29 th April 2014 Teleconference

17
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative

description

28 th IG Meeting South Gas Regional Initiative. 29 th April 2014 Teleconference . Agenda. II. Early implementation of the CAM NC. II.1. Supervision of the yearly capacity auction in March 2014 (for information by NRAs). II. Early implementation of the CAM NC. - PowerPoint PPT Presentation

Transcript of 29 th April 2014 Teleconference

Page 1: 29 th  April 2014 Teleconference

1

29th April 2014Teleconference

28th IG Meeting South Gas Regional Initiative

Page 2: 29 th  April 2014 Teleconference

2

Agenda

I. Opening

I.1 Welcome

I.2 Approval of the agenda and minutes of the last meeting (for approval)

II. Early implementation of the CAM NC

II.1 Supervision of the yearly capacity auction in March 2014 (for information by NRAs)

II.2 Quarterly capacity auction on 3rd of June 2014. Preparation

Process of information to stakeholders. Publication of capacity to be offered in

the auction (for information by TSOs)

II.3 Information about other capacity allocations calendar in the region and beyond.

III. Iberian Gas Hub: update on the study on models for integration of the Spanish and Portuguese

gas markets (for information by NRAs)

IV. Balancing and interoperability

Calendar and detailed tasks for the harmonisation: gas day, nomination and

renomination procedures, data exchange and reference temperature –

priorities for 1st Nov 2015 (for discussion)

V. Update of the development of GRIP / TYNDP (for information by TSOs)

VI. AOB and next meetings

Page 3: 29 th  April 2014 Teleconference

3

II.1. Supervision of the yearly capacity auction in March 2014

(for information by NRAs)

II. Early implementation of the CAM NC

Page 4: 29 th  April 2014 Teleconference

4

II.1. Supervision of the yearly capacity auction in March 2014 CAM NC establishes that NRAs should ensure that CAMs are

implemented at the IPs in the most effective way

SPAIN• Following the Circular 1/2014 de la CNMC, the Spanish regulator is going to

supervise the application of CAM in last 3rd March auction.

• For this purpose, CNMC has requested information to ENAGÁS. The deadline to receive the information on the process is 28 April.

II. Early implementation of the CAM NC

Page 5: 29 th  April 2014 Teleconference

5

II.2. Quarterly capacity auction on 3rd of June 2014. PreparationProcess of information to stakeholders. Publication of capacity to be offered in the auction

(for information by TSOs)

II. Early implementation of the CAM NC

Page 6: 29 th  April 2014 Teleconference

6

II.3. Information about other capacity allocations calendar in the region and beyond

II. Early implementation of the CAM NC

Page 7: 29 th  April 2014 Teleconference

7

III. Update. Study on models for integration of the Spanish and Portuguese gas markets

(for information by NRAs)

III. Iberian Gas Hub

Page 8: 29 th  April 2014 Teleconference

8

MIBGAS

Models for the integration of the Spanish and Portuguese gas markets in a common Iberian

Natural Gas HUB Area of work Responsibl

eStartin

gQuestions

to Stakeholder

s

Deadline

Analysis of the possible models for the integration of the Spanish and Portuguese gas markets in a common Iberian Natural Gas HUB

NRAs 2013 May 2014 Q3 - 2014

Page 9: 29 th  April 2014 Teleconference

9

General Objective

. In order to assess the feasibility for the development of a gas hub, the study analyzes different aspects of the current gas market situation in Spain and Portugal, including prices in the gas market, as the most important factors.

. The study covers three different models for Iberian gas market integration, comparing the advantages and disadvantages for each model.

Market Area Model. Trading Region Model. Wholesale Market with Implicit Capacity

Allocation.

Page 10: 29 th  April 2014 Teleconference

10

1 The Market Area Model (full integration)

Market Area ACountry A

Country A Country B

Market Area AB

Cross-border market

area

National market

area

Final customers (A)

Final customers (B)

VP

Final customers (A)

VP

. Features. The adjacent transmission and distribution networks situated in the same geographical area (and well interconnected) are forged into a single entry/exit system.. The market area includes all gas transmission and distribution systems of participating countries (one single market area).. The market area enables a single wholesale market with a single virtual point.. The market region has a single balancing system (with a single balancing entity and balancing rules).

Page 11: 29 th  April 2014 Teleconference

11

2 The Trading Region Model (full integration, except balancing)

Country A Country B

Trading Region AB

End userzone A

End userzone B

Final customers (A) Final customers (B)

VP

. Features:. The adjacent transmission and distribution networks that are situated in the same geographical area and that are well interconnected are forged into a single entry/exit system with a single virtual point.

. The Trading Region has two end-user balancing zones. The balancing in each end user zone is performed according to the respective national rules (unbalances are managed by the National balancing entities).

Page 12: 29 th  April 2014 Teleconference

12

3. Wholesale market with implicit allocation of capacity

. Features:

. A certain amount of the interconnection capacity is reserved for implicit allocation.. In this model, gas trade and allocation capacity are assigned simultaneously via a gas exchange (or a gas trading platform).. The implicit allocation may promote market liquidity on the Iberian gas market and can represent a first step for market integration. The introduction of this model would give a new approach to the development of a wholesale gas market, providing price transparency as well as benefits to the retail market, being a preliminary step for further integration through the trading region model or the gas market area model .   

