14.04.18 CHD-III M/S Nosad Contractor Sec 07/CHD-III/16-17/28.09.16 519/25 06.04.18 Security 80957.00B- 17 16.04.18 AHD-II M/S India Engg.Works Ist 13/AHD-II/17-18/30.09.17 515/19 11.02.18 Repairing Of Grinding Rolls. 26487.00B- 18 16.04.18 AHD-II M/S India Engg.Works Ist 04/AHD-II/17-18/15.05.17 515/20 28.02.18 Fabrication & Repairing 46367.00B- 20 17.04.18 ECM&EMD M/S Vijay Kumar Gupta Sec 12/ECM&EMD/16-17/20.09.16 439/69 22.03.18 Security 129957.00B- 25 20.04.18 TMD-II M/S Harsh & Brothers 8th 08/TMD-II/17-18/09.01.18 475/43 16.02.18 Repairing & Reconditioning 58212.00B- 26 20.04.18 TMD-II M/S Thermal India Engineers Sec 33/TMD-II/16-17/17.06.17 475/45 27.01.18 Break Down Maintinance 41453.00B- 27 20.04.18 TMD-II M/S Thermal India Engineers Sec 21/TMD-II/16-17/19.10.16 475/48 06.03.18 Security 249219.00B- 28 20.04.18 TMD-II M/S Thermal India Engineers T&f 02/TMD-II/16-17/11.04.16 475/49 06.03.18 Security 146636.00B- 29 20.04.18 TMD-II M/S Thermal India Engineers 9th 19/TMD-II/16-17/19.10.17 475/58 20.02.18 Dismentling & Shifting of

Vaccum Pump54841.00

B- 30 20.04.18 TMD-II M/S Thermal India Engineers I&F 33/TMD-II/16-17/17.06.17 475/60 19.02.18 Reparivs/Replacement OH-3 107664.00B- 35 21.04.18 EMD-IV M/S M.A.K.Construction Co. I&F 11/EMD-IV/17-18/02.02.18 472/89 05.02.18 Fabrication & Repairing 30240.00B- 40 23.04.18 CAMD-II M/S India Engg.Works 01/CAMD-II/17-18/20.02.17 468/33 15.02.18 Maintenance & Relocation 76204.00B- 50 23.04.18 CSD-II M/S Incom Power Pvt.Ltd. 394/CPD-II/O-I/24.03.18 374/194 23.04.18 Supply 640191.00B- 51 23.04.18 CSD-II M/S Incom Power Pvt.Ltd. 395/CPD-II/O-I/24.03.18 374/195 23.04.18 Supply 465807.00B- 55 24.04.18 EMD-IV M/S M.R.P. Construction I&F 11/EMD-IV/17-18/27.03.18 347/81 24.03.18 Testing of areva make motor 23128.00B- 63 24.04.18 CHD-II M/S S.K.Engineering Works 07/CHD-II/17-18/29.11.16 503/02 10.04.18 Security 25500.00B- 64 25.04.18 EMD-V M/S Priya Const Co. Sec 12/EMD-IV/17-18/12.12.17 316/76 18.11.17 Repair Rewainding 162111.00B- 65 25.04.18 EMD-V M/S Priya Const Co. II 345/EMD-IV/PTPP/07.10.17 316/78 26.02.18 Repair Rewainding 330080.00B- 68 25.04.18 EMD-V M/S Priya Construction I&F 17/EMD-IV/17-18/16.02.18 317/59 31.03.18 Modification of existing 107460.00B- 70 25.04.18 CSD-II M/S Govardhan Controls 1407/CPD-I/O-I/24.01.18 411/118 24.04.18 Supply 119426.00

TOTAL TOTAL 1766132.00 3689273.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 71 02.05.18 CHD-II M/S M.K. Traders Sec 10/CHD-II/16-17/09.09.16 2009 19.03.18 Security 126382.00B- 73 02.05.18 EMD-V M/S M.R.P.Constructions I&F 110/EMD-V/CF/13.04.18 372/33 26.04.18 OH of Compressor Bus Bar 10553.00B- 80 02.05.18 TMD-II M/S Baboolal & Co. Sec 02/TMD-II/17-18/12.07.17 475/82 06.01.18 Security 6500.00B- 87 04.05.18 CSD-II M/S Instrumentation Ltd. 1677/CPD-II/O-I/02.11.16 450/87 27.04.18 Supply OH-3 447931.00B- 90 04.05.18 BMD-III M/S M.K. Traders 06/BMD-III/17-18/01.01.18 436/51 20.01.18 Break Down Maintinance 55213.00B- 92 08.05.18 CSD-II M/S Jalvid Udyog 928/CPD-I/O-I/30.05.18 485/118 04.05.18 Supply 10665.00B- 93 08.05.18 CSD-II M/S K.V M Engineers (P) Ltd. 275/CPD-II/O-I/23.02.18 409/180 13.03.18 Supply 485954.00B- 96 08.05.18 CHD-III M/S Priya Construction Co. Sec 10/CHD-III/16-17/08.02.17 323/127 02.05.18 Security 48356.00B- 97 08.05.18 CHD-III M/S M.R.P.Constructions Sec 09/CHD-III/1617/08.02.17 323/127 20.04.18 Security 53127.00B- 98 11.05.18 ECM&EMD M/S Pushpendra Singh Sec 18/ECM&EMD/16-17/29.12.16 214/80 13.04.18 Security 8838.00B- 99 11.05.18 ECM&EMD M/S B.K. Enterprises Sec 03/ECM&EMD/14-15/05.11.14 439/70 28.03.18 Security 7009.00B- 100 11.05.18 ECM&EMD M/S B.K. Enterprises Sec 12/ECM&EMD/15-16/21.12.15 439/71 28.03.18 Security 6930.00B- 101 11.05.18 ECM&EMD M/S B.K. Enterprises Sec 01/ECM&EMD/16-17/01.06.16 424/62 28.03.18 Security 6815.00B- 102 11.05.18 ECM&EMD M/S B.K. Enterprises Sec 03/ECM&EMD/17-18/13.06.17 424/62 28.03.18 Security 6930.00B- 103 11.05.18 ECM&EMD M/S B.K. Enterprises Sec 01/ECM&EMD/15-16/10.04.15 439/72 28.03.18 Security 6891.00B- 104 11.05.18 ECM&EMD M/S B.K. Enterprises Sec 16/ECM&EMD/16-17/05.12.16 424/63 28.03.18 Security 8396.00B- 105 11.05.18 CSD-II M/S Allusion Controls Pvt.Ltd. Sec 1547/CPD-I/O-I/24.02.18 492/05 09.05.18 Supply O&M 328996.00B- 106 11.05.18 CHD-IV M/S Harsh & Brothers Sec 19/CHD-IV/15-16/07.01.16 505/7 05.05.18 Security 27585.00B- 107 11.05.18 CHD-IV M/S Harsh & Brothers Sec 09/CHD-IV/16-17/25.07.16 505/7 05.05.18 Security 62073.00B- 108 11.05.18 CHD-IV M/S Krishna Kumar Sec 10/CHD-IV/17-18/25.09.17 495/49 04.05.18 Security 17520.00

T/T to A list via order no. 226/CAMD-II dt. 22.05.2018

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 15

Page 42: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 109 11.05.18 CHD-IV M/S Deepak Kumar Sec 08/CHD-IV/17-18/18.09.17 495/49 04.05.18 Security 11083.00B- 110 11.05.18 CHD-IV M/S Indrajeet Singh Sec 09/CHD-IV/17-18/18.09.17 495/49 05.05.18 Security 6930.00B- 111 11.05.18 CSD-II M/S Vikash Chauda 1623/CPD-I/O-I/13.03.18 449/69 08.05.18 Supply O&M 17700.00B- 112 11.05.18 CSD-II M/S Balaji Corporation 496//CPD-II/O-I/18.04.18 449/69 08.05.18 Supply O&M 1627299.00B- 113 11.05.18 CSD-II M/S Jalvid Udyog 302/CPD-II/O-I/05.03.18 374/198 07.05.18 Supply O&M 398392.00B- 116 11.05.18 BMD-III M/S Bharat Mechanical & Structural

WorksIst 09/BMD-III/17-18/15.01.18 392/98 26.11.17 Break Down Maintinance OH-3 87380.00

B- 122 11.05.18 BMD-III M/S Bharat Mechanical & Structural Works

II 09/BMD-III/17-18/15.01.18 283/111 18.04.18 B/d Maintinance Of Pressure 118330.00

B- 124 14.05.18. CHD-IV M/S Hind Udyog V 06/CHD-IV/17-18/12.07.17 504/33 07.05.18 Reparing & Reconditioning 97916.00B- 126 16.05.18 CSD-II M/S Supertech Engineers 1545/CPD-I/O-I/24.02.18 427/74 10.05.18 Supply O&M 561470.00B- 127 17.05.18 CHD-III M/S Priya Const Co. II 10/CPD-III/17-18/06.01.18 513/22 02.5.18 Rewainding Of LT. Motor 46776.00B- 128 19.05.18 EMD-IV M/S A.K. Engineers Sec 04/EMD-IV/13-14/10.01.14 94/79 25.04.18 Security 39960.00B- 129 19.05.18 AHD-II M/S India Engg.Works II 04/AHD-II/PTPP/15.05.17 515/27 18.04.18 Fabrication & Repairing 33485.00B- 130 19.05.18 AHD-II M/S India Engg.Works II 13/AHD-II/17-18/30.09.17 515/28 22.04.18 Repairing Of Grinding Rolls 37812.00B- 132 19.05.18 AHD-II M/S Hind Udyog Ist 14/AHD-II/17-18/30.11.17 515/31 18.04.18 Replacement / Repairing 41109.00B- 132

(B)24.05.18 C&ID-II M/S Syndicate Engineers Sec 01/C&ID-II/14-15/10.03.15 328/64 09.05.18 Security 768721.00

TOTAL TOTAL 1748620.00 3430476.00 447931.00 0.00 0.00 0.00 0.00 0.00

B- 137 04.06.18 CSD-II M/S Ocean Wire and Cables (P)Ltd 20/CPD-I/PTPP/06.04.18 487/61 22.05.18 Supply O&M 191041.00B- 138 04.06.18 CSD-II M/S Aarseller Tredco 120/EMD-V/PTPP/24.04.18 487/63 23.05.18 Supply O&M 233664.00B- 139 04.06.18 CSD-II M/S Guru Enterprises 1642/CPD-I/O-I/ 493/15 26.05.18 Supply O&M 912834.00B- 140 04.06.18 CSD-II M/S Thermoserve Corporation 583/CPD-II/O-I/18.05.18 428/125 25.05.18 Supply O&M 423703.00B- 142 04.06.18 CSD-II M/S Trade India Corporation 1706/CPD-I/O-I/05.10.15 428/128 22.05.18 Supply O&M 22842.00B- 143 04.06.18 CSD-II M/S Trade India Corporation 1706/CPD-I/O-I/05.10.15 428/128 26.05.18 Supply O&M 16932.00B- 146 04.06.18 C&ID-III M/S M.S.Engg.Works Sec 11/C&ID-III/15-16/02.11.15 418/40 24.12.17 Security 64501.00B- 148 04.06.18 CHD-IV M/S Shiva Construction Sec 05/CHD-IV/15-16/27.06.15 507/07 29.05.18 Security 42468.00B- 149 05.06.18 CAMD-II M/S Usha Enterprises II 20/CAMD-II/17-18/27.02.18 388/59 23.04.18 Servicing & B/D Maintinance 6921.00B- 150 05.06.18 CHD-III M/S S.R. Constructions Ist 02/CHD-III/18-19/07.05.18 519/29 15.05.18 Preventine & B/D Maintinance 78302.00

B- 151 05.06.18 CHD-III M/S M.R.P.Constructions Ist 01/CHD-III/18-19/07.05.18 323/133 01.06.18 B/D Maintinance Of Tranformer 38649.00

B- 152 08.06.18 CSD-II M/S Aarseller Tredco 178/EMD-V/CF/02.06.18 411/122 06.06.17 Supply 1163527.00B- 153 08.06.18 CSD-II M/S Power Engineers 1669/CPD-I/O-I/21.03.18 466/90 31.05.18 Supply 2218381.00B- 156 13.06.18 BMD-III M/S Bharat Mechanical & Structural

WorksIII 09/BMD-III/17-18/15.01.18 273/46 06.05.18 Break Down Maintinance 76658.00

B- 157 13.06.18 BMD-III M/S M.K. Traders II 16/BMD-III/17-18/28.03.18 273/46 17.04.18 Erection Of New Hoist 22692.00B- 161 14.06.18 CAMD-II M/S Hars & Brothers Sec 17/CAMD-II/15-16/14.10.15 415/73 09.05.18 Security 60000.00B- 162 14.06.18 CSD-II M/S Hindustan Rubbers 115/CPD-III/O-I/20.04.18 409/181 08.06.18 Supply 1626630.00B- 163 14.06.18 TMD-II M/S Hind Udyog Ist 01/TMD-II/18-19/20.04.18 446/25 27.04.18 Fabrication & Repairing 58814.00B- 164 17.06.18 AHD-II M/S India Engg.Works III 13/AHD-II/17-18/30.09.17 459/59 14.05.18 Repairing of grinding Rolls 50525.00B- 165 17.06.18 AHD-II M/S India Engg.Works III 04/AHD-II/17-18/15.05.17 459/59 12.06.18 Repairing & Fabrication 52526.00B- 166 17.06.18 AHD-II M/S Hind Udyog II 14/AHD-II/17-18/30.11.17 459/60 17.05.18 Repairing & Replacement 43150.00B- 171 17.06.18 CSD-II M/S Jalvid Udyog 178/CPD-I/O-I/21.05.18 341/183 13.06.18 Supply 143748.00B- 172 17.06.18 CSD-II M/S Technow Engg. Works 177/CPD-I/O-I/21.05.18 341/182 13.06.18 Supply 12042.00B- 173 17.06.18 CSD-II M/S Supath Engineering Services P.

Ltd189/CPD-III/18.05.18 487/64 09.06.18 Supply 42854.00

B- 174 17.06.18 CSD-II M/S Govardhan Controls 1408/CPD-I/O-I/24.01.18 487/65 09.06.18 Supply 206770.00B- 175 17.06.18 CSD-II M/S Simplex Switchgear P. Ltd 1428/CPD-I/O-I/31.01.18 487/66 12.06.18 Supply 467899.00B- 176 17.06.18 CSD-II M/S Trade India Corporation 1546/CPD-I/O-I/24.02.18 406/46 09.06.18 Supply 867578.00B- 178 17.06.18 CSD-II M/S AIA Engg.Ltd 740/CPD-II/O-I/02.07.16 391/75 09.06.18 Supply 861017.00B- 179 19.06.18 CSD-II M/S Thermoserve Corporation 632/CPD-II/O-I/01.06.18 466/93 08.06.18 Supply 1114798.00B- 180 19.06.18 BMD-IV M/S Roshni Enterprises Sec 07/BMD-IV/14-15/29.11.14 403/161 09.06.18 Security 303778.00B- 181 19.06.18 BMD-IV M/S Roshni Enterprises Sec 14/BMD-IV/15-16/31.03.16 403/160 09.06.18 Security 87000.00B- 182 19.06.18 BMD-IV M/S Roshni Enterprises Sec 13/BMD-IV/15-16/31.03.16 403/162 09.06.18 Security 207285.00B- 185 22.06.18 CHD-IV M/S Hind Udyog 14/CHD-IV/17-18/19.03.18 504/36 15.06.18 Repairing & Reconditioning 142620.00B- 189 23.06.18 TMD-II M/S M.K. Traders I&Fin

al05/TMD-II/17-18/10.08.17 511/9 15.04.18 Break Down Maintinance 48850.00

B- 190 23.06.18 TMD-II M/S Thermal India Engineers Final 33/TMD-II/16-17/17.06.17 511/10 17.04.18 Preventine & B/D Maintinance 54591.00

B- 197 28.06.18 CAMD-II M/S Balram Engg. Contractor & Supplier

Sec 18/CAMD-II/17-18/25.11.17 467/60 27.04.18 B/D Maintinance of Fixed fire system

21130.00

B- 198 28.06.18 CAMD-II M/S Balram Engg. Contractor & Supplier

I&Final

85/CWCD-IV/12-13/12.02.13 467/62 01.06.18 Security 47472.00

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 16

Page 43: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 199 28.06.18 CAMD-II M/S Banaco Technology Pvt.Ltd. V 24/CAMD-II/15-16/24.12.15 467/63 Complete OH of Clorination 400330.00B- 201 28.06.18 CHD-IV M/S Hind Udyog Sec 06/CHD-IV/17-18/12.07.17 504/34 14.06.18 Repairing & Reconditioning 101088.00B- 203 29.06.18 CSD-II M/S Fluidomat Ltd 250/CPD-III/O-I/13.06.18 499/10 29.06.18 Supply 3397730.00B- 204 29.06.18 CSD-II M/S Neelkanth Power Systems (P)

LTD.618/CPD-II/O-I/29.05.18 499/11 29.06.18 Supply 102490.00

B- 205 29.06.18 CSD-II M/S Shri. Bhawani Trading Co. 201/CPD-III/O-I/23.05.18 499/12 29.06.18 Supply 1725864.00B- 206 29.06.18 CSD-II M/S Siddhi Vinayak Engg. 1645/CPD-I/O-I/23.09.15 486/54 25.06.18 Supply 160797.00B- 207 29.06.18 CSD-II M/S Mohan Lal 1536/CPD-I/O-I/03.09.15 486/53 25.06.18 Supply 149688.00B- 208 29.06.18 CSD-II M/S R.S. P.Overseas Pvt.Ltd 1341/CPD-I/O-I/10.01.18 450/91 25.06.18 Supply 26019.00

TOTAL 2009350.00 16088848.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 210 04.07.18 CSD-II M/S Net Cascade Automation Pvt Ltd

268/CPD-I/O-I/15.06.18 492/8 02.07.18 Supply 654726.00

B- 211 04.07.18 CSD-II M/S Aarseller Tredco 120/EMD-V/CF/24.04.18 445/100 21.06.18 Supply 233664.00B- 212 04.07.18 CSD-II M/S Smap Engineers Pvt.Ltd 02/CPD-II/O-I/01.01.18 449/70 29.06.18 Supply OH-3 1007626.00B- 213 04.07.18 CSD-II M/S Thermoserve Corporation 677/CPD-II/O-I/13.06.18 449/71 30.06.18 Supply OH-4 2601746.00B- 215 09.07.18 CHD-II M/S S. Prince High Tech Pvt.Ltd. Sec 09/CHD-III/17-18/13.10.17 323/134 12.06.18 Security 3098.00B- 216 09.07.18 CSD-II M/S Shri. Bhawani Trading Co. 589/CPD-I/O-I/11.04.16 465/113 12.10.17 Supply 491028.00B- 217 09.07.18 CSD-II M/S Shri. Bhawani Trading Co. 589/CPD-I/O-I/11.04.16 465/113 12.10.17 Supply 200211.00B- 218 10.07.18 CHD-IV M/S Hind Udyog Sec 17/CHD-IV/15-16/17.12.15 504/36 07.07.18 Security 183982.00B- 219 10.07.18 CHD-IV M/S Hind Udyog Sec 26/CHD-IV/15-16/31.03.16 504/37 07.07.18 Security 114663.00B- 220 10.07.18 CHD-IV M/S Hind Udyog Sec 04/CHD-IV/16-17/27.05.16 504/37 07.07.17 Security 172045.00B- 221 12.07.18 EMD-V M/S R.P.Costruction Co. I&F 02/EMD-V/18-19/25.04.18 413/119 01.06.18 Removal Of Refurbishment 115050.00B- 222 12.07.18 CSD-II M/S Fludomat Ltd 753/CAD-II/O-I/29.06.18 426/94 11.07.18 Supply 1728357.00B- 223 12.07.18 CAMD-II M/S Rahul Gupta & Co. I&F 23/CAMD-II/17-18/26.04.18 312/88 28.04.18 Fabrication & Repairing 102910.00B- 227 19.07.18 CHD-IV M/S Hind Udyog F 07/CHD-IV/17-18/10.08.17 504/38 14.07.18 Fabrication 167692.00B- 228 19.07.18 CHD-IV M/S Hind Udyog IX 06/CHD-IV/17-18/12.07.18 504/39 16.07.18 Repairing & Reconditioning 224541.00B- 229 20.07.18 CSD-II M/S AtoZ Infraspares Pvt.Ltd 301/CPD-I/22.06.18 535/1,2 12.07.18 V-Belt Supply 63046.00B- 230 21.07.18 AHD-II M/S Anil Kumar Singh Sec 08/AHD-II/17-18/12.09.17 530/1 04.07.18 Security 6552.00B- 231 21.07.18 BMD-III M/S Idle Flow Controls Pvt.Ltd. Ist 08/BMD-III/17-18/12.01.18 436/55 01.04.18 Complete Recortilioning Of Oil

Gun53209.00

B- 232 21.07.18 BMD-III M/S Tech Thermalogy I&F 11/BMD-III/17-18/03.02.18 436/55 24.11.17 Fabrication & Erection 269407.00B- 233 21.07.18 BMD-III M/S Jahangir Enterprises Sec 12/BMD-III/16-17/25.10.16 436/56 30.05.18 Security 20766.00B- 234 21.07.18 BMD-III M/S S.K.Engineering Works Sec 10/BMD-III/16-17/24.10.16 436/57 30.05.18 Security 36934.00B- 235 21.07.18 BMD-III M/S Bharat Mechanical & Structural

WorksV 09/BMD-III/17-18/15.01.18 282/170 08.06.18 Break Down Maintinance 106464.00

B- 236 21.07.18 BMD-III M/S M.K. Traders IV 06/BMD-III/17-18/01.01.18 282/174 20.06.18 Break Down Maintinance 47083.00B- 237 21.07.18 BMD-III M/S M.K. Traders IX 15/BMD-II/15-16/06.10.15 282/175 22.06.18 Repairing Of Flue Gas Path 42946.00B- 241 21.07.18 CSD-II M/S AtoZ Infraspares Pvt.Ltd 300/CPD-I/O-I/22.06.18 535/01 18.07.18 Supply 24620.00B- 242 23.07.18 CSD-II M/S Fludomat Ltd 150/CPD-II/O-I/23.01.17 427/77 20.07.18 Supply O & M 237340.00B- 243 23.07.18 BMD-IV M/S Nosad Contractor F 10/BMD-IV/16-17/16.01.17 500/142 17.04.18 Maintinance & Reparing 78655.00B- 244 23.07.18 BMD-IV M/S Ravindra Singh & Co. Sec 12/BMD-IV/16-17/02.02.17 500/143 07.06.18 Security 90503.00B- 245 23.07.18 BMD-IV M/S S.S.Singh Contractor Sec 04/BMD-IV/17-18/31.08.17 500/144 09.07.18 Security 14310.00B- 246 24.07.18 CHD-IV M/S Hind Udyog II 14/CHD-IV/17-18/19.03.18 504/41 17.07.18 Repairing & Reconditioning 326680.00B- 248 24.07.18 CHD-IV M/S Hind Udyog Sec 17/CHD-IV/16-17/15.12.16 504/41 21.07.18 Security 157970.00B- 249 26.07.18 CSD-II M/S Balaji Corporation 301/CPD-III/O-I/05.07.18 409/185 25.07.18 Supply O&m 319662.00B- 250 26.07.18 CSD-II M/S Instrumentation Ltd. 1775/CPD-II/O-I/15.11.16 466/95 18.07.18 Supply O&m 1521157.00B- 252 26.07.18 AHD-II M/S India Engg.Works 4 04/AHD-II/17-18/15.05.17 515/36 24.06.18 Fabrication & Repairing 55809.00B- 253 26.07.18 AHD-II M/S India Engg.Works 4 13/AHD-II/17-18/30.09.17 515/38 24.06.18 Repairing of grinding rolls 51255.00B- 255 28.07.18 CSD-II M/S J.K. Engg. Co. 805/CPD-II/O-I/12.07.18 449/72 26.07.18 Supply O&m 71916.00B- 256 28.07.18 CSD-II M/S J.K. Engg. Co. 805/CPD-II/O-I/12.07.18 449/73 26.07.18 Supply O&m 883889.00B- 257 30.07.18 ECM&EMD M/S Vijay Kumar Gupta Contractor Sec 19/ECM&EMD/16-17/29.12.16 230/100 27.07.18 Security 159479.00

TOTAL TOTAL 2602003.00 6429616.00 1007626.00 2601746.00 0.00 0.00 0.00 0.00

B- 258 02.08.18 EMD-IV M/S Nosad Contractor Ist 04/EMD-IV/18-19/06.07.18 520/96 12.07.18 Preventive Break Down Maintinance

61979.00

B- 259 02.08.18 CHD-III M/S Priya Const. Co. Sec 08/CHD-III/16-17/03.11.16 513/30 12.06.18 Security 60000.00B- 260 02.08.18 CHD-III M/S S.R. Constructions III 02/CHD-III/18-19/07.05.18 513/29 16.07.18 Preventive Break Down

Maintinance 23464.00

B- 261 07.08.18 CSD-II M/S Power Sales Corporation 750/CPD-II/O-I/28.06.18 466/101 04.08.18 Supply O & M 1953151.00B- 263 09.08.18 EMD-V M/S Priya Const. Co. III 12/EMD-V/17-18/12.12.17 316/81 30.07.18 Repair. Rewainding Of LT.

Motor427671.00

B- 264 09.08.18 EMD-V M/S Electrical & Instrumentation Engineer

Sec 17/EMD-V/16-17/03.02.17 316/82 23.05.18 Security 21577.00

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 17

Page 44: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 265 09.08.18 EMD-V M/S S.K.Enterprises Sec 06/EMD-V/16-17/05.08.16 316/82 07.05.18 Security 27915.00B- 266 09.08.18 EMD-V M/S R.L.Engineering Sec 19/EMD-V/16-17/04.02.17 316/82 04.07.18 Security 54957.00B- 267 09.08.18 EMD-V M/S R.L.Engineering Sec 10/EMD-V/16-17/28.10.17 316/83 04.07.18 Security 45511.00B- 268 09.08.18 EMD-V M/S R.L.Engineering Sec 09/EMD-V/17-18/09.10.17 316/83 17.07.18 Security 2685.00B- 269 13.08.18 CAMD-II M/S Rakesh Kumar & Co. Sec 15/CAMD-II/16-17/30.10.17 415/82 11.07.18 Security 7007.00B- 270 13.08.18 CSD-II M/S Adyaant Enterprises 210/CPD-I/O-I/30.05.17 411/126 30.07.18 Supply 372933.00B- 271 13.08.18 CSD-II M/S Supath Engineering Services P.

Ltd1006/CPD-I/O-I/01.06.16 411/127 30.07.18 Supply 442608.00

B- 272 13.08.18 CSD-II M/S Supath Engineering Services P. Ltd

1006/CPD-I/O-I/01.06.16 411/127 30.07.18 Supply 393281.00

B- 273 13.08.18 CHD-III M/S Priya Const. Co. 3 10/CHD-III/17-18/06.01.18 519/42 01.08.18 Rewainding Of LT. Motor 247528.00B- 274 14.08.18 CSD-II M/S Atlas Copco (India) Ltd. 641/CPD-II/O-I/05.06.18 409/185 14.08.18 Supply O & M 1458358.00B- 275 14.08.18 BMD-III M/S Jha Const.Co. IX 05/BMD-III/17-18/05.10.17 258/89 16.07.18 Installation & Operation 28512.00B- 276 14.08.18 BMD-III M/S Kailash Trading Corporation II 169/EMD-IV/CF/01.05.17 394/71 29.07.18 Repair Of C T M M Relay 76871.00B- 278 16.08.18 CAMD-II M/S Usha Enterprises III 20/CAMD-II/17-18/27.02.18 312/93 10.07.18 B/D Maintinance 11596.00B- 279 16.08.18 CAMD-II M/S Singh Metal Casting Sec 12/CAMD-II/15-16/16.07.15 387/20 27.07.18 Security 70110.00B- 280 16.08.18 C&ID-III M/S Globe Enterprises 59/C&ID-III/CF/26.02.18 344/113 20.06.18 Supply of Telephone Quectoy 14974.00B- 281 18.08.18 CSD-II M/S Deepak Traders 420/CPD-I/O-I/24.07.18 444/116 14.08.18 Supply 341712.00B- 282 18.08.18 CSD-II M/S Deepak Traders 539/CPD-I/O-I/03.08.18 444/117 16.08.18 Supply 646352.00B- 283 18.08.18 CSD-II M/S Authentic Systems &

Technalois858/CPD-I/O-I/21.09.17 444/117 14.08.18 Supply 167248.00

B- 284 18.08.18 TMD-II M/S Thermal India Engineers Ist 05/TMD-II/18-19/28.07.18 475/97 22.06.18 Break Down Maintinance 310273.00B- 285 18.08.18 TMD-II M/S S.K.Engineering Works Ist 04/TMD-II/18-19/19.07.18 475/103 05.06.18 Break Down Maintinance 35058.00B- 286 22.08.18 BMD-IV M/S M.A.K.Construction Co. Sec 10/BMD-IV/14-15/31.12.14 500/145 06.08.18 Security 131105.00B- 287 22.08.18 BMD-IV M/S M.A.K.Construction Co. Sec 12/BMD-IV/15-16/31.03.16 500/146 06.08.18 Security 95106.00B- 288 22.08.18 BMD-IV M/S M.A.K.Construction Co. Sec 09/BMD-IV/16-17/16.01.17 500/146 06.08.18 Security 22440.00B- 289 22.08.18 BMD-IV M/S Nosad Contractor Sec 15/BMD-IV/14-15/28.02.15 500/147 06.08.18 Security 123524.00B- 290 22.08.18 BMD-IV M/S M.A.K.Construction Co. Sec 05/BMD-IV/17-18/07.09.17 500/148 06.08.18 Security 124834.00B- 291 22.08.18 BMD-IV M/S Nosad Contractor Sec 03/BMD-IV/16-17/22.09.16 500/149 06.08.18 Security 93845.00B- 292 22.08.18 BMD-IV M/S Nosad Contractor Sec 10/BMD-IV/16.17-16.01.17 500/149 06.08.18 Security 76286.00B- 293 22.08.18 BMD-IV M/S M.A.K.Construction Co. Sec 09/BMD-IV/14-15/31.12.14 500/150 06.08.18 Security 16663.00B- 294 22.08.18 BMD-IV M/S O.S. Contractor Sec 16/BMD-IV/15-16/31.03.16 278/74 21.06.18 Insullation Work 21576.00B- 295 22.08.18 BMD-IV M/S Nosad Contractor II 04/EMD-IV/18-19/06.07.18 520/104 03.06.18 Preventione Break Down

Maintinance38927.00

B- 296 22.08.18 BMD-IV M/S M.A.K.Construction Co. I&F 05/EMD-IV/18-19/06.07.18 471/183 13.06.18 Fabrication & Erwction 92364.00B- 297 25.08.18 AHD-II M/S Hind Udyog 3 14/AHD-II/17-18/30.11.17 515/40 28.07.18 Repairing & Replacement 45213.00B- 298 25.08.18 AHD-II M/S India Engg.Works 5 04/AHD-II/17-18/15.05.17 515/36 28.07.18 Fabrication & Repairing 52525.00B- 299 25.08.18 AHD-II M/S India Engg.Works 5 13/AHD-II/17-18/30.09.17 515/43 02.08.18 Repairing of grinding rolls 28077.00B- 302 25.08.18 AHD-II M/S Bharti Enterprises Sec 08/AHD-II/16-17/20.09.16 530/02 09.08.18 Security 107692.00B- 303 25.08.18 AHD-II M/S Balram Engg. Contractor &

