HOWO HOWO‐290 ON HIGHWAY REAR DUMP TRUCK ‐‐ RIGID BODY BDT‐R‐209 Start Date ‐‐‐ End Date ‐‐‐ Total Calendar 9 Hours achieve Frequent Down 1 times Transmission UB1 MECHANIC UB2 MATERIAL / PARTS UB3 FACILITIES / TOOLS UB4 3rd PARTY 18 ## ## ltr/hr 14 ## ## BDWN ### 7 ## ## STBY/NO WO 0 Transmission 3,5 ## ## OPRT 0 POPULATION HOWO-290 2 units ## ## by DURATION hours by FREQUENCIES times WEEK PERIOD 1 2 3 4 5 0 ltr 10 Day Service 10 Day Service FLEET - TOP PROBLEM TREND 10 Day Service 10 Day Service 10 Day Service 10 Day Service 10 Day Service 10 Day Service Wheel/Roller Drum Transmission Transmission 1 216,00 Transmission 1 10 Day Service 10 Day Service 10 Day Service 10 Day Service 10 Day Service BDT‐R‐209 WEEK #DIV/0! AVAILABILITY - PA (%) 49,9% 48,0 168,4 5 4 3 2 1 #### 0,0% 100,0% 0,0% 1‐Dec 10‐Dec TOP 5 PROBLEM dur TOTAL DOWN (hours) 0 AVAILABILITY - PA (%) MTBF (hours) MTTR (hours) 216,00 0,0% hours % 16,7% 66,7% 216,00 DELAY MAINTENANCE (compare to down) UNSCHEDULE 0,0% 216,00 0,00 <42360 <42353 <42346 1 FLEET WEEK HOURS DOWN SCHEDULE TOP 5 PROBLEM frq UTILIZATION - UA (%) 0,0% HIGH MIDDLE LOW LOW times UB1 UB2 UB3 UB4 FLEET DELAY HOURS 50% 86% 100% 100% 100% 25‐Dec 7‐Dec 13‐Dec 19‐Dec 25‐Dec 31‐Dec 36 144 0 0 1‐Dec 7‐Dec 13‐Dec 19‐Dec 10 Day Service 10 Day Service 10 Day Service 0,37 Unit Code BDT‐R‐304 BDT‐R‐302 BDT‐R‐209 BDT‐R‐208 49,9% 85,7% 100,0% 100,0% 100,0% 0% 20% 40% 60% 80% 100% 1 2 3 4 5 FLEET PA WEEK (%) WEEK 36,0 144,0 UB1 UB2 UB3 UB4 PT. MUARA BUKIT BILLITON PLANT Department Key Performance Indicator ‐ UNIT PA graph FUEL CONSUMPTION BDWN 100% STBY/NO WORK 0% OPRT 0% HOURS DISTRIBUTION 0,00% 85,71% 100,00% 100,00% 100,00% 1 2 3 4 5 Weekly PA (%) Key Performance Indicator ‐ FLEET PA graph on target / achieve out of target / bad

description

980

Transcript of 290

Page 1: 290

HOWO HOWO‐290 ON HIGHWAY REAR DUMP TRUCK ‐‐ RIGID BODY

BDT‐R‐209

Start Date ‐‐‐ End Date ‐‐‐ Total Calendar  9 Hours achieve

Frequent Down 1 times

Transmission UB1 MECHANICUB2 MATERIAL / PARTSUB3 FACILITIES / TOOLSUB4 3rd PARTY

18## ## ltr/hr

14 ## ## BDWN ###

7 ## ## STBY/NO WO 0 Transmission3,5 ## ## OPRT 0

POPULATION HOWO-290 2 units

## ## by DURATION hours by FREQUENCIES times

WEEK PERIOD 1

2

3

4

5

0 ltr

10 Day Service ‐                  

10 Day Service ‐                  

FLEET - TOP PROBLEM TREND

10 Day Service ‐                  

10 Day Service ‐                  

10 Day Service ‐                  

10 Day Service ‐                  

10 Day Service ‐                  

10 Day Service ‐                  

Wheel/Roller Drum

Transmission Transmission 1                 216,00            

‐                       

Transmission 1                 

10 Day Service

10 Day Service

10 Day Service

10 Day Service

10 Day Service

‐                       

BDT‐R‐209

WEEK#DIV/0!

AVAILABILITY - PA (%)

49,9%

49,9%

‐            ‐            ‐            48,0     168,4   

54321

‐                       

0,0%

####

0,0% 100,0% 0,0%

1‐Dec 10‐Dec

TOP 5 PROBLEM durTOTAL DOWN (hours)

0

AVAILABILITY - PA (%)

MTBF (hours)MTTR (hours)

216,000,0%

hours %

16,7%66,7%

216,00    

DELAY MAINTENANCE (compare to down)

UNSCHEDULE 0,0% 216,00 0,00

<42360<42353<42346

1              

FLEET WEEK HOURS DOWN

SCHEDULE

TOP 5 PROBLEM frqUTILIZATION - UA

(%)

0,0%

HIGH

MIDDLELOWLOW

times

UB1 UB2 UB3 UB4

FLEET DELAY HOURS

50% 86% 100% 100% 100%

25‐Dec

7‐Dec

13‐Dec

19‐Dec

25‐Dec

31‐Dec

36 144 0 0

1‐Dec

7‐Dec

13‐Dec

19‐Dec

‐                       

‐                       10 Day Service

10 Day Service

10 Day Service

‐                       

‐                       

0,37                 

‐                       

Unit Code

BDT‐R‐304

BDT‐R‐302

BDT‐R‐209

BDT‐R‐208

49,9%

85,7%100,0% 100,0% 100,0%

0%

20%

40%

60%

80%

100%

1 2 3 4 5

FLEET PA WEEK (%)

WEEK

36,0 

144,0 

‐ ‐

UB1 UB2 UB3 UB4

PT. MUARA BUKIT BILLITONPLANT Department

Key Performance Indicator ‐ UNIT

PA graph

FUEL CONSUMPTION

BDWN100%

STBY/NO WORK

0%

OPRT0%

HOURS DISTRIBUTION

0,00%

85,71%

100,00% 100,00% 100,00%

1 2 3 4 5

Weekly PA (%)

Key Performance Indicator ‐ FLEET

PA graph

on target / achieve

out of target / bad