Market participants make “bids” and “offers” for

buying or selling of gas

Interconnection capacity is being reserved for

implicit allocation

The implicit mechanism matches those bids and

offer with the highest price differences

Capacity is automatically assigned once a trade is made until cross-border capacity is sold out or prices have converged

Page 13: 29 th  April 2014 Teleconference

13

Preliminary evaluation of the models

Market Area Model Trading Region Model Wholesale market with implicit allocation of capacity

•Requires substantial legal and regulatory alignment among Spain and Portugal (implementation will take many years).

• Requires very good interconnection capacity.

• Can be considered as a long term objective for the Iberian Market.

•Requires substantial legal and regulatory alignment among Spain and Portugal.

• Requires very good interconnection capacity.

• Co-habitation of one single virtual point with two end-user balancing zones (possibly with different balancing rules) is really a challenge.

• Can be applied with limited interconnection capacity (the markets will decouple when the interconnection capacity is fully used).•Does not require a high level on harmonization of national legislations (implementation can be faster).• Will directly promote market liquidity on the common Iberian gas hub.• Can be a first step for the Iberian gas market integration.

The implicit allocation may promote market liquidity on the Iberian gas market and can represent a first step for market integration. The introduction of this model would give a new approach to the development of a wholesale gas market, providing price transparency as well as benefits to the retail market, being a preliminary step for further integration through the trading region model or the gas market area model[CNMC1] .[ERSE2] 

 [CNMC1]We agree with the new wording [ERSE2]Because this is a consultation document it seems to us that we should not be so affirmative. And give more space to the comments of the agents.Furthermore, the gas hub is not an objective for itself.

The implicit allocation may promote market liquidity on the Iberian gas market and can represent a first step for market integration. The introduction of this model would give a new approach to the development of a wholesale gas market, providing price transparency as well as benefits to the retail market, being a preliminary step for further integration through the trading region model or the gas market area model[CNMC1] .[ERSE2] 

 [CNMC1]We agree with the new wording [ERSE2]Because this is a consultation document it seems to us that we should not be so affirmative. And give more space to the comments of the agents.Furthermore, the gas hub is not an objective for itself.

Page 14: 29 th  April 2014 Teleconference

14

IBERIAN GAS HUB Work in progress

1. Document analyzing the advantages and drawbacks of the possible models, the regulatory harmonization requisites for its implementation by CNMC – ERSE (2014 April) .

2. Public hearing (2014 May)3. Analysis of stakeholders responses to the public hearing

(2014-Q3)4. Final document to be approved by CNMC- ERSE (2014-

Q3)

Page 15: 29 th  April 2014 Teleconference

15

IV. Calendar and detailed tasks for the harmonisation: gas day, nomination and renomination procedures, data exchange and reference temperature – priorities for 1st Nov 2015

(for discussion)

IV. Balancing and interoperability

Page 16: 29 th  April 2014 Teleconference

16

(for information by TSOs)

V. Update of the development of GRIP /TYNDP

Page 17: 29 th  April 2014 Teleconference

17

Next meetings:

• SG meeting on 22 May is cancelled• RCC meeting: date to be determined

VI. AOB and next meetings - 2014JANUARY FEBRUARY MARCH

L M X J V S D L M X J V S D L M X J V S D1 2 3 4 5 1 2 1 2

6 7 8 9 10 11 12 3 4 5 6 7 8 9 3 4 5 6 7 8 913 14 15 16 17 18 19 10 11 12 13 14 15 16 10 11 12 13 14 15 1620 21 22 23 24 25 26 17 18 19 20 21 22 23 17 18 19 20 21 22 2327 28 29 30 31 24 25 26 27 28 24 25 26 27 28 29 30

31

APRIL MAY JUNEL M X J V S D L M X J V S D L M X J V S D

1 2 3 4 5 6 1 2 3 4 17 8 9 10 11 12 13 5 6 7 8 9 10 11 2 3 4 5 6 7 8

14 15 16 17 18 19 20 12 13 14 15 16 17 18 9 10 11 12 13 14 1521 22 23 24 25 26 27 19 20 21 22 23 24 25 16 17 18 19 20 21 2228 29 30 26 27 28 29 30 31 23 24 25 26 27 28 29

30Auctions Spanish Bank Holiday Portuguese Bank Holiday French Bank Holiday

SG MeetingIG MeetingRCC Meeting

APRIL MAY JUNEL M X J V S D L M X J V S D L M X J V S D

1 2 3 4 5 6 1 2 3 4 17 8 9 10 11 12 13 5 6 7 8 9 10 11 2 3 4 5 6 7 8

14 15 16 17 18 19 20 12 13 14 15 16 17 18 9 10 11 12 13 14 1521 22 23 24 25 26 27 19 20 21 22 23 24 25 16 17 18 19 20 21 2228 29 30 26 27 28 29 30 31 23 24 25 26 27 28 29

30

JULY AUGUST SEPTEMBERL M X J V S D L M X J V S D L M X J V S D

1 2 3 4 5 6 1 2 3 1 2 3 4 5 6 77 8 9 10 11 12 13 4 5 6 7 8 9 10 8 9 10 11 12 13 14

14 15 16 17 18 19 20 11 12 13 14 15 16 17 15 16 17 18 19 20 2121 22 23 24 25 26 27 18 19 20 21 22 23 24 22 23 24 25 26 27 2828 29 30 31 25 26 27 28 29 30 31 29 30