SupplierSec 11/AHD-II/15-16/14.01.16 530/02B 08.08.18 Security 86501.00

B- 304 25.08.18 AHD-II M/S Energo Construction Ltd Sec 06/AHD-II/17-18/10.06.17 451/27 06.08.18 Security 842710.00B- 305 25.08.18 ECM&EMD M/S Puneet Construction I&F 10/ECM&EMD/18-19/31.07.18 424/68 18.08.18 Clenins of Roofs 274537.00B- 306 27.08.18 EMD-V M/S Shri Pooran Singh Sec 16/EMD-V/16-17/28.12.16 413/128 19.07.18 Security 8190.00B- 307 27.08.18 EMD-V M/S Shri Pooran Singh Sec 02/EMD-V/17-18/29.06.17 413/129 19.07.18 Security 8235.00B- 308 27.08.18 EMD-V M/S Shri Pooran Singh Sec 11/EMD-V/17-18/12.12.17 413/129 19.07.18 Security 8055.00B- 309 29.08.18 ECM&EMD M/S Vijay Kumar Gupta III 11/ECM&EMD/15-16/21.12.15 362/126 21.08.18 Security 158405.00B- 310 29.08.18 CSD-II M/S New Allenberry Works 374/CPD-III/O-I/02.08.18 409/186 28.08.18 Supply O & M 2106288.00B- 311 29.08.18 CSD-II M/S New Allenberry Works 375/CPD-III/O-I/02.08.18 409/187 28.08.18 Supply O & M 104154.00B- 312 29.08.18 CSD-II M/S SAPS Power Equipmeut Pvt.Ltd. 646/CPD-II/O-I/06.06.18 450/94 27.08.18 Supply O & M 953923.00

B- 313 29.08.18 CSD-II M/S Tirupati Industril Agencis 593/CPD-I/O-I/08.08.18 450/95 27.08.18 Supply O & M 899132.00B- 314 29.08.18 EMD-IV M/S Electrical & Instrumentation

EngineerSec 04/EMD-IV/17-18/23.06.17 517/08 10.07.18 Security 23880.00

TOTAL 3993404.00 9854114.00 0.00 0.00 0.00 0.00 0.00 0.00

B- 315 19.09.18 CPD-II M/S J.K. Engineering Co. 400/CPD-II/23.07.18 535/13 03.08.18 Supply 53233.00B- 316 19.09.18 CPD-II M/S J.K. Engineering Co. 400/CPD-II/23.07.18 535/14 03.08.18 Supply 65882.00B- 317 19.09.18 CPD-I M/S Asha Printing Press 165/CPD-I/07.09.18 535/14 18.05.18 Supply 157518.00B- 319 19.09.18 CPD-III M/S Supath Engg. Services (P) Ltd. 437/CPD-III/O-I/20.08.18 411/132 20.08.18 Supply 558139.00B- 320 19.09.18 CPD-I M/S J.Umashankar & Co. Pvt.Ltd 462/CPD-I/26.07.18 428/134 14.08.18 Supply O & M 341020.00B- 321 19.09.18 CPD-I M/S Trade India Corporation 463/CPD-I/26.07.18 428/135 26.07.18 Supply O & M 206128.00B- 322 19.09.18 CPD-I M/S Commercial Enterprises 464/CPD-I/26.07.18 428/136 01.08.18 Supply O & M 671526.00B- 323 19.09.18 CPD-II M/S VP. Engineers 1031/CPD-II/28.08.18 449/77 28.08.18 Supply O & M 170156.00B- 324 19.09.18 C&ID-II M/S Nosad Contractor Ist 06/C&ID-II/05.06.18 453/37B 17.08.18 Miscellaneons 52559.00

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 18

Page 45: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 325 20.09.18 BMD-III M/S Sunrise Engineers & Contoractor Ist 04/BMD-III/28.06.18 483/115 16.07.18 Preventione Break Down Maintinance

44388.00

B- 327 20.09.18 CHD-IV M/S Hind Udyog XI 06/CHD-IV/12.07.17 504/43 27.08.18 Repairing 271677.00B- 328 20.09.18 CHD-IV M/S Hind Udyog Ist 03/CHD-IV/09.08.18 504/44 03.09.18 Fabrication 159410.00B- 329 20.09.18 AHD-II M/S Hind Udyog 4 14/AHD-II/30.11.17 515/51 25.08.18 Repairing 53294.00B- 330 20.09.18 AHD-II M/S India Engg.Works 6 13/AHD-II/30.09.17 515/54 08.09.18 Repairing 49996.00B- 331 20.09.18 AHD-II M/S India Engg.Works 6 04/AHD-II/15.05.17 515/55 02.09.18 Repairing 52525.00B- 332 20.09.18 AHD-II M/S Bharti Enterprises II 04/AHD-II/15.05.17 496/133 07.09.18 Lifting & shifting 106757.00B- 333 20.09.18 TMD-II M/S Bharti Enterprises 9 06/TMD-II/28.08.17 522/7 06.07.18 Removal Of Refurbishment 81697.00B- 334 20.09.18 TMD-II M/S Bharti Enterprises 10 06/TMD-II/28.08.17 522/9B 21.05.18 Removal Of Refurbishment 81697.00B- 335 20.09.18 TMD-II M/S Bharti Enterprises 11 06/TMD-II/28.08.17 522/10B 21.06.18 Removal Of Refurbishment 105303.00B- 336 20.09.18 TMD-II M/S Bharti Enterprises 12 06/TMD-II/28.08.17 522/14B 21.07.18 Removal Of Refurbishment 130255.00B- 337 20.09.18 TMD-II M/S Bharti Enterprises 13 06/TMD-II/28.08.17 522/15B 21.08.18 Removal Of Refurbishment 130255.00B- 338 20.09.18 TMD-II M/S Omega Industries Pvt.Ltd. Ist 06/TMD-II/01.8.18 475/110 14.09.18 Repairing 832785.00B- 339 20.09.18 TMD-II M/S Omega Industries Pvt.Ltd. Ist &

Final19/TMD-II/20.11.15 475/109 06.09.18 Repairing 724786.00

B- 340 20.09.18 CHD-II M/S M.K. Traders VIII 15/CHD-II/20.11.17 490/111 31.07.18 Supply OH-4 95493.00B- 341 20.09.18 CHD-II M/S S.R. Constructions 4 02/CHD-II/07.05.18 513/32 16.08.18 Preventione Break Down

Maintinance14619.00

B- 342 20.09.18 CHD-III M/S Nosad Contractor Ist 05/CHD-III/16.03.18 513/34 04.09.18 Overhaling Of HT/LT 20699.00B- 344 24.09.18 ECM&EMD M/S Ravindra Singh & Co. 235/ECM&EMD/07.10.17 364/168 Security 36527.00B- 346 25.09.18 CAMD-II M/S Balram Engg. Contractor &

SupplierII 470/CAMD-II/01.11.17 468/45 12.09.18 Break Down Maintinance 45624.00

B- 347 25.09.18 EMD-IV M/S Shiv Mahadev Engg.Works 15/EMD-IV/23.03.18 472/115 Security 9336.00B- 352 29.09.18 CSD-II M/S Shiv Mahadev Engg.Works 05/CSD-II/06.10.17 486/57 13.09.18 Security 4200.00B- 353 29.09.18 EMD-IV M/S Panjab Electrical Industries 11/EMD-IV/09.06.16 304/97 10.09.18 Security 63793.00B- 354 29.09.18 EMPED-VI M/S Cleanflo India Pvt.Ltd 384/EE.MPED-VI/22.08.17 341/198 27.09.18 Chemical 98642.00B- 355 29.09.18 CPD-I M/S Industrial Sales & Supply

Agencies401/CPD-I 341/199 27.09.18 Supply O & M 66287.00

B- 356 29.09.18 EMD-V M/S AAR Seller Tred Co. Fist 05/EMD-V/05.06.18 508/27 07.09.18 Erection & Commies 141070.00B- 357 29.09.18 CPD-I M/S Sone Obra Enterprises Pvt.Ltd 828/CPD-I 427/80 13.09.18 Supply OH-4 1558069.00B- 358 29.09.18 CPD-II M/S Asan Engineers Pvt.Ltd 1046/CPD-II/30.08.18 427/81 26.09.18 Supply 600081.00B- 359 29.09.18 CPD-II M/S Multi Tech Engineers 987/CPD-II/09.08.18 409/188 09.08.18 Supply 480741.00B- 360 29.09.18 CPD-II M/S Multi Tech Engineers 988/CPD-II 409/188 25.08.18 Supply 635958.00B- 361 29.09.18 CSD-II M/S S.K. System Pvt.Ltd. 379/CPD-III/09.07.18 409/190 26.09.18 Supply O & M 3508037.00B- 362 29.09.18 CSD-II M/S S.K. System Pvt.Ltd. 311/CPD-III/09.07.18 409/189 26.09.18 Supply O & M 3412575.00B- 363 29.09.18 CPD-III M/S Upadhayay Engineering Works 327/CPD-III/13.07.18 409/192 26.09.18 Supply O & M 607730.00

B- 364 29.09.18 CPD-III M/S Fluidomat Ltd. 404/CPD-III/09.08.18 409/191 26.09.18 Supply O & M 822094.00TOTAL TOTAL 3311894.00 12357105.00 0.00 1653562.00 0.00 0.00 0.00 0.00

B- 365 03.10.18 BMD-III M/S Garg Engineering & Sons 09/BMD-III/21.07.16 436/61 08.09.18 Security 47796.00B- 366 03.10.18 CPD-I M/S A.K. Agencies 465/CPD-I/26.07.18 426/97 18.09.18 Supply O & M 2124.00B- 367 03.10.18 CPD-I M/S A.K. Agencies 465/CPD-I/26.07.18 426/98 18.09.18 Supply O & M 23600.00B- 368 03.10.18 CPD-I M/S Tirupati Industrial Agenecies 750/CPD-I/31.08.18 426/98 12.09.18 Supply O & H4 519952.00

B- 369 03.10.18 CPD-I M/S Anurag Engineeriing Works 405/CPD-I/23.07.18 426/99 22.09.18 Supply O & M 40863.00B- 370 03.10.18 CPD-II M/S T C I Freight 548/CPD-II/09.05.18 426/100 24.08.18 Freght 3610.00B- 371 03.10.18 CPD-II M/S T C I Freight 548/CPD-II/09.05.18 426/100 24.08.18 Freght 4011.00B- 372 03.10.18 CPD-II M/S T C I Freight 548/CPD-II/09.05.18 426/101 24.08.18 Freght 777.00B- 373 03.10.18 CPD-I M/S Bearing Edge Technocret 540/CPD-I/03.08.18 487/101 26.03.18 Supply O & M 225008.00B- 374 03.10.18 CHD-III M/S S.R. Construction 5 02/CHD-III/07.05.18 513/37 15.09.18 Preventvi & Rew 25563.00B- 376 08.10.18 CPD-II M/S Shree Bhawani Trading Co. 1030/CPD-II/O-1/28.08.18 409/194 08.10.18 Supply 85809.00B- 377 08.10.18 CHD-IV M/S Hind Udyog 06/CHD-IV/12.07.17 504/45B 29.09.18 Reperaring & rew 171239.00B- 379 09.10.18 CAMD-II M/S Rahul Gupta & Comp I &f 03/CAMD-II/02.06.18 387/22 24.05.18 Reperaring & Spare 86992.00B- 381 09.10.18 CAMD-II M/S Rahul Gupta & Comp I &f 10/CAMD-II/20.09.18 387/23 10.09.18 Reperaring & rew 195900.00B- 382 09.10.18 CPD-I M/S Sone Obra Enterprises 863/CPD-I/CF722/14.09.18 466/102 06.10.18 Supply O & H4 213788.00B- 383 09.10.18 CPD-I M/S Govardhan Contrals 749/CPD-I/31.08.18 486/58 06.10.18 Supply O & H5 537815.00B- 384 11.10.18 CSD-II M/S Srikant 08/CSD-II/03.04.18 428/140 02.10.18 Security 7084.00B- 385 CPD-I M/S Madras Hydraulic Hase (P)

Ltd.111/CPD-I/21.01.17 428/141 09.10.18 Supply 77760.00

B- 386 12.10.18 TMD-II M/S Vee Kay Engineers 28/TMD-II/08.03.16 410/87B 01.10.18 Security 58000.00B- 387 12.10.18 TMD-II M/S Marfat Construction 03//TMD-II/19.07.18 410/87A 01.10.18 Thermal Insulation 46698.00B- 388 12.10.18 TMD-II M/S Thermal India Engineers 22/TMD-II/19.10.16 475/117 25.09.18 Security 112841.00

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 19

Page 46: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 391 16.10.18 CFA&BO M/S Sanjog Professioal Services 05/CPD-II/17.05.17 Security 22620.00B- 392 22.10.18 BMD-IV M/S G.S. Construction Co. Iind 11/BMD-IV/2017-18/09.03.18 524/5B Majon Overhaling 219240.00B- 393 22.10.18 AHD-II M/S Amit Kumar Singh3 16/AHD-II/2017-18/28.03.18 530/3 Security 6552.00B- 394 22.10.18 AHD-II M/S Anirudh Singh 15/AHD-II/2017-18/25.01.18 530/3 Security 8190.00B- 395 23.10.18 BMD-IV M/S Usha Enterprises 12 253/BMD-IV/02.02.17 274/64B 20.10.18 Maintinance (OH) 74163.00B- 397 23.10.18 BMD-IV M/S U.S.Enterprises V 01/BMD-IV/16.06.18 500/166 01.10.18 Maintinance (OH) 491088.00B- 398 23.10.18 BMD-IV M/S Nosad Contractor Ist 03/BMD-IV/04.09.18 500/170 01.10.18 Maintinance (OH) 156334.00B- 399 23.10.18 BMD-IV M/S Nosad Contractor Ist 04/BMD-IV/04.09.18 500/172 01.10.18 Maintinance (OH) 273575.00B- 401 23.10.18 AHD-II M/S India Engg.Works 7 13/AHD-II/30.09.17 459/66B 25.09.18 Repairing of Griding 56554.00B- 402 23.10.18 AHD-II M/S Hind Udyog 5 14/AHD-II/30.11.17 459/65B 22.09.18 Repairing 50937.00B- 403 23.10.18 CHD-IV M/S Hind Udyog XIII 06/CHD-IV/12.07.17 504/47 11.10.18 Repairing 89796.00B- 404 23.10.18 CPD-I M/S Atlas Copco 476/CPD-I/27.07.18 492/12 22.10.18 Supply O & M 405815.00B- 405 25.10.18 C&ID-III M/S Bhatuali Electro Industries

Sdution12/C&ID-III/21.10.16 532/5 Security 25000.00

B- 406 25.10.18 C&ID-III M/S Bhatuali Electro Industries Sdution

05/C&ID-III/24.06.16 532/5 Security 13870.00

B- 407 25.10.18 CSD-II M/S J.K. Engineering Compny 1099/CPD-II/11.09.18 450/100 Supply O & M 2217113.00B- 408 25.10.18 CSD-II M/S Indian Oil Cor. Ltd 832/CPD-I/590/11.09.18 242/103 25.10.18 Supply O/H 919338.00B- 409 25.10.18 CSD-II M/S Bharat Petroleum Cor. Ltd 131/CPD-I/1630/08.05.18 242/103 25.10.18 Supply O & M 184205.00B- 410 25.10.18 CAMD-II M/S India Engg.Works 01/CAMD-II/20.07.17 004/06 Security 40347.00B- 411 26.10.18 C&ID-III M/S Siddhi Vinayak Engg. 09/C&ID-III/2017-18/20.09.17 526/12 Supply Matenal 44091.00B- 412 29.10.18 CSD-II M/S Scope T&M Pvt.Ltd. 513/CPD-II/15.10.18 487/82 Supply 3864500.00

TOTAL TOTAL 3033737.00 8403033.00 0.00 213788.00 0.00 0.00 0.00 0.00

B- 413 02.11.18 CSD-II M/S ESK India Commercer and Trade (P) Ltd

1579/CPD-I/05.03.18 493/18 Supply O & M 442795.00

B- 414 02.11.18 CSD-II M/S FLUIDOMAT Ltd. 404/CPD-III/09.08.18 409/195 Supply O & M 822094.00B- 415 02.11.18 CSD-II M/S Leading Edge Technocrat 470/CPD-III/07.09.18 409/196 Supply O & M 512083.00B- 416 02.11.18 CSD-II M/S Simplex Switchgear P. Ltd 302/CPD-III/05.07.18 409/197 Supply O & M 865478.00B- 417 02.11.18 CSD-II M/S ARC Ltd. 1820/CPD-II/21.11.16 449/77 Freght 29448.00B- 418 02.11.18 CSD-II M/S Thermoserve Corps 1207/CPD-II/11.01.18 449/80 Supply O & M 1048863.00B- 419 02.11.18 CSD-II M/S Paramount Intranational 1208/CPD-II/AHD-II/11.10.18 449/81 Supply O & M 929078.00B- 420 02.11.18 CSD-II M/S Joy Marketing Company (P) Ltd. 890/CPD-II/27.07.18 449/82 Supply O & M 695708.00

B- 421 02.11.18 C&ID-III M/S Kapatia Instrument Erector 09/C&ID-III/10.08.18 526/15 Opration & Preventive 27911.00B- 422 02.11.18 CSD-II M/S Chanki Construction Co. 1650/CSD-II/06.09.17 449/85 Security 26958.00B- 423 03.11.18 CPD-I M/S Govardhan Controls 508/CPD-I/31.07.18 491/25 Supply O & M 22252.00B- 424 03.11.18 CPD-I M/S Govardhan Controls 508/CPD-I/31.07.18 491/25 Supply O & M 21075.00B- 429 03.11.18 CPD-I M/S Usha Enterprises IV 20/CAMD-II/27.02.18 41/195 30.10.18 Servicing of B/D 7624.00B- 431 03.11.18 CHD-IV M/S Deepak Kumar 15/CHD-IV/19.03.18 495/68 23.10.18 Security 8100.00B- 432 03.11.18 CHD-IV M/S Krishna Kumar 16/CHD-IV/22.03.18 495/68 23.10.18 Security 8820.00B- 433 03.11.18 CHD-IV M/S Indrajeet Singh 18/CHD-IV/22.03.18 495/68B 01.11.18 Security 6930.00B- 434 03.11.18 CSD-II M/S Ma Bhagwati Shardey Engg. 636/CPD-I/18.08.18 450/105 03.11.18 Supply O & H4 933752.00B- 435 03.11.18 CSD-II M/S Balaji Corporation 1210/CPD-II/11.10.18 450/106 22.10.18 Supply O & H4 187823.00B- 436 03.11.18 CSD-II M/S Balaji Corporation 1210/CPD-II/11.10.18 450/106 22.10.18 Supply O & M 375645.00B- 437 03.11.18 CSD-II M/S Balaji Corporation 1096/CPD-II/10.09.18 450/107 22.10.18 Supply O & M 466296.00B- 438 13.11.18 CAMD-II M/S Balram Engineers Contractrs 18/CAMD-II/25.11.17 468/49 01.11.18 Maintinance B/D 43690.00

B- 439 14.11.18 BMD-III M/S M.K. Traders 06/BMD-III/01.11.18 258/94 08.09.18 Break Down Maintinance 20100.00B- 440 14.11.18 BMD-III M/S M.K. Traders 16/BMD-III/28.03.18 258/94B 04.08.18 Erectin of new Haist 43786.00B- 441 14.11.18 BMD-III M/S Jha Construction 05/BMD-III/05.10.17 282/180 08.09.18 Instalin and operating 23976.00B- 442 14.11.18 BMD-III M/S Bharat Mechanical & Structural

Works09/BMD-III/15.01.18 282/181 08.09.18 Break Down Maintinance 85376.00

B- 443 14.11.18 BMD-III M/S Leak Seal Experrts (India) Pvt.Ltd 01/BMD-III/02.05.18 282/182 10.10.18 Service charge for maintinance 24960.00

B- 444 14.11.18 CPD-III M/S Electrocontrols India 499/CPD-III/22.09.18 411/133 07.11.18 Supply O & M 18105.00B- 445 14.11.18 CPD-III M/S Leading Edge Technocrat 372/CPD-III/02.08.18 497/39 13.11.18 Supply O & M 475650.00B- 446 14.11.18 CPD-III M/S FLUIDOMAT Ltd. 250/CPD-III/13.06.18 497/40 05.11.18 Supply O & M 3344641.00B- 447 14.11.18 C&ID-III M/S R.K. Traders 400/C&ID/10.10.18 492/14 06.11.18 Supply O & M 63944.00B- 448 14.11.18 BMD-III M/S Ideal Flow Control Pvt.Ltd. 08/BMD-III/12.01.18 436/64 15.10.18 Complete Reconditining 242380.00B- 449 14.11.18 BMD-III M/S Shraddha Engg.& Const Co. 07/ BMD-III/04.08.18 436/64 01.11.18 Removing of tech wastage 43317.00B- 450 14.11.18 BMD-III M/S Ideal Flow Control Pvt.Ltd. 100/BMD-III/04.03.16 436/65B 05.11.18 Security 163650.00B- 451 14.11.18 BMD-III M/S U.S. Enterprises 13/BMD-III/23.03.18 319/193 26.10.18 Security 298928.00B- 452 14.11.18 BMD-III M/S U.S. Enterprises 97/BMD-III/22.03.18 319/194 26.10.18 Security 17040.00B- 453 14.11.18 EMD-V M/S Priya Const. Co. 12/EMD-V/12.12.17 316/85A 01.11.18 Repeires Rewinding 216210.00

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 20

Page 47: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 454 14.11.18 CHD-III M/S S.R. Constrution 08/CHD-III/07.05.18 513/40 15.10.18 Prevetive & B/D 16218.00B- 455 14.11.18 CHD-III M/S Nosad Contractor II 05/CHD-III/16.03.18 513/41 01.11.18 Overhaling Of HT/LT 34547.00B- 456 14.11.18 CHD-III M/S M.R.P. Constructions 5 01/CHD-III/07.05.18 513/41B 01.11.18 Prevetive & B/D 58834.00B- 457 14.11.18 C&ID-II M/S Process Mainteance 07/C&ID-II/24.03.18 453/40B Security 22392.00B- 458 14.11.18 C&ID-II M/S D.K. & Sons Co. 01/C&ID-II/04.04.18 453/41 Security 8466.00B- 459 14.11.18 C&ID-II M/S Process Mainteance 06/C&ID-II/24.03.18 453/40 Security 26825.00B- 460 14.11.18 C&ID-II M/S Industrial Engineering

Enterprises04/C&ID-II/18.04.18 453/40 Security 28050.00

B- 461 16.11.18 EMD-IV M/S Priya Const. Co. 76/CWCD-IV/28.12.12 254/82 Security 36534.00B- 462 16.11.18 EMD-IV M/S Priya Const. Co. 191/CWCD-IV/29.11.13 254/82B Security 41945.00B- 463 16.11.18 EMD-IV M/S Priya Const. Co. 08/EMD-IV/10.12.14 254/83B Security 47247.00B- 464 16.11.18 EMD-IV M/S Vikas Electricals 17/EMD-IV/08.01.16 254/84 Security 49705.00B- 465 16.11.18 EMD-IV M/S Priya Const. Co. 16/EMD-IV/24.12.16 254/84B Security 48900.00B- 466 19.11.18 CPD-I M/S Maharam Industrial Equipment

(P)785/CPD-I/07.09.18 449/85 15.11.18 Supply O & M 110625.00

B- 467 19.11.18 CPD-II M/S Joy Marketing Co. Pvt.Ltd. 890/CPD-II/27.07.18 449/86 15.11.18 Supply O & M 606962.00B- 468 19.11.18 CPD-II M/S Vinay Trading Corporation 1840/CPD-II/22.11.16 449/87 15.11.18 Supply O H 3 1079612.00B- 469 19.11.18 CPD-I M/S R.L. Rasaysn Udyog 1135/CPD-I/17.11.17 535/27 24.09.18 Supply 57263.00B- 470 19.11.18 CPD-I M/S R.L. Rasaysn Udyog 1135/CPD-I/17.11.17 535/28 17.11.18 Supply 45100.00B- 471 19.11.18 CPD-II M/S Navnidhi Trade Line 1435/CPD-II/17.10.17 535/28 05.10.18 Supply 2946.00B- 472 19.11.18 CPD-I M/S Industrial Sale & Supply Agencies 1194/CPD-I/07.07.15 535/29 17.11.18 Supply 199789.00

B- 473 19.11.18 CSD-II M/S Shree Sander Industrial 676/CSD-II/13.06.18 535/30 17.11.18 Supply 205416.00B- 474 19.11.18 CSD-II M/S Shree Sander Industrial 676/CSD-II/13.06.18 535/30 15.11.18 Supply 216143.00B- 475 19.11.18 CPD-II M/S Sudha Chemical Co. 714/CPD-II/22.06.18 535/31 15.11.18 Supply 203364.00B- 476 19.11.18 CPD-II M/S Sudha Chemical Co. 714/CPD-II/22.06.18 535/36 15.11.18 Supply 243065.00B- 477 19.11.18 CPD-II M/S Sudha Chemical Co. 714/CPD-II/22.06.18 536/36 15.11.18 Supply 243065.00B- 478 19.11.18 TMD-II M/S Usha Enterprises 28/CWCD-III/TMD-II/28.07.14 522/19B 23.10.18 Security 129957.00

B- 479 19.11.18 TMD-II M/S Usha Enterprises 27/TMD-II/30.01.16 522/22 23.10.18 Security 88558.00B- 480 19.11.18 TMD-II M/S Hind Udyog II 01/TMD-II/20.04.18 522/20B 23.10.18 Repiring Febrication 84273.00B- 481 19.11.18 TMD-II M/S Balram Engineers Contractor 05/TMD-II/02.05.16 527/06 Security 132109.00

B- 482 19.11.18 BMD-III M/S U.S. Enterprises 14/BMD-III/02.01.17 477/73 Security 259721.00B- 483 19.11.18 TMD-II M/S S.K. Works II 04/TMD-II/19.07.18 538/03 10.09.18 Break Down Maintinance 133561.00B- 484 19.11.18 BMD-IV M/S O.S. Contractor 7&F 16/BMD-IV/31.03.16 356/71B 13.08.18 Insulation Work 32596.00B- 485 19.11.18 C&ID-III M/S M.S. Engineering Works 01/C&ID-III/24.04.15 461/154 06.11.18 Security 80640.00B- 486 20.11.18 AHD-II M/S Rajeev Kumar Contractor I&F 14/AHD-II/27.10.18 530/04 Providing and Lying of Cem 28936.00B- 487 20.11.18 AHD-II M/S Hind Udyog 6&F 14/AHD-II/30.11.17 459/68 Repeiring /Reelamation 59609.00B- 488 20.11.18 AHD-II M/S India Engineering Works 8&F 13/AHD-II/30.09.17 459/69B 15.11.18 Repeiring /Reelamation 39932.00B- 489 26.11.18 OGD-II M/S Tulsi Ram Enterprises II 08/OGD-II/18.09.17 423/155 Upgredating/Repaire 33406.00B- 490 27.11.18 CPD-II M/S J.K. Engineering Company 1190/CPD-II/08.10.18 466/109 14.11.18 Supply (OH&4) 21071.00B- 491 27.11.18 CPD-II M/S J.K. Engineering Company 1190/CPD-II/08.10.18 466/109 14.11.18 Supply (OH&4) 917514.00B- 492 27.11.18 CPD-II M/S Western Carriers (P) Ltd. 548/CPD-II/09.05.18 466/110 26.11.18 Freght 18188.00B- 493 27.11.18 CPD-II M/S Western Carriers (P) Ltd. 765/CPD-II/05.07.18 466/111 26.11.18 Freght (O&M) 19429.00B- 494 27.11.18 CPD-II M/S Western Carriers (P) Ltd. 772/CPD-II/06.07.18 466/111 13.11.18 Freght (O&M) 26784.00

TOTAL 2926566.00 12237445.00 1079612.00 2060160.00 0.00 0.00 0.00 0.00

B- 495 03.12.18 CPD-I M/S Industrial Sales & Supply Agencies

1100/CPD-I/25.10.18 485/142 29.11.18 Supply (OH&4) 423000.00

B- 496 03.12.18 CPD-I M/S Tayalco Automobiles 1065/T-02/11.10.18 485/143 26.11.18 Supply 148222.00B- 497 03.12.18 CPD-I M/S JainMill Stores Pvt.Ltd 345/CPD-I/12.09.18 485/143 29.11.18 Supply 117873.00B- 498 03.12.18 CPD-II M/S Flow Tech Industrial Com. 561/CPD-II/11.05.18 427/83 28.11.18 Freght (O&M) 306936.00B- 499 03.12.18 CSD-II M/S Flocon Hyodraulies (P) Ltd 456/CSD-III/30.08.18 499/20 28.11.18 Supply 554787.00B- 500 03.12.18 CSD-II M/S Instant Engineers 498/CPD-III/22.09.18 445/110 27.11.18 Supply 58445.00B- 501 03.12.18 CSD-II M/S AA Rseller Tredco 1172/CPD-I/02.11.18 445/111 27.11.18 Freght (O&M) 31012.00B- 502 03.12.18 CSD-II M/S Deepak Traders 1173/CPD-I/02.11.18 445/111 29.11.18 Freght (O&M) 28273.00B- 503 03.12.18 CHD-IV M/S Abhay Kumar Singh Ist&F 06/CHD-IV/20.09.18 505/12 16.10.18 Recasting of Denager 800263.00

B- 504 03.12.18 CAMD-II M/S Balram Engineers Contructor II 29/CAMD-II/28.02.17 416/114 26.11.18 FRP Coating In HCL 190800.00B- 505 03.12.18 CAMD-II M/S Jahangir Enterprises 10/CAMD-II/22.08.17 389/34B Security 27871.00B- 506 05.12.18 C&ID-III M/S S.R. Construction 8 03/C&ID-III/03.05.18 525/19 15.11.18 Servicing Repairing 19310.00B- 507 05.12.18 C&ID-III M/S Kapatiya Instrument Elector 02/C&ID-III/14.06.16 526/19B Security 29683.00B- 508 05.12.18 C&ID-III M/S Kapatiya Instrument Elector 03/C&ID-III/06.07.17 526/20 Security 29620.00B- 509 15.12.18 CAMD-II M/S P.K. Enterprises 14/CAMD-II/30.10.17 312/96 05.12.18 Maintinance B/D 73089.00

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 21

Page 48: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 510 15.12.18 CAMD-II M/S Shiv Mahadev Engg.Works Ist&F 11/CAMD-II/25.10.18 312/96B 05.12.18 Complete Cleanig 285901.00

B- 511 15.12.18 CHD-IV M/S Abhay Kumar Singh 04/CHD-IV/15.06.17 505/13B 13.12.18 Security 51696.00B- 512 15.12.18 CHD-IV M/S Elecor Hydraulics Pvt.Ltd 01/CHD-IV/17.04.18 507/09 10.12.18 Security 25095.00

TOTAL 3201876.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

61720412.00 150536896.00 21683280.00 5832968.00 0.00 0.00 0.00 0.00Grand Total

Dy. Chief Accounts Officer

G:\Pending 210MW\2018-19\12-18\Liab_15.12.18_210MW 22

Page 49: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Reg Index

Bill No DateName Of Division

RAB Agr/PO/LOI/WO and Dt MB NO./ Page No

Description of Work/Supply Work Supply Part Paid Amount

Fund Reserved Amount

B- 253 20/08/2015 CSD-II M/s Kay Mohan Corporation 1126/CPD-I/25.06.15 134L 19.08.15 Supply 16758B- 290 31/08/2015 CSD-II M/s Sumal Engineering P. Ltd. 1194/CPD-II/12.06.15 69L 31.08.15 Supply 1221051

