2nd Qatar BIM User Day BIM Technology Outlook

45
1 10/2/2012 1 Outlook for BIM Presenter: Lionel Lambourn Managing Director Gehry Technologies Gehry Technologies

description

Speaker: Lionel Lambourn, Gehry Technologies -New technologies on the horizon -What can professionals expect from major software vendors in the next few years? About the Qatar BIM User Day: Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM. More information: www.bimuserday.com Follow BUD on Twitter @bimuserday

Transcript of 2nd Qatar BIM User Day BIM Technology Outlook

Page 1: 2nd Qatar BIM User Day  BIM Technology Outlook

1 10/2/2012 1

Outlook for BIM Presenter: Lionel Lambourn Managing Director Gehry Technologies

Gehry Technologies

Page 2: 2nd Qatar BIM User Day  BIM Technology Outlook

2

Why is this still so hard?!

• Every project is different

• Don’t know needs in advance

• A lot of BIM data isn’t BIM

• Information is out of sync

• Limitless information

Good news is…

• There are basic commonalities

• Smart people can work it out

• Systems can handle this

• Automation to pull info forward

• The cloud

i.e. it’s always going to be hard, but it’s not too hard project management + system management + information management Gehry Technologies

Page 3: 2nd Qatar BIM User Day  BIM Technology Outlook

3

Systems Integration

10/2/2012 3

Gehry Technologies

Page 4: 2nd Qatar BIM User Day  BIM Technology Outlook

4

Global Project Delivery project data is created by dispersed 24x7 global teams

Gehry Technologies

Page 5: 2nd Qatar BIM User Day  BIM Technology Outlook

5

CONTRACT DELIVERY CONCEPT

data is multi-representational

Gehry Technologies

Page 6: 2nd Qatar BIM User Day  BIM Technology Outlook

6

Integrating the systems

Architectural Model By AREP

Facade Model By Yuanda

Concrete Model by DDD

Steel Model By Eversendai

MEP Model By ETA

IFC IFC

IFC

NATIVE NATIVE

Gehry Technologies

Page 7: 2nd Qatar BIM User Day  BIM Technology Outlook

7

Cloud Computing

10/2/2012 7

Gehry Technologies

Page 8: 2nd Qatar BIM User Day  BIM Technology Outlook

8

Cloud Computing

•Collaboration

•Facilities Maintenance and Operations Database

•Construction Sequencing

•Lighting Simulation

•Geometrical Optimizations

•Cloud Rendering Gehry Technologies

Page 9: 2nd Qatar BIM User Day  BIM Technology Outlook

9

Web based 3D Teamwork : BIM and file storing, sharing, viewing, communicating

Aspects of social and collaboration technologies like Facebook, Dropbox, Skype

Easy access to 3D for project leadership and other non-modelers

Easy monitoring, design history and tracing of responsibility

Open - supports a wide range of data: BIM, 3D & 2D CAD, Documents, Images, …

Simple to set up – no IT

Cloud Collaboration

Gehry Technologies

Page 10: 2nd Qatar BIM User Day  BIM Technology Outlook

11

Gehry Technologies

Page 11: 2nd Qatar BIM User Day  BIM Technology Outlook

12

Gehry Technologies

Page 12: 2nd Qatar BIM User Day  BIM Technology Outlook

13

Gehry Technologies

Page 13: 2nd Qatar BIM User Day  BIM Technology Outlook

14

Gehry Technologies

Page 14: 2nd Qatar BIM User Day  BIM Technology Outlook

15

Gehry Technologies

Page 15: 2nd Qatar BIM User Day  BIM Technology Outlook

16

Gehry Technologies

Page 16: 2nd Qatar BIM User Day  BIM Technology Outlook

17

Asset Data Cobie Maximo

BIM Models

GTeam 3D plugin

IBM Maximo Integration

Gehry Technologies

Page 17: 2nd Qatar BIM User Day  BIM Technology Outlook

18

IBM Maximo Integration

Gehry Technologies

Page 18: 2nd Qatar BIM User Day  BIM Technology Outlook

19

apache Web server

Schedule

Activities

Primavera

Dojo Web UI toolkit

BIM Models

Oracle Primavera Integration

Gehry Technologies

Page 19: 2nd Qatar BIM User Day  BIM Technology Outlook

20

Oracle Primavera Integration

Gehry Technologies

Page 20: 2nd Qatar BIM User Day  BIM Technology Outlook

21

front end plugins

Radiance Server

Environmental Lighting Simulation & Optimization

txt

Gehry Technologies

Page 21: 2nd Qatar BIM User Day  BIM Technology Outlook

22

Environmental Lighting Simulation & Optimization

Gehry Technologies

Page 22: 2nd Qatar BIM User Day  BIM Technology Outlook

23

Gehry Technologies

Page 23: 2nd Qatar BIM User Day  BIM Technology Outlook

24

Automation

10/2/2012 24

Gehry Technologies

Page 24: 2nd Qatar BIM User Day  BIM Technology Outlook

25

Project: Fondation Louis Vuitton Type: 70,000 sf new contemporary art space in Paris. Galleries, performance spaces, meeting areas, terraces.

