29th September 2012T.J. Williams VEKA plc

CE Marking & Regulations

Network VEKA AGM

Issue 2 - 13-09-12

Page 2: 29 th September 2012 T.J. Williams VEKA plc CE Marking & Regulations Network VEKA AGM Issue 2 - 13-09-12.

Contents

• What is CE Marking?• When will it happen?• Will it affect me?• What do I need to do?• How can the VEKA Group help?

Page 3: 29 th September 2012 T.J. Williams VEKA plc CE Marking & Regulations Network VEKA AGM Issue 2 - 13-09-12.

What is CE Marking?

• Required by European & UK law.• Construction Products Regulations.• It is facilitated through EN 14351.• It is a declaration, made by the

manufacturer, that the product meets all the legal requirements of that market place.

• It is not a quality mark.

Page 4: 29 th September 2012 T.J. Williams VEKA plc CE Marking & Regulations Network VEKA AGM Issue 2 - 13-09-12.

When will it happen?

• All doors and windows placed on the market after 1st July 2013 must be CE Marked.

• There isn’t a honeymoon period.• The date will not be extended.• If your products are not CE Marked and

you are reported, you will be investigated by Trading Standards.

Page 5: 29 th September 2012 T.J. Williams VEKA plc CE Marking & Regulations Network VEKA AGM Issue 2 - 13-09-12.

Will it affect me?

• YES. It is the responsibility of the manufacturer to CE Mark all doors and windows.

• The manufacturer is the person or organisation that puts the glass and frame together.

Page 6: 29 th September 2012 T.J. Williams VEKA plc CE Marking & Regulations Network VEKA AGM Issue 2 - 13-09-12.

What do I need to do? (1)

• An FPC (Factory Production Control) system must be in place within your organisation. (See BS EN 14351)

• You must have a method for applying the CE Mark to every product.

• You must have a DoP (Declaration of Performance).

Page 7: 29 th September 2012 T.J. Williams VEKA plc CE Marking & Regulations Network VEKA AGM Issue 2 - 13-09-12.

What do I need to do? (2)

• You must have a Statement on Dangerous Substances.

• You must have Handling, Installation, Maintenance and Care Guides.

• You must have relevant technical data including test results approved by a Notified Body.

Page 8: 29 th September 2012 T.J. Williams VEKA plc CE Marking & Regulations Network VEKA AGM Issue 2 - 13-09-12.

What do I need to do? (3)

• You must CE Mark against :-

Thermal Transmittance (U-value).Load Bearing Capacity of Safety Devices (Child

restrictors).Ability to Release (Fire escape doors).

Height of doors.

Page 9: 29 th September 2012 T.J. Williams VEKA plc CE Marking & Regulations Network VEKA AGM Issue 2 - 13-09-12.

What do I need to do? (4)

• You can also CE Mark against :-

Air permeabilityWater tightnessWind resistance

Acoustic performanceRadiation properties

NPD (No Performance Determined).

Page 10: 29 th September 2012 T.J. Williams VEKA plc CE Marking & Regulations Network VEKA AGM Issue 2 - 13-09-12.

How can Network VEKA help? (1)

VEKA can provide:•A template and guidance document for FPC.•A template and guidance document for DoP.•A template and guidance document for affixing CE Marking.

Page 11: 29 th September 2012 T.J. Williams VEKA plc CE Marking & Regulations Network VEKA AGM Issue 2 - 13-09-12.

How can Network VEKA help? (2)

VEKA can provide:-•A template and guidance document for Dangerous Substances.•A generic Handling, Installation, Maintenance and Care Guide.•Documentation including ITT (Initial Type Testing) form Notified Bodies as evidence of performance.

Page 12: 29 th September 2012 T.J. Williams VEKA plc CE Marking & Regulations Network VEKA AGM Issue 2 - 13-09-12.

How can Network VEKA help? (3)

Remember: It is the responsibility of the manufacturer to ensure that all aspects of the CE Marking process are up to date, correct and appropriate and that every product is CE Marked.You must speak to your gearing and glass suppliers etc. to obtain their DoPs and underpinning data.

Page 13: 29 th September 2012 T.J. Williams VEKA plc CE Marking & Regulations Network VEKA AGM Issue 2 - 13-09-12.

Thank you for listening.

Any Questions?