Total

B- 303 04/09/2015 CSD-II M/s Jalvid Udyog 988/CPD-I/06.06.15 126L 03.09.15 Supply 16329B- 332 21/09/2015 CSD-II M/s Jain Mill Stores P. Ltd 1055/CSD-II/18.06.15 126L 19.09.15 Supply 150185

Total

B- 443 20/10/2015 CSD-II M/s Saurabh Udyog 538/CSD-II/24.07.15 154L 20.10.15 Supply 33879B- 453 20/10/2015 CSD-II M/s Jain Mill Stores P. Ltd 1193/CSD-II/07.07.15 75L 20.10.15 Supply 102196

Total

B- 493 05/11/2015 CSD-II M/s Shyam Furniture 2001/CSD-II/07.10.15 74L 05.11.15 Supply 35627TOTAL

B- 559 05-12-2015 CSD-II M/s Indian Rubber Products 1124/CSD-II/25.06.15 75L 05.12.15 Supply 87653B- 566 14/12/2015 CSD-II M/s Eureka Industrial Equipment P.Lt 1348/CSD-II/29.07.15 89L 14.12.15 Supply 48583

Total

B- 698 30/01/2016 CSD-II M/s Jain Mill Stores P. Ltd 1873/CSD-II/18.11.15 75L 29.01.16 Supply 308619B- 699 30/01/2016 CSD-II M/s Jain Mill Stores P. Ltd 1873/CSD-II/18.11.15 75L 29.01.16 Supply 85754

Total

B- 705 03-02-2016 CSD-II M/s Flowserve Sanmar Ltd 59/CSD-II/09.01.15 61L 21.01.16 Excise Duty Diff 3057B- 735 06-02-2016 CSD-II M/s Shree Shyam Bearing P. Ltd 1986/CSD-II/18.12.15 134L 06.02.16 Supply 37375B- 737 06-02-2016 CSD-II M/s Trade India Corporation 1989/CSD-II/18.12.15 134L 06.02.16 Supply 30273B- 757 18/02/2016 CSD-II M/s Ashbond Engineers P. Ltd 1810/CSD-II/30.10.15 215L 17.02.16 Supply 942091

Total

B- 65 04-05-2016 CSD-II M/s Emerson Network Power (I) P Ltd 1504/CSD-II/25.08.15 215L 03.05.16 Supply 278082B- 66 04-05-2016 CSD-II M/s Placka Instruments India P. Ltd 142/CSD-II/27.01.16 215L 03.05.16 Supply 23138B- 67 04-05-2016 CSD-II M/s Authentic Sys. & Tech 1772/CSD-II/20.10.15 215L 03.05.16 Supply 27872B- 104 13/05/2016 CSD-II M/s Dynamic Power Services 12/CSD-II/04.04.16 212L 11.05.16 Supply 1800000 518802B- 105 13/05/2016 CSD-II M/s Dynamic Power Services 15/CSD-II/04.04.16 212L 11.05.16 Supply 3093461B- 108 13/05/2016 CSD-II M/s Amco Industries 13/CSD-II/04.04.16 212L 11.05.16 Supply 411746B- 109 13/05/2016 CSD-II M/s Amco Industries 16/CSD-II/04.04.16 212L 11.05.16 Supply 3067542B- 112 13/05/2016 CSD-II M/s Omega Industries P. Ltd 17/CSD-II/04.04.16 212L 11.05.16 Supply 22226B- 114 16/05/2016 CSD-II M/s Paharpur Cooling Tower Ltd 2588/CSD-II/06.02.16 203L 13.05.16 Supply 1736843B- 115 16/05/2016 CSD-II M/s Anurag Engineering Works 532/CSD-II/04.04.16 427L 13.05.16 Supply 183750B- 116 16/05/2016 CSD-II M/s Kay Mohan Corporation 533/CSD-II/04.04.16 427L 13.05.16 Supply 120504B- 117 16/05/2016 CSD-II M/s Kay Mohan Corporation 533/CSD-II/04.04.16 427L 13.05.16 Supply 44591B- 118 16/05/2016 CSD-II M/s Harsh & Brothers 534/CSD-II/04.04.16 427L 13.05.16 Supply 16193B- 119 16/05/2016 CSD-II M/s Harsh & Brothers 534/CSD-II/04.04.16 427L 13.05.16 Supply 403155 37740B- 121 19/05/2016 CSD-II M/s Limitorque India Ltd 1773/CSD-II/20.10.15 215L 17.05.16 Supply 243978B- 122 19/05/2016 CSD-II M/s Limitorque India Ltd 835/CSD-II/08.08.14 215L 17.05.16 Supply 444059B- 126 19/05/2016 CSD-II M/s Commercial Engineering Mart 2906/CSD-II/11.03.16 194L 17.05.16 Supply 21856B- 127 19/05/2016 CSD-II M/s Power Engineers 25/CSD-II/06.04.16 194L 17.05.16 Supply 2379708B- 146 26/05/2016 CSD-II M/s Jalvid Udyog 58/CSD-II/11.01.16 74L 23.05.16 Supply 575B- 147 26/05/2016 CSD-II M/s Veerangna Enterprises 2763/CSD-II/24.02.15 74L 23.05.16 Supply 247491B- 151 30/05/2016 CSD-II M/s Pee Kay Tribols 527/CSD-II/04.04.16 127L 28.05.16 Supply 301109

2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi)"B"

Name of Firm

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 50: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Total 0 14538787 556542

B- 157 06-06-2016 CSD-II M/s Rama Industries 104/CPD-II/18.04.16 213L 03.06.16 Supply 826917B- 160 06-06-2016 CSD-II M/s V.R. Powergen Equipment 89/CPD-II/16.04.16 190L 03.06.16 Supply 80325B- 174 15/06/2016 CSD-II M/s Trade India Corp 776/CSD-II/07.05.16 185L 13.06.16 Supply 1009035 1681725B- 181 15/06/2016 CSD-II M/s Digita Promoters (I) P. Ltd 1959/CSD-II/11.12.15 215L 13.06.16 Supply 5647B- 182 15/06/2016 CSD-II M/s Instant Engineers 423/CSD-II/07.05.16 215L 13.06.16 Supply 281809 1000000B- 183 15/06/2016 CSD-II M/s Adarsh Tubes & Machinery Cor 851/CSD-II/13.05.16 215L 13.06.16 Supply 1456146B- 188 18/06/2016 CSD-II M/s Hydromech Engineers 2920/CSD-II/15.03.16 213L 16.06.16 Supply 16865B- 197 20/06/2016 CSD-II M/s Genuine Filters 95/CSD-II/16.04.16 173L 18.06.16 Supply 278166B- 199 20/06/2016 CSD-II M/s Govardhan Controls 194/CSD-II/28.04.16 173L 18.06.16 Supply 889361B- 201 20/06/2016 CSD-II M/s AIA Engineering Ltd. 366/CSD-II/13.05.16 173L 18.06.16 Supply 3406698B- 203 20/06/2016 CSD-II M/s Akshat Enterprises 844/CSD-II/13.05.16 232L 18.06.16 Supply 103410B- 206 20/06/2016 CSD-II M/s Vinay Trading Corporation 484/CSD-II/28.03.16 232L 18.06.16 Supply 43819B- 207 20/06/2016 CSD-II M/s Vinko Auto Industries 105/CSD-II/18.04.16 232L 18.06.16 Supply 141915B- 208 20/06/2016 CSD-II M/s J.K. Engineering Co 819/CSD-II/10.05.16 232L 18.06.16 Supply 151972B- 216 30/06/2016 CSD-II M/s Select-n-Drive 2006/CSD-II/08.10.15 190L 27.06.16 Supply 171298

Total 0 8863383 2681725

B- 244 14/07/2016 CSD-II M/s Kay Mohan Corporation 853/CSD-II/13.05.16 239L 13.07.16 Supply 73080B- 245 14/07/2016 CSD-II M/s Kay Mohan Corporation 853/CSD-II/13.05.16 239L 13.07.16 Supply 44467B- 246 14/07/2016 CSD-II M/s Anurag Engineering Works 854/CSD-II/13.05.16 239L 13.07.16 Supply 618456B- 247 14/07/2016 CSD-II M/s Anurag Engineering Works 854/CSD-II/13.05.16 239L 13.07.16 Supply 158357B- 264 18/07/2016 CSD-II M/s Siddhi Vinayak Engg 1016/CSD-II/01.06.16 215L 15.07.16 Supply 227561B- 269 18/07/2016 CSD-II M/s Multi Tech Engineers 27/CSD-II/06.04.16 212L 15.07.16 Supply 2140718B- 278 25/07/2016 CSD-II M/s Sumal Engineering P. Ltd 91/CSD-II/16.04.16 173L 22.07.16 Supply 770148B- 280 25/07/2016 CSD-II M/s Quick Well Engineering Ass 726/CSD-II/03.05.16 233L 22.07.16 Supply 351083B- 285 25/07/2016 CSD-II M/s K. S. & Brothers 1267/CSD-II/20.06.16 233L 22.07.16 Supply 555138B- 287 25/07/2016 CSD-II M/s Placka Instruments India P. Ltd 312/CSD-II/25.02.16 233L 22.07.16 Supply 12600B- 303 30/07/2016 CSD-II M/s Emience Engineering Services PLt 593/CSD-II/13.06.16 194L 27.07.16 Supply 492987B- 306 30/07/2016 CSD-II M/s Kay Mohan Corporation 666/CSD-II/22.06.16 194L 27.07.16 Supply 3980B- 307 30/07/2016 CSD-II M/s Globus Engineers 516/CSD-II/01.06.16 194L 27.07.16 Supply 319364B- 308 30/07/2016 CSD-II M/s Vijay Engineering 702/CSD-II/30.06.16 194L 27.07.16 Supply 310123 410627B- 309 30/07/2016 CSD-II M/s Om Sri Sai Ram Global Impex 703/CSD-II/30.06.16 194L 27.07.16 Supply 968923 1213031B- 295 25-07-2016 M/s Alstom I&D Limited 70L 181606

Total 181606 7046985 1623658

B- 320 05-08-2016 CSD-II M/s Adarsh Tubes & Machinary Corp 486/CPD-III/CSD-II/18.5.16 215L 03.08.16 Supply 828779B- 322 05-08-2016 CSD-II M/s Mohan Lal 255/CPD-II/CSD-II/4.5.16 215L 03.08.16 Supply 69972B- 323 05-08-2016 CSD-II M/s Krishna Engg Company 1164/CPD-I/CSD-II/13.6.16 215L 03.08.16 Supply 947928B- 339 09-08-2016 CSD-II M/s Amazone Control Technology P. 266/CSD-II/05.05.16 212L 08.08.16 Supply 2509974

B- 342 09-08-2016 CSD-II M/s J. Umashanker & Co. P. Ltd 1508/CSD-II/13.07.16 240L 08.08.16 Supply 6457

B- 371 19-08-2016 CSD-II M/s Globus Engineers 517/CPD-II/01.06.16 190L 17.08.16 Supply 943226

B- 377 19-08-2016 CSD-II M/s Atlas Copco Compressor Tech. 1433/CPD-II/30.06.16 213L 17.08.16 Supply 161723 216766

B- 401 31-08-2016 EPED-I M/s D. K. & Sons Co 09/EPED-I/27.12.14 220L 10.07.16 Security 18784Total 18784 5468059 216766

B- 411 02-09-2016 CSD-II M/s Trade India Corporation 362/CPD-I/03.03.16 185L 31.08.16 Supply 154364 57301

B- 416 02-09-2016 CSD-II M/s S.S. Jaiswal & Brothers 1429/CPD-I/30.06.16 233L 31.08.16 Supply 861645

B- 418 02-09-2016 CSD-II M/s S.S. Jaiswal & Brothers 1497/CPD-I/13.07.16 233L 31.08.16 Supply 1273294

B- 421 02-09-2016 CSD-II M/s Aarseller Tradco 965/CPD-II/28.07.16 233L 31.08.16 Supply 396385

B- 422 02-09-2016 CSD-II M/s Aarseller Tradco 965/CPD-II/28.07.16 233L 31.08.16 Supply 558158

B- 424 02-09-2016 CSD-II M/s J.K Engineering Co. 1072/CPD-I/06.06.16 232L 02.09.16 Supply 618224

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 51: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 425 02-09-2016 CSD-II M/s Jain Mill Stores P. Ltd 820/CPD-I/10.05.16 232L 02.09.16 Supply 116668

B- 426 02-09-2016 CSD-II M/s Jain Mill Stores P. Ltd 1073/CPD-I/06.06.16 232L 02.09.16 Supply 400263

B- 427 02-09-2016 CSD-II M/s Jain Mill Stores P. Ltd 1073/CPD-I/06.06.16 232L 02.09.16 Supply 363243

B- 429 02-09-2016 CSD-II M/s Industrial Sales & Supply Agency 1074/CPD-I/06.06.16 232L 02.09.16 Supply 766869

B- 430 02-09-2016 CSD-II M/s Jalvid Udyog 1510/CPD-I/13.07.16 232L 02.09.16 Supply 26752

B- 433 02-09-2016 CSD-II M/s Uttam Sales Corporation 1069/CPD-II/09.08.16 232L 02.09.16 Supply 2828262

B- 437 02-09-2016 CSD-II M/s United Engineering Works 664/CPD-II/22.06.16 194L 02.09.16 Supply 67876

B- 438 02-09-2016 CSD-II M/s Jalvid Udyog 1058/CPD-II/09.8.16 194L 02.09.16 Supply 40968

B- 456 09-09-2016 CSD-II M/s Kay Mohan Corp 933/CPD-II/25.07.16 360L 06.09.16 Supply 77941

B- 458 09-09-2016 CSD-II M/s Jay Pee Machining Indus 1888/CPD-I/24.08.16 360L 08.09.16 Supply 81865 697369

B- 466 21/09/2016 CSD-II M/s Shree Shyam Bearing P. Ltd 361/CSD-II/03.03.16 239L 07.09.16 Supply 133728

B- 467 21/09/2016 CSD-II M/s Shree Shyam Bearing P. Ltd 1505/CSD-II/13.07.16 239L 19.09.16 Supply 10124

B- 468 21/09/2016 CSD-II M/s Shree Shyam Bearing P. Ltd 1105/CSD-II/08.06.16 239L 19.09.16 Supply 44550

B- 469 21/09/2016 CSD-II M/s Shree Shyam Bearing P. Ltd 1105/CSD-II/08.06.16 239L 19.09.16 Supply 60017

B- 473 21/09/2016 CSD-II M/s Shree Shyam Bearing P. Ltd 1105/CSD-II/08.06.16 239L 19.09.16 Supply 54789

B- 479 24/09/2016 CSD-II M/s Aarseller Tradco 748/CSD-II/02.08.16 233L 19.09.16 Supply 675304

B- 481 24/09/2016 CSD-II M/s S.K. Engipro & Allied Solution P 1743/CSD-II/03.08.16 233L 19.09.16 Supply 341330

B- 492 28/09/2016 CSD-II M/s Amco Industries 1887/CSD-II/24.08.16 61L 27.09.16 Supply 67599

B- 494 28/09/2016 CSD-II M/s Amazone Control Tech P. Ltd 999/CSD-II/02.08.16 61L 27.09.16 Supply 978451

B- 495 28/09/2016 CSD-II M/s MAK Construction Co 198/CSD-II/30.12.13 61L 27.09.16 Security 38340Total 38340 10998669 754670

B- 497 04-10-2016 CSD-II M/s Jalvid Udyog 1834/CPD-I/17.08.16 126L 03.10.16 Supply 41628 71855

B- 498 04-10-2016 CSD-II M/s Jalvid Udyog 1834/CPD-I/17.08.16 126L 03.10.16 Supply 7214

B- 499 04-10-2016 CSD-II M/s Technow Engineering Work 1835/CPD-I/17.8.16 126L 03.10.16 Supply 20839

B- 501 04-10-2016 CSD-II M/s Technow Engineering Work 1835/CPD-I/17.8.16 126L 03.10.16 Supply 27332

B- 502 04-10-2016 CSD-II M/s Technow Engineering Work 1835/CPD-I/17.8.16 126L 03.10.16 Supply 17445

B- 554 26/10/2016 CSD-II M/s Jai Balaji Control Gears P. Ltd 905/CPD-I/18.05.16 233L 25.10.16 Supply 74358

B- 555 26/10/2016 CSD-II M/s Net Cascade Automation Pvt. Ltd 1928/CPD-I/29.08.16 233L 25.10.16 Supply 91922

B- 556 26/10/2016 CSD-II M/s S.K. Engipro & Allied Solution 2046/CPD-I/14.09.16 233L 25.10.16 Supply 257449

B- 557 26/10/2016 CSD-II M/s Aarseller Tredco 865/CPD-III/06.09.16 233L 25.10.16 Supply 50444

B- 558 26/10/2016 CSD-II M/s Aditya Enterprises 2041/CPD-I/14.09.16 233L 25.10.16 Supply 529554

B- 559 28/10/2016 CSD-II M/s Atlas Copco Compressure Solu 1445/CPD-II/29.09.16 197L 27.10.16 Supply 344083 269209

B- 560 28/10/2016 CSD-II M/s Jay Pee Machining Industries 1926/CPD-I/29.08.16 61L 27.10.16 Supply 68040

B- 563 28/10/2016 CSD-II M/s Amco Industries 1925/CPD-I/29.08.16 61L 27.10.16 Supply 8838

B- 564 28/10/2016 CSD-II M/s A.V. Valves Ltd. 724/CPD-II/02.07.16 61L 27.10.16 Supply 206798Total 0 1745944 341064

B- 591 15/11/2016 CSD-II M/s Control Component India P Ltd 2017/CPD-I/12.09.16 215L 11.11.16 Supply 1877391

B- 592 15/11/2016 CSD-II M/s Keltron Controls 2043/CPD-I/14.07.16 215L 11.11.16 Supply 31554

B- 615 30/11/2016 CSD-II M/s J.K. Engineering Co 1838/CSD-II/17.08.16 246L 29.11.16 Supply 429411 513823

B- 618 30/11/2016 CSD-II M/s Jain Mill Stores P. Ltd 1839/CSD-II/17.08.16 246L 29.11.16 Supply 326430

B- 619 30/11/2016 CSD-II M/s Jalvid Udyog 2090/CSD-II/22.09.16 246L 29.11.16 Supply 33571

B- 620 30/11/2016 CSD-II M/s Jalvid Udyog 2090/CSD-II/22.09.16 246L 29.11.16 Supply 99095 240417

B- 621 30/11/2016 CSD-II M/s Technow Engg Works 2091/CSD-II/22.09.16 246L 29.11.16 Supply 36166

B- 625 30/11/2016 CSD-II M/s Technow Engg Works 2091/CSD-II/22.09.16 246L 29.11.16 Supply 28341Total 0 953014 754240

B- 626 02-12-2016 CSD-II M/s Jaisia Industries P. Ltd. 1528/CPD-II/14.10.16 173L 01.12.16 Supply 338460 143154

B- 629 02-12-2016 EPED-IV M/s G.E. T&D India Ltd 482/EPED-IV/24.11.16 30L 01.12.16 Resetting & Testing 150000

B- 637 15/12/2016 CSD-II M/s U.P. Udyog 1079/CPD-II/11.08.16 250L 14.12.16 Supply 84573 263091

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 52: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 638 15/12/2016 CSD-II M/s U.P. Udyog 1080/CPD-II/11.08.16 250L 14.12.16 Supply 455619 615346

B- 644 15/12/2016 CSD-II M/s Aditya Enterprises 921/CPD-III/22.09.16 233L 08.12.16 Supply 571934

B- 646 15/12/2016 CSD-II M/s K.S & Brothers 895/CPD-III/14.09.16 233L 08.12.16 Supply 344509

B- 660 22/12/2016 CPD-II M/s V.R. Powergen Equipments 1393/CPD-II/23.09.16 190L 21.12.16 Supply 200395

B- 661 22/12/2016 CPD-II M/s krishna Kumar Distributors P. Ltd. 950/CPD-II/26.09.16 234L 21.12.16 Supply 265718

B- 662 22/12/2016 CPD-III M/s krishna Kumar Distributors P. Ltd. 951/CPD-III/26.09.16 234L 21.12.16 Supply 180424

B- 672 26/12/2016 CSD-II M/s Trade India Corporation 2191/CPD-I/14.10.16 249L 26.12.16 Supply 17962 507464

B- 678 27/12/2016 MPED-VI M/s Hind Scientific Industries VI 18/EE/MPED-VI/02.11.16 245L 21.12.16 Digital Controller & SSR 63175

B- 680 30/12/2016 CSD-II M/s SMAP Engineers (P) Ltd 1581/CPD-II/20.10.16 194L 29.12.16 Supply 186963 986781

B- 682 30/12/2016 CSD-II M/s Vijay Engineers (P) Ltd. 1799/CPD-II/18.11.16 194L 29.12.16 Supply 2082963

B- 685 30/12/2016 CSD-II M/s Amalgmated Industrial Com.P.Ltd 1201/CPD-II/30.08.16 250L 29.12.16 Supply 2827476

B- 686 30/12/2016 CSD-II M/s Authentic Sys. & Technology 2384/CPD-I/23.11.16 250L 29.12.16 Supply 409252Total 213175 7966248 2515836

B- 706 04/01/2017 CSD-III M/s Saurabh Udyog 896/CPD-III/30.05.14 234L 03.01.17 Supply 102993 65048

B- 707 04/01/2017 CSD-III M/s Saurabh Udyog 896/CPD-III/30.05.14 234L 03.01.17 Supply 5003 36860

B- 708 04/01/2017 CSD-I M/s Goodwill Gavernor Services 1268/CPD-I/20.06.16 234L 03.01.17 Supply 55404

B- 713 04/01/2017 CSD-I M/s RNS Automation 2138/CPD-I/30.09.16 234L 03.01.17 Supply 1159414

B- 722 07/01/2017MPED-I M/s

Kiran Constractor IIIrd RAB 04/MPED-I/06.04.16 117L 01.12.16 Preventive Maintance 35673

B- 723 10/01/2017 CSD-II M/s Lord Vishwakarma Heat Exchange P. Ltd

1662/CPD-II/28.10.16 173L 06.01.17 Supply 1861178

B- 728 10/01/2017 CSD-II M/s Atlas Copco Compressure Solu 1458/CPD/29.09.16 61L 10.01.17 Supply 599196

B- 734 13/01/2017 ECM M/s Sadan Engineering Works II & F 144/ECM&EMD/03.06.16 362L 05.01.17 Cleaning of Drain 84183

B- 735 13/01/2017 CPD-III M/s Elecon Engineering Co. Ltd 1116/CPD-III/02.12.16 360L 13.01.17 Supply 1706440

B- 736 13/01/2017 CPD-I M/s Hindustan Petroleum Corporation Ltd

2240/CPD-I/22.10.16 126L 13.01.17 Supply 254356 1797106

B- 738 13/01/2017 CSD-I M/s Instant Engineers 2464/CPD-I/13.12.16 233L 13.01.17 Supply 172973

B- 739 13/01/2017 CSD-I M/s Krishna Engg. Com. 2466/CPD-I/13.12.16 233L 13.01.17 Supply 508820

B- 743 21.01.2017 EPED-IV M/s MRP Construction 128/CWCD-IV/24.06.13 70L/72 28.11.15 B/D Maintenance 9074

B- 746 27.01.2017 CSD-I M/s Shree Shyam Bearings Pvt. Ltd. 2190/CPED-I/14.10.16 249L/03 27.01.17 Supply 121256

B- 750 27.01.2017 CSD-I M/s Simplex Switchgear Pvt. Ltd. 1031/CPED-III/22.10.16 233L/46 27.01.17 Supply 7722

B- 751 27.01.2017 CSD-I M/s Krishan Kumar Distributors P. Ltd. 484/CPED-III/18.05.16 233L/47 27.01.17 Supply 25718

B- 752 28.01.2017 MPED-I M/s O.S.Contractor V 07/MPED-I/08.08.16 159L/46 01.01.17 Maintenance work 25993

B- 753 28.01.2017 MPED-I M/s Kiran Construction Company IX 04/MPED-I/31.12.16 169L/126 01.01.17 Preventive maintenance 36862

B- 758 28.01.2017 ECCU-V M/s Sadan Engineering Works V & Final

17/ECCU/14.03.16 64L/61A 31.12.16 4727

B- 759 28.01.2017 ECCU-V M/s Sadan Engineering Works V & Final

18/ECCU/14.03.16 64L/62 31.12.16 125449

B- 761 28.01.2017 ECCU-V M/s Sadan Engineering Works 22/ECCU/23.01.17 64L/63B 31.12.16 Ash dump yard 125701Total 447662 6580473 1899014

B- 783 13/02/2017ECCU M/s Sadan Engineering Works Ist &

Final25/ECCU/24.01.17 369L 06.02.17 carritage of material 298751

B- 784 13/02/2017ECCU M/s Sadan Engineering Works Ist &

Final24/ECCU/23.01.17 368L 06.02.17 carritage of material 294303

B- 785 13/02/2017 EPED-I M/s D.K. & Sons Co. Ist 10/EPED-I/10.08.16 235L 11.12.16 Overhuling B/d 7625

B- 789 13/02/2017 CSD-II M/s Aarseller Tredco 130/CPD-II/21.01.17 233L 10.02.17 Supply 711978

B- 790 13/02/2017 CSD-II M/s Atlas Copco Compressor Sales 1457/CPD-II/29.09.16 61L 09.02.17 Supply 607799

B- 791 13/02/2017 CSD-II M/s Atlas Copco Compressor Sales 1459/CPD-II/29.09.16 61L 09.02.17 Supply 663985

B- 794 16/02/2017 ECM&EMD M/s Ravindra Singh & Co. Ist R/A 22/ECM&EMD/31.01.17 112L 10.02.17 Develoment of Parkin frant of servise house

25908 50000

B- 796 17/02/2017 CSD-II M/s Uttam Sales Corporation 1137/CPD-III/21.12.16 234L 16.02.17 Supply 30528

B- 797 17/02/2017 MPED-IV M/s MAK Construction Co. Vth 06/MPED-IV/25.07.16 82L 03.12.16 febrication of Support 61668

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 53: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 798 17/02/2017 MPED-IV M/s MAK Construction Co. III 06/MPED-IV/25.07.16 196L 30.09.16 febrication of Support 18032

B- 799 17/02/2017 MPED-IV M/s MAK Construction Co. IV 06/MPED-IV/25.07.16 196L 24.10.16 febrication of Support 77625

B- 800 17/02/2017 MPED-IV M/s MAK Construction Co. VI 06/MPED-IV/25.07.16 102L 31.12.16 febrication of Support 43636

B- 801 17/02/2017 MPED-IV M/s MAK Construction Co. VII 06/MPED-IV/25.07.16 102L 21.01.17 febrication of Support 171479

B- 804 17/02/2017 EPED-I M/s D.K. & Sons Co. II 10/EPED-I/10.08.16 220L 03.01.17 Overhuling Rewinding 3796

B- 805 17/02/2017 EPED-I M/s D.K. & Sons Co. III 10/EPED-I/10.08.16 220L 08.10.16 Overhuling Rewinding 26936

B- 806 21/02/2017 MPED-II M/s Thermal India Engineers 06/MPED-II/07.08.15 55L Security 144739

B- 808 21/02/2017 MPED-II M/s Thermal India Engineers 20/MPED-II/01.03.16 206L Security 29514

B- 809 21/02/2017 MPED-II M/s Thermal India Engineers 14/MPED-II/19.12.14 206L Security 65892

B- 811 21/02/2017 MPED-II M/s Thermal India Engineers 23/MPED-II/03.03.15 206L Security 71475

B- 812 21/02/2017 MPED-II M/s Thermal India Engineers 08/MPED-II/23.06.16 206L B/d Maint 100780

B- 813 21/02/2017 MPED-II M/s Thermal India Engineers 9th 07/MPED-II/23.06.16 229L B/d Maint 73696

B- 814 22/02/2017 CSD-II M/s Hind Udyog Vth 1988/CPD-II/15.12.16 249L 22.02.17 Fabrication and supply 452231

B- 815 27/02/2017 MPED-VI M/s Balram Engineers Contractor & Supp.