Site: Suspended above water basin in Bois du Bologne

Gehry Technologies

Page 25: 2nd Qatar BIM User Day  BIM Technology Outlook

26

Range of generative details

Gehry Technologies

Page 26: 2nd Qatar BIM User Day  BIM Technology Outlook

27 Parametrically integrated machine tolerances for industrial process of mass-customized cylindrical glass

Several exeriments: Cylindrical Conic Rectifying developable

Gehry Technologies

Page 27: 2nd Qatar BIM User Day  BIM Technology Outlook

28

Local Surface Deformation

Parametric Component

Global Project Optimization

Surface-Level Optimization

Frequency Optimization

Glass Optimization Process

Gehry Technologies

Page 28: 2nd Qatar BIM User Day  BIM Technology Outlook

29

Families of panels, collectively forming discrete integration systems

Minimizing distance of boundary to original surface

Gehry Technologies

Page 29: 2nd Qatar BIM User Day  BIM Technology Outlook

30

Divergence of approximate surface from original surface minimized by optimization of boundary line integral, using discrete methods

Gehry Technologies

Page 30: 2nd Qatar BIM User Day  BIM Technology Outlook

31

Gehry Technologies

Page 31: 2nd Qatar BIM User Day  BIM Technology Outlook

32

Augmented Reality

10/2/2012 32

Gehry Technologies

Page 32: 2nd Qatar BIM User Day  BIM Technology Outlook

33

33

Augmentations On-Site

Gehry Technologies

Page 33: 2nd Qatar BIM User Day  BIM Technology Outlook

34

34

Model Overlay

Gehry Technologies

Page 34: 2nd Qatar BIM User Day  BIM Technology Outlook

35

Survey Verification, from Model

Construction quality was monitored with on-site with laser equipment, and round-tripped back into the model.

Predicted Coordinate Extraction Point Cloud Confirmation Site Survey Gehry Technologies

Page 35: 2nd Qatar BIM User Day  BIM Technology Outlook

36

Geometric Constraints Fabrication Constraints Installation Constraints Integrated Optimizations

Constraints based on edge-edge clamp tolerances, fixation depths, allowable gasket sizes

Gehry Technologies

Page 36: 2nd Qatar BIM User Day  BIM Technology Outlook

37

Each panel is robotically scanned and automatically positioned in the model, to confirm correct design and fixation ahead of shipping installation.

Robotic Design Confirmation

3D Scan Robotic Scanner

Gehry Technologies

Page 37: 2nd Qatar BIM User Day  BIM Technology Outlook

38

38

Immersive Environments

Gehry Technologies

Page 38: 2nd Qatar BIM User Day  BIM Technology Outlook

39

39

CAVE

Gehry Technologies

Page 39: 2nd Qatar BIM User Day  BIM Technology Outlook

40

40

Virtual Reality Headsets

Gehry Technologies

Page 40: 2nd Qatar BIM User Day  BIM Technology Outlook

41

41

Microsoft Xbox Patent Pending

Gehry Technologies

Page 41: 2nd Qatar BIM User Day  BIM Technology Outlook

42

Conclusions

Gehry Technologies

Page 42: 2nd Qatar BIM User Day  BIM Technology Outlook

43

Outlook of BIM? A few of many trends… Scale • Unlimited continuum of data from Urban / Global to Detail Connectedness & convergence • BIM -> GIS, FM, Embedded Systems • Mashup of data/intelligence Collaboration & inclusiveness • Globally distributed concurrent design • BIM for public engagement Model intelligence • Self configuring / optimizing / documenting objects • Interoperability on demand • Fault tolerance & indeterminacy mgmt. Process Change & Process Controls • Governance and Risk Managment • Formalized vs. Self configuring / organic processes Can we innovate on process as we have on systems design?

Gehry Technologies

Page 43: 2nd Qatar BIM User Day  BIM Technology Outlook

44

Future Vision Things that are changing 5-10 years • The speed of the innovation cycle has arrived in AEC • The boxes are being shaken, new roles and organizations are emerging

• Internationalization will create opportunities, in the face of relentless commoditization • Production will trend toward zero as a measure of value.

• Convergence of construction and manufacturing • Convergence of digital and physical, planned and actual, facility and occupancy systems

• The consolidation phase of AEC has begun • Digital expertise will be commodity

• Information will represent power, and the potential for authority.

DFC

10/2/2012 44

Gehry Technologies

Page 44: 2nd Qatar BIM User Day  BIM Technology Outlook

45

Some things that won’t change

Personal relationships will continue to be a central business value The value of reputation and identifiable expertise Professional expertise (architectural, engineering, …) will continue to be required The world will be filled with new, tough problems. There will be value in design, and in innovation

DFC

10/2/2012 45

Gehry Technologies

Page 45: 2nd Qatar BIM User Day  BIM Technology Outlook

46 10/2/2012 46

Thank you [email protected]

www.gteam.com

Gehry Technologies