XII 24/EE/MPED-III/27.01.16 253L 28.11.16 B/d Maint 97020

Total 2065106 2014290 50000

B- 818 02-03-2017 CSD-II M/s AIA Engineering Ltd. 740/CPD-II/02.07.16 194L, 96 02.03.17 Supply 4409257 4812512

B- 819 02-03-2017 MPED-IV M/s India Engg. Works 14th 21/MPED-IV/09.03.16 111L, 74 03.01.17 Repairing & Maintenance 45822

B- 820 02-03-2017 MPED-IV M/s India Engg. Works 16th 21/MPED-IV/09.03.16 111L, 75 17.01.17 Repairing & Maintenance 49817

B- 822 03-03-2017 MPED-IV M/s India Engg. Works 1st 22/MPED-IV/24.09.16 195L, 35 12.01.16 Repairing of Ash Intake 14291

B- 823 03-03-2017 MPED-IV M/s India Engg. Works 1st 07/MPED-IV/25.07.16 195L, 36 13.02.17 Fabrication & Erection 22358

B- 824 03-03-2017 MPED-IV M/s India Engg. Works II 22/MPED-IV/12.01.17 195L, 37 21.12.16 Repairing of Ash Intake 5770

B- 825 03-03-2017 MPED-IV M/s India Engg. Works 13 21/MPED-IV/09.03.16 195L, 38 28.12.16 Repairing and Maintenenca 53988

B- 826 03-03-2017 MPED-IV M/s India Engg. Works II 07/MPED-IV/25.07.16 195L, 41 14.02.17 Fabrication & Erection 263649

B- 827 03-03-2017 MPED-IV M/s India Engg. Works 15 21/MPED-IV/09.03.16 103L, 101 10.01.17 Replacement/Refitting of gesket 41952

B- 828 03-03-2017 MPED-IV M/s India Engg. Works 17 21/MPED-IV/19.01.17 103L, 103 24.01.17 Replacement/Refitting of gesket 31581

B- 829 03-03-2017 MPED-IV M/s India Engg. Works 18 21/MPED-IV/09.03.16 103L, 104 31.01.17 Repairing & Maintenance 41906

B- 830 03-03-2017 MPED-IV M/s India Engg. Works III 07/MPED-IV/25.07.16 103L, 105 05.02.16 Fabrication & Erection 147759

B- 833 06-03-2017 MPED-V M/s MAK Construction co. X & Final

65/CWCD-II/MPED-V/22.08.14 107L, 90 15.06.16 Operation of bowl mill 184956

B- 834 06-03-2017 MPED-V M/s Hind Udyog I 08/MPED-V/17.06.16 107L, 90B 01.01.17 Rectification/Repairing, Febrication & Machining

918245

B- 835 06-03-2017 MPED-IV M/s India Engg. Works IV & last 07/MPED-IV/25.07.16 82L, 60 03.03.17 Fabrication & Erection of platforms 76821

B- 836 06-03-2017 MPED-IV M/s Hind Udyog I 019/MPED-IV/12.01.17 81L, 79 20.02.17 fabrication & Supply 298387

B- 837 07-03-2017 CSD-II M/s Globe Enterprises 37/CPD-I/10.01.17 232L, 12A 07.03.17 Supply 172901

B- 838 07-03-2017 CSD-II M/s Jalvid Udyog 157/CPD-1/30.01.17 232L, 12B 07.03.17 Supply 10626

B- 839 07-03-2017 CSD-II M/s Jalvid Udyog 31/CPD-I/09.01.17 232L, 13A 07.03.17 Supply 30228

B- 843 08-03-2017 MPED-III M/s Usha Enterprises VII 11/EE/MPED-III/10.09.15 165L, 158 11.01.17 B/D maintenance 24585

B- 845 08-03-2017 ECCU-V M/s Sadan Engineering Works I 26/ECCU/27.01.17 64L, 65A 01.03.17 Earthwork in Ash 67602

B- 846 08-03-2017 ECCU-V M/s Sadan Engineering Works II 22/ECCU/23.01.17 64L, 66 01.03.17 Carriage of Material 19847

B- 848 09-03-2017 MPED-I M/s Bharat Machanical Structural Work VII 06/MPED-I/02.05.16 117L, 80A 13.01.17 B/D maintenance 58899 50502

B- 852 09-03-2017 CSD-II M/s Kakati Karshak Industries P.L. 155/CPD-II/27.04.16 203L, 55B 09.03.17 Vacuum pump 3423

B- 854 09-03-2017 MPED-I M/s Kiran Construction Com. X & Final

04/MPED-I 210L, 61 01.02.17 Maintenance 46389

B- 857 09-03-2017 MPED-VI M/s S.R. Construction I & II 28/EE/MPED-VI/05.01.17 163L, 92 24.02.17 AMC 63373 39442

B- 861 15-03-2017 MPED-II M/s Thermal India Engg. 08/MPED-II/12.11.14 51L,75 Security 2750

B- 862 15-03-2017 MPED-II M/s Bharti Enterprises 11/MPED-II/23.11.15 51L, 75 Security 77540

B- 863 15-03-2017 MPED-II M/s Thermal India Engg. 06/CWCD-II/MPED-II/16.06.14 51L, 76 Security 12522

B- 864 15-03-2017 MPED-II M/s Thermal India Engg. 06/MPED-II/04.09.14 51L, 76 Security 79075

B- 867 15-03-2017 MPED-II M/s Usha Enterprises 05/MPED-II/04.09.14 206L, 51 Security 80121

B- 868 15-03-2017 MPED-II M/s Usha Enterprises 09/MPED-II/24.08.15 206L, 52 Security 83147

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 54: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 869 15-03-2017 MPED-II M/s Thermal India Engg. I 06/MPED-II/23.06.16 206L, 55 19.02.17 Fabrication of Working Platform 171464

B- 875 24-03-2017 CSD-II M/s Uttam Sales Corporation 146/CPD-I/30.01.17 233L 23.03.17 Supply 7047

B- 876 24-03-2017 CSD-II M/s Aditya Enterprises 48/CPD-II/28.01.17 233L 23.03.17 Supply 630288

B- 878 24-03-2017 CSD-II M/s Keltron Controls 2425/CPD-I/28.11.16 233L 23.03.17 Supply 368522

B- 879 24-03-2017 MPED-I M/s Sunrise Engineers & Contractor II 19/MPED-I/30.11.16 247L 13.01.17 B/d Maint 24870

B- 880 24-03-2017 MPED-I M/s O.S. Contractor VI 07/MPED-I/08.08.16 159L 01.02.17 Maintenance 24686

B- 881 24-03-2017 MPED-III M/s SGL Engg Industries 12/EE/MPED-III/09.11.12 226L 06.03.17 Security 4200

B- 882 24-03-2017 MPED-III M/s SGL Engg Industries 13/EE/MPED-III/19.11.12 226L 06.03.17 Security 1600

B- 885 24-03-2017 EPED-V M/s Nosad Contractor Vth 14/EPED-V/22.10.16 157L 08.02.17 B/d Maint 80467

B- 887 24-03-2017 EPED-V M/s BPL Tech 07/EPED-V/16.11.15 157L 23.03.17 Security 4200

B- 889 24-03-2017 EPED-V M/s Awasthi Motor Winding II 06/EPED-V/06.11.15 157L 23.03.17 Annul Rate Contract 604245

B- 892 30-03-2017 CPD-I M/s RSP OVERSEAS PVT. LTD. 1108/CPD-I/08.06.16 239L 07.03.17 Supply of bearing 92211Total 3433920 6019467 4902456

B- 1 01.04.2017 ECM&EMD M/s Ravindra Singh & Co. IIIrd 07/ECM&EMD/30.08.16 141L 24.03.17 Painting & Distempring 79210

B- 2 07.04.2017 CSD-II M/s Shivam Enterprise 213/CPD-I/20.02.17 194L 06.04.17 Supply 28305

B- 5 07.04.2017 MPED-I M/s R.B. Engineering Works IV 12/MPED-I/09.09.16 219L 14.02.17 B/d Maintenance 129629

B- 8 07.04.17 MPED-I M/s MAK Construction II & Final

09/MPED-V/18.05.15 140L 06.03.17 Rouitin & B/d Maint 313309

B- 9 10.04.17 EPED-I M/s Kapatiya Instrument Erector Ist 063/EPED-I/25.02.16 166L B/d Maint 12847 62910

B- 10 10.04.17 EPED-I M/s Industrial Engineering Enterprises Ist 211/EPED-I/29.06.16 166L B/d Maint 66331

B- 14 19.04.17 MPED-IV M/s Hind Udyog II 504/MPED-IV/10.11.16 112L 30.03.17 Reparing Rectingcalian 104708

B- 15 19.04.17 ECCU-IV M/s Ramit Erectors I & final 22/ECCU/18.01.17 08L 06.02.17 PVC rain water Pipe 135388

B- 17 19.04.17 EPED-II M/s Balram Engineers Contractors & Supp.

II 03/EPED-II/04.07.14 258L 23.03.17 Security 17325

B- 20 20.04.17 MPED-V M/s Energo Engineering Pvt. Ltd. 07/MPED-V/15.07.15 139L Security 719218

B- 21 21.04.17 MPED-I M/s Tech Thermology I & final 23/MPED-I/15.03.17 218L 22.10.16 Complete Deplacment of Coal Burner 295680

B- 22 21.04.17 MPED-I M/s Leak Seal Experts India Pvt.Ltd. IV 04/BMD-III/26.04.16 218L 02.04.17 Service Charger 21000

B- 24 21.04.17 MPED-I M/s Sunrise Engineers & Contractor III 19/MPED-I/30.11.16 247L 11.02.17 B/d Maintenance 175740

B- 27 22.04.17 EPED-III M/s Vikas Electrical 3rd 14/EPED-III/12.01.16 222L 02.02.17 Reparing, Rewinding 197382

B- 28 22.04.17 EPED-II M/s MRP Construction 35/EPED-III/07.11.14 171L 07.02.17 Security 120580

B- 29 25.04.17 ECMD-I M/s Rambali Singh & Co. II & final 22/ECM&EMD/31.01.17 112L 29.03.17 Service 41322

B- 32 25.04.17 ECCU-V M/s sadan Engineering Works III 22/ECCU/23.01.17 64L 17.04.17 Carriage of material 156593

B- 33 25.04.17 ECCU-V M/s sadan Engineering Works I & final 28/ECCU/14.03.17 64L 17.04.17 Carriage of material 309205

B- 35 28.04.17 MPED-II M/s Thermal India Engineers VI 07/MPED-II/23.06.16 51L 17.03.16 B/d Maintenance 89985Total 2985452 28305 62910

B- 42 04.05.17 CSD-II M/s Shree Bhawani Trading Co. 110/CPD-III/01.03.17 197L 02.05.17 Supply 1485380

B- 45 08.05.17 MPED-VI M/s Hemant Singh 66/CWCD-II/22.08.14 96L 01.05.17 Security 33480

B- 46 08.05.17 MPED-VI M/s Hemant Singh 67/EE-MPED-VI/01.06.15 96L 04.05.17 Security 36000

B- 48 09.05.17 EPED-I M/s Process Maintenance Enterprises IV 12/EPED-I/21.11.15 179L Security 3885

B- 50 11.05.17 CSD-II M/s Mechfield Corporation 257/CPD-II/15.02.17 250L 09.05.17 Supply 157255

B- 51 11.05.17 CSD-II M/s Mechfield Corporation 258/CPD-II/15.02.17 250L 09.05.17 Supply 514776

B- 52 11.05.17 CSD-II M/s Mechfield Corporation 259/CPD-II/15.02.17 250L 09.05.17 Supply 298562

B- 54 15.05.17 ECM&EMD M/s Ravindra Singh & Co. Ist 02/ECM&EMD/06.05.17 237L 22.04.17 M&K of Stor 234342

B- 55 15.05.17 ECM&EMD M/s Harsh & Brothers 02/MPED-II/18.04.16 55L Fabrication of Short 159178

B- 59 15.05.17MPED-VI M/s Syndicate Engineers Ist &

Final16/MPED-V/10.02.17 120L Removal of 01 NOPGB 293265

B- 60 18.05.17 MPED-IV M/s MAK Construction VIII 06/MPED-IV/25.07.16 82L 08.04.17 Ash Sburry Disposal Pipe 19564

B- 61 18.05.17 MPED-IV M/s MAK Construction IX 06/MPED-IV/25.07.16 82L 18.04.17 Ash Sburry Disposal Pipe 49632

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 55: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 62 18.05.17 MPED-IV M/s MAK Construction X 06/MPED-IV/25.07.16 82L 22.04.17 Ash Sburry Disposal Pipe 21818

B- 64 18.05.17 EPED-IV M/s MRP Construction 07/EPED-IV/20.10.15 192L 15.05.17 Security 37018

B- 65 19.05.17 MPED-IV M/s MAK Construction XI 06/MPED-IV/25.05.16 103L 28.04.17 Ash Shurry Disposal 54906

B- 66 20.05.17 MPED-I M/s Bharti Machanical & Structural Works

XI 06/MPED-I/02.05.16 218L 07.05.17 B/d Maint 112904

B- 70 20.05.17 MPED-I M/s Hind Udhyog Ist 17/MPED-I/27.09.16 231L 01.04.17 Repairing & Belding 154168

B- 71 20.05.17MPED-I M/s Tech Thermology Ist &

Final02/MPED-I/21.04.17 19L 15.02.17 Reclamation /Repairing 292824

B- 72 20.05.17MPED-I M/s HiTEk NDT Services Ist &

Final03/MPED-I/21.04.17 19L 07.04.17 Fabrication & Cretion 294840

B- 74 20.05.17 MPED-IV M/s MAK Construction XII 06/MPED-IV/25.07.16 102L 16.05.17 Extension & Diversion 110713

B- 75 20.05.17 MPED-IV M/s Hind Udhyog 4th 19/MPED-IV/12.01.17 112L 01.05.17 Repairing/ Rectification 104708

B- 76 26.05.17 MPED-IV M/s MAK Construction Co. XIII 06/MPED-IV/25.07.16 195L 20.05.17 Extension & Diversion ash sburrydisspr 50577

B- 77 27.05.17 MPED-I M/s Kiran Construction Co. XI & Final

04/MPED-I/10.02.16 209L 01.04.17 Maintenance Work 30930

B- 78 27.05.17 MPED-I M/s O.S. Contractor VII 07/MPED-I/08.08.16 159L 01.05.17 Maintenance Work of ESP of Unit 40440

B- 79 27.05.17 MPED-I M/s Leak Seal Experts (India) Pvt.Ltd V 04/BMD-III/26.04.16 159L 17.05.17 Service Charge of Mobilization 2100Total 2137292 2455973 0

B- 82 05.06.17MPED-III M/s Hind Udyog Ist &

final08/EE/MPED-III/29.07.16 181L 06.05.17 Supply of maintenance 293120

B- 83 05.06.17 MPED-III M/s Jahngir Enterprises VI 18/MPED-III/03.12.16 181L 26.10.16 B/d Maintenance 33979

B- 84 05.06.17 MPED-III M/s Bharti Enterprises II 07/EE/MPED-III/27.05.16 181L 10.01.17 B/d Maintenance 123687

B- 86 05.06.17 MPED-III M/s Electrical & instrumentation 12th 16/EPED-III/18.01.16 242L 07.02.17 Repair & Overhauling

B- 87 06.06.17 EPED-III M/s K.S. Brothers 1st 15/EPED-III/18.04.17 207L 26.04.17 Repairing of C&S 196510 31190

B- 91 06.06.17 MPED-III M/s Usha Enterprises VIII 11/EE/MPED-III/10.09.15 180L 09.05.17 B/d Maintenance 71378

B- 92 06.06.17 MPED-III M/s Jahngir Enterprises 1st 19/EE/MPED-III/12.01.17 180L 09.05.17 B/d Maintenance 79616

B- 93 07.06.17 MPED-V M/s syndicate Engineers 93/MPED-V/15.03.17 107L Security 245380

B- 94 07.06.17 MPED-IV M/s India Engineering Works 1th 02/MPED-IV/05.05.17 81L 25.04.17 Replacement/Retitling 6546

B- 95 07.06.17 MPED-IV M/s India Engineering Works II 02/MPED-IV/05.05.17 81L 08.05.17 Replacement/Retitling 836

B- 96 07.06.17 MPED-IV M/s Hind Udyog IV 19/MPED-IV/12.02.17 84L 26.05.17 Supply of Staff 27480

B- 100 07.06.17 MPED-IV M/s Arun Kumar 02/MPED-IV/17.05.16 111L 29.05.17 Security 2400

B- 101 07.06.17 MPED-IV M/s India Engineering Works III 22/MPED-IV/12.01.17 111L 11.04.17 Repairing of Ash intake 29130

B- 102 07.06.17 MPED-IV M/s India Engineering Works IV 22/MPED-IV/12.01.17 111L 24.04.17 Repairing of Ash intake 29693

B- 106 08.06.17 ECCU-V M/s Sadan Engineering Works 17/ECMD-I/27.03.15 64L 07.06.17 Security 21090

B- 107 08.06.17 ECCU-V M/s Ramit Erectors 05/ECCU/09.06.15 64L 07.06.17 Security 38729

B- 108 08.06.17 ECCU-V M/s Sadan Engineering Works II 26/ECCU/27.01.17 64L 01.06.17 Carriage of material 103181

B- 109 08.06.17ECCU-V M/s Sadan Engineering Works Ist &

final02/ECCU/02.05.17 368L 15.05.17 shifting of reject 288929

B- 111 08.06.17 MPED-III M/s Bharti Enterprises III 07/EE/MPED-III/27.05.16 165L 24.03.17 B/d Maintenance 87390

B- 112 08.06.17 MPED-III M/s Jahngir Enterprises II 19/EE/MPED-III/12.01.17 165L 03.05.17 B/d Maintenance 43259

B- 115 08.06.17 MPED-III M/s Bharti Enterprises 14/EE/MPED-III/13.12.14 165L 25.05.17 Security 82710

B- 116 08.06.17 MPED-III M/s Pushpendra Singh 09/EE/MPED-III/25.11.14 165L 25.05.17 Security 7007

B- 117 09.06.17 MPED-III M/s Usha Enterprises IX 11/EE/MPED-III/10.09.15 244L 01.02.17 B/d Maintenance 15612

B- 118 09.06.17EPED-IV M/s Nosad Contractor Ist &

final01/EPED-IV/16.05.17 200L 30.01.17 Providing additional conductor 30240

B- 119 09.06.17 EPED-II M/s Instrument Care Group 155/CWCD-IV/26.08.13 241L 22.05.17 Security 40824

B- 120 09.06.17 EPED-II M/s Instrument Care Group 08/EPED-II/25.08.14 241L 23.05.17 Security 42840

B- 122 09.06.17MPED-I M/s Tech Thermology Ist &

final08/MPED-I/08.06.17 158L 01.04.17 Heat Forey of SS Coal 226371

B- 123 09.06.17 MPED-I M/s syndicate Engineers I & final 63/MPED-I/01.03.17 158L 07.03.17 Replacement of Coal 172620

B- 125 09.06.17MPED-I M/s Kiran Construction Ist &

final25/MPED-I/30.03.17 209L 23.10.16 Replacement of Coal 295680

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 56: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 126 14.06.17 ECCU M/s Ram Lakhan 17/ECCU/10.11.16 08L 12.06.17 Security 7007

B- 127 15.06.17 MPED-V M/s syndicate Engineers I 03/MPED-II/27.05.17 152L 06.03.17 Removal of damage 269799 23466

B- 130 15.06.17 EPED-I M/s D.K.& Sons Co. V 10/EPED-I/10.08.16 98L 12.04.17 Overhauling, Rewinding 3552

B- 132 17.06.17 CSD-II M/s Vinay Trading Corporation 144/CPD-I/30.01.17 232L 16.06.17 Supply 77010

B- 133 17.06.17 CSD-II M/s Globe Enterprises 331/CPD-I/12.05.16 232L 16.06.17 Supply 77189

B- 134 17.06.17 CSD-II M/s Globe Enterprises 331/CPD-I/12.05.16 232L 16.06.17 Supply 31732

B- 139 22.06.17 CSD-II M/s Flowtech Engineers 530/CPD-II/15.04.17 249L 22.06.17 Supply 455707

B- 140 22.06.17 CSD-II M/s Flowtech Engineers 529/CPD-II/15.04.17 249L 22.06.17 Supply 176508 1210117

B- 141 30.06.17 MPED-I M/s R.B. Engineering Works II 12/MPED-I/09.09.16 189L 07.05.17 ESP by wire brush 32492

B- 142 30.06.17 MPED-I M/s O.S. Contractor I 05/MPED-I/04.05.17 189L 07.05.17 bailer to ESP 123375

B- 143 30.06.17 MPED-I M/s M.K. Traders VI 11//MPED-I/26.08.16 231L 08.05.17 B/d Maintenance 18219 50000

B- 144 30.06.17 MPED-I M/s Sunrise Engineers & Contractors IV 19/MPED-I/30.11.16 231L 08.05.17 B/d Maintenance 23851

B- 146 30.06.17 MPED-I M/s O.S. Contractor VIII 07/MPED-I/08.06.17 159L 01.06.17 Maintenance of ESP 24117

Total 3138649 818146 1314773

B- 147 01.07.17 CSD-II M/s RSP Overseas Pvt. Ltd. 1507/CPD-I/13.07.16 239L 30.06.17 Supply 1814

B- 148 01.07.17 CSD-II M/s RSP Overseas Pvt. Ltd. 363/CPD-I/03.03.16 239L 30.06.17 Supply 357

B- 149 01.07.17 CSD-II M/s RSP Overseas Pvt. Ltd. 363/CPD-I/03.03.16 239L 30.06.17 Supply 9685

B- 150 01.07.17 CSD-II M/s RSP Overseas Pvt. Ltd. 1108/CPD-I/08.06.16 239L 30.06.17 Supply 37732

B- 151 01.07.17 CSD-II M/s RSP Overseas Pvt. Ltd. 1108/CPD-I/08.06.16 239L 30.06.17 Supply 32884

B- 152 01.07.17 MPED-IV M/s Hind Udyog 06 19/MPED-IV/12.01.17 111L 30.06.17 Fabrication of fineel supply 60275 50000

B- 154 01.07.17 MPED-IV M/s Hind Udyog V 19/MPED-IV/12.01.17 84L 23.06.17 Repairing of warnaut 25852

B- 155 01.07.17 MPED-IV M/s India Engineering Works V 22/MPED-IV/12.01.17 84L 29.06.17 Fabrication of brone 119447

B- 156 01.07.17 MPED-IV M/s India Engineering Works III 02/MPED-IV/05.05.17 112L 19.05.17 Repairing of House Gaserv 36896

B- 157 01.07.17 MPED-IV M/s Garg Engineering & Sons IV 01/MPED-IV/28.04.17 112L 22.06.17 Slurry pump house 28722

B- 158 01.07.17 MPED-IV M/s India Engineering Works IV 02/MPED-IV/05.05.17 112L 09.06.17 Repairing of House Gaserv 57397

B- 160 01.07.17 MPED-IV M/s MAK Construction XVI 06/MPED-IV/25.07.16 102L 19.06.17 Diverside of ash 39443

B- 161 01.07.17 MPED-IV M/s MAK Construction XVII 06/MPED-IV/25.07.16 102L 27.06.17 Diverside of ash 123466

B- 162 01.07.17 MPED-IV M/s MAK Construction XIV 06/MPED-IV/25.07.16 103L 06.06.17 Diverside of ash 33132

B- 163 01.07.17 MPED-IV M/s MAK Construction XV 06/MPED-IV/25.07.16 103L 13.06.17 Diverside of ash 58420

B- 164 01.07.17 MPED-III M/s Usha Enterprises 17/EE/MPED-III/31.03.15 226L 15.06.17 Security 45990

B- 170 01.07.17 EPED-III M/s Vikash Electrical I 13/EPED-III/20.02.17 207L 23.05.17 Repairing, Rewinding 442361

B- 172 11.07.17 ECM&EMD M/s Vijay Kumar Gupta Contractor II 319/ECM&EMD/15.12.16 399L 16.05.17 Repairing of neutrazitam 3553 30018

B- 178 11.07.17 EPED-I M/s Industrial Engg. Enterprises II 16/EPED-I/16.12.16 166L 28.06.17 (ARC) B/D Maintenance 28731

B- 179 13.07.17 MPED-V M/s Hind Udyog II 08/MPED-V/07.10.16 152L 01.07.17 Repairing fabrication 426650

B- 180 13.07.17 MPED-V M/s Hind Udyog 318/MPED-IV/17.06.16 152L Comling of Mills 80493

B- 181 13.07.17 MPED-V M/s MAK Construction I 05/MPED-V/20.06.17 152L 01.07.17 operation of boul 43643

B- 182 13.07.17 MPED-V M/s MAK Construction I 04/MPED-V/27.05.17 139L 01.07.17 Revinding & B/D Maintenance 34957

B- 183 13.07.17 CSD-II M/s Bharat Petroleum Corporation Ltd. 128/CPD-I/20.06.16 126L 12.07.17 Supply 141365

B- 184 13.07.17 CSD-II M/s Bharat Petroleum Corporation Ltd. 192/CPD-I/08.02.17 126L 12.07.17 Supply 202391 107867

B- 185 13.07.17 ECM&EMD M/s Ravindra Singh & Co. IV 07/ECM&EMD/30.08.16 141L 31.05.17 Painting & Distempering 91441

B- 187 15.07.17 EPED-II M/s Sanjay Electronics IV 09/EPD-II/28.07.16 241L 08.06.17 B/D Maintenance 92153

B- 188 15.07.17 ECCU M/s Sadan Engineering Works IV & Final 22/ECCU/23.01.17 64L 20.06.17 Carriage of Material 7462

B- 189 15.07.17 ECCU M/s Sadan Engineering Works III & Final 26/ECCU/27.01.17 64L 20.06.17 Carriage of Material 7562

B- 190 15.07.17 ECCU M/s Sadan Engineering Works I 05/ECCU/13.07.17 64L 30.06.17 Ash pond 53043

B- 191 15.07.17 ECCU M/s Sadan Engineering Works I 04/ECCU/13.07.17 368L 30.06.17 Filling with ash 142209

B- 193 17.07.17 MPED-VI M/s Jahangir Enterprises V 08/CAMD-II/13.06.16 256L 15.06.17 B/D Maintenance 60611

B- 196 17.07.17 MPED-VI M/s S.R. Constructions IX 28/EE/MPED-VI/05.01.17 248L 30.06.17 AMC 60732

B- 198 17.07.17 MPED-VI M/s S.R. Constructions X 28/EE/MPED-VI/05.01.17 163L 08.05.17 AMC 121464

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 57: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 199 19.07.17 EPED-V M/s Nosad Contractor VI,VII 14/EPED-V/22.02.16 157L 17.07.17 B/D Maintenance 99735

B- 200 19.07.17 EPED-V M/s Electrical & Instrumentation Engg. Final 13/EPED-V/18.01.16 157L 17.07.17 Security 40197

B- 201 19.07.17 EPED-V M/s Punjab Electric Industries 01/EPED-V/12.06.17 211L 17.07.17 Temperature Dial 87112 199902

B- 202 19.07.17 EPED-V M/s Punjab Electric Industries I 01/EPED-V/12.06.17 211L 17.07.17 Rotor Mill Motar 88042

B- 204 19.07.17 MPED-I M/s O.S. Constractor VII 07/MPED-I/08.08.16 159L 01.07.17 B/D Maintenance 24006

B- 206 19.07.17 MPED-I M/s S.K. Engineering Works V 10/MPED-II/17.07.15 210L 14.07.17 Security 65481

B- 207 19.07.17 MPED-I M/s M.K. Traders 29/MPED-I/27.06.17 210L 14.07.17 Security 38915

B- 211 20.07.17 CHD-II M/s Pitambra Engineers & Contractor VII 16/CHD-II/06.12.16 271L 30.06.17 Unloading Fo BTPN 78924

B- 213 20.07.17 MPED-V M/s Hind Udyog III 08/MPED-V/07.10.16 107L 17.07.17 Gear of bot 30290

B- 214 20.07.17 MPED-V M/s Hind Udyog 01/MPED-V/09.05.14 121L 28.06.17 Security 15900

B- 215 20.07.17 MPED-V M/s Hind Udyog 06/MPED-V/07.08.14 121L 28.06.17 Security 18593

B- 216 20.07.17 MPED-V M/s Hind Udyog 07/MPED-V/07.08.14 121L 28.06.17 Security 26500

B- 217 20.07.17 MPED-V M/s Hind Udyog 12/MPED-V/18.11.14 121L 28.06.17 Security 28600

B- 218 20.07.17 MPED-V M/s Hind Udyog 13/MPED-V/18.11.14 121L 28.06.17 Security 8512

B- 219 20.07.17 MPED-V M/s Hind Udyog 14/MPED-V/18.11.14 121L 28.06.17 Security 27356

B- 220 20.07.17 MPED-V M/s Hind Udyog 16/MPED-V/04.12.14 121L 28.06.17 Security 11722

B- 221 20.07.17 MPED-V M/s Hind Udyog 27/MPED-V/20.03.15 121L 14.07.17 Security 138950

B- 224 20.07.17 MPED-V M/s Syndicate Engineers 16/MPED-V/10.02.17 121L 14.07.17 Security 27930

B- 225 20.07.17 MPED-V M/s Syndicate Engineers 03/MPED-V/27.05.17 121L 14.07.17 Security 27930

B- 227 20.07.17 MPED-V M/s Energo Construction 05/MPED-V/29.08.16 150L 15.07.17 Security 745000

B- 228 22.07.17 CSD-II M/s RSP Overseas Pvt. Ltd. 1108/CPD-I/08.06.16 185L 21.07.17 Supply 43541

B- 229 22.07.17 CSD-II M/s RSP Overseas Pvt. Ltd. 1108/CPD-I/08.06.16 185L 21.07.17 Supply 490

B- 230 22.07.17 CSD-II M/s RSP Overseas Pvt. Ltd. 1507/CPD-I/13.07.16 185L 21.07.17 Supply 3743

B- 231 22.07.17 CSD-II M/s RSP Overseas Pvt. Ltd. 1504/CPD-I/13.07.16 185L 21.07.17 Supply 7013

B- 232 26.07.17 EPED-IV M/s Electrical & Instrumentation Engg. 04/EPED-IV/29.09.14 99L 25.07.17 Supply 1995

B- 233 26.07.17 EPED-IV M/s Electrical & Instrumentation Engg. 05/EPED-IV/29.09.14 99L 25.07.17 Supply 2682

B- 234 26.07.17 EPED-IV M/s MRP Construction 128/CWCD-IV/24.06.16 99L 25.07.17 B/D Maintenance 117074

B- 235 28.07.17 ECM&EMD M/s Ravindra Singh & Co. 06/ECM&EMD/30.08.16 214L 27.07.17 Security 21794

B- 236 29.07.17 CSD-II M/s Globus Engineers 1869/CPD-II/28.11.16 249L 28.07.17 Supply 191520

B- 238 29.07.17 CSD-II M/s Globus Engineers 2044/CPD-II/21.12.16 249L 28.07.17 Supply 1043285

B- 240 29.07.17 MPED-I M/s O.S. Constractor 05/MPED-I/04.05.17 209L 24.06.17 Complite insulation 95014

Total 4189682 1720497 387787

B- 243 19.08.17 CSD-II M/s Northland Rubber Mills 272/CPD-III/05.06.17 61L 19.08.17 Supply 2765448

B- 244 22.08.17 MPED-IV M/s India Engg Works 12/MPED-II/24.10.16 84L 11.08.17 Security 29050

B- 245 22.08.17 MPED-IV M/s Hind Udyog 01/MPED-IV/07.05.16 81L 11.08.17 Security 52944

B- 246 22.08.17 MPED-IV M/s Hind Udyog 19/MPED-IV/12.01.17 81L 11.08.17 Security 59344

B- 247 22.08.17 MPED-IV M/s India Engg Works 13/MPED-IV/03.11.15 111L 11.08.17 Security 93830

B- 248 22.08.17 MPED-IV M/s India Engg Works 21/MPED-IV/09.03.16 111L 11.08.17 Security 65214

B- 250 30.08.17 MPED-I M/s Jha Construction 07/MPED-I/08.06.17 158L 02.08.17 Security 11367

B- 252 30.08.17 MPED-IV M/s Hind Udyog 06/MPED-IV/15.07.17 112L 31.07.17 Supply 51763

B- 253 30.08.17 MPED-IV M/s India Engg Works 02/MPED-IV/05.05.17 112L 18.08.17 Supply 30119

B- 255 30.08.17 MPED-IV M/s India Engg Works 14/MPED-IV/03.11.15 112L 19.08.17 Security 28924

B- 256 30.08.17 MPED-IV M/s India Engg Works 08/MPED-IV/25.07.16 82L 16.08.17 Security 28941

B- 257 30.08.17 MPED-IV M/s India Engg Works 05/MPED-IV/22.11.14 82L 16.08.17 Security 36608

B- 258 30.08.17 MPED-IV M/s Nosad Contractor 15/MPED-IV/08.12.15 82L 16.08.17 Security 96338

B- 259 30.08.17 MPED-IV M/s Rajeev Kumar Contractor 20/MPED-IV/12.01.17 82L 17.08.17 Supply 100347

B- 260 30.08.17 MPED-IV M/s India Engg Works 22/MPED-IV/12.01.17 83L 19.08.17 Supply 23116

B- 261 30.08.17 MPED-IV M/s India Engg Works 02/MPED-IV/05.05.17 83L 19.08.17 Supply 23390

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 58: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Total 502560 2994183 0

B- 264 01.09.17 MPED-IV M/s India Engg. Works 05/MPED-IV/17.05.16 195L 16.08.17 Security 806400

B- 265 01.09.17 MPED-IV M/s India Engg. Works 17/MPED-IV/07.01.16 195L 16.08.17 Security 36608

B- 266 01.09.17 MPED-IV M/s India Engg. Works 07/MPED-IV/25.07.16 195L 16.08.17 Security 48642

B- 267 01.09.17 MPED-IV M/s India Engg. Works 04/MPED-IV/17.05.16 195L 16.08.17 Security 60505

B- 268 01.09.17 MPED-IV M/s MAK Construction Co. 06/MPED-IV/25.07.16 195L 28.08.17 Dishposal pipe line 67946

B- 269 01.09.17 MPED-IV M/s MAK Construction Co. 06/MPED-IV/25.07.16 216L 28.08.17 Dishposal pipe line 11102

B- 271 05.09.17 MPED-II M/s Thermal India Engineers I 08/MPED-II/03.08.17 206L B/D Maintenance 270059

B- 273 07.09.17 MPED-IV M/s Garg Engineering & Sons I 05/MPED-IV/29.06.17 103L 24.08.17 Battom ash hopper 13402

B- 274 07.09.17 MPED-IV M/s Garg Engineering & Sons II 05/MPED-IV/29.06.17 81L 28.08.17 Battom ash hopper 13621

B- 275 07.09.17 MPED-IV M/s Hind Udyog II 06/MPED-IV/15.07.17 81L 28.08.17 Ash Slurry pump 110802

B- 276 14.09.17 EPED-I M/s Process Maintenance Enterprises 17/EPED-I/06.01.17 235L 04.09.17 Security 10193

B- 277 14.09.17 EPED-I M/s Kapatiya Instrument Erector 16/EPED-I/05.02.15 129L 07.09.17 Security 20356

B- 278 14.09.17 MPED-III M/s usha Enterprises 18/MPED-III/04.01.13 226L 08.09.17 Security 43800

B- 279 22.09.17 MPED-V M/s MAK Construction Co. II 04/MPED-V/27.05.17 151L 08.08.17 B/D Maintenance 61603

B- 280 22.09.17 ECCU-V M/s Sadan Engineering Works II Final 05/ECCU/13.07.17 64L 11.08.17 M&R of Ash Pond 44017

B- 281 22.09.17 ECCU-V M/s Bharti Enterprises I 11/ECCU/19.09.17 64L 25.08.17 M&R of Ash Pond 32600

B- 282 22.09.17 ECCU-V M/s Sadan Engineering Works II Final 04/ECCU/13.07.17 368L 11.08.17 Raising of bundiation batlom 160189

B- 283 22.09.17 ECCU-V M/s Sadan Engineering Works I,Final 09/ECCU/19.09.17 368L 16.08.17 Excavation of ash 293951

B- 286 23.09.17 EPED-II M/s Sanjay Electronics V 09/EPED-II/28.07.16 241L 15.09.17 B/D Maintenance 56870

B- 288 25.09.17 MPED-I M/s Kiran Construction Co. II 11/MPED-I/14.07.17 117L 01.09.17 Prentive Maintenance 110928

B- 290 26.09.17 ECCU M/s Sadan Engineering Works I,Final 10/ECCU/19.09.17 26L Carriage of report 344184

B- 291 26.09.17 MPED-V M/s MAK Construction Co. III 67/MPED-V/14.02.17 274L 01.09.17 B/D Maintenance 68052

B- 292 27.09.17 MPED-III M/s Jahangir Enterprises III 19/EE/MPED-III/12.01.17 238L 09.09.17 B/D Maintenance 21082

B- 293 27.09.17 MPED-III M/s Jahangir Enterprises IV 19/EE/MPED-III/12.01.17 238L 09.09.17 B/D Maintenance 24599

B- 294 27.09.17 MPED-III M/s Jahangir Enterprises V 19/EE/MPED-III/12.01.17 238L 09.09.17 B/D Maintenance 19777

B- 295 27.09.17 MPED-III M/s Jahangir Enterprises VII 19/EE/MPED-III/12.01.17 244L 10.09.17 B/D Maintenance 26111

B- 296 27.09.17 MPED-III M/s Jahangir Enterprises VII 19/EE/MPED-III/12.01.17 244L 10.09.17 B/D Maintenance 20262

B- 297 27.09.17 MPED-III M/s Jahangir Enterprises VIII 19/EE/MPED-III/12.01.17 244L 10.09.17 B/D Maintenance 19877

B- 298 27.09.17 CSD-II M/s Instant Engineers 419/CPD-I/28.06.17 215L 27.09.17 Supply 24666

B- 299 27.09.17 CSD-II M/s Aditya Enterprises 398/CPD-I/22.06.17 215L 27.09.17 Supply 618075

B- 302 27.09.17 CSD-II M/s Aarseller Tredco 690/CPD-I/26.08.17 215L 27.09.17 Supply 115693Total 2817538 758434 0

B- 310 11.10.17 MPED-I M/s Bhart Mechanical & Structural Works

XII 06/MPED-I/02.05.16 158L 07.07.17 B/D Maintenance 168020

B- 311 11.10.17 MPED-I M/s R.B. Engineering Works VI 12/MPED-I/09.09.16 158L 07.07.17 B/D Maintenance 161382

B- 312 11.10.17 CSD-II M/s U.W. & Associates 537/CPD-I/25.05.17 234L 11.10.17 Supply 31360

B- 315 12.10.17 ECM&EMD M/s Vijay Kumar Gupta 23/ECM&EMD/31.01.17 1826L 10.10.17 Security 28914

B- 317 16.10.17 CSD-II M/s Ion Exchange India Ltd. 1217/CPD-II/05.09.17 126L 13.10.17 Supply 655537

B- 320 17.10.17 MPED-VI M/s Hemant Singh 32/EE-MPED-VI/06.05.14 245L 04.08.17 Security 4200

B- 321 17.10.17 MPED-VI M/s Hemant Singh 47/EE-MPED-VI/28.10.14 245L 18.08.17 Security 4200

B- 322 17.10.17 MPED-VI M/s Hemant Singh 65/EE-MPED-VI/06.05.14 245L 21.08.17 Security 4200

B- 323 17.10.17 MPED-VI M/s Hemant Singh 77/EE-MPED-VI/03.11.15 245L 21.08.17 Security 4200

B- 324 17.10.17 MPED-VI M/s Hemant Singh 34/EE-MPED-VI/30.05.14 245L 02.09.17 Security 4200

B- 325 17.10.17 MPED-VI M/s Hemant Singh 46/EE-MPED-VI/28.10.14 245L 04.09.17 Security 4200

B- 326 17.10.17 MPED-VI M/s Hemant Singh 64/EE-MPED-VI/06.05.15 245L 22.09.17 Security 4200

B- 327 17.10.17 MPED-VI M/s Hemant Singh 78/EE-MPED-VI/03.11.15 245L 22.09.17 Security 4200

B- 328 25.10.17 MPED-VI M/s MAK Construction Co. IV 04/MPED-V/27.05.17 275L 03.10.17 B/D Maintenance 64251

B- 329 26.10.17 CSD-II M/s Flowtech Engineers 1402/CPD-II/03.10.17 217L 36.10.17 Supply 1845855

B- 330 26.10.17 CSD-II M/s Flowtech Engineers 1402/CPD-II/03.10.17 217L 36.10.17 Supply 1804750

B- 331 26.10.17 CSD-II M/s Flowtech Engineers 1402/CPD-II/03.10.17 217L 36.10.17 Supply 1226133

B- 332 26.10.17 CSD-II M/s Flowtech Engineers 1402/CPD-II/03.10.17 217L 36.10.17 Supply 1214834

B- 333 26.10.17 CSD-II M/s Flowtech Engineers 1402/CPD-II/03.10.17 217L 36.10.17 Supply 1975561

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 59: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 334 26.10.17 CSD-II M/s Flowtech Engineers 1402/CPD-II/03.10.17 217L 36.10.17 Supply 1494065

B- 335 26.10.17 CSD-II M/s Flowtech Engineers 1402/CPD-II/03.10.17 217L 36.10.17 Supply 1459385

B- 336 26.10.17 MPED-IV M/s Mak Construction Co. 14/MPED-IV/26.09.17 195L 28.08.17 Slurry Disposal Pipe 9584

B- 337 26.10.17 MPED-IV M/s Mak Construction Co. 14/MPED-IV/26.09.17 195L 28.08.17 Slurry Disposal Pipe 9584

B- 339 26.10.17 ECCU M/s Pitambra Engineers & Contractor 15/ECCU/23.10.17 368L 22.08.17 Cleaning & Maintenance 297243

B- 340 30.10.17 MPED-IV M/s Hind Udyog 1 09/MPED-IV/21.08.17 83L 28.09.17 Supply 146874

B- 341 30.10.17 MPED-IV M/s India Engg. Works VII 22/MPED-IV/12.10.17 83L 08.09.17 Supply 29796

B- 342 30.10.17 MPED-IV M/s India Engg. Works VII 02/MPED-IV/05.05.17 83L 15.09.17 Cutting of Old & Distrurbed 27760

B- 343 30.10.17 MPED-IV M/s India Engg. Works VIII 22/MPED-IV/12.01.17 83L 25.09.17 Supply 18750

B- 344 30.10.17 CSD-II M/s Pee Kay Trivals 686/CPD-I/26.08.17 127L 28.10.17 Supply 198720

B- 345 30.10.17 CSD-II M/s Hindustan Petroleum Corporation Ltd.

501/CPD-I/12.10.17 127L 28.10.17 Supply 269925

B- 346 30.10.17 CSD-II M/s Rajat Associates 919/CPD-I/05.10.17 285L 28.10.17 Supply 114528

B- 349 31.10.17 EPED-I M/s Process Maintenance Enterprises 12/EPED-I/23.10.16 237L 28.08..17 Security 3885Total 1478510.00 11811786.00 0.00

B- 350 01.11.17 CSD-II M/s Asan Engineers Pvt. Ltd. 1451/CPD-II/07.10.17 250L 01.11.17 Supply 355769 222026

B- 351 02.11.17 CSD-II M/s Flowtech Engineers 587/CPD-II/28.04.17 249L 02.11.17 Supply 65464

B- 353 03.11.17 MPED-IV M/s MAK Constrcution Co. III 14/MPED-IV/26.09.17 102L 09.09.17 Ash Slurry dishposal 117302

B- 355 03.11.17 MPED-IV M/s India Engg. Works IX 02/MPED-IV/05.05.17 102L 30.09.17 Replacement of jungle 24321

B- 356 03.11.17 MPED-IV M/s Garg Engineering & Sons III 05/MPED-IV/29.06.17 196L 17.10.17 Running welding 24650

B- 357 03.11.17 MPED-IV M/s MAK Constrcution Co. IV 14/MPED-IV/26.09.17 82L 16.10.17 Ash Slurry dishposal 58652

B- 358 03.11.17 MPED-IV M/s MAK Constrcution Co. V 14/MPED-IV/26.09.17 82L 23.10.17 Ash Slurry dishposal 32426

B- 363 10.11.17 CFA&BO M/s Sanjog Professional Services 20/CPD-II/17.06.16 419L 10.11.17 Security 25900

B- 364 14.11.17 MPED-II M/s Thermal India Engineers II 08/MPED-II/03.08.17 228L 28.08.17 B/D Maintenance 224755

B- 365 14.11.17 MPED-II M/s Thermal India Engineers I 09/MPED-II/24.10.17 228L 01.10.17 Supply 152822

B- 366 14.11.17 MPED-IV M/s Hind Udyog 304/MPED-IV/05.08.17 112L 31.10.17 Supply 133477

B- 367 14.11.17 MPED-IV M/s India Engg. Works 499/MPED-IV/07.11.16 112L 31.10.17 Supply 115628

B- 368 14.11.17 MPED-IV M/s Hind Udyog 196/MPED-IV/02.06.17 112L 31.10.17 Supply 119888

B- 370 15.11.17 CSD-II M/s Aarsellr Tredco 862/CPD-I/21.09.17 233L 15.11.17 Supply 1067432 276226

B- 371 15.11.17 CSD-II M/s V.K. Trading Corporation 957/CPD-I/10.10.17 233L 15.11.17 Supply 118810

B- 372 15.11.17 MPED-I M/s O.S. Contractor XI 07/MPED-I/08.08.16 104L 01.10.17 Preventive Maintenance 34916

B- 373 15.11.17 MPED-I M/s O.S. Contractor X 07/MPED-I/08.08.16 159L 01.09.17 Preventive Maintenance 64354

B- 374 15.11.17 MPED-I M/s O.S. Contractor III 05/MPED-I/04.05.17 209L 07.07.17 Inslation Work 152301

B- 376 15.11.17 MPED-I M/s Jha Construction II 04/MPED-I/04.05.17 169L 09.09.17 Instalation of sky chember 61950

B- 378 15.11.17 MPED-I M/s O.S. Contractor IV 05/MPED-I/04.05.17 169L 18.09.17 Comnpti Instalation 30964

B- 380 15.11.17 MPED-I M/s Bharat Machanical & Structural Works

IXIV 06/MPED-I/02.05.16 169L 06.11.17 B/D Maintenance 234364

B- 381 15.11.17 MPED-I M/s M.K. Traders VIII 11/MPED-I/26.08.16 282L 22.08.17 B/D Maintenance 40870

B- 383 15.11.17 MPED-I M/s Hind Udyog III 17/MPED-I/27.09.16 282L 12.10.17 Reparing reating 124726

B- 384 15.11.17 MPED-V M/s MAK Constrcution Co. II 05/MPED-V/20.06.17 121L 01.11.17 Operation of Bowl 296568

B- 386 18.11.17 EPED-III M/s Electrical & Instrumentation Engg. III,IV 01/EPED-III/15.05.17 242L 08.10.17 Repairing & Overhauling 42456

B- 387 20.11.17 MPED-IV M/s India Engg. Works XII 22/MPED-IV/12.01.17 81L 13.11.17 Fabrication of brones 129576

B- 388 20.11.17 MPED-IV M/s Hind Udyog III 09/MPED-IV/21.08.17 81L 08.11.17 Repairing/ Rectefication 109589

B- 389 20.11.17 MPED-IV M/s Hind Udyog IV 06/MPED-IV/15.07.17 81L 08.11.17 Repairing of Ash 53065

B- 390 20.11.17 MPED-IV M/s India Engg. Works XI 22/MPED-IV/12.01.17 168L 13.10.17 Repairing of Ash 31530

B- 391 20.11.17 MPED-IV M/s India Engg. Works X 02/MPED-IV/05.05.17 168L 30.10.17 Repairing and Maintenance 30204

B- 392 20.11.17 MPED-IV M/s MAK Constrcution Co. VI 14/MPED-IV/26.09.17 103L 30.10.17 Diviversion of Ash 29326

B- 393 20.11.17 MPED-IV M/s India Engg. Works X 22/MPED-IV/12.01.17 103L 01.11.17 Fabrication of Vorius 30728

B- 394 21.11.17 MPED-VI M/s Bharti Enterprises VI 05/EE-MPED-VI/21.03.17 130L 02.10.17 Dusting of UCV Service 141130

B- 395 21.11.17 MPED-VI M/s Bharti Enterprises VII 05/EE-MPED-VI/21.03.17 130L 13.11.17 Dusting of UCV Service 144944

B- 396 24.11.17 MPED-III M/s Jahangir Enterprises 02/MPED-III/05.08.17 244L 31.10.17 Security 65298

B- 397 24.11.17 MPED-III M/s Usha Enterprises 09/MPED-III/03.09.13 244L 31.10.17 Security 13995

B- 398 24.11.17 MPED-III M/s Usha Enterprises 01/MPED-III/11.04.13 244L 31.10.17 Security 5000

B- 399 24.11.17 MPED-III M/s Jahangir Enterprises 01/MPED-III/02.05.15 244L 31.10.17 Security 40506

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 60: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 402 24.11.17 MPED-III M/s Jahangir Enterprises V 03/EE-MPED-III/05.05.16 238L 16.09.17 B/D Maintenance 26372

B- 404 24.11.17 MPED-III M/s Pushpendra Singh 14/MPED-III/23.10.15 238L 30.10.17 Security 7046

B- 405 24.11.17 MPED-III M/s SGL Engg. Industries 14/MPED-III/23.10.15 284L 30.10.17 Security 6579

B- 407 25.11.17 ECCU M/s Rambali Contractors IFinal 22/ECCU/24.11.17 26L 20.11.17 Evacuting ash for creati 117107

B- 410 28.11.17 MPED-V M/s M.K. Traders III 20/MPED-V/19.09.17 256L 02.11.17 Operation Maintenance 20323

B- 413 30.11.17 MPED-VI M/s Thermal India Engineers I 10/MPED-VI/16.05.17 256L 16.11.17 Instalation Agriment 48600Total 3063626 1708057 498252

B- 418 06.12.17 CSD-II M/s Hindustan Petroleum Corporation Ltd. 1054/CPD-I/01.11.17 126L 06.12.17 Supply 957161

B- 421 07.12.17 ECCU-IV M/s Rambali Singh Contractor 19/ECCU/13.11.17 369L 16.09.17 Construction of RCC drian 291982

B- 423 07.12.17 EPED-I M/s Shiv Mahadev Engineering Works 15/EPED-I/06.11.17 268L 27.11.17 Discription side bolyo 152738

B- 424 07.12.17 EPED-I M/s A.K. Construction 18/EPED-I/30.12.15 220L 27.09.17 Security 29640

B- 425 07.12.17 EPED-I M/s A.K. Construction 02/EPED-I/22.04.15 220L 27.09.17 Security 137784

B- 426 12.12.17 EPED-II M/s Kapatiya Instrument Erector III 02/EPED-II/16.05.16 269L 16.06.17 B/d Maintenance 57307

B- 428 12.12.17 CSD-II M/s Lucent & Technologies 1078/CPD-I/07.11.17 215L 08.12.17 Battery 35840

B- 429 13.12.17 CSD-II M/s Balaji Corporation 572/CPD-II/22.04.17 203L 12.12.17 Battery 348023 270000

B- 431 13.12.17 MPED-II M/s Hind Udyog I 06/MPED-II/15.07.17 228L 06.09.17 Fabrication and maching 30770

B- 432 13.12.17 MPED-II M/s Hind Udyog II 06/MPED-II/15.07.17 228L 26.09.17 Fabrication and maching 138214

B- 433 14.12.17 MPED-IV M/s MAK Construction Co. VII 14/MPED-IV/96.09.17 102L 15.11.17 Diversion of ash Slurry 106570

B- 434 14.12.17 MPED-IV M/s India Engg. Works IX 02/MPED-IV/05.05.17 102L 23.10.17 Removal of Checking of ash 47367

B- 435 15.12.17 CSD-II M/s S.S. Jaiswal & Brothers 809/CPD-I/15.09.17 214L 15.12.17 Supply 1479170

B- 436 15.12.17 CSD-II M/s S.S. Jaiswal & Brothers 780/CPD-I/11.09.17 214L 15.12.17 Supply 1293825

B- 437 15.12.17 CSD-II M/s Narendra Kumar Gupta 1117/CPD-I/14.11.17 214L 15.12.17 Supply 108930 108930

B- 438 19.12.17 MPED-I M/s R.B. Engineering Works 2/MPED-I/09.09.16 175L 12.12.17 Security 81528

B- 440 20.12.17 MPED-V M/s MAK Construction Co. V 04/MPED-V/27.05.17 151L 02.11.17 B/d Maintenance 99765

B- 444 20.12.17 MPED-V M/s MAK Construction Co. 65/MPED-V/22.08.14 151L 28.11.17 Security 86347

B- 445 20.12.17 MPED-V M/s MAK Construction Co. 09/MPED-V/18.07.15 151L 28.11.17 Security 97427

B- 446 20.12.17 MPED-V M/s MAK Construction Co. 10/MPED-V/20.07.15 151L 28.11.17 Security 51951

B- 447 27.12.17 ECCU M/s Bharti Enterprises II, Final 11/ECCU/19.09.17 64L 06.11.17 Carriage of Material 279060

B- 448 27.12.17 ECCU M/s Sadan Engineering Works I, Final 18/ECCU/07.11.17 113L 20.11.17 Carriage of Material 316468

B- 450 27.12.17 MPED-VI M/s Bhisham Narayan 08/MPED-VI/11.05.16 260L 19.12.17 Security 8967

B- 451 27.12.17 MPED-VI M/s Bhisham Narayan 21/EE-MPED-VI/10.11.16 260L 22.12.17 Security 8918

B- 455 28.12.17 EPED-III M/s Electrical & Instrumentation Engineering

V,VI,VII 01/EPED-III/15.05.17 242L 11.12.17 Repairing & Overhandling 27807

B- 458 30.12.17 EPED-III M/s Vikas Electrical II 13/EPED-III/20.02.17 208L 10.10.17 Repairing Rewinding 267144Total 2701617 3839086 378930

B- 460 04.01.18 MPED-VI M/s Usha Enterprises 31/CAMD-II/31.03.16 256L/36 02.01.18 Security 82356

B- 461 04.01.18 MPED-VI M/s Jahangir Enterprises 08/CAMD-II/13.06.16 256L/36B 02.01.18 Security 46765

B- 462 06.01.18 MPED-V M/s M.K. Traders IV 20/MPED-V/19.09.7 150L/68 04.12.17 Operation Maintenance 19667 1821

B- 463 06.01.18 MPED-V M/s MAK Construction Co. III 05/MPED-V/20.06.17 150L/69B 18.12.17 Opration of bowl 29598 2741

B- 464 06.01.18 MPED-V M/s G.S. Construction Co. 28/MPED-V/30.01.16 120L/89B Security 245645

B- 465 06.01.18 MPED-V M/s G.S. Construction Co. 10/MPED-V/ 120L/90 Security 14500

B- 466 10.01.18 MPED-IV M/s India Engineering Works XIV 22/MPED-IV/12.01.17 167L/47 22.11.17 Fabrication/ Repairing 20816

B- 468 10.01.18 CSD-II M/s Ion Exchange (India ) Ltd. 1738/CPD-II/04.12.17 232L/35B 10.01.18 Supply 0

B- 471 11.01.18 MPED-IV M/s Lakhan Construction 09/MPED-IV/20.01.17 83L/75 20.12.17 Security 6588

B- 472 11.01.18 MPED-IV M/s India Engg. Works XIII 22/MPED-IV/12.02.17 83L/75 09.11.17 Febrication/ Repairing 13298

B- 473 11.01.18 MPED-IV M/s India Engg. Works XV 22/MPED-IV/12.02.17 83L/75B 30.11.17 Febrication/ Repairing 64664

B- 474 11.01.18 MPED-IV M/s India Engg. Works XVI 22/MPED-IV/12.02.17 83L/76 20.12.17 Febrication/ Repairing 32332

B- 476 12.01.18 MPED-II M/s Sunrise Engg. Contractor I 26/MPED-I/05.12.17 19L/74 01.01.18 B/d Maintenance 59711

B- 477 12.01.18 MPED-II M/s R.B. Engineers Contractor V 19/MPED-I/30.11.16 247L/30 07.07.17 B/d Maintenance 68804

B- 480 12.01.18 MPED-II M/s Sunrise Engg. Contractor VI 19/MPED-I/30.11.16 247L/44 09.09.17 B/d Maintenance 36959

B- 481 12.01.18 MPED-II M/s M.K. Traders IX 11/MPED-I/26.08.16 247L/47 17.10.17 B/d Maintenance 9830

B- 482 15.01.18 ECCU-IV M/s Tech Kriti Infrateck Pvt. Ltd. I, Final 12/ECCU/21.09.17 368L/107 04.10.17 Topography Survey 289100

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 61: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 483 15.01.18 ECCU-IV M/s Tech Kriti Infrateck Pvt. Ltd. I, Final 13/ECCU/21.09.17 368L/108 04.10.17 Topography Survey 342790

B- 484 15.01.18 ECCU-IV M/s Pitambra Engineers & Contractor I, Final 25/ECCU/29.12.17 368L/110 02.01.18 Cleaning Jungle 311695

B- 485 15.01.18 MPED-IV M/s Hind Udyog V 06/MPED-IV/15.07.17 81L/111 07.12.17 Repairing of Base 53065

B- 486 15.01.18 MPED-IV M/s Hind Udyog 196/MPED-IV/02.06.17 81L/111 26.12.17 Fabrication of Complative 44232

B- 492 18.01.18 MPED-V M/s M.K. Traders V 20/MPED-V/19.09.7 275L/28 01.01.18 Opration maintenance 20323

B- 493 18.01.18 MPED-V M/s MAK Construction Co. IV 05/MPED-V/20.06.17 275L/30 01.01.18 Opration of bowl 45878

B- 494 18.01.18 MPED-V M/s Hind Udyog I 11/MPED-V/14.07.17 275L/35 01.01.18 Repairing Febrication 168221

B- 495 18.01.18 MPED-V M/s MAK Construction Co. VI 04/MPED-V/27 297L/6B 02.01.18 Raining & breakdwon 121194

B- 504 19.01.18 CPD-II M/s Leak Seal Engineering 1745/CPD-II/07.12.17 197L/21 18.01.18 Supply 126201

B- 505 19.01.18 EPED-I M/s Arun Kumar 15/EPED-I/29.12.15 179L/142 07.11.17 Security 4200

B- 506 19.01.18 EPED-I M/s Arun Kumar 24/EPED-I/30.03.16 179L/142 07.11.17 Security 2400

B- 507 19.01.18 EPED-I M/s Arun Kumar 04/EPED-I/25.05.16 179L/143 07.11.17 Security 2400

B- 508 19.01.18 EPED-I M/s Arun Kumar 13/EPED-I/25.11.16 179L/144 07.11.17 Security 2400

B- 509 19.01.18 EPED-I M/s Arun Kumar 14/EPED-I/25.11.16 179L/144 07.11.17 Security 2400

B- 514 19.01.18 EPED-V M/s Rajdhani Engineering 05/EPED-V/25.09.17 273L/19 18.01.18 Complete Operation 172800

B- 515 19.01.18 EPED-V M/s Priya Construction Co. 03/EPED-V/04.09.17 273L/21 18.01.18 Routine (T To A List) 0

B- 516 19.01.18 EPED-V M/s Rajdhani Engineering 05/EPED-V/25.09.17 157L/192 18.01.18 Complete Operation 172800

B- 517 19.01.18 EPED-V M/s Rajdhani Engineering 05/EPED-V/25.09.17 157L/194 18.01.18 Complete Operation 172800

B- 518 19.01.18 EPED-V M/s Nosad Contractor 04/EPED-V/04.09.17 157L/197 18.01.18 B/d Maintenance 184708

B- 519 19.01.18 EPED-V M/s Priya Construction Co. 04/EPED-V/15.07.16 157L/200 18.01.18 Security 47360

B- 520 23.01.18 ECM&EMD M/s Ravindra Singh & Co. 318/ECM&EMD/10.12.16 397L/66 12.10.17 Security 11665

B- 521 23.01.18 MPED-I M/s Bharat Mechanical & Structural Works I 28/MPED-I/15.01.18 104L/98 16.10.17 B/d Maintenance 98678

B- 528 23.01.18 CSD-I M/s Atlas Copco 1447/CPD-II/29.09.16 213L/42 23.01.18 Supply (PI allredy verified B-792 dt. 13.02.17)

0

B- 533 25.01.18 MPED-V M/s O.S. Contractor I 18/MPED-V/18.07.17 121L/178 01.11.17 Servicing of hat air gats 59046

B- 536 29.01.18 EPED-I M/s R.K. Constructions I, Final 08/EPED-I/30.08.17 220L/108 14.01.18 B/d Maintenance 35867

B- 555 30.01.18 MPED-IV M/s India Engineering Works II 13/MPED-IV/24.08.16 82L/82 23.01.17 OH#5 166408

B- 570 31.01.18 MPED-IV M/s Hemant Singh 13/MPED-VI/04.06.17 245L/59 30.01.18 Security 2100

B- 571 31.01.18 MPED-IV M/s Hemant Singh 25/MPED-VI/03.12.16 245L/60 30.01.18 Security 4200

B- 572 31.01.18 MPED-IV M/s Hemant Singh 07/MPED-VI/08.05.16 245L/60 30.01.18 Security 4200

B- 573 31.01.18 MPED-IV M/s Hemant Singh 06/MPED-VI/07.05.16 245L/61 30.01.18 Security 4200

B- 574 31.01.18 MPED-IV M/s Hemant Singh 24/MPED-VI/01.12.16 245L/61 30.01.18 Security 4200

B- 575 31.01.18 MPED-IV M/s Hemant Singh 12/EE/MPED-VI/04.06.17 245L/62 30.01.18 Security 4200

B- 576 31.01.18 MPED-IV M/s Hemant Singh 12/EE/MPED-VI/06.06.16 245L/63 30.01.18 Security 36720Total 3343783 126201 4562

B- 578 02.02.18 MPED-IV M/s India Engg. Works III 11/MPED-IV/24.08.16 84L/83 16.12.17 Complet OH of Ash 81834

B- 581 03.02.18 MPED-I M/s Leak Seal Experts India Pvt. Ltd. VI 04/BMD-III 209L/50 Service Charge 54000

B- 582 03.02.18 MPED-I M/s Syndicate Engineering I 14/MPED-I/ 209L/51 22.08.17 Replacement Coal 38675

B- 583 03.02.18 EPED-I M/s R.P. Construction Co. I 11/EPED-I/31.08.17 161L/70 Miscellamians 43393

B- 584 03.02.18 MPED-III M/s Pushpendra Singh 05/EE/MPED-III/15.05.17 238L/101 23.01.18 Security 7046

B- 585 03.02.18 MPED-III M/s Balram Engineer Contractor & Suppliers 20/EE/MPED-III/21.12.15 238L/102 23.01.18 Security 80370

B- 586 03.02.18 MPED-III M/s M.S. Elevators 120/CWCD-II/24.12.13 238L/102 23.01.18 Security 88209

B- 601 13.02.18 EPED-IV M/s MRP Constrcution 05/EPED-IV/01.09.17 200L/76 15.09.17 B/d Maintenance 3051

B- 602 13.02.18 EPED-IV M/s MRP Constrcution 05/EPED-IV/01.09.17 200L/77 05.12.17 B/d Maintenance 2966

B- 605 13.02.18 EPED-IV M/s sieger Electrical System Pvt. Ltd. I Final 193/EPED-IV/04.07.17 200L/81 12.02.18 Deputation of Engg. OH 172800

B- 606 17.02.18 MPED-V M/s M.K. Traders VI 20/MPED-V/19.09.17 151L/86 01.02.18 Operation maintaine 20323

B- 607 17.02.18 MPED-V M/s MAK Construction V 05/MPED-V/03.08.16 151L/88B 03.02.18 Opration Bwol Mill 79121

B- 611 23.02.18 MPED-IV M/s Hind Udyog 304/MPED-IV/05.08.17 83L/82 31.01.18 Fab. Of Supply 99647

B- 612 23.02.18 MPED-IV M/s Hind Udyog 304/MPED-IV/05.08.17 81L/82B 31.01.18 Fab. Of Supply 73348

B- 613 23.02.18 MPED-II M/s MAK Construction VII 04/MPED-II/27.05.17 297L/13B 01.02.18 B/d Running 62597

B- 614 23.02.18 MPED-V M/s Hind Udyog II 11/MPED-V/14.07.17 275L/43 01.02.18 Rep. Of Upper houseing 356910

B- 615 23.02.18 MPED-V M/s MAK Construction I,II 26/MPED-V/10.01.18 106L/97 21.01.18 Strenghening by 121176

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 62: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 616 24.02.18 ECM&EMD M/s Ravindra Singh & Co. IV Final 02/ECM&EMD/06.05.17 397L/67B 15.12.17 M& K of Store 2882

B- 617 24.02.18 ECM&EMD M/s Vijay Kumar Gupta IFinal 15/ECM&EMD/29.01.18 439L/67 17.02.18 Structural Steel Work 204370 144064

B- 618 24.02.18 ECM&EMD M/s Ravindra Singh & Co. 07/ECM&EMD/30.08.16 1826L/139 13.02.18 Security 42527

B- 619 24.02.18 ECM&EMD M/s Bharti Enterprises IIFinal 07/ECM&EMD/20.09.17 112L/89 26.12.18 Cleaning vegltations 89227

B- 620 24.02.18 ECM&EMD M/s Ravindra Singh & Co. I 08/ECM&EMD/26.12.17 363L/144 08.01.18 Cleaning the Grass 73153 97085

B- 623 26.02.18 ECM&EMD M/s Vijay Kumar Gupta I 14/ECM&EMD/29.01.18 230L/95 24.02.18 Water Supply 319351

B- 628 27.02.18 MPED-I M/s Abhay Kumar Contractor 01/MPED-I 13L/40 Security 67756 70000

B- 629 27.02.18 CSD-II M/s S.K. Engipro & Allied Solution (P) Ltd, 1006/CPD-I/17.10.17 233L/70 26.02.18 Pressure Gayses 239400

B- 630 27.02.18 CSD-II M/s Simplex Switchgear Pvt. Ltd. 1491/CPD-I/22.12.14 233L/71 26.02.18 Thermostart 198240

B- 631 27.02.18 CSD-II M/s Pawor Engineers 42/CPD-II/06.01.18 217L/16 15.02.18 Supply 538792

B- 632 27.02.18 CSD-II M/s Simplex Switchgear Pvt. Ltd. 133/CPD-II/29.01.18 217L/16 26.02.18 Alkal Unloading 104030

B- 633 27.02.18 CSD-II M/s Simplex Switchgear Pvt. Ltd. 1692/CPD-I/20.11.17 217L/17 26.02.18 Fume Absorber 140892

B- 634 27.02.18 CSD-II M/s Globus Engineers 1783/CPD-II/15.11.17 217L/19 26.02.18 Supply 699955

B- 635 27.02.18 CSD-II M/s Globus Engineers 2044/CPD-II/21.12.16 217L/20 26.02.18 Replaceable Seat 39552

B- 636 27.02.18 CSD-II M/s Technow Engineering Works 1404/CPD-I/24.01.18 232L/42B 26.02.18 Supply 22237

B- 637 27.02.18 CSD-II M/s Technow Engineering Works 1265/CPD-I/19.12.17 232L/43A 26.002.18 Supply 26451

B- 638 27.02.18 CSD-II M/s Jalvid Udyog 1264/CPD-I/19.12.17 232L/43B 26.02.18 Supply 287183TOTAL 2733851 1747613 311149

B- 640 07.03.18 CSD-II M/s Astech Marketing Pvt. Ltd. 1832/CPD-II/28.12.17 246L/31A 07.03.18 Supply (T To A List A-240) 0

B- 641 08.03.18 MPED-I M/s Bharat Mechanical & Structural Works II 28/MPED-I/15.01.18 247L/53 07.12.18 B/D maintenance 98733

B- 643 08.03.18 MPED-I M/s Goga Jahangir Contruction Co. XII 18/MPED-I/30.11.16 293L/10 01.01.18 Descalling Of Pressure 44227

B- 646 16.03.18 EPED-V M/s Rajdhani Engineering V 05/EPED-V/21.09.17 216L/99 09.03.18 Complete opration Maintance 172800

B- 647 16.03.18 EPED-V M/s Rajdhani Engineering VI 05/EPED-V/21.09.17 309L/01B 09.03.18 Complete opration Maintance 172800

B- 648 16.03.18 EPED-V M/s Nosad Contractor II 04/EPED-V/04.09.17 287L/20B 09.03.18 B/D maintenance 122333

B- 654 19.03.18 MPED-I M/s HiTek NDT Services IFinal 31/MPED-I/24.01.18 219L/33 28.02.18 Radiography of HP 97896 1084488

B- 656 19.03.18 MPED-I M/s United Hi-Tech (P) Ltd. 24/MPED-I 219L/37 07.03.18 Security 268867

B- 657 19.03.18 CSD-II M/s Trade India Corporation 1343/CPD-I/10.01.18 284L/4A 19.03.18 Supply 443214

B- 658 20.03.18 EPED-III M/s Electrical Instrumentation Engineers VIII,IX 01/EPED-III/15.05.17 202L/54 29.01.18 Reparing OH 21240

B- 659 20.03.18 CSD-II M/s BPCL 1055/CPD-I/01.11.17 126L/53 20.03.18 Supply (T To A List A-259dt.07.06.18) 0

B- 661 22.03.18 CSD-II M/s Goverdhan Controls 767/CPD-I/07.09.17 89L/58B 21.03.18 Supply 424120

B- 663 22.03.18 MPED-II M/s Thermal India Engineers III 08/MPED-II/03.08.17 55L/79B 15.11.17 B/D maintenance 140340

B- 664 22.03.18 MPED-II M/s Thermal India Engineers IV,V 08/MPED-II/03.08.17 55L/80B B/D maintenance 110829

B- 665 22.03.18 MPED-II M/s Hind Udyog III 06/MPED-II/15.07.17 55L/81B 25.01.18 Reparing Fabrication 242522

B- 666 22.03.18 MPED-V M/s MAK Construction Co. VIII 04/MPED-V/27.05.17 298L/06 02.03.18 Running & Maintenance 96247

B- 667 22.03.18 MPED-V M/s MAK Construction Co. I 022/MPED-II/13.11.17 298L/6B 24.02.18 Patch work of PA,FD 85536

B- 668 22.03.18 MPED-V M/s MAK Construction Co. III 26/MPED-V/10.01.18 276L/14 24.02.18 Strengthening by Reparing 80784

B- 669 22.03.18 MPED-V M/s MK Traders VII 20/MPED-V/19.09.17 274L/42 05.03.18 Opration Maintenance 18356

B- 670 22.03.18 MPED-V M/s Hind Udyog III 11/MPED-V/14.07.17 274L/44 05.03.18 Reparing of uper housekeeping 57240

B- 671 24.03.18 ECM&EMD M/s SGL Engineering Industries 04/ECM&EMD/13.01.15 214L/79B 08.03.18 Security 35590

B- 673 24.03.18 ECM&EMD M/s S.R. Enterprises 04/ECM&EMD/01.07.16 112L/90 23.03.18 Security 4890

B- 675 24.03.18 ECM&EMD M/s Puneet Construction 17/ECM&EMD/29.01.18 141L/127 10.03.18 Painting & Distempring 52193

B- 676 26.03.18 EPED-III M/s K.S. Brothers IIFinal 15/EPED-III/18.04.17 208L/129 11.01.18 Reparing of C&S 77880

B- 677 26.03.18 EPED-III M/s Vikas Electrical III 13/EPED-III/20.02.17 208L/132 31.01.18 Repair Rewainding 113933

B- 678 26.03.18 CSD-II M/s Astech Marketing Pvt. Ltd. 1641/CPD-I/16.03.18 214L/113 26.03.18 Supply 319339

B- 682 28.03.18 EPED-I M/s A.K. Construction 07/EPED-I/25.08.15 129L/43B 14.03.18 Security 228628

B- 683 28.03.18 EPED-I M/s A.K. Construction 19/EPED-I/30.12.15 129L/44 14.03.18 Security 101686

B- 684 28.03.18 EPED-I M/s R.P. Construction 11/EPED-I/31.08.17 129L/44B 14.03.18 Misc. mechanical Work 81346

B- 685 28.03.18 EPED-I M/s R.K. Electrical Works 23/EPED-I/10.03.16 129L/45 14.03.18 Security 18013

B- 689 28.03.18 ECCU M/s Pitambara Engineers & Contractor II 14/ECCU/26.09.17 1764L/168 05.03.18 Providing & Laying 202853 202853

B- 690 28.03.18 CHD-II M/s M.K. Traders Final 10/CHD-II/09.09.16 254L/64 Maintenance OH 24802TOTAL 2772564 1186673 1287341

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 63: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 1 03.04.18 CSD-II M/s Hind Udyog 207/CPD-II/09.02.18 213L/50 03.04.18 Supply 589528

B- 4 03.04.18 MPED-I M/s Nico Engineering Services Ltd. II 411/MPED-I/24.01.18 247L/56 OH 45312

B- 7 03.04.18 MPED-I M/s Bharat Mechanical & Structural Works III 28/MPED-I/15.01.18 169L/160 12.02.18 B/d Maintenance 137675

B- 9 03.04.18 MPED-I M/s U.S. Enterprises II 17/MPED-I/25.07.17 291L/10B 10.02.18 OH#5 315944

B- 10 03.04.18 MPED-I M/s U.S. Enterprises II 18/MPED-I/25.07.17 291L/11 10.02.18 OH#5 433939 919463B- 11 03.04.18 MPED-I M/s Syndicate Engineers II 14/MPED-I/19.07.17 291L/20 Replacement of Coal 102944

B- 12 03.04.18 MPED-I M/s S.K. Engineering Works III 27/MPED-I/15.01.18 291L/20B B/d Maintenance 38258

B- 13 03.04.18 MPED-I M/s Bharat Mechanical & Structural Works IV 28/MPED-I/15.01.18 291L/21B B/d Maintenance 179550

B- 14 03.04.18 MPED-I M/s Hind Udyog I 32/MPED-I/21.03.18 281L/05 27.02.18 Repairing 254290

B- 15 04.04.18 CSD-II M/s K.S. & Brothers 958/CPD-I/10.10.17 198L/26 04.04.18 Supply 105545

B- 16 04.04.18 CSD-II M/s K.S. & Brothers 1403/CPD-I/29.01.18 198L/27 04.04.18 Supply 43746

B- 17 04.04.18 CSD-II M/s K.S. & Brothers 23/CPD-III/29.01.18 198L/28 04.04.18 Supply 793518

B- 19 04.04.18 EPED-II M/s R.K. Electrical Works 22/EPED-II/10.03.16 313L/01 19.02.18 Security 18644

B- 20 04.04.18 EPED-II M/s R.P. Construction Co. 07/EPED-II/26.10.17 313L/03 07.03.18 Misc. Mechanical Works 58611

B- 21 06.04.18 ECM&EMD M/s Ravindra Singh & Co. II 08/ECM&EMD/26.12.17 363L/150 07.03.18 Maintenance of Park 45199

B- 22 06.04.18 ECM&EMD M/s Ravindra Singh & Co. I,II 16/ECM&EMD/29.01.18 1826L/144 07.03.18 Up Keeping of Admi 215471

B- 23 06.04.18 ECM&EMD M/s Ravindra Singh & Co. I 08/ECM&EMD/09.01.18 316L/02 08.03.18 Closing of Pumping 253648

B- 24 09.04.18 MPED-IV M/s Kiran Devi 25/MPED-IV 84L/86 28.02.18 Security 7007

B- 25 09.04.18 MPED-IV M/s India Engg. Works XIII 02/MPED-IV/05.05.17 84L/86B 12.02.18 Replacement/ Rafiting 51637

B- 26 09.04.18 MPED-IV M/s India Engg. Works XX 22/MPED-IV/12.02.17 83L/85 27.02.18 Febrication & Repairing 31624

B- 27 09.04.18 MPED-IV M/s India Engg. Works XXI 22/MPED-IV/12.02.17 83L/85B 06.03.18 Febrication & Repairing 64664

B- 29 09.04.18 MPED-IV M/s India Engg. Works 23/MPED-IV/12.01.17 83L/86 27.03.18 Security 18000

B- 30 09.04.18 MPED-IV M/s India Engg. Works 13/MPED-IV/24.03.17 83L/86B 27.03.18 Security 23650

B- 31 09.04.18 MPED-IV M/s India Engg. Works 11/MPED-IV/24.08.16 83L/87 27.03.18 Security 49568

B- 32 09.04.18 MPED-IV M/s India Engg. Works 04/MPED-IV/21.06.17 83L/87 27.03.18 Security 29256

B- 33 09.04.18 MPED-IV M/s MAK Construction Co. 06/MPED-IV/25.07.16 83L/87B 28.03.18 Security 98133

B- 34 09.04.18 MPED-IV M/s Rahul Gupta & Co. I 22/MPED-IV/12.01.18 83L/88B 31.03.18 Fab. Of Shaft Repairing 96649

B- 35 09.04.18 MPED-IV M/s Arun Kumar 08/MPED-IV/29.07.17 112L/77B 27.03.18 Security 1200

B- 36 09.04.18 MPED-IV M/s Kiran Devi 15/MPED-IV/29.09.16 112L/78L 27.03.18 Security 4582

B- 38 09.04.18 MPED-IV M/s India Engg. Works 02/MPED-IV/05.05.17 112L/78B 06.01.18 Repairing & Maintenance 24762

B- 39 09.04.18 MPED-IV M/s India Engg. Works 22/MPED-IV/12.01.17 112L/79 11.01.18 Repairing of ash 25110

B- 40 10.04.18 ECCU M/s Pitambra Engineers & Contractor IFinal 30/ECCU/26.03.18 369L/71 22.02.18 Evacuating ash 352550

B- 41 10.04.18 MPED-V M/s Bharti Enterprises IFinal 32/MPED-V/07.03.18 107L/99 01.03.18 Repairing & Reconding 312704

B- 42 12.04.18 MPED-IV M/s India Engg. Works XIV 02/MPED-IV/05.05.17 102L/126 19.01.18 Repairing Maintenance 45453

B- 43 12.04.18 MPED-IV M/s India Engg. Works XVIII 22/MPED-IV/12.01.17 102L/127 24.01.16 Fabrication/ Repairing 23860

B- 44 12.04.18 MPED-IV M/s India Engg. Works XV 02/MPED-IV/05.05.17 102L/128 28.01.18 Repairing Maintenance 21501

B- 45 12.04.18 ECCU M/s RITES Ltd. VI 2170/ECCU/21.11.09 300L/03 11.04.18 Project Management Consultancy Works 1685756

B- 46 12.04.18 CSD-II M/s Sone Obra Enterprises Pvt Ltd. 1668/CPD-I/21.03.18 206L/90 11.04.18 Supply 1043625

B- 48 17.04.18 MPED-II M/s Usha Enterprises 13/MPED-II/31.08.16 206L/82 Security 81932

B- 49 17.04.18 MPED-II M/s Thermal India Engineers 07/MPED-II/25.01.18 228L/99 Security 67920

B- 50 17.04.18 MPED-II M/s Thermal India Engineers 08/MPED-II/23.06.16 228L/100 Security 73873

B- 52 17.04.18 MPED-IV M/s MAK Construction IX 14/MPED-IV/26.01.18 103L/129 26.01.18 DP Extension & Diversion of Ash 86494

B- 53 17.04.18 MPED-IV M/s India Engg. Works XVI 02/MPED-IV/05.05.17 112L/82 10.03.18 Reelacment/Refitting 18889

B- 54 17.04.18 ECM&EMD M/s Vijay Kumar Gupta IFinal 20/ECM&EMD/14.03.18 399L/67B 11.04.18 M&R of door Reiforce cement 331112

B- 55 19.04.18 MPED-I M/s Bharat Mechanical & Structural Works V 28/MPED-I/15.01.18 176L/49 12.03.18 B/d Maintenance 105933

B- 56 19.04.18 MPED-I M/s Goga Jaharbeer Construction Co. XIII 18/MPED-I/30.11.16 292L/10 01.03.18 Descallling of pressure 63504

B- 58 20.04.18 MPED-V M/s M.K Traders VIII 20/MPED-IV/19.09.17 151L/95 02.04.18 Opration Maintenance 20323

B- 60 20.04.18 MPED-V M/s MAK Construction Co. VI 05/MPED-V/20.06.17 151L/96B 02.04.18 opration of Bowler 269480

B- 61 20.04.18 MPED-V M/s O.S. Contractor IFinal 17/MPED-V/18.07.17 297L/22 15.01.18 Supply 713016

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 64: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 62 20.04.18 MPED-V M/s MAK Construction Co. IX & Final 04/MPED-V/27.05.17 297L/23B 02.04.18 B/d Maintenance 110258

B- 63 20.04.18 MPED-V M/s O.S. Contractor II 18/MPED-V/18.07.17 121L/181 12.03.18 Servicing of hot air gats 35776

B- 64 20.04.18 MPED-III M/s Usha Enterprises II 27/MPED-III/10.03.17 238L/103 16.03.18 OH 97952

B- 65 20.04.18 MPED-III M/s Jahangir Enterprises IX 19/MPED-III/12.01.17 238L/119 29.03.18 B/d Maintenance 27335

B- 66 20.04.18 MPED-III M/s Jahangir Enterprises X 19/MPED-III/12.01.17 238L/120 29.03.18 B/d Maintenance 21335

B- 67 20.04.18 MPED-III M/s Jahangir Enterprises XI 19/MPED-III/12.01.17 238L/122 29.03.18 B/d Maintenance 29294

B- 68 20.04.18 MPED-III M/s Jahangir Enterprises XII 19/MPED-III/12.01.17 238L/123 29.03.18 B/d Maintenance 27786

B- 69 20.04.18 CSD-II M/s Power Tech Corporation 306/CPD-II/05.03.18 61L/90B 20.04.18 Supply 306677

B- 72 23.04.18 MPED-VI M/s Jahangir Enterprises II 28/EE-MPED-VI/29.10.17 256L/44B 02.04.18 B/d Maintenance 47003

B- 73 23.04.18 MPED-VI M/s Jahangir Enterprises III 28/EE-MPED-VI/29.10.17 256L/45B 02.04.18 B/d Maintenance 88038

B- 75 23.04.18 MPED-VI M/s Thermal India Engineers VI 08/MPED-II/03.08.17 228L/106 03.03.18 B/d Maintenance 203964

B- 76 23.04.18 MPED-VI M/s Thermal India Engineers VIII 08/MPED-II/03.08.17 228L/111 03.03.18 B/d Maintenance 203257

B- 77 23.04.18 MPED-VI M/s Thermal India Engineers VII 08/MPED-II/03.08.17 229L/114 B/d Maintenance 62569

B- 81 24.04.18 EPED-V M/s Awasthi Motar Winding Works Final 06/EPED-V/06.11.15 211L/82 03.04.17 Compelete Rotor care 310658

B- 83 24.04.18 MPED-I M/s S.K. Engineering Works IV 27/MPED-I/15.01.18 281L/9B 04.04.18 B/d Maintenance 26996

B- 84 24.04.18 MPED-I M/s Bharat Mechanical & Structural Works VI 28/MPED-I/15.01.18 281L/12 04.04.18 B/d Maintenance 56700

B- 87 24.04.18 MPED-I M/s O.S. Contractor IIFinal 30/MPED-I/30.03.17 290L/5B 20.04.18 Repairing 173420TOTAL 8015629 3288978 919463

B- 88 03.05.18 M/s D.K. & Sons Co. IFinal 16/EPED-I/06.11.17 278L/17 16.03.18 Fab & Eveebon 276473

B- 90 03.05.18 MPED-VI M/s D.K. & Sons Co. VI 10/EPED-I/10.08.16 98L/77 16.03.18 B/D Maintenance 56004

B- 91 03.05.18 EPED-I M/s A.K. Construction 09/EPED-I/04.08.16 98L/78B Security 200387

B- 92 03.05.18 EPED-I M/s A.K. Construction 01/EPED-I/11.05.16 98L/79 Security 173943

B- 93 03.05.18 EPED-I M/s Bharat Mechanical & Structural Works IFinal 24/MPED-I/05.12.17 292L/11 23.02.18 Replacement of & 165526

B- 94 03.05.18 MPED-I M/s Sunrise Engineers & Contractor VII 19/MPED-I/30.11.16 292L/12 09.02.18 B/D Maintenance 53855

B- 95 03.05.18 MPED-I M/s Sunrise Engineers & Contractor VIII 19/MPED-I/30.11.16 292L/13 11.03.18 B/D Maintenance 10936

B- 97 03.05.18 MPED-I M/s O.S. Contractor XII 07/MPED-I/08.08.16 13L/41 16.04.18 B/D Maintenance 202628

B- 98 03.05.18 MPED-I M/s O.S. Contractor XIII 07/MPED-I/08.08.16 13L/41B 21.04.18 Maintenance 114269

B- 99 03.05.18 MPED-I M/s R,B. Engineering Works II 26/MPED-I/05.12.17 13L/42B 23.04.18 B/D 101979

B- 105 03.05.18 MPED-III M/s Jahangir Enterprises I 15/MPED-III/21.03.18 182L/14 25.02.18 B/D Maintenance 37267

B- 106 03.05.18 MPED-III M/s Jahangir Enterprises security 23/MPED-III/06.02.17 164L/85 08.04.18 Security 22500

B- 107 03.05.18 MPED-III M/s Balram Engineer Contractor & Suppliers 70/CWCD-III/07.10.13 164L/86 08.04.18 Security 30660

B- 108 03.05.18 MPED-III M/s Jahangir Enterprises 17/MPED-III/18.11.15 164L/87 08.04.18 Security 17819

B- 109 03.05.18 MPED-III M/s SGL Engineering Industries 22/MPED-III/22.03.13 164L/87 08.04.18 Security 1600

B- 110 03.05.18 MPED-III M/s Khemraj Singh 18/MPED-III/02.12.16 164L/88 12.04.18 Security 7046

B- 111 03.05.18 MPED-IV M/s Rajeev Kumar Contractor I 25/MPED-IV/13.03.18 196L/39 01.03.18 Laying of ms Pipe Line 3000 139876

B- 113 03.05.18 MPED-IV M/s India Engineering Works IFinal 05/MPED-IV/26.04.18 320L/07 24.04.18 Lifting & Shifting 97308

B- 114 03.05.18 CSD-II M/s Vijay Chandra Industries 305/CPD-II/05.03.18 212L/61 01.05.18 Supply 881621

B- 118 07.05.18 EPED-IV M/s Zentih Engineers 06/EPED-IV/25.07.16 155L/18B 04.05.18 Security 51142

B- 119 07.05.18 MPED-V M/s Syndicate Engineers 19/MPED-V/09.03.17 153L/70B 04.05.18 Security 245310

B- 120 07.05.18 MPED-V M/s Syndicate Engineers 12/MPED-V/15.07.17 121L/181 10.05.18 Security 9700

B- 121 07.05.18 MPED-V M/s Syndicate Engineers 14/MPED-V/17.07.17 121L/182 10.05.18 Security 358200

B- 122 07.05.18 MPED-V M/s Syndicate Engineers 13/MPED-V/17.07.17 121L/183 10.05.18 Security 47821

B- 123 07.05.18 CSD-II M/s Paramount International 1837/CPD-II/29.12.17 250L/31 11.05.18 Supply 146360 288088

B- 126 07.05.18 CSD-II M/s Paramount International 1836/CPD-II/29.12.17 250L/36 11.05.18 Supply 259124

B- 127 07.05.18 CSD-II M/s Jalvid Udyog 302/CPD-II/05.03.18 250L/37 11.05.18 Supply 64223

B- 129 15.05.18 EPED-II M/s R.P. Construction Co. III 07/EPED-II/26.10.17 304L/13B 17.04.18 Laying Testing 45748

B- 133 17.05.18 MPED-IV M/s U.S. Enterprises Ifinal 03/MPED-IV/17.04.18 103L/132 18.04.18 OH 194400

B- 134 17.05.18 MPED-IV M/s India Engineering Works I 02/MPED-IV/16.04.18 112L/85B 07.04.18 Reparing 18164

B- 135 17.05.18 MPED-IV M/s India Engineering Works XIX 02/MPED-IV/05.05.18 112L/85B 11.04.18 Replacement refitting 29662

B- 136 17.05.18 MPED-IV M/s Rahul Gupta & Co. II 22/MPED-IV/12.01.18 112L/86B 30.04.18 Febrication of enf cover 58470

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 65: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 137 17.05.18 MPED-IV M/s India Engineering Works II 18/MPED-IV/21.04.18 112L/87B 07.05.17 Fabricatin of CL Gland 105723

B- 138 17.05.18 MPED-IV M/s India Engineering Works XX 02/MPED-IV/05.05.18 83L/90 28.04.18 Replacment Refiting 29080

B- 139 17.05.18 MPED-IV M/s Garg Engineering & Sons V 05/MPED-IV/29.06.17 83L/92B 28.04.18 Reparing/ Replecment 32958

B- 141 23.05.18 CSD-II M/s Trade India Corporation 1343/CPD-II/10.01.18 284L/5B 23.05.18 Supply 133057

B- 142 23.05.18 CSD-II M/s Mechfield Corporation 304/CPD-II/05.03.18 246L/34B 23.05.18 Supply 3197

B- 143 23.05.18 CSD-II M/s Hind Scientific Industries 546/CPD-II/08.05.18 246L/35 23.05.18 Supply 1662

B- 144 23.05.18 CSD-II M/s Priya Construction Co. 10/EPED-III/09.11.12 89L/60 23.05.18 Security 23873

B- 145 25.05.18 CSD-II M/s Naushad & Brothers 87/CPD-I/20.04.18 90L/38A 23.05.18 Supply 1033370

B- 148 26.05.18 MPED-IV M/s MAK Construction Co. X 14/MPED-IV/26.09.17 81L/122 13.04.18 Divirsion of ash 47872

B- 149 26.05.18 MPED-IV M/s Garg Engineering & Sons II 24/MPED-IV/10.01.18 81L/123 13.04.18 Febrication & Erection 54879

B- 150 26.05.18 MPED-IV M/s India Engineering Works I 07/MPED-IV/02.05.18 81L/124 04.05.18 OH of Sal 200861

B- 151 26.05.18 MPED-IV M/s S.R. Enterprises 14/MPED-IV/06.09.16 81L/126 05.05.18 Security 10290

B- 152 26.05.18 MPED-IV M/s India Engineering Works 22/MPED-IV/12.01.17 81L/126 05.05.18 Security 87430

B- 153 26.05.18 MPED-IV M/s Garg Engineering & Sons IV 05/MPED-IV/29.06.17 102L/129 15.04.18 Crack vlalveelzing 38344

B- 155 28.05.18 EPED-V M/s Nosad Contractor III 04/EPED-V/04.09.17 299L/7B 10.05.18 B/D Maintenance 19197

B- 156 30.05.18 ECM&EMD M/s Puneet Construction IIIFinal 17/ECM&EMD/29.01.18 141L/130 08.05.18 Distempering with Oil 11269

B- 157 30.05.18 ECM&EMD M/s S.R. Enterprises II 23/ECM&EMD/15.03.18 397L/73B 16.04.18 Eart work 4132 36647

B- 158 31.05.18 MPED-II M/s Thermal India Engg. 14/MPED-II/19.10.16 55L/88B 30.05.18 Security money 116334TOTAL 3414059 2522614 464611

B- 159 01.06.18 CSD-II M/s Technow Engineering Works 177/CPD-I/21.05.18 232L/47B 31.05.18 Supply 116373

B- 160 01.06.18 CSD-II M/s Technow Engineering Works 177/CPD-I/21.05.18 232L/48B 31.05.18 Supply 44958

B- 161 04.06.18 MPED-VI M/s Jahangir Enterprises IV 28/MPED-VI/29.10.17 317L/34 B/d Maintenance 42680

B- 162 04.06.18 MPED-VI M/s Jahangir Enterprises V 28/MPED-VI/29.10.17 317L/36 25.04.18 B/d Maintenance 56008

B- 163 04.06.18 MPED-VI M/s Jahangir Enterprises VI 28/MPED-VI/29.10.17 318L/20 07.05.18 B/d Maintenance 59145

B- 168 04.06.18 MPED-V M/s Ravindra Singh & Co. 02/MPED-V/29.05.16 150L/74B 21.05.18 Security 90124

B- 170 04.06.18 MPED-V M/s MK Traders IX 20/MPED-V/19.09.17 274L/52 01.05.18 Maintenance 19667

B- 171 04.06.18 MPED-V M/s MAK Construction Co. I 01/MPED-V/24.04.18 274L/55 01.05.18 B/d Maintenance 29596

B- 172 05.06.18 MPED-IV M/s India Engineering Works XXII 22/MPED-IV/12.01.17 82L/88 06.03.18 Fabrication Repairing 56558

B- 173 05.06.18 MPED-IV M/s India Engineering Works XVII 02/MPED-IV/05.05.17 82L/88 17.03.18 Replacement Refting 24945

B- 174 05.06.18 MPED-IV M/s India Engineering Works XVIII 02/MPED-IV/05.05.17 82L/89 26.03.18 Replacement Refting 24125

B- 175 05.06.18 MPED-IV M/s MAK Construction Co. IX 14/MPED-IV/26.09.17 82L/90 26.03.18 D.P. Extension 44774

B- 176 05.06.18 MPED-IV M/s India Engineering Works III 02/MPED-IV/16.04.18 84L/89 02.05.18 Reparing 65070

B- 177 05.06.18 MPED-IV M/s Hind Udyog 06/MPED-IV/15.07.17 84L/89A 03.05.18 Security 40241

B- 178 07.06.18 MPED-I M/s S.K. Engineering Works V 27/MPED-I/15.01.18 231L/85 14.05.18 B/d Maintenance 28391

B- 179 07.06.18 MPED-I M/s Bharat Mechanical & Structural Work VII 28/MPED-I/15.01.18 231L/88 30.04.18 B/d Maintenance 165306

B- 180 07.06.18 MPED-I M/s Jahangir Enterprises 13/MPED-I/09.09.16 292L/15 22.05.18 Security 46094

B- 184 07.06.18 CSD-II M/s Atlas Copco (India) Ltd. 1673/CPD-II/16.11.17 212L/62 06.06.18 Supply 3440305

B- 185 07.06.18 CSD-II M/s Atlas Copco (India) Ltd. 1667/CPD-II/14.11.17 212L/63 06.06.18 Supply 990781

B- 188 14.06.18 ECCU M/s Sadan Engineering Works I 26/ECCU/09.01.18 64L/87 05.03.18 M& Raf Ash Dump 176552

B- 189 14.06.18 ECCU M/s Sadan Engineering Works II 26/ECCU/09.01.18 64L/89 20.04.18 M& Raf Ash Dump 92131

B- 191 14.06.18 ECCU M/s Sadan Engineering Works IF 31/ECCU/28.03.18 26L/67B 20.04.18 Cleaning Jungle 302501

B- 193 14.06.18 ECCU M/s Sadan Engineering Works IF 03/ECCU/21.05.18 300L/5B 30.04.18 Distempring & Painting 322631

B- 195 15.06.18 CSD-II M/s Shree Shyam Bearing Pvt. Ltd. 1342/CPD-I/10.01.18 285L/7A 14.06.18 Supply 96255

B- 196 15.06.18 CSD-II M/s Rajat Associates 1698/CPD-II/24.11.17 285L/7B 14.06.18 Supply PI 9333

B- 197 15.06.18 CSD-II M/s Rajat Associates 133/CPD-I/08.05.18 285L/7B 14.06.18 Supply PI 521520

B- 198 18.06.18 EPED-II M/s S.K.Engineering & Allied Solution IF 165/CPD-I/02.02.16 304L/14B 12.06.18 Supply 196176

B- 200 18.06.18 CSD-II M/s Jalvid Udyog 178/CPD-I/21.05.18 330L/01 15.06.18 Supply 22397

B- 201 18.06.18 CSD-II M/s Jalvid Udyog 178/CPD-I/21.05.18 330L/02 15.06.18 Supply 868

B- 202 19.06.18 ECM&EMD M/s Sawen Consultancy Services Pvt. Ltd. ILast 02/ECM&EMD/07.06.18 364L/154 22.05.18 Document for Submission (Transfer To A List A-278 dt. 21.06.18

0

B- 203 20.06.18 EPED-III M/s Electrical & Instrumentation Engineering

XIII 01/EPED-III/15.05.17 202L/56 22.05.18 Reparing & OH 56346

B- 204 20.06.18 MPED-I M/s R.B. Engineering Works III 26/MPED-I/13.10.17 290L/09 10.05.18 B/d Maintenance 58799

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 66: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 205 20.06.18 MPED-I M/s R.B. Engineering Works IV 26/MPED-I/05.12.17 290L/14B 06.06.18 B/d Maintenance 117995

B- 207 20.06.18 MPED-I M/s Syndicate Engineers 15/MPED-I 290L/16B 18.06.18 Security 89100

B- 208 22.06.18 MPED-I M/s Bharat Mechanical & Structural Work IX 28/MPED-I/15.01.18 170L/113 04.06.18 B/d Maintenance 64700

B- 209 22.06.18 MPED-I M/s Syndicate Engineers III 14/MPED-I/19.07.18 170L/115 15.05.18 Replae of caal Nozal 26158

B- 210 22.06.18 MPED-I M/s Bharat Mechanical & Structural Work VIII 28/MPED-I/15.01.18 247L/62 07.05.18 B/d Maintenance 124632

B- 211 22.06.18 MPED-I M/s Leak Seal Experts (India) Pvt. Ltd. I 01/BMD-III/02.05.18 247L/64 Service Charges 68040

B- 212 22.06.18 CSD-II M/s Commercial Enterprises 1344/CPD-I/10.01.18 285L/6B 22.06.18 Supply 487816

B- 213 26.06.18 MPED-V M/s MAK Construction Co. Final 26/MPED-V/10.01.18 276L/14B 08.05.18 Repairing 40392

B- 214 26.06.18 MPED-V M/s M.K. Traders X 20/MPED-V/19.09.17 275L/58 01.05.18 Opration Maintenance 20323

B- 215 26.06.18 MPED-V M/s Hind Udyog V 11/MPED-V/14.07.17 275L/64 09.06.18 Repairing 326570

B- 216 26.06.18 MPED-V M/s Thermal India Engineers IX&X 08/MPED-II/03.08.17 228L/118 B/d Maintenance 137254

B- 217 26.06.18 MPED-V M/s Hind Udyog VII 09/MPED-IV/01.08.17 84L/92 22.06.18 Supply 16850

B- 219 27.06.18 ECCU M/s Vijay Kumar Gupta Contractor IFinal 06/ECCU/15.06.18 08L/117 15.06.18 Evacuating ash for creating 112620

B- 220 27.06.18 MPED-IV M/s India Engineering Works 03/MPED-IV/05.05.17 112L/88B 27.06.18 Security 806400

B- 221 29.06.18 CSD-II M/s New Allenberry Works 202/CPD-III/23.05.18 61L/92B 28.06.18 Gearbox 2802377

B- 222 29.06.18 MPED-III M/s Usha Enterprises I 06/MPED-III/10.10.17 244L/72 11.05.18 B/d Maintenance 104282

B- 224 29.06.18 MPED-III M/s Usha Enterprises IFinal 03/MPED-III/16.04.18 164L/91 12.06.18 Repairing 83268

B- 225 29.06.18 MPED-III M/s Jalvid Udyog 178/CPD-I/21.05.18 330/09 29.06.18 Supply 25053 79141

B- 226 30.06.18 MPED-III M/s Jahangir Enterprises XIII 19/MPED-III/12.01.17 182L/33 29.04.18 B/d Maintenance 28505

B- 227 30.06.18 MPED-III M/s Jahangir Enterprises XIV 19/MPED-III/12.01.17 182L/35 11.05.18 B/d Maintenance 21048

B- 228 30.06.18 MPED-I M/s U.S. Enterprises 18/MPED-I 290L/17 25.06.18 Security 242252

B- 229 30.06.18 MPED-I M/s U.S. Enterprises 17/MPED-I 290L/17 25.06.18 Security 267550

B- 230 30.06.18 MPED-I M/s U.S. Enterprises 16/MPED-I 189L/19 19.06.18 Security 280500

B- 231 30.06.18 MPED-I M/s U.S. Enterprises 16/MPED-I 189L/20 19.06.18 Security 18900

B- 232 30.06.18 MPED-I M/s Hind Udyog 17/MPED-I/27.09.16 189L/20 14.12.17 Repairing 61950

B- 233 30.06.18 MPED-I M/s Goga Jaharbeer Construction Co. 18/MPED-I/30.01.16 292L/16 02.04.18 Descallig of pressure 11636

B- 234 30.06.18 MPED-I M/s S.K. Engineering Works VI 27/MPED-I/15.01.18 247L/66 28.06.18 B/d Maintenance 119248

B- 235 30.06.18 MPED-IV M/s Rajeev Kumar Contractor I 06/MPED-IV/28.04.18 320L/2B 01.06.18 Opration of dewating 25138TOTAL 7802522 5968685 79141

B- 236 03.07.18 CSD-II M/s Supath Engineering Services Ltd. 765 1727/CPD-I/07.10.15 154L/51 31.03.18 Supply 9854

B- 237 04.07.18 EPED-IV M/s Maa Shakti Enterprises 02/EPED-IV/03.06.16 279L/03 30.06.18 Security 64098

B- 239 06.07.18 ECM&EMD M/s Ashish Enterprises I 05/ECM&EMD/23.06.18 438L/76 05.06.18 Earth Work 362946

B- 240 07.07.18 CSD-II M/s Yokogawa India Ltd. KA1801001193

1617/CPD-I/13.03.18 90L/40B 24.05.18 Supply 787323

B- 241 07.07.18 CSD-II M/s Yokogawa India Ltd. KA1801001192

1618/CPD-I/13.03.18 90L/40B 24.05.18 Supply 752969

B- 242 07.07.18 CSD-II M/s Aarseller Tredco PIN No. 06

1332/CPD-I/09.01.18 90L/41B 15.01.18 Supply 452184

B- 243 07.07.18 MPED-IV M/s Rajeev Kumar Contractor II 06/MPED-IV/28.04.18 320L/04 01.07.18 Opration of Dewating 16396

B- 245 07.07.18 MPED-I M/s O.S. Contractor XIIIFinal 07/MPED-I/08.08.16 291L/28 07.07.18 Maintenance 34376

B- 246 10.07.18 CSD-II M/s Masibud Automation And Instrument 173622 1411/CPD-I/24.01.18 234L/33 24.03.18 Supply 172575

B- 248 11.07.18 EPED-I M/s D.K. & Sons Co. VII 10/EPED-I/10.08.16 179L/167 11.06.18 OH#5 58625

B- 249 16.07.18 MPED-I M/s Bharat Mechanical & Structural Works XIIIFinal 28/MPED-I/15.01.18 231L/93 11.06.18 B/d Maintenance 59084

B- 250 16.07.18 MPED-V M/s Nosad Contractor 15/MPED-V/18.07.17 132L/97B 04.07.18 Security 77437

B- 251 16.07.18 MPED-V M/s MAK Construction Co. 23/MPED-V/07.11.17 132L/97B 04.07.18 Security 7045

B- 253 16.07.18 CSD-II M/s Flowtech Engineers 623/CPD-II/31.05.18 269L/20 13.07.18 Supply 1721692

B- 254 16.07.18 CSD-II M/s Trade India Corporation 1343/CPD-I/10.01.18 284L/6A 13.07.18 Supply 38745

B- 256 19.07.18 ECCU-III M/s Ashirvad Construction Co. I 08/ECCU/25.06.18 27L/02 10.07.18 Cleaning of ash 116387

B- 257 19.07.18 ECCU-III M/s Ashirvad Construction Co. I 09/ECCU/25.06.18 27L/2B 10.07.18 Cleaning of ash 116387

B- 258 19.07.18 EPED-V M/s Nosad Contractor IV 04/EPED-V/04.09.17 302L/3B 03.07.18 B/d Maintenance 26392

B- 259 19.07.18 EPED-V M/s Electrical & Instrumantation Engg. 08/EPED-V/10.01.17 302L/4 17.07.18 Security 38160

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 67: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 260 19.07.18 EPED-V M/s Electrical & Instrumantation Engg. 10/EPED-V/27.03.17 302L/4B 17.07.18 Security 21058

B- 261 19.07.18 EPED-V M/s Electrical & Instrumantation Engg. 11/EPED-V/27.03.17 302L/4B 17.07.18 Security 8230

B- 262 19.07.18 EPED-V M/s MRP C onstruction 10/EPED-V/05.01.16 302L/5 17.07.18 Security 94031

B- 263 19.07.18 MPED-VI M/s S.R. Constructions II 01/MPED-VI/01.04.18 163L/122 25.05.18 B/d Maintenance 58187

B- 264 19.07.18 MPED-VI M/s S.R. Constructions III 01/MPED-VI/01.04.18 163L/124 20.06.18 B/d Maintenance 55599

B- 265 20.07.18 MPED-V M/s M.K. Traders XI 20/MPED-V/19.07.17 150L/82 02.07.18 Opration of Maintenance 19667

B- 266 20.07.18 MPED-V M/s MAK Construction Co. II 01/MPED-V/24.04.18 150L/82B 02.07.18 Opration of Bowl 30092

B- 267 20.07.18 MPED-V M/s O.S. Contractor III 18/MPED-V/18.07.17 106L/99B 08.05.18 Servicing of hat Air 62651

B- 268 20.07.18 MPED-V M/s A.S. Enterprises 28/MPED-V/10.01.18 153L/70B Security 27800

B- 271 21.07.18 MPED-II M/s India Engineering Works XXII 02/MPED-IV/05.05.17 84L/93 25.06.18 R&m of Bottam ash 34092

B- 272 21.07.18 MPED-IV M/s India Engineering Works XXI 02/MPED-IV/05.05.17 83L/92B 14.06.18 Repairing Maintenance 28495

B- 273 21.07.18 MPED-IV M/s Hind Udog VIII Final 09/MPED-IV/21.08.17 83L/93 28.06.18 Febrication Repairing 15020

B- 274 21.07.18 MPED-IV M/s Rajeev Kumar Contractor 17/MPED-IV/15.12.17 81L/130 12.07.18 Security 6552

B- 275 21.07.18 MPED-IV M/s Jitendra Kumar 26/MPED-IV/24.03.17 81L/130 12.07.18 Security 8232

B- 276 21.07.18 MPED-IV M/s Jitendra Kumar 11/MPED-IV/28.08.17 81L/131 12.07.18 Security 8918

B- 277 24.07.18 MPED-IV M/s MAK Construction Co. XIII, XIV 14/MPED-IV/26.09.17 102L/133 29.06.18 Ash Slury Disposal 83396

B- 279 24.07.18 MPED-VI M/s Jahangir Enterprises VII 28/MPED-VI/29.10.17 317L/53 18.05.18 B/d Maintenance 7340

B- 280 24.07.18 MPED-VI M/s Bharti Enterprises XIII 29/MPED-VI/10.01.17 317L/54 21.05.18 B/d Maintenance 13041

B- 281 24.07.18 MPED-VI M/s Bharti Enterprises XIV 29/MPED-VI/10.01.17 317L/56 30.05.18 B/d Maintenance 6804

B- 283 24.07.18 MPED-VI M/s Jahangir Enterprises VIII 28/MPED-VI/29.10.17 317L/66 12.06.18 B/d Maintenance 14378

B- 284 24.07.18 MPED-VI M/s Jahangir Enterprises IX 28/MPED-VI/29.10.17 317L/68 25.06.18 B/d Maintenance 18283

B- 285 24.07.18 MPED-VI M/s Balram Engineer Contractror & Suppliers

II 13/MPED-VI/02.06.18 317L/70 06.07.18 B/d Maintenance 12144

B- 286 26.07.18 CSD-II M/s Hemen Industrial Corporation 682/CPD-II/14.06.18 194L/157 23.07.18 Supply 247328

B- 288 26.07.18 CSD-II M/s Vaith Turboput Ltd. 544/CPD-II/08.05.18 194L/159 23.07.18 Supply 1541777

B- 289 28.07.18 MPED-VI M/s Balram Engineer Contractror & Suppliers

I 13/MPED-VI/02.06.18 318L/43 15.06.18 B/d Maintenance 9253

B- 290 28.07.18 CSD-II M/s Industrial Mill Stores 1297/CPD-I/22.12.17 233L/72 27.07.18 Supply 339073

B- 291 28.07.18 CSD-II M/s Shavo Norgren India Pvt. Ltd. 1549/CPD-I/24.02.18 233L/73 27.07.18 Supply 5381

B- 292 28.07.18 CSD-II M/s Elecon Engineering Co. Ltd. 24/CPD-II/27.01.18 212L/72 27.07.18 Supply 2734650

B- 293 31.07.18 ECM&EMD M/s Jai Mahaveer Construction I,Final 03/ECM&EMD/18.06.18 310L/06 30.06.18 Cleaning of Jungle 106245

B- 294 31.07.18 CSD-II M/s AIA Engineering Ltd. 740/EPED-II/02.07.16 329L/4B 30.07.18 Supply (T to A List A-651) dt. 09.10.18 0

B- 295 31.07.18 CSD-II M/s Soniji Engineering Pvt. Ltd. 1053/CPD-I/01.11.17 217L/23 30.07.18 Supply 1104422

B- 296 31.07.18 MPED-III M/s Jahangir Enterprises III 15/MPED-III/21.03.18 244L/76 05.07.18 B/d Maintenance 21491

B- 297 31.07.18 MPED-III M/s Jahangir Enterprises IV 15/MPED-III/21.03.18 244L/77 05.07.18 B/d Maintenance 24577

B- 298 31.07.18 MPED-III M/s Bharti Enterprises IX 07/MPED-III/27.05.16 244L/78 09.07.18 B/d Maintenance 16817

B- 299 31.07.18 MPED-III M/s Voltas Limited 11/EE-MPED-III/08.09.16 244L/83 11.07.18 Security 104056

B- 300 31.07.18 MPED-III M/s Usha Enterprises 11/MPED-III/10.09.15 238L/133 28.07.18 Security 39277

B- 301 31.07.18 MPED-III M/s Jahangir Enterprises 16/MPED-III/24.10.16 238L/134 28.07.18 Security 83544

B- 302 31.07.18 MPED-III M/s Usha Enterprises 27/MPED-III/10.03.17 238L/134 28.07.18 Security 33405

B- 303 31.07.18 MPED-III M/s Usha Enterprises 114/MPED-III/13.12.13 238L/135 28.07.18 Security 76650

B- 304 31.07.18 MPED-III M/s Jahangir Enterprises II 15/MPED-III/21.03.18 238L/136 28.07.18 B/d Maintenance 37723TOTAL 2164381 9907973 0

B- 305 01.08.18 CSD-I M/s Supath Engineering Services Ltd. 287/CPD-III/29.06.18 89L/60B 01.08.18 Supply 644697

B- 306 01.08.18 CSD-I M/s Net Casecade Automation Pvt. Ltd. 352/CPD-I/11.07.18 89l/61B 01.08.18 Supply 278670

B- 307 01.08.18 MPED-III M/s Jahangir Enterprises XV 19/MPED-III/12.1.17 180L/160 14.05.18 B/d Maintenance 19873

B- 308 02.08.18 MPED-IV M/s Rajeev Kumar Contractor 18/MPED-IV/15.12.17 112L/90 27.07.18 Security 20410

B- 309 02.08.18 MPED-IV M/s Garg Engineering & Sons 19/MPED-IV/19.12.17 112L/90 27.07.18 Security 28847

B- 310 02.08.18 MPED-IV M/s Garg Engineering & Sons 20/MPED-IV/19.12.17 112L/90B 27.07.18 Security 8167

B- 311 02.08.18 MPED-IV M/s Garg Engineering & Sons 01/MPED-IV/28.04.17 112L/91 27.07.18 Security 28758

B- 312 02.08.18 MPED-IV M/s Garg Engineering & Sons 20/MPED-IV/21.01.17 112L/91 27.07.18 Security 9344

B- 314 02.08.18 MPED-IV M/s Rajeev Kumar Contractor 24/MPED-IV/13.03.18 112L/91B 27.07.18 Security 29001

B- 316 08.08.18 MPED-II M/s Bharti Enterprises Security 18/MPED-II/16.12.16 322L/06 06.08.18 Security 66920

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 68: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 317 08.08.18 MPED-V M/s G.S. Construction Co. Security 20/MPED-V/09.03.17 297L/31B 24.07.18 Security 245310

B- 318 08.08.18 MPED-V M/s MAK Construction Co. Security 04/MPED-V/27.05.17 297L/32 24.07.18 Security 92058

B- 319 08.08.18 MPED-V M/s MAK Construction Co. Security 27/MPED-V/10.01.18 297L/32 24.07.18 Security 17355

B- 320 08.08.18 MPED-V M/s O.S. Contractor Security 16/MPED-V/18.07.17 297L/32 26.07.18 Security 29493

B- 321 08.08.18 MPED-V M/s O.S. Contractor Security 17/MPED-V/18.07.17 297L/32B 26.07.18 Security 66020

B- 322 08.08.18 MPED-V M/s Authentic System & Technologis 1548/CPD-I/24.02.18 214L/115 08.08.18 Supply 6778

B- 323 08.08.18 MPED-V M/s Shravan Engineering Enterprises Pvt. Ltd.

1557/CPD-I/26.02.18 214L/115 08.08.18 Supply 1534

B- 324 08.08.18 EPED-I M/s Kapatiya Instrument Erector I 12/EPED-I/27.10.17 199L/35 21.06.18 Miss Mechanical 79461

B- 325 08.08.18 EPED-I M/s R.P. Construction Co. III 11/EPED-I/21.08.17 199L/38 27.06.18 Laying & Fixing of cable 24487

B- 326 09.08.18 EPED-IV M/s Ge T&D India Limited 482/EPED-IV/24.11.16 279L/04 08.08.18 Service Charges 200000

B- 327 09.08.18 MPED-V M/s Bharti Enterprises I,Final 04/MPED-V/04.04.18 307L/04 02.08.18 Fabrication 319415

B- 328 09.08.18 ECCU M/s Ashish Enterprises I 32/ECCU/23.03.18 114L/11 02.06.18 Cariage of Material 647455

B- 329 09.08.18 ECM&EMD M/s Sadan Engineering Works I 19/ECM&EMD/05.02.18 362L/110 10.03.18 Cleaning of obrain 235636

B- 330 09.08.18 ECM&EMD M/s Sadan Engineering Works III 19/ECM&EMD/05.02.18 362L/116 10.04.18 Cleaning of obrain 80354

B- 331 09.08.18 ECM&EMD M/s Pitambra Engineering & Contractors I 07/ECM&EMD/02.07.18 362L/124 26.07.18 Cleaning of obrain (T to A List A-487) 0

B- 332 09.08.18 ECM&EMD M/s Pitambra Engineering & Contractors I 06/ECM&EMD/02.07.18 364L/161 02.07.18 Cleaning of obrain (T to A List A-488) 0

B- 333 09.08.18 ECM&EMD M/s Sadan Engineering Works I 18/ECM&EMD/29.01.18 462L/55 17.02.18 Cleaning of Toilats 151762

B- 334 09.08.18 ECM&EMD M/s Sadan Engineering Works III 18/ECM&EMD/29.01.18 462L/60 18.04.18 Cleaning of Toilats 59124

B- 335 09.08.18 ECM&EMD M/s Sadan Engineering Works III 18/ECM&EMD/29.01.18 462L/65 17.06.18 Cleaning of Toilats 60197

B- 336 13.08.18 MPED-III M/s Jahangir Enterprises 87/MPED-III/18.03.16 227L/110 28.07.18 Security 11616

B- 340 13.08.18 CSD-II M/s Ace Communication 293/CPD-III/02.07.18 234L/35 10.08.18 Supply 330919

B- 342 14.08.18 MPED-I M/s O.S. Contractor V 05/MPED-I/04.05.17 282L/11 03.08.18 Complete instalation work 109528

B- 344 16.08.18 MPED-VI M/s Cleanflo India Pvt. Ltd. I Final 15/MPED-VI/02.06.18 331L/14 12.06.18 Consultancy Services 59400

B- 345 18.08.18 CSD-II M/s Atlas Copco India Ltd. 457/CPD-I/26.07.18 90L/42 18.08.18 Supply 401618

B- 346 18.08.18 EPED-II M/s Dheeraj 21/EPED-II/11.01.16 243L/99 16.08.18 Security 6589

B- 347 18.08.18 EPED-II M/s Dheeraj 03/EPED-II/31.07.17 243L/99 16.08.18 Security 6624

B- 348 18.08.18 EPED-II M/s Dheeraj 16/EPED-II/10.02.17 243L/100 16.08.18 Security 6516

B- 349 18.08.18 EPED-II M/s S.K. Engineering & Allied Solutions IFinal 130/EPED-II/22.05.18 303L/15B 16.08.18 Checking & Testing 70800

B- 350 18.08.18 MPED-V M/s A.K. Construction Co. III 01/MPED-V/24.04.18 274L/67 01.08.18 Opration of Bowl 15293

B- 351 18.08.18 MPED-V M/s M.K. Traders XIIFinal 20/MPED-V/19.09.17 274L/71 06.08.18 Opration Maintenance 22944

B- 352 18.08.18 MPED-V M/s Aadityesh Construction VIFinal 19/MPED-V/19.09.17 274L/73 09.08.18 Security 29454

B- 353 18.08.18 MPED-V M/s Hind Udyog IIFinal 11/MPED-V/14.07.17 150L/85B 02.08.18 Repairing 228960

B- 354 18.08.18 ECM&EMD M/s Sadan Engineering Works IFinal 11/ECM&EMD/26.12.17 362L/102 10.01.18 Drain Cleming 24666

B- 355 18.08.18 ECM&EMD M/s Vijay Kumar Gupta IFinal 04/ECM&EMD/18.06.18 214L/82 10.07.18 Construction of Re 105979

B- 356 20.08.18 MPED-V M/s Pitambra Engineering & Contractors III 11/MPED-V/13.07.18 335L/01B 11.08.18 Providing and Laying 348797

B- 357 20.08.18 MPED-V M/s Abhay Kumar Singh 14/ECM&EMD/15.11.16 425L/78 02.07.18 Misc. Civil Works 24996

B- 358 21.08.18 MPED-VI M/s Thermal India Engineers 14/MPED-VI/18.05.16 130L/136 09.08.18 Security 17700

B- 359 21.08.18 MPED-VI M/s S.R. Construction 28/MPED-VI/05.01.17 130L/137 09.08.18 Security 63373

B- 361 21.08.18 ECM&EMD M/s Ravindra Singh & Co. III 08/ECM&EMD/26.12.17 363L/155 08.05.18 Maintenance of Park 44298

B- 362 21.08.18 ECM&EMD M/s Ravindra Singh & Co. IV 08/ECM&EMD/26.12.17 363L/161 07.07.18 Maintenance of Park 42352

B- 363 24.08.18 CSD-II M/s Atlas Copco India Ltd. 336/CPD-I/05.07.18 212L/76 21.08.18 Supply 460016

B- 364 24.08.18 CSD-II M/s Siemens Ltd. 569/CPD-II/16.05.18 212L/77 21.08.18 Supply 1025013

B- 366 29.08.18 MPED-III M/s SGL Engineering II 01/MPED-III/09.04.18 46L/70 19.08.18 Maintenance 21558

B- 367 29.08.18 CSD-II M/s Nausad & Brothers 583/CPD-I/07.08.18 233L/73 27.08.18 Supply 651867

B- 368 29.08.18 CSD-II M/s Aarseller Tredco 378/CPD-III/04.08.18 233L/74 27.08.18 Supply 1604655

B- 369 29.08.18 CSD-II M/s Astech Marketing Pvt. Ltd. 892/CPD-II/27.07.18 197L/29 29.08.18 Supply 450089

B- 371 29.08.18 EPED-I M/s D.K. & Sons Co. 10/EPED-I/10.08.16 179L/175 04.07.18 Overhauling Maintenance 31029

B- 372 29.08.18 EPED-I M/s Priya Construction Co. 04/EPED-I/28.04.18 98L/83 07.08.18 Security 30652

B- 373 29.08.18 EPED-I M/s Priya Construction Co. 17/EPED-I/29.12.15 98L/83B 07.08.18 Security 26086

B- 374 29.08.18 EPED-I M/s Priya Construction Co. 02/EPED-I/23.05.16 98L/84 07.08.18 Security 52536

B- 375 29.08.18 CSD-II M/s Deepak Traders 397/CPD-I/23.07.18 198L/33 27.08.18 Supply 2082528

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 69: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 376 29.08.18 CSD-II M/s Deepak Traders 546/CPD-I/04.08.18 198L/34 27.08.18 Supply 1340920

B- 377 29.08.18 CSD-II M/s J.K. Engineering Co. 400/CPD-I/23.07.18 246L/49A 27.08.18 Pure Graphite Merallic 199806

B- 378 29.08.18 CSD-II M/s J.K. Engineering Co. 400/CPD-I/23.07.18 246L/49A 27.08.18 Pure Graphite Merallic 118293

B- 379 29.08.18 CSD-II M/s G.P. Distributars 403/CPD-I/23.07.18 246L/49B 27.08.18 Supply 258646

B- 380 31.08.18 EPED-I M/s D.K. & Sons Co. Final Bill 04/EPED-I/26.07.18 326L/08 08.08.18 Fabrication 174636

B- 381 31.08.18 MPED-IV M/s Rajeev Kumar Contractor III 06/MPED-IV/28.04.18 320L/06 07.08.18 Opration of Dewating 16941Total 5484354 8484465 0

B- 382 05.09.18 EPED-II M/s D.K. & Sons Co. 13/EPED-II/10.01.17 304L/18A 04.09.18 Security 28145

B- 383 05.09.18 CSD-II M/s Aditya Enterprises 270/CPD-III/21.06.18 234L/35 05.09.18 Supply 667687

B- 387 05.09.18 CSD-II M/s Electronics & Electricals 414/CPD-III/16.08.18 234L/38 05.09.18 Supply 242733

B- 388 06.09.18 MPED-IV M/s Garg Engineering & Sons 10/MPED-IV/28.08.17 83L/95 29.08.18 Security 9872

B- 389 06.09.18 MPED-IV M/s Garg Engineering & Sons 23/MPED-IV/29.01.18 83L/95 31.08.18 Security 28281

B- 390 06.09.18 MPED-IV M/s Rahul Gupta & Co. 22/MPED-IV/23.08.18 112L/93B 31.08.18 Supply 109985

B- 391 07.09.18 CSD-II M/s J. Umashankar & Co. Pvt. Ltd. 462/CPD-I/26.07.18 284L/6A 07.09.18 Supply 76759

B- 392 07.09.18 CSD-II M/s J. Umashankar & Co. Pvt. Ltd. 462/CPD-I/26.07.18 284L/6B 07.09.18 Supply 25260

B- 393 07.09.18 CSD-II M/s Rajat Associates 458/CPD-I/26.07.18 284L/6B 07.09.18 Supply 875050

B- 394 07.09.18 CSD-II M/s Rajat Associates 458/CPD-I/26.07.18 284L/7A 07.09.18 Supply 365604

B- 395 07.09.18 CSD-II M/s Commercial Enterprises 464/CPD-I/26.07.18 284L/7B 07.09.18 Supply 86848

B- 396 07.09.18 CSD-II M/s Commercial Enterprises 464/CPD-I/26.07.18 284L/7B 07.09.18 Supply 1279

B- 397 10.09.18 CHD-II M/s M.K. Traders VI 15/CHD-II/20.11.17 254L/102 30.12.17 Maintenance 49903

B- 398 10.09.18 CHD-II M/s M.K. Traders IX 15/CHD-II/20.11.17 254L/104 01.08.17 Maintenance 80343

B- 399 11.09.18 EPED-IV M/s GE T&D India Ltd. 273/EPED-IV/13.09.17 70L/75B 29.08.18 Supervision Service 547520

B- 401 12.09.18 MPED-I M/s Bharat Mechanical & Structural Work Ist final 07/MPED-I/03.08.18 179L/20 Fabrication 263520

B- 402 12.09.18 MPED-I M/s Jahangir Enterprises Ist final 05/MPED-I/03.08.18 282L/12B Fabrication 302400

B- 406 14.09.18 CSD-II M/s Aarseller Tredco 630/CPD-I/18.08.18 214L/118 12.09.18 Supply 124491 1554329

B- 408 14.09.18 CSD-II M/s Govardhan Controls 399/CPD-I/23.07.18 214L/120 12.09.18 Supply 408569

B- 410 14.09.18 CSD-II M/s Govardhan Controls 638/CPD-I/18.08.18 214L/122 12.09.18 Supply 448180

B- 412 14.09.18 CSD-II M/s Asha Printing Press 165/CPD-I/18.05.18 246/51B 12.09.18 Supply 134206

B- 414 14.09.18 CSD-II M/s Krishna Agencies 559/CPD-I/04.08.18 234L/42 12.09.18 Supply 252803

B- 416 14.09.18 CSD-II M/s Sone obra Enterprises Pvt. Ltd. 675/CPD-I/21.08.18 203L/94B 13.09.18 Supply 67225

B- 417 14.09.18 CSD-II M/s Ashbond Engineers Pvt. Ltd. 936/CPD-II/03.08.18 212L/78 13.09.18 Supply 980287

B- 418 19.09.18 ECM&EMD M/s Ravindra Singh & Company 22/ECM&EMD/15.03.18 112lL/93 08.06.18 Development of Nearby 119107

B- 419 20.09.18 EPED-II M/s Siddhi Vinayak Enggi. 05/EPED-II/04.07.16 303L/18B 18.09.18 Security 38170

B- 421 20.09.18 CSD-II M/s Indian Rubber Products 562/CPD-I/04.08.18 360L/12 20.09.18 Supply 46824

B- 422 20.09.18 CSD-II M/s RSP Overseas Pvt. Ltd. 1341/CPD-I/10.01.18 285L/09 20.09.18 Supply 87178

B- 423 22.09.18 CSD-II M/s Aarseller Tredco 154/EPED-III/07.07.18 233L/76 20.09.18 Consumable Material 38940

B- 424 22.09.18 CSD-II M/s Industrial Sales & Supply Agencies 401/CPD-I/23.07.18 330L/18 20.09.18 Supply 524326

B- 427 24.09.18 CSD-II M/s Control Component India Pvt.. Ltd. 774/CPD-II/06.07.18 213L/53 22.09.18 Supply 1908089

B- 428 24.09.18 CSD-II M/s Flowtech Engineer 1035/CPD-II/29.08.18 249L/21 22.09.18 Supply 481344

B- 429 24.09.18 CSD-II M/s Flowtech Engineer 1036/CPD-II/29.08.18 249L/21 22.09.18 Supply 550675

B- 430 24.09.18 CSD-II M/s Flowtech Engineer 1038/CPD-II/29.08.18 249L/ 22.09.18 Supply 2940000

B- 431 24.09.18 CSD-II M/s Paramount International 1040/CPD-II/30.08.18 249L/23 22.09.18 Supply 138241

B- 432 24.09.18 CSD-II M/s Paramount International 1043/CPD-II/30.08.18 249L/23 22.09.18 Supply 465443

B- 433 24.09.18 CSD-II M/s Soneji Engineering Pvt. Ltd. 677/CPD-I/21.08.18 249L/26 22.09.18 Supply 528874

B- 434 24.09.18 CSD-II M/s Raviraj Enineering Company 1041/CPD-II/30.08.18 249L/27 22.09.18 Supply 164364

B- 435 24.09.18 CSD-II M/s Raviraj Enineering Company 1041/CPD-II/30.08.18 249L/27 22.09.18 Supply 190723

B- 436 24.09.18 CSD-II M/s Raviraj Enineering Company 1042/CPD-II/30.08.18 249L/29 22.09.18 Supply 116919

B- 437 24.09.18 CSD-II M/s Raviraj Enineering Company 1042/CPD-II/30.08.18 249L/30 22.09.18 Supply 189600

B- 438 24.09.18 CSD-II M/s Flowtech Engineers 1068/CPD-II/07.09.18 249L/31 22.09.18 Supply 215972 251693

B- 440 24.09.18 ECM&EMD M/s Ravindra Singh & Company 02/ECM&EMD/06.05.17 397L/76 22.09.18 Security 53148

B- 441 24.09.18 ECM&EMD M/s Ravindra Singh & Company 21/ECM&EMD/15.03.18 310L/3B 09.04.18 Half Brick 68027

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 70: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 442 25.09.18 MPED-IV M/s Rajeev Kumar Contractor 06/MPED-IV/28.04.18 320L/7B 01.09.18 Operation of dewatering 16941

B- 443 27.09.18 EPED-I M/s Basch Rexroth (I) Pvt. Ltd. I 373/EPED-I/18.11.17 326L/09 14.09.18 Repairing testing work 14160

B- 444 27.09.18 EPED-I M/s Basch Rexroth (I) Pvt. Ltd. II 373/EPED-I/18.11.17 326L/10 14.09.18 Repairing testing work 413016

B- 445 27.09.18 EPED-I M/s Basch Rexroth (I) Pvt. Ltd. III 373/EPED-I/18.11.17 326L/11 14.09.18 Repairing testing work 14160

B- 446 27.09.18 EPED-I M/s Basch Rexroth (I) Pvt. Ltd. IV 373/EPED-I/18.11.17 326L/12 14.09.18 Repairing testing work 413016

B- 447 27.09.18 EPED-II M/s Sadhna Constructions 01/EPED-II/20.12.11 241L/106 05.09.18 Security 6516

B- 448 27.09.18 EPED-II M/s Sadhna Constructions 06/EPED-II/21.11.12 241L/107 05.09.18 Security 6552

B- 449 27.09.18 EPED-II M/s Manoj Singh Rajpoot 19/EPED-II/25.12.15 241L/108 05.09.18 Security 8190

B- 450 27.09.18 EPED-II M/s Manoj Singh Rajpoot 04/EPED-II/20.06.16 241L/109 05.09.18 Security 12359

B- 451 27.09.18 EPED-II M/s Manoj Singh Rajpoot 15/EPED-II/12.01.17 241L/110 05.09.18 Security 12470

B- 452 27.09.18 EPED-II M/s Manoj Singh Rajpoot 02/EPED-II/17.07.17 241L/110 05.09.18 Security 12447

B- 453 27.09.18 MPED-V M/s M.A.K. Construction Co. IV 01/MPED-V/24.04.18 334L/6B 05.09.18 Operation 15293

B- 454 27.09.18 MPED-V M/s Energo Construction Ltd. 09/MPED-V/07.07.18 334L/9B 14.09.18 Security 697880

B- 457 28.09.18 CSD-II M/s Switchgear & transformer care centre 162/EPED-IV/09.07.18 200L/106 24.09.18 Hiring SF6 gas 33600

B- 461 28.09.18 CSD-II M/s Keltron Controls 130/CPD-I/08.05.16 234L/45 27.09.18 Supply 159045

B- 462 28.09.18 CSD-II M/s Govardhan Controls 715/CPD-I/28.08.16 234L/46 27.09.18 Supply 234878

B- 463 28.09.18 CSD-II M/s K.S. & Brothers 396/CPD-III/08.08.18 234L/47 27.09.18 Supply 534989

B- 465 28.09.18 CSD-II M/s Flowtech Engineers 751/CPD-I/31.08.18 234L/49 27.09.18 Supply 2916100TOTAL 3303976 17260550 1806022

B- 466 09.10.18 ECM&EMD M/s Ashish Enterprises II 05/ECM&EMD/23.06.18 438L/79 02.08.18 Earth Work 275688

B- 467 09.10.18 MPED-V M/s Rambali Singh Contractor I Final 13/MPED-V/27.08.18 307L/02B 05.09.18 Providing and Laying 349601

B- 468 09.10.18 MPED-V M/s Jahagir Enterprises XI Final 28/MPED-VI/29.10.17 317L/75 06.09.18 B/d Maintenance 22885

B- 469 09.10.18 MPED-V M/s Balram Engineers & Suppliers III 13/MPED-VI/02.06.18 317L/77 23.08.18 B/d Maintenance 11043

B- 470 09.10.18 MPED-V M/s Jahagir Enterprises 22/MPED-VI/23.10.17 317L/83 17.09.18 Security 2495

B- 471 09.10.18 MPED-V M/s Jahagir Enterprises X 28/MPED-VI/29.10.17 331L/16 27.07.18 B/d Maintenance 12349

B- 472 09.10.18 MPED-I M/s Leak Seal Experts (India) II 01/BMD-III/02.05.18 281L/25B Service Charges 66943

B- 473 09.10.18 CSD-II M/s Flowtech Engineers 1110/CPD-II/14.09.18 250L/39 09.10.18 Supply 792336

B- 475 09.10.18 CSD-II M/s Kakati Karshak industries Pvt. Ltd. 569/CPD-II/22.04.18 250L/40 09.10.18 Supply 890786

B- 476 09.10.18 CSD-II M/s Kakati Karshak industries Pvt. Ltd. 1131/CPD-II/18.09.18 250L/41 09.10.18 Supply 1891056

B- 479 09.10.18 CSD-II M/s Jay Marketing Company Pvt. Ltd. 347/CPD-I/07.07.18 233L/78 06.10.18 Supply 67487

B- 480 09.10.18 CSD-II M/s Bearing & Engineering Co. 398/CPD-I/23.07.18 233L/79 06.10.18 Supply 756000

B- 481 09.10.18 CSD-II M/s Bearing & Engineering Co. 421/CPD-I/24.07.18 233L/79 06.10.18 Supply 881440

B- 482 09.10.18 CSD-II M/s Bearing & Engineering Co. 540/CPD-I/03.08.18 233L/80 06.10.18 Supply 402192

B- 485 09.10.18 CSD-II M/s Atlas Copco India Ltd. 876/CPD-I/15.09.18 233L/82 06.10.18 Supply 67216

B- 487 09.10.18 CSD-II M/s Simplex Switchgear Pvt. Ltd. 483/CPD-II/15.09.18 197L/38 08.10.18 Supply 3511796

B- 488 10.10.18 CSD-II M/s Aditya Enterprises 839/CPD-I/12.09.18 234L/51 09.10.18 Supply 36338

B- 490 11.10.18 MPED-IV M/s India Engineering Works XXIII 02/MPED-IV/05.05.17 81L/133 09.08.18 Replascement Refitting 33538

B- 491 11.10.18 MPED-IV M/s MAK Construction Co. XII 14/MPED-IV/26.09.17 111L/82B 17.08.18 Division ash Slurry 47272

B- 492 11.10.18 MPED-IV M/s India Engineering Works XXIV 02/MPED-IV/05.05.17 84L/97 19.08.18 Replacement Refting 22760

B- 493 11.10.18 CFA&BO M/s Sanjog Professional Services 05/CPD-II/17.05.17 419L/123 Security 22620

B- 494 22.10.18 MPED-III M/s Jahangir Enterprises V 15/MPED-III/21.03.18 244L/86 22.09.18 B/d Maintenance 15776

B- 496 22.10.18 MPED-III M/s Jahangir Enterprises XIV To XVIII Final

15/MPED-III/21.03.18 244L/88 24.09.18 B/d Maintenance 31093

B- 497 22.10.18 MPED-III M/s SGL Engineering Industries 08/MPED-III/18.12.14 244L/89 28.09.18 Security 4200

B- 498 22.10.18 MPED-III M/s Electrical & Instrumentation Engineers 03/MPED-III/06.05.13 244L/89 28.09.18 Security 4200

B- 499 22.10.18 EPED-III M/s Simplex Switchgear Pvt. Ltd. 01/EPED-III/15.05.17 242L/33 10.10.18 Repairing Overhauling 101585

B- 500 24.10.18 CSD-II M/s Industrial Sals & Supply Agencies 748/CPD-I/31.08.18 246L/54B 22.10.18 Supply 1124136

B- 501 24.10.18 CSD-II M/s Industrial Sals & Supply Agencies 841/CPD-I/12.09.18 246L/55A 22.10.18 Supply 933674

B- 502 24.10.18 CSD-II M/s Industrial Sals & Supply Agencies 830/CPD-I/11.09.18 246L/55B 22.10.18 Supply 409638

B- 503 24.10.18 CSD-II M/s RNS Automation 844/CPD-I/12.09.18 246L/56A 22.10.18 Supply 41457

B- 504 24.10.18 CSD-II M/s Asan Engineers Pvt. Ltd. 1152/CPD-II/01.10.18 246L/56B 22.10.18 Supply 693906

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 71: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 505 24.10.18 CSD-II M/s Harsh & Brothers 1132/CPD-II/18.09.18 246L/57A 13.10.18 Security 82926

B- 506 24.10.18 CSD-II M/s Vijay Engineering 44/CPD-II/11.04.16 329L/10 22.10.18 Security 21589

B- 507 24.10.18 CSD-II M/s Balaji Corporation 591/CPD-II/13.06.16 329L/10B 22.10.18 Supply 247350

B- 509 24.10.18 CSD-II M/s Trade India Corporation 463/CPD-I/26.07.18 285L/9A 22.10.18 Supply 100816

B- 511 24.10.18 MPED-II M/s Thermal India Engineers 06/MPED-II/15.07.17 228L/133 04.08.18 B/d Maintenance 63976

B- 512 24.10.18 MPED-II M/s Vijay Kumar Gupta 08/MPED-II/03.08.17 228L/134 01.09.18 Security 275752

B- 513 24.10.18 ECM&EMD M/s Vijay Kumar Gupta 15/ECM&EMD/29.01.18 439L/77 23.10.18 Security 29781

B- 514 24.10.18 ECM&EMD M/s Aarseller Tredco 14/ECM&EMD/29.01.18 439L/78 23.10.18 Supply 29570

B- 515 25.10.18 CSD-II M/s Govardhan Controls 497/CPD-III/22.09.18 215L/96 25.10.18 Supply 728140

B- 516 25.10.18 CSD-II M/s Jakson Enterprises 933/CPD-I/22.09.18 215L/98 17.10.18 Supply 155481

B- 518 25.10.18 CSD-II M/s Qwick Well Engineering Associates 561/CPD-I/04.08.18 215L/100 25.10.18 Supply 630135

B- 519 25.10.18 CSD-II M/s Qwick Well Engineering Associates 873/CPD-I/15.09.18 215L/101 25.10.18 Supply 145067

B- 520 25.10.18 CSD-II M/s Super Tech Engineers 881/CPD-I/18.09.18 215L/101 25.10.18 Supply 44281

B- 521 25.10.18 CSD-II M/s Qwick Well Engineering Associates 885/CPD-I/18.09.18 215L/102 25.10.18 Supply 1387882

B- 522 25.10.18 CSD-II M/s Qwick Well Engineering Associates 887/CPD-I/18.09.18 215L/103 25.10.18 Supply 327036

B- 523 25.10.18 CSD-II M/s Simplex Switchgear Pvt. Ltd. 890/CPD-I/18.09.18 215L/104 25.10.18 Supply 280663

B- 524 25.10.18 CSD-II M/s Aarseller Tredco 930/CPD-I/22.09.18 215L/105 25.10.18 Supply 252418

B- 525 25.10.18 CSD-II M/s Govardhan Controls 934/CPD-I/22.09.18 215L/105 25.10.18 Supply 510057

B- 526 25.10.18 CSD-II M/s Electronics & Electricals 1009/CPD-I/03.10.18 215L/107 25.10.18 Supply 390661

B- 527 25.10.18 CSD-II M/s Electronics & Electricals 1011/CPD-I/03.10.18 215L/109 25.10.18 Supply 8860

B- 528 25.10.18 CSD-II M/s Naushad & Brothers 1012/CPD-I/03.10.18 215L/109 25.10.18 Supply 8525

B- 529 25.10.18 CSD-II M/s Rajeev Kumar Contractor 1044/CPD-II/30.08.18 203L/95 25.10.18 Supply 937056

B- 530 25.10.18 MPED-IV M/s S.R. Contractor V Final 06/MPED-IV/28.04.18 321L/4B 12.10.18 Opration of Dewating 22953

B- 531 26.10.18 MPED-VI M/s S.R. Contractor IV 01/MPED-VI/01.04.18 163L/130 16.08.18 B/d Maintenance 107878

B- 532 26.10.18 MPED-VI M/s Hind Scientific Industries I Final 20/MPED-VI/13.08.18 163L/133 18.09.18 Repair for muffle 46804

B- 533 29.10.18 MPED-V M/s Harsh & Brothers 02/MPED-V/ 106L/100 Security 17525

B- 534 29.10.18 MPED-V M/s MAK Construction Co. V 01/MPED-V/24.04.18 333L/8B 01.10.18 Opration of baul 14801

B- 535 29.10.18 MPED-I M/s S.K. Engineering Works I Final 12/MPED-I/26.09.18 189L/42 08.10.18 Replacement leying 264864

B- 536 30.10.18 MPED-I M/s R.B. Engineering Works V 26/MPED-I/05.12.18 168L/38 29.09.18 B/d Maintenance 82097

B- 537 31.10.18 CSD-II M/s Simplex Switchgear Pvt. Ltd. 801/CPD-II/11.07.18 249L/249 15.10.18 Supply 104030

B- 539 31.10.18 CSD-II M/s Uttam Sales Corporation 299/CPD-I/22.06.18 90L/40A 30.11.18 Supply 56284

TOTAL 2054994 18843770 0 0

B- 542 01.11.18 ECM&EMD M/s Ravindra Singh Co. II Final 22/ECM&EMD/15.03.18 399L/11 16.06.18 Development of Near Area Building 199283

B- 543 01.11.18 CSD-II M/s Authentic System & Technology 618/CPD-I/13.08.18 89L/63B 31.10.18 Supply 424330

B- 544 01.11.18 CSD-II M/s S.S. Jaiwal & Brothers 738/CPD-I/30.08.18 89L/64A 31.10.18 Supply 457740

B- 545 01.11.18 CSD-II M/s Tromosoft Infotech 928/CPD-I/22.09.18 89L/64B 31.10.18 Supply 1029120

B- 546 01.11.18 CSD-II M/s V.K. Trading Corporation 932/CPD-I/22.09.18 89L/64B 31.10.18 Supply 160166

B- 547 01.11.18 CSD-II M/s S.K.Engineering & Allied Solutions 788/CPD-I/07.09.18 89L/65A 31.10.18 Supply 78613

B- 548 01.11.18 CSD-II M/s Authentic System & Technology 849/CPD-I/13.09.18 89L/65A 31.10.18 Supply 256328

B- 550 01.11.18 CSD-II M/s S.K. Engineering Works 851/CPD-I/13.09.18 89L/65B 31.10.18 Supply 145140

B- 551 01.11.18 CSD-II M/s Power Tech Corporation 1008/CPD-I/03.10.18 89L/66A 31.10.18 Supply 60902

B- 552 02.11.18 MPED-II M/s MAK Construction Co. II 22/MPED-II/13.09.17 298L/27 01.10.18 Path Work 113077

B- 553 02.11.18 MPED-I M/s Hind Udyog II 32/MPED-I/23.01.18 281L/26B 01.10.18 Repairing 202326

B- 554 02.11.18 MPED-I M/s Jahangir Enterprises 05/MPED-I/13.08.18 281L/27 Security 28000

B- 555 02.11.18 MPED-I M/s S.K. Engineering Works VI 27/MPED-I/15.01.18 175L/61 23.10.18 B/d Maintenance 105933

B- 556 02.11.18 MPED-I M/s Syndicate Engineers IV 14/MPED-I/29.07.18 175L/63 23.10.18 Replacement of Coal 113356

B- 557 02.11.18 MPED-I M/s Bharatt Mechanical & Structural Works X, Final 28/MPED-I/15.01.18 290L/22B 18.10.18 B/d Maintenance 64707

B- 558 02.11.18 MPED-I M/s Bharatt Mechanical & Structural Works I 13/MPED-I/05.10.18 290L/24B 18.10.18 B/d Maintenance 113550

B- 559 02.11.18 MPED-I M/s Syndicate Engineers I 03/MPED-I/25.06.18 290L/26B 18.10.18 Repairing 85847

B- 560 02.11.18 CSD-II M/s Naushad & Brothers 1124/CPD-II/15.09.18 194L/179 02.11.18 Supply 63401

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 72: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 561 02.11.18 CSD-II M/s Fluidomat Ltd. 1125/CPD-I/15.09.18 194L/186 02.11.18 Supply 1664

B- 562 02.11.18 CSD-II M/s Jindal Electronics Pvt. Ltd. 888/CPD-I/18.09.18 154L/58 02.11.18 Supply 148529

B- 563 02.11.18 CSD-II M/s Balaji Corporation 1010/CPD-I/03.10.18 154L/59 02.11.18 Supply 344200

B- 564 02.11.18 CSD-II M/s Vidyut Carbon Products Pvt. Ltd. 1044/CPD-I/09.10.18 154L/59 02.11.18 Supply 139122

B- 565 02.11.18 CSD-II M/s Net Cascade Automation Pvt. Ltd. 1063/CPD-I/11.10.18 154L/60 02.11.18 Supply 147453

B- 566 03.11.18 EPED-II M/s Kapatiya Instrument Erector III,IV 10/EPED-II/26.10.17 201L/52 18.05.18 Replacement of Damage 54887

B- 567 03.11.18 EPED-II M/s Kapatiya Instrument Erector V 10/EPED-II/26.10.17 201L/54 31.10.18 Miss. Callament mechanical 51996

B- 568 03.11.18 EPED-II M/s Kapatiya Instrument Erector 02/EPED-II/16.02.16 201/56 02.11.18 Security 27815

B- 570 03.11.18 MPED-VI M/s Balram Engineers & Suppliers IV 13/MPED-VI/02.06.18 256/55 29.09.18 B/d Maintenance 54034

B- 571 12.11.18 ECCU M/s Ashish Enterprises II 32/ECCU/23.03.18 114L/13B 01.10.18 Carriage of Material 626083

B- 572 12.11.18 ECCU M/s Pitambra Engineers & Contractor III, Final 14/ECCU/26.09.17 1764L/170 01.10.18 Providing and Laying 106985

B- 574 14.11.18 ECM&EMD M/s Sadan Engineering Works IV 18/ECM&EMD/29.01.18 462L/68 02.07.18 Cleaning of Toilet 13311

B- 575 14.11.18 MPED-III M/s Jahangir Enterprises I 10/EE-MPED-III/22.09.18 180L/170 14.08.18 B/d Maintenance 31521

B- 576 14.11.18 MPED-III M/s Jahangir Enterprises II 10/EE-MPED-III/22.09.18 180L/171 28.08.18 B/d Maintenance 41543

B- 578 14.11.18 MPED-III M/s Jahangir Enterprises III 10/MPED-III/22.09.18 180L/174 09.09.18 B/d Maintenance 43512

B- 579 14.11.18 MPED-III M/s Jahangir Enterprises IV 10/MPED-III/22.09.18 180L/176 25.09.18 B/d Maintenance 31921

B- 580 14.11.18 MPED-III M/s Harsh & Brothers I Final 17/MPED-III/28.10.16 180L/177 29.08.19 Repairing 198180

B- 581 14.11.18 MPED-III M/s Jahangir Enterprises VIII 15/MPED-III/21.03.18 164L/116 24.10.18 B/d Maintenance 32808

B- 582 14.11.18 MPED-III M/s Jahangir Enterprises IX 15/MPED-III/21.03.18 164L/117 24.10.18 B/d Maintenance 28808

B- 583 14.11.18 MPED-III M/s Jahangir Enterprises X 15/MPED-III/21.03.18 164L/118 24.10.18 B/d Maintenance 38867

B- 584 14.11.18 MPED-III M/s Balram Engineers & Suppliers I 11/MPED-III/01.10.18 164L/120 26.10.18 B/d Maintenance 21651

B- 585 14.11.18 MPED-III M/s SGL Engineering Industries III 01/MPED-III/09.04.18 46L/74 19.10.18 Maintenance 34742

B- 587 15.11.18 CSD-II M/s Industrial Salution 1126/CPD-I/29.10.18 285L/10A 14.11.18 Fabric Sutable 1121483

B- 588 15.11.18 CSD-II M/s Trade India Corporation 936/CPD-I/22.09.18 285L/10B 14.11.18 Supply 159021

B- 589 15.11.18 CSD-II M/s A.K. Agencies 465/CPD-I/26.07.18 285L/10B 14.11.18 Supply 5575

B- 590 15.11.18 CSD-II M/s A.K. Agencies 465/CPD-I/26.07.18 285L/11A 14.11.18 Supply 609

B- 591 17.11.18 MPED-IV M/s Garg Engineering & Sons VI 05/MPED-IV/29.06.17 167L/58 30.09.18 Reparing 36999

B- 592 17.11.18 MPED-IV M/s MAK Construction Co. II 14/MPED-IV/26.09.17 167L/59 03.11.18 DP Extenstion & Division 116326

B- 593 17.11.18 MPED-IV M/s India Engineering Works IV 02/MPED-IV/16.04.18 167L/60 20.10.18 Repairing 19272

B- 594 17.11.18 MPED-IV M/s Ashish Enterprises III 05/ECM&EMD/23.06.18 438L/83 02.11.18 Earth Work 168231

B- 595 17.11.18 MPED-IV M/s Vijay Kumar Gupta Contractor I Final 14/ECM&EMD/11.09.18 214L/84 12.11.18 Repairing 318929

B- 597 17.11.18 CSD-II M/s S.R. Industries 773/CPD-II/06.07.18 250L/46 15.11.18 Supply 401755

B- 598 17.11.18 CSD-II M/s S.R. Industries 1141/CPD-II/22.09.18 250L/47 15.11.18 Supply 764426

B- 599 17.11.18 CSD-II M/s S.R. Industries 1142/CPD-II/22.09.18 250L/47 15.11.18 Supply 1282648

B- 600 17.11.18 CSD-II M/s S.R. Industries 1143/CPD-II/22.09.18 250L/48 15.11.18 Supply 706087

B- 601 17.11.18 CSD-II M/s S.R. Industries 1144/CPD-II/22.09.18 250L/49 15.11.18 Supply 1326458

B- 602 17.11.18 CSD-II M/s S.R. Industries 1145/CPD-II/22.09.18 250L/50 15.11.18 Supply 1308602

B- 603 17.11.18 CSD-II M/s Jalvid Udyog 1252/CPD-II/29.10.18 250L/51 15.11.18 Supply 1538838

B- 604 22.11.18 MPED-VI M/s Pushpendra 38/MPED-VI/25.07.14 248L/103 26.10.18 Security 6480

B- 605 22.11.18 MPED-VI M/s Pushpendra 55/MPED-VI/12.03.15 248L/104 26.10.18 Security 5184

B- 606 22.11.18 MPED-VI M/s Pushpendra 80/MPED-VI/12.01.18 248L/105 26.10.18 Security 6588

B- 607 22.11.18 MPED-VI M/s Pushpendra 70/MPED-VI/18.08.15 248L/105 26.10.18 Security 6588

B- 608 22.11.18 EPED-I M/s D.K. & Sons Co. Final 10/EPED-I/10.08.16 179L/192 16.10.18 OH Reveinting & Maintenance 30370

B- 609 29.11.18 CSD-II M/s Simplex Switchgear Pvt. Ltd. 1078/CPD-I/12.10.18 90L/53 26.11.18 Supply 64236

B- 610 29.11.18 EPED-III M/s R.P. Construction Co. I 07/EPED-III/25.09.18 208L/165 26.11.18 Removal & Refurbishment 71075

B- 611 29.11.18 EPED-III M/s R.P. Construction Co. II Final 07/EPED-III/25.09.18 208L/166 01.11.18 Removal & Refurbishment 171304

B- 616 29.11.18 CSD-II M/s Jain Mill Stores Pvt. Ltd. 831/CPD-I/11.09.18 330L/26 28.11.18 Supply 27833

B- 617 29.11.18 CSD-II M/s Jain Mill Stores Pvt. Ltd. 831/CPD-I/11.09.18 330L/27 28.11.18 Supply 413249

B- 618 29.11.18 CSD-II M/s Jain Mill Stores Pvt. Ltd. 842/CPD-I/12.09.18 330L/28 28.11.18 Supply 703934

B- 619 29.11.18 CSD-II M/s Jain Mill Stores Pvt. Ltd. 842/CPD-I/12.09.18 330L/30 28.11.18 Supply 576434

B- 620 29.11.18 CSD-II M/s Jain Mill Stores Pvt. Ltd. 845/CPD-I/12.09.18 330L/31 28.11.18 Supply 170089TOTAL 4543572 12906502 0

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 73: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

B- 621 01.12.18 MPED-IV M/s India Engineering Works XXV Final 02/MPED-IV/05.05.17 84L/99 10.10.18 Replacement/ refiting 13032

B- 622 01.12.18 MPED-I M/s Sunrise Engineers & Contractor I 14/MPED-I/12.11.18 219L/39 17.11.18 B/d Maintenance 109248

B- 623 01.12.18 MPED-VI M/s S.R. Construction VI,VII 01/MPED-VI/01.04.18 163L/136 16.10.18 B/d Maintenance 80685

B- 624 03.02.18 CSD-II M/s Samsan Controls Pvt. Ltd. 1061/CPD-II/11.10.18 233L/86 30.11.18 Supply 196128

B- 625 03.02.18 CSD-II M/s Cenlub Industries Ltd. 1206/CPD-II/11.10.18 329L/18 30.11.18 Supply 22844

B- 626 05.12.18 MPED-V M/s Syndicate Engineers I 12/MPED-V/09.08.18 336L/15 01.11.18 Replacement of CMR 66146

B- 627 05.12.18 MPED-V M/s MAK Construction Co. VI 01/MPED-V/24.04.18 275L/74 01.11.18 Opration of Bowl 15293

B- 628 05.12.18 MPED-V M/s Yash Computers 11A 30/MPED-V/16.01.18 275L/75 25.11.18 Security 2400

B- 629 05.12.18 CSD-II M/s Kay Mohan Corporation 1161/CPD-I/01.11.18 285L/11A 04.12.18 Supply 465948

B- 630 05.12.18 CSD-II M/s Kay Mohan Corporation 1161/CPD-I/01.11.18 285L/11B 04.12.18 Supply 846078

B- 631 05.12.18 CSD-II M/s Jyesth Marketing 1166/CPD-I/02.11.18 285L/12B 04.12.18 Supply 1358256

B- 632 05.12.18 CSD-II M/s Commercial Enterprises 1069/CPD-I/11.10.18 285L/13 04.12.18 Supply 317972

B- 633 05.12.18 CSD-II M/s Commercial Enterprises 1069/CPD-I/11.10.18 285L/13B 04.12.18 Supply 21537

B- 634 05.12.18 CSD-II M/s Commercial Enterprises 1069/CPD-I/11.10.18 285L/13B 04.12.18 Supply 34180

B- 635 05.12.18 CSD-II M/s Commercial Enterprises 1069/CPD-I/11.10.18 285L/14A 04.12.18 Supply 55139

B- 636 05.12.18 CSD-II M/s Commercial Enterprises 1069/CPD-I/11.10.18 285L/14B 04.12.18 Supply 172344

B- 637 05.12.18 CSD-II M/s J. Umashankar & Co. Pvt. Ltd. 1068/CPD-I/11.10.18 285L/15 04.12.18 Supply 492625

B- 639 05.12.18 CSD-II M/s Govardhan Controls 939/CPD-II/22.09.18 232L/57A 04.12.18 Supply 11328

B- 640 05.12.18 CSD-II M/s Tayalco Automobiles 1065/CPD-I/11.10.18 232L/57A 04.12.18 Supply 199461

B- 641 05.12.18 CSD-II M/s J.K. Engineering Co. 829/CPD-I/11.09.18 232L/57B 04.12.18 Supply 301875

B- 642 05.12.18 CSD-II M/s J.K. Engineering Co. 840/CPD-I/12.09.18 232L/58B 04.12.18 Supply 589904

B- 643 05.12.18 CSD-II M/s M.P. Associates 931/CPD-I/22.09.18 232L/58B 04.12.18 Supply 758150

B- 644 05.12.18 CSD-II M/s M.P. Associates 931/CPD-I/22.09.18 232L/59A 04.12.18 Supply 667172

B- 645 05.12.18 CSD-II M/s Industrial Sales & Supply Agencies 1100/CPD-I/25.10.18 232L/59A 04.12.18 Supply 56503

B- 646 05.12.18 CSD-II M/s Technow Engineering Works 1158/CPD-I/01.11.18 232L/60A 04.12.18 Supply 45276

B- 647 05.12.18 CSD-II M/s Technow Engineering Works 1158/CPD-I/01.11.18 232L/60B 04.12.18 Supply 66983

B- 648 05.12.18 CSD-II M/s Jalvid Udyog 1159/CPD-I/01.11.18 232L/61A 04.12.18 Supply 145992

B- 649 05.12.18 CSD-II M/s Jalvid Udyog 1159/CPD-I/01.11.18 232L/61B 04.12.18 Supply 430044

B- 650 05.12.18 CSD-II M/s Anil Scientific Corporation 1291/CPD-II/03.11.18 232L/62A 04.12.18 Supply 32802

B- 655 05.12.18 CSD-II M/s Regent Trading Co. 504/CPD-III/01.10.18 213L/70 05.12.18 Supply 796927

B- 656 05.12.18 CSD-II M/s Neelkanth Power 538/CPD-II/05.05.18 213L/72 05.12.18 Supply 210366

B- 658 05.12.18 MPED-IV M/s Garg Engineering & Sons VII 05/MPED-IV/29.06.17 320L/9B 10.11.18 Repairing 41028

B- 660 06.12.18 CSD-II M/s Paramount International 1244/CPD-II/24.10.18 249L/35 26.11.18 Supply 1700173

B- 661 06.12.18 CSD-II M/s Jalvid Udyog 1286/CPD-II/03.11.18 249L/36 26.11.18 Supply 101598

B- 662 06.12.18 CSD-II M/s Jalvid Udyog 1288/CPD-II/03.11.18 249L/37 26.11.18 Supply 45609

B- 663 06.12.18 CSD-II M/s Jalvid Udyog 1292/CPD-I/03.11.18 249L/37 26.11.18 Supply 107097

B- 664 10.12.18 CSD-II M/s A.K. Agencies 1070/CPD-I/11.10.18 284L/9B 10.12.18 Supply 33486

B- 665 10.12.18 CSD-II M/s A.K. Agencies 1070/CPD-I/11.10.18 284L/9B 10.12.18 Supply 301695

B- 666 10.12.18 CSD-II M/s A.K. Agencies 1070/CPD-I/11.10.18 284L/10 10.12.18 Supply 42945

B- 667 10.12.18 CSD-II M/s A.K. Agencies 1070/CPD-I/11.10.18 284L/10B 10.12.18 Supply 18551

B- 668 10.12.18 CSD-II M/s A.K. Agencies 1070/CPD-I/11.10.18 284L/11 10.12.18 Supply 4078

B- 669 10.12.18 CSD-II M/s A.K. Agencies 1167/CPD-I/02.11.18 284L/11B 10.12.18 Supply 2570

B- 670 11.12.18 CSD-II M/s Jalvid Udyog 1365/CPD-II/20.11.18 329L/21B 10.12.18 Supply 79642

B- 671 11.12.18 CSD-II M/s Jalvid Udyog 1365/CPD-II/20.11.18 329L/21B 10.12.18 Supply 2520

B- 672 11.12.18 ECM&EMD M/s Abhay Kumar Singh 14/ECM&EMD/15.11.16 438L/85 07.12.18 Security 168939

B- 673 11.12.18 ECM&EMD M/s Abhay Kumar Singh 11/ECM&EMD/09.08.18 141L/149 20.11.18 Misc. Civil Works 337959

B- 674 13.12.18 ECCU M/s Ram Lakhan 01/ECCU/25.04.17 08L/129 11.12.18 Security 7045

B- 675 14.12.18 MPED-IV M/s MAK Construction Co. XIV 14/MPED-IV/26.09.17 321L/9B 04.12.18 DP Extenstion & Division 155690

B- 676 14.12.18 MPED-I M/s R.B. Engineering Works VI Final 26/MPED-I/05.12.18 321L/10 04.12.18 B/d Maintenance 129824

Total 1127289 10735798 0

Grand Total 76174493.00 191309608.00 23810912.00

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW

Page 74: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B...B-1247 04.03.17 CSD-I M/s Vishal Electricals 107/CPD-I/21.01.17 1749/66 Supply Spares 484942.00 ... 2X110 MW Parichha

Dy. Chief Accounts Officer

G:\Pending 250MW\2018-19\12-18\Liab_15.12.18_250MW B-List